1 NSF Final Report CMMI Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 2. Teleco Office Tower Civil Engineering and Engineering Mechanics Department University of Arizona 18 September

2 A B North Wing C C1 concrete wall D Beam Masonry wall E Column F 9a 9 South Wing concrete wall K J M L Figure B2-1. Teleco Building (now NATCOM Building): (a) Structural Plan of Typical Floor A1 C1 D1 F1 North Wing South Wing Figure B2-2. Teleco Building: Overall view of West Face (Vertex) [A1-F1] 18 September

3 C1 A1 Interface Cracks Masonry Infill Wall Concrete Spandrel Beam Figure B2-3. Teleco Building: West Face of North Wing Vertex [A1-C1] showing horizontal interface cracks between the masonry infill wall and the RC frame at each level, including local spalling of the cement wash. 18 September

4 E1 F1 End of Core Wall Masonry Infill Wall Concrete Spandrel Beam Figure B2-4. Teleco Building: West Face of South Wing Vertex [D1-F1] showing: (1) vertical crack along interface between core wall and infill wall at E1; (2) Shear cracks along the masonry infill wall between E and F; (3), spalling and out-of-plane failure at the vertex corner F1; (3) pier failure between bathroom windows. 18 September

5 C1 D1 F1 M9 Core Wall Pier Failure 3 rd Wall Outof-plane Failure 2 nd Figure B2-5. Teleco Building: West Face of South Wing Vertex view from truck dock [D1-F1] showing: (1)Wall out-of-plane failure at the vertex corner F1 in the ground (2 nd ) story; (2) complete pier failure along the core wall outer face at level September

6 Elevator Core Vent Openings Core Wall Pier Failures Shear Failure Extends to Core Wall Curved Stem [D1-E1] Elevator Core Stair Core 3 rd Floor Shear Failure Extends Beyond Core Wall Figure B2-6. Teleco Building: Core Wall Pier Failure at 3 rd Floor: (a) Close-up [C1-D1]; (b) Wide view showing shear failure extending to curved core wall portion D1-E1 and to CMU wall E1-F1. 18 September

7 Beam E1-2 Beam E-F1 See Fig. B2-55 for interior view Figure B2-6 (con t). Teleco Building Core Wall: (c) Close-up of curved core wall at 3 rd floor [D1-E1] showing difference in construction quality between Core Wall curved stem around Stairwell and space frame beams/wall E1-2 and E1-F1. 18 September

8 Figure B2-7. Teleco Building West Face showing relationship of core wall pier shear failure and shear cracks and interface failures of north wing. 18 September

9 3 rd 5 th Shear X-cracking of wall piers 2 nd 4 th Figure B2-8. Core Wall West Face; (a) Diagonal Crack Extending from 3 rd Flr. window C1 down to 2 nd Floor Vent C1-1, presumably due to southward shear deformation of 3 rd floor core wall piers; (b) Core Wall piers at 4 th and 5 th floor indicating reverse shear X-cracking on some but not all of the piers. Figure B2-9. South Wing Vertex, Close up of 2 nd (ground) floor out-of-plane wall failure [E1-F1]. 18 September

10 M9a M9 See Fig. B2-XX for Interior View Figure B2-10. South views of South Wing Vertex: (a) south wing vertex damage at F1; (b) Vertical cracks at end of window well between F1 and M9a; (c) View of F1 looking Northwest showing out-ofplane movement of infill wall; and (d) Close-up of masonry wall failures at south bathroom windows. 18 September

11 M9a M9 Figure B2-11. South views of South Wing: (a) Damage at transition to window wall at M9; (b) Close up of M9 damage at lower floors; (c) South wing overall view showing full window wall. 11

12 M15 L15 K15 J15 Concrete L Wall RC Stair Core Wall Figure B2-12. East Face of South Wing showing: (1) General intact condition of this wing end which contains a RC stair core between J15-K15; (2) Horizontal interface cracks between the masonry infill wall and the RC floor spandrel beams K15-L15, presumably to large translation of the wing end; (3) Vertical interface crack at the junction between the south window wall and concrete L wall L15-M15. 12

13 Figure B2-13. North face of Teleco structure (front entrance of building) on Rue Fernand Lamartiniere. This column is an architectural feature Figure B2-14. Teleco North Face: (a) overall view; (b) Close up of one architectural column. 13

14 3 rd 2 nd A2 A3 Main Entrance Stairs to 2 nd Level Toward Column Line A1 Figure B2-15. Teleco North Face, showing grading of landscaping from 2 nd (ground) level at front entrance between A4 and A5, down toward even with 1 st (basement) level at A1. 14

15 C1 A1 2 nd 3 rd 2 nd Figure B2-16. Teleco North-West Corner, showing: (a) grading of landscaping at A1; (b) relationship of this region to the West Face (Note core wall repair at C1 2 nd level is visible at base the wall looked in good condition in this reagion and it was assumed repairs were limited to finish work) 15

16 A3 Figure B2-17. Teleco North Face, West Architectural Column at A3: (a,b) Failure at base of due to unanticipated load path; (c) Shear crack in stem wall extending from base indicating architectural feature likely transferred significant forces prior to failure. 16

