ENMAX POWER CORPORATION. Requirements for Distribution Wires Access

Size: px
Start display at page:

Download "ENMAX POWER CORPORATION. Requirements for Distribution Wires Access"

Transcription

1 ENMAX POWER CORPORATION Requirements for Distribution Wires Access December 7, 2016

2 Table of Contents Foreword 4 Section One: Making an Application for New Services, Upgrades or Changes 6 1. New Connections and Service Upgrades 6 2. Joint Use Trenching 6 3. Submission of Information 7 4. Drawing Requirements 7 5. Acceptance of Drawings 8 6. Payments 8 7. Line Assignment 9 8. Permits and Approvals 9 9. Environmental Information Site Conditions Protection Equipment Information Customer's Equipment Easements & Rights-Of-Way Construction Delays Building Clearances Public Safety Electrical Permits Upgrade or Relocation of EPC Facilities 12 Section Two: Access to ENMAX Power Corporation s Facilities Right to Enter Property Reasonable Access 13 Section Three: Conditions of Service Number of Services Service Locations Underground Secondary Service Installations Location of Surface Facilities Maximum Service Size Sensitive and Special Loads Connecting Generators to EPC Distribution System Motors Power Quality Customer Load Balance 17

3 11. Impedance Grounded Systems Overvoltage Service Installation Route Single and Three Phase Service Availability Dedicated Alternate Service Non-dedicated Alternate Facilities Line Extensions Optional Facilities Temporary Facilities 20 Section Four: Disconnection and Reconnection of Service Disconnection Reconnection 22 Section Five: Service Characteristics Steady State Voltage Variation Limits Frequency Power Quality Service Interruption and Shortage of Supply Restoration Priorities 24 Section Six: Primary Metered Areas kv and 25 kv Service Area 25 Section Seven: Specific Requirements for URD Developments URD Servicing Pre-Installed Road Crossing Ducts Modified Underground System Total Underground System Sites Requiring Three Phase Power Conditions of Standard Subdivision, Detached and Semi-detached Dwelling Units Conditions for Non-Standard Subdivision 27 Section Eight: Responsibilities for Supplying Services Responsibilities for Supplying Services Meter Equipment and Instrument Transformers Ownership and Removal 31

4 List of Tables Table 1: Single Phase Secondary Metered Service Maximum Allowable Service Size 15 Table 2: Three Phase Secondary Metered Service Maximum Allowable Service Size 15 Table 3: Primary Metered Service Minimum Allowable Service Size 16 Table 4: Voltage Variation Limits at Service Entrances 23 Table 5: Responsibilities for Supplying Overhead Single or Three Phase Secondary Metered Services 28 Table 6: Responsibilities for Supplying Underground Single Phase Secondary Metered Services 29 Table 7: Responsibilities for Supplying Underground Three Phase Secondary Metered Services 30 Table 8: Responsibilities for Supplying Underground Three Phase Primary Metered services 31

5 Foreword Introduction This document outlines the basic procedural and technical requirements that must be met by the customer for ENMAX Power Corporation (EPC) to provide an electrical service connection within the EPC service area (see Figure 1 below), but excluding the downtown network area. This document is supplemental to the ENMAX Power Corporation Distribution Tariff Terms and Conditions which can be found at In case of discrepancies, the Distribution Tariff Terms and Conditions document shall prevail. Definitions/ Acronyms Customer The term customer includes developers, consultants, and electrical contractors during the design and construction phases. Once electrical service is established, customer is defined by the Electric Utilities Act as a person purchasing electricity for the person s own use. AEUC Alberta Electrical Utility Code CEC Canadian Electrical Code Network Area For information concerning electrical servicing in the downtown network area, refer to the Network Servicing Policies and Guidelines which can be found at RCN Replacement Cost New Standards EPC construction standards comply with the AEUC under the Alberta Safety Codes Act, CEC, and accepted electrical utility practices. URW Utility Right-of-Way 4

