Pre-Engineered Walk-In Coolers and Freezers. Installation Manual
|
|
- Pierce Gilmore
- 6 years ago
- Views:
Transcription
1 Pre-Engineered Walk-In Coolers and Freezers Installation Manual Part One: The Bally Walk-In 1. Preparation for Installing the Walk-In 3 2. Operation of the Bally Speed-Lok 3 Part Two: Installation 1. Positioning 4 2. Walk-Ins with Screeds 4 3. Installing Less-Floor Walk-Ins 4 4. Door Installation 5 5. Installing With-Floor Walk-Ins 5 6. Vertical and Ceiling Panel Installation 5 7. Installing Multi-Compartment Walk-Ins 6 Part Three: Other Important Information 1. Preventing Vapor Leaks 6 2. Partition Wall Caulking 7 3. Air Gap Circulation Recommendation 7 4. Making holes for Refrigeration Tubing and Electrical Lines 7 5. Making Electrical Connections to Entrance Doors and Vapor-proof Lights 7 Part Four: Completing the Bally Installation Completing Installation of the Walk-In BALLY sales@ballync.com UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 1
2 Bally identifies panels with barcode labels that specify: a. Panel type: FLR- Floor CLG- Ceiling V- Vertical VC- Vertical corner BKR- Breaker b. Panel dimensions c. Panel finishes Listed Exterior/Interior d. Bally Part# and Serial# Miscellaneous Box #1 with the orange sticker contains all the information you will need. Before attempting to install the Bally Walk-In, review these instructions and any others supplied with the shipment. For future reference, make sure there is a record of the original order number and a list of all serial numbers for the Walk-In and refrigeration systems. A plan view showing the proper layout of panels is enclosed with other documents as well as this manual. Make sure you are using the As-Built drawings as opposed to any previously supplied Proposal drawings. Before placing any panel into position, check the plan view for location. 1. Installation Preparation A. When the building is delivered, make sure you have the right equipment and manpower on hand to unload the truck. A forklift or high jack can be helpful if the shipment includes heavy steel or refrigeration equipment. The carrier typically imposes time constraints on unloading your box, and in all situations one person is not enough. B. As you are unloading look for any freight damage; all products left our factory in perfect condition. Once the Bill of Landing was signed by the carrier, safe delivery became their responsibility and the equipment became your property. Check the packing list and make sure that all component parts are accounted for. Before signing the Bill of Landing, inspect all items. If any damage is noted or the number of pieces received does not agree with the invoice, do not accept shipment without notation by the carrier s agent on the Freight Bill. If damage or shortage is discovered when unpacking leave material and request an inspection by the carrier. Keep all documents and information so you can file you claim properly with the carrier. The Bill of Landing, Freight Bill, and the original invoice, are needed to file a claim, and must be filed within one week of the date of shipment. C. Use extreme caution when unpacking to prevent damage to panels and other equipment. Pay close attention to hardware affixed to the door and door-frame. Do not lift the door by its Hardware or the Light Base. Do not drop panels or slide over unfinished surfaces. Keep panels dry and out of direct sunlight. D. The protective plastic coating on the panels may be removed before or after the installation depending on the timing of construction schedules. The protective plastic on the bottom of the floor panels must be removed prior to setting the floors in place. In all cases, ALL plastic must be removed before the final completion of the installation. This includes all unexposed areas and all surfaces under membrane roofs. E. The most important requirement for installation of this Walk-In is to have a level floor. If the floor is level the process will be very smooth. Otherwise, it s impossible to make sure that the panels will align correctly and be plumb and level. Use a laser level or transit to identify the high spots on the floor. Whenever Walk-Ins are to be installed where concrete is curing or tile is being set, it is important to provide adequate ventilation. Concrete and tile grout release hydrogen while curing, which can damage the panel finishes, especially any type of Aluminum finish. For immediate service, call Bally s Parts and Service Hotline toll-free: UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 2
3 2. Operation of the Bally Speed-Lok: A. Before attempting to erect panels, familiarize yourself with the operation of the locks Figures 2, 3, and 4. On Bally panels, locks will always be on the left turning in clockwise rotation. If for any reason you have to unlock a panel, refer to Section B below. Figure 1 B. Replacing broken or stripped locks 1. The panel contained the lock must be slid away from adjacent panels in order to obtain adequate working space. First check for any obstructions (dirt, foam, etc.) once you have unlocked a panel reset the cam stop by turning the lock fully back to its original position. If the hook is broken or stripped replacements can be found in Miscellaneous Parts Box#1. 2. Position the lock wrench on the hex rod and turn clock-wise until the locking arm protrudes. 3. Place your hand near the bend in the wrench and use a lift-up motion. This will produce a clamping action on the hex rod. While doing this, pull forward until the rod is free of the panel. The locking arm will then drop free. See Figure Hold the new locking arm in position. Make sure the hook of the arm faces in the proper direction. See Figure Insert the new hex rod into the lock hole. Care must be taken to insert the notched end of the rod. The end to be inserted has a notch located 1 from the end. This notch acts as a stop so the rod will not be inserted too far. 6. Align the hex rod with the hex hold of the locking arm; gently tap it until the notch stops against the locking arm. 7. Replace and refasten the panel in its original position. Figure 2 Figure 3 Always refer to your Plan View when installing your Bally Walk-In Cooler or Freezer. UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 3