17 Figure B2-18. Teleco North Face, West Architectural Column at A3: (a) Close up of base failure shwoing minimal reinforcement/confinement. 17

18 A4 Figure B2-19. Teleco North Face, Main Entrance, outer face (looking east) of the stairwell wall at A4, showing cracking in masonry wall and at interface with RC pilaster element. 18

19 A5 A4 Figure B2-20. Teleco North Face: (a) Main Entrance between A4-A5; (b) View of inner face of masonry wall A4; (c) Shear crack on inner face of masonry wall A4. 19

20 A6 Figure B2-21. Teleco North Face, East Architectural Column at A6: (a) Damage at base due to unanticipated load path; note spalling of Column B6 in the background; (b) Close up of damage. 20

21 B7 Figure B2-22. Teleco North Face, view looking south into central courtyard with Columns B7 and C7 visible in center of photo, and the north wing stairwell in the background on the left. 21

22 A8 A8 Figure B2-23. Teleco North Face, Corner RC L Wall at A8 showing significant spalling but otherwise good performance of this element. 22

23 Figure B2-24. Teleco North Face, Corner RC L Wall Ground (2 nd Story) Exposed Detailing at: (a) top of story; (b) bottom of story, showing smooth #2 ties at. ~ 50mm. 23

24 A8 N Figure B2-25. Teleco East Face of North Wing, East face of Corner RC L Wall at A8 showing full spalling but otherwise good performance of this element. 24

25 C1-8 C8 B8 A8 Masonry Stair Wall Concrete L Wall Interface Cracks Figure B2-26. Teleco East Face of North Wing showing: (1) Horizontal interface cracks between masonry infill wall with RC frame; (2) damage at masonry stair well 8C and 8-C1 in lower levels. 25

26 See Fig. B2-XX for Interior View Figure B2-27. Teleco East Face of North Wing: (a) Upper levels; (b) Open ground level. 26

27 C1-8 C8 See Fig. B2-31 for interior views of these walls Figure B2-28. Teleco North Wing Masonry Stairwell: (a) Post EQ Condition; (b) Ground level entrance. 27

28 Figure B2-29. Teleco North Wing Masonry Stairwell: (a) Lower region showing RC L-wall; Inset: Close up of region showing masonry infill on either side of RC L wall. 28

29 Figure B2-30. Teleco East Face of North Wing: (a) Composite Photo showing ground floor, stairwell to the south and open architecture to the north; (b) Close-up of masonry infill showing poor quality. 29

30 30

31 Figure B2-31. Teleco East Face of North Wing. 31

32 Figure B2-32. Teleco North Wing Stair Well Interior: (a) Showing Horizontal Shear Failure across underside of 3 rd Floor Masonry Stariwell core wall East face; (b) In-plane shear failure of masonry wall. 32

33 Figure B2-33. Teleco Courtyard (2 nd Level) at interior of the V showing evidence of tile buckling. 33

34 Figure B2-34. Teleco Courtyard (2 nd Level) views: a) Inner view of south tower showing one story inner wing.; (b) Exterior view of internal region of vertex; (c) Junction of south wing and one story building wing showing exposed portion of south stair well shear walls. 34

35 Figure B2-35. One-Story building appendage Teleco Courtyard (2 nd Level) views. 35

36 D1 Figure B2-36. Basement (1 st ) Level: (a); (b) 36

37 F1 Figure B2-37. Basement (1 st ) Level: (a); (b) 37

38 38

39 Figure B2-38. Teleco Basement (1 st Level) Parking Level below courtyard. Note large haunched girders. 39

40 Figure B2-39. Teleco Roof Views: (a) North Wing, looking east toward mountains; (b) Vertex, looking west toward bay; inset: condition inside elevator mechanical room. 40

41 Figure B2-40. Teleco 9 th flr (a,b): View of the elevator lobby between the wings, looking N-NE from south wing. Note inner face of the North wing visible through the window.. 41

42 Figure B2-40. Teleco 9 th flr (c,d): Typical corridor down center of Wing with offices on either side. 42

43 Masonry Infill Wall Concrete L Wall Figure B2-41. Teleco 9 th flr: (a) Interior View of RC L wall at A1, 9 th Flr.; (b) Full height masonry partition between B2 and A2, 9 th Flr. 43

44 Figure B2-42. Teleco 9 th flr : (a) Full height masonry partition walls.built to the underside of the RC frames (any interface shear connection?); (b) Full height masonry partition walls bearing on main girders. 44

45 Figure B2-43. Teleco 9 th flr : (a) RC Floor System showing floor joists and slab; (b) Column line. 45

46 Figure B2-44. Teleco 8 th flr: Typical partition damage in elevator lobby; (b) at entrance to south bathrooms [E2-3]; at junction with south wing [9L-K]. 46

47 F1 Figure B2-45. Teleco 8 th flr, Bathrooms Interior views: (a) Masonry Curtain wall failure at F1; (b) Damage at F1window openings showing mortar interface at underside of beam E1-F1. 47

