1 Level 2 Technical Certificate in Plastering March 2016 Version 1.0 Qualification Handbook

2 Contents Contents 2 1 Introduction 3 2 Assessment 6 3 Units 7 Unit 201 Principles of construction 8 Unit 202 Internal plastering and fixing sheet materials 16 Unit 203 Applying external plain rendering 21 Unit 204 Floor screed systems 26 Unit 205 Direct bond, taping and jointing 32 Unit 206 Producing, fixing and finishing plain plaster mouldings to match existing 38 Unit 207 Installing linings and encasement systems 46 Unit 208 Installing metal furring ceiling systems 51 Unit 209 Installing metal stud partitioning systems 56

3 1 Introduction What is this qualification about? The following purpose is for the Level 2 Technical Certificate in Plastering. Area Who is this qualification for? Description This qualification is for you if you wish to work as a plasterer in the construction industry. While there are no formal entry requirements, it is recommended learners have either completed the Level 1 qualification or have prior knowledge and skills at Level 1 in Plastering. What does the qualification cover? This qualification is suitable for you if you are 16 years old or over. This qualification covers a wide range of skills and knowledge required for preparing to work in the construction industry. You will have the opportunity to specialise in solid plastering, fibrous plastering or dry lining. The following topics are covered within this qualification: health, safety and welfare in construction principles of building construction, information and communication applying plastering materials to interiors. The optional topics you will cover for the solid pathway include: laying floor screed systems installing direct bond and taping and jointing applying plastering materials to external backgrounds. The optional topics you will cover for the fibrous pathway include: producing reverse moulds constructing running moulds repairing damaged fibrous plasterwork. The optional topics you will cover for the dry lining pathway include: fixing and finishing lining systems installing metal furring ceilings fixing metal stud partitioning systems. City & Guilds Level 2 Technical Certificate in Plastering ( ) 3

4 What opportunities for progression are there? Will this qualification lead to further learning? Who did we develop the qualification with? This qualification could lead to a job as a solid or fibrous plasterer or a dry liner, working for a house-building company, a property development company, or work as part of a small business repairing and refurbishing buildings. This qualification could also lead to an apprenticeship or traineeship in plastering or dry lining. You could progress onto any of the following qualifications: Level 3 Advanced Technical Diploma in Plastering (450) Level 3 NVQ Diploma in Plastering (Construction) Solid Level 3 NVQ Diploma in Plastering (Construction) Fibrous Level 3 NVQ Diploma in Occupational Work Supervision (Construction). City & Guilds developed this qualification with employers currently working in the plastering and dry lining industry and tutors currently teaching plastering and dry lining at colleges/training providers. 4 City & Guilds Level 2 Technical Certificate in Plastering ( )

5 Structure To achieve the City & Guilds Level 2 Technical Certificate in Plastering learners must achieve two mandatory units plus three units from pathway A or one unit from pathway B or three units from pathway C. City & Guilds Level 2 Technical Certificate in Plastering UAN Mandatory Pathway A (Solid) Pathway B (Fibrous) Pathway C (Dry lining) City & Guilds unit number Unit title GLH 201 Principles of construction Internal plastering and fixing sheet materials Applying external plain rendering Floor screed systems Direct bond, taping and jointing Producing, fixing and finishing plain plaster mouldings to match existing Installing linings and encasement systems Installing metal furring ceiling systems Installing metal stud partitioning systems 60 Total GLH 360 City & Guilds Level 2 Technical Certificate in Plastering ( ) 5

6 2 Assessment Summary of assessment methods Learners must: successfully complete the following two assessments for the pathway they choose. Assessment types Assessment methods External exam Synoptic assignment Description/conditions Unit reference Where to obtain assessment materials This assessment is externally set and externally marked. The test is designed to assess learner s knowledge and understanding across the qualification at the end of the period of learning. This assessment is externally set, internally marked and is subject to external moderation. All mandatory units and all units from one of the following pathways: A (solid) B (fibrous) C (dry lining). All mandatory units and all units from one of the following pathways: A (solid) B (fibrous) C (dry lining). TBC TBC Contribution of assessment towards overall qualification achievement grade Assessment method Grade profile % contribution External exam U/P/M/D 40% Synoptic assignment U/P/M/D 60% 6 City & Guilds Level 2 Technical Certificate in Plastering ( )

7 3 Units Availability of units The following units can also be obtained from the Register of Regulated qualifications: Structure of units These units each have the following: City & Guilds reference number unit accreditation number (UAN) title level guided learning hours purpose of the unit learning outcomes which are comprised of a number of topics guidance for delivery. City & Guilds Level 2 Technical Certificate in Plastering ( ) 7

8 Unit 201 Principles of construction UAN: Level: 2 GLH: 60 What is this unit about? The aim of this unit is to introduce learners to the construction industry and to give a wider context to the trade area they are studying, as construction is a vital part of the economy and plays an important role in all our lives. Learners will discover that this sector can be very rewarding and that there are opportunities for career progression. This unit provides learners with an understanding of the principles of construction, building technology and terminology used. This unit also covers various pieces of legislation, including health and safety, planning and building control. Learners can be introduced to this unit by asking themselves questions, such as: 1. How are materials and components used in construction? 2. How are work areas set up and organised through to completion? 3. What types of career progression opportunities are available in the construction industry? 4. Who needs to communicate throughout a construction project? Learning outcomes In this unit, learners will be able to: 1. Understand how to work in the construction industry 2. Understand construction information 3. Understand how to set up and secure work areas 4. Understand building substructure 5. Understand building superstructure. 8 City & Guilds Level 2 Technical Certificate in Plastering ( )

9 Learning outcome: 1. Understand how to work in the construction industry 1.1 Range of construction work 1.2 Building team 1.3 Team communication Topic 1.1 Range of construction work: new build renovation maintenance restoration domestic commercial industrial. Organisations that contribute to the construction process: building contractors manufacturers suppliers local authorities legislative bodies. Topic 1.2 Members of the building team and their roles: professional craft operatives. Career opportunities that exist in the construction industry: progression routes continuing professional development (CPD)/qualifications. Topic 1.3 Key personnel involved in day to day communication: site managers supervisors fellow operatives clients. Additional parties involved in wider communication: architects Health and Safety Executive local authorities local residents registered building control Construction (Design and Management) (CDM) co-ordinator City & Guilds Level 2 Technical Certificate in Plastering ( ) 9

10 environmental bodies other trade areas. Methods of communication: written verbal. Learning outcome: 2. Understand construction information 2.1 Building control 2.2 Construction documentation 2.3 Technical drawings 2.4 Health and Safety legislation Topic 2.1 Regulations that control construction process: planning permission building regulations health and safety law quality and standards. Topic 2.2 Construction documentation: specifications drawings schedules bill of quantities programme of works Building Information Modelling (BIM). Topic 2.3 Methods of drawing: hand Computer Aided Design (CAD). Types of drawing: orthographic projection isometric projection. Drawing information: scale symbols and hatchings. 10 City & Guilds Level 2 Technical Certificate in Plastering ( )

11 Topic 2.4 Health and safety legislation: Health and Safety at Work Act (HASAWA) Reporting Injuries, Diseases and Dangerous Occurrences Regulations (RIDDOR) Control of Substances Hazardous to Health (COSHH) Construction (Design and Management)(CDM)regulations Provision and Use of Work Equipment Regulations (PUWER) Manual Handling Operations Regulations Personal Protective Equipment (PPE) at Work Regulations Work at Height Regulations Control of Noise at Work Regulations. Learning outcome: 3. Understand how to set up and secure work areas 3.1 Planning 3.2 Welfare 3.3 Security Topic 3.1 Importance of the following areas on planning: material deliveries material storage neighbouring properties noise considerations parking waste management/recycling protection to the natural environment access/egress plant. Topic 3.2 Areas of welfare: toilets washing facilities storage of personal items canteen drying room. Topic 3.3 Protection of work areas considering: the public materials tools and equipment. City & Guilds Level 2 Technical Certificate in Plastering ( ) 11