4 Part Two: Installation 1. Positioning Walk-Ins erected near existing building walls must be positioned with minimum 2 clearance to allow for air circulation and prevent possible condensation on the exterior surface of the Walk-In. It is important to check that the building s walls are square and plumb, if they are not this will have to be taken into account when erecting the sidewalls. If refrigeration and coil drain tubing is to be run between Walk- In and building wall allow space for installation. Check for overhead objects that will intrude the Walk-Ins height. Depending on temperature and humidity, air circulation may be needed to equalize the air temperature and the panel surface temperature above the dew point; this is usually required in a dead air space and high humidity environment. 2. Walk-Ins with Screeds If any part of your Walk-In employs screeds, lock the screeds to the bottoms of the panels before placing any vertical panels. Vinyl floor screeds are anchored to concrete in lessfloor Walk-Ins via drive pins with sleeve anchors provided by Bally. Drill into the concrete or other surface with a masonry bit. When using vinyl screeds, shim to make sure panels are level inside the screed. If the Walk-In is being installed on quarry tile, floor holes may be drilled to hit tile seams. Check all dimensions before proceeding. Figure 4 Figure 5 3. Assembly of Less-Floor Walk-Ins A. After you have checked that the building floor is level, use a transient or builders level to find the highest point on the perimeter. Position the first 12 x 12 corner to be level with the high point. Begin at corner and align panels at the top. See Figure 4. B. Position a vertical panel to the right and left of the corner panel (as per Plan View) and flush with the perimeter line. Once properly aligned, fully engage all vertical-to-vertical locks. See Figure 5. C. Level panels to the perimeter high point and check for plumb with a 48 spirit level. (Panels over 10 high use a plumb bob.) See Figure 7. D. As each panel is installed, check to make sure it s plumb and level. If the panel is not plumb, shim to adjust for plumb. Making the same check down the panel s leading edge shows whether it s level along the top or not. If not adjust accordingly. E. Continue installing vertical panels in the same manner, periodically checking to make sure that panels remain plumb and level. See Figure 6 (staggered locking sequence). F. When enough vertical panels are set to accept the installation of the first ceiling and end panel, begin assembly of the ceiling panels. See Section 6 for method of installing remaining vertical and ceiling panels. G. With installation complete, caulk the bases of the vertical panels where they meet the concrete floor. Figure 6 Figure 7 Always check to make sure that each new panel is level and plumb. UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 4
5 4. Door Installation A. When erecting a door panel for an installation on a concrete floor and without Bally floor panels, it is necessary to provide a cutout in the concrete floor for all freezer applications so that the heater channel may be inserted to prevent icing. Doors intended for Coolers are simply set on top of the concrete. If your door sticks out at the top, your frame is not plumb. Move the bottom of the frame in or out to correct this problem. If the gap at the top of the door is inconsistent, your frame is not level and the door latch may not work properly. Shim the low side of the frame to level it with the high side. B. Caulk and seal any gaps under panels or door to floor. Apply base trim as per plan view. For outdoor installation it is recommended that all exterior panel joints be caulked during installation. C. Anchor panels to floor using either Continuous Angle provided or, for outdoor boxes, L-bracket attachments known as WA-1 or Wa-2. See Figure Assembly of With-Floor Walk-Ins A. Make sure the floor is level. The entire area beneath the Walk-In floor should be covered with a heavy polyethylene vapor barrier to prevent possible damage by moisture. (Check state and local codes to determine the mil thickness.) B. Check plan view for any special panel configuration, then place a 23½ wide floor end panel along the most logical starting point (usually the furthest corner from existing building wall). Level the floor panel to high point of concrete slab. See Figure 9. C. Install the next panel and align. Level to the high point of the concrete slab every time a new panel is installed. D. Install shims (Bally recommends asphalt shingles) under corners and cross panel joints as needed to ensure proper support and levelness of panels. Be sure the shims are not more than 23 apart at any given point under the panel. Place additional shims, equally spaced, along the door frame area for proper support, and to eliminate potential sagging. E. Continue to install floor panels as per Plan View, locking each panel to its adjoining panel, and keeping ends of panels even. Continue until all floor panels are assembled, check for levelness and squareness. (Adjust if necessary.) F. Check bottom section of door to be used to insure the proper door is in the correct location. Doors are specifically located by the floor plan drawing which is enclosed with the installation instructions (A freezer door may have a different stepplate condition than a cooler door Follow the suffix that corresponds to the drawing). G. If structural steel is required it should be located and installed before installing further. Figure 8 6. Vertical and Ceiling Panel Installation A. Determine the critical areas to find a starting point (For smaller Walk-Ins this