48 M-9a Figure B2-46. Teleco 8 th flr, Bathrooms Interior views: Intersection of Masonry Partition wall and Masonry Curtain wall failure at M-9a, showing shear cracks in full height partition wall. 48

49 Figure B2-47. Teleco 7 th flr, Bathrooms Interior views: Failure at corner of masonry curtain wall between window openings [F1]. 49

50 Figure B2-48. Teleco 6 th flr, Elevator Lobby. 50

51 A8 B8 Figure B2-49. Teleco 6 th flr, Infill shear failure on North wing [A8]. 51

52 Figure B2-50. Teleco 5 th flr, Elevator Lobby. 52

53 Figure B2-51. Teleco 5 th flr (Col M9?) showing haunches on long- and short-span moment frame beams. Fig Teleco Tower Haunched Frame, 4 th Floor: (a) Along Column Line L; (b) Column B6; (c) Span L10-11; (d) Close up of Column L10. 53

54 54

55 Figure B2-53. Teleco 4 th flr South Wing with floor system and frame structure partially exposed. 55

56 Figure B2-54. Teleco 3 rd flr. (a) shear crack in column at 3rd near attachment to 1-story bldg (See Fig. X); (b) no damage to north side of core wall at 3rd flr. 56

57 57

58 Figure B2-55. Teleco SW Core Stair: (a) 3 rd flr down to 2 nd (See Fig. B2-6 for outer view); (b) close up; (c) Teleco West Stair Well 3 rd Floor. 58

59 Figure B2-56. Repair and Rebuilding Materials Teleco. 59

60 60

61 Figure B2-57. Ongoing Repair of the Teleco Building 61

Project Findings: Appendix 2

Project Findings: Appendix 2 NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 1. St. Louis Gonzague Cafeteria Building Civil Engineering and Engineering Mechanics Department

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2017 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2017 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

PRODUCER'S PRODUCE CONCEPT MASTER PLAN 501 North Main, Springfield, Missouri. Prepared for: Joe Costello and Charlie Hoke October 12, 2009

PRODUCER'S PRODUCE CONCEPT MASTER PLAN 501 North Main, Springfield, Missouri. Prepared for: Joe Costello and Charlie Hoke October 12, 2009 PRODUCER'S PRODUCE CONCEPT MASTER PLAN 501 North Main, Springfield, Missouri Prepared for: Joe Costello and Charlie Hoke Southeast Corner looking Northwest Aerial View looking Northeast 0' 8 16 32 64'

More information

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF

More information

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA

THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA THE DISASTERS OF SEPTEMBER 11, 2001 DAVID T. BIGGS, P.E. Principal Ryan-Biggs Associates, P.C. Troy, New York USA SUMMARY This paper presents some structural observations, findings, and recommendations

More information

Technical Report 1. Seneca Allegany Casino Hotel Addition. Salamanca, NY

Technical Report 1. Seneca Allegany Casino Hotel Addition. Salamanca, NY Technical Report 1 Seneca Allegany Casino Hotel Addition Salamanca, NY Nicholas Reed Structural Option Advisor: Prof. Parfitt Executive Summary The purpose of this technical report was to analyze the existing

More information

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report 1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive

More information

STRUCTURAL ASSESSMENT REPORT

STRUCTURAL ASSESSMENT REPORT STRUCTURAL ASSESSMENT REPORT FOR WASHINGTON PARK NATIONAL BANK 6300 South Cottage Grove Ave. Chicago, Illinois 60637 Prepared For: Cook County Land Bank Authority 69 W. Washington, Chicago Illinois April

More information

UNREINFORCED MASONRY STRUCTURES -PART I - DEFINITIONS AND PROBLEMS UNDER LATERAL LOADS

UNREINFORCED MASONRY STRUCTURES -PART I - DEFINITIONS AND PROBLEMS UNDER LATERAL LOADS UNREINFORCED MASONRY STRUCTURES -PART I - DEFINITIONS AND PROBLEMS UNDER LATERAL LOADS Some Definitions UnReinforced Masonry (URM): Defined as masonry that contains no reinforcing in it. Masonry Unit:

More information

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax:

ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA Tel: Fax: ROOME & GUARRACINO, LLC Consulting Structural Engineers 48 Grove Street Somerville, MA 02144 Tel: 617.628.1700 Fax: 617.628.1711 March 3, 2016 Mr. Jeff Hoover, Principal Tappe Architects, 6 Edgerly Place

More information

STRUCTURAL ASSESSMENT OBSERVATION REPORT

STRUCTURAL ASSESSMENT OBSERVATION REPORT Consulting Engineers THORSON BAKER & Associates, Inc. 3030 West Streetsboro Road (330) 659-6688 phone Richfield, Ohio 44286 (330) 659-6675 fax www.thorsonbaker.com STRUCTURAL ASSESSMENT OBSERVATION REPORT

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

Structural Concepts and Existing Conditions Report

Structural Concepts and Existing Conditions Report Daniel Chwastyk F.W. Olin Center Louis Geschwindner Advisor Structural Concepts and Existing Conditions Report Executive Summary The following report discusses many of the structural concepts that were

