1 The Bristol Green Capital Partnership PassivHaus Conference How can we build greener and better buildings? The case for PassivHaus development Building PassivHaus Communicating the Challenge Colin Powell BA(Hons) DipArch Msc RIBA :
2 Introduction Effective sustainable design requires a detailed knowledge of building science, technology and construction Our core skills as architects provide our clients with a depth of understanding that informs our advice on energy and sustainability Our consulting business provides the specialised knowledge of sustainable and low energy design needed to help our clients achieve their ambitions
3 Communicating the challenge Feedback Review Performance in-use Learning CLIENT Brief User group Management Budget Marketing BUILDING USER DESIGN TEAM Quality control Testing Commissioning Recording BUILDER (site) BUILDER (tender) Performance Specification Details Products Testing Management Program Sequencing Subcontractors Trades
4 Design Decisions understanding the issues Being comfortable in buildings requires energy, for heating, lighting, hot water and appliances To design low energy buildings the first thing we need to understand is where the all energy goes Its all a matter of balance!
5 Design Decisions understanding the issues Understanding where energy goes is a key part of optimising design PassivHaus enables informed design After internal & solar gains this model needs 74 kw/m 2 Heating to balance energy loss 47% 3% Proportional losses 4% energy loss 101 kwh/m 2 /yr 13% 24% 9% Floor Wall Roof Windows Ventilation Therm.Bridge Proportion of energy lost through elements Building Regs
6 Design Decisions understanding the issues Understanding where energy goes is a key part of optimising design PassivHaus enables informed design After internal & solar gains this model needs 14 kw/m 2 Heating to balance energy loss 38% 16% 0% Proportional losses 9% energy loss 36 kwh/m 2 /yr 14% 23% Floor Wall Roof Windows Ventilation Therm.Bridge Proportion of energy lost through elements PassivHaus
7 Design Decisions developing a strategy Start with a simple strategy Complexity is not your friend! A simpler strategy will be easier to deliver
8 Design Decisions developing a strategy Think about the space implications at design stage it is difficult to create spaces for services later on Ensure the team understand why spaces are there and what they are for
9 Tendering performance spec Communicating critical issues Performance specification needs to be embedded from the outset Standardisation and variations one size will not fit all! Responding to site specific issues how is this identified and recorded
10
11 Tendering ensuring everything is included Tender information needs to be clear on factors that will affect trades and specialist suppliers PassivHaus details may affect sequence of works and this needs to be understood at tendering Beware of value engineering!
12
13 Construction understanding the priorities Engaging with site team and trades Toolbox talks and presentation to key trades Share objectives and reasons why the project is different Emphasis on detail, change control and responsibility for workmanship
14 Construction understanding the priorities Engaging with site team and trades Toolbox talks and presentation to key trades Thermal bypass can reduce the effectiveness of insulation by as much as 70% Share objectives and reasons why the project is different Emphasis on detail, change control and responsibility for workmanship
15 Construction understanding the priorities Check details for buildability, test details to ensure they work
16 Construction controlling the works Continuity between tender and contract team
17 Construction controlling the works Attention to detail
18 Construction controlling the works Sequence of work and controlling trades Interior space enclosed in a continuous barrier to reduce uncontrolled ventilation Materials and methods of construction and jointing Position and protection Junctions and sealing Site control to achieve continuity and avoid damage
19 the construction challenge Testing testing testing! Test early whilst the problem can still be fixed Establish a system of control for following trades
20 Consider alternatives ICF construction Fast and easy to build Highly insulated First air test 0.45 AC/H
21 Engaging the user Success of the project will rely on a good briefing for the end-user Heating by towel rails press boost if you need some extra warmth The boiler is small and won t be running very much don t worry it s not broken! PassivHaus needs to be driven and will take time to acclimatise - the user and the building Explaining the reason for controls is as important as knowing what they do Understanding seasonal variations will ensure comfort in different conditions On hot summer days keep the windows closed! Open windows in the evening for cooling Keep the ventilation on auto and press boost if things get steamy
22 : delivering effective low-energy buildings Collaborative Supportive Creative Pragmatic Professional thank you : colin.powell@arch.co.uk
Project Description. Projected build start date 31 Jan 2009 Projected date of occupation 31 Aug
http://lowenergybuildings.org.uk Project name The Curly House Project summary Initial project meetings first started in January of 2008, the clients owned a small cottage on the site which had been extended
More informationWhat you need to know about 6 Star. 6 Star. for new homes, home renovations, alterations, additions and relocations
What you need to know about 6 Star 6 Star for new homes, home renovations, alterations, additions and relocations Introduction From 1 May 2011, all new homes, home renovations, additions, alterations and
More informationDesigning zero carbon homes: an architects perspective
Designing zero carbon homes: an architects perspective Elaine Toogood Architect, The Concrete Centre May 2014 Nearer to Zero: South West Hilltop House, Adrian James Architects The Concrete Centre: Taking
More informationProject Description. Projected build start date 01 Mar 2010 Projected date of occupation 01 Aug Energy target.