is the door location); this section must be perfectly plumb and square to insure proper operation of the door. B. Begin by erecting a vertical corner panel (If the Walk-In is being installed near a building start at a corner nearest that). Speed-Lok holes are always on the left when facing the interior of the panel. C. Erect the vertical panels to the right and left of the corner panel (Check the plan view), align tops of the panels and check for plumb and level. Lock panels together, check to be sure the proper metal finish is exposed where specified on the plan view. D. When enough vertical panels have been set to allow installation of the first ceiling panel, install the panel walls in an order that will allow a ceiling section to be installed before proceeding with more panel walls. Fasten ceiling panels to one another. When a few are in place, lock the first ceiling panel to vertical panels. E. To check for correct alignment measure the distance from the edge of the ceiling or floor to the nearest vertical joint. This should be 11½ and maintained at every joint of the Walk-In. Use a staggered locking sequence as shown in Figure 6. See Figure 10. F. When all walls and ceiling panels are in place, lock all vertical panels to floor panels. Door sections are held down through the threshold plate. Drill through thresholds pre-drilled holes into floor. Secure to floor with screws provided. See Figure 11. G. For a Walk-In requiring anchors on the outside of the walls, begin by centering anchors WA-3 to vertical panel joints and WA-4 to corners. See Figure 12. Figure 9 Figure 10 UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 5
6 7. Installing Multi-Compartment Walk-Ins A. The most common arrangement for a Walk-In is a two compartment cooler/ freezer combination. Installation of panels in this situation is the same as described above. The use of a Breaker or Tee panel is used to separate the different compartments. These panels will be either 23 or 46 ; typically the verticals are the opposite of the ceilings and floors. B. The Partition Wall will have at least two special panels referred to as P-1 and P-2. The panel widths are either 7.6 or 19.1 and are marked with a special blue sticker that corresponds to the drawing. The P-2 panels are double tongued (has hook pockets on both sides) which allows for final locking of the partition wall. C. In large multi-compartment Walk-Ins, (three compartments or more) it is very important to control the alignment of the panels and make sure if there is any growth in the vertical panels that they are growing at the same rate as the ceiling and floors. A quick and accurate way to check for correct alignment is to measure the distance from the edge of the ceiling to the nearest vertical panel joint. This measurement must be 11½ ; it must be maintained at every joint to assure proper assembly of the Walk-In. See Figure 10. In these instances we recommend that after the floors are placed and leveled that the center most partition be the starting point and to work toward either end of the box. D. Look at the plan view and take special note of which side of the panels the wrench hold are on. If there is not a door in the partition wall the panels will lock to ceiling and floors in either orientation. An error on the partition will could cost many man hours to correct. The entire box will most likely have to be taken down to correct this error because condensation will occur. As a general rule of thumb, the wrench holes should always be on the colder compartment side, usually the freezer. Figure 11 Figure 12 Part Three: Other Important Information 1. Preventing Vapor Leaks A. Modular panels are square and dimensionally accurate so in most installations they will seal effectively against vapor leaks. However in some unusual cooler applications, minor vapor leaks may occur. The leaks can occur if the panels follow slab variations or if the building in which the Walk-In is installed settles. If the internal temperature is cycled periodically, the expansion and contraction of building materials will cause enough movement to allow some vapor penetration. B. Unfortunately, internal dripping does not always occur directly across from the vapor leak which can make locating a leak troublesome. In order to avoid time-consuming search procedures, caulk the exterior junction of three or more panel joints. Most leaks caused by settlement will be at these points. See Figure 13. C. All wall penetrations should be sealed. This includes any protruding clips or hangers installed in panels joints. See Figure 14. D. Use either industrial-grade or silicone calking. When silicone is used, sealed areas must be cut opened whenever the panels are to be disassembled for relocation or enlargement. Figure 13 Figure 14 UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 6
7 2. Partition Wall Caulking As an added precaution against vapor leaks, Bally recommends that all joints from partition wall panels to breaker panels (vertical, ceiling, floor) be caulked on warm side during assembly. See Figure Air gap/circulation recommendation. Bally recommends a 2 gap between Walk-In vertical panels and existing building walls for proper air circulation. It is also recommended that air exchange/circulation be provided for Walk-In s that are within an enclosed area. 4. Making holes for Refrigeration Tubing and Electrical Lines If penetrations in panels are needed, avoid the areas that are shown. Penetrations should be made as needed by competent installer or mechanical service. If shaded areas are avoided, urethane insulation can be easily removed from opening. After equipment installation, fill in hole with permagum caulk. See Figure 16. A. When a remote refrigeration system is used, it will be necessary at the job site to make holes for refrigeration and electrical lines. B. After installation, use permagum to caulk around the electrical and refrigeration lines. Caulk both the interior and exterior gaps. C. Condensation in electrical junction boxes is caused by warm vapor passing from the exterior to the interior of the Walk-In through electrical conduit lines. This problem can be eliminated by installing a seal-off fitting in the conduit line where it passes through the wall. Install the fitting as shown in Figure 17 and fill it with sealant. Figure 15 Figure Making electrical connections to Entrance Doors and Installing Vapor-proof Lights A. Electrical connections to the Walk-In doors are made at the top interior of each door panel. See Figure 18. Remove the socket plate to expose the wire connections in the junction box. Cont. on page 8 Figure 18 Figure 17 LIGHT BASE LIGHT JUNCTION BOX GROUND TERMINAL GREEN WIRE DOOR INTERIOR UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 7
8 Making electrical connections to Entrance Doors and Installing Vapor-proof Lights (Continued) B. Remove the short wire pigtails and connect the service at the wire nuts, through the hole provided in the junction box. Refer to serial tag for proper electrical characteristics. Insure that the electrical service is properly grounded. See Figure 19. Remount the vapor-proof light assembly after all connections have been made. Do not turn on power to door section until after the refrigeration system has been started. Figure 19 Color Codes: Black Line White Neutral Green Ground Red From switch to light Orange Wires for -3 and -4 way switches. Grey Connect like colors to complete the circuit. UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 8
9 Part Four: Completing the Bally Installation A. Trim door wiper gasket (if necessary) from the inside bottom of door. The wiper gasket should gently touch the threshold when the door is in the closed position. Adjust hinges and latch if necessary (shims provided in Miscellaneous Box #1) B. After all locks are engaged, it is very important to secure the plug buttons over the Speed-Lok holes. (These buttons are in Miscellaneous Box #1) C. Make sure all of the protective plastic is removed from the panels and the job site debris is cleaned up. D. Inform the electrician that he is now able to complete connections to door light and Pressure Relief Port (if on a separate circuit) Please note that it is not recommended to hook up door heaters until the mechanical refrigeration is fully operational. The heat will melt the door gasket. E. After the installation is complete use a silicone caulk between the outside vertical panels and the concrete floor. If large gaps exist, make certain to first till the voids with expanding foam prior to sealing with caulk. Apply sealant to building floor if water tight seal. F. If installing an outdoor Bally Box with a membrane roof, make sure all the termination bars are securely fastened and that all exterior joints have been caulked to prevent water leaks. All outdoor Walk-Ins must be protected against the weather by a roof of some type, refer to Instructions for Membrane Roof to properly install. We can also supply a standing seam aluminum roof where specified; Bally will provide separate installation instructions as needed for these products. G. You are now ready to hang evaporators and connect refrigeration. See separate instructions supplied by the manufacturer of the refrigeration s mechanical equipment. Installation Reference Information Please Fill in the spaces below and retain this manual for easy reference. Purchaser s name and address: Date Installed: Name of Installer: Installer s Phone Number: Walk-In Serial Number (from plate above door): Refrigeration System Model Numbers: Refrigeration System Serial Numbers: Notes: Bally Refrigerated Boxes, Inc BALLY sales@ballync.com Phone: Fax: Little Nine Drive, Morehead City, NC UPDATED: 4/2017 Instruction Manual IM Bally Refrigerated Boxes, Inc. 9
Modular Buildings. Installation Manual
Modular Buildings Installation Manual 1. Introduction 2 2. Marking Installation Area 2 3. Speed-Lok Operation 2 4. 'Z' Base Trim 3 5. Less Floor Walk-Ins 3 6. Floor Panel Installation 4 7. With-Floor Installation
More informationInstallation Instructions Wood Frame & Foam Rail
Installation Instructions Wood Frame & Foam Rail CrownTonka Walk-ins A division of Crown Fixtures Incorporated Corporate -15600 37 th Ave N Plymouth, MN 55446 Phone: 800-523-7337 Fax: 763-541-1563 Manufacturing
More informationManufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL
Manufacturer of Coolers, Freezers, Step-Ins, Refrigeration Trailers and Sliding Doors COOLER AND FREEZER INSTALLATION MANUAL http://www.walkincoolersandfreezers.com 786-286-2926 1 BEFORE INSTALLATION Please
More informationINSTALLATION INSTRUCTIONS
INSTALLATION INSTRUCTIONS **When your shipment arrives please:** check for damage check for the correct number of parts according to your bill of lading. Inform the trucking company of any damage or incorrect
More informationWalk-In Unit Installation & Operation Manual
Walk-In Unit Installation & Operation Manual Manitowoc Foodservice Walk-In Division 2915 Tennessee Avenue North Parsons, TN 38363 Phone: 800-225-9916 www.manitowocfsusa.com 500000400-5 October 2012 www.manitowocfsusa.com
More informationWalk-ins. Installation, Use & Care Manual
Walk-ins Installation, Use & Care Manual This manual is updated as new information and models are released. Visit our website for the latest manual. www.manitowocfsg.com Specified #1 Among Walk-ins Part
More informationIMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.
Floor panels INSTALLATION This section is applicable only if your walk-in has a floor. If not, proceed with next section. These are probably the most important panels you will install. To install the floor
More informationKolpak Walk-In Unit Installation & Operation Manual
Kolpak Walk-In Unit Installation & Operation Manual Kolpak 2915 Tennessee Avenue North Parsons, TN 38363 Phone: 800-225-9916 www.kolpak.com 500000400-9 August 2018 Table of Contents Safety Information....