6 Figure 1 EPC Service Area 5

7 Section One: Making an Application for New Services, Upgrades or Changes Written Notice A customer must give EPC written notice of any changes in service requirements, including a change in load requiring an ampacity increase to the main breaker or the fuse size for main disconnect. If a customer neither gives written notice nor obtains written approval from EPC for any additions or changes in load or location, the customer shall be liable for any damage to EPC equipment caused by such additions or changes. 1. New Connections and Service Upgrades New connections or service upgrades will be provided only after: project quotation and a drawing indicating EPC s proposed facilities and location for wires service has been accepted and signed by the customer the customer's electrical installation meets the criteria outlined in this document, and the ENMAX Power Corporation Distribution Tariff Terms and Conditions an electrical permit has been obtained from City of Calgary Electrical Inspection site ID has been obtained, and the customer's electrical installation has been approved by City of Calgary Electrical Inspection or other responsible authorities and the customer s account has been confirmed to be in good standing Where customer owned generation facilities are planned, refer to Section Three 7. Connecting Generators to EPC Distribution System 2. Joint Use Trenching The cost of a joint use trench is shared equally amongst all parties utilizing the shared trench for such things as communication, natural gas, electric utilities, and/or customer owned facilities. If a customer requests joint usage of an EPC trench located on private property (e.g. to add communication ducts) and a company/utility chooses not to invest in the duct/trench, the customer is responsible for any additional costs. 6

8 3. Submission of Information To enable EPC to start the design process, the information listed below is required (as applicable): in-service date type of electrical service installation (overhead or underground) metering requirements - primary or secondary metered (see Section Six Primary Metered Areas) secondary voltage and service size (see Section Three - 5. Maximum Service Size) electrical single line diagram (including main breaker/fuse size, bus ampacity, metering, etc) anticipated maximum demand the type and loading of electrical equipment such as large motors, arc furnaces, harmonic producing loads, UPS or generation facilities, and submission of drawings (see 4. Drawing Requirements) 4. Drawing Requirements All of the drawings submitted must be fully dimensioned and to scale where applicable. Drawings must be provided in standard Microstation CAD format (.dgn) in NAD83 coordinate system with 3TM projection. Note: the drawings submitted to EPC are used for design and construction layout purposes. Any revisions (after the initial submission) to the drawings must be submitted to EPC in a timely manner prior to quotation. EPC will not be responsible for the relocation/alteration of any installed facility resulting from the use of outdated drawings. Residential Development To initiate the EPC design process, the customer must provide the following information. Plans must be fully dimensioned and scaled where applicable. two copies of the tentative legal plan subdivision plan easement/right-of-way plan deep utility plan sidewalk cover sheet overland drainage plan shallow utilities plan driveway plan 7

9 grade plan size of the service (100A, 200A, or 400A) extra coil length (i.e. more than 25 m) where required, and a tentative in-service date Commercial or Industrial Development Drawing requirements may vary depending on the type of projects. The typical drawing requirements for commercial or industrial projects are as follows: electrical and mechanical site plan site grading plan drainage plan street designation and municipal address location of service entrance, switchgear, meter centers and other utilities (gas, communications, sewer, water, etc.) property boundary designations, building layout, and dimensions of building to the property lines deep utilities shallow utilities a single line diagram showing the following items: voltage size of the main bus or panel size of the main fuse disconnect or breaker size, type, and number of service conductors metering provisions power quality control equipment generation facilities 5. Acceptance of Drawings At the time of acceptance of the EPC quotation, the customer must return a signed copy of EPC s design, indicating acceptance of the proposed EPC facility layout. Changes to the scope of work following drawing acceptance may result in a revised quotation to the customer. 6. Payments The customer shall submit payment as per the terms outlined in the project quotation letter. EPC will make an applicable investment as per EPC s investment policy as outlined in the ENMAX Power Corporation Distribution Tariff Terms and Conditions. EPC may offer the customer a credit application. If applicable and the customer 8