http://lowenergybuildings.org.uk Project name Larch House, Ebbw Vale, Wales Project summary The Larch House, designed by bere:architects, is the UKs first zero carbon (code 6), low cost, Certified Passivhaus,
More informationProject Description. Projected build start date 12 Apr 2010 Projected date of occupation 28 Feb
http://lowenergybuildings.org.uk Project name PassivHaus Retrofit - Octavia Housing Project summary PassivHaus retrofit of a three storey solid brick Victorian terraced house in a conservation area. Produce
More informationProject name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles
http://lowenergybuildings.org.uk Project name Gentoo Retrofit Bid 1 Project summary Refurbishment of 2no. Semi Detached houses using Passivhaus principles Project Description Projected build start date
More informationProject Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec Existing external wall construction
http://lowenergybuildings.org.uk Project name Tower Hamlets - naturally ventilated Passivhaus Retrofit Project summary The property is a 3 bedroom mid terrace single family residence built in the 1960
More informationProject Description. Projected build start date Projected date of occupation. Existing external wall construction.
http://lowenergybuildings.org.uk Project name Admirals Hard Project summary FINALIST of the UK Passivhaus Awards 2015 - Situated on the Stonehouse peninsula, by the banks of the River Tamar, Number 3 Admirals
More informationSt Loyes Extra Care Facility PHPP Pre-Assessment Report
St Loyes Extra Care Facility PHPP Pre-Assessment Report Gale & Snowden Architects & Engineers July 2011 Gale & Snowden Architects St Loyes Extra Care Facility PHPP Pre-Assessment Report Page 2 of 10 St
More informationProject Description. Projected build start date 01 Mar 2010 Projected date of occupation 31 May Aberdare, Rhondda Cynon Taff, Wales
http://lowenergybuildings.org.uk Project name Self Heating Social Housing- the zero carbon retrofit Project summary The target for this project is to create the first UK PassivHaus retrofit using low/zero
More informationProject Description. Projected build start date 02 Aug 2010 Projected date of occupation 03 Dec
http://lowenergybuildings.org.uk Project name Hounslow Council Passivhaus Retrofit - and the development of a decision making matrix Project summary The house is a 3-bedroom semi-detached single-family
More informationDenby Dale Passivhaus
Denby Dale Passivhaus Residential New-build Green Building Store Senate House, London 4th July 2012 Project Overview Name: Denby Dale Passivhaus Type: Single house for retired couple Build type: Masonry
More informationPassive House Object Documentation
Passive House Object Documentation Detached house with 4no. Bedrooms in Crawsfordsburn, Northern Ireland. Project Designer Mr Paul McAlister Paul McAlister Architects Ltd Year of construction 2012/2013
More informationThermal performance LIST OF CONTENTS
LIST OF CONTENTS Page 1 A brief explanation Page 2 Heat loss through walls Page 3 Heat loss examples Page 4 Secret behind the walls. Thermal Storage Page 5 Air tightness Page 6 Density of EPS Page 7 Insulating
More informationProject Description. Projected build start date Projected date of occupation 01 Jun Low Energy Buildings
http://lowenergybuildings.org.uk Project name Knights Place Project summary When the client, Exeter City Council, was offered a funding opportunity by the HCA to develop the first council housing in Exeter
More informationProject Description. Projected build start date 01 May 2010 Projected date of occupation 01 Nov Belfast, County Antrim, Northern Ireland
http://lowenergybuildings.org.uk Project name Eco-Energy Retrofit, Grove Housing Association, Belfast Project summary The mid terrace solid wall house built in 1896, is located in North Belfast and owned
More informationPassiveDesign.org. Passive Construction. Name:...
