1 Bridge Development Update Rebecca Curtis, PE Michigan Department of Transportation Bridge Management Engineer 2014 Michigan Bridge Conference
2 Bridge Development Update Load Rating Plan of Corrective Action Update Technical Assistance for Load Ratings Metric 14 MiBridge Update Scour Management Questions
3 Load Rating Plan of Corrective Action What are the major points of the Load Rating PCA? Tiered Deadlines for Load Ratings Three Tiers Deadlines every two years Continuing Compliance Checks (Metric 13)
4 Load Rating Plan of Corrective Action Tier 1 Bridges without load ratings as of January 1 st, 2011 Due on December 31 st, 2012
5 Load Rating Plan of Corrective Action Tier 2 Local Agency Tier 2 is comprised of bridges in poor condition Load Ratings must be reviewed or updated to account for the poor condition Tier 2 Load Ratings are due on December 31 st, 2014
6 Load Rating Plan of Corrective Action Tier 3 Local Agency Tier 3 is comprised of bridges with load rating inconsistencies Proper rating method based on year of construction or reconstruction Load posting inconsistencies Tier 3 Load Ratings are due on December 31 st, 2016
7 Load Rating Plan of Corrective Action
8 Load Rating Plan of Corrective Action
9 Technical Assistance for Load Rating Bridge Load Rating Program Support with MTU Center for Technology and Training 2013 Accomplishments User Needs Survey Camelback bridge tutorial, CMP culvert spreadsheet, SHV analysis Over 68 technical assistance cases Processed 68 license requests
10 Technical Assistance for Load Rating 2014 Plans 3 bridge rating workshops 4+ Webinars (starts April 3 rd ) The Basics Theory and Policy Output Reports Concrete Box Culverts Update CMP culvert spreadsheet Continued technical support and license facilitation
11 AASHTOWare Bridge Design & Rating User Group Meeting for software formerly known as Virtis/Opis Basic and/or advanced training included August 12 th and 13 th Park Place Hotel, Traverse City
12 Metric 14 Inspection Procedures, Post or Restrict Metric 14 Rating less than 100% legal loads and still open Posting recommended Rating less than 3 Tons and open without restrictions At this time last year, there were 183 bridges with postings recommended
13 Metric 14 Inspection Procedures, Post or Restrict MDOT will check data monthly for possible Metric 14 compliance issues Safety issues must be addressed as soon as possible Inventory must be addressed within 180 days for Local Agency structures
14 MiBridge Update MBIS and MBRS were combined into one system National Bridge Element Inspection is in place Highlights of future planned development Add remaining element level inspection items Compliance dashboard Request for Action dashboard Call for Projects dashboard Performance Report dashboard
15 Scour Management FHWA Stewardship Agreement Goal Mitigate or reduce the number of interstate scour critical bridges, using risked-based selection procedures, by 5 percent each year. MDOT 426 scour critical bridges Local agencies 1331 scour critical bridges
16 Scour Management
17 Scour Management Interactive Risk Assessment Spreadsheet Created to prioritize mitigation efforts Data-driven risk assessment Adds weighted factors to water crossing bridges to quantify vulnerability and criticality Provided local agency focused version to CRAM
18 Scour Management
19 Scour Management MDOT Scour Committee is working to update guidance on design, coding, and plans of action for scour critical bridges Updating coding guidance (Item 113) Will reflect changes in HEC-23
20 Scour Management Scour countermeasures can be used to mitigate existing piers so they are no longer scour critical Source: FHWA
21 Scour Management Scour countermeasures can be considered in the design of abutments to mitigate local (abutment) scour Source: FHWA
22 Questions? Rebecca Curtis, PE Michigan Department of Transportation Bridge Management Engineer 2014 Michigan Bridge Conference
23 Bridge Field Services Update Michigan Bridge Conference March 19, 2014
24 Outline 2013 FHWA 23 Metrics Audit ABC Workshop Steel Fabrication Timeline Temporary Earth Retaining Structure Workshop Bulb T Beams Lodge Freeway Retaining Walls Bridge Approach Details Bridge Deck BOHIM (revised) 2013 BFSA Advisories Vertical underclearance Revised MDOT Construction Manual
25 FHWA 23 Metrics 2013 Audit 13 of 23 Metrics determined to be fully compliant Plans of Corrective action required for: METRIC 6 Inspection Frequency, Routine, LOW Risk METRIC 7 Inspection Frequency, Routine, HIGH Risk METRIC 10 Inspection Frequency, Fracture Critical METRIC 11 Inspection Frequency Frequency Criteria METRIC 13 Inspection Procedures, Load Rating METRIC 14 Inspection Procedures, Post or Restrict METRIC 15 Inspection Procedures, Bridge Files METRIC 16 Inspection Procedures, Fracture Critical Members METRIC 20 Inspection Procedures, QC/QA METRIC 21 Inspection Procedures, Critical Findings
26 FHWA 23 Metrics 2013 Audit METRICs 6, 7, 10, and 11 MDOT will develop and implement a statewide policy to require all inspection reports to be entered into to the bridge management database within thirty (30) days of completing the field portion of the inspection for all types of inspections. This will allow MDOT to start the process of verifying timeliness earlier and as a result reduce the number of inspection that are more than (1) month late and eliminate inspections that are more than (4) months late. This policy exceeds FHWA s regulation 23 CFR (b) of 90/180 days to update the condition ratings.
