1 Construction Simulation An Introduction Tim O Leary Construction Solutions Europe & Africa
2 Solutions BRIDGES BUILDINGS CADASTRE AND LAND DEVELOPMENT CAMPUSES COMMUNICATION S ELECTRIC AND GAS UTILITIES FACTORIES METALS AND MINING OIL AND GAS POWER GENERATION RAIL AND TRANSIT ROADS WATER AND WASTEWATER 2
3 Construction Simulation CONSTRUCTION TODAY Best practices and the challenges in applying them BENTLEY S CONSTRUCTSIM OVERVIEW Proven solution to plan, process and status construction USING CONSTRUCTSIM VPM Data Reorganisation 4D playback Status tracking Work Packs Look ahead planning BENEFITS Greater workforce productivity Shorter project time Substantial cost savings 3
4 Overview Construction Best Practices Software Technology ConstructSim Virtual Plant Model 4
5 Current Major Issues Engineering 7 1, 2 3, 4, 5 6, 8 1.Poor communications between disciplines and functions 2.Concurrent engineering 3.Fast-track projects 4.Limited resources 5.Ageing skilled workforce 6.Schedule / install by area test and turnover by systems Delivery + Fabrication 7.Short time between AFC/IFC and construction a) Engineering deliverables 8.Many revisions b) Materials availability 9.Operate in scramble mode c) Allocation of materials and work with whatever is available d) Fabrication deliverables 7 Installation 9 1, 2 3, 4, 5 6, 8 Testing 9 1, 2 3, 4, 5 6, 8 1, 2 3, 4, 5 6, 8 Systems Turnover 5
6 Common Questions Is the planned schedule achievable? What is the exact progress to date? How will engineering changes affect work content, cost and schedule? How will the schedule be kept given the changing circumstances? What effort is needed to complete? What will be the project impact be if materials are delayed? 6
7 Workflow Planning Engineering Define Priority Areas Early on in Design Suppliers / Fabricators IFC Drawings Constructor Automate MTOs Last Planner Lean Construction Issue work to the field that can be done Create Work Packs Validate Constraints 7
8 Linear Definition of Priorities Construction Ideal Construction Sequence Based on Turnover Systems Drawings Issued Materials Delivery Installation Complete Testing Complete Completion Date Engineering Delivery Installation Testing Systems Turnover Definition of Priorities 8
9 Managing Work Buffers to Speed Projects Engineering Delivery + Fabrication Installation Testing Systems Turnover 9
10 Construction Simulation CONSTRUCTION TODAY Best practices and the challenges in applying them BENTLEY S CONSTRUCTSIM OVERVIEW Proven solution to plan, process and status construction USING CONSTRUCTSIM VPM Data Reorganisation 4D playback Status tracking Work Packs Look ahead planning BENEFITS Greater workforce productivity Shorter project time Substantial cost savings 10
11 ConstructSim Approach Drive priorities based on ideal construction sequence based on turnover systems Expedite both engineering and fabrication to deliver against ideal plan Allocate materials based on priorities Accurately track effort for completion Manage work-fronts effectively as constraints change on site 11
12 Client Feedback Increase field productivity 7 25% Streamline sequencing Reduced rework Automated production of work packages Work packages are executable Save time and cost on Brownfield projects TIC $50M Savings $1M Completed 1 month ahead of schedule ConstructSim Piping 2x faster Welding 1.8x faster 12
13 Diesel Refinery: $2M Savings in Mechanical Sub Change Orders Background New Refinery Unit - TIC $320M Lump Sum Contract with Mechanical Sub ConstructSim Pipe purchased by Owner and utilized by Construction Management firm ConstructSim enabled us to recover project schedule losses, and complete on time - without paying for unwarranted change orders. Claim: $2.5M Settled: $0.5M ConstructSim Use Case Excessive change order submitted by Mechanical Sub Actual progress not in alignment with progress reported ConstructSim used to analyze change order and update progress reporting system 13
14 Offshore Platform: Saved $17M, Reduced Schedule 3 Months Background Deepwater Offshore Platform - $150M Time and materials contract with Fab Yard ConstructSim Pipe purchased by Owner and utilized by module Fab Yard contractor The labour efficiency we obtained using ConstructSim enabled us to save 3 months and U.S.$17M, as well as reduce the punch list items by over 99%. ConstructSim Use Case ConstructSim used to re-baseline project schedule Development of crew-level work face plans with ConstructSim Project completes on time, under budget, and sails away with only 7 punch list items (compared to 1000 s for other projects) 14
15 ConstructSim Provides Measureable Savings Reduce Impact of Change Reduce Wasted Time Minimize Rework 1% to 5% TIC Reduce Lengthy Planning Process Streamline Materials Management 15
16 Who Uses ConstructSim? Engineers and Constructors, Ltd. 16
17 ConstructSim Solves Complex Planning and Execution Problems ConstructSim Work the Plan Owners Reporting & Simulation Construction Managers Constructors CAD Databases Project Schedule Materials Management System Virtual Plant Model Project Controls Database 17