PassiveDesign.org Passive Construction About: This handout contains the information from the Passive Construction topic pages on passivedesign.org. Name:... Passive Construction A Passivhaus is a super-insulated,
More information4.2.3 MINERGIE ORIGIN AND ORGANISATION
As described earlier, the energy performance of a building is calculated and compared with the requirements for the chosen Minergie system. The calculations are then sent to a Minergie administrator who
More informationProject Description. Projected build start date 24 Dec 2004 Projected date of occupation. Energy target. Existing external wall construction
http://lowenergybuildings.org.uk Project name Withy Cottage Project summary Timber Frame & Straw Bale self build with thermal bridge free construction (other than door and window frames). Simple flat raft
More informationPHPP Report. Beattie Passive Inchkeith Drive
PHPP Report Beattie Passive Inchkeith Drive 1. Introduction Passive House is the world-leading building standard in energy-efficient construction. It is comfortable, affordable and ecological at the same
More informationBuilding Better Buildings BPE Case Study Dungannon Passivhaus
Building Better Buildings BPE Case Study Dungannon Passivhaus Choice Housing Ireland Ltd Lisnahull Terrace, Dungannon Building Performance Evaluation The Performance Gap Lessons for industry Choice Housing
More informationProject Description. Projected build start date Projected date of occupation. Dungannon, County Tyrone, Northern Ireland
http://lowenergybuildings.org.uk Project name Lisnahull Project summary The terrace of 5 two storey houses have been developed as the first certified social housing project in Ireland for Oaklee Homes
More informationARCHITECTURAL QUALITY AND SUSTAINABILITY
ARCHITECTURAL QUALITY AND SUSTAINABILITY Rab Bennetts Bennetts Associates, Architects, 1 Rawstorne Place, London EC1 V 7NL, UK, rab.bennetts@bennettsassociates.com, www.bennettsassociates.com Summary Rab
More informationMarylebone s first Passivhaus
Marylebone s first Passivhaus The experience of the Portman estate Mark Hopkins, Associate Director The Portman Estate October 2018 Drivers for Passivhaus Maintain the Estate s position as a leading provider
More informationPresentation to Irish Building Control Institute
Presentation to Irish Building Control Institute Liam Smyth FIEI Head of Marketing & Technical Irish Concrete Federation 26 th March 2009 Irish Concrete Federation National Representative Organisation
More informationNZEBs = Passivhaus, but can we deliver real energy efficiency?