27 FHWA 23 Metrics 2013 Audit METRICs 13, 14 and 15 Currently part of the Load Rating corrective action plan. Metrics 16, 20 and 21 PCA involves development and implementation of Michigan Bridge Inspection Reference Manual, which MDOT Bridge Field Services is in the process of creating. Draft sections are complete pending reviews from Region Bridge Engineers. Local agency will also be engaged in reviews.
28 Accelerated Bridge Construction Workshop Workshop held December 9 th, participants (MDOT, local agencies, consultants, industry) Presentations from contractors, consultants, states (Utah) and ABC experts Focus on specialized work such as structural moves and prefabricated elements Future workshops will be coordinated.
29 Accelerated Bridge Construction Workshop Requires change in philosophy must think like a contractor during design Consider equipment capacities
30 Accelerated Bridge Construction Workshop Consider methods to accelerate construction
31 Accelerated Bridge Construction Workshop Bridge Slide Special Provision MDOT publications New section of the Bridge Design Manual
32 Steel Fabrication Timelines Plate Girders with flange thicknesses less than 3 inches, and rolled beams = 26 weeks after award Provide sufficient time in letting for fabrication of steel beams Up to 3 months for rolling, and material delivery from mill to fabricator Up to 1 month for RFI and shop drawing review and approval Up to 2 months for fabrication and delivery to project site
33 Steel Fabrication Timelines Variables that effect fabrication timelines Fabricator chosen by contractor may have less work or greater production capacity Some fabricators make book their production schedules in late winter/early spring Mill order and other milestones may take equal time whether it includes one or both stages The relationship of the contractor and fabricator
34 Steel Fabrication Timelines New BOHIM to be released, which will included MITA and fabricator input Information will also be included in the Construction Manual Wiki Please consider interim completion, or interim open to traffic dates in your progress schedule when building steel beam bridges
35 Cofferdam Reviews Working with Geotechnical Services to ensure all cofferdam and temporary sheeting plans and calculations are reviewed, and provide comments to field office. Developing and Temporary Earth Retaining Structures design and construction workshop, and prequal category
36 Cofferdam Reviews
37 Cofferdam Reviews
38 Bulb-T Beam Implementation MDOT Bridge Committee currently working through implementation plan for prestressed Bulb-T beam Many states including Texas, Nebraska, Washington, Indiana and Wisconsin already use prestressed Bulb-T s
39 Bulb-T Beam Implementation
40 Bulb-T Beam Implementation Benefits High load carrying capacity More efficient fabrication Improved stability during handling and transport Shallower depths per span length increased underclearance Reduction in overall costs
41 Spliced Bulb-T, US-23 First use of spliced bulb-t on MDOT project Single span, 181 ft long Temporarily supported, Post-Tensioned with closure pour (UHPC) Post-Tensioning SP from Muskegon project, with Bulb-T fabrication SP
42 Spliced Bulb-T, I-96 EB over US-23 SB
43 Spliced Bulb-T, I-96 EB over US-23 SB 90 Indiana Bulb Tee beams 7,500 psi concrete strength Eight lines of beams Longest Beam is Shortest beam is Longest segments is 139 (89 tons) Five PT ducts with 12 strands in each duct ( strands) Duct diameter is 3 3/8 (corrugated plastic duct) 2,600 kips of PT force per beam.