18 Construction Simulation CONSTRUCTION TODAY Best practices and the challenges in applying them BENTLEY S CONSTRUCTSIM OVERVIEW Proven solution to plan, process and status construction USING CONSTRUCTSIM VPM Data Reorganisation 4D playback Status tracking Work Packs Look ahead planning BENEFITS Greater workforce productivity Shorter project time Substantial cost savings 18
19 Using Bentley s ConstructSim Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 19
20 Project Schedule Integration MTO From CAD + Production Information Schedule ConstructSim Work Steps Task Templates & Standard Norms 20
21 Project Milestones Project Milestone 1 Project Milestone 2 Project Milestone 3 Project Milestone N Rules Of Progress Rules Of Progress Rules Of Progress Rules Of Progress Engineering Initial Design Final Design Check 1 Check 2 Check 3 Approval Fabrication Drawings Received In Production Shipped Installation Install Test Hand over Testing Completions Commissioning Etc. Etc. 21
22 Automatic Data Organization Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 22
23 ConstructSim Automatic Data Reorganization for Construction Tasks 23
24 4D Playback Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 24
25 4D Playback to Optimize and Communicate the Construction Sequence 25
26 Status Tracking Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 26
27 On-Demand Status Tracking and Visualisation 27
28 Tracking Equipment Delivery 28
29 Pipe Delivery Status Visualization 29
30 Area 08 (Mod and Non-Mod Pipe) 30 Pipe Delivery Status Visualization
31 Area 11 Pipe Delivery Status Visualization
32 Area 15 Pipe Delivery Status Visualization
33 Area Pipe Hydro Test Status Visualization
34 Area Pipe Hydro Test Status Visualization
35 35 Area 16 Pipe Hydro Test Status Visualization
36 Work Packs Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 36
37 Fast, Easy Work Pack Creation 37
38 Look Ahead Planning Status Tracking 4D Playback Week 1 Work Packs Automatic Data Organization ConstructSim Look Ahead Planning Virtual Plant Model 38
39 Work Pack Reports and Look Ahead Planning to Streamline Scheduling 39
40 Construction Simulation CONSTRUCTION TODAY Best practices and the challenges in applying them BENTLEY S CONSTRUCTSIM OVERVIEW Proven solution to plan, process and status construction USING CONSTRUCTSIM VPM Data Reorganisation 4D playback Status tracking Work Packs Look ahead planning BENEFITS Greater workforce productivity Shorter project time Substantial cost savings 40
41 ConstructSim Benefits for Owner Operator Enables schedule date to be met Reduces costs Provides an insight to project progress Potential to shorten schedule and achieve additional production 41
42 ConstructSim Benefits for Construction Managers Saves 1-5% TIC or 7 25% of field man-hours Reduced claims litigation Greater control and visibility of project Start up date controlled / compressed Know where you are at and what needs to be completed 42
43 ConstructSim Benefits for Direct Hire Contractors Reduces wasted time on-site Improves field productivity by 7-25% Reduces rework and out of sequence work Maximises productivity of on-site equipment e.g. cranes / scaffold Improves co-ordination between disciplines 43
44 Cost Savings Co-ordination between disciplines to maximise effectiveness of resources such as scaffolding / cranes REDUCE REMOVE Work pack planning man-hours Wasted field man-hours Rework Punch list items Out of sequence work SAVE ACHIEVE Between 1% - 5% of TIC On-time project completion 44
45 Sustaining Infrastructure Thank you
46 Additional Information Streamlining Materials Planning Levels Additional Details Electrical / Instrumentation 46
Bentley Plant Update and Directions BE User Group Vejle,
Bentley Plant Update and Directions BE User Group Vejle, 10.11.08 Carsten Gerke Senior Sales Director Bentley Plant Europe Agenda Business Update News and developments for Plant The Year in Infrastructure
More informationThe Effects of Comparative 4D Models on Schedule Development and Controls. Abstract
The Effects of Comparative 4D Models on Schedule Development and Controls Kevin Coyne, P.E. Managing Engineer, Exponent, Inc. Abstract In this paper the argument is made that the use of comparative 4D
More informationVS. THE STATUS QUO A CASE STUDY. A side-by-side comparison of EPC legacy materials management system and Jovix for field transactions
VS. THE STATUS QUO A CASE STUDY A side-by-side comparison of EPC legacy materials management system and Jovix for field transactions A top global EPC firm performed a 3-month Jovix pilot project on a module
More informationINDUSTRY EXPERT PANEL SESSION
INDUSTRY EXPERT PANEL SESSION DURING THIS SESSION THE PANEL WILL DISCUSS THE BENEFITS OF WORKFACE PLANNING, THEIR THOUGHTS ON HOW WORKFACE PLANNING SHOULD BE APPLIED, AND HOW THE MODEL SHOULD BE DEVELOPED
More informationPath of Construction. Laying the Foundation for Success
Path of Construction Laying the Foundation for Success Agenda Item Topic Presenter/Facilitator Timing (min) 1 Safety Moment Linda Clary 3 2 Introduction Linda Clary 5 3 Session & Path of Construction Objectives