NZEBs = Passivhaus, but can we deliver real energy efficiency? Tom Dollard Head of Sustainability Pollard Thomas Edwards @dollardtom @ptearchitects tom.dollard@ptea.co.uk NZEBs The performance gap? The
More informationLocal project in Dublin - IRELAND
Local project in Dublin - IRELAND Tyrrelstown Housing is a new development of Social Rented, Shared Equity and Affordable Purchase family dwellings by National Association of Building Co-operatives (NABCo)
More informationLessons from UK Passivhaus projects. - a certifiers view. peter warm CEng BSc MCIBSE MIE
Lessons from UK Passivhaus projects - a certifiers view peter warm CEng BSc MCIBSE MIE WARM: Low Energy Building Practice www.peterwarm.co.uk PLYMOUTH (01752) 542546 What is a Passivhaus? Examples of UK
More informationEngland Building Regulations Part L 2013
England Building Regulations Part L 2013 Domestic buildings Tom Lelyveld, David Ross 08 October 2013 Content Introduction Background Changes to meeting the five new-build compliance steps Existing dwellings
More informationPart L Review New Domestic Buildings Tom Lelyveld, AECOM
Part L Review New Domestic Buildings 2014 Tom Lelyveld, AECOM 11 th -13 th February 2014 What I will be talking about Introduction Background Key changes to Part L1A 2014 meeting the five new-build compliance
More informationMinimum Energy Consumption 84% energy heating savings*
3 HOUSE DESIGNS OF 140m² A modern concept for energy efficiency ENERGY EFFICIENCY AND ENVIRONMENTAL QUALITY Minimum Energy Consumption 84% energy heating savings* * According to a home fulfilling thermal
More informationCapital Markets Day - Welcome
Capital Markets Day - Welcome Adrian Ringrose, Chief Executive 17 th October 2012 Delivering our strategy Strategy Showcased Examples Outcomes Building Strong Core businesses West Yorkshire Police Customer
More informationHomesol Passive House Design Process
Homesol Passive House Design Process Passive Houses are residential, commercial and institutional buildings in which a comfortable temperature can be achieved year round with a 75% 85% reduction in energy
More information> Performance requirements: Part L UK vs Energiesprong vs Passivhaus.
> Performance requirements: Part L UK vs Energiesprong vs Passivhaus. Introduction The purpose of this paper is to highlight and compare the difference in performance requirements between UK Building Regulations
More informationBeattie. A step-change innovation delivering a complete build system with continuous insulation. P A SSIVE Patent No. GB
Beattie P A SSIVE Patent No. GB0906278.7 A step-change innovation delivering a complete build system with continuous insulation For more information contact: 08456 449003 www.beattiepassive.com The Beattie
More informationQuantification of carbon emissions from the UK building stock
Quantification of carbon emissions from the UK building stock Paul Davidson Director, Sustainable Energy November 2009 Overview Contribution of buildings to UK carbon emissions Modelling energy use in
More informationProject Description. Projected build start date 19 Apr 2010 Projected date of occupation 30 Sep
http://lowenergybuildings.org.uk Project name LB Greenwich - How low can we go? Project summary Our project has sought to produce a retrofit solution which is practical to build, easy to run and maintain,
More informationSingle family semi-detached four-bedroom home in London, England
Passivhaus Project Documentation Hiley Road Retrofit Passivhaus, London, UK Abstract Single family semi-detached four-bedroom home in London, England Building data Year of Construction 2016 0.076 Space
More informationProject name SOLAR HOUSE 80/50 Project summary
http://lowenergybuildings.org.uk Project name SOLAR HOUSE 80/50 Project summary Project Description Projected build start date 01 Mar 2010 Projected date of occupation 19 Jul 2010 Project stage Under construction
More informationDetailed design, airtightness and on-site QA
Detailed design, airtightness and on-site QA A presentation for UKPHC 2015 Authors Helen Brown Paul Jennings Date 20 th October 2015 Paul Jennings: Testing buildings for airtightness since 1987 started
More informationBuilding Control. A Guide to Compliance When Designing Domestic Extensions
Building Control Technical Guidance Leaflet No. 18 Approved Document L1B 2010 Conservation of Fuel and Power This leaflet is one of a series produced by the Hertfordshire Building Control Technical Forum
More informationDefining a Fabric Energy Efficiency Standard for zero carbon homes
Defining a Fabric Energy Efficiency Standard for zero carbon homes Appendix A Work Group 1 Form and Fabric The views and recommendations within this report are those of the Task Group and do not necessarily
More informationProject Description. Projected build start date 11 Feb 2013 Projected date of occupation 14 Nov
http://lowenergybuildings.org.uk Project name Clapham Retrofit Project summary This 4-storey semi-detached Grade II listed Victorian townhouse has been eco retrofitted to a high standard of airtightness
More informationPractical guidance to achieve excellent levels of airtightness in Passivhaus building fabric
bere:architects Mildmay Centre Woodville Road London N16 8NA T +44(0)20 7241 1064 www.bere.co.uk Airtightness Report Practical guidance to achieve excellent levels of airtightness in Passivhaus building
More informationDesign specifications for the Future Creating a masterpiece
PRES/42 Design specifications for the Future Creating a masterpiece Verney Ryan Beacon Pathway Inc Source: World Green Building Council Source: World Green Building Council as quoted by NZGBC Features
More information71 kwh/(m²a) Project Documentation. 1 Abstract. Single family house in Bellbrae, Victoria, Australia. 1.1 Data of building. Year of construction
Project Documentation 1 Abstract Single family house in Bellbrae, Victoria, Australia 1.1 Data of building Year of construction U-value external wall 2015 Space heating 0.220 W/(m²K) 16 kwh/(m²a) U-value
More informationProject Description. Projected build start date 03 May 2010 Projected date of occupation 06 Aug
http://lowenergybuildings.org.uk Project name Retrofit - Appledore, Ashford Project summary The key project approach is to develop a solution that uses complementary technologies and techniques, and primarily
More informationWhat are the PassivHaus, EnerPHit and AECB Silver Standards?