44 Spliced Bulb-T, I-96 EB over US-23 SB Stage 1
45 Spliced Bulb-T, I-96 EB over US-23 SB Stage 2
46 Spliced Bulb-T, I-96 EB over US-23 SB Stage 3
47 Spliced Bulb-T, I-96 EB over US-23 SB Stage 3
48 Lodge Freeway Retaining Walls
49 Lodge Freeway Retaining Walls
50 Lodge Freeway Retaining Walls
51 Lodge Freeway Retaining Walls
52 Lodge Freeway Retaining Walls
53 Lodge Freeway Retaining Walls
54 Bridge Approach Details (Sleeper Slabs)
55 Bridge Approach Details (Sleeper Slabs)
56 Bridge Approach Details (Sleeper Slabs)
57 Bridge Approach Details (Sleeper Slabs) 12 minimum (36 max) Agg base or Open Graded Drainage Course (OGDC) under sleeper slab 6 x 1 6 cut below backwall/abutment connection for joint waterproofing and drain installation Geotextile separator used only with OGDC
58 Bridge Approach Details (Sleeper Slabs) Agg base compacted to 98%, OGDC compacted per Special Provision 30 cut to prevent settlement of slab during construction 20 approach typical Independent backwalls may have shorter approaches based on expansion over the wall. Site restriction may require shorter approaches.
59 Bridge Deck BOHIM Revised
60 Bridge Deck BOHIM Revised Emphasized debris clean-up prior to pour Epoxy coated steel touch-up Bridge deck pour sequence Bridge deck haunches Change in night casting pay items No adjustments to super concrete, night casting or Super Conc, Form Finish and Cure, Night Casting
61 Bridge Deck BOHIM Revised Texturing and curing bridge decks Exemptions to two hour limit on placement of burlap Reference to A to change this as necessary in cold weather conditions to accommodate additional curing time Cold weather protection clarification
62 Rigid Overlays Concerns regarding thickness of Silica Fume Modified Concrete(SFMC) overlays More than 6 becomes troublesome and creates risk of cracking Working with CFS Materials to create alternatives to SFMC. Anticipated (design) depths < 4 = SFMC 4-6 = Grade D slag cement with 26A > 6 = Grade D slag cement with 6AA
63 FS Advisories
64 BFS Vertical Under- Clearance Superstructure/Bridge replacement Roadway grade changes Beam repairs
65 BFS Vertical Under- Clearance Clearance signs to be present for all vehicular structures with under-clearance of 16 0 or less. Measurements taken 2 off edge of pavement Sign will indicate 2 less than actual measurement to accommodate live load deflections
66 BFS Vertical Under- Clearance Measurement included in Contractor Staking Form 1190 Structure Clearance Measurements to be completed Form 1120 Final Inspection/Acceptance and Certification Report indicates clearance measurements taken Contact Statewide Signs for assistance
67 Revised MDOT Construction Manual Division 7 has been re-written from the ground up Construction Manual to be released in Wiki format in April 2014 Sample of Section 704: _Steel_Sheet_Piling_and_Cofferdams
68 Zilwaukee Bridge SB complete NB to begin March 25, 2014
69 US-131 over Muskegon River
70 look forward working with u all again this son Thank you Questions?
I-94/I-69 Interchange Bridge Construction
I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationAccelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents
Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi
More informationAccelerated Bridge Construction Award
Accelerated Bridge Construction Award PBES SR 288 Main Street Bridge Project Wampum Borough, Pennsylvania This is a first for PADOT to incorporate an all precast project built in an accelerated manner
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationCONCRETE SPLICED GIRDERS IN TEXAS. Nicholas Nemec, P.E. TxDOT-BRG
CONCRETE SPLICED GIRDERS IN TEXAS Nicholas Nemec, P.E. TxDOT-BRG October 15, 2014 What is a Concrete Spliced Girder? 2 What is a Concrete Spliced Girder? What it is NOT : Continuous For Live Load 3 What
More informationAccelerated and Innovative Bridge Construction In Washington State
Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More informationACCELERATED BRIDGE CONSTRUCTION IN TEXAS. Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M.