12 Learning outcome: 4. Understand building substructure 4.1 Substructure 4.2 Building services Topic 4.1 Types and purposes of foundations: pad pile raft strip. Range and characteristics of materials: brick block steel concrete Damp Proof Course (DPC)/Damp Proof Membrane (DPM) insulation. Topic 4.2 Types of services: electricity gas water drainage (surface and foul) communication networks. Learning outcome: 5. Understand building superstructure 5.1 Walls 5.2 Floors 5.3 Roofs 5.4 Finishes 5.5 Building elements Topic 5.1 Types of walls and their components: solid cavity timber frame partitions. 12 City & Guilds Level 2 Technical Certificate in Plastering ( )

13 Types of materials: brick block stone timber metal stud. Topic 5.2 Types of floors: solid suspended. Types of materials: block concrete timber steel reinforcement insulation DPM Screed. Topic 5.3 Types of roofs and their components: pitched o traditional hand cut o trussed flat. Types of materials: timber lead slate tile felt sheet other synthetic systems. Topic 5.4 Types of internal finishes: paint systems paper coverings plaster dry lining tiling. Types of external finishes: paint systems rendering systems coatings external wall insulation (EWI) City & Guilds Level 2 Technical Certificate in Plastering ( ) 13

14 cladding. Topic 5.5 Building elements: first fix o partitions o external door and window frames o internal door lining o stairs o services second fix o finishings o doors o kitchen units o sanitary ware. 14 City & Guilds Level 2 Technical Certificate in Plastering ( )

15 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Because this unit has a broad content, tutors should consider utilising the skills and expertise of relevant trade areas to support delivery. Teaching and learning strategies must help learners to develop a clear and simple understanding of how the construction industry functions. This can be done by examining the industry from a variety of perspectives, breaking the knowledge down into bite-sized pieces and then asking the learners to work out how they fit together to form a united whole. This should be based on real-life case studies. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. Learning Outcome 2: An in-depth knowledge of the content of the building regulations (2.1) and health and safety (2.4) is not a requirement at this stage. Learning Outcome 5: Learners do not need to have an in depth knowledge of each type of wall (5.1), floor (5.2) and roof (5.3) construction and their components. Sustainability and the environmental impact of the materials used should be considered during teaching delivery. City & Guilds Level 2 Technical Certificate in Plastering ( ) 15

16 Unit 202 Internal plastering and fixing sheet materials UAN: Level: 2 GLH: 120 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to prepare and finish internal ceilings and walls within buildings. Learners will use a selection of sheet materials, preformed beads, backing and finishing plasters. The unit will provide learners with skills and understanding of how to plan, select resources and apply plasters and sheet materials in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the plastering process. Learners can be introduced to this unit by asking themselves questions, such as: 1. What is the difference between modern and traditional plasters? 2. What is performance plasterboard? 3. What type of backgrounds will I come across in buildings? 4. Why are preformed beads used today? Learning outcomes In this unit, learners will be able to 1. Plan for internal plastering work 2. Prepare background surfaces for internal plastering 3. Apply plasters and sheet materials. 16 City & Guilds Level 2 Technical Certificate in Plastering ( )

17 Learning outcome: 1. Plan for internal plastering work 1.1 Information sources 1.2 Calculate quantities Topic 1.1 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations. Topic 1.2 Calculations: area volume linear measurements ratios allowance for waste (percentages) costs o materials o labour. Learning outcome: 2. Prepare background surfaces for internal plastering 2.1 Backgrounds 2.2 Tools and equipment 2.3 Prepare surfaces Topic 2.1 Characteristics of backgrounds: types high suction/low suction condition strength compatibility. Topic 2.2 Uses of tools and equipment: hand tools power tools City & Guilds Level 2 Technical Certificate in Plastering ( ) 17

18 equipment. Topic 2.3 Protect surfaces: windows and doors floors and walls fixtures and fixings. Methods of preparing solid and over skim surfaces: mechanical o hand o machine chemical o powder o liquid. Methods of preparing old lath/plasterboard surfaces: timber joist/stud overboarding. Effects of incorrect disposal of waste: dust blocking drains contamination. Learning outcome: 3. Apply plasters and sheet materials 3.1 Tools and equipment 3.2 Fix sheet materials 3.3 Mix materials 3.4 Apply plasters Topic 3.1 Uses of tools and equipment: hand tools power tools equipment. Topic 3.2 Types of plasterboards: Fixings: types standard boards performance boards. 18 City & Guilds Level 2 Technical Certificate in Plastering ( )

19 sizes. Methods of fixing: single double staggered. Topic 3.3 Methods of traditional and modern undercoats and finishing plasters: premixed plasters site mixed lime or cement based mortars factory batched lime or cement based mortars. Considerations when mixing: mixing area storage consistency contamination shelf life extraction and ventilation. Topic 3.4 Accessories: beads o fixing locations o lining, squaring and jointing o methods of fixing reinforcements. Forming hard angles: reveals soffits returns. Applying and finishing: scratch, float and set board and set hard angle arris cleanliness. Defects and problem solving: defective materials poor workmanship. City & Guilds Level 2 Technical Certificate in Plastering ( ) 19

20 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to apply plasters and sheet materials will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. 20 City & Guilds Level 2 Technical Certificate in Plastering ( )

21 Unit 203 Applying external plain rendering UAN: Level: 2 GLH: 90 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to prepare, apply and finish external plain rendering. The unit will provide learners with the skills and understanding of how to plan, select resources and apply external plain rendering in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the plastering process. Learners who have completed this unit can progress onto more complex render finishes. Learners can be introduced to this unit by asking themselves questions, such as: 1. What is the purpose of rendering buildings? 2. What types of surfaces can you apply external render to? 3. Can you get coloured renders? 4. How does weather affect applying external render? Learning outcomes In this unit, learners will be able to 1. Plan for external plain rendering 2. Prepare background surfaces for external plain rendering 3. Apply external plain rendering. City & Guilds Level 2 Technical Certificate in Plastering ( ) 21

22 Learning outcome: 1. Plan for external plain rendering 1.1 Information sources 1.2 Calculating quantities 1.3 Analyse for external plain rendering Topic 1.1 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations. Topic 1.2 Calculations: area volume linear measurements ratios allowance for waste (percentages) costs o materials o labour. Topic 1.3 Considerations: types of access services protection of work area. Learning outcome: 2. Prepare background surfaces for external plain rendering 2.1 Backgrounds 2.2 Tools and equipment 2.3 Prepare surfaces Topic 2.1 Characteristics of backgrounds: types high suction/low suction 22 City & Guilds Level 2 Technical Certificate in Plastering ( )

23 condition strength compatibility. Topic 2.2 Uses of tools and equipment: hand tools power tools equipment. Topic 2.3 Protect surfaces: surrounding areas services windows and doors. Methods of preparing solid surfaces: mechanical o hand o machine chemical o powder o liquid. Effects of incorrect disposal of waste: dust blocking drains contamination. Learning outcome: 3. Apply external plain rendering 3.1 Tools and equipment 3.2 Mix materials 3.3 Apply render Topic 3.1 Uses of tools and equipment: hand tools power tools equipment. Topic 3.2 Mixing traditional and modern backing and finishing renders: City & Guilds Level 2 Technical Certificate in Plastering ( ) 23

24 premixed renders site mixed lime or cement based renders factory batched lime or cement based renders. Considerations when mixing: mixing area storage consistency contamination shelf life. Topic 3.3 Accessories: beads o fixing locations o lining, squaring and jointing o methods of fixing reinforcements. Forming hard angles: reveals soffits returns bell casts. Applying and finishing render: scratch/backing coats floating coat hard angle arris cleanliness. Defects and problem solving: defective materials poor workmanship. 24 City & Guilds Level 2 Technical Certificate in Plastering ( )