More informationCORNERCUBE. Lean Construction and Lean Project Delivery: Implications for Cost and Schedule CORNERCUBE. Optimizing Project Outcomes
Optimizing Project Outcomes Lean Construction and Lean Project Delivery: Implications for Cost and Schedule What s Happening On LPD Projects Cost Improvement Opportunity Cost LPD Time Improvement Opportunity
More informationPath of Construction Enhancing the Best Practice for Engineering & Supply Chain to Support AWP Implementation
Path of Construction Enhancing the Best Practice for Engineering & Supply Chain to Support AWP Implementation Presenters Glen Warren COAA Co-Chair, Industry Expert Emeritus Yogesh Srivastava Intergraph,
More informationSmartPlant Materials Benefits and Case Studies. Callum Ford
SmartPlant Materials Benefits and Case Studies Callum Ford 21-22 August 2008 Hilton Opera Hotel Hanoi, Vietnam What is Materials Management Why do we do it What is the solution How do we do it What are
More informationISO and Bentley
ISO 15926 and Bentley Manoj Dharwadkar, Ph.D. Director, Data Interoperability PCA FORUM 2009 AND MEMBERS MEETING Kuala Lumpur, October 20-21, 2009 Presentation Overview Bentley s portfolio and the interoperability
More informationSuccessful WorkFace Planning. 10% Technology, 90% Sociology
Successful WorkFace Planning 10% Technology, 90% Sociology Robin M. Mikaelsson PMP Senior Construction Consultant Quick Bio: Over 20 years in the construction industry Started as a tradesman in the field
More informationAdvanced Work Packaging An Owner s Perspective
October, 2014 Advanced Work Packaging An Owner s Perspective ExxonMobil Development Company ExxonMobil Production Company ExxonMobil Research & Engineering This presentation includes forward-looking statements.
More informationProcurement and Supply Chain In a Work Face Planning Environment
Procurement and Supply Chain In a Work Face Planning Environment COAA Workface Planning Forum Calgary, Alberta December 1 2010 Presented by: Bill Somerville Overview Scope of Discussion Owners and Contractors
More informationNORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY, CA APRIL 22-24, "The Last Planner" by Glenn Ballard
NORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY, CA APRIL 22-24, 1994 "The Last Planner" by Glenn Ballard Introduction Better planning improves productivity by reducing delays, getting the work done
More informationYantai Raffles Shipyard. Charting the future of the offshore and marine industry with Dassault Systèmes PLM Solutions
DS plm success story Charting the future of the offshore and marine industry with Dassault Systèmes PLM Solutions YRS Objectives Streamline processes for greater efficiency and lower costs Implement design
More informationLean Production Management In Design
Lean Production Management In Design Future Concrete 2017 16.05.2017 www.jacobs.com worldwide Lean: Improving Efficiency and Reducing Waste Its foundation relies on the lean approach of getting value to
More informationCHAPTER 7 Building Information Modeling
CHAPTER 7 Building Information Modeling Dr Nabil Elsawalhi Associate Professor of Construction Management 1 Information and Communication Technology/ Building Information Modeling New approaches to construction
More informationThe Structural Enterprise License
2014 Bentley Systems, Incorporated The Structural Enterprise License A Wide-Reaching Structural Software Solution What is Structural Enterprise License? Structural Enterprise is a special license allowing
More informationMANAGEservices. Managed Services for Integrated Projects
MANAGEservices Managed Services for Integrated Projects Transform Your Project Delivery Capabilities with ProjectWise MANAGEservices Bentley can provision, manage, monitor and support its industry-leading
More informationSmartPlant Construction Streamline Work Process
SmartPlant Construction Streamline Work Process Jason Dubose Executive Business Consultant Materials and Construction Americas Region 2015 AWP Conference Tuesday, October 6 th, 2015 11:30 am -12:30 PM
More informationIn order to achieve major productivity and cost-efficient breakthroughs, a solution is
Igor Juricic, Intergraph, Italy, examines the advances made in vessel design software. In order to achieve major productivity and cost-efficient breakthroughs, a solution is required that can manage today
More informationEduard Marfà, EMEA Portfolio Marketing. Energy & Utilities Overview
Eduard Marfà, EMEA Portfolio Marketing Energy & Utilities Overview Smarter decisions, better products. Energy Industry Trends Power Generation Oil & Gas Fossil Renewables Nuclear Utilities Infrastructure
More informationLeading Indicators and Dashboarding for Advanced Work Packaging. Lloyd Rankin
Leading Indicators and Dashboarding for Advanced Work Packaging Lloyd Rankin Slide # AWP KPIs EWP RFI POC PWP CWP IWP 2017-10-24 Slide # 2 POC Defined Path of Construction (POC) Path of Construction is
More information4D Modeling: Applications and Benefits
4D Modeling: Applications and Benefits Martin Fischer Assoc. Prof., Stanford University Director, CIFE Founder, Common Point Technologies, Inc. The big idea: Build virtually before building in reality.
More informationA White Paper February System for piping global management
A White Paper February 2004 System for piping global management Page blank Table of contents Summary... 4 Modules... 5 Piping Classes... 6 Data Dictionaries 6 Tables 6 Piping Classes 7 Branch Tables 7
More informationOff-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018
Off-site manufacturing for construction Response to the House of Lords Science and Technology Committee, 4 May 2018 Introduction The Royal Academy of Engineering welcomes this opportunity to submit evidence
More informationDigital Line of Sight Jim Newman, Senior Director, Asset Performance, Bentley Systems
Digital Line of Sight Jim Newman, Senior Director, Asset Performance, Bentley Systems Digital Line of Sight for Operational Excellence Execs, Shareholders, Public, Regulators Assets Workforce INDUSTRY
More informationMobilizing the next generation of EPC projects. Case Study
Mobilizing the next generation of EPC projects Case Study COMPASS DIGITAL HELPS CLIENT SAVE MILLIONS OF DOLLARS Paper-based systems are notoriously slow, difficult, and costly to manage. With a web-based
More informationTop 10 Areas for Productivity Improvement on Alberta Mega Oil Sands Construction Projects
Top 10 Areas for Productivity Improvement on Alberta Mega Oil Sands Construction Projects George F. Jergeas PhD, PEng Professor of Project Management, University of Calgary October 24, 2012: BREAKOUT:
More informationProject Production Institute Challenges and Myths of Offsite Fabrication for Mega Projects
Project Production Institute Challenges and Myths of Offsite Fabrication for Mega Projects Alan Richard Director Capital Projects Deloitte Transactions and Business Analytics LLP December 3, 2014 How did
More informationSeradex White Paper. ERP for Engineer to Order. A Discussion of High Performance Manufacturing Issues
Seradex White Paper A Discussion of High Performance Manufacturing Issues ERP for Engineer to Order Congratulations - you finally landed the big contract. But there's no time for a long celebration. You've
More information2014 Bentley Systems, Incorporated. Project Delivery benefits of ProjectWise Connection Services
2014 Bentley Systems, Incorporated Project Delivery benefits of ProjectWise Connection Services Agenda Why we are building ProjectWise CONNECTION Services? Market challenges to address ProjectWise CONNECTION
More informationDRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS
05 DRAFT RAMBOLL-SUBC END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS 2 END-TO-END EPCIC SOLUTIONS FOR ENERGY PROJECTS List of contents Page 3 End-to-end EPCIC solutions Page 4 Integrated project execution
More informationPetro-Canada Refinery Conversion Project. Presentation to AACE, Calgary. November 9, 2005
Petro-Canada Refinery Conversion Project Presentation to AACE, Calgary November 9, 2005 TLM MOMENT All Losses are important and represent an opportunity to improve Health Safety Environmental Quality BUILDING
More informationFROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD
FROM AUTOCAD TO ADVANCE STEEL 1 MOVE FROM 2D TO 3D WITH ADVANCE STEEL BASED ON AUTOCAD FROM AUTOCAD TO ADVANCE STEEL 2 CONTENTS 1 2 3 LEVERAGE YOUR AUTOCAD INVESTMENT WITH DEDICATED TOOLS FOR STRUCTURAL
More informationWHITE PAPER. Integrated Design and Production Planning for Ship Block Assembly and Construction
WHITE PAPER Integrated Design and Production Planning for Ship Block Assembly and Construction Contents 1. Summary... 1 1.1. Nomenclature... 2 2. Introduction... 3 3. Key Considerations in Ship-block Production
More informationAbout us. A proudly Western Australian owned Services company, SMS Group offers a full range of services including:
About us Scaffolding Management Services was formed by the Welsh family in Western Australia in 2001. Since then, SMS has rapidly expanded to deliver a range of services to the commercial, industrial and
More informationVICTAULIC VIRTUAL DESIGN
VICTAULIC VIRTUAL DESIGN AND CONSTRUCTION ESTIMATING, BIM, AND SOFTWARE SOLUTIONS FOR THE COMMERCIAL, INDUSTRIAL AND PIPELINE CONSTRUCTION BUSINESS SM FASTER FROM THE START VICTAULIC VIRTUAL DESIGN AND
More informationProjectWise Construction Work Package Server. Enjoy More Predictable and Consistent Construction by Implementing Industry-standard Processes
ProjectWise Construction Work Package Server Enjoy More Predictable and Consistent Construction by Implementing Industry-standard Processes ProjectWise Construction Work Package Server will assist the
More informationDesign to Production for the Air Warfare Destroyer
Design to Production for the Air Warfare Destroyer J.A Carr Air Warfare Destroyer Alliance jim.carr@ausawd.com INTRODUCTION The Air Warfare Destroyer (AWD) Program is executed by the AWD Alliance consisting
More informationYARDS AHEAD THE REQUIREMENTS OF FUTURE YARD MANAGEMENT TECHNOLOGY
YARDS AHEAD THE REQUIREMENTS OF FUTURE YARD MANAGEMENT TECHNOLOGY Back to basics the wider impacts on technology Some of the wider considerations for yard management innovation Many types of yard: Many
More informationMapping and Surveying. Reality Modeling for Going Digital Strategy
IMAGE COURTESY OF IMAO Mapping and Surveying Reality Modeling for Going Digital Strategy Reality modeling makes mapping and surveying faster and safer. Reality modeling is the process of capturing existing
More information3D BIM - Virtual Design and Construction Gehry Technologies Experience
3D BIM - Virtual Design and Construction Gehry Technologies Experience Martin Riese OAA AIA - Director GT Asia, Hong Kong e-mail: martin.riese@gtasia.cn David Peake BE MBA Engineering Technology Consultant,
More informationSmartPlant Spoolgen for Fabrication and Construction
WHITE PAPER SmartPlant Spoolgen for Fabrication and Construction Fast and Accurate Spool and Erection Isometrics Contents 1. Introduction... 1 1.1. For the Owner Operator... 2 1.2. For the EPC... 2 1.3.
More informationA Guide to the Last Planner for Construction Foremen and Supervisors Gregory A. Howell, P.E.
A Guide to the Last Planner for Construction Foremen and Supervisors Gregory A. Howell, P.E. Last Planners prepare assignments for people who do work. Last Planners can be found throughout construction
More informationSIMUL8-PLANNER FOR COMPOSITES MANUFACTURING
Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. SIMUL8-PLANNER FOR COMPOSITES MANUFACTURING Kim Hindle Project
More informationImprove revenue Drive performance Optimise project team. Visit envisionapp.com
Improve revenue Drive performance Optimise project team Visit envisionapp.com 1 2 Envision has provided accurate real-time reporting that has enabled fast and effective decision-making that has led to
More informationGetting Started on your Structural Project
BIM Pilot Guide Getting Started on your Structural Project What is BIM? Framework for implementing a BIM pilot project BIM vision Driven BIM leadership Getting started with your BIM pilot project Moving
More informationEmergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking
Emergent models in integration Emergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking A substantially Building information
More informationIdentification Selection Definition Execution. Schedule.
SCHEDULE DEVELOPMENT Schedule development is the identification, definition and sequencing of activities that are required to be performed for successful completion of the project scope. Identification
More informationBolting it all together
Bolting it all together How integrating structural steel detailing with plant or offshore layout design reduces project cost, risk and delivery time An AVEVA Business Paper AVEVA Solutions Limited Published
More informationWHY IS THE ROI FROM LEAN CONSTRUCTION TRAINING SO COMPELLING?
WHY IS THE ROI FROM LEAN CONSTRUCTION TRAINING SO COMPELLING? DPS Engineering & Leading Edge Group Presentation Overview Why is the ROI from Lean Construction Training so Compelling? Lean in DPS Engineering
More informationSmart TM Yard and Smart TM Production. Arne Monsholm Vice President Business Development
Smart TM Yard and Smart TM Production Arne Monsholm Vice President Business Development HEXAGON Geosystems Metrology 15,000+ people 3B revenue 3,200 active patents Intergraph Process, Power & Marine 2200
More informationIntergraph Smart Yard
W H I T E P A P E R Intergraph Smart Yard Integrated Design and Production Planning for Smart Modular Assemblies and Smart Production Contents 1. Summary... 1 1.1. Nomenclature... 2 2. Introduction...
More informationLONG INTERNATIONAL. Long International, Inc Skytrail Drive Littleton, Colorado USA Telephone: (303) Fax: (303)
Sean P. Pellegrino, P.E. LONG INTERNATIONAL Long International, Inc. 5265 Skytrail Drive Littleton, Colorado 80123-1566 USA Telephone: (303) 972-2443 Fax: (303) 200-7180 www.long-intl.com Sean P. Pellegrino,
More informationTekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS
Tekla Structures for Precast Concrete Industry Model, Fabricate and Erect all Precast Structures Faster and with Better Quality Working with the constructible Tekla models minimizes costly surprises and
More informationDoing things differently to deliver genuine efficiency.
Doing things differently to deliver genuine efficiency. Removing complexity. Maximising efficiency Transforming to a new way of working Industry challenges, and a rising cost base, has exerted significant
More informationImprove Quality with PMI
Improve Quality with PMI Siemens PLM Connection 2016 Orlando, FL May 16-19 www.plmworld.org #PLMCONX Challenges Cost of Quality External Failure Costs Internal Failure Costs Assurance Costs Prevention
More informationSupply chain management theory, NQF level 6, Credits 10
SUPPLY CHAIN MANAGER Knowledge modules 132401-001-01-00 KM-01 Supply chain theory, NQF level 6, Credits 10 132401-001-01-00 KM-02 Supply chain service delivery operational planning, NQF level 6, Credits
More informationPrinciples of Planning for Building and. by Eastwood Harris Pty Ltd. Introduction Emergency Evacuation. Course Outline.
Principles of Planning for Building and Construction by Eastwood Harris Pty Ltd Introduction Emergency Evacuation Timings Meals Mobile Phones Conduct of course Introductions: Your name Position Experience
More informationModularization in Total Systems Integration. Rudi Roeslein May 11, 2015
Modularization in Total Systems Integration Rudi Roeslein May 11, 2015 Agenda Overview Understanding Conventional vs. Modular Unitizing & Pre-Assembly Reference Projects Review of Values and Benefits Schedule
More informationBuilding Foreman s Workface Packages. WFP Conference 2010 Calgary, Alberta December 1, 2010
Building Foreman s Workface Packages WFP Conference 2010 Calgary, Alberta December 1, 2010 Introduction to FIWP Planning Plan the Work Release the Work Work the Plan Dedicated Planner Supervisor Materials
More informationEmerson Digital Twin: A Key Technology for Digital Transformation
Emerson Digital Twin: A Key Technology for Digital Transformation Introduction As decision-makers in the process industry embrace Digital Transformation to improve visibility over their businesses, to
More informationVEIL of OPPORTUNITY AND/OR VEIL of CONFUSION. Presented by: Carmine Militano, P.Eng. Senior VP Business Development and Innovation December 10, 2014
VEIL of OPPORTUNITY AND/OR VEIL of CONFUSION Presented by: Carmine Militano, P.Eng. Senior VP Business Development and Innovation December 10, 2014 The A/E/C industry is being transformed through a number
More informationSTREAMLINE YOUR WORKFLOW TO INCREASE EFFICIENCY
W H I T E P A P E R STREAMLINE YOUR WORKFLOW TO INCREASE EFFICIENCY Copyright 2017, PartsSource. All Rights Reserved. The 5 Step Solution Streamlining the Overall Procurement Process Streamline Your Workflow
More informationBIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated
BIM for infrastructure, Paul King 1 WWW.BENTLEY.COM 2016 Bentley Systems 2016 Bentley Systems, Incorporated 3D infrastructure pic Bentley one! - green Role of the owner Defining better business outcomes
More informationSiemens PLM Software. NX for shipbuilding. An integrated environment for design, planning and manufacturing. siemens.com/nx
Siemens PLM Software NX for shipbuilding An integrated environment for design, planning and manufacturing siemens.com/nx 2 Shipbuilders are being called upon to improve their designs to be more energy-efficient,
More informationQuality Assurance When Outsourcing: Risk Management to Ensure Quality of Overseas Engineering and Fabrication