ACCELERATED BRIDGE CONSTRUCTION IN TEXAS Michael D. Hyzak, PE 1 Gregg A. Freeby, PE 2 Lloyd M. Wolf, PE 3 David P. Hohmann, PE 4 John M. Holt, PE 5 ABSTRACT The Texas Department of Transportation (TxDOT)
More informationStructural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options
Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements
More informationI-64 DUNLAP CREEK BRIDGE REHABILITATION JOINTLESS BRIDGES, DECK OVERLAYS, AND CONCRETE MATERIALS
I-64 DUNLAP CREEK BRIDGE REHABILITATION JOINTLESS BRIDGES, DECK OVERLAYS, AND CONCRETE MATERIALS June 8, 2016 Celik Ozyildirim, PhD, PE, Principal Research Scientist, VTRC, Charlottesville, VA Rex Pearce,
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Project/Plan Authorization and Approval Authority SPECIFIC SUBJECT:
More informationWest Virginia s Basnettville Bridge Lateral Slide
Welcome to Webinar on Accelerated Bridge Construction West Virginia s Basnettville Bridge Lateral Slide Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES. Engineering Manual Preamble
MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE DESIGN GUIDES Engineering Manual Preamble This manual provides guidance to administrative, engineering, and technical staff. Engineering practice requires that
More informationAccelerated Bridge Construction in New York State
Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in New York State Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationIronton Russell Bridge Project
Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationI-35W Retaining Wall Design Exhibit A - Draft Scope of Work
Background MnDOT, Metro Transit, Hennepin County, and the City of Minneapolis are in the process of developing a project for Interstate 35W between 43 rd Street in Minneapolis and 15 th Street in Minneapolis.
More informationBoeing North Bridge in Washington State
Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing
More informationBRIDGE CONSTRUCTION APPROACHES
SYNTHESIS ON THE USE OF ACCELERATED BRIDGE CONSTRUCTION APPROACHES FOR BRIDGE REHABILITATION By: Meghan Cronin July 29 th, 2016 Outline 2 Introduction Deck Joints Decks Girders Piers and Columns Abutments
More informationVDOT s New High Performance Concrete Specifications
VDOT s New High Performance Concrete Specifications Celik Ozyildirim, Ph.D., P.E. A partnership of the Virginia Department of Transportation and the University of Virginia since 1948 3/4/2010 1 HPC in
More informationMASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK
MASTER AGREEMENT FOR BRIDGE DESIGN SERVICES SCOPE OF WORK The professional services to be provided by the Consultant under this Agreement shall be as necessary to complete the required analyses, layouts,
More informationNJDOT s use of High Early Strength Concrete on Route I 76. Donald S Matlack Regional Materials Engineer
NJDOT s use of High Early Strength Concrete on Route I 76 Donald S Matlack Regional Materials Engineer NJDOTRegion South About Interstate 76 I-76 Runs from Akron OH to Bellmawr NJ Comprises most of the
More informationTitle Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders
Catbas, Darwash, Fadul / 0 0 0 Title Page: Modeling & Load Rating of Two Bridges Designed with AASHTO and Florida I-Beam Girders F.N. Catbas, H. Darwash and M. Fadul Dr. F. Necati Catbas, P.E. Associate
More informationAASHTO Manual for Bridge Evaluation: Section 3, Bridge Management Systems A Practical Tour
0 0 0 AASHTO Manual for Bridge Evaluation: Section, Bridge Management Systems A Practical Tour Dave Juntunen P.E. Michigan Department of Transportation Bridge Development Engineer Vice-Chair AASHTO SCOBS
More informationIn Service Replacement of Box Girder Bottom Slab
In Service Replacement of Box Girder Bottom Slab WSDOT Bridge No. 5/537S - Span 11 Craig R. Boone, P.E., S.E. Lynn Peterson Secretary of Transportation 2015 Western Bridge Engineers Seminar Reno, Nevada
More informationMANUAL OF THE STRUCTURE AND BRIDGE DIVISION
MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design
More informationPrecast, Pretensioned, Post-Tensioned Concrete for Bridge Decks
Precast, Pretensioned, Post-Tensioned Concrete for Bridge Decks M. J. G utzw iller, R. H. L ee and C. F. Scholer Research Engineers, Joint Highway Research Project IN TRODUCTIO N The problem of concrete
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationBoeing North Bridge: Lessons Learned in Accelerated Bridge Construction
Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT
More informationSUNSHINE SKYWAY BRIDGE
SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation
More informationIronton Russell Bridge Project
Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationBrD Superstructure Tutorial
AASHTOWare BrD 6.8 BrD Superstructure Tutorial PS12 Prestressed Concrete I Beam Using BrD LRFD Engine BrD Superstructure Training PS12 - Prestressed Concrete I Beam Using BrD LRFD Engine 1'-9" 55'-6" Total
More informationCASE STUDY. Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design
CASE STUDY Amish Sawmill Bridge: An Innovative Steel Solution for Short Span Bridge Design Project Overview Visitors traveling near Fairbank, Iowa take a step back in time as they pass by large farms and
More informationTABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4
TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement
More informationHIGH PERFORMANCE CONCRETE. by John J. Roller CTLGroup
HIGH PERFORMANCE CONCRETE by John J. Roller CTLGroup Early Louisiana HPC Research Law & Rasoulian (1980) Adelman & Cousins (1990) Bruce, Russell & Roller (1990-1993) Law & Rasoulian (1980) Concrete strengths
More informationBRIDGE DESIGN MANUAL UPDATES. Jamie F. Farris, P.E.
BRIDGE DESIGN MANUAL UPDATES Jamie F. Farris, P.E. October 2015 Table of Contents 1 BDM Chapter 2 Limit States and Loads 2 BDM Chapter 3 Superstructure Design 3 BDM Chapter 4 Substructure Design 4 Questions
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationRapid Repair Materials and Construction Rapid Bridge Repair Workshop Holiday Inn Tanglewood-Roanoke, Virginia May 21 and 22, 2009
Rapid Repair Materials and Construction Rapid Bridge Repair Workshop Holiday Inn Tanglewood-Roanoke, Virginia May 21 and 22, 2009 Michael Sprinkel, P.E. Associate Director Virginia Transportation Research
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationBenefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway
Benefits of Ultra-High Performance Concrete for the Rehabilitation of the Pulaski Skyway Michael D. McDonagh, P.E., P.Eng., WSP Parsons Brinckerhoff Andrew J. Foden, Ph.D., P.E., WSP Parsons Brinckerhoff
More informationBRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS
BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara
More informationCurrent Standard Plates including Transmittal Letters are available on the web at:
MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards ISSUED BY: Office of Project Management and Technical Support, Design Support Section TRANSMITTAL LETTER NO. (6-03) MANUAL: Standard
More informationBRIDGE GIRDERS TECHNICAL GUIDE
ARMTEC.COM BRIDGE MATERIALS / / TECHNICAL GUIDE REGIONal SPECIFICATIONS / AB / MB / SK PRECAST CONCRETE GIRDERS AND BEAMS DESIGNED TO SUPPORT BRIDGE DECKS AND TRAFFIC LOADS Proven strength In-house engineering
More informationSection 906. STRUCTURAL STEEL
906.01 Section 906. STRUCTURAL STEEL 906.01. General Requirements. Finished rolled shapes must be free from imperfections that affect strength and durability in accordance with ASTM A 6. Rolled shapes
More informationJULY 2014 LRFD BRIDGE DESIGN 5-1
JULY 014 LRFD BRIDGE DESIGN 5-1 5. CONCRETE STRUCTURES Reinforced and prestressed concrete are used extensively in bridge projects. In addition to general design guidance and information on detailing practices,
More informationODOT Design & Construction Requirements for MSE Walls
ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation
More informationMnDOT s Experience With High Performance Concrete Bridge Decks & Reinforcement
2017 Minnesota Concrete Council MnDOT s Experience With High Performance Concrete Bridge Decks & Reinforcement Ed Lutgen Bridge Construction & Maintenance Engineer Minnesota Department of Transportation
More informationEvaluation of Performance Based Concrete For Bridge Decks. DeWayne Wilson WSDOT Bridge Asset Management Engineer
Evaluation of Performance Based Concrete For Bridge Decks DeWayne Wilson WSDOT Bridge Asset Management Engineer National Concrete Consortium Columbus, Ohio 4/26/2016 Problem - WSDOT has observed abnormal
More informationNCC Accelerated Construction. Dan DeGraaf, P.E. Michigan Concrete Association April 26, 2011
NCC Accelerated Construction Dan DeGraaf, P.E. Michigan Concrete Association April 26, 2011 language to use Maslansky Luntz & Partners AASHTO Much of the standstill you experience sitting in traffic could
More informationAlberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.
STANDARD BRIDGE & CULVERT COMPONENTS Alberta Bridge Inventory In Alberta there are about 13,300 bridges. Types of bridges in Alberta: Standard bridges 3521 (26%) Bridge size culverts 8348 (63%) Major bridges
More informationNational Bridge Inspection Program (NBIP) Off System Bridge Compliance Update
National Bridge Inspection Program (NBIP) Off System Bridge Compliance Update March 2, 2016 Issues for Discussion Program Overview Element Level Inspection NBIS Reviews (23 Metrics) Bridge Ratings Challenges
More informationProject Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce
Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,
More informationTECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &
TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed
More informationSECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE
SECTION 1 INTRODUCTION TO POST-TENSIONED CONCRETE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams to the tensile
More informationGet In, Get Out, Stay Out!
Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration
More informationTypes of Cracking and Influencing Causes
Types of Cracking and Influencing Causes TRB Cracking Webinar May 25, 2016 R. Doug Hooton NSERC/ Cement Association of Canada, Senior Industrial Research Chair in Concrete Durability & Sustainability hooton@civ.utoronto.ca
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA
More information2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE. Fawaz K. Saraf, P.E.
2013 VIRGINIA CONCRETE CONFERENCE LESSONS LEARNED / CHALLENGES NOVA MEGAPROJECTS PROGRAM STRUCTURE AND BRIDGE FIELD PERSPECTIVE Fawaz K. Saraf, P.E. CHALLANGES Poor Detailing a challenge on some bridge
More informationRehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
More informationFull-Depth Precast Concrete Bridge Deck Construction
Full-Depth Precast Concrete Bridge Deck Construction John R. Fowler, P.Eng., President Canadian Precast/Prestressed Concrete Institute Paper prepared for presentation at the Bridges Links to a Sustainable
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationODOT Asset Management Plan 0
ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0
More informationOhio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin
Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2
More informationBMI Precast PRECAST & PRESTRESSED CONCRETE PRODUCTS
PRECAST & PRESTRESSED CONCRETE PRODUCTS has over 80 years experience in the building and concrete industry. We manufacture a wide range of precast, prestressed products from boat ramp planks to pilings,
More informationBids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)
General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationNational Bridge Inspection Program Risk-based, Data-driven FHWA Oversight
National Bridge Inspection Program Risk-based, Data-driven FHWA Oversight March 20, 2012 Previous FHWA NBIP Oversight Typical annual review o review of files and documentation o on-site bridge visits o
More informationBridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager
Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager 1 Local Bridge Program Asset Management for Local Bridges 2008 started approving Rehabilitation
More informationConcrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay
Overlays February 22, 2012 ACPA Pennsylvania Chapter Overlays John M. Becker, P.E. ACPA Penn Chapter February 22, 2012 One of 25 state paving associations affiliated with ACPA National Comprised of approximately
More informationThe State of Ohio Bridges
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.
More informationShort Span Steel Bridges
Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics
More informationBridge Engineering/Construction Ultra High Performance Concrete (UHPC)
Bridge Engineering/Construction Ultra High Performance Concrete (UHPC) Ductal UHPC Paul White, PE, P. Eng. Bridge Engineering Manager, UHPC/Ductal U.S. LafargeHolcim October, 2016 UHPC Premix/Constituents
More informationContinuous for Live Load: A Texas Historical Perspective
Continuous for Live Load: A Texas Historical Perspective Scott Walton, M.S.C.E., E.I.T. 1, and Timothy E. Bradberry, M.S.E., P.E. 2 Abstract A significant number of engineers in the United States have
More informationStructural Steel: An Industry Overview
Structural Steel: An Industry Overview A White Paper by the American Institute of Steel Construction October 2017 The United States structural steel industry supplied fabricated and erected structural
More informationCarter Bridge to Brooks Street Design Build RFI Questions and Answers
1. Project Limits -- Nick Wyatt of Kokosing Construction Co., Inc The project criteria defines the project limits by listing 19 bridges. However, portions of these structures were very recently overlayed
More informationTC3 AASHTO Technical Service Program for Training
TC3 AASHTO Technical Service Program for Training Feb. 7 th 9 th Mid Atlantic Quality Assurance Workshop Ron Stanevich, PE Director of Materials Division, WVDOH TC3 AASHTO Technical Service Program for
More informationREINFORCING TABLES INSTALLATION MANUAL
REINFORCING TABLES 201 REINFORCING TABLES Design Limitations Introduction The structural wall reinforcing and lintel design tables contained within the Appendix of NUDURA s Installation Manual have been
More informationNational Industry Update and Strategic Directions CPAM Annual Workshop March 12, 2015
National Industry Update and Strategic Directions CPAM Annual Workshop March 12, 2015 Gerald F. Voigt, PE President & CEO American Concrete Pavement Association T 2 Thru Our Clearinghouse! Game Changer
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationSpecialty Expansion Joint Systems
www.dsbrown.com Specialty Expansion Joint Systems Bridges Expansion Joint Systems for Architectural, Parking Garage and Bridge Applications Bridge the World with Leading Infrastructure Solutions Corporate
More informationLIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS
Structural Technical Report 1 LIFE SCIENCES BUILDING STRUCTURAL CONCEPTS AND EXISTING CONDITIONS Prepared for: Dr. Aly M. Said Dr. Thomas Boothby Professor Kevin Parfitt Dr. Charles D. Cox Prepared by:
More informationPREFABRICATED STEEL TRUSS SPECIFICATIONS
PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to
More informationNATIONAL BRIDGE INSPECTION STANDARDS (NBIS)
NATIONAL BRIDGE INSPECTION STANDARDS (NBIS) THE HISTORY OF THE NATIONAL BRIDGE INSPECTION STANDARDS SILVER BRIDGE SILVER BRIDGE Completed in 1928 Traversed the Ohio River between Point Pleasant, WV and
More informationMOA Project # Golden View Drive Intersection & Safety Upgrades
Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an
More informationI-405 Sepulveda Pass Widening Project. Community Advisory Committee Meeting June 24, 2010
I-405 Sepulveda Pass Widening Project Community Advisory Committee Meeting June 24, 2010 1 MWD LA-29 Project Drilling to install beams for shoring to support excavation at Sunset Bl and Church Ln 2 MWD
More informationD D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.
Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete
More informationAASHTOWare BrDR 6.8 Steel Tutorial STL6 Two Span Plate Girder Example
AASHTOWare BrDR 6.8 Steel Tutorial STL6 Two Span Plate Girder Example STL6 - Two Span Plate Girder Example (BrDR 6.5) 1'-6" 37'-0" 34'-0" 1'-6" 8 1/2" including 1/2" integral wearing surface FWS @ 25 psf
More informationMaintenance & Rehabilitation. Treatments. Crack Sealing. Sealant Types. Asphalt Pavement Preservation: Identification of Alternative Treatments
Asphalt Pavement Preservation: Evaluation, Maintenance & Rehabilitation Maintenance & Rehabilitation Treatments Identification of Alternative Treatments Before selecting a treatment for a pavement, we
More informationReason for Acceptance or Rejection
Value Engineering Approval Form Project: 25th Avenue & Union Pacific Grade Separation #6 VE Study Date: January 28 through February 1, 2013 Form updated: 5/7/2013 (Final) FHWA Functional ENV 1 ROW 1 The
More informationAUGUST 2016 LRFD BRIDGE DESIGN 3-1
AUGUST 2016 LRFD BRIDGE DESIGN 3-1 3. LOADS AND LOAD FACTORS The loads section of the AASHTO LRFD Specifications is greatly expanded over that found in the Standard Specifications. This section will present
More informationMIDAS Training Series
MIDAS midas Civil Title: All-In-One Super and Sub Structure Design NAME Edgar De Los Santos / MIDAS IT United States 2016 Substructure Session 1: 3D substructure analysis and design midas Civil Session
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationDistrict Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016
District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016 Ohio Transportation Engineering Conference 2016 Columbus, Ohio Agenda About
More informationSmarter. Safer. Leaner.
Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter
More information