25 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to apply external plain rendering will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. City & Guilds Level 2 Technical Certificate in Plastering ( ) 25

26 Unit 204 Floor screed systems UAN: Level: 2 GLH: 30 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to lay floor screed systems to levels and falls. The unit will provide learners with the skills and understanding of how to plan, select resources and finish floor screeds in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the plastering process. Learners can be introduced to this unit by asking themselves questions, such as: 1. What is the difference between modern and traditional floor screed systems? 2. How is a floor screed laid and levelled? 3. Can you lay a semi-dry floor screed over underfloor heating? 4. Why is a solid floor screed mixed semi-dry? Learning outcomes In this unit, learners will be able to: 1. Plan for laying floor screed systems 2. Prepare surfaces for floor screeds 3. Lay floor screed systems. 26 City & Guilds Level 2 Technical Certificate in Plastering ( )

27 Learning outcome: 1. Plan for laying floor screed systems 1.1 Information sources 1.2 Calculate quantities 1.3 Analyse for floor screed systems Topic 1.1 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations. Topic 1.2 Calculations: area volume linear measurements ratios for mixes allowance for waste (percentages) costs o materials o labour. Topic 1.3 Considerations: existing floor levels new floor levels thickness of screeds type of screeds reinforcements thermal performance protection of work area and finished floor. Learning outcome: 2. Prepare surfaces for floor screeds 2.1 Surfaces 2.2 Floor screed systems 2.3 Tools and equipment 2.4 Prepare surfaces City & Guilds Level 2 Technical Certificate in Plastering ( ) 27

28 Topic 2.1 Types of surfaces: concrete rigid insulation block and beam. Topic 2.2 Types of floor screed systems: un-bonded bonded monolithic separate under floor liquid. Topic 2.3 Uses of tools and equipment: hand tools power tools equipment. Topic 2.4 Protection: access and door linings gullies and outlets. Methods of preparing surfaces for floor screeds: mechanical key o hacking laitance o scabbling smooth surfaces o brushing newly laid concrete surface chemical o primers o cement grout o bonding agents o bitumen. Effects of incorrect disposal of waste: dust blocking drains contamination. 28 City & Guilds Level 2 Technical Certificate in Plastering ( )

29 Learning outcome: 3. Lay floor screed systems 3.1 Tools and equipment 3.2 Mix materials 3.3 Lay floor screed systems Topic 3.1 Uses of tools and equipment: hand tools power tools equipment. Topic 3.2 Mixing traditional and modern materials for floor screed systems: on site mechanical and hand/pump factory batched. Reinforcements for the mix: fibres stainless steel mesh. Considerations when mixing: mixing area consistency. Topic 3.3 Methods of setting out, laying and finishing floor screed systems: setting out from datums o transferring datums o setting levels o setting falls to outlets o expansion strips o levelling gauges methods of laying floors systems o timber dots o timber battens o free hand perimeter screeds o day work joints methods of finishing o consolidated o ruled o floated o troweled o cured. Defects and problem solving: City & Guilds Level 2 Technical Certificate in Plastering ( ) 29

30 considerations for patch work making good to defective floor surfaces o prepare o key o replace o finish. 30 City & Guilds Level 2 Technical Certificate in Plastering ( )

31 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to lay floor screed systems will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. City & Guilds Level 2 Technical Certificate in Plastering ( ) 31

32 Unit 205 Direct bond, taping and jointing UAN: Level: 2 GLH: 60 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to install wall boards using direct bond. Learners will also learn how to tape and joint surfaces. The unit will provide learners with skills and understanding of how to plan, select resources, install direct bond and apply jointing materials in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the plastering process. Learners can be introduced to this unit by asking themselves questions, such as: 1. Can direct bond surfaces receive plaster finish or taping and jointing? 2. What is the benefit of direct bond over solid plastering application? 3. Will direct bond increase performance levels of old and new walls? 4. Why are window cills and door linings wider when using direct bond? 5. Can plasterboard surfaces receive paint and wallpaper finishes? Learning outcomes In this unit, learners will be able to 1. Plan for installing direct bond 2. Install wall boards 3. Select and apply jointing materials. 32 City & Guilds Level 2 Technical Certificate in Plastering ( )

33 Learning outcome: 1. Plan for installing direct bond 1.1 Information sources 1.2 Calculate quantities 1.3 Analyse for direct bond 1.4 Backgrounds 1.5 Tools and equipment Topic 1.1 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations. Topic 1.2 Calculations: area volume linear measurements allowance for waste (percentages) costs o materials o labour. Topic 1.3 Considerations: width of internal door linings window and door profile depths services preparing party walls thermal performance protection of work area. Topic 1.4 Type of surfaces: solid masonry solid painted parge coated. Topic 1.5 Uses of tools and equipment: hand tools power tools equipment. City & Guilds Level 2 Technical Certificate in Plastering ( ) 33

34 Learning outcome: 2. Install wall boards 2.1 Tools and equipment 2.2 Set out and mix materials 2.3 Install wall boards Topic 2.1 Uses of tools and equipment: hand tools power tools equipment. Topic 2.2 Types and sizes of plasterboards: standard boards performance boards. Types of fixings: dry wall premixed compound mastic adhesive fixing foam fixing mechanical fixing. Methods of setting out: plain walls window walls soffits reveals returns stairwell walls. Considerations when mixing: mixing area storage consistency contamination shelf life extraction and ventilation. Topic 2.3 Preparing for direct bond: sound proofing party walls 34 City & Guilds Level 2 Technical Certificate in Plastering ( )

35 checking evenness and straightness of backgrounds applying perimeter seals to avoid air movement between adjoining rooms and floors lifts/levels. Installing direct bond: setting out and marking for vertical wall boards positioning of dabs plumbing levelling squaring. Effects of incorrect disposal of waste: dust blocking drains contamination. Learning outcome: 3. Select and apply jointing materials 3.1 Tools and equipment 3.2 Mix, apply and finish Topic 3.1 Uses of tools and equipment: hand tools power tools equipment. Topic 3.2 Taping and finishing joints: straight internal external fixing points sanding priming and sealing. Materials: premixed ready mixed reinforcements o reinforced/paper tape o self-adhesive scrim o dry wall beads. City & Guilds Level 2 Technical Certificate in Plastering ( ) 35

36 Considerations when mixing and finishing: mixing area consistency contamination extraction and ventilation. Defects and problem solving defective materials poor workmanship making good on repairs to direct bond making good to taping and jointing surfaces. Effects of incorrect disposal of waste: dust blocking drains contamination. 36 City & Guilds Level 2 Technical Certificate in Plastering ( )

37 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to install direct bond and apply jointing materials will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. City & Guilds Level 2 Technical Certificate in Plastering ( ) 37

38 Unit 206 Producing, fixing and finishing plain plaster mouldings to match existing UAN: Level: 2 GLH: 180 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to produce and repair plain plaster mouldings. Learners will learn how to use various methods of fibrous plastering, including taking squeezes, constructing running moulds and running reverse mouldings. The unit will provide learners with the skills and understanding of how to plan, select resources and finish plain plaster mouldings in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the plastering process. Learners can be introduced to this unit by asking themselves questions, such as: 1. What are plaster mouldings? 2. How are they made? 3. What type of plaster is used to produce these mouldings? 4. What are the differences between an internal and external mitre? 5. Where are cornice mouldings installed? Learning outcomes In this unit, learners will be able to 1. Plan to repair damaged plain plaster mouldings 2. Repair damaged plain plaster mouldings 3. Take squeezes and construct running moulds 4. Produce in situ, run casts and reverse mouldings 5. Fix and finish plaster mouldings. 38 City & Guilds Level 2 Technical Certificate in Plastering ( )

39 Learning outcome: 1. Plan to repair damaged plain plaster mouldings 1.1 Information sources 1.2 Calculate quantities and costs Topic 1.1 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations defects report/survey site visit/surveying. Topic 1.2 Calculations: area volume linear measurements ratios allowance for waste (percentages) costs o materials o labour. Learning outcome: 2. Repair damaged plain plaster mouldings 2.1 Prepare and evaluate backgrounds 2.2 Repair mouldings Topic 2.1 Considerations: extent of damage methods of repair listed buildings locations of moulding protection of work area. Moulding materials: in situ fibrous. City & Guilds Level 2 Technical Certificate in Plastering ( ) 39

40 Types of backgrounds: masonry timber laths expanded metal lath (EML) plaster. Preparing damaged moulds: securing, consolidating existing moulding complete removal of section creating a key controlling suction. Topic 2.2 Methods of repairing: run in situ run cast reverse mould and cast. Learning outcome: 3. Take squeezes and construct running moulds 3.1 Tools and equipment 3.2 Obtain moulding outlines 3.3 Construct running moulds Topic 3.1 Uses of tools and equipment: hand tools power tools equipment. Topic 3.2 Considerations: Methods: cut section of moulding thickness of wall and ceiling line undercut. single and loose piece plaster squeeze removal of section piece cut through and mark. Topic 3.3 Types of running moulds: single slipper 40 City & Guilds Level 2 Technical Certificate in Plastering ( )

41 double slipper left hand right hand. Construction considerations: robustness suitability strength materials components. Learning Outcome 4. Produce in situ, run casts and reverse mouldings 4.1 Set out running rules and backboards 4.2 Run the core 4.3 Run the finish 4.4 Cast from reverse Topic 4.1 Considerations when fixing running rules: types of backgrounds fixing points types of fixings sizes, types and conditions of running rules straight/ line able correct depth (in situ). Fixing running rules: benches (fibrous) walls (in situ). Uses of tools and equipment: hand tools power tools equipment. Topic 4.2 Considerations: thickness of finish drying times of materials providing adequate keys coring out of mitres sealing surfaces applying release agents reinforcements. City & Guilds Level 2 Technical Certificate in Plastering ( ) 41

42 Methods of coring out: plaster reverse moulds run casts in situ run work. Uses of tools and equipment: Materials: hand tools power tools equipment. traditional modern reinforcements. Topic 4.3 Considerations: Methods: Materials: drying times of materials providing adequate keys finishing of mitres sealing surfaces applying release agents reinforcements. plaster reverse moulds run casts in situ run work. traditional modern additives sealers. Tools and equipment for: mixing applying finishing. Quality of finished run work: bad practice good practice. Topic 4.4 Considerations: setting times of materials applying release agents 42 City & Guilds Level 2 Technical Certificate in Plastering ( )

43 reinforcements. Casting: firstings and secondings, one gauge tools and equipment materials reinforcements additives. Quality of finished and storing casts: bad practice good practice. Learning Outcome 5. Fix and finish plaster mouldings 5.1 Prepare backgrounds 5.2 Set out 5.3 Cut mitres and fix 5.4 Making good Topic 5.1 Types of backgrounds: unsealed plasterwork painted plasterwork. Considerations: make good damaged surfaces types of adhesives matching and lining in members remove original plasterwork provide a key. Uses of tools and equipment: hand tools power tools equipment. Topic 5.2 Marking out for setting out: wall lines ceiling lines. Topic 5.3 Marking out for cutting and fixing: straight City & Guilds Level 2 Technical Certificate in Plastering ( ) 43

44 internal external return stop complex (eg bay windows). Methods of fixing: mechanical chemical. Quality of workmanship: bad practice good practice. Topic 5.4 Considerations: controlling of suction tools materials. Quality of workmanship: reinforcing joints mitres and members sharp excess materials removed from mouldings wall and ceiling lines clean and free from misses correct alignment to internal and external angles. 44 City & Guilds Level 2 Technical Certificate in Plastering ( )

45 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to produce, fix and finish plain plaster mouldings will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. City & Guilds Level 2 Technical Certificate in Plastering ( ) 45

46 Unit 207 Installing linings and encasement systems UAN: Level: 2 GLH: 60 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to install and finish linings and encasement systems. This unit will include elements of other dry wall systems that are fitted to the interiors of buildings to meet design specifications for construction projects. The unit will provide learners with the skills and understanding of how to plan, set out and install lining systems in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the dry lining process. Learners who have completed this unit can progress onto installing a broader variety of metal drywall systems that meet more complex design specifications in domestic and commercial settings. Learners can be introduced to this unit by asking themselves questions, such as: 1. What is dry lining? 2. What is the purpose of dry lining? 3. What skills do I need to be a dry liner? Learning outcomes In this unit learners will be able to: 1. Plan for interior linings and encasements 2. Set out lining systems 3. Install lining systems. 46 City & Guilds Level 2 Technical Certificate in Plastering ( )

47 Learning outcome: 1. Plan for interior linings and encasements 1.1 Design benefits of using lining systems 1.2 Information sources 1.3 Calculate quantities Topic 1.1 System benefits: thermal properties speed of installation fire resistant sound resistant mechanical and electrical services. Topic 1.2 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations site instructions (eg closing up order of services). Topic 1.3 Calculations: area linear measurements allowance for waste (percentages) costs o materials o labour. City & Guilds Level 2 Technical Certificate in Plastering ( ) 47

48 Learning outcome: 2. Set out lining systems 2.1 Surface preparation 2.2 Tools and equipment 2.3 Setting out Topic 2.1 Surface sub straight: analysis of backgrounds types of backgrounds condition. Topic 2.2 Uses of tools and equipment: Topic 2.3 Setting out: hand tools power tools equipment. datums fixing points, centres and perimeters doorways and openings. Learning outcome: 3. Install lining systems 3.1 Materials 3.2 Tools and equipment 3.3 Fix and finish lining systems Topic 3.1 Types of materials: system components (eg track, studs) fixings sheet materials insulation finishing materials. Topic 3.2 Uses of tools and equipment: hand tools power tools 48 City & Guilds Level 2 Technical Certificate in Plastering ( )

49 equipment. Topic 3.3 Considerations: background substrate thermal insulation fire proofing sound proofing finish. Methods of fixing and finishing lining systems: fix lining systems o screwed o crimped o clipped fixing boards o staggered/vertical o double boarded finishing plasterboards o plastered o taped and jointed (eg hand/mechanical) o sprayed o primed and sealed Defects and problem solving: defective materials poor workmanship. City & Guilds Level 2 Technical Certificate in Plastering ( ) 49

50 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to install linings and encasement systems will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. It is recommended that this unit be delivered before Unit 208 Installing metal furring ceiling systems and Unit 209 Installing metal stud partitioning systems. 50 City & Guilds Level 2 Technical Certificate in Plastering ( )

51 Unit 208 Installing metal furring ceiling systems UAN: Level: 2 GLH: 60 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to install and finish metal furring (MF) ceiling systems. This unit will include elements of other dry wall systems that are fitted to the interiors of buildings to meet design specifications for construction projects. The unit will provide learners with the skills and understanding of how to plan, set out and install ceiling systems in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the dry lining process. Learners who have completed this unit can progress onto installing a broader variety of metal drywall systems that meet more complex design specifications in domestic and commercial settings. Learners can be introduced to this unit by asking themselves questions, such as: 1. What are MF ceiling systems? 2. What is the purpose of MF ceiling systems? 3. What skills do I need to install them? Learning outcomes In this unit, learners will be able to 1. Plan for installing MF ceiling systems 2. Set out MF ceiling systems 3. Install MF ceiling systems. City & Guilds Level 2 Technical Certificate in Plastering ( ) 51

52 Learning outcome: 1. Plan for installing MF ceiling systems 1.1 Design benefits of using MF ceiling systems 1.2 Information sources 1.3 Calculate quantities Topic 1.1 System benefits: thermal properties speed of installation fire resistant sound resistant mechanical and electrical services access. Topic 1.2 Information sources used to establish types and quantities of materials: drawings specifications schedules manufacturer information building regulations site instructions (eg closing up order of services). Topic 1.3 Calculations: area linear measurements allowance for waste (percentages) costs o materials o labour. 52 City & Guilds Level 2 Technical Certificate in Plastering ( )

53 Learning outcome: 2. Set out MF ceiling systems 2.1 Tools and equipment 2.2 Setting out Topic 2.1 Uses of tools and equipment: Topic 2.2 Setting out: hand tools power tools equipment. datums location of anchor points and grid fixing points, centres and perimeters access points and services. Learning outcome: 3. Install MF ceiling systems 3.1 Materials 3.2 Tools and equipment 3.3 Fix and finish MF ceiling systems Topic 3.1 Types of materials: system components (eg furrings) fixings sheet materials insulation finishing materials Topic 3.2 Uses of tools and equipment: hand tools power tools equipment. Topic 3.3 Considerations: background substrate (increased load) services (depth of ceiling) City & Guilds Level 2 Technical Certificate in Plastering ( ) 53

54 thermal insulation fire proofing sound proofing finish. Methods of fixing and finishing MF ceiling systems: fix MF ceiling systems o screwed o clipped fixing boards o staggered o double boarded finishing plasterboards o plastered o taped and jointed (eg hand/mechanical) o sprayed o primed and sealed Defects and problem solving: defective materials poor workmanship. 54 City & Guilds Level 2 Technical Certificate in Plastering ( )

55 Guidance for delivery Tutors need to be aware of prior learning that has taken place and use this information to structure individualised learning where appropriate. Tutors should make the best use of available resources to provide learners with the opportunity to use a wide range of activities that could include lectures, discussions, self-study, City and Guilds SmartScreen materials, research opportunities, visits to exhibitions and practical training to stimulate, motivate and educate the learner. Naturally occurring training activities used to install MF ceiling systems will facilitate the completion of this unit. This will support the holistic approach of delivering and assessing the qualification as well as stimulate a realistic experience for the learners. Learners should adhere to relevant Building Regulations and select materials to minimise waste. Health, safety and welfare issues are an important factor to consider during the delivery of this unit; therefore, strict safe working methods as outlined by legislation should be demonstrated and reinforced through close supervision of all activities. Risk assessments, method statements and COSHH assessments must be completed prior to any practical activities taking place. City & Guilds Level 2 Technical Certificate in Plastering ( ) 55

56 Unit 209 Installing metal stud partitioning systems UAN: Level: 2 GLH: 60 What is this unit about? The aim of this unit is for learners to have the knowledge, understanding and skills required to install and finish metal stud partitioning systems. This unit will include elements of other dry wall systems that are fitted to the interiors of buildings to meet design specifications for construction projects. The unit will provide learners with the skills and understanding of how to plan, set out and install partitioning systems in a safe way to the correct specification. Protection of the work environment must be considered during all stages of the dry lining process. Learners who have completed this unit can progress onto installing a broader variety of metal drywall systems that meet more complex design specifications in domestic and commercial settings. Learners can be introduced to this unit by asking themselves questions, such as: 1. What is a partition? 2. What are the benefits of a metal stud partitioning system? 3. What skills do I need to install partitioning systems? Learning outcomes In this unit learners will be able to: 1. Plan for installing metal stud partitioning systems 2. Set out metal stud partitioning systems 3. Install metal stud partitioning systems 56 City & Guilds Level 2 Technical Certificate in Plastering ( )

/501 Level 3 Plastering (Solid) Version 1.0 November Sample Marking Scheme

/501 Level 3 Plastering (Solid) Version 1.0 November Sample Marking Scheme 7908-001/501 Level 3 Plastering (Solid) Version 1.0 November 2016 Sample Marking Scheme The correct responses to the multiple questions are in BOLD. 1 What must be checked by a building control officer

More information

CONSTRUCTION SMARTSCREEN

CONSTRUCTION SMARTSCREEN 6704 Level 1 Construction Trade Occupations - 325 + VAT (SS6704-LV1 ) Unit 102 - Construction Trade Occupations - Painting and Decorating Unit 103 - Construction Trade Occupations - Plastering Unit 104

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10 CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances

More information

PRACTICAL TASK MANUAL

PRACTICAL TASK MANUAL Level 2 Diploma in Dry Lining (6713-23) Task Manual PRACTICAL TASK MANUAL September 2016 Version 1.2 Contents Candidate details 2 Instructions to candidates 3 Unit 254 Install Suspended Ceiling Systems

More information

Level 3 NVQ Diploma in Trowel Occupations (Construction) ( )

Level 3 NVQ Diploma in Trowel Occupations (Construction) ( ) Level 3 NVQ Diploma in Trowel Occupations (Construction) (6570-03) September 2018 (Version 3.0) Qualification Handbook Qualification at a glance Subject area Trowel Occupations (Construction) City & Guilds

More information

Level 2 NVQ Diploma in Trowel Occupations (Construction) Qualification Specification

Level 2 NVQ Diploma in Trowel Occupations (Construction) Qualification Specification Level 2 NVQ Diploma in Trowel Occupations (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 5 Support

More information

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme

/503 Level 3 Plastering (Fibrous) Version 1.0 November Sample Marking Scheme 7908-003/503 Level 3 Plastering (Fibrous) Version 1.0 November 2016 Sample Marking Scheme The correct responses to the multiple questions are in BOLD. 1 Where would multi-foil insulation most commonly

More information

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

Level 2 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification (QCF) Qualification Specification ProQual 2015 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Centre requirements 6 Support

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09260 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SUMMARY A. Provide gypsum board assemblies. 1.2 SUBMITTALS A. Product Data: Submit manufacturer's product data and installation instructions for

More information

TILING SPECIFICATIONS

TILING SPECIFICATIONS TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Plastering (Construction) (6573-22/24) March 2018 Version 1.0 Qualification at a glance Subject area Plastering (Construction) City & Guilds number 6573 Age

More information

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification

Level 2 NVQ Certificate in Wall and Floor Tiling (Construction) Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 5 Support for candidates 5 Assessment 6 Internal quality assurance

More information

Unit 8 Walls & Partition

Unit 8 Walls & Partition Unit 8 Walls & Partition 1 1 Learning Objectives Briefly explain the functions & functional requirements of walls Differentiate and compare between load bearing and non-load bearing walls Briefly describe

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes

COSVR67 SQA Unit Code HL75 04 Apply solid render to background surfaces and produce finishes Apply solid render to background surfaces and produce finishes Overview This standard is about interpreting information, adopting safe, healthy and environmentally responsible work practices, selecting

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

Building Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management

Building Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Building Construction 14 Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Plaster Plaster is a wet mixed material applied to internal walls as a finish to fill in any irregularities

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -SQA-SCOTTISH QUALIFICATIONS AUTHORITY Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR -Module Number- 0085137 -Session-1988-89 -Superclass- TE -Title- BUILDING TECHNOLOGY

More information

CONSTRUCTION & BUILDING SERVICES ADVANCED AND HIGHER APPRENTICESHIPS

CONSTRUCTION & BUILDING SERVICES ADVANCED AND HIGHER APPRENTICESHIPS CONSTRUCTION & BUILDING SERVICES ADVANCED HIGHER APPRENTICESHIPS WHY CHOOSE US? ESTABLISHED & NEW We are an established Further Education College, located in the heart of Coventry. We recently merged City

More information

Specifications for Insulation Board wall and ceiling applications

Specifications for Insulation Board wall and ceiling applications Specifications for Insulation Board wall and ceiling applications Product Ref: Marmox Multiboard 600mm wide, 1250/2500mm long. 10, 12.5, 20, 30, 40, 50, 60mm thick. Also known as Marmox Board- Pro and

More information

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD

CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS. BME Lepel, Adrienn PhD CONCRETE SCREEDS, INTERIOR FLOORING AND WALL COVERINGS BME Lepel, Adrienn PhD Claddings Place in the sequence of activities 13Constructing roof LB structure (carpentry) 14Roof tiling (waterproofing, battens,

More information

INSTALLATION METHOD STATEMENT

INSTALLATION METHOD STATEMENT INSTALLATION METHOD STATEMENT 1.0 Introduction - Liquid screed is a flowing screed flooring system comprising a calcium sulphate binder, fine aggregate and water. - It is for internal use only, in general

More information

Construction Technology Revision Guide

Construction Technology Revision Guide Construction Technology Revision Guide Sub structures and Super structures Super structure (Wall, floors roof) Sub structure (Foundations) 2 Thermal Insulation Thermal insulation helps to prevent heat

More information

Level 1 Certificate in Basic Construction Skills

Level 1 Certificate in Basic Construction Skills Qualification Specification ProQual 2011 ProQual, May 2016 1 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Credit transfer

More information

Level 1 Certificate in Basic Construction Skills. Qualification Specification

Level 1 Certificate in Basic Construction Skills. Qualification Specification Qualification Specification ProQual 2011 Contents Page Introduction 3 Qualification profile 4 Qualification structure 5 Centre requirements 7 Support for candidates 7 Assessment 8 Internal quality assurance

More information

Drywall & Veneer Plaster Products

Drywall & Veneer Plaster Products ii Contents 1 Drywall & Veneer Plaster Products Describes complete line of construction products, including Sheetrock brand gypsum panels and Imperial brand gypsum base for drywall and veneer plaster construction,

More information

Qualification and Assessment Specification

Qualification and Assessment Specification Qualification and Assessment Specification NOCN Level 3 Diploma in Bricklaying Qualification No: 603/0965/9 Operational Start Date: 1 st January 2017 Version 1.0 January 2017 Introduction NOCN is a leading

More information

Unit 32: Plastering and Rendering Surfaces

Unit 32: Plastering and Rendering Surfaces Unit 32: Unit code: QCF Level: 2 Credit value: 10 Guided learning hours: 100 Unit aim and purpose Plastering and Rendering Surfaces J/503/4945 This unit should enable learners to gain the knowledge needed

More information

Qualification and Assessment Specification

Qualification and Assessment Specification Qualification and Assessment Specification NOCN Level 2 NVQ Diploma in Plastering Qualification No: 600/7969/1 Operational Start Date: 1st February 2013 Version 2.0 December 2017 Introduction NOCN is a

More information

Level 1 Certificate in Basic Construction Skills - Plastering ( )

Level 1 Certificate in Basic Construction Skills - Plastering ( ) Level 1 Certificate in Basic Construction Skills - Plastering (6217-04) Qualification handbook www.cityandguilds.com June 2005 Version 1.1 (February 2014) About City & Guilds City & Guilds is the UK s

More information

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products.

GypLyner. GypLyner. Metal framed wall lining system. All our systems are covered by SpecSure when using genuine Gyproc and Isover products. GypLyner GypLyner Metal framed wall lining system All our systems are covered by SpecSure when using genuine Gyproc and Isover products Linings GypLyner GypLyner is a cost-effective, virtually independent

More information

TECHNICAL INFORMATION CEMSCREED 5

TECHNICAL INFORMATION CEMSCREED 5 TECHNICAL DATA SHEET CEMSCREED 5 Ver May 2016 TECHNICAL INFORMATION CEMSCREED 5 Product Data Sheet No. 110/03 INTRODUCTION Tarmac Cemscreed 5 is a rapid drying floor screed developed by Tarmac to fulfil

More information

roofing ROOFING Design of the base ROOFING DETAILS

roofing ROOFING Design of the base ROOFING DETAILS DETAILS The general arrangement details and the principles to be followed at skirtings, upstands, abutments, verges, gutters and expansion joints are as details illustrated. SELECTION PARAMETERS It is

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 3 NVQ Diploma in Plastering (Construction) (6573-07/08) April 2018 Version 1.1 Qualification at a glance Subject area City & Guilds number 6573 Age group approved 16-18; 19+

More information

11/09/2018 LBP licence classes

11/09/2018 LBP licence classes LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary

More information

HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD

HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION WITH PLASTERBOARD GTEC MOISTURE AND VAPOUR BOARD 3 MOISTURE AND HUMIDITY Kitchens, utility rooms and cloak rooms are areas of high humidity, modern

More information

PRACTICAL TASK MANUAL

PRACTICAL TASK MANUAL 6808-33 Level 3 Diploma in Plastering December 2017 Version 1.2 PRACTICAL TASK MANUAL Contents Task manual amendments 2 Candidate details 3 Unit assessment overview 4 Practical task completion record 4

More information

Gain an NVQ qualification for your skills

Gain an NVQ qualification for your skills 1 Gain an NVQ qualification for your skills Health & Safety? DIY? Construction Trade Skills? We've got it covered. Find out more in our range of brochures shown below. DIY academy with CST 1 H ea lt h

More information

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11

RENOVATE BUILDING 18-C FTFA SECTION GYPSUM BOARD 05/11 SECTION 09 29 00 GYPSUM BOARD 05/11 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text

More information

Check, coat and reinforce fibre cement substrate to form a Proprietary Plaster Cladding System on site

Check, coat and reinforce fibre cement substrate to form a Proprietary Plaster Cladding System on site Page 1 of 5 Check, coat and reinforce fibre cement substrate to form a Proprietary Plaster Cladding System on site Level 3 Credits 20 Purpose People credited with this unit standard are able to: check

More information

Level 3 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification

Level 3 NVQ Diploma in Trowel Occupations (Construction) (QCF) Qualification Specification (QCF) Qualification Specification ProQual 2015 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Centre requirements 6 Support

More information

Chapter 8: External solid plastering

Chapter 8: External solid plastering Candidate name: Candidate number: Date: Chapter 8: External solid plastering Circle the correct answers. 1 Which of the following is required for preparing new blockwork for a plainfloat finish? a Coating

More information

Thermal Laminate Board.

Thermal Laminate Board. Thermal Laminate Board www.speedlinedrywall.co.uk The Dry Lining and Thermal Insulation Solution The Dry Lining and Thermal Insulation Solution Around a third of all heat lost within un-insulated or poorly

More information

Qualification and Assessment Specification

Qualification and Assessment Specification Qualification and Assessment Specification NOCN Level 2 Diploma in Construction Crafts Painting and Decorating Qualification No: 600/6568/0 Operational Start Date: 1st September 2012 Version 3.0 December

More information

6219 Entry Level and Level 1 Awards, Certificates and Diplomas in Construction Skills

6219 Entry Level and Level 1 Awards, Certificates and Diplomas in Construction Skills 6219 Entry Level and Level 1 Awards, Certificates and Diplomas in Construction Skills Candidate task manual Wall and floor tiling, Construction operations, Painting and decorating www.cityandguilds.com

More information

Section 10. Rendering, Plasterboard & Fibre Cement Sheeting

Section 10. Rendering, Plasterboard & Fibre Cement Sheeting MARKETING PROPERTY-PROJECT SERVICES STD - D905 VOLUME 2 Service Station Construction SPECIFICATION Section 10 Rendering, Plasterboard & Fibre Cement Sheeting Index 10.1 Extent of Work 10.2 Rev 07.8 General

More information

Opportunities. with the Heathrow Shared Apprenticeship Scheme

Opportunities. with the Heathrow Shared Apprenticeship Scheme Recruitment Apprenticeship Development Opportunities with the Heathrow Shared Apprenticeship Scheme INSPIRING GROWTH, CHANGING PEOPLE S LIVES The Shared Apprenticeship Scheme brings together a some of

More information

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS 1 FOCUS ON GETTING IT RIGHT As with any building project the quality of finish is determined by the foundation upon which it is installed. The most important

More information

External solid plastering: overview

External solid plastering: overview External solid plastering: overview Render gives a weatherproof surface that protects the building and provides a decorative finish. Traditional render is applied by hand; modern render can also be applied

More information

An introduction to Part L U-values

An introduction to Part L U-values December 2010 An introduction to Part L This document provides a wide selection of building fabric constructions with their associated. It has been produced a support to our publication An introduction

More information

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness,

Wall Linings. As well as complete dry lining solutions we also provide fast-drying parge coat to ensure airtightness, Wall Linings Our versatile range of wall lining systems makes it easy to produce a high-quality, high-performance finished wall regardless of the background. Whether your priority is acoustic control,

More information

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES WITH PLASTERBOARD GTEC THERMAL BOARD 1 BUILDING INSULATION THE REGULATIONS Building regulations are in place to drive improvements in thermal efficiency,

More information

An eros group of company

An eros group of company An eros group of company An eros group of company At Village, Manaba, Ta.: Maliya (Miyana), Dist.: Morbi - 363670 (Gujarat) E-mail: sales@erosminerock.com, erosminerock@yahoo.com www.erosminerock.com An

More information

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas.

BRANZ Appraisal Certificate # 461 (2010) Internal wet areas. SPECIFICATION FOR PROTECTO WRAP AFM-WM FOR INTERNAL WET AREAS BRANZ Appraisal Certificate # 461 (2010) Internal wet areas AFM/WM INTERNAL 0104 Page 1 AFM-WM INTERNAL SPECIFICATION PRODUCT DESCRIPTION Anti

More information

TECHNICAL INFORMATION SCREED

TECHNICAL INFORMATION SCREED TECHNICAL DATA SHEET SCREED Ver Nov 2015 TECHNICAL INFORMATION SCREED Product Data Sheet No. 110/01 INTRODUCTION Tarmac ready-to-use cement sand levelling screed is a correctly proportioned factory produced

More information

Chameleon. School of Construction Ltd. Courses Available. Training for an ever changing world

Chameleon. School of Construction Ltd. Courses Available. Training for an ever changing world Chameleon School of Construction Ltd Training for an ever changing world Funding available for qualifications* *Subject to availability/eligibility. Courses Available Plastering Floor & Wall Tiling Maintenance

More information

Prior to training with this module, it is recommended that the trainee shall have successfully completed Core Curriculum.

Prior to training with this module, it is recommended that the trainee shall have successfully completed Core Curriculum. Orientation to the Trade Annotated Instructor s Guide Module 45101-07 MODULE OVERVIEW This module provides the trainee with an overview of drywall installation and career opportunities. The module also

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) ( ) December 2015 Version 2.

Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) ( ) December 2015 Version 2. QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Building Maintenance Multi-trade Repair and Refurbishment Operations (Construction) (6562-22) December 2015 Version 2.0 Qualification at a glance Subject area

More information

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6

Project No: Pakenham Branch Library, Pakenham, Ontario Section DECEMBER, 2016 Page 1 of 6 DECEMBER, 2016 Page 1 of 6 1 GENERAL 1.01 RELATED SECTIONS.1 Section 01 33 00 - Submittal Procedures..2 Section 07 21 16 - Batt and Blanket Insulation..3 Section 07 92 10 - Sealants..4 Section 09 91 00

More information

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor 70, 100, 150, 200, 250

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor 70, 100, 150, 200, 250 46 APPLICATION: Products:,,, 200, 250 insulation can be used over all types of precast suspended concrete floor systems including beam and block and hollow core plank. It is available in a range of grades

More information

Level 3 NVQ Diploma in Wood Occupations (Construction) (6571) August 2015 Version 4.4

Level 3 NVQ Diploma in Wood Occupations (Construction) (6571) August 2015 Version 4.4 QUALIFICATION HANDBOOK Level 3 NVQ Diploma in Wood Occupations (Construction) (6571) August 2015 Version 4.4 Qualification at a glance Subject area City & Guilds number 6571 Age group approved 16-18,19+

More information

SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications.

SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications. SECTION D Wall Systems. Contents. SUBJECT Introduction Design Considerations Installation Components PAGE D2 D2 D4 D5 System Specifications Stud One Side Stud Both Sides Stud and Furring Channel Resilient

More information

ARTEX AND PLASTER. 2 - Choosing the right product

ARTEX AND PLASTER. 2 - Choosing the right product ARTEX AND PLASTER Proper plastering is not easy. But DIY plasters are designed with ease of use in mind, and Artex TM is no more difficult to apply than thick paint. It is best to wear gloves when mixing

More information

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints. SECTION 09200 PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The extent of lath and plaster work is shown on the drawings and in schedules and includes interior and exterior plaster work, and fibreglass

More information

BUILDING CONSTRUCTION HANDBOOK. Ninth edition. Roy Chudley. and. Roger Greeno. O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK

BUILDING CONSTRUCTION HANDBOOK. Ninth edition. Roy Chudley. and. Roger Greeno. O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK BUILDING CONSTRUCTION HANDBOOK Ninth edition Roy Chudley and Roger Greeno O Routledge ^ Taylor ^Francis Croup LONDON AND NEW YORK notations CONTENTS Preface to ninth edition xi Part One General Built environment

More information

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor Premium 70 and 100

APPLICATION: Floor insulation precast suspended concrete floor. Products: Jabfloor Premium 70 and 100 38 APPLICATION: Products: 70 and 100 insulation can be used over all types of precast suspended concrete floor systems including beam and block and hollow core plank. It is available in a range of grades

More information

our courses: BRICKWORK PAINTING & DECORATING WALL & FLOOR TILING CARPENTRY & JOINERY

our courses: BRICKWORK PAINTING & DECORATING WALL & FLOOR TILING CARPENTRY & JOINERY our courses: BRICKWORK PAINTING & DECORATING WALL & FLOOR TILING CARPENTRY & JOINERY PLUMBING PLASTERING KITCHEN FITTING MULTI CRAFT Without any hesitation WDP would recommend CST to any other business

More information

Typical detail: New roof with breathable underlay

Typical detail: New roof with breathable underlay New roof with breathable underlay 6. WALLTITE CL00 insulation to achieve target U-value. Vapour control layer. Plasterboard and skim. Unventilated air space 5. WALLTITE returned to insulated cavity stop

More information

1.3 Work shall include all reinforcement and accessories necessary to complete installation.

1.3 Work shall include all reinforcement and accessories necessary to complete installation. CERAMIC TILING GENERAL INFORMATION 1.1 Ceramic mosaic tile floors and bases, glazed wall tile wainscots and walls, and marble thresholds. 1.2 Installation will typically be with latex-portland cement mortar

More information

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for

Leaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for Leaving Certificate Revision Notes Airtightness 6 7 8 8 9 10 5 11 5 12 4 3 1 2 13 12 14 Potential air leakage paths (the numbered points in section 2.1 give a description for Airtightness Introduction

More information

SSS001: Substrate Specification Sheet 1 - Plasterboard Drylining Installation and Finishing

SSS001: Substrate Specification Sheet 1 - Plasterboard Drylining Installation and Finishing SSS001: Substrate Specification Sheet 1 - Plasterboard Drylining Installation and Finishing Page 1 of 20 Document: 9678.53 Collection: 116: Substrate Specification Sheets (SSS) Modified: 28/10/2016 09:50

More information

TECHNICAL INFORMATION

TECHNICAL INFORMATION TECHNICAL DATA SHEET TRUSCREED & TRUSCREED HD Ver July 2017 TECHNICAL INFORMATION TRUSCREED & TRUSCREED HD Product Data Sheet No. 110/05 INTRODUCTION Tarmac Truscreed and Truscreed HD systems were developed

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 3 NVQ Diploma in Fenestration Installation (6575-03) May 2013 Version 1.0 Qualification at a glance Subject area City & Guilds number 6575 Construction Age group approved 16-18,

More information

Level 2 NVQ Diploma in Insulation and Building Treatments (Construction)

Level 2 NVQ Diploma in Insulation and Building Treatments (Construction) Level 2 NVQ Diploma in Insulation and Building Treatments (Construction) Qualification Specification ProQual 2018 Contents Page Introduction 3 Qualification profile 3 Qualification Structure 4 Centre requirements

More information

Curved partition and wall lining system

Curved partition and wall lining system C05 Specialist partitions Curved partition and wall lining system All our systems are covered by SpecSure when using genuine Gyproc and Isover products is a lightweight system specifically designed to

More information

Part E robustdetails. robustdetails. January 2018 Update Pack

Part E robustdetails. robustdetails. January 2018 Update Pack Part E Pack Dear Colleague, The first Update Pack of the year, and the first welcome from me as Chief Executive. Although new to the role, I have been with the company for nine years with responsibility

More information

THERMAL INSULATION SYSTEM

THERMAL INSULATION SYSTEM opuscolo Kibitherm_EN.FH10 27-06-2007 20:14 Pagina 1 Contents KIBITHERM: a certified system...page 5 Why insulate with KIBITHERM...page 6 KIBITHERM performance features...page 7 How to apply KIBITHERM...page

More information

Kolorines Glass Mosaic Tiles Project Specification

Kolorines Glass Mosaic Tiles Project Specification Kolorines Glass Mosaic Tiles Project Specification SUGGESTED SPECIFICATION Glass Mosaic Tile Installation for Swimming Pools NOTES TO SPECIFIER: 1. Specify PremiumPlus Thin-Set mixed with CustomFlex Additive

More information

Installation Recommendations Ceramic Floor and Wall Tiles. Floor Tiles

Installation Recommendations Ceramic Floor and Wall Tiles. Floor Tiles Installation Recommendations Ceramic Floor and Wall Tiles This information is based on the recommendations given in the following codes of practice: BS 5385-1 The design and installation of internal ceramic

More information

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI

PROPOSED OFFICE BLOCK FOR THE COUNTY ASSEMBLY OF KILIFI - PLOT No MALINDI GROUND FLOOR COMPLETION OF WORKS TO GROUND FLOOR SITE WORKS DEMOLITIONS AND ALTERATIONS Ground floor Removing a polythene damp proof membranes, complete with mesh fabric reference A 252, hacking edges

More information

Level 2 NVQ Diploma in Wood Occupations (Construction)

Level 2 NVQ Diploma in Wood Occupations (Construction) Qualification Specification ProQual 2015 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Centre requirements 8 Support for candidates

More information

Garage Conversion - Between and Under Joist Applications

Garage Conversion - Between and Under Joist Applications Issue 1, August 2013 CI/SfB (2 -) Rn7 (M2) Garage Conversion - Between and Under Joist Applications Flat Roof Insulation Introduction Celotex is the brand leading manufacturer of PIR insulation boards,

More information

The Revolutionary New Plasterboard TIMBER FRAME GUIDE

The Revolutionary New Plasterboard TIMBER FRAME GUIDE The Revolutionary New Plasterboard TIMBER FRAME GUIDE 2 HABITO BOARD is a stronger plasterboard that provides enhanced sound insulation, extra durability and for the first time, direct fixing capability.

More information

Caparol System PRO Data sheet

Caparol System PRO Data sheet System features Expanded polystyrene insulation Cost effective solution Excellent detailing options Proven technology Wide variety of colours Reliable protection and crack resistance Proven track record

More information

Independent twin frame high performance acoustic separating wall system

Independent twin frame high performance acoustic separating wall system C04 Partitions Independent twin frame high performance acoustic separating wall system All our systems are covered by SpecSure when using genuine Gyproc and Isover products is a lightweight, non-loadbearing

More information

i-act: Health and Safety Regulations, Roles and Responsibilities i-act: Dealing with Accidents and Illnesses

i-act: Health and Safety Regulations, Roles and Responsibilities i-act: Dealing with Accidents and Illnesses 1 Health, Safety and Welfare in and Associated Industries J/504/7856 Level 1 i-act: Health and Safety Regulations, Roles and Responsibilities i-act: Dealing with Accidents and Illnesses i-ask: Roles and

More information

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide

DriLyner 5.2. DriLyner. Drywall masonry lining systems. Key facts. Sector Guide systems provide simple and effective techniques for fixing Gyproc plasterboards or Gyproc thermal laminates to brick, block, and concrete walls. They can be used in all building types in both new-build

More information

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185

External Steel Stud and Top Hat Walls. Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 Details SYSTEMS 176 NON-FIRE RATED SYSTEMS 176 FIRE RATED SYSTEMS 178 BRICK VENEER SYSTEMS 183 INSTALLATION 185 GENERAL REQUIREMENTS 185 FRAMING 185 PLASTERBOARD LAYOUT 189 PLASTERBOARD FIXING 190 EXTERIOR

More information

C08. S04. P02 P08 Tiling

C08. S04. P02 P08 Tiling ! This section includes updated information, added since it was first published in December 2015. Last updated 29/03/2018 C08. S04. P02 P08 Including C08. S01. P02 Finishes introduction C08 Finishes Introduction

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

PRELIMINARY INSPECTION FRAMEWORK

PRELIMINARY INSPECTION FRAMEWORK PRELIMINARY INSPECTION FRAMEWORK 1. Oversite Striping of topsoil Forming site entrance Clearing off topsoil for service roadway Roadside drainage continued under entrance bay Any mature trees in vicinity

More information

Level 2 NVQ Diploma in Specialist Concrete Operations (Construction)

Level 2 NVQ Diploma in Specialist Concrete Operations (Construction) (Construction) Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 10 Support for candidates 10 Assessment 10 Internal

More information

Plant, Construction & Business NVQs

Plant, Construction & Business NVQs Plant, Construction & Business NVQs We offer a wide range of National Vocational Qualifications (NVQs). NVQs are qualifications that allow you to prove your competence in the workplace. You will have the

More information

Entry Level 3 Award in Basic Construction Skills ( )

Entry Level 3 Award in Basic Construction Skills ( ) Entry Level 3 Award in Basic Construction Skills (6218-01) Qualification handbook for centres 501/1097/4 www.cityandguilds.com July 2011 Version 1.1 About City & Guilds City & Guilds is the UK s leading

More information

National Occupational Standards Developer s pack for Passive Fire Protection (Construction)

National Occupational Standards Developer s pack for Passive Fire Protection (Construction) National Occupational Standards Developer s pack for Passive Fire Protection (Construction) Project 2016 (COSVR350, COSVR351, COSVR352, COSVR353, COSVR354, COSVR355, COSVR356, COSVR357, COSVR358) To be

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 NVQ Diploma in Floorcovering Occupations (Construction) (6568-02) May 2013 Version 1.0 Qualification at a glance Subject area City & Guilds number 6568 Age group approved

More information

Cavity Drain Systems.

Cavity Drain Systems. Grommet & Nail Platon Sealing Rope Sheet Piling Platon P8 Platon P8 Platon Cornerstrip Platon P20 Membrane Reinforced Concrete incorporating: Triton TT Super Admix @ 1.2Kg/100Kg OPC Sheet Piling PLATON

More information

Level 2 NVQ Diploma in Specialist Concrete Operations (Construction)

Level 2 NVQ Diploma in Specialist Concrete Operations (Construction) (Construction) Qualification Specification ProQual 2015 Contents Page Introduction 3 The Qualifications and Credit Framework (QCF) 3 Qualification profile 4 Rules of combination 5 Centre requirements 11