Quality Assurance When Outsourcing: Risk Management to Ensure Quality of Overseas Engineering and Fabrication Classification: Internal 2011-04-04 CANADIAN INSTITUTE ENERGY GROUP S 3RD ANNUAL CONFERENCE
More informationA. POSITION DESCRIPTION
A. POSITION DESCRIPTION Position: Terminal Yard Planner Responsible to: Terminal Supervisor Responsible for: Nil Purpose: Managing the day-to-day planning and coordination of container movements to and
More informationAutodesk BIM solutions for construction. Get started >
Autodesk BIM solutions for construction Get started > Introduction Today s successful construction firms are adopting new practices that help them improve all areas of their business and create a competitive
More informationPMP Exam Preparation Course Project Time Management
Project Time Management 1 Project Time Management Processes Define Activities Sequence Activities Estimate Activity Resources Estimate Activity duration Develop Schedule Control Schedule In some projects,
More informationTHE INTELLIGENT APPROACH TO ADF MANAGEMENT
THE INTELLIGENT APPROACH TO ADF MANAGEMENT Producing and delivering high integrity customer communications Pitney Bowes Offers ADF Solutions to Improve Your Mailstream in Four Important Areas: Compliance
More informationProject Time Management
Project Time Management Project Time Management Project Time Management includes the processes required to manage timely completion of the project. Plan schedule management The process of establishing
More informationBIM Pilot Getting Started Guide. next
BIM Pilot Getting Started Guide What is BIM? Framework for implementing a BIM pilot project Driven BIM leadership Getting started with your BIM pilot project Moving to BIM can seem like a daunting task.
More informationLeveraging C3D to Ensure Compliance of Site Execution Teams
Leveraging C3D to Ensure Compliance of Site Execution Teams Speaker Introduction AMR EL-SERSY Current: VP Marketing and Consulting Services (CCT) Group Manager Learning and Innovation (CCC) Past: Deputy
More informationPROJECT TIME PLANNING. Process and Bar Chart Technique
PROJECT TIME PLANNING Process and Bar Chart Technique Definition of Planning Planning is the process of thinking systematically about the future in order to decide what our goals are, and how we are going
More informationRethinking the way personal computers are deployed in your organization
IBM Global Technology Services August 2009 Rethinking the way personal computers are deployed in your organization Leveraging an innovative, end-to-end model to save time and reduce costs 2 IBM Global
More information20/02/2016. The BIM Hub. A trusted environment for BIM professionals. Why BIM? Why BIM? We need a more Sustainable Model of Building Procurement
BENEFIT 20/02/2016 The BIM Hub A trusted environment for BIM professionals The I in BIM Why BIM? What is BIM? Benefits of BIM? BIM for Product Manufacturers thebimhub and Cadenas Why BIM? We need a more
More informationMining & Metals - EPCM
www.beca.com Mining & Metals - EPCM We make things happen. Problem-solvers with a passion for transforming our world. Beca Mining & Metals Beca is a leading provider in the mining and metals market across
More informationVirtual Design and Construction in Support of Construction Engineering
Virtual Design and Construction in Support of Construction Engineering Martin Fischer Professor, Civil and Environmental Engineering Director, Center for Integrated Facility Engineering (CIFE) http://www.stanford.edu/~fischer
More informationTHE ROYAL INSTITUTION OF NAVAL ARCHITECTS
THE ROYAL INSTITUTION OF NAVAL ARCHITECTS IMPROVING SUPERYACHTS DEVELOPMENT PROCESSES WITH AN INTEGRATED SOLUTION OF PRODUCT LIFECYCLE MANAGEMENT (PLM) F Mathieu, Dassault Systemes, France SUMMARY Product
More informationMATERIAL VISIBILITY. for Owners/Operators: The Importance of A CASE STUDY
The Importance of MATERIAL VISIBILITY for Owners/Operators: A CASE STUDY Canadian Oil Sands Refinery project owner gains unprecedented material visibility across multiple contractors INTRODUCTION ABOUT
More informationVolume 18 Number 11 - November 2018 ADVANCED, FAST, AND TRUSTED SOLUTION
Volume 18 Number 11 - November 2018 ADVANCED, FAST, AND TRUSTED SOLUTION Steve Slusarenko, ProStar Geocorp Inc., USA, and Layne Tucker, EchoRFID LLC, USA, explain why RFID is a critical technology for
More informationThe Project Confidence Book. Eight best practices for driving project confidence
The Project Confidence Book Eight best practices for driving project confidence With $57 trillion in spend expected by 2030, the capital project industries remain challenged to deliver projects on time
More informationGARRETT J. BROWN. EDUCATION M.B.A. Program (partially complete), Regis University, 2002 B.S., Civil Engineering, Washington State University, 1994
GARRETT J. BROWN Mr. Brown is an Executive Consultant for Long International and has 20 years of progressive work experience related to various aspects of engineering, procurement, and construction. Key
More informationCollaborative Design and Scoping. CH2M s practice of Target Value Design
Collaborative Design and Scoping CH2M s practice of Target Value Design Agenda Purpose of the Collaborative Design and Scoping Process How does the CDS relate to Target Value Delivery? CDS outcome: the
More informationMODULE CAPABILITY GUIDE
MODULE CAPABILITY GUIDE powered by AX Foundation & Supply Chain Produce Dimensions Manage product through utilisation of produce dimensions for different produce types and dimension groups, such as, produce
More informationSoftware project management. ITNP090 Object Oriented Software Design. Management activities. Software Management Challenges
Software project management ITNP090 Object Oriented Software Design Dr Andrea Bracciali Module Co-ordinator 4B86 abb@cs.stir.ac.uk Concerned with activities involved in ensuring that software is delivered
More informationTough business in rough water Offshore Technology. Complete Drive and Control Solutions
Tough business in rough water Offshore Technology Complete Drive and Control Solutions 210 High tech in a rough industry As an example, technology used in 6 DOF-motion systems to train pilots, or used
More informationAchieving Balance: The New Pivotal Points of Software Development
White Paper Software Delivery & Testing Achieving Balance: The New Pivotal Points of Software Development A rational model of software is to design it quickly; the economic pressure to improvise presents
More informationINTEGRATED FLOOR SYSTEM
INTEGRATED FLOOR SYSTEM Improving the design and construction management of control rooms July 6 th, 2017 Belgioioso, Italy 1.0 Our Company 2.0 Hilti Energy & Industry 3.0 Integrated System Business 4.0
More informationAdvancements in ERP for FMCG
Advancements in ERP for FMCG Introduction Prior to a discussion of the advancements in Enterprise Resource Planning (ERP) for the Fast Moving Consumer Goods (FMCG) industry, it is important to first take
More informationDigitising house building
Digitising house building Introductions Adrian Wild, Founder and MD of HBXL group Previously builder and developer for 20+ years Built 80 new homes and 300 extensions/conversions Developed first estimating
More informationAccess Orchestrate
0845 345 3300 orchestrate.info@theaccessgroup.com www.theaccessgroup.com/orchestrate Access Orchestrate Advanced planning and scheduling software to optimise your factory; improving productivity, fulfilment
More informationIntegrated Planning The Sasol Oil Journey BACKGROUND LENUSHKA NAIDOO
Integrated Planning The Sasol Oil Journey LENUSHKA NAIDOO BACKGROUND Historically, the portfolio of work for the planning function in Sasol Oil spanned production planning and high-level supply and demand
More informationOPERATIONS & MAINTENANCE IN THE GULF COAST YOUR INTEGRATED MAINTENANCE, MODIFICATION & ASSET INTEGRITY PARTNER
OPERATIONS & MAINTENANCE IN THE GULF COAST YOUR INTEGRATED MAINTENANCE, MODIFICATION & ASSET INTEGRITY PARTNER FLUOR & STORK A COMBINED FORCE By combining the forces of Fluor and Stork, we support clients
More informationWater Technologies. Omnipac Field-Erected SBR Package Plants
Water Technologies Omnipac Field-Erected SBR Package Plants Synergy happens when two inputs exceed the sum of their total. And that s what the OMNIFLO SBR process and Davco package plant technologies do
More informationBIM Event. Martin Huggins Senior R&D Consultant University of Wolverhampton. Black Country Constructing Excellence Club
Black Country Constructing Excellence Club BIM Event Martin Huggins Senior R&D Consultant University of Wolverhampton Why Needed? 30% of construction is rework 60% of labour effort is wasted 10% loss due
More informationInformation Technology in the Reinforcement Supply Chain
Information Technology in the Reinforcement Supply Chain 1.0 Introduction Designers, detailers, engineers, contractors, fabricators and reinforcement producers are recognising the benefits of exchanging
More informationSmartPlant Materials Handling
SmartPlant Materials Handling Intergraph Australia 2008 15-19 September 2008 Global Outlook - Commodities Iron Ore Aluminium & Alumina Metallurgical Nickel Coal Thermal Coal Copper Source: Deutsche Bank,Research,
More informationSoftware Engineering
Software Engineering Project Management 1 Objectives To explain the main tasks undertaken by project managers To introduce software project management and to describe its distinctive characteristics To
More information