More information

Group Eight Engineering Limited

Group Eight Engineering Limited Group Eight Engineering Limited Structural Mechanical Electrical 499 King Street East, Suite 200 Hamilton, ON L8N 1E1 Consulting Engineers Tel: (905) 525-6069 Fax: (905) 528-7310 E-Mail: info@group8eng.com

More information

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI

Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI Courtesy of HGA Technical Report 1 Bed Tower Addition at Appleton Medical Center Appleton, WI Jessel Elliott Structural 2011 Architectural Engineering Senior Thesis Studio Advisor: Dr. Richard Behr Date:

More information

Structural Condition Assessment

Structural Condition Assessment 108 6 th Street, Garland, Texas Engineering Report Date: September 29, 2016 RLG No. : 16729 Prepared for: Mr. Jeff D. Bulls III AIA 3030 LBJ Freeway, Suite 1220 Dallas, TX 75234 PM: Harold F. Phillips

More information

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase

NAME OF PROJECT Design Development. General Objectives of Phase. Phase Task Checklist. Quality Management Phase General Objectives of Phase Drawings and other documents to fix and describe the size and character of the project as to architectural, structural, mechanical and electrical systems, materials and such

More information

Limited Exterior Masonry Assessment Roosevelt Elementary School

Limited Exterior Masonry Assessment Roosevelt Elementary School Limited Exterior Volume 2 of 2 November 29. 2007 Produced for: Medford Public Schools Medford, Oregon In Consultation with: 710 NE 21 st Avenue, Suite 200, Portland, Oregon 97232 P: 503.517.0283 F: 503.517.0285

More information

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity

Structural System. Design Criteria Fire Resistance Concrete designed for 2 HR rating (worst case) Geotechnical Report Allowable Bearing Capacity System Codes and Criteria Design Codes and Standards The design code used is the Wisconsin Administrative Code along with the State of Wisconsin Department of Commerce-Safety & Buildings Chapters Comm

More information

SEISMIC RETROFITTING OF EXISTING BUILDINGS

SEISMIC RETROFITTING OF EXISTING BUILDINGS SEISMIC RESILIENT SCHOOL BUILDING CONSTRUCTION OF SCHOOL BUILDINGS FOR SUB-ENGINEER SEISMIC RETROFITTING OF EXISTING BUILDINGS R.K. MALLIK Structural Engineer RND CENTRE PVT. LTD. OBJECTIVE KNOW RETROFITTING

More information

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan

Structural Conditions Assessment of Current Lapeer District Schools Administration Building 250 Second Street, Lapeer, Michigan November 2, 2015 Melissa A. Malcolm Library Director Lapeer District Library 201 Village West Dr S Lapeer, MI 48446 RE: Structural Conditions Assessment of Current Lapeer District Schools Administration

More information

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee

The Structural Redesign of Boyds Bear Country and its Related Systems. Boyds Bear Country, Pigeon Forge, Tennessee The Structural Redesign of Boyds Bear Country and its Related Systems Included in this Presentation: Background and Existing System Proposal Problem / Solution Structural System Redesigns Pre-cast Concrete

More information

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers

REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR. Prepared by: Global Village Engineers REPORT OF BUILDING INSPECTIONS TECOLUCA, EL SALVADOR Prepared by: Global Village Engineers 23 JANUARY, 2001 23 January 2001 Senor Carlos Cortez Hernandez Alcaldia Municipal de Tecoluca San Vicente, El

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

Module 4 Waterside Bensalem, Pa Date

Module 4 Waterside Bensalem, Pa Date Date 8-8-16 WATERSIDE CONSTRUCTION, L.P. Building to be fully sprinklered per NFPA13D General Notes GN-1 General Notes DIAGRAMMATIC STAIR DETAIL GN-2 General Notes ¾" - GN-3 General Notes (R301.2.2.4 &

More information

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax

City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA (925) phone (925) fax City of Walnut Creek Development Review Services 1666 N. Main Street, Walnut Creek, CA 94596 (925) 943-5834 phone (925) 256-3500 fax Issued July 22, 2010 Information Bulletin No. IB-016 DOCUMENT SUBMITTAL

More information

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf

Dead Loads (psf): Concrete Floor Slab on Metal Deck 45 psf Mechanical and Ceiling 7 psf Miscellaneous 5 psf Exterior Wall 80 psf CODES AND REQUIREMENTS The structural design of Northbrook Corporate Center was based on the International Building Code 2003, which incorporates many of the provisions of ASCE 7. The lateral load design

More information

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/ 120 Montgomery Street, Suite 1410 San Francisco, California 94104 415/781-1505 Fax 415/781-2718 sde@sdesf.com Rajendra Sahai, SE Principal John W. Laws, SE Principal Steven Lepisto, SE Principal STRUCTURAL