More informationINSTALLATION/MAINTENANCE MANUAL FOR WALK-IN COOLERS/FREEZERS
INSTALLATION/MAINTENANCE MANUAL FOR WALK-IN COOLERS/FREEZERS THERMO-KOOL/MID-SOUTH INDUSTRIES, INC. 723 East 21st Street, Laurel MS 39440 Phone: (601) 649-4600 Fax: (601) 649-0558 THERMO-KOOL/Mid-South
More informationDETAIL INSTRUCTION No. 1
BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com
More informationROOF MOUNT KIT OWNERS MANUAL
ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF
More informationSPECIFICATION GUIDE BALLY
SPECIFICATION GUIDE 1-800-24BALLY www.ballyrefboxes.com sales@ballync.com Trade Approvals Underwriters Laboratories (UL): Bally Refrigerated Boxes, Inc. 4, 5, and 6 panels generated a flame spread of 25
More informationINSTALLATION MANUAL KOCH
INSTALLATION MANUAL KOCH TECHNICAL SYSTEMS GROUP PRE-FAB ACOUSTICAL/THERMAL PANELS AND ENCLOSURES GEORGE KOCH SONS, LLC TECHNICAL SYSTEMS GROUP 10 South Eleventh Avenue Evansville, Indiana 47744 812-465-9600
More informationThermaSteel Corporation ASSEMBLY MANUAL
ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation
More informationStandard Model Coolers, Freezers and Combination Cooler/Freezers In Stock for SAME DAY SHIPMENT
NOR-LAKE, INCORPORATED 727 Second Street P.O. Box 248 Hudson, Wisconsin 54016 800-955-5253 715-386-2323 866-961-5253 Parts 800-388-5253 Service 715-386-4290 FAX www.norlake.com Kold Locker Walk-Ins Standard
More informationGenesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions
Genesis Panel Systems LLC Dura-Max Brick Panel Siding Installation Instructions Thank you for purchasing the Genesis Dura-Max Brick Panel system for your project. The system allows you to have the look
More informationTABLE OF CONTENTS. 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers
version 2.5 updated as of 08.04.2017 2 TABLE OF CONTENTS 1.0 INTRODUCTION 1.1 Greenstone Structural Engineered Panels 1.2 Drawing and Element Numbers 2.0 ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation
More informationSECTION ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS
PART 1 GENERAL SECTION 08 1116 ALUMINUM-FRAMED HIGH PERFORMANCE THERMAL ENTRANCE DOORS 1.01 SECTION INCLUDES A. Aluminum-framed storefront, with vision glass. B. Infill panels of glass. C. Aluminum doors
More informationMETALWORKS RH215 Faceted Custom Hook-on Panels
METALWORKS RH215 Faceted Custom Hook-on Panels Assembly and Installation Instructions 1. GENERAL 1.1 Product Description MetalWorks RH215 Faceted Custom Hook-on panel system is a downward accessible, custom
More informationSPECIFICATION GUIDE BALLY
SPECIFICATION GUIDE 1-800-24BALLY www.ballyrefboxes.com sales@ballync.com Trade Approvals Underwriters Laboratories (UL): Bally Refrigerated Boxes, Inc. 4, 5, and 6 panels generated a flame spread of 25
More informationSECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:
Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for
More informationExterior System installation instructions
Exterior System installation instructions 11/20/14 WPS ES-400 & 500 INSTALLATION INSTRUCTION. The WPS ES-400 & 500 systems Façade panels are designed for use as an external wall cladding in conjunction
More informationWeep Valves Stucco Wire Mesh Reinforcement Weather Resistive Barrier Sheathing Insulation Framing
INSTALLATION INSTRUCTION FOR SINGLE-HUNG AND FIXED WINDOW REPLACEMENT using FLUSH FLANGE Installation Instructions for replacing windows in a Typical Stucco Application. These instructions were developed
More informationFORM HEADWALL. FORM HEADWALL (floating) (floating) Installation Manual
FORM HEADWALL (floating) Installation Manual FORM HEADWALL (floating) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated
More informationFORM HEADWALL. FORM HEADWALL (floor mount) (floor mount) Installation Manual
FORM HEADWALL (floor mount) Installation Manual FORM HEADWALL (floor mount) OVERVIEW The Form is a UL-listed configurable headwall system. This system includes multiple horizontal equipment channels integrated
More informationSECTION INDUSTRIAL ACCESS / INSPECTION HATCH. A. Industrial Access / Inspection Hatch: Model AH-710
Page 1 of 6 PART 1 - GENERAL SECTION 08370 INDUSTRIAL ACCESS / INSPECTION HATCH 1.1 SECTION INCLUDES A. Industrial Access / Inspection Hatch: Model AH-710 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry
More informationSIEMENS. Instructions. Outdoor Metal Clad Switchgear. Installation Assembly OGM&SGM SG kV and 15kV. www. ElectricalPartManuals.
SIEMENS Outdoor Metal Clad Switchgear 5kV and 15kV Instructions Installation Assembly OGM&SGM SG 3258-00 THIS EQUIPMENT CONTAINS HAZARDOUS VOLTAGES. SEVERE PERSONAL INJURY OR PROPERTY DAMAGE CAN RESULT
More informationSECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:
Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project
More informationIn-Wall Slide-out OEM INSTALLATION MANUAL
In-Wall Slide-out OEM INSTALLATION MANUAL TABLE OF CONTENTS System and Safety Information 2 In-Wall Slide-Out Chassis Specification 3 6.1.1 Slide-Out Configurations 3 In-Wall Slide-Outs 3 Recommended Wall
More informationSECTION WATERTIGHT DOORS. A. Horizontal Sliding Flood Barrier with frame and hardware.
Page 1 of 6 Part 1. GENERAL 1.1 SECTION INCLUDES SECTION 08390 WATERTIGHT DOORS A. Horizontal Sliding Flood Barrier with frame and hardware. 1.2 RELATED SECTIONS 1.3 REFERENCES A. Section 03300 - Cast-In-Place
More informationGuardian Wall Panel Installation Manual
Guardian 275 4 Wall Panel Installation Manual Guardian 275 4 Wall Panel Installation Manual This instructional manual provides General Installation Instruction. Installers should refer to the "as-built"
More informationSECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:
Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for
More informationMounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.
The Knife Edge Cove is a modular lighting system consisting of two parts: 1- An aluminum fixture housing extrusion 2- Drop-in lighting modules The fixture will provide a continuous knife edge architectural
More informationINSTALLATION MANUAL. FOOTWALL/SINKWALL (floor mount)
INSTALLATION MANUAL FOOTWALL/SINKWALL (floor mount) OVERVIEW The Form is a UL-listed configurable footwall/sinkwall system. This system can include any combination of base cabinets, upper cabinets, wardrobes,
More informationSECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM
Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING
More informationKolpak Walk-In Installation & Operation Manual
Kolpak Walk-In Installation & Operation Manual Kolpak 2915 Tennessee Avenue North Parsons, TN 38363 Phone: 800-225-9916 500000400-10 September 2017 www.kolpak.com 800-225-9916 1 Table of Contents General
More informationKS SERIES - VERTICAL INSTALLATION
CS-DS-01-KSV CS DISCLAIMER CS-PP-01-KSV PANEL PROFILES CS-PP-02-KSV PANEL PROFILES CS-PP-03-KSV PANEL PROFILES CS-PJ-01-KSV KS SERIES EXPANDED PANEL JOINT CS-PJ-02-KSV KS SERIES ENGAGED PANEL JOINT CS-PJ-03-KSV
More informationFORM FOOTWALL. FORM FOOTWALL (floating) (floating) Installation Manual
FORM FOOTWALL (floating) Installation Manual FORM FOOTWALL (floating) OVERVIEW The Form is a UL-listed configurable footwall system. This system can include any combination of base cabinets, upper cabinets,
More informationC.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions
Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex
More informationMETALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description
Ceiling Systems Between us, ideas become reality METALWorkS General Installation Instructions RH200 Custom Hook-on Panels 1.0 GENERAL 1.1. Product Description RH200 system is a downward accessible, metal
More information6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions
Assembly Manual 6x5 PATENTS ARE PENDING Building Dimensions Approximate Size Storage Area Exterior Dimensions Interior Dimensions Roof Edge to Roof Edge Wall to Wall Sq. Ft. Cu. Ft. Width Depth Height
More informationSECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:
SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.
More informationNortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1
16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationSECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:
Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x5 PATENTS ARE PENDING Approximate Size 7980303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationHouseWrap Applications System R-Value: R-4.17 Horizontal Heat Flow Only
Installation Method (Existing Walls) 1. ESP Low-E Housewrap is installed over exterior wall sheathing, make sure reflective side faces out: foil flange faces down. 2. Determine width of ESP Low-E HouseWrap
More informationDO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING
DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING INSTRUCTIONS ENCLOSED IN THIS OWNER S MANUAL. 2 SAFETY PROCEDURES
More informationSECTION TOILET PARTITIONS. A. Section Structural Steel: Supports for ceiling hung compartments.
SECTION 10155 TOILET PARTITIONS PART 1 GENERAL 1.1 SECTION INCLUDES A. Stainless steel toilet compartments. 1.2 RELATED SECTIONS A. Section 05120 - Structural Steel: Supports for ceiling hung compartments.
More informationHDPE SOLID POLYMER-PLASTIC FLOOR BRACED COMPARTMENTS SECTION FB WEIS/POLY TOILET PARTITIONS
3501 East La Palma Avenue - Anaheim, California 92806 Ph: 714-666-0108 and 714-666-0109 Fax: 714-666-0110 www.weisrobart.com PART 1 GENERAL HDPE SOLID POLYMER-PLASTIC FLOOR BRACED COMPARTMENTS SECTION
More informationSERIES 487 CENTER GLAZED SLIDING DOOR WITH 1-1/2" TRIM
INSTALLATION INSTRUCTIONS SERIES 487 CENTER GLAZED SLIDING DOOR WITH 1-1/2" TRIM Phone: (800) 421-6144 Fax: (866) 921-0531 crlaurence.com usalum.com crl-arch.com 11M0200 GENERAL INSTALLATION NOTES Recommended
More informationOperable / Fixed Skylight Milgard Aluminum Window
Skylight Operable / Fixed Skylight Milgard Aluminum Window The Series Skylight has been specifically designed to provide maximum thermal efficiency by incorporating a special polyurethane barrier between
More informationH D P SOLID PHENOLIC FLOOR BRACED COMPARTMENTS SECTION FB TOILET PARTITIONS
3501 East La Palma Avenue - Anaheim, California 92806 PART 1 GENERAL Ph: 714-666-0108 and 714-666-0109 Fax: 714-666-0110 www.weisrobart.com H D P SOLID PHENOLIC FLOOR BRACED COMPARTMENTS 1.1 RELATED DOCUMENTS:
More informationYCW 250 I-Beam Curtain Wall System Installation Manual
Installation Manual 2004 YKK AP America Inc. is a subsidiary of YKK Corporation of America. TABLE OF CONTENTS INSTALLATION NOTES..................................... Page ii PARTS DESCRIPTION Framing
More informationPATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge
Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMETAL LADDERS (LADDER SAFETY GATE FALL PROTECTION)
Page 1 of 6 SECTION 05515 METAL LADDERS (LADDER SAFETY GATE FALL PROTECTION) PART 1 - GENERAL 1.1 SECTION INCLUDES A. Specialty custom designed, spring assisted, self-closing LADDER SAFETY GATE (LSG) for
More informationINSTALLATION MANUAL SURFACE-MOUNTED HEADWALL
INSTALLATION MANUAL SURFACE-MOUNTED HEADWALL Model # Series 7200-S Top Mounting Plate Electrical Junction Box Located Behind Removable Upper Panel Medical Gas Connections Lower Mounting Plate OVERVIEW
More informationOmniFlex 300 Plus Installation Instructions
OmniFlex 300 Plus Installation Instructions IMPORTANT PortaFab advises a thorough reading of these instructions before beginning installation. INTRODUCTION Instructions should be read thoroughly and cross-referenced
More informationSECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationTender No Section St. James - Assiniboia Centennial Pool Fitness Facility Addition Page 1
Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 SECTION INCLUDES.1 Extruded aluminum windows with fixed sash..2 Factory glazed..3 Perimeter sealant. 1.2 RELATED SECTIONS.1 Section 05500 - Metal Fabrications.2
More informationSt. Monica Food Pantry Walk-In Cooler Freezer System SBA-13105
St. Monica Food Pantry 11 4124-1 SECTION 11 4124 - WALK-IN COOLER/FREEZER SYSTEM PART 1 - GENERAL 1.1 SCOPE OF WORK: A. All equipment specified for one Walk-In Cooler/Freezer to be delivered to job site,
More informationSECTION OUTLET, PULL, AND JUNCTION BOXES
SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:
More informationDuct Wrap Flexible Wraps
Design No. 3MU/ 60-01 December 23, 2010 VENTILATION DUCT PROTECTION 3M Company 3M Fire Barrier Duct Wraps: 615 and 615+ 3M Fire Barrier Sealants: Water-Tight 1000-NS Silicone, Water-Tight 1003-SL Silicone
More informationSECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS
SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,
More informationSECTION WATERTIGHT FLOOD PLANKS. A. ASTM A 36 - Standard Specification for Carbon Structural Steel.
Page 1 of 5 Part 1. GENERAL SECTION 08390 WATERTIGHT FLOOD PLANKS 1.1 SECTION INCLUDES A. Flood Plank 1.2 RELATED SECTIONS 1.3 REFERENCES A. Section 03300 - Cast-In-Place Concrete. B. Section 04810 - Unit
More informationHOME SYSTEMS CONSTRUCTION PROCEDURE
HOME SYSTEMS WWW.QUICKBUILTHOMES.COM.AU CONSTRUCTION PROCEDURE INDEX - PARTS LIST PARTS LIST QBRC75(C) QBRM75C) QBSIPS75 QBRFSZ75C QBRFBC75C QBRF3030G QBRGSQC QBRFRC75C QBRFZEC QBRF4040C QBSACC75 QBFR7330WC
More informationLiner Replacement Instructions:
Liner Replacement Instructions: Before beginning the replacement procedure... Be sure to disconnect electrical service to all of your electrical components of the pool. Use extreme caution when working
More informationRevision Date: April 01, Premier Vinyl Enclosure
Premier Vinyl Enclosure www.urbanindustries.com 53 Urban Industries, Inc. 2008 Tools The following tools are recommended for the installation of the Premier Vinyl Enclosure and roof. 1 2 Level 1 4 Level
More informationSECTION NON-STRUCTURAL METAL FRAMING
SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories
More informationHeartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)
Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket
More informationInstall Instructions. Helix Z1. Important Information. Important:
Congratulations, you have just purchased the highest quality entrance mat available. Proper installation is necessary to ensure that your warranty will be honored by Impact Specialties. Important Information
More informationPANEL FINISH Metal finish of the panels shall be as follows. (Specify finish desired, combinations may be used)
Specifications GENERAL Walk-ins shall be constructed of prefab, precision-formed, modular panels designed for accurate, rapid field assembly. Walk-ins shall be test assembled at the factory and shall be
More informationModular Coldroom Installation Manual
Modular Coldroom Installation Manual May 2005 Disclaimer: The information contained in this installation guide is provided "as is". Bromic Pty Ltd does not warrant the accuracy, adequacy or completeness
More informationPLASTIC LAMINATED FLOOR TO CEILING COMPARTMENTS SECTION FC TOILET PARTITIONS
Phone: 714.666.0108 PHONE /(734) 714.666.0109 467-8711 FAX Fax: (734) 714.666.0110 467-8710 www.weisrobart.com 3501 E. La Palma Ave., Anaheim, CA 92806 3737 S. VENOY RD. P.O. BOX 130 www.weisrobart.com
More informationHDPE SOLID POLYMER-PLASTIC FLOOR TO CEILING COMPARTMENTS SECTION FC WEIS/POLY TOILET PARTITIONS
3501 East La Palma Avenue - Anaheim, California 92806 Ph: 714-666-0108 and 714-666-0109 Fax: 714-666-0110 www.weisrobart.com HDPE SOLID POLYMER-PLASTIC FLOOR TO CEILING COMPARTMENTS PART 1 GENERAL SECTION
More informationB. Shop Drawings: Include plans, elevations, sections, details, and attachments.
SECTION 055119 - METAL GRATING STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationModel # 338SM-OP. 9/30/2011 Page 1 of 12
Model # 338SM-OP 9/30/2011 Page 1 of 12 9/30/2011 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationSECTION STAINLESS STEEL WALL PANELS
SECTION 07400 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Dry joint, Rainscreen stainless steel wall panel system. 2. Accessories including attachments, clips, sub girts, shims, and fasteners 3.
More informationFundamentals of Insulated Panel Installation. MBCEA 2016 Clearwater, FL
Fundamentals of Insulated Panel Installation MBCEA 2016 Clearwater, FL Fundamentals of Insulated Panel Installation Industrial Roof & Walls Not Architectural Not Cold Storage Topics Preparation Installation
More informationModel # 238HS-P8. 4/27/2011 Page 1 of 11
Model # 238HS-P8 4/27/2011 Page 1 of 11 4/27/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationDIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS
PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.
More informationInstructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000
Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000 (How to move your pallet racking using the Link 4 Pallet Rack Lifter) This process is for a typical rack move and reset. Each
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationMulti-Piece Shower with Trench Drain
INSTALLATION INSTRUCTIONS Multi-Piece Shower with Trench Drain (For models with standard pan) 105 This packet includes installation instructions for the Bestbath products shown below. (These instructions
More information210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009
210 Series UL Listed Modular Vault Panel Installation Procedures January 15, 2009 Model 210, UL Class M Model 211, UL Class 1 Model 212, UL Class 2 Model 213, UL Class 3 CAUTION EXTREMELY HEAVY THIS PRODUCT
More informationSECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More informationA. ASTM A 36 - Standard Specification for Carbon Structural Steel.
Page 1 of 5 SECTION XXXXX INDUSTRIAL VENTILATION LOUVER / DAMPER Part 1. GENERAL 1.1 SECTION INCLUDES A. Top Pivot Louver / Damper B. Bottom Pivot Louver / Damper C. Center Pivot Louver / Damper D. Sliding
More informationINSTRUCTIONS AND GUIDELINES
INSTRUCTIONS AND GUIDELINES NOISEBLOCK TM MODULAR PANEL SYSTEMS ENCLOSURES & PRESSURIZED PLENUMS PLANNING HINTS & NOTES: 1. Review the Kinetics Noise Control submittal and installation drawings and bill
More informationH D P SOLID PHENOLIC CEILING HUNG COMPARTMENTS SECTION CH TOILET PARTITIONS
3501 East La Palma Avenue - Anaheim, California 92806 Ph: 714-666-0108 and 714-666-0109 Fax: 714-666-0110 www.weisrobart.com PART 1 GENERAL 1.1 RELATED DOCUMENTS: H D P SOLID PHENOLIC CEILING HUNG COMPARTMENTS
More informationAD 0 O~ Partitions, Inc East La Palma Avenue - Anaheim, California Ph: and Fax:
AD 0 O~ Partitions, Inc. 3501 East La Palma Avenue - Anaheim, California 92806 Ph: 714-666-0108 and 714-666-0109 Fax:714-666-0110 www.weisrobart.com HOPE SOLID POLYMER-PLASTIC COMPARTMENTS PART 1 - GENERAL
More informationSECTION SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Doors B. Track and Framing 1.2 RELATED SECTIONS A. Section 04810 - Unit Masonry Assemblies: Prepared opening in masonry.
More informationMulti-Piece Shower with Trench Drain
INSTALLATION INSTRUCTIONS Multi-Piece Shower with Trench Drain (For models requiring mud set) 1069 This packet includes installation instructions for the Bestbath products shown below. (These instructions
More informationFirstEnergy Program Overview
FirstEnergy Program Overview Builder incentives $400 per unit + $0.10/kWh in projected savings Eligibility Located in service area of a FirstEnergy Utility Certificate of Occupancy Dates: FirstEnergy Ohio
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationInstallation Guide. IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.
Installation Guide IMPORTANT: Read all sections before starting. For the most up-to-date information, visit our website: leadvisioninternational.com Before installing a composite wall cladding, it is recommended
More informationSERVICE MANUAL. PW & RPW Series Proofer / Retarder Installation Instructions - NOTICE -
SERVICE MANUAL PW & RPW Series Proofer / Retarder Installation Instructions For a complete listing of Models and ML's; see MODELS & ML NUMBERS section. PW1 PW2 PW3 RPW1 RPW2 - NOTICE - This Manual is prepared
More informationSYSTEM 600 BILL CHANGER INSTALLATION INSTRUCTIONS Congratulations...
www.standardchange.com 1-800-968-6955 Technical Phone Support is from 8:00AM to 7:30PM E.S.T., Monday-Friday Walk-in Service is from 8:00AM to 4:30PM E.S.T., Monday-Friday Parts Department is from 8:00AM
More informationThe fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general specifications:
Query No.1 ; we need more specs. about fire resistant doors Answer to Query No. 1: The fire resistance required for doors in this building is 1 (one) hour resistance in compliance with the below general
More informationSECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS
Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,
More information