What are the PassivHaus, EnerPHit and AECB Silver Standards? Tips, architectural principles and insights on building new homes and communities in Northern England Forward Congratulations and welcome to
More informationBuilt for sustainability Built for the environment Built for fuel efficiency Built for life
Integrity and London s first and jointly England s first Certified Passivhaus Built for sustainability Built for the environment Built for fuel efficiency Built for life Coming Soon to Cambridge the City
More informationSMART SOLUTIONS DOUBLE GLAZING SOLAR COMFORT TINTING GLASS ASK OUR SALES REPRESENTATIVES ABOUT. Reduce your 23% energy costs * by as much as
C-VIEW WINDOWS SMART SOLUTIONS DOUBLE GLAZING SOLAR COMFORT TINTING GLASS ASK OUR SALES REPRESENTATIVES ABOUT Reduce your 23% energy costs * by as much as Key Benefits Year Round Comfort Keeps homes at
More informationWhen the London Borough of Camden decided
18 social housing special report Andy Matthews Photography Passivhaus is a standard for insulating buildings to such high levels that energy bills fall to a fraction of their normal cost. A development
More informationEagle Stadium Werribee, Victoria
Eagle Stadium Werribee, Victoria Page 2 Project Overview Kingspan Insulated Panels roofing and walling systems have been used to construct a landmark sporting venue in Werribee, Victoria. A multi-coloured
More informationEco retrofit beginner s guide
Eco retrofit beginner s guide Contents Why Bother? Where to Start? The wish list of eco improvements Choosing between options Eco-retrofitting can be more than energy efficiency How do I start and where
More informationProject Description. Projected build start date 18 Mar 2013 Projected date of occupation 11 Nov 2013
http://lowenergybuildings.org.uk Project name Coventry Eco House Project summary A project vision for Coventry & Warwickshire FORCE Group to design and build two 3 bedroom detached houses for Orbit Homes
More informationJon Chadwick Associated Architects. Scaling Up Passivhaus The Centre for Medicine, University of Leicester
Jon Chadwick Associated Architects Scaling Up Passivhaus The Centre for Medicine, University of Leicester The Centre for Medicine, University of Leicester Overview of the Client Brief: Bring together the
More informationNet-Zero Construction. By Jamie Clark owner of Synergy Home LLC INDUSTRY RD LEXINGTON KY 40505
Net-Zero Construction By Jamie Clark owner of Synergy Home LLC 859-687-0553 WWW.MYSYNERGYHOME.COM 1164 INDUSTRY RD LEXINGTON KY 40505 What is Net-Zero There are two terms we often talk about Net-Zero:
More informationBuilding the Future for Care Homes
Building the Future for Care Homes Innovaré Systems Limited Unit 3, Siskin Parkway West, Middlemarch Business Park, Coventry CV3 4PW 0845 674 0020 enquiries@innovarésystems.co.uk www.innovarésystems.co.uk
More informationEnergy Efficiency Rating
Energy Performance Certificate Northern Ireland 1a Primrose Street BANGOR BT20 3AZ Date of assessment: 28 April 2016 Date of certificate: 28 April 2016 Reference number: 9866-0734-6860-1908-8922 Type of
More informationBUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM)
BUILDING REGULATIONS PART L 2011 PROVISIONS & COSTS (STANDARD 3-BED SEMI-D, CIRCA 120 SQM) NOV 2012 OVERALL PRIMARY ENERGY, CO 2 & RENEWABLES TGD L 2005-2013 2005 2007/8 2011 2013? CO 2 % 100% 69% 46%
More informationStep Code for Part 9 Buildings: Process and Case Studies
Step Code for Part 9 Buildings: Process and Case Studies Conclusion Agenda: 1) Step Code review 2) Understanding the Step Code metrics 3) Who are/working with an Energy Advisor 4) Case study- getting a
More informationF Standard & Right-Sizing HVAC Systems:
F280-12 Standard & Right-Sizing HVAC Systems: Prepared by: Rob Pope Ecolighten Energy Solutions Ltd. Prepared for: City of New Westminster Spring 2017 Builder & Designer Breakfast Using analysis developed
More informationPassivhaus in Australia
Passivhaus in Australia relevance to natural cooling Presentation by Kylie Mills Registered Architect - NSW ARB 7511, Director, Teacher, Tutor AIA A+, Director - Australian Passive House Association National
More informationExterior Perspective, East End
Interior Open Plan Private to Public Gradation Obstruction of Open Plan Exterior Perspective, East End University of Texas at Austin s intends to be an adaptable design using solar power as its inspiration.
More informationADAPTING TO PART L REGULATION CHANGES
ADAPTING TO PART L REGULATION CHANGES Discover how to efficiently respond to the UK government s building regulation changes. We use the Part L regulation in this paper as an example of how regulation
More informationPlanning a basement 22/6/2018. Elaine Toogood Senior architect The Concrete Centre. June
Planning a basement Elaine Toogood Senior architect The Concrete Centre June 2018 www.tbic.org.uk Aims to encourage and enable the design and construction of quality basements on new developments and the
More informationProject name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus.
http://lowenergybuildings.org.uk Project name Fulford Passivhaus, York Project summary New-build singe-family detached house for individual clients. Certified as Passivhaus Plus. Project Description Projected
More informationFramework document for the ECOWAS directive for Energy Efficiency in Buildings Table of contents
Framework document for the ECOWAS directive for Energy Efficiency in Buildings Table of contents 1. Considerations... 2 2. Objective of the ECOWAS directive on energy efficiency in buildings... 2 3. Definitions...
More informationDISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group
DISCOVERIES AT NET ZERO Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group DISCOVERIES AT NET ZERO So, what is a Net Zero Energy building? A building achieves Net Zero Energy when it
More informationHealthy, Durable, Low Energy Buildings: Thermal: High R. Thermal bridges. Fundamentals, techniques, and pitfalls
Dr John Straube, P.Eng. Associate Professor, University of Waterloo Principal, Building Science Corporation Healthy, Durable, Low Energy Buildings: Fundamentals, techniques, and pitfalls Thermal: High
More informationL2A 2010 In 30 Minutes!!
00:14:58 L2A 2010 In 30 Minutes!! The Stroma Group Building Sustainability & Compliance Presented by: Richard de Fleury BEng (hons) MSc 14:59:56 Part L 2010 - Agenda Summary of changes Criterion 1 Criterion
More informationThe Top Five Ways an Architect Can Drive Sustainability. Early-stage design decisions that can have a significant impact on building performance
The Top Five Ways an Architect Can Drive Sustainability Early-stage design decisions that can have a significant impact on building performance Architects are responsible for a large number of fundamental
More informationDenby Dale Passivhaus: monitoring & performance report
Denby Dale Passivhaus: monitoring & performance report Two year occupancy performance data, collected and analysed by Leeds Metropolitan University, Centre for the Built Environment Research methodology
More informationRENOVATIONS & REFURBISHMENTS
RENOVATIONS & REFURBISHMENTS This Activity received funding from the Department of Industry as part of the Energy Efficiency Information Grants Program The nature of the tourism and hospitality industries
More informationTOWARDS LOW CARBON HOMES MEASURED PERFORMANCE OF FOUR PASSIVHAUS PROJECTS IN SCOTLAND
TOWARDS LOW CARBON HOMES MEASURED PERFORMANCE OF FOUR PASSIVHAUS PROJECTS IN SCOTLAND Tim Sharpe 1 and Chris Morgan 1 1 Mackintosh Environmental Architecture Research Unit (MEARU), Glasgow School of Art,
More informationProject Description. Projected build start date 15 Aug 2011 Projected date of occupation 19 Dec Existing external wall construction
http://lowenergybuildings.org.uk Project name Redlands Project summary Deep retrofit of 1955 brick house in Devon based on EnerPHit standard. House had old gas boiler, double glazing, cavity wall insulation
More information5 social row houses (Wachtebeke)
5 social row houses (Wachtebeke) 1. OVERVIEW PROJECT SUMMARY - Year of construction: 1971 - Renovation: 2012 - Building typology: Social housing SPECIAL FEATURE - Demolition of facade brick & adding 30
More informationZEMedS: Implementation
ZEMedS: Implementation Implementation Case: El Calamot, Gavà, Catalonia (Spain) General data 3 Name of the School Type of school El Calamot High School High School Number of students Owner 1000 public
More information8 th International Construction Management Day GMIT
8 th International Construction Management Day GMIT Deep Retrofit Towards Zero Energy Brian McIntyre, SEAI 6 th March 2018 Our Vision Sustainable, secure, affordable, and clean energy. Use less energy,
More informationBuilding Sustainability Why Passive House?
Building Sustainability Why Passive House? Paul McAlister RIBA Northern Ireland s First Certified Passive House Designer Agenda Timeline to Carbon Zero Features of a Passive House How it works Benefits
More informationEnergy-Efficient Passive House using thermal mass to achieve high thermal comfort
Energy-Efficient Passive House using thermal mass to achieve high thermal comfort Loa Andersson Managing Director RLI Byggdata AB rli@termodeck.com Alexander Engström Technical Director RLI Byggdata AB
More informationUnleash your creativity with natural materials! A guide for Architects
Unleash your creativity with natural materials! A guide for Architects Sustainable building going mainstream Having natural buildings going mainstream demands verified solutions that can be easily applied
More informationProject Description. Projected build start date 10 Sep 2012 Projected date of occupation 03 May
http://lowenergybuildings.org.uk Project name Bristol Retrofit Project summary A full thermal retrofit of a mid-century, three-storey property built into a hill and located within a Conservation Area in
More informationFEBRUARY 22, GREEN BUILDING: Past, Present and Future
FEBRUARY 22, 2010 GREEN BUILDING: Past, Present and Future SUSTAINABILITY: Thinking holistically about how everything you do affects everything around you. It is an attempt to minimize each person s impact
More informationStanding Committee on Policy and Strategic Priorities. General Manager, Planning, Urban Design and Sustainability
ADMINISTRATIVE REPORT Report Date: October 23, 2017 Contact: Chris Higgins Contact No.: 604.871.6288 RTS No.: 11921 VanRIMS No.: 08-2000-20 Meeting Date: November 1, 2017 TO: FROM: SUBJECT: Standing Committee
More informationPASSIVE HOUSE OBJECT DOCUMENTATION
PASSIVE HOUSE OBJECT DOCUMENTATION Rua do Mar House B, single family house, Ílhavo Portugal (Passive House project database: ID 2403) 2.1 PROJECT OVERVIEW Project designer: João Marcelino, Homegrid (www.homegrid.pt)
More information2000 Antwerp, terraced house
2000 Antwerp, terraced house 1. INTRODUCTION PROJECT SUMMARY - First phase energy renovation: 1999 - Second phase energy renovation: 2007 SPECIAL FEATURES - Two phased energy renovation - The owners stayed
More informationCase for Passivhaus at Hastoe
Case for Passivhaus at Hastoe John Lefever Regional Head of Development Hastoe This was me when it was suggested we do Passivhaus Hastoe overview 50 years old 5,000 homes Working in more than 200 villages
More informationRoutes for Nearly Zero Energy
PassREg Project Routes for Nearly Zero Energy Andrew Sutton RIBA Associate Director, BRE Building Regulations Advisory Committee (Wales) Wales Low/Zero Carbon Hub Past President, Royal Society of Architects
More informationGreen Deal: the story so far Tokyo Green Deal Seminar 24 February 2014
Green Deal: the story so far Tokyo Green Deal Seminar 24 February 2014 Alan Clifford Senior Policy Advisor Household Energy Efficiency Programme Overview Context and background How Green Deal works Development
More informationSUSTAINABLE DESIGN STRATEGIES FOR BUILDING DESIGNERS
SUSTAINABLE DESIGN STRATEGIES FOR BUILDING DESIGNERS Building Designers should consider the four following inter-related principles of environmental sustainability at all stages of a building s life: bio-diversity
More informationA L C H E M # $ % &
ALCHEMY! @ # $ % & BUILDING BLOCKS How much space are you looking for? 1x 300-850 SF 2x 1200-1600 SF 3x 1200-2000 SF 4x 1800-2400 SF H 8 or 9 interior 14 or 16 W L up to 60 The maximum dimensions for
More informationLeast Cost Path to Achieving 50% Reduction in Residential Energy Use (in Heating Climates)
Least Cost Path to Achieving 50% Reduction in Residential Energy Use (in Heating Climates) Jan Harris, X Prize Foundation Michael Blasnik, Blasnik and Associates ABSTRACT This paper describes the findings
More informationLITTLEPITS PASSIVHAUS PLUS
#UKPHC18 LITTLEPITS PASSIVHAUS PLUS with PH15 SYSTEM Jae Cotterell Chartered Architect & Certified Passivhaus Designer Director of Passivhaus Homes Ltd and Passivhaus Store Co-author of The Passivhaus
More information9.36 Energy Modeling and Energy Auditing
9.36 Energy Modeling and Energy Auditing BOABC Conference 2014 Einar Halbig, Principal Speaker introduction. Outline: Define energy modeling and energy auditing Applications Process Who does it Example
More informationProject name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure
http://lowenergybuildings.org.uk Project name Old Dover Road Project summary Whole house retrofit and formation of new habitable roof structure Project Description Projected build start date Projected
More informationPositive measures to. Winter-Proof Your Home. and reduce energy costs
Positive measures to Winter-Proof Your Home and reduce energy costs With temperatures plummeting and energy prices soaring - it s time to Winter-Proof Your Home At Kingspan Retrofit we know that your home
More informationTotnes Passivhaus B&B
Totnes Passivhaus B&B Case Study Passivhaus retrofit lessons learnt living experience Bristol European Green Capital Passivhaus Conference 17 November 2015, Bristol Living in a Passivhaus Lessons learnt
More informationLearning facilitated through collaborative research A case study
Learning facilitated through collaborative research A case study Lecture by Dr. Henrik Schoenefeldt 23 February 2017 Developing Teaching for Experienced Staff, Unit for the Enhancement of Learning and
More informationProject Description. Projected build start date 05 Jul 2010 Projected date of occupation 25 Sep
http://lowenergybuildings.org.uk Project name Bringing Wates homes into the Future Project summary Wates property structural and low energy refurbishment based on an optimised structural insulated render
More informationSustainable Building Training Guide Learning outcomes for standards, qualifications and training
Sustainable Building Training Guide Learning outcomes for standards, qualifications and training 1 This guide has been produced by the Green Construction Board with the support of CITB. We would like to
More information