More information

Utah Knitting & Dyeing Ltd #9533. Boran, Monipur, Mirzapur, Gazipur 03.May.2014

Utah Knitting & Dyeing Ltd #9533. Boran, Monipur, Mirzapur, Gazipur 03.May.2014 Utah Knitting & Dyeing Ltd #9533 Boran, Monipur, Mirzapur, Gazipur 03.May.2014 Identified Priority 2 Concerns Chemical & Sewing Buildings No loading plan in effect. Washing Building Cracks in upstand beams

More information

Commercial Structures

Commercial Structures Commercial Structures Structural Components Footing Piles Foundation Beams Joists Column Substructure Superstructure Reinforced concrete Re-bar Pre-cast concrete panel Deflection Cantilever Footings A

More information

Strengthening or Retrofitting

Strengthening or Retrofitting Post-earthquake School Reconstruction Project Workshop on Earthquake Resilient Design for School Buildings Day-2 Session 4 Strengthening or Retrofitting Chandani Chandra Neupane Various Terms used with

More information

ARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE

ARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE TEST PROJECT PROJET D ÉPREUVE ARCHITECTURAL TECHNOLOGY & DESIGN DESSIN ET TECHNOLOGIE ARCHITECTURALE POST-SECONDARY NIVEAU POSTSECONDAIRE Day 1 Competition Test & Appendix I Page 2 Day 1 (7 hours) REMEMBER

More information

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents

Volume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Preparation of Seismic Design Manuals for Earthquake Disaster Mitigation Volume 1 HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Part I: A house and its behavior during earthquake A House? How

More information

H y a t t C e n t e r Chicago, Illinois (71 South Wacker Drive) Acoustics Study

H y a t t C e n t e r Chicago, Illinois (71 South Wacker Drive) Acoustics Study 8.0 Acoustics and Fire Rating Study Introduction An acoustics and fire rating study was performed on the Hyatt Center to establish an acceptable infill wall assembly for use in the proposed braced frame

More information

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014

K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur ( N, E) 01.July.2014 K.L. Fashion Ltd. (10982) 75/1, Master Bari, Tongi, Gazipur (+23.903394N, +90.369739E) 01.July.2014 Identified Priority 1 Concerns None Identified Priority 2 Concerns The building does not contain any

More information

CONFINED MASONRY CONSTRUCTION

CONFINED MASONRY CONSTRUCTION CONFINED MASONRY CONSTRUCTION Mario Rodriguez, Universidad Nacional Autonoma de Mexico, Mexico BACKGROUND Confined masonry construction consists of unreinforced masonry walls confined with reinforced concrete

More information

Check the strength of each type of member in the one story steel frame building below.

Check the strength of each type of member in the one story steel frame building below. CE 331, Summer 2015 nalysis of Steel Braced Frame Bldg 1 / 9 Check the strength of each type of member in the one story steel frame building below. 4 @ 8 ft B 20 f 1 2 3 @ 25 ft Side Elevation 3 4 Plan

More information

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission

Hale Allen Jones The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence Submission The Institution of Structural Engineers East Anglian Branch Award for Structural Excellence - 2003 Submission Details of Project Location Jarrold Whitefriars Office Development Whitefriars, Norwich. Project

More information

April 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320

April 10, Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 508 Baylor Court Suite C Chesapeake, VA 23320 757.436.2070 ph 757.436.0610 fx Mr. Steven McMahon Manager of Architectural Services East Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:

More information

Effect of Infill as a Structural Component on the Column Design of Multi-Storied Building

Effect of Infill as a Structural Component on the Column Design of Multi-Storied Building Effect of Infill as a Structural Component on the Column Design of Multi-Storied Building Hossain Mohammad Muyeed-Ul-Azam 1 and Khan Mahmud Amanat 2 Abstract The structural effect of brick infill is generally

More information

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw

U.S. EDITION RESIDENTIAL CONSTRUCTION DETAILS SAMPLE. A visual guide to construction detailing. Emma Walshaw RESIDENTIAL CONSTRUCTION DETAILS U.S. EDITION A visual guide to construction detailing Emma Walshaw Contents INTRODUCTION 4 PRINCIPLES OF CONSTRUCTION DETAILING 6 FOUNDATIONS 9 PRINCIPLES OF FOUNDATION

More information

No structural deficiencies were observed to the west exterior elevation.

No structural deficiencies were observed to the west exterior elevation. August 9, 2016 Ms. Jennifer Spencer, AIA, NCARB Gary W. Anderson Architects 200 Prairie Street, Suite 201 Rockford, IL 61107 Subject: Structural Observations 227 North Wyman Street Rockford, IL Dear Ms.

More information

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools

Table of Contents Executive Summary 2 Introduction 3 Structural Systems Problem Statement 9 Proposed Solution 10 Breadth Topics 11 Tasks and Tools Table of Contents Executive Summary...2 Introduction...3 Structural Systems Foundation System...4 Gravity System...6 Lateral System...7 Problem Statement...9 Proposed Solution...10 Breadth Topics...11

More information

Module 4 Waterside Bensalem, Pa Date

Module 4 Waterside Bensalem, Pa Date Date 2-12-16 WATERSIDE CONSTRUCTION, L.P. Building to be fully sprinklered per NFPA13R General Notes GN-1 General Notes DIAGRAMMATIC STAIR DETAIL GN-2 General Notes ¾" - GN-3 General Notes (R301.2.2.4

More information

Structural Technical Report 1 Structural Concepts / Existing Conditions

Structural Technical Report 1 Structural Concepts / Existing Conditions Chris Shelow Structural Advisor: M. Kevin Parfitt Koshland Integrated Natural Science Center 10/05/05 AE 481W Structural Technical Report 1 Structural Concepts / Existing Conditions Executive Summary The

More information

Fundamentals of Building Construction: Materials and Methods

Fundamentals of Building Construction: Materials and Methods Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of

More information

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No

KORA_Req._for_Eng._Studies_on_Stouffer_Apts. KU Reference No 000130 1 PURPOSE: Professional Engineering Consultants, P.A. (PEC) was engaged by University of Kansas Design & Construction Management to perform an assessment of Stouffer Place Apartment Building 20

More information

1000 CONNECTICUT AVENUE

1000 CONNECTICUT AVENUE 1000 CONNECTICUT AVENUE Gea Johnson Structural Option Faculty Advisor: Dr. Hanagan September 23, 2011 Revised: December 16, 2011 Washington DC Technical : Existing Conditions Table of Contents Executive

More information

Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY

Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY Structural Option Thesis Proposal Submitted: 1/2/12 Table of Contents Executive Summary..3 Introduction.4 Structural Systems...5

More information

Photographer: Richard M. Casella, Historic Documentation Company, Inc., Portsmouth, RI November 2007 DESCRIPTION OF PHOTOGRAPHS

Photographer: Richard M. Casella, Historic Documentation Company, Inc., Portsmouth, RI November 2007 DESCRIPTION OF PHOTOGRAPHS MHC PHOTOGRAPHIC DOCUMENTATION WEIR STOVE COMPANY, GLENWOOD RANGE COMPANY, F. B. ROGERS SILVER COMPANY COMPLEX West Water Street along Taunton River Taunton, Bristol County, Massachusetts Photographer:

More information

PRELIMINARY STRUCTURAL INVESTIGATION REPORT

PRELIMINARY STRUCTURAL INVESTIGATION REPORT 124 E. Broadway Tucson, AZ Prepared for: CBRE Brokerage Services 3719 N. Campbell Ave. Tucson, AZ 85719 BACKGROUND: The Tucson Veterans of Foreign Wars building, located at 124 E. Broadway, Tucson, AZ

More information

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD)

STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) STRUCTURAL EVALUATION OF WASHINGTON ELEMENTARY SCHOOL WEST CONTRA COSTA UNIFIED SCHOOL DISTRICT (WCCUSD) For WLC Architects Kaiser Building 1300 Potrero Avenue Richmond, CA 94804 By DASSE Design, Inc.

More information

[TECHNICAL REPORT 3] Lateral System Analysis

[TECHNICAL REPORT 3] Lateral System Analysis Science Center Research Park 3711 Market St. The Pennsylvania State University Department of Architectural Engineering Senior Thesis 2009-2010 Prepared by: November 30, 2009 [TECHNICAL REPORT 3] Lateral

More information

City of Washburn Building Assessment

City of Washburn Building Assessment City of Washburn Building Assessment Structural Assessment Report 204 W. Bayfield St. September 30, 2016 KOA No. 162078.01 Prepared For: City of Washburn 119 Washington Ave. Washburn, WI 54891 Prepared

More information

SEISMIC RESPONSE OF A MID RISE RCC BUILDING WITH SOFT STOREY AT GROUND FLOOR

SEISMIC RESPONSE OF A MID RISE RCC BUILDING WITH SOFT STOREY AT GROUND FLOOR SEISMIC RESPONSE OF A MID RISE RCC BUILDING WITH SOFT STOREY AT GROUND FLOOR 1 DHARMESH VIJAYWARGIYA, 2 Dr. ABHAY SHARMA, 3 Dr. VIVEK GARG 1 Post Graduate Student, Civil Engineering Department, MANIT,

More information

John Jay College Expansion Project

John Jay College Expansion Project Technical Report #3 Michael Hopper Mike AE Consultant: Dr. Lepage [Type the company name] November 21 st, 2008 Technical Report #3 Table of Contents Executive Summary.3 Introduction.4 Existing Composite

More information

R Code and Commentary for 2012 NC Residential Code final 03/06/13

R Code and Commentary for 2012 NC Residential Code final 03/06/13 R602.10 Code and Commentary for 2012 NC Residential Code final 03/06/13 Commentary italicized and printed in red 1. Section R602.10 -- provides charging language for two simplified bracing approaches (isolated

More information

NYC Department of Education

NYC Department of Education Architectural Inspection Building Assessment Survey 2017-2018 Asset: P.S./I.S. 266 - QUEENS, 74-10 COMMONWEALTH BLVD, New York, 11426 Inspection Id Inspection Type Time In Last Edited SA : Architectural

More information

05/16/2016 1:36:13 PM

05/16/2016 1:36:13 PM 1223 Mineral Spring Avenue North Providence, RI 02904 STRUCTURAL EXISTING CONDITIONS REPORT Prepared for: Jonathan Levi Architects 266 Beacon Street Boston, Massachusetts, 02116 May 16, 2016Draft WESTPORT,

More information

Overall Existing Conditions Summary

Overall Existing Conditions Summary September 12, 2002 Overall Executive Summary: The multi-use project on 250 West Street is a 7-story building with space for offices, retail, storage and parking. The project is a small part of the development

More information

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.

More information

OVERALL STRUCTURAL SYSTEM

OVERALL STRUCTURAL SYSTEM EXECUTIVE SUMMARY The at the Pittsburgh International Airport, PA, is a 275,000 square foot multi-use building located directly adjacent to the airport s landside terminal. The building consists of an

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

Slave Housing Data Base

Slave Housing Data Base Slave Housing Data Base Building Name: Tuckahoe Plantation, Quarter B Evidence Type: Extant Site ID: Historical Site Name: Tuckahoe Plantation City or Vicinity: County: Goochland State: Virginia UTM: @NW

More information

Structural Breadth. Landmark Façade

Structural Breadth. Landmark Façade Jessica Lucas Hearst Tower Mechanical Option New York, NY Structural Breadth Landmark Façade As mentioned before, the building has two distinct pieces: the historic landmark façade and the new office tower.

More information

Letter of Transmittal

Letter of Transmittal Letter of Transmittal November 17, 2014 Ali Said Structural Thesis Advisor The Pennsylvania State University aus59@psu.edu Dear Doctor Said, The following technical report fulfills the fourth Technical

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

Thesis Proposal. Matthew R Peyton

Thesis Proposal. Matthew R Peyton This Document is for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. S t r u c t u r a l O p t i o n P r o f e s s o r B e h r H o s p i t a l

More information

Temecula Medical Center Temecula, CA

Temecula Medical Center Temecula, CA Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas

More information

FDA OC/ORA Office Building

FDA OC/ORA Office Building FDA OC/ORA Office Building Table of Contents Executive Summary... 3 Introduction... 4 Structural System... 5 Foundation:... 5 Floor System:... 7 Building 31:... 7 Building 32:... 9 Columns... 10 Lateral

More information

La Jolla Commons Phase II Office Tower

La Jolla Commons Phase II Office Tower La Jolla Commons Phase II Office Tower San Diego, California Photos Provided Courtesy of HINES Alyssa Stangl Structural Option Faculty Advisor Dr. Hanagan Preliminary Vibrations and Layout Building Introduction

More information

Pushover Analysis of High Rise Reinforced Concrete Building with and without Infill walls

Pushover Analysis of High Rise Reinforced Concrete Building with and without Infill walls Pushover Analysis of High Rise Reinforced Concrete Building with and without Infill walls Phadnis P.P. 1, Prof. (Dr.) Kulkarni D. K. 2 1Research Scholar, Department of Technology, Shivaji University, Kolhapur,

More information

Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.

Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S. Experimental Study on behavior of Interior RC Beam Column Joints Subjected to Cyclic Loading P.Rajaram 1 A.Murugesan 2 and G.S.Thirugnanam 3 1 P.G.Student, Department of Civil Engineering, Institute of

More information

Tier 1 Assessment Linderman Gymnasium Polson, MT

Tier 1 Assessment Linderman Gymnasium Polson, MT Tier 1 Assessment Linderman Gymnasium Polson, MT June 15, 2018 Prepared by: 128 W. ALDER ST SUITE a MISSOULA, MT 59802 (406) 274-7671 June 15, 2018 Mr. Paul Bishop Paradigm v.2.0 125 ½ W. Main Street RE:

More information

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011 ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari December 12 th, 2011 Table of Contents Executive

More information

Rutgers University Law School Building Addition and Renovation Camden, NJ

Rutgers University Law School Building Addition and Renovation Camden, NJ Building Addition and Renovation Camden, NJ Technical Assignment 1 October 5, 2007 Nathan E. Reynolds Structural Option Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M.

More information

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103

Project Seismic Vulnerability Assessment For SFCC District Building 33 Gough Street San Francisco, California 94103 Project For SFCC District Building 33 Gough Street San Francisco, California 94103 Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103 Prepared By Thornton

More information

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302 Larson Engineering, Inc. 118 S. Clinton Street, Suite 250 Chicago, IL 60661-5775 312.345.0540 Fax: 312.332.1484 www.larsonengr.com May 17, 2016 Mr. Fred Preuss Oak Park River Forest High School 201 North

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems Technical Report 2 Pro-Con Structural Study of Alternate Floor Systems Columbia University Broadway & 120 th Street, New York, NY Jonathan R. Torch Pennsylvania State University Architectural Engineering

More information

HIGH RISE CONDO SOHO, NEW YORK, NY

HIGH RISE CONDO SOHO, NEW YORK, NY HIGH RISE CONDO SOHO, NEW YORK, NY TECHNICAL ASSIGNMENT 1 October 5, 2006 Joseph The Pennsylvania State University Structural Option Faculty Advisor: Andres Lepage TABLE OF CONTENTS TABLE OF CONTENTS 2

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016)

Re.: Dollar Tree D10236 Startown Crossing, Newton, NC Structural Report on Findings, Site Visit (September 21, 2016) 508 Baylor Court Suite C Chesapeake, VA 23320 757.436.0610 phone 757.436.2070 fax Mr. Steven McMahon Manager of Architectural Services Dollar Tree Stores, Inc. 500 Volvo Parkway Chesapeake, VA 23320 Re.:

More information

Building Architecture

Building Architecture The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L

More information

Building Division Informational Handout

Building Division Informational Handout CITY OF SAN JOSÉ, CALIFORNIA Building Division Informational Handout Conventional Light Frame Construction Design Provisions 2007 CBC Handout No. 2-21 Published: 1/1/08 Page 1 of 3 This document summarizes

More information

GENERAL & AXIAL LOADBEARING

GENERAL & AXIAL LOADBEARING LIGHTWEIGHT STEEL FRAMING DETAILS GENERAL & AXIAL LOADBEARING THE STRENGTH WITHIN MONTREAL TORONTO CALGARY EDMONTON VANCOUVER WALL ELEVATIONS Bailey Wind Bearing Walls (BWB) Lightweight Steel Framing (LSF)

More information

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012

ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012 ECMC Skilled Nursing Facility Architectural Engineering Senior Thesis 2011 Class: Subject: Faculty Consultant: Submitted: AE 481W Thesis Proposal Dr. Ali Memari January 13 th, 2012 Table of Contents Executive

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

AIR CRE Industrial Building Standards

AIR CRE Industrial Building Standards AIR CRE Industrial Building Standards Established March 1993 AIR CRE 500 N Brand Blvd, Suite 900, Glendale CA, 91203 AIR CRE INDUSTRIAL BUILDING STANDARDS TABLE OF CONTENTS SECTION 1 Introduction P. 1

More information

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07

Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07 Drexel University Race Street Dormitory REVISED THESIS PROPOSAL Doug Tower Structural Advisor: Kevin Parfitt 2/7/07 Table of Contents I. Executive Summary... 3 II. Introduction... 4 III. Background...

More information

4.6 Procedures for Connections

4.6 Procedures for Connections 4.6 Procedures for Connections This section provides Tier 2 evaluation procedures that apply to structural connections: anchorage for normal forces, shear transfer, vertical components, interconnection

More information

Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY

Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY Weill Cornell Medical Research Building 413 E. 69 th Street New York, NY Structural Option Technical Report 1 9/23/11 Table of Contents Executive Summary..3 Introduction.4 Structural Systems...5 Foundation

More information

Slide 1. Slide 2. Slide 3. Pentagon Source Material: Mlaker et. al., The Pentagon Building Performance Report, ASCE, 2002.

Slide 1. Slide 2. Slide 3. Pentagon Source Material: Mlaker et. al., The Pentagon Building Performance Report, ASCE, 2002. Slide 1 Columns in Buildings Subject to Attack The Pentagon (September 11, 2001) The Murrah Building (April 19, 1995) In one sense, these two buildings provide a roughly equivalent set of circumstances

More information

Elegant Design & Detail in High Seismic Zone

Elegant Design & Detail in High Seismic Zone Elegant Design & Detail in High Seismic Zone Brigham Young University Laundry and Maintenance Facilities R E S I L I E N T D E S I G N Photo courtesy of MHTN Architects Despite the more industrial function,

More information

Seismic Performance of Multistorey Building with Soft Storey at Different Level with RC Shear Wall

Seismic Performance of Multistorey Building with Soft Storey at Different Level with RC Shear Wall Research Article International Journal of Current Engineering and Technology E-ISSN 2277 4106, P-ISSN 2347-5161 2014 INPRESSCO, All Rights Reserved Available at http://inpressco.com/category/ijcet Seismic

More information

Types Of Roofs - Vault

Types Of Roofs - Vault 1 Types Of Roofs - Vault Implementation Of the Concrete On Vault Implementation Of Vault Earthquake Damage 2 Types Of Roofs - Joist And Block 3 Types Of Coverage Roofs-Composite 4 5 Building Structure

More information

Technical Report #1. Indiana Regional Medical Center Indiana, PA. Cody A. Scheller. Structural Concepts & Existing Conditions Report

Technical Report #1. Indiana Regional Medical Center Indiana, PA. Cody A. Scheller. Structural Concepts & Existing Conditions Report Technical Report #1 Technical Report #1 Structural Concepts & Existing Conditions Report Indiana Regional Medical Center Cody A. Scheller The Pennsylvania State University Architectural Engineering Faculty

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

John Jay College Expansion Project

John Jay College Expansion Project Technical Report #1 Michael Hopper Mike AE Consultant: Dr. Lepage [Type the company name] September 29 th, 2008 Technical Report #1 Table of Contents Executive Summary.3 Introduction.4 Structural System.6

More information