10 meets EPC s credit criteria, a deposit may be requested with the balance of payment due at the completion of construction. Note that EPC may also request a design deposit from customers to cover preliminary engineering costs incurred in preparation of a customer quotation. 7. Line Assignment Where new infrastructure is required within road allowance or public property, acceptance and authorization for line assignment must be granted by the appropriate municipality or governing body prior to construction commencing. 8. Permits and Approvals Prior to the installation of EPC overhead and underground facilities, all project applicable permits and approvals must be obtained by EPC. These may include but are not limited to the following: Alberta Transporation Alberta Environment The City of Calgary Parks and Urban Forestry Railway Crossing Agreements (CP, CN, City of Calgary Light Rail Transit) Pipeline Crossing Agreements Navigable Waters Department of Fisheries and Oceans 9. Environmental Information The customer is required to supply EPC with information regarding potential or actual contamination, waste or hazardous materials, or other adverse environmental conditions on the customer's premises on or near where EPC facilities are to be located. The customer has a continuing obligation to provide EPC (upon request) with copies of all environmental assessments relating to the premises. The customer must ensure that EPC equipment, such as but not limited to: transformers, switching cubicles, and manholes, is protected from contact when disposal of wastes and deleterious materials occurs on the customer s property. 10. Site Conditions The grade along the entire area of purposed alignment must be within 150 mm of final grade and free from obstruction before the electrical installation can begin. If installed facilities subsequently require alterations (i.e. height adjustments) because the final grades do not conform to the site grading plans, the cost of such 9

11 adjustments will be the responsibility of the customer. Incremental cost incurred by EPC, due to changes to an approved design by the customer, shall be charged to the customer. Changes to the scope of work may result in additional charges to the customer and may not be covered by EPC investment policies. Delays caused by obstruction on the customer site which impede the installation of EPC s facilities may result in additional charges to the customer. According to the above criteria, if the entire site is not ready for construction, extra costs surrounding construction set up may be applied. Transformer boxpads, switch cubicles, pullboxes etc. require subsoil material having a minimum bearing strength of 200 kpa. EPC must be informed of any poor subsoil material on site (i.e. wet material, loose material, soft clay, etc.) that may cause unacceptable settlement of the transformer. Otherwise, the customer shall be responsible for the expenses incurred in rectifying any resulting problems. Frozen Ground Conditions The customer is responsible for additional costs associated with construction during frost conditions. Costs may result from extra activities such as hydrovacing, ground thawing or ripping along the trench line and excavation sites. Customers may choose to alter their project timelines to avoid frost charges. Compaction EPC will compact the trenchline and equipment locations in accordance with the City of Calgary compaction guidelines. 11. Protection Equipment Information Fault Level Consideration The short-circuit rating of the customer's service panel and distribution protection must be higher than or equal to the design fault level at the connection point of the EPC distribution system. The customer is responsible for all fault calculations beyond the transformer secondary bushings. EPC may request the customer to provide these calculations prior to connecting electrical service. Customer Relaying and Protection The customer is responsible for providing protective devices such as fuses, circuit breakers, or relays, that are capable of protecting the customer s equipment against phase failure, low voltage, high voltage, and the maximum available shortcircuit current. Short-circuit current levels at the transformer secondary bushings or delivery point for primary metered services and relevant protection 10

12 characteristics are available from EPC. The customer shall demonstrate to EPC that their protective devices will coordinate with EPC's protective equipment for primary metered services. Under no circumstances will the customer s system be permitted to adversely affect other EPC customers or EPC s equipment. The customer is responsible for commissioning the primary metered high voltage switchgear and associated customer owned equipment. To ensure the safety of EPC s employees and equipment, EPC reserves the right to observe the commissioning test, and requires a commissioning report certified by a Professional Engineer. 12. Customer's Equipment The customer's electrical equipment must comply with all applicable standards, codes, and regulations. 13. Easements & Rights-Of-Way A URW or easement provides immediate service access to electrical equipment and allows a utility to use the land within the URW in controlled ways. EPC will require a URW when EPC has to cross over, under, or upon a titled property other than the property that requires the proposed electrical service. EPC will require a URW for common property within a condominium. When a URW is required, the owner of the property to be encumbered must agree to the URW or easement before EPC can proceed. For more information see the Utility Rights-of-Way brochure available at Contact the EPC Land department for other questions regarding land. Customer's Land The customer shall grant to The City of Calgary and/or EPC such easements or URW, in perpetuity, for erecting and maintaining its extension(s) on, over, or under the land of the customer, as may be necessary to complete and maintain any such extension(s) that EPC may require to enable it to supply and service other customers. Intervening Land The customer requesting electrical service is responsible for the granting of and delivery to The City of Calgary and/or EPC, free from cost, permanent easements or URW from the owners of private property on, over, or under whose property it is necessary to extend in order to supply and service the customer. 14. Construction Delays Incremental construction costs incurred by EPC due to customer changes to an approved design shall be charged to the customer. The customer may also be 11

13 accountable for additional costs resulting from customer driven changes to the project scope or schedule. Delays due to obstructions in the EPC construction zone, caused by the customer, may result in additional charges to the customer. 15. Building Clearances Public Safety In accordance with the AEUC: a) anyone working near power lines must maintain safe limits of approach; and b) person(s) responsible for the design or construction of any infrastructure near powerlines must follow clearance requirements. Any change(s) required to EPC s facilities in order to maintain the greater of the minimum clearances as stated within the AEUC (or Canadian Standards Association) and the current EPC minimum standard clearances shall be at the expense of the person(s) responsible for non-compliance. This is notwithstanding any City of Calgary or Municipality Authority approvals. 16. Electrical Permits Permits and Licences The customer's electrical installation must conform to all applicable legislation. The customer must obtain all necessary permits, licences and authorizations before electrical service connection. At any time before or after electrical service connection, EPC may inspect the customer s installation, but is under no obligation to do so. Such inspection shall not relieve the customer from their responsibilities to conform to all applicable legislation. 17. Upgrade or Relocation of EPC Facilities If a customer requests the upgrade, relocation, or removal of distribution facilities, any associated costs are the responsibility of the customer. The customer is also required to pay for any changes to associated joint use facilities such as TELUS, Shaw, Street Lights, or other affected infrastructure. This includes obtaining all necessary approvals, URWs and easements. In addition, the customer is responsible to obtain consent from anyone who may be affected by the proposed change for reasons such as, but not limited to: significant alteration of viewscapes access, and use and enjoyment of existing amenities. EPC reserves the right to refuse the request to upgrade, relocate, or remove distribution facilities if such a change is not feasible. 12

14 Section Two: Access to ENMAX Power Corporation s Facilities 1. Right to Enter Property Refer to the ENMAX Power Corporation Distribution Tariff Terms and Conditions Section Reasonable Access The customer must provide EPC with reasonable access to all EPC facilities located on or near the customer's or public property, as well as in road allowance. This includes all transformers, switches, pullboxes, and any other facilities owned, leased or operated by EPC. The customer is required to give EPC permission to manage vegetation on the property owned or controlled by the customer, and the right to maintain proper clearances in accordance with the AEUC. EPC will make every effort to notify the customer before such work is performed. To ensure the safe operation of the electrical equipment by EPC personnel, the customer shall not place any structures (eg. fences, garden sheds, retaining walls, etc.) or vegetation (eg. trees, shrubs, etc) that will interfere with the safe operation of EPC facilities or affect compliance with any applicable legislation. Proper clearance to equipment must be maintained at all times. The customer shall not modify final design grading along or in the vicinity of EPC s infrastructure which may cause clearance, drainage or operational issues. For further information, contact EPC Engineering. 13

15 Section Three: Conditions of Service 1. Number of Services The limitation on the number of services permitted to a building or a piece of land is determined by the CEC. If multiple services to one building are requested and comply with the CEC, EPC will require a single point of disconnection from EPC s distribution system. The customer will be accountable for any additional costs associated with provision of the single point of disconnect. In cases where additional infrastructure is required, a URW or easement on a customer s property may be required. 2. Service Locations The transformer location proposed by the customer must be approved by EPC before design of electrical service commences. EPC may request voltage drop calculations from the customer to ensure steady state voltage variation limits are met. (See Section Five, Table 4 - Voltage Variation Limits at Service Entrance) 3. Underground Secondary Service Installations Commercial On private property outside of any URW boundary, the customer shall provide and install all necessary duct required for the secondary voltage service cables from the building to EPC s duct at the secondary side of the transformer. The customer shall provide and install all secondary voltage cables required. All work done at or near the transformer must be done under EPC s supervision and inspected by EPC before energization. Note: if a transformer for a commercial service is located within a URW, EPC will perform the installation of any secondary ductwork required within the URW and charge the customer accordingly. Residential For single family, and semi-detached dwellings, EPC will provide a service coil at property line. The customer shall install duct from property line to their service entrance and install the secondary voltage cable (i.e. service coil). For multi-family dwellings, the EPC transformer supplying the service is usually located within a URW. EPC installs secondary duct from the transformer to a stub location just outside of the URW. The customer is accountable for the cost of this EPC ductwork. The customer shall install secondary duct from the stub to their ganged meter base and is also responsible for the sizing, supplying and installing 14

16 of all secondary voltage cables to the transformer. All work done at or near the transformer must be done under EPC s supervision and inspected by EPC before energization. The customer is accountable for EPC costs associated with EPC supervision and inspection. 4. Location of Surface Facilities The customer shall provide the necessary space (as determined by EPC) for all EPC s facilities such as transformers, pull boxes, switchgear, poles, or anchors, as per EPC s requirements. Sufficient space must allow for both the physical size of the equipment as well as the clearance requirements for safe operation and maintainence of the equipment. Contact EPC Engineering for further information. 5. Maximum Service Size Table 1: Single Phase Secondary Metered Service Maximum Allowable Service Size Maximum Allowable Service Size Single Phase Secondary Metered Service Supply Voltage (Line to Ground) Size of Overhead Services Permitted Size of Underground Services Permitted 7.6 kv-120/240 V 1 phase 3 wire *400 A **600 A 14.4 kv-120/240 V 1 phase 3 wire *400 A **600 A * Based on 50 kva transformer ** Based on 75 kva transformer Table 2: Three Phase Secondary Metered Service Maximum Allowable Service Size Maximum Allowable Service Size Three Phase Secondary Metered Service Supply Voltage (Line to Line) Size of Overhead Services Permitted Size of Underground Services Permitted 13.2 kv-120/208 V 3 phase 4 wire 400 A 3000 A 25 kv-120/208 V 3 phase 4 wire 400 A 2000 A 13.2 kv-277/480 V 3 phase 4 wire Not available 2000 A 25 kv-277/480 V 3 phase 4 wire Not available 2000 A 13.2 kv-347/600 V 3 phase 4 wire Not available 2000 A 25 kv-347/600 V 3 phase 4 wire Not available 2000 A 15

17 Contact EPC Engineering for single and three phase voltage availabilty within the EPC service area. Table 3: Primary Metered Service Minimum Allowable Service Size Minimum Allowable Service Size New Commercial or Industrial Primary Metered Service Supply Voltage 7.6/13.2 kv 3 phase 4 wire 14.4/24.9 kv 3 phase 4 wire Size of Overhead Services Permitted Not available Not available Size of Underground Services Permitted Single electrical services greater than the ampacities shown in Table 2 must be primary metered. EPC will give consideration to supplying large customer loads with multiple services and transformers. See Section Three - 1. Number of Services 6. Sensitive and Special Loads Certain customer loads may require special requirements. In these instances the customer may choose to install additional customer owned equipment at their cost for reliability of supply. Some examples of these requirements are as follows: A customer installed Uninterruptible Power Supply (UPS) may be necessary for critical loads to avoid power interruption in the event of a power outage. A customer may consider a separate service for special voltage sensitive loads which may be affected by voltage fluctuations caused by load distribution within the customer owned electrical equipment. This second service must meet CEC requirements and EPC s standards. 7. Connecting Generators to EPC Distribution System Customers wishing to connect a generator to their facilitiles for the purposes of export, load shaving, or emergency backup must meet requirements set out by EPC and contact generationinterconnection@enmax.com. Customers are also responsible to contact the Alberta Utilities Commission at to ensure they have received all the required approvals. EPC has created a document titled Guide for Generator Interconnection to the Wires Owner Distribution System to assist customers with their generation design. This document may be found on the ENMAX website Note that EPC does not provide design or consulting services to customers. EPC 16

18 recommends customers engage the services of a registered (APEGA) professional engineer or registered (APEGA) engineering consulting firm qualified to provide design and consulting services for electrical interconnection facilities. 8. Motