G632:G581 JR12 CI/SfB (52.7) In6 June 2015 OWIC001. Water management PRODUCT AND INSTALLATION MANUAL. Wavin. Inspection Chambers

Size: px
Start display at page:

Download "G632:G581 JR12 CI/SfB (52.7) In6 June 2015 OWIC001. Water management PRODUCT AND INSTALLATION MANUAL. Wavin. Inspection Chambers"

Transcription

1 Water management PROUT N INSTLLTION MNUL Uniclass EPI G632:G581 JR12 I/Sf (52.7) In6 June 2015 OWI001 J34 Inspection hambers Wavin Inspection hambers

2 ontents Osma/Wavin hambers Introduction 2 The Osma/Wavin Non Man-Entry Inspection hamber Range 2 Material 2 Standards 2 cceptance 2 General Information 3 Range Overview 4 Osma Inspection hambers Shallow 4 Wavin Inspection hambers eep 4 Product etails Osma 5 23 Inspection hambers Shallow Shallow I 5 7 Multi-ase I 8 12 Universal I Non Man-Entry I Installation Osma Inspection hambers Shallow Shallow/Multi-ase I Universal/Non Man-Entry I Product etails Wavin Inspection hambers eep Range 200 I Range 315 I Range 450 I Range 600 I Installation Wavin Inspection hambers eep Range 200 I Range 315 I Range 450 I Range 600 I Typical ackdrop onnection 57 Ranges 315, 450 and 600mm I 57 Testing and Maintenace 58 Testing 58 Maintenance technical.design@wavin.co.uk Osma/Wavin hambers PIM 1

3 Introduction Osma/Wavin hambers The Osma/Wavin Non Man-Entry Inspection hamber Range The Osma/Wavin range of Non Man-Entry Inspection hambers are designed for use in gravity drainage installations and are offered for connections to pipe diameters: 110mm, 150/160mm, 225mm and 300mm. The Osma/Wavin range of chambers offers a number of base and shaft configurations to gain access to underground drainage pipelines, giving Specifiers and Installers the freedom to choose the most suitable system for their needs. The alternatives available are: Inspection hambers Shallow For use at a maximum invert depth of 0.6 metres in uilding ontrol applications and/or 0.9 metres in Sewers for doption 7 (Sf7) applications. (Multi-ase range only). Inspection hambers eep For use at a maximum invert depth of 1.2 metres in uilding ontrol applications and 3.0 metres in Sewers for doption 7 (Sf7) applications. Standards a ritish Standards Institution The Osma/Wavin range of Non Man-Entry Inspection hambers comply where applicable with the requirements of the following ritish Standards: S EN 124:1994 Gully tops and manhole tops for vehicular and pedestrian areas. S EN Parts 1 & 2 Plastics piping systems for nonpressure underground drainage and sewerage. S 7158:2001 Plastic inspection chambers for drains and sewers- Specification. cceptance The Osma/Wavin range of Non Man-Entry Inspection hambers are included in the following publication:- Sewers for doption, 7th Edition, under clause E2.31. Material a) Inspection hambers Polypropylene is used in the manufacture of the majority of the Osma/Wavin Non Man-Entry Inspection hamber range. b) Sealing Rings Snap-ap-Polypropylene and Sealing Ring TPE. 2 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

4 General Information Osma/Wavin hambers escriptions escriptions and illustrations in this publication are for guidance only. No responsibility can be accepted for any errors, omissions or incorrect assumptions. Refer to the product itself if more detailed information is required. ue to the continuing programme of product improvement, Wavin reserves the right to amend any published information or to modify any product without prior notice. imensions Unless otherwise stated all dimensions are in millimetres (mm). Symbols a) ritish Standard Kitemark a Identifies chambers which are manufactured under the.s.i. ertification Scheme. b) ritish oard of grément $ Identifies Non-Kitemarked fittings which are covered by a ritish oard of grément ertificate. olour Most Inspection hambers lack Ring Seals lack Supply ll Osma/Wavin Non Man-Entry Inspection hambers are supplied through a nationwide network of merchant distributors. For further information contact ustomer Services on Technical dvice The Osma/Wavin Non Man-Entry Inspection hamber Range is backed by Wavin s comprehensive technical advice service. This is available to provide expert assistance at every stage of a project, from planning and product selection to installation and maintenance. Literature The following Wavin publications are also available from the Literature epartment at hippenham. General Wavin elow Ground & ivils System: Trade Price List Gravity rain and Sewer Systems Osmarain System: Product and Installation Guide Osma UltraRib System: Product and Installation Guide Osma Non Man-Entry Inspection hamber Range: Product and Installation Guide Stormwater Management Systems Wavin quaell System: Product and Installation Guide Wavin Flow ontrol Range: Product and Installation Guide Wavin ommercial Rainwater Re-use System: Product Summary Wavin Poly-oncrete hannel Systems: Product and Installation Guide Wavin Quickstream Siphonic Roof rainage Systems: Product and Installation Guide To request details with regards to any of the above components and/or for any technical enquires please contact: Literature Request Tel: literature@wavin.co.uk Technical esign Tel: technical.design@wavin.co.uk Wavin Online The complete range of Osma/Wavin product and installation guides are also available online at: wavin.co.uk ontact Wavin Technical esign epartment: Tel: technical.design@wavin.co.uk or via online enquiry at wavin.co.uk technical.design@wavin.co.uk Osma/Wavin hambers PIM 3

5 Range Overview Osma/ Wavin hambers The Osma/Wavin Non Man-Entry Inspection hamber Range offers a comprehensive portfolio of inspection chambers which can provide the optimum solution for every adoptable and non-adoptable situation, within the uilding and onstruction markets. See Osma Inspection hambers Shallow for, components complying to S EN See Wavin Inspection hambers eep for, components complying to S EN Osma Inspection hambers Shallow ase Type Shallow I Multi-ase I Universal NI Max Invert epth (m) ase/shaft ia (mm) Sf7 Type No of inlets 1 l 1 to 3 l l l l 4 to 5 l l Inlet Sizes (mm) / /160 Kitemarked to: S EN l l l S EN 7158 l Note 1: Under Sf7 maximum permitted depth can be increased from 0.6m to 0.9m Note 2: Under S 7158:2001 maximum permitted depth is 3m Wavin Inspection hambers eep ase Type Range 200 Range 315 Range 450 Range 600 Max Invert epth (m) ase/shaft ia (mm) Sf7 Type No of inlets 1 l l l l 1 to 3 l l l 4 to 5 l Inlet Sizes (mm) 110/ / / /225/300 Kitemarked to: S EN l S EN l l l Note 1: Under Sf7 maximum permitted depth can be increased from 0.6m to 2.0m Note 2: Under Sf7 maximum permitted depth can be increased from 1.2m to 3.0m Product and Installation details for Osma Inspection hambers Shallow are shown in the orange section and Wavin Inspection hambers eep are shown in the blue section of this booklet. 4 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

6 Product etails Shallow I Introduction escription 250mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. Single unit with integral shaft, for use with 110mm Osmarain system. Shaft may be cut to length to achieve required invert depth. pplications For above ground access and maintenance inspection of buried pipework up to 0.6 metres deep For loading applications up to 10kN (1.0 Tonne) Key imensions External shaft diameter: 250mm Inlets/outlets: 110mm Key Features & enefits Fast, easy installation: no wet trades Lightweight: no lifting equipment required Shaft can be cut to required length No additional trench excavation required ompliance The Shallow Inspection hamber complies with the following standards and regulations S EN : 2010 a Sf7 Typical hamber etail Type 4: (to max. 0.6m depth only) uilding Regulations Part H1: Shallow only, to maximum depth 0.6m Shallow Inspection hamber assembly technical.design@wavin.co.uk Osma/Wavin hambers PIM 5

7 Product etails Shallow I Shallow Inspection hamber Maximum invert depth 0.6m. whether used in adoptable or non-adoptable applications. /S Equal Shallow Inspection hamber E G F 250mm dia. base with integral shaft, incorporating straight channel and three inlets, including 2 x 45 equal branch inlets For use with 110mm Osmarain Supplied with two profiled blank-off plugs for unused side entries Size (mm) Number E F G over & Frame Round over & Frame For non-trafficked/landscaped locations Sealed For loadings up to 10kN (1.0 tonne) when supported by a concrete collar an be used internally Size (mm) Number Square over & djustable Frame For non-trafficked/landscaped locations Sealed For loadings up to 10kN (1.0 tonne) when supported by a concrete collar an be used internally Size (mm) Number Osma/Wavin hambers PIM ustomer Services: Technical dvice:

8 Spares over to Frame Seal 250mm diameter for use with 4325 and 4961 overs & Frames Material: EPM Nominal Part Size (mm) Number 4314 Screws Pack of 4 for securing 4325/4961 cover to its frame Material: Metal Nominal Part Size (mm) Number 4318 Round over Spare for use with 4325 and 4961 Frame Nominal Part Size (mm) Number 4328 lank-off Plugs For use with 4960 Nominal Part Size (mm) Number technical.design@wavin.co.uk Osma/Wavin hambers PIM 7

9 Product etails Multi-ase I Introduction escription 315mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of ten base configurations for use with 110mm Osmarain system. Shaft may be assembled to required invert depth by using shaft sections pplications For above ground access and maintenance inspection of buried pipework own to 0.6m deep under uilding Regulations Part H1 own to 0.9m deep under Sf7 Typical hamber etail Type 4 For loading applications up to 15kN (1.0 Tonne) Key imensions Invert depth of base: 205mm External shaft diameter: 315mm Shaft section length: 150mm Inlets/outlets: 110mm Key Features & enefits Multiple options for maximum installation flexibility Fast, easy installation: no wet trades Lightweight: no lifting equipment required Push-fit shaft sections: one or more can be used to achieve required invert depth Final shaft section can be cut to required length No additional trench excavation required ompliance Multi-ase Inspection hambers comply with the following standards and regulations S EN : 2010 a Sf7 Typical hamber etail Type 4 (to max. 0.9m depth only) uilding Regulations Part H1: Shallow only, to maximum depth 0.6m Multi-ase Inspection hamber assembly 8 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

10 Multi-ase Inspection hamber ases When used in non-adoptable applications, maximum invert depth 0.6m. When used in adoptable applications, maximum invert depth 0.9m. E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and single inlet For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and two inlets including 90 left-hand equal branch inlet For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and two inlets including 90 right-hand equal branch inlet For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and two inlets including 45 left-hand equal branch inlet For use with 110mm Osmarain Size (mm) Number E F a technical.design@wavin.co.uk Osma/Wavin hambers PIM 9

11 Product etails Multi-ase I E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and two inlets including 45 right-hand equal branch inlet For use with 110mm Osmarain Size (mm) Number E F a E G F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and 3 inlets including 2 x 45 equal branch inlets For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating 90 bent channel and single inlet For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and three inlets including 45 and 90 left-hand equal branch inlets For use with 110mm Osmarain Size (mm) Number E F a Osma/Wavin hambers PIM ustomer Services: Technical dvice:

12 E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and three inlets including 45 and 90 right-hand equal branch inlets For use with 110mm Osmarain Size (mm) Number E F a E F /S Equal Shallow Inspection hamber ase 315mm dia. base incorporating straight channel and three inlets including 2 x 90 equal branch inlets For use with 110mm Osmarain Size (mm) Number E F a Shaft P/E Inspection hamber Shaft 315mm diameter x 150mm long For use with all types of Multi-ase 315mm bases Supplied with a pre-fitted elastomeric seal Size (mm) Number a * *imension = effective height over & Frame Square over & djustable Frame For non-trafficked/landscaped locations For loadings up to 15kN (1.5 tonnes) when supported by a concrete collar For external use only Size (mm) Number technical.design@wavin.co.uk Osma/Wavin hambers PIM 11

13 Product etails Multi-ase I Spares Multi-ase Shaft Seal 315mm diameter for use with 4937 shaft sections Material: EPM Nominal Part Size (mm) Number Osma/Wavin hambers PIM ustomer Services: Technical dvice:

14 Product etails Universal I Introduction escription 450mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of five base configurations for equal and unequal pipe connections. ase configurations available for use with either 110/160mm Osmarain or 150mm UltraRib. Shaft may be assembled to required invert depth by using shaft sections 4975 (maximum 1.2m). pplications For above ground access and maintenance inspection of buried pipework up to 1.2 metres deep For loading applications up to 15kN (1.5 tonnes) Key imensions Height of bases: 295mm [for 110mm system] 270mm [for 150mm and 160mm systems] External shaft diameter: 450mm Shaft section length: 305mm Maximum installation depth: 1.2m Key Features & enefits Fast, easy installation: no wet trades Lightweight: no lifting equipment required Push-fit shaft sections: one or more can be used to achieve required invert depth Final shaft section can be cut to required length No additional trench excavation required ompliance Universal Inspection hambers comply with the following standards and regulations S EN : 2010 a Sf7 Typical hamber etail Type 4 (to max. 1.2m depth only) uilding Regulations Part H1: Shallow and/or eep Universal Inspection hamber assembly technical.design@wavin.co.uk Osma/Wavin hambers PIM 13

15 Product etails Universal I Universal Inspection hambers 450mm Shaft When used in adoptable/non-adoptable applications, maximum invert depth 1.2m. E F /S Equal Inspection hamber ase 450mm dia. base incorporating straight channel and 5 inlets including 2 x 45 and 2 x 90 equal branch inlets For use with 110mm Osmarain Supplied with 3 blank-off plugs for unused side entries Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E F /S Equal Inspection hamber ase 450mm dia. base incorporating straight channel and 3 inlets including 2 x 90 equal branch inlets For use with 160mm Osmarain Supplied with 1 blank-off plug for unused side entry Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E F /S Equal Inspection hamber ase 450mm dia. base incorporating 160mm straight channel and 5 inlets including 2 x 45 and 2 x mm branch inlets For use with 110mm and 160mm Osmarain Supplied with 3 blank-off plugs for unused side entries Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) 14 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

16 E /S Equal Inspection hamber ase straight channel with two 90 branches (left and right) F 450mm dia. base incorporating 150mm straight channel and 3 x 150mm inlets including 2 x 90 equal branch inlets For use with 150mm UltraRib Supplied with 1 blank-off plug for unused side entry Size (mm) Number E F 150 6UR928 a * *imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E /S UnEqual Inspection hamber ase straight channel with four branches (two left, two right) F 450mm dia. base incorporating 150mm straight channel and 4 x 110mm inlets including 2 x 45 and 2 x mm branch inlets For use with 150mm UltraRib Supplied with 3 blank-off plugs for unused side entries Size (mm) Number E F 150 6UR929 a * *imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) Shaft P/E Inspection hamber Shaft 450mm dia. plain-ended shaft. Length: 305mm For use with all Universal bases Supplied with integral, co-injected, elastomeric seal Size (mm) Number a * *Note: dimension = effective height technical.design@wavin.co.uk Osma/Wavin hambers PIM 15

17 Product etails Universal I over & Frame Options Round over & Frame 125 For medium duty loaded locations For loadings up to 125kN (12.5 tonnes) when frame is supported by a concrete plinth Material: uctile Iron Size (mm) Number 4942 a Square over & Frame 15 Used with 4975 shaft for lightly-loaded locations For loadings up to 15kN (1.5 tonnes) Supplied with 350mm Restricted ccess an be suitable for loadings up to 50kN (5.0 tonnes) when frame is supported by a concrete plinth Size (mm) Number 4920 a * *Note: dimension = fully inserted Round over & Frame 15 Used with 4975 shaft for lightly-loaded locations For loadings up to 15kN (1.5 tonnes) Supplied with 350mm Restricted ccess Size (mm) Number 4924 a * *Note: dimension = fully inserted 16 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

18 Round over & Frame 15 Used with 4975 shaft for lightly-loaded locations For loadings up to 15kN (1.5 tonnes) Size (mm) Number 4927 a * *Note: dimension = fully inserted Square Recessed over & Frame Used with 4975 shaft For loadings up to 25kN (2.5 tonnes) when frame is supported by a concrete plinth Material: Steel cover/polypropylene frame Size (mm) Number Square Recessed over & Frame Used with 4975 shaft Sealed For loadings up to 25kN (2.5 tonnes) when frame is supported by a concrete plinth Suitable for internal use Material: Steel Size (mm) Number ccessories Inspection hamber hannel over left Left-hand for use with 4922 ase only To blank-off unused side entry Nominal Part Size (mm) Number technical.design@wavin.co.uk Osma/Wavin hambers PIM 17

19 Product etails Universal I Inspection hamber hannel over right Right-hand for use with 4922 ase only To blank-off unused side entry Nominal Part Size (mm) Number 4949 over Sealing Ring For sealing 4920/4924/4927 to its corresponding frame Material: EPM Nominal Part Size (mm) Number 4994 Spares Inlet lank-off Plugs For use with all 110mm base inlets Nominal Part Size (mm) Number 4926 Screws for 4920 Pack of 4 for securing 4920 cover to its frame Material: Stainless Steel Nominal Part Size (mm) Number 4995 Screws for 4927 Pack of 3 for securing 4927 cover to its frame Material: Stainless Steel Nominal Part Size (mm) Number Osma/Wavin hambers PIM ustomer Services: Technical dvice:

20 Eye olts for 4920 Pack of 3 for securing 4920 frame to its shaft Material: Stainless Steel Nominal Part Size (mm) Number technical.design@wavin.co.uk Osma/Wavin hambers PIM 19

21 Product etails Non Man-Entry I Introduction escription 500mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of three base configurations for equal and unequal pipe connections. ase configurations available for use with either 110/160mm Osmarain or 150mm UltraRib. pplications For above ground access and maintenance inspection of buried pipework For loading applications up to 15kN (1.5 tonnes) Key imensions External shaft diameter: 572mm Maximum installation depth: 1.2m Key Features & enefits Easy to install Lightweight: no lifting equipment required Shaft can be easily cut to required length No additional trench excavation required ompliance The Non Man-Entry Inspection hamber complies with the following standards and regulations S 7158: 2001 a Sf7 Typical hamber etail Type 4: (to max. 1.2m depth only) uilding Regulations Part H1: Shallow and/or eep Non Man-Entry Inspection hamber assembly 20 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

22 Non Man-Entry Inspection hambers 500mm Shaft Inspection hamber 500mm dia. is Kitemarked to S 7158, when used in adoptable areas maximum invert depth is 1.2m, when used in non-adoptable areas, maximum invert depth available under S 7158 is 3m. E F /S Equal Inspection hamber ase 110mm straight channel with two 110mm x 45 and two 110mm x 90 left/right hand branch entries For use with 110mm Osmarain components Supplied complete with a base to shaft sealing ring and 3 blank-off plugs for use in unused side entries Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E F /S Equal Inspection hamber ase 160mm straight channel with two 160mm x 90 left/right hand branch entries For use with 160mm Osmarain Supplied complete with a base to shaft sealing ring and 1 blank-off plug for use in unused side entries Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E F /S UnEqual Inspection hamber ase 160mm straight channel with two 110mm x 45 and two 110mm x 90 left/right hand branch entries, for use with 110mm components For use with 160mm Osmarain Supplied complete with a base to shaft sealing ring and 3 blank-off plugs for use in unused side entries Size (mm) Number E F a * *Note: dimension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) technical.design@wavin.co.uk Osma/Wavin hambers PIM 21

23 Product etails Non Man-Entry I E /S Equal Inspection hamber ase F 150mm straight channel with two 150mm x 90 left/right hand branch entries For use with 150mm UltraRib components Supplied complete with a base to shaft sealing ring and 1 blank-off plug for use in unused side entries Size (mm) Number E F 150 6UR936 a * *imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E /S UnEqual Inspection hamber ase F 150mm straight channel with two 110mm x 45 and two 110mm x 90 left/right hand branch entries, for use with 110mm components For use with 150mm UltraRib components Supplied complete with a base to shaft sealing ring and 3 blank-off plugs for use in unused side entries Size (mm) Number E F 150 6UR937 a * *imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) Shaft P/E Inspection hamber Shaft 500mm diameter for use with all types of 500mm dia. hamber ases Shaft 1.5m or 3.0m length Size (mm) Number a a Osma/Wavin hambers PIM ustomer Services: Technical dvice:

24 Restriction ccess aps Restriction ccess ap For use with 6934/6938 shaft sections, restricts access to 350mm, supplied with one 500mm sealing ring Size (mm) Number a hamber ase/restriction ccess ap Seal spare 500mm diameter for use with 6934/6938 shaft sections and 6930/940 restriction access caps Material: EPPM Nominal Part Size (mm) Number a NI Telescopic daptor For use with 4920 cover and frame. llows height adjustment and accomodation of slope. Restricted to 350mm internal diameter Size (mm) Number technical.design@wavin.co.uk Osma/Wavin hambers PIM 23

25 Installation Shallow/Multi-ase I Typical Installation of 250/315mm dia. Inspection hambers The following is a typical summary of the installation procedures required to install the Osma 250/315mm dia Inspection hambers. The Shallow and Multi-ase Inspection hamber may be installed in the same minimum trench width as required for standard 110mm drainage pipework. NO extension of trench width is required. ll elements are lightweight: may be handled/installed by a single person. Preparation Prepare and compact 100mm regulating bed of as dug or granular material in trench bottom Positioning/connection Position ase on regulating bed. heck outlet is facing in the correct direction Ensure all inlets/outlet are free from dirt or grit In the case of the Shallow Inspection hamber, remove profile plug(s) for the side outlets required Use standard jointing sequence to connect 110mm Osmarain pipes to inlets/outlet Inspection hamber lean inside of ase socket and lubricate this entire area Position first shaft section into ase socket. Vertically push home manually Push-fit further shaft sections as required for invert depth. Ensure inside of each shaft section is prelubricated ut final shaft section to approximate required height, using a fine-toothed saw. (Grooves at 30mm centres act as cutting guides) ackfill trench Figure 1: Typical installation detail: Shallow Inspection hamber efore starting backfill, cover top of shaft to prevent ingress of dirt or grit Select suitable sidefill use as dug. If not appropriate, use suitable granular material, similar to bedding material void knocking shaft during backfilling and keep free of debris ackfill to formation level. Then trim shaft to required height using finetoothed saw NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion (Round) or 4961 (Square) over & Frame NH requirement secure frame to shaft using screws ompacted backfill as dug if suitable, or granular material 4960 Shallow Inspection hamber with 250mm dia. Shaft 110mm Osmarain NOTE: The main through channel MUST be used. ends up to 45 may be used on any inlet or outlet. Granular bedding material utting shaft Shallow Inspection hamber ut shaft to approximate required height, using a fine-toothed saw, using the cutting guides shown on the hamber unit hamfer the cut end to approx. 15 using plain-toothed rasp or scraper Shaft assembly Multi-ase 24 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

26 Figure 2: Typical installation detail: Multi-ase Inspection hamber 4969 over and Frame *For 15 applications subject to occasional loading up to 15kN (1.5 tonnes) (See Figures 4 & 6). ompacted backfill as dug if suitable, or granular material 4937 Inspection hamber Shaft 110mm Osmarain EXMPLE: 250mm Inspection hamber in domestic paths/patios Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft section Prepare polypropylene over and Frame [4325 or 4961] for installation onto and/or into the shaft section, as previously discribed over and Frame: Installation onto/ into 250/315mm dia. Inspection hambers For green areas and pedestrian areas NOT* subject to vehicle loading (See Figures 3 & 5). EXMPLE: 250mm Inspection hamber in domestic gardens Trim shaft section at last stage of construction. Ensure unit is at correct height. Use cutting guides shown on chamber unit Prepare polypropylene over and Frame [4325 or 4961] for installation onto and/or into the shaft section: [4325] lean and lubricate outside of shaft top Ensure sealing ring inside the frame section is seated correctly and free from dirt and grit Position the cover and frame socket over the shaft and push-fit home Fix frame to shaft using self-tapping screws (not provided) [4961] Granular bedding material 4910 Inspection hamber ase lean and lubricate inside of shaft top Ensure sealing ring located on the outside of the frame section is seated correctly and free from dirt and grit Position the cover and frame spigot into the shaft and push-fit home Fix frame to shaft using self-tapping screws (not provided) EXMPLE: 315mm Inspection hamber in domestic gardens Trim shaft section at last stage of construction. Ensure unit is at correct height Lubricate inside of top shaft section Prepare polypropylene over and Frame [4969] for installation into shaft: ensure pre-fitted ring seal is clean and not twisted Position the cover and frame socket into the shaft section and push home Fix frame to shaft using self-tapping screws (not provided) EXMPLE: 315mm Inspection hamber in domestic paths/patios Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber Lubricate inside of top shaft section Prepare polypropylene over and Frame [4969] for installation into shaft: ensure pre-fitted ring seal is clean and not twisted Position the cover and frame socket into the shaft section and push home Fix frame to shaft using self-tapping screws (not provided) [4961] lean and lubricate inside of shaft top Ensure sealing ring located on the outside of the frame section is seated correctly and free from dirt and grit Position the cover and frame spigot into the shaft and push-fit home Fix frame to shaft using self-tapping screws (not provided) technical.design@wavin.co.uk Osma/Wavin hambers PIM 25

27 Installation Shallow/Multi-ase I Figure 3: Installation detail green areas (non-loaded) 4325 (Round) or 4961 (Square) over & Frame NH requirement secure frame to shaft using screws ompacted backfill as dug if suitable, or granular material 4960 Shallow Inspection hamber with 250mm dia. Shaft Figure 4: Installation detail 15 areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) 4961 (Square) over & Frame NH requirement secure frame to shaft using screws 150mm deep concrete collar ompacted backfill as dug if suitable, or granular material 4960 Shallow Inspection hamber with 250mm dia. Shaft Figure 5: Installation detail green areas (non-loaded) 4969 over and Frame 110mm ompacted Osmarain backfill as dug if suitable, or granular material 100mm bedding material 4937 Inspection hamber Shaft Universal Inspection hamber ase Figure 6: Installation detail 15 areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) 110mm Pipe 4969 over and Frame 100mm bedding material mm Inspection deep concrete collar hamber ase 4937 Inspection hamber Shaft ompacted backfill as dug if suitable, or granular material 26 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

28 Installation Universal/Non Man-Entry I Typical Installation of 450/500mm dia. Inspection hamber The following is a typical summary of the installation procedures required to install Osma 450/500mm dia. Inspection hambers. ll elements are lightweight: may be handled/installed by a single person. Excavation Take precautions against trench collapse: support trench sides deeper than 1.2m Shaft assembly 500mm Inspection hamber ut corrugated shaft to approx. Invert depth of hamber. REOMMENTION: leave extra 300mm depth to allow for possible final site changes Locate sealing ring between 2nd and 3rd ribs from shaft bottom. Ensure ring is seated correctly/not twisted lean inside of ase socket and lubricate this entire area Position shaft at 45 angle into ase socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft) ackfill trench efore starting backfill, cover top of shaft to prevent ingress of dirt or grit Select suitable sidefill use as dug. If not appropriate, use suitable granular material, similar to bedding material void knocking shaft during backfilling and keep free of debris ackfill to formation level. Then trim shaft to required height using finetoothed saw NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. Preparation Prepare and compact 100mm regulating bed of as dug or granular material in trench bottom Positioning Use standard jointing sequence to connect 110/160mm Osmarain or 150mm UltraRib pipes to inlets/ outlets Push blank-off plugs externally into any unused outlet(s) Figure 7: Typical installation detail: Universal Inspection hamber I over and Frame 4942 S EN Medium uty ar surface 150mm deep concrete collar 4975 Inspection hamber Shaft ompacted backfill as dug if suitable, or granular material NOTE: The main through channel MUST be used. ends up to 45 may be used on any inlet or outlet. Shaft assembly 450mm Inspection hamber lean inside of ase socket and lubricate this entire area Position first shaft section into ase socket. Vertically push home manually Push-fit further shaft sections as required for invert depth. Ensure inside of each shaft section is prelubricated ut final shaft section to approximate required height, using a fine-toothed saw. (Use external rings as cutting guides) 110mm Osmarain Granular bedding material 4922 Universal Inspection hamber ase technical.design@wavin.co.uk Osma/Wavin hambers PIM 27

29 Installation Universal/Non Man-Entry I over and Frame: Installation onto/ into 450/500mm dia. Inspection hambers For green areas and pedestrian areas NOT* subject to vehicle loading (See Figure 8). EXMPLE: 450mm Inspection hamber in domestic gardens Trim shaft section at last stage of construction. Ensure unit is at correct height Prepare selected over and Frame [4920, 4924 or 4927] for installation into shaft Position the cover and frame spigot into the shaft section Fix frame to shaft using self-tapping screws EXMPLE: 500mm Inspection hamber in domestic gardens Trim shaft section at last stage of construction Locate sealing ring (6917) between 2nd and 3rd ribs from shaft top. Ensure ring is sealed correctly, not twisted Prepare NI Telescopic daptor (6940), position over top of shaft and push fully home Prepare selected over and Frame [4920] Position the cover and frame spigot into the Telescopic daptor Fix frame to adaptor using the eyebelts provided *For 15 applications subject to occasional loading up to 15kN (1.5 tonnes) (See Figure 9). EXMPLE: 450/500mm Inspection hambers domestic paths/patios Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber Prepare selected over and Frame [4920, 4924 or 4927] for installation into shaft Position the cover and frame spigot into the shaft section Fix frame to shaft using self-tapping screws Figure 8: Installation detail green areas (non-loaded) For 125 applications subject to medium duty loading up to 12.5kN (12.5 tonnes) (See Figure 10). EXMPLE: 450/500mm Inspection hambers in paved areas with limited traffic load Trim shaft section at last stage of construction. Ensure unit is at correct height Protect shaft from traffic loading by shuttering its external ribs Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 500mm x 500mm or 500mm diameter to ensure that any loads are distributed away from the shaft On top of slab, construct lass engineering brickwork OR concrete blocks OR pre-cast concrete seating rings up to required height ccording to required loading application, position uctile Iron 125 over and Frame or 400 over and Frame on top of slab PP Square over and Frame 4920 secured to shaft 4975 Inspection hamber Shaft ompacted backfill as dug if suitable, or granular material Figure 9: Installation detail 15 areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) PP Square over and Frame 4920 secured to shaft ar surface 150mm deep concrete collar 4975 Inspection hamber Shaft ompacted backfill as dug if suitable, or granular material 28 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

30 Figure 10: Typical installation detail: 500mm dia Inspection hamber, Type 4 over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 500mm dia to 350mm dia 500mm dia Shaft ompacted backfill as-dug or granular bedding material 100/110mm or 150/160 dia Pipe Granular bedding material technical.design@wavin.co.uk Osma/Wavin hambers PIM 29

31 Product etails Range 200 I Introduction escription 200mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. For use directly with either 110/160mm plastic pipework or 150mm UltraRib system via the appropriate adaptor (6UR141). 200mm diameter shaft may be cut to length to achieve required invert down to amaximum of 2 metres. pplications For above ground access and maintenance inspection of buried pipework down to 2 metres deep For loading applications: 15 (1.5 tonnes) 125 (12.5 tonnes) * 400 (40 tonnes) * * With cover & frame supported by concrete plinth (suppied by others) Key imensions Invert depth of base: 430mm [for 110mm system] 450mm [for 160mm system] External shaft diameter: 200mm Shaft length: 2m Maximum installation depth: 2m Key Features & enefits Fast, easy installation: no wet trades Lightweight: no lifting equipment required Reinforcing ribs on underside to withstand groundwater pressure Shaft can be cut to required length No additional trench excavation required ompliance Range 200 chambers comply with the following standards and regulations S EN : 2010 a Sf7 Typical hamber etail Type 4: (Non-entry. Maximum depth from cover level to soffit of pipe: 2m) uilding Regulations Part H1: Shallow only to maximum depth 0.6m Range 200 Inspection hamber assembly 30 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

32 ase When used in adoptable applications, maximum invert depth 2m. /S Equal Inspection hamber ase E F 200mm dia. base incorporating straight channel and single inlet For use with 110/160mm plastic pipework systems lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E F NE300 a NE300 a Shaft P/E Inspection hamber Shaft 200mm dia. plain-ended shaft Length: 2 metres For use with Range 200 bases 24NE300 and 26NE300 Size (mm) Number 20NE * * imension = effective height over & Frame Square over & Frame 15 For non-trafficked/landscaped locations Sealed For loadings up to 15kN (1.5 tonnes) when supported by a concrete plinth Size (mm) Number 20NE technical.design@wavin.co.uk Osma/Wavin hambers PIM 31

33 Product etails Range 200 I ccessories daptor for UltraRib Pipe For connecting 150mm UltraRib pipe to chamber base 26NE300 Size (mm) Number 150 6UR141$ Spares Square over Spare for use with 20NE015 frame Size (mm) Number 20NE Screws Pack of 4 for securing 20NE015 cover to its frame Nominal Part Size (mm) Number Osma/Wavin hambers PIM ustomer Services: Technical dvice:

34 Product etails Range 315 I Introduction escription 315mm diameter polypropylene inspection chambers for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of eight base configurations for equal pipe connections. For use directly with either 110/160mm plastic pipework or 150mm UltraRib system via the appropriate adaptor (6UR141). ompliance Range 315 chambers comply with the following standards and regulations S EN : 2009 a Sf7 Typical hamber etail Type 4: (Non-entry. Maximum depth from cover level to soffit of pipe: 2m) uilding Regulations Part H1: Shallow only to maximum depth 0.6m 315mm diameter shaft may be cut to length to achieve required invert down to a maximum of 2 metres. pplications For above ground access and maintenance inspection of buried pipework down to 2 metres deep For loading applications: 15 (1.5 tonnes) 125 (12.5 tonnes) * 400 (40 tonnes) * * With cover & frame supported by concrete plinth Key imensions Invert depth of base: 238mm [for 110mm system] 290mm [for 160mm system] External shaft diameter: 315mm Shaft length: 2m Maximum installation depth: 2m Key Features & enefits Fast, easy installation: no wet trades Lightweight: no lifting equipment required Reinforcing ribs on underside to withstand groundwater pressure Shaft can be cut to required length No additional trench excavation required Range 315 Inspection hamber assembly technical.design@wavin.co.uk Osma/Wavin hambers PIM 33

35 Product etails Range 315 I ases ll Range 315 bases are supplied with a base-to-shaft sealing ring. When used in adoptable applications, maximum invert depth 2m. E G F /S Equal Inspection hamber ase 315mm dia. base incorporating straight channel and single inlet For use with 110/160mm plastic pipework lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E F G NE300 a * NE300 a * 103 * imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E G F /S Equal Inspection hamber ase 315mm dia. base incorporating straight channel and 2 inlets, including 45 left-hand equal branch inlet For use with 110/160mm plastic pipework lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E F G NE301 a * NE301 a * 103 * imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) E G F /S Equal Inspection hamber ase 315mm dia. base incorporating straight channel and 2 inlets, including 45 right-hand equal branch inlet For use with 110/160mm plastic pipework lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E F G NE302 a * NE302 a * 103 * imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) 34 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

36 E G F /S Equal Inspection hamber ase 315mm dia. base incorporating straight channel with 3 inlets, including 2 x 45 equal branch inlets For use with 110/160mm plastic pipework lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E F G NE303 a * NE303 a * 103 * imension F = height at centre point of base (all bases have a 15 inlet-to-outlet fall) Shaft P/E Inspection hamber Shaft 315mm dia. plain-ended corrugated shaft Length: 2 metres For use with all Range 315 bases Size (mm) Number NE * * imension = effective height over & Frame Square over & Frame 15 For non-trafficked/landscaped locations Sealed For loadings up to 15kN (1.5 tonnes) when supported by a concrete plinth Size (mm) Number 30NE technical.design@wavin.co.uk Osma/Wavin hambers PIM 35

37 Product etails Range 315 I ccessories onnector Kit For connecting 110/160mm plastic pipework to Range 315 Inspection hamber shaft Material: PV-U Nominal Part Size (mm) Number 110 NE NE960 hamber Shaft utter omponents For cutting 110/160mm connection holes to receive plastic pipework in Range 315 Inspection hamber shaft Material: Iron*/Steel Size (mm) Number 110* NE NE daptor for UltraRib Pipe For connecting 150mm UltraRib pipe to all Range 315 Inspection hamber bases Size (mm) Number 150 6UR141$ Spares hamber ase to Shaft Seal 315mm diameter for use with 30NE002 at foot of shaft Material: EPM Size (mm) Number 30NE Osma/Wavin hambers PIM ustomer Services: Technical dvice:

38 over & Frame Seal to Shaft 315mm diameter for use with 30NE002 at top of shaft Material: EPM Size (mm) Number 12TW Square over Spare for use with 30NE015 frame Size (mm) Number 30NE Screws Pack of 4 for securing 30NE203 cover to its frame Nominal Part Size (mm) Number 30NE technical.design@wavin.co.uk Osma/Wavin hambers PIM 37

39 Product etails Range 450 I Introduction escription 450mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of eight bases for equal and unequal pipe connections. ompliance Range 450 chambers comply with the following standards and regulations S EN : 2009 a Sf7 Typical hamber etail Type 3: (Non-entry. Maximum depth from cover level to soffit of pipe: 3m) uilding Regulations Part H1: Shallow and/or eep edicated bases for use directly with either 110/160mm plastic pipework or 150mm UltraRib system via the appropriate adaptor (6UR141). 450mm diameter shaft may be cut to length to achieve required invert up to maximum 3 metres. pplications For above ground access and maintenance inspection of buried pipework up to 3 metres deep For loading applications: 15 (1.5 tonnes) 125 (12.5 tonnes) * 400 (40 tonnes) * * With cover & frame supported by concrete plinth NOTE: oncrete plinth not required for non-loaded applications such as domestic gardens Key imensions Invert depth of bases: mm (at centre point of base) External shaft diameter: 515mm Shaft length: 3m Maximum installation depth: 3m Key Features & enefits Full range of dedicated bases, ensure that smooth flow can be achieved Quick & easy to install, with a sculpturedneck on the base, which allows the shaft to be fitted with little effort Lightweight polypropylene chamber bases, no lifting equipment required 3m shaft can be cut to required length Range 450 Inspection hamber assembly 38 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

40 ases For use with 110mm plastic pipework ll Range 450 bases are supplied with a base-to shaft sealing ring. When used in adoptable applications, maximum invert depth 3m. /S Equal Inspection hamber ase 450mm dia. base straight channel and single inlet Size (mm) Number E NE300 a /S Equal Inspection hamber ase 450mm dia. base incorporating straight channel with 3 inlets, including 1 x 45 and 1 x 90 left-hand, equal branch inlets Supplied with 1 x 110mm blank-off plug Size (mm) Number E NE304 a /S Equal Inspection hamber ase 450mm dia. base incorporating straight channel with 3 inlets, including 1 x 45 and 1 x 90 right-hand, equal branch inlets Supplied with 1 x 110mm blank-off plug Size (mm) Number E NE305 a /S Equal Inspection hamber ase 450mm dia. base incorporating straight channel with 5 inlets, including 2 x 45 and 2 x 90 left/right-hand, equal branch inlets Supplied with 3 x 110mm blank-off plugs Size (mm) Number E NE306 a technical.design@wavin.co.uk Osma/Wavin hambers PIM 39

41 Product etails Range 450 I ases For use with 160mm plastic pipework ll Range 450 bases are supplied with a base-to shaft sealing ring. When used in adoptable applications, maximum invert depth 3m. /S Equal Inspection hamber ase 450mm dia. base straight channel and single inlet lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E NE300 a /S UnEqual Inspection hamber ase 450mm dia. base incorporating 160mm straight channel with 3 inlets, including a 110mm x 45 and a 160mm x 90 lefthand, equal branch inlets Supplied with 1 x 110mm blank-off plug lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E NE307 a /S UnEqual Inspection hamber ase 450mm dia. base incorporating 160mm straight channel with 3 inlets, including a 110mm x 45 and a 160mm x 90 righthand, equal branch inlets Supplied with 1 x 110mm blank-off plug lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E NE308 a Osma/Wavin hambers PIM ustomer Services: Technical dvice:

42 /S UnEqual Inspection hamber ase 450mm dia. base incorporating 160mm straight channel with 5 inlets, including 2 110mm x 45 and 2 160mm x 90 left/righthand, equal branch inlets Supplied with 2 x 110mm and 1 x 160mm blank-off plugs lso for use with 150mm UltraRib, using daptor 6UR141 Size (mm) Number E NE309 a Shaft P/E Inspection hamber Shaft 450mm dia. plain-ended corrugated shaft Length: 3 metres For use with all Range 450 bases Size (mm) Number NE * * imension = effective height Restriction ccess ap Restriction ccess ap For use with 40NE300 shaft Restricts access to 350mm Supplied with one 450mm sealing ring Size (mm) Number NE technical.design@wavin.co.uk Osma/Wavin hambers PIM 41

43 Product etails Range 450 I ccessories onnector Kit For connecting 110/160mm plastic pipework to Range 450 Inspection hamber shaft Material: PV-U Nominal Part Size (mm) Number 110 NE NE960 hamber Shaft utter omponents For cutting 110/160mm connection holes to receive plastic pipework in Range 450 Inspection hamber shaft Material: Iron*/Steel Size (mm) Number 110* NE NE daptor for UltraRib Pipe For connecting 150mm UltraRib pipe to all Range 450 Inspection hamber bases Size (mm) Number 150 6UR141$ Spares hamber ase to Shaft Seal 450mm diameter for use with 40NE300 at foot of shaft Material: EPM Size (mm) Number 450TW Osma/Wavin hambers PIM ustomer Services: Technical dvice:

44 Product etails Range 600 I Introduction escription 600mm diameter polypropylene inspection chamber for adoptable and non-adoptable applications. ompliant with Sewers for doption 7th edition [Sf7]. hoice of twelve bases for equal pipe connections. ompliance Range 600 chambers comply with the following standards and regulations S EN : 2009 a Sf7 Typical hamber etail Type 3: (Non-entry. Maximum depth from cover level to soffit of pipe: 3m) uilding Regulations Part H1: Shallow and/or eep For use directly with 150mm, 225mm and 300mm UltraRib system. 600mm diameter shaft may be cut to length to achieve required invert down to a maximum of 3 metres. pplications For above ground access and maintenance inspection of buried pipework down to 3 metres deep For loading applications: 125 (12.5 tonnes) * 400 (40 tonnes) * * With cover & frame supported by concrete plinth Key imensions Invert depth of base: 646mm [for 150mm system] 705mm [for 225mm and 300mm systems] External shaft diameter: 683mm Shaft length: 3m Maximum installation depth: 3m Key Features & enefits Fast, easy installation: no wet trades Lightweight: no lifting equipment required Reinforced base plate to withstand groundwater pressure Shaft can be cut to required length ll inlets and outlet sockets allow 7.5 movement in all directions Range 600 Inspection hamber assembly technical.design@wavin.co.uk Osma/Wavin hambers PIM 43

45 Product etails Range 600 I ases ll Range 600 bases are supplied with a base-to shaft sealing ring. When used in adoptable applications, maximum invert depth 3m. E /S Equal Inspection hamber ase 600mm dia. base straight channel and single inlet For use with 150mm, 225mm and 300mm UltraRib lso for connection to 150mm, 225mm and 300mm TwinWall using daptors 6TW145 (with 150 ase), 9TW145 (with 225 ase) or 12TW145 (with 300 ase) Size (mm) Number E NE300 a NE300 a NE300 a E /S Equal Inspection hamber ase 600mm dia. base incorporating bent 90 channel and single inlet For use with 150mm, 225mm and 300mm UltraRib lso for connection to 150mm, 225mm and 300mm TwinWall using daptors 6TW145 (with 150 ase), 9TW145 (with 225 ase) or 12TW145 (with 300 ase) Size (mm) Number E NE314 a NE314 a NE314 a E /S Equal Inspection hamber ase 600mm dia. base incorporating bent 30 channel and single inlet For use with 150mm, 225mm and 300mm UltraRib lso for connection to 150mm, 225mm and 300mm TwinWall using daptors 6TW145 (with 150 ase), 9TW145 (with 225 ase) or 12TW145 (with 300 ase) Size (mm) Number E NE315 a NE315 a NE315 a Osma/Wavin hambers PIM ustomer Services: Technical dvice:

46 E /S Equal Inspection hamber ase 600mm dia. base incorporating straight channel and three inlets including 2 x 90 equal branch inlets For use with 150mm, 225mm and 300mm UltraRib lso for connection to 150mm, 225mm and 300mm TwinWall using daptors 6TW145 (with 150 ase), 9TW145 (with 225 ase) or 12TW145 (with 300 ase) Size (mm) Number E NE316 a NE316 a NE316 a Shaft P/E Inspection hamber Shaft 600mm dia. plain-ended corrugated shaft Length: 3 metres For use with all Range 600 bases Size (mm) Number NE * * imension = effective height Restriction ccess ap Restriction ccess ap For use with 60NE300 shaft Restricts access to 350mm Supplied with one 600mm sealing ring Size (mm) Number NE technical.design@wavin.co.uk Osma/Wavin hambers PIM 45

47 Product etails Range 600 I ccessories onnector Kit For connecting 110/160mm plastic pipework to Range 600 Inspection hamber shaft Material: PV-U Nominal Part Size (mm) Number 110 NE NE960 hamber Shaft utter omponents For cutting 110/160mm connection holes to receive plastic pipework in Range 600 Inspection hamber shaft Material: Iron*/Steel Size (mm) Number 110* NE NE Spares hamber ase to Shaft Seal 600mm diameter for use with 60NE003 at foot of shaft Material: EPM Size (mm) Number 600TW Osma/Wavin hambers PIM ustomer Services: Technical dvice:

48 Installation Range 200 I Range 200 hamber and Shaft NOTE: The following is a summary of installation procedures following selection of a suitable Range 200 ase. The Range 200 inspection chamber may be installed in the same minimum trench width as required for standard 110mm or 160mm drainage pipework. NO extension of trench width is required. ll elements are lightweight: may be handled/installed by a single person. Excavation Take precautions against trench collapse: support trench sides deeper than 1.2m Preparation Prepare and compact 100mm regulating bed of granular material in trench bottom Positioning/connection Preparing shaft ut shaft to approx. Invert depth of hamber. REOMMENTION: leave extra 300mm depth to allow for possible final site changes lean inside of ase socket lean and lubricate entire spigot end of shaft to be inserted Position shaft at 45 angle into ase socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft) ackfill trench efore starting backfill, cover top of shaft to prevent ingress of dirt or grit NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. Figure 11: Typical installation detail: Range 200 Inspection hamber Type 4 over & Frame lass 125 loading riveway 150mm deep concrete collar Shuttering to external shaft 200mm dia Shaft Position ase on regulating bed. heck outlet is facing in the correct direction ompacted backfill as-dug or granular bedding material NOTE: On 24NE300/26NE300 Straight ases, a flow indication arrow is inscribed Ensure all inlets/outlet are free from dirt or grit If connecting to 150mm UltraRib, insert the appropriate adaptors into the required inlet/outlet as follows: 150mm UltraRib use daptor 6UR141 ends up to 45 may be used on inlet and outlet 100/110mm or 150/160 dia Pipe Granular bedding material ackfill Using same material as bedding, backfill around ase in 150mm layers up to underside of shaft socket. Ensure inside of ase is free of debris technical.design@wavin.co.uk Osma/Wavin hambers PIM 47

49 Installation Range 200 I 15 over and Frame 15 polypropylene cover and frames 20NE015 uses a dual fixing system for additional safety. The cover is pre-fixed to the frame using screws. REOMMENTION: use self-tapping screws [not supplied] to secure the frame to the shaft. Figure 12: Installation detail green areas (non-loaded) over & Frame lass 15 loading Garden 200mm dia Shaft ompacted backfill as-dug or granular bedding material For installation in areas not subject to loading, such as domestic gardens, no concrete plinth support is required (See Figure 12). For 15 applications subject to occasional/temporary vehicle loading up to 15kN (1.5 tonnes) such as domestic driveways, the frame should be supported by a concrete plinth (See Figure 13). Installation procedures: For green areas and pedestrian areas NOT* subject to vehicle loading (See Figure 12) EXMPLE: domestic gardens Trim shaft section at last stage of construction. Ensure unit is at correct height *For 15 applications subject to occasional vehicle loading up to 15kN (1.5 tonnes) (See Figure 13) Figure 13: Installation detail 15 areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) For both non-load and occasional loading applications, as above Prepare polypropylene over and Frame [20NE015] for installation onto shaft Position the cover and frame spigot into the shaft section Fix frame to shaft using self-tapping screws over & Frame lass 15 loading Footways and landscaped areas 150mm deep concrete collar 200mm dia Shaft ompacted backfill as-dug or granular bedding material 100/110mm or 150/160 dia Pipe EXMPLE: domestic driveways Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber 48 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

50 125 & 400 over and over & Frame lass 125 loading riveway uctile iron cover and frames uctile iron options are recommended 150mm for heavier deep loaded applications: concrete collar lass 125 with medium duty loading Shuttering capacity to of external 125kN (12.5 tonnes) where shaft the frame is supported by a concrete plinth. Suitable for applications such as 200mm dia Shaft car parks and service roads. Figure 14: Installation detail for 125 loading: paved areas with limited traffic load over & Frame lass 125 loading riveway 150mm deep concrete collar Shuttering to external shaft 200mm dia Shaft ompacted backfill as-dug or granular bedding material lass 400 classification with loading ompacted backfill as-dug capability or granular of up to 400kN (40 tonnes) bedding where material supported by a concrete plinth. Suitable for carriageways and roads subject to motor vehicle trafficking. Installation procedures: 100/110mm or 150/160 dia Pipe For 125 applications (See Figure 14) 100/110mm or 150/160 dia Pipe Granular bedding material EXMPLE: car parks and service roads Trim shaft section at last stage of construction. Ensure unit is at correct height Protect shaft from traffic loading by shuttering the outside of the shaft (See Figure 14) Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 450mm x 450mm or 450mm diameter to ensure that any loads are distributed away from the shaft Position uctile Iron 125 over and Frame on top of slab (See Figure 14) Trafficked application (e.g. roadway) Follow Highway Specification for installation of a 400 over and Frame technical.design@wavin.co.uk Osma/Wavin hambers PIM 49

51 Installation Range 315 I Range 315 hamber and Shaft NOTE: The following is a summary of installation procedures following selection of a suitable ase for the required number of inlets. The Range 315 inspection chamber may be installed in the same minimum trench width as required for standard 110mm or 160mm drainage pipework. NO extension of trench width is required. ll elements are lightweight: may be handled/installed by a single person. Excavation Take precautions against trench collapse: support trench sides deeper than 1.2m Preparation Prepare and compact 100mm regulating bed of granular material in trench bottom Positioning/connection Position ase on regulating bed. heck outlet is facing in the correct direction NOTE: On 34NE300/36NE300 Straight ases, a flow indication arrow is inscribed ackfill Using same material as bedding, backfill around ase in 150mm layers up to underside of shaft socket. Ensure inside of ase is free of debris. Preparing shaft ut corrugated shaft to approx. Invert depth of hamber. REOMMENTION: leave extra 300mm depth to allow for possible final site changes Locate sealing ring between 2nd and 3rd ribs from shaft bottom. Ensure ring is seated correctly/not twisted lean inside of ase socket and lubricate this entire area. Position shaft at 45 angle into ase socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft) ackfill trench efore starting backfill, cover top of shaft with cap provided NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. Figure 15: Typical installation detail: Range 315 Inspection hamber. Type 4 over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external ribs If connecting to 150mm UltraRib, insert the appropriate adaptors into the required inlet/outlet as follows: 150mm UltraRib use daptor 6UR141 Use standard jointing sequence to connect 100/110mm or 150/160mm pipes to inlets/outlet. Push lank-off Plugs into any unused inlets 315mm dia Shaft ompacted backfill as-dug or granular bedding material NOTE: The main through channel MUST be used. ends up to 45 may be used on any inlet or outlet. 100/110mm or 150/160 dia Pipe Granular bedding material 50 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

52 15 over and Frame 15 polypropylene cover and frames Figure 16: Installation detail green areas (non-loaded) over & Frame lass 15 loading Garden 30NE015 uses a dual fixing system for additional safety. The cover is pre-fixed to the frame using screws. REOMMENTION: use self-tapping screws [not supplied] to secure the frame to the shaft. 315mm dia Shaft ompacted backfill as-dug or granular bedding material For installation in areas not subject to loading, such as domestic gardens, no concrete plinth support is required. (See Figure 16). For 15 applications subject to occasional/temporary vehicle loading up to 15kN (1.5 tonnes) such as domestic driveways, the frame should be supported by a concrete plinth. (See Figure 17). Installation procedures: For green areas and pedestrian areas NOT* subject to vehicle loading (See Figure 16) Figure 17: Installation detail 15 areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) For all 15 applications over & Frame lass 15 loading Footways and landscaped areas 150mm deep concrete collar 315mm dia Shaft ompacted backfill as-dug or granular bedding material 110/160mm dia Pipe EXMPLE: domestic gardens Trim shaft section at last stage of construction. Ensure unit is at correct height *For 15 applications subject to occasional vehicle loading up to 15kN (1.5 tonnes) (See Figure 17) EXMPLE: domestic driveways Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber lean outside of shaft section between first and second rib Locate sealing ring ensuring it is seated correctly/not twisted Prepare polypropylene 15 over and Frame [30NE015] for installation onto shaft: clean inside of frame socket area apply lubricant to entire surface area Position the cover and frame socket over the shaft section and push home Screw frame to shaft using selftapping screws [not provided] Granular bedding material 110/160mm dia Pipe Granular bedding material technical.design@wavin.co.uk Osma/Wavin hambers PIM 51

53 Installation Range 315 I 125 & 400 over and Frame uctile iron cover and frames uctile iron options are recommended for heavier loaded applications: lass 125 with medium duty loading capacity of 125kN (12.5 tonnes) where the frame is supported by a concrete plinth. Suitable for applications such as car parks and service roads. lass 400 classification with loading capability of up to 400kN (40 tonnes) where supported by a concrete plinth. Suitable for carriageways and roads subject to motor vehicle trafficking. Figure 18: Installation detail for 125 loading: paved areas with limited traffic load over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external ribs 315mm dia Shaft ompacted backfill as-dug or granular bedding material Installation procedures: For 125 applications (See Figure 18) EXMPLE: car parks and service roads Trim shaft section at last stage of construction. Ensure unit is at correct height Protect shaft from traffic loading by shuttering its external ribs (See Figure 18) Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 450mm x 450mm or 450mm diameter to ensure that any loads are distributed away from the shaft Position uctile Iron 125 over and Frame on top of slab. (See Figure 18) 110/160mm dia Pipe Granular bedding material Trafficked application (e.g. roadway) Follow Highway Specification for installation of a 400 over and Frame 52 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

54 Installation Range 450 I Range 450 hamber and Shaft NOTE: The following is a summary of installation procedures following selection of a suitable Range 450 ase for the required number of inlets. Excavation Take precautions against trench collapse: support trench sides deeper than 1.2m Preparation Prepare and compact 100mm regulating bed of granular material in trench bottom Positioning/connection Preparing shaft ut corrugated shaft to approx. Invert depth of hamber. REOMMENTION: leave extra 300mm depth to allow for possible final site changes Locate sealing ring between 2nd and 3rd ribs from shaft bottom. Ensure ring is seated correctly/not twisted lean inside of ase socket and lubricate this entire area Position shaft at 45 angle into ase socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft) ackfill trench efore starting backfill, cover top of shaft to prevent ingress of dirt or grit Trim shaft/fit restriction access cap Trim shaft to required height using finetoothed saw NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. When shaft trimmed to final height, locate sealing ring between 2nd and 3rd ribs from shaft top. Ensure ring is seated correctly/not twisted Lubricate inside of the 450 to 350mm restrictor cap, position over top of shaft, and push fully home Position ase on regulating bed. heck outlet is facing in the correct direction: i.e. with side inlets swept to follow water flow If connecting to 150mm UltraRib, insert the appropriate adaptors into the required inlet/outlet as follows: 150mm UltraRib use daptor 6UR141 Use standard jointing sequence to connect 100/110mm or 150/160mm pipes to inlets/outlet. Push lank-off Plugs into any unused inlets Figure 19: Typical installation detail: Range 450 Inspection hamber. Type 4 over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 450mm dia to 350mm dia NOTE: The main through channel MUST be used. ends up to 45 may be used on any inlet or outlet. 450mm dia Shaft ackfill Using same material as bedding, backfill around ase in 150mm layers up to underside of shaft socket. Ensure inside of ase is free of debris ompacted backfill as-dug or granular bedding material 100/110mm or 150/160 dia Pipe Granular bedding material technical.design@wavin.co.uk Osma/Wavin hambers PIM 53

55 Installation Range 450 I Installation procedures: For 15 applications in domestic garden areas and/or subject to occasional vehicle loading up to 15kN (1.5 tonnes) (See Figure 20) EXMPLE: domestic driveways Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber Prepare 15 over and Frame for installation in accordance with manufacturer s instructions Position the cover and frame socket on top of slab and fix in accordance with manufacturer s instructions 125 & 400 over and Frame Installation procedures: For 125 Paved areas with limited traffic load Trim shaft section at last stage of construction. Ensure unit is at correct height Protect shaft from traffic loading by shuttering its external ribs (See Figure 21) Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 750mm x 750mm or 750mm diameter to ensure that any loads are distributed away from the shaft Position uctile Iron 125 over and Frame on top of slab. (See Figure 21) Trafficked application (e.g. roadway) Follow Highway Specification for installation of a 400 over and Frame Figure 20: Installation detail 15 domestic gardens and/or areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) over & Frame lass 15 loading ar Surface 150mm deep concrete collar Shuttering to external cap Restrictor cap 450mm dia to 350mm dia 450mm dia Shaft ompacted backfill as-dug or granular bedding material Figure 21: Installation detail for 125 loading: paved areas with limited traffic load over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar 150mm, Shuttering 225mm to external or cap 300mm dia Pipe Restrictor cap 450mm dia to 350mm dia Granular bedding material 450mm dia Shaft ompacted backfill as-dug or granular bedding material 150mm, 225mm or 300mm dia Pipe Granular bedding material 54 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

56 Installation Range 600 I Range 600 hamber and Shaft NOTE: The following is a summary of installation procedures following selection of a suitable Range 600 ase for the required number of inlets. Excavation Take precautions against trench collapse: support trench sides deeper than 1.2m Preparation Prepare and compact 100mm regulating bed of granular material in trench bottom Positioning/connection Preparing shaft ut corrugated shaft to approx. Invert depth of hamber. REOMMENTION: leave extra 300mm depth to allow for possible final site changes Locate sealing ring between 2nd and 3rd ribs from shaft bottom. Ensure ring is seated correctly/not twisted lean inside of ase socket and lubricate this entire area Position shaft at 45 angle into ase socket. Vertically push home manually or, if required, with mechanical assistance (if so, protect top of shaft) ackfill trench efore starting backfill, cover top of shaft to prevent ingress of dirt or grit Trim shaft/fit restriction access cap Trim shaft to required height using finetoothed saw NOTE: If finished ground level is not yet known, leave shaft proud of surface and keep open end covered until final completion. When shaft trimmed to final height, locate sealing ring between 2nd and 3rd ribs from shaft top. Ensure ring is seated correctly/not twisted Lubricate inside of the 600 to 350mm restrictor cap, position over top of shaft, and push fully home Position ase on regulating bed. heck outlet is facing in the correct direction: i.e. with side inlets swept to follow water flow Ensure all inlets/outlet are free from dirt or grit Use standard jointing sequence to connect 150mm, 225mm or 300mm UltraRib pipes to inlets/outlet For connection of TwinWall pipes in these sizes, use daptors 6TW145, 9TW145 or 12TW145. Figure 22: Typical installation detail: Range 600 Inspection hamber. Type 3 over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 600mm dia to 350mm dia NOTE: The main through channel MUST be used. ends up to 45 may be used on any inlet or outlet. ackfill 600mm dia Shaft Using same material as bedding, backfill around ase in 150mm layers up to underside of shaft socket. Ensure inside of ase is free of debris ompacted backfill as-dug or granular bedding material 150mm, 225mm or 300mm dia Pipe Granular bedding material technical.design@wavin.co.uk Osma/Wavin hambers PIM 55

57 Installation Range 600 I Installation procedures: For 15 applications in domestic garden areas and/or subject to occasional vehicle loading up to 15kN (1.5 tonnes) (See Figure 23) EXMPLE: domestic driveways Leave top 150mm of shaft clear of backfill Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber Prepare 15 over and Frame for installation in accordance with manufacturer s instructions Position the cover and frame socket on top of slab and fix in accordance with manufacturer s instructions 125 & 400 over and Frame Installation procedures: For 125 Paved areas with limited traffic load Trim shaft section at last stage of construction. Ensure unit is at correct height Protect shaft from traffic loading by shuttering its external ribs (See Figure 24) Lay 150mm thick slab of pre-cast or in situ concrete around top of shaft chamber with minimum opening 750mm x 750mm or 750mm diameter to ensure that any loads are distributed away from the shaft Position uctile Iron 125 over and Frame on top of slab. (See Figure 24) Trafficked application (e.g. roadway) Follow Highway Specification for installation of a 400 over and Frame Figure 23: Installation detail 15 domestic gardens and/or areas subject to occasional vehicle loading up to 15kN (1.5 tonnes) over & Frame lass 125 loading ar Surface 150mm deep concrete collar Shuttering to external cap Restrictor cap 600mm dia to 350mm dia 600mm dia Shaft ompacted backfill as-dug or granular bedding material Figure 24: Installation detail for 125 loading: paved areas with limited traffic load over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar 150mm, Shuttering 225mm to external or cap 300mm dia Pipe Restrictor cap 600mm dia to 350mm dia Granular bedding material 600mm dia Shaft ompacted backfill as-dug or granular bedding material 150mm, 225mm or 300mm dia Pipe Granular bedding material 56 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

58 Installation Typical ackdrop onnection ackdrop onnections for Ranges 315, 450 and 600 Installation of backdrop connections chamber which has substantially different invert levels will require backdrop connection of one or more drains. This operation can be done externally on site (See Figure 25). Use a combination of ackdrop Kit [NE950 or NE960], with associated 100/110mm or 150/160mm fittings, for in situ connection to a shaft, as follows: rill required opening into corrugated shaft section at appropriate place lean and remove any swarf from the opening Install the special 110mm or 160mm seal into the opening Fully lubricate around the entire internal surface of the seal Insert specially designed in-situ socket connector into the seal opening Lubricate the outside surface of the spigot pipe to be connected and insert into the socket connector Make remaining connections in the same way as for standard jointing of 110mm or 160mm pipes and or fittings Figure 25: Typical installation detail typical backdrop situation over & Frame lass 125 loading riveway lass engineering bricks set in class 1 mortar 150mm deep concrete collar Shuttering to external cap Restrictor cap 450mm dia to 350mm dia 450mm dia Shaft ompacted backfill as-dug or granular bedding material 100/110mm or 150/160mm dia Pipe Granular bedding material technical.design@wavin.co.uk Osma/Wavin hambers PIM 57

59 Testing and Maintenace Osma/Wavin hambers Testing ll testing of these non-man entry chambers and connecting pipework must be undertaken at ground level. For guidance, please use the following: ir Testing using remote test bags: equipment required 3 x 1 metre x 8mm Steel rainage Rods 50mm ouble Worm Screw for use with Steel rainage Rods PV sealing bags fitted with Schrader Valve and 6 metre hose Steel drain plug with testing point icycle Pump Tyre pressure gauge to ensure correct inflation pressure of the test bags ir Testing procedure 1. ssemble drain rods to 3 metres in length with double worm attachment on end. 2. Remove as much air as possible from the PV Sealing ag. Method: hold valve open and squeeze bag flat. Tip: folding the bag in half to make it as small as possible will make it easier to locate. 3. Twist neck of PV Sealing ag into double worm attachment until it has firm grip on bag. 4. Ensure valve end of hose is secure with no danger of falling down the chamber. 5. Hold drain rods and hose from the PV Sealing ag together. Start to lower the test bag into the base. 9. If required, remove rods by twisting them in an anti-clockwise direction to release the double worm. heck the valve end of hose is safely positioned. 10. Place a similar sealing bag or a steel drain plug at the other end of the pipe length to be tested. (This could be another chamber or a terminal access point.) oth bag and steel drain plug must include a suitable testing point. 11. ttach a manometer. arry out required air test method. 12. Remove sealing bag. Method: twist double worm attachment around the hose at ground level. Lower it down the hose, guiding the rods to the bottom of the chamber and once again grip the bag. NOTE: No requirement to grip bag tightly. This is simply to aid its removal. Release as much air as possible from bag. Then slide bag back out the pipe with the rods. When this is done, lift/remove all test equipment out of the chamber. Maintenance s with all Osma/Wavin hambers, the smooth interior bore of chamber channels and associated pipe systems will aid the flow of water and waste through the system. ecause man-entry of Osma/Wavin chambers is not possible, maintenance work such as Rodding, Jetting and TV inspection must be undertaken at ground level. lways follow the Health & Safety and Operational procedures of equipment suppliers. Tip: Keep hose tight while lowering bag. This helps to keep bag in place. 6. When bag is in chamber base, position it into the channel of the run to be tested. 7. y using the channel as a guide, slide test bag into the mouth of the pipe, and as far as possible into the pipe. Method: use rods to push bag into position. 8. Leave rods attached (this ensures bag is held in position). Start to pump the bag up using a bicycle pump. NOTE: When inflating the test bags, follow manufacturer s instructions to ensure pressure is not exceeded. Use tyre pressure valve to monitor bag pressure. 58 Osma/Wavin hambers PIM ustomer Services: Technical dvice:

60 iscover our broad portfolio at Water management Plumbing and heating Waste water drainage Water and gas distribution able ducting Wavin Limited Registered Office Edlington Lane oncaster N12 1Y Tel Wavin Limited Wavin operates a programme of continuous product development, and therefore reserves the right to modify or amend the specification of their products without notice. ll information in this publication is given in good faith, and believed to be correct at the time of going to press. However, no responsibility can be accepted for any errors, omissions or incorrect assumptions. Users should satisfy themselves that products are suitable for the purpose and application intended. For further product information visit: wavin.co.uk OWI001 June 2015

Osma UltraRib System:

Osma UltraRib System: Uniclass EPI JR12 L21721 P7114 J344 X725 I/Sf (52.3) In6 June 2014 UR102 Osma UltraRib System: Product and Installation Guide Solutions for Essentials ontents Introduction The Osma UltraRib System 4 Material

More information

Wavin: Range 600 Inspection Chambers

Wavin: Range 600 Inspection Chambers Uniclass EPIC G632:G581 JR12 CI/SfB (52.7) In6 August 2013 WP004 J34 Wavin: Range 600 Inspection Chambers Product Technical Guide Solutions for Essentials Contents Foul water Surface water Indicates where

More information

Product and Installation Guide

Product and Installation Guide Uniclass CI/SfB Feb 2005 L7314:P71 (52.5) In6 TW203 EPIC J3413:X71 TwinWall Surface & Storm Water Drainage System Product and Installation Guide FOR COMMERCIAL AND INDUSTRIAL APPLICATIONS Intelligent Solutions

More information

G632:G77 JR12/JR13 A16 J34 X71 CI/SfB (52.7) In6 (Y2) June 2015 OD107. Waste water drainage PRODUCT AND INSTALLATION MANUAL.

G632:G77 JR12/JR13 A16 J34 X71 CI/SfB (52.7) In6 (Y2) June 2015 OD107. Waste water drainage PRODUCT AND INSTALLATION MANUAL. Waste water drainage PRODUT ND INSTLLTION MNUL Uniclass EPI G632:G77 JR12/JR13 16 J34 X71 I/Sf (52.7) In6 (Y2) June 2015 OD107 Drainage ontents Introduction 2 The System 2 Material 2 Standards 2 cceptance

More information

Product and installation manual. UltraRib. Foul and Surface Water Drainage

Product and installation manual. UltraRib. Foul and Surface Water Drainage Product and installation manual UltraRib Foul and Surface Water Drainage Contents Introduction 2 The System 2 Material 2 Standards 2 cceptance 2 Pipe and Joint Technology 3 General Information 4 Weights

More information

(For compliance with the new sewers for adoption regulation or building regulations part H1)

(For compliance with the new sewers for adoption regulation or building regulations part H1) Plastic Drainage Keyline offers a comprehensive range of products suitable for all building, foul, surface water and land drainage applications - including new innovative, cost-effective systems for compliance

More information

Product guide. TwinWall. Surface and Stormwater Drainage

Product guide. TwinWall. Surface and Stormwater Drainage Product guide Surface and Stormwater Drainage Contents Introduction 2-3 Product Details 4-12 Jointing 13 General Information 14-15 Notes 16 www.wavin.co.uk Email: technical.design@wavin.co.uk Surface and

More information

Rodding Eye Details. Inspection Chambers

Rodding Eye Details. Inspection Chambers Rodding Eye Details Inspection Chambers 1 2 Deep Inspection Chambers BS7158:2001 Installation Procedures 1. Excavate to the required depth for the Polypipe Non Man Entry Deep Inspection Chamber system

More information

Adoptable and Non-Adoptable Assemblies.

Adoptable and Non-Adoptable Assemblies. Access and Inspection Chambers Adoptable and Non-Adoptable Assemblies www.brettmartin.com New render DRAINAGE PLUMBING RAINWATER ROOFING DRAINAGE PLUMBING DRAINAGE SYSTEMS Brett Martin s Plumbing and Drainage

More information

DRAFT. Draft Bill of Quantities. Drainage

DRAFT. Draft Bill of Quantities. Drainage Draft Bill of Quantities September 2015 STORM DRAINAGE INFORMATION Measurement notes Drawings used : WYG (80) 140 Rev T1, D-(80) 001 Rev T1, D-(80) 002 Rev T1, D-(80) 003 Rev T1 and D-(80) 004 Rev T1 All

More information

Hepworth SuperSleve Drainage Specification

Hepworth SuperSleve Drainage Specification Hepworth SuperSleve Drainage Specification Client name Date - Site address 1 Manufacturer details Wavin Limited, Edlington Lane, Edlington, Doncaster, DN12 1BY T: 0844 856 5165 E: drainage@hepworth.co.uk

More information

Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual

Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the Marshalls CPM Perfect manhole

More information

Product and installation manual AquaCell Systems

Product and installation manual AquaCell Systems Product and installation manual quacell Systems Water Management Contents quacell Systems Introduction to SuDS 4 Keeping you on top of legislation 5 Overview 6 Product Range Summary 8 Product Details

More information

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints

Perfect Manhole Installation Manual May 2012 Rev 8 Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Perfect Manhole System Precast concrete manholes with load bearing elastomeric joints Installation Manual 1 1 Introduction This manual gives guidance on how to install the CPM Group Perfect manhole system

More information

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems

7.00 MANHOLES AND INSPECTION CHAMBERS. Hunter Underground Systems 7.00 MANHOLES AND INSPECTION CHAMBERS Hunter Underground Systems 7.01 Access to drains 7.02 preformed plastic Inspection Chambers 7.03 Manholes 7.04 450mm diameter inspection chambers Equal 110mm inspection

More information

Oil Separation Systems Product and Installation Guide

Oil Separation Systems Product and Installation Guide Uniclass JR20/JV50 L731/L75624 CI/SfB (56.3) May 2009/rev Dec 2009 WM422 EPIC L634 L2242 L511 Intelligent stormwater solutions by Wavin Oil Separation Systems Product and Installation Guide For residential,

More information

Agrément Certificate 89/2206 website: Product Sheet 6

Agrément Certificate   89/2206 website:   Product Sheet 6 Polypipe Ltd t/a Polypipe Building Products Broomhouse Lane Edlington Doncaster DN12 1ES Tel: 01709 770000 Fax: 01709 770001 British Board of Agrément Bucknalls Lane Watford Herts WD25 9BA 2017 Page 1

More information

Densleeve. Description. Specification. Availability. 2 Tel: Fax:

Densleeve. Description. Specification. Availability. 2 Tel: Fax: The Naylor ensleeve underground drainage system of plain-end vitrified clay pipes and fittings with flexible sleeve couplings, was developed for building drainage and associated sewerage and is all manufactured

More information

AWASHAFT DN400. Product and Installation Guide

AWASHAFT DN400. Product and Installation Guide AWASHAFT DN400 Product and Installation Guide AWASHAFT DN400 Safety for generations The AWASHAFT DN400 is a cleaning, inspection and transfer chamber for installation in private or municipal sewerage or

More information

OSMADRAIN UNDERGROUND DRAINAGE SYSTEM OSMADRAIN UNIVERSAL GULLY SYSTEM

OSMADRAIN UNDERGROUND DRAINAGE SYSTEM OSMADRAIN UNIVERSAL GULLY SYSTEM Wavin UK (Holdings) Ltd Parsonage Way Chippenham Wiltshire SN15 5PN Tel: 01249 654121 Fax: 01249 443286 e-mail: info@wavin.co.uk website: www.wavin.co.uk APPROVAL INSPECTION TESTING CERTIFICATION TECHNICAL

More information

Regulations Detail Sheet 1

Regulations Detail Sheet 1 Electronic Copy Polypipe Building Products Ltd Broomhouse Lane Edlington Doncaster South Yorkshire DN12 1ES Tel: 01709 770000 Fax: 01709 770001 CI/SfB (52) In6 Agrément Certificate No 02/3923 Designated

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

JR12:L731/L71121/L2123 J3413:X721 CI/SfB (52.5) (H1) October 2015 WM424. Water management PRODUCT AND INSTALLATION MANUAL.

JR12:L731/L71121/L2123 J3413:X721 CI/SfB (52.5) (H1) October 2015 WM424. Water management PRODUCT AND INSTALLATION MANUAL. Water management PRODUCT AND INSTALLATION MANUAL Uniclass EPIC JR12:L731/L71121/L2123 J3413:X721 CI/SfB (52.5) (H1) October 2015 WM424 AquaCell Systems Contents AquaCell Systems Overview 2 Principal Components

More information

Polysewer Gravity Sewer System SPECIFICATION

Polysewer Gravity Sewer System SPECIFICATION Polysewer Gravity Sewer System SPECIFICATION July 2014 SCOPE OF WORKS To meet the specific performance criteria detailed within this specification and accompanying drawings. The completed drainage systems

More information

CPM Concrete Drainage Systems

CPM Concrete Drainage Systems CPM Group Ltd offer a complete range of precast concrete manhole units from DN 900 to DN 4000 in varying depths with tongue and groove joints. A djusting units Ductile iron cover & frame Cover slab DN1200

More information

Uniclass L731 CI/SfB (52.5) Ih. Pave. High-performance access covers for paved areas. Pave

Uniclass L731 CI/SfB (52.5) Ih. Pave. High-performance access covers for paved areas. Pave Uniclass 731 I/f (52.5) Ih. High-performance access covers for paved areas. 2017 The Gatic Quality Management ystem has been approved to EN IO 9001:8 ertificate No. FM 593418 The Gatic Environmental Management

More information

ACO Building Drainage

ACO Building Drainage ACO Building Drainage Backflow systems Installation, Operation and Maintenance Manual ACO TRIPLEX Anti-flood valve for GREYWATER drainage (wastewater without sewage) PLEASE READ THESE INSTRUCTIONS BEFORE

More information

VANSTONE PRECAST (PTY) LTD. PRECAST CONCRETE PANEL MANHOLE / DRAW BOX FOR TELECOMS INSTALLATIONS 780 x 780 x 815 mm

VANSTONE PRECAST (PTY) LTD. PRECAST CONCRETE PANEL MANHOLE / DRAW BOX FOR TELECOMS INSTALLATIONS 780 x 780 x 815 mm VNSTONE PRECST (PTY) LTD PRECST CONCRETE PNEL MNHOLE / DRW OX FOR TELECOMS INSTLLTIONS x x 815 mm SPECIFICTION Update 1: September 2008 (alternative concrete lid) Introduction The Panel Manhole is a x

More information

Installation Instructions for Perfect Manhole System DN 1200 DN PD 71 rev B 31/01/12

Installation Instructions for Perfect Manhole System DN 1200 DN PD 71 rev B 31/01/12 Installation Instructions for Perfect Manhole System DN 1200 DN 1500 31/01/12 Page 1 of 10 Stanton Bonna Manhole System gives a complete Invert to Slab watertight manhole system with a design life of 120

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

NELSON CITY COUNCIL INFRASTRUCTURAL ASSETS SD 601 APPROVED SENIOR EXECUTIVE INFRASTRUCTURE

NELSON CITY COUNCIL INFRASTRUCTURAL ASSETS SD 601 APPROVED SENIOR EXECUTIVE INFRASTRUCTURE SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 601 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 602 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 603 SENIOR EXECUTIVE INFRASTRUCTURE DATE SD 604 NOTES 1. PRE-FORMED PLASTIC

More information

Drexus Pave Drain. Linear Channel. Water Management. Water Linear Management Drainage Design Guide Drexus Pave Drain Linear Drainage Channel

Drexus Pave Drain. Linear Channel. Water Management. Water Linear Management Drainage Design Guide Drexus Pave Drain Linear Drainage Channel Linear Channel Water Management Linear Channel Drexus Pave Drain Textured Silver Grey Textured Charcoal Textured Buff D400 Yorkstone, Scoutmoor Mid Grey Granite Silver Grey Granite Drexus Pave Drain Concrete

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications.

Box Culverts. Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. Box Culverts Box Culverts Easy to install, suitable for very shallow or deep fill, ideal for use in a wide variety of civil engineering applications. 2 3 System Overview Forterra is one of the largest

More information

Selection & Installation

Selection & Installation Rev. June 2006 W0036/05 Rainwater Systems Selection & Installation 3 identify your OSMA the brand you can trust OSMA Rainwater Systems from Wavin offer you more. They give you more than just outstanding,

More information

Infiltration and Attenuation Systems Product and Installation Guide

Infiltration and Attenuation Systems Product and Installation Guide Uniclass JR12/JS10 L731/L71121/L2123 CI/SfB (52.5) (90.51) May 2009/rev February 2010 WM424 EPIC J3413 X721 Intelligent stormwater solutions by Wavin Infiltration and Attenuation Systems Product and Installation

More information

WAVIN ROAD GULLIES. Date of First issue: 16 April 2014 Brian Chamberlain Claire Curtis-Thomas

WAVIN ROAD GULLIES. Date of First issue: 16 April 2014 Brian Chamberlain Claire Curtis-Thomas HAPAS Wavin Ltd Parsonage Way Chippenham Wiltshire SN15 5PN Tel: 01249 766600 Fax: 01249 443286 e-mail: info@wavin.co.uk website: www.wavin.co.uk WAVIN ROAD GULLIES APPROVAL INSPECTION TESTING CERTIFICATION

More information

GL0025P Washdown & Silt Separator Installation & Operation Guidelines

GL0025P Washdown & Silt Separator Installation & Operation Guidelines GL0025P Washdown & Silt Separator Installation & Operation Guidelines Contact Numbers: UK: Service Tel: +44 (0) 845 355 0555 Service Fax: +44 (0) 1264 325245 Ireland: Service Tel: +44 (0) 28 302 54077

More information

Technical Data Sheet NEC/GRAN/95:01

Technical Data Sheet NEC/GRAN/95:01 Technical Data Sheet NEC/GRAN/95:01 Installation Guidance Notes Granular Surround Note : These guidance notes refer only to the installation of Granular surround underground tanks. These guidance notes

More information

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY

TITLE: SLAUGHTER HOUSE SEPTIC TANK. ITEM No. D E S C R I P T I O N UNIT QTY D DEMOLITION & SITE CLEARANCE D1 GENERAL CLEARANCE 6-D152 Open bush and thicket in and around ha 0.02 the ponds. Locally disposed. D2 REMOVAL OF TREES AND STUMPS 6-D212 Trees of girth: 150 mm - 500 mm

More information

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual New York

On-Site Leaching Chamber Specifications & Features. Design & Installation Manual New York On-Site Leaching Chamber Specifications & Features Design & Installation Manual New York 1 This manual provides general design and installation information for use of Arc plastic leaching chambers in the

More information

Retaining Guide. TerraFirm mm. 750mm (typical)

Retaining Guide. TerraFirm mm. 750mm (typical) Retaining Guide TerraFirm 75 2016 1800mm 750mm (typical) Modular Retaining Panel Construction Parameters The following conditions must be observed: Wind Region Refer Modular Wall Systems standard installation

More information

Bollard Chain Eye 3/8" (Powder Coated) Quick Link Connector 5/16" (Powder Coated) Optional Accessories:

Bollard Chain Eye 3/8 (Powder Coated) Quick Link Connector 5/16 (Powder Coated) Optional Accessories: ollard R-98- General escription: 0 / /8 R-98- Solar Light ollards feature bike-locking arms to to operate for days without direct sunlight. Lighting hardwiring or underground conduits. hoose from a range

More information

CI/SfB (11.5) In6. WavinCoil Product and Installation Guide. Land Drainage Systems FOR SURFACE AND SUB-SURFACE WATER DRAINAGE

CI/SfB (11.5) In6. WavinCoil Product and Installation Guide. Land Drainage Systems FOR SURFACE AND SUB-SURFACE WATER DRAINAGE Uniclass JR13 L13 CI/SfB May 2004 (11.5) In6 EPIC A221/1 X725 LD102 Land Drainage Systems WavinCoil Product and Installation Guide FOR SURFACE AND SUB-SURFACE WATER DRAINAGE Intelligent Solutions for Below

More information

ULTRARIB GRAVITY DRAINAGE AND SEWERAGE SYSTEM. WAVIN ULTRARIB 150 mm, 225 mm AND 300 mm INTERNAL DIAMETER PIPES AND FITTINGS

ULTRARIB GRAVITY DRAINAGE AND SEWERAGE SYSTEM. WAVIN ULTRARIB 150 mm, 225 mm AND 300 mm INTERNAL DIAMETER PIPES AND FITTINGS HPS Roads and ridges Wavin Plastics Limited Parsonage Way Chippenham Wiltshire SN15 5PN Tel: 01249 766600 Fax: 01249 443286 e-mail: info@wavin.co.uk website: www.wavin.co.uk ULTRRI GRVITY DRINGE ND SEWERGE

More information

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION

CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES PRECAST BOX CULVERTS CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 CONSTRUCTION SPECIFICATION CAPRICORN MUNICIPAL DEVELOPMENT GUIDELINES C222 ISSUE: NO:3 July 2018 TABLE OF CONTENTS CLAUSE CONTENTS PAGE GENERAL... 2 C222.01

More information

Installation Overview

Installation Overview Installation Overview Access Cover & Frame See page 6 for detail Cover Supports Hardwood, Concrete or Galvanised Angle 225mm PVC Push On Cap Code: 750191 Shroud Code: 750138 225mm PVC Extension Pipe Cut

More information

UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT

UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT www.brettmartin.com UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT QUALITY UNDERGROUND SYSTEMS When you select an underground system you need to be sure of its pedigree, convinced of its ability to perform,

More information

CI/SfB (52.5) X June 2008 CH301. Domestic Channel Drainage Systems. Product Guide

CI/SfB (52.5) X June 2008 CH301. Domestic Channel Drainage Systems. Product Guide Uniclass L7315 CI/SfB (52.5) X June 2008 CH301 EPIC J3413 Domestic Channel Drainage Systems Product Guide Domestic Channel Drainage Systems The Hepworth range of domestic linear drainage products offers

More information

A reliable solution for ditching, underpassing and rainwater drainage

A reliable solution for ditching, underpassing and rainwater drainage PIPES AND CHAMBERS CULVERT PIPES A reliable solution for ditching, underpassing and rainwater drainage Culvert pipes are used to convey drain pipe water or rainwater under the ground. The smallest (110

More information

TraffikDrain. 2 bolts per half meter grates for removable grate option

TraffikDrain. 2 bolts per half meter grates for removable grate option ACO ROAD TraffikDrain Eup to 2,788 psi Typical Applications Urban areas Highways Interstates State roads 2 bolts per half meter grates for removable grate option Ductile iron USA Made grate provides 60%

More information

DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE. Installation Guide ARMTEC.COM

DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE. Installation Guide ARMTEC.COM DRAINAGE SOLUTIONS SINCE 1908 SURFACE DRAINAGE Installation Guide ARMTEC.COM RECYFIX PRODUCTS RECYFIX trench drain systems are available in a wide range of load class ratings and grate options. They are

More information

Integrated Manhole Ladder System

Integrated Manhole Ladder System Application: This innovative product has been designed to provide safe access and egress to precast concrete manholes and inspection chambers. It can also be used within any other underground concrete

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated.

A. This Section includes sanitary waste and vent piping inside the building and to locations indicated. SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Current Standard Plates including Transmittal Letters are available on the web at:

Current Standard Plates including Transmittal Letters are available on the web at: MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard

More information

building the future PVC-UE Roofline, Window & Cladding Systems Soil & Waste Systems Underground Drainage Systems Rainwater Systems

building the future PVC-UE Roofline, Window & Cladding Systems Soil & Waste Systems Underground Drainage Systems Rainwater Systems building the future Underground Drainage PVC-UE Roofline, Window & Cladding Rainwater Soil & Waste Underground Drainage Hot & Cold Plumbing HIGH QUALITY UNDERGROUND DRAINAGE SYSTEM FloPlast are an established

More information

Agrément Certificate 03/3979 website: www. polypipe.com Product Sheet 1

Agrément Certificate   03/3979 website: www. polypipe.com Product Sheet 1 Polypipe Ltd t/a Polypipe Civils Charnwood Business Park North Road Loughborough Leicestershire LE11 1LE Tel: 01509 615100 Fax: 01509 610215 Agrément Certificate e-mail: civilssales@polypipe.com 03/3979

More information

Product Regulations Detail Sheet 1

Product Regulations Detail Sheet 1 Electronic opy Polypipe uilding Products roomhouse Lane Edlington Doncaster DN12 1ES Tel: 01709 770000 Fax: 01709 770127 I/Sf (52) In6 grément ertificate No 89/2206 Third issue* Designated by Government

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

High performance durable concrete pipes. Concrete Pipes

High performance durable concrete pipes. Concrete Pipes High performance durable concrete pipes oncrete Pipes Introduction Humes are the leading manufacturer of concrete pipes in New Zealand. Humes concrete pipes are manufactured to AS/NZS 4058:2007 standard

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Concrete Solutions. Utilities

Concrete Solutions. Utilities Concrete Solutions Utilities Catchpits Sometimes called Gullies or Road Gullies. Catchpits are normally used only on rural roadways and are designed to receive standard 405 x 355mm Gully Grids. The depth

More information

Installation Procedure FP McCann DN1050 Easi-Pit

Installation Procedure FP McCann DN1050 Easi-Pit Installation Procedure FP McCann DN1050 Easi-Pit This document describes the recommended procedure for the installation of FP McCann Easi- Pit DN1050 Precast Concrete Catch-Pit, used in manhole construction

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

Sewerage Code WSA Addendum PART 3 STANDARD DRAWINGS

Sewerage Code WSA Addendum PART 3 STANDARD DRAWINGS Addendum to the Water Industry Technical Standards and National Codes of Practice DOCUMENT W2 Sewerage Code WSA 02-1999 Addendum PART 3 STANDARD DRAWINGS Gippsland Water Business Management System Detailed

More information

Agrément Certificate 89/2206 website: Product Sheet 4 THE POLYPIPE UNDERGROUND DRAINAGE SYSTEM

Agrément Certificate   89/2206 website:   Product Sheet 4 THE POLYPIPE UNDERGROUND DRAINAGE SYSTEM Polypipe Ltd t/a Polypipe Building Products Broomhouse Lane Edlington Doncaster DN12 1ES Tel: 01709 770000 Fax: 01709 770001 Agrément Certificate e-mail: info@polypipe.com 89/2206 website: www.polypipe.com

More information

CI/SfB Oct 12 (52.5) Uniclass L7314

CI/SfB Oct 12 (52.5) Uniclass L7314 CI/SfB Oct 12 (52.5) Uniclass L7314 Bailey Flow-therm Product Selector A RANGE OF QUALITY AND ROBUST RAINWATER OUTLET AND VENTILATION SYSTEMS FOR FLAT ROOFS, MANUFACTURED FROM RIGID POLYURETHANE. Bailey

More information

Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank

Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank Installation and maintenance instructions for PLATIN and PLATIN XL Rainwater Underground Tank PLATIN 1500 L 3000 L 5000 L 7500 L Order No. 390000 Order No. 390001 Order No. 390002 Order No. 390005 PLATIN

More information

EASY HYDRO PLUS INSTALLATION GUIDELINES UNDERGROUND WATER TANK INSTALLATION

EASY HYDRO PLUS INSTALLATION GUIDELINES UNDERGROUND WATER TANK INSTALLATION Page 1 of 9 UNDERGROUND WATER TANK INSTALLATION These guidelines are designed to cover the installation of Ecosure underground water tanks with a capacity up to 7,000 litres. Separate guidelines are available

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

CI/SfB Oct 12 (52.5) Uniclass L7314

CI/SfB Oct 12 (52.5) Uniclass L7314 CI/SfB Oct 12 (52.5) Uniclass L7314 Bailey Flow-therm Product Selector A RANGE OF QUALITY AND ROBUST RAINWATER OUTLET AND VENTILATION SYSTEMS FOR FLAT ROOFS, MANUFACTURED FROM RIGID POLYURETHANE. Bailey

More information

Below ground System of pipework required to carry waste fluids from building to disposal site.

Below ground System of pipework required to carry waste fluids from building to disposal site. 1 Below ground System of pipework required to carry waste fluids from building to disposal site. Disposal site County Council sewage treatment facility. Septic tank system or alternative systems 2 1. Layout

More information

Uponor Ltd Aycliffe Industrial Estate Newton Aycliffe Co Durham DL5 6EA Tel: Fax:

Uponor Ltd Aycliffe Industrial Estate Newton Aycliffe Co Durham DL5 6EA Tel: Fax: CI/SfB (52) In6 Uponor td Aycliffe Industrial Estate Newton Aycliffe Co urham 5 6EA Tel: 01325 300010 Fax: 01325 321307 Roads and Bridges Agrément Certificate No 89/R044 Third issue* esignated by Government

More information

Manholes. ...a real breakthrough in sewer technology. Jeevan bhar ka saath... Unique features. Design Registered

Manholes. ...a real breakthrough in sewer technology. Jeevan bhar ka saath... Unique features. Design Registered Manholes...a real breakthrough in sewer technology Design Registered Unique features ReadymadeComplete in itself and a practical solution 90% Lighter than concrete manhole Robust design to withstand heavy

More information

Illustrated Hard Landscape Seminars - Student Notes Copyright 1995 John Heather Rev Curriculum No. GD x 1.25hrs.

Illustrated Hard Landscape Seminars - Student Notes Copyright 1995 John Heather Rev Curriculum No. GD x 1.25hrs. The Oxford College of Garden Design Illustrated Hard Landscape Seminars - Student Notes Copyright 1995 John Heather Rev. 21.01.2009 Curriculum No. GD604-2 3 x 1.25hrs This part of the seminar deals with

More information

Uniclass July 2014 L CI/SfB (52.9) Parade. Stainless Steel and Aluminium Access Covers and Frames Technical Details

Uniclass July 2014 L CI/SfB (52.9) Parade. Stainless Steel and Aluminium Access Covers and Frames Technical Details Uniclass July 2014 217241 I/f (52.9) Parade tainless teel and luminium ccess overs and Frames Technical etails Text Features and benefits Materials The majority of the Gatic Parade range of floor access

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

Maintenance Access Shafts

Maintenance Access Shafts Maintenance Access Shafts For wastewater and stormwater systems Utilities Solutions INTRODUCTION The Marley Maintenance Access Shaft System has been developed to primarily help local authorities eliminate

More information

SANITARY WASTE AND VENT PIPING

SANITARY WASTE AND VENT PIPING SECTION 15420 - SANITARY WASTE AND VENT PIPING PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Specification for Installation of Quadbox Modular Access Chambers JMF102, JMF104, JMF106

Specification for Installation of Quadbox Modular Access Chambers JMF102, JMF104, JMF106 Specification for Installation of Quadbox Modular Access Chambers JMF102, JMF104, JMF106 Page 1 of 8 INDEX 1 General information...3 2 Safety...3 3 Installation Procedure...3 3.1 Chamber Depth... 4 3.2

More information

Installation instructions and maintenance for the GRAF Optimax external commercial filter

Installation instructions and maintenance for the GRAF Optimax external commercial filter Installation instructions and maintenance for the GRAF Optimax external commercial filter Optimax external commercial filter for green areas (pedestrian weight resistant)) Order- No. 340035 Optimax external

More information

L7315+L21233 J342 X2. CI/SfB (52.5) If9 FOR RESIDENTIAL AND LIGHT COMMERCIAL APPLICATIONS

L7315+L21233 J342 X2. CI/SfB (52.5) If9 FOR RESIDENTIAL AND LIGHT COMMERCIAL APPLICATIONS Uniclass EPIC L7315+L21233 J342 X2 CI/SfB July 4 (52.5) If9 CH301 Channel Drainage Systems Product Guide FOR RESIDENTIAL AND LIGHT COMMERCIAL APPLICATIONS Intelligent Solutions for Below Ground Projects

More information

High performance durable concrete pipes. Concrete Pipes

High performance durable concrete pipes. Concrete Pipes High performance durable concrete pipes oncrete Pipes Introduction Humes are the leading manufacturer of concrete pipes in New Zealand. Humes concrete pipes are manufactured to AS/NZS 4058:2007 standard

More information

For more information on ACO Drain visit

For more information on ACO Drain visit Uniclass L7315 + L2123 EPIC J3413 CI/SfB (52.5) Heavy duty channel drainage system ACO S Range ACO S Range CHANNEL DRAINS Load Class BS EN 1433:2002 Optimum solution The ACO S Range is an interconnecting

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings freestone eco Retaining Wall SystemTM The Freestone ECO Retaining Wall System TM is a more sustainable DIY, vertical retaining wall which is manufactured with up to 40% recycled glass aggregate to provide

More information

Preparation & Jointing Doing Prevents Align bell and spigot of pipes to be joined. Before homing the joint, check that the gasket is in contact with the entry taper around the entire circumference Make

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install Pro Series Channel Drain and made it even better.

Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install Pro Series Channel Drain and made it even better. MODuLAr CHANNEL DrAiNS Patented PrO SEriES CHANNEL DrAiNS HAvE you SEEN THE NEW AND improved PrO SEriES CHANNEL DrAiN? Never ones to rest on our laurels, at NDS we ve taken our popular, easy-to-install

More information

INSTALLATION, OPERATING & MAINTENANCE GUIDELINES FOR WASH DOWN & SILT SEPARATORS

INSTALLATION, OPERATING & MAINTENANCE GUIDELINES FOR WASH DOWN & SILT SEPARATORS INSTALLATION, OPERATING & MAINTENANCE GUIDELINES FOR WASH DOWN & SILT SEPARATORS Klargester Environmental Limited College Road North, Aston Clinton, Aylesbury, Buckinghamshire, HP22 5EW Tel: (01296) 633033

More information

Fabrication and Installation Table of Contents

Fabrication and Installation Table of Contents Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection

More information

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe Design and Installation Guide PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe TABLE OF CONTENTS Introduction 2 Products 3 Main-Line Fittings & Service-Line Fittings 3-4 Connections to Dissimilar

More information

EASI-BASE DRAINAGE & WATER MANAGEMENT. v2.1

EASI-BASE DRAINAGE & WATER MANAGEMENT. v2.1 EASI-BASE DRAINAGE & WATER MANAGEMENT v2.1 FMCCANN.CO.UK Lisnaskea Magherafelt ARMAGH UddingSton Alnwick Weston Underwood Ellistown Byley Grantham Littleport Wellesbourne Lydney London Cadeby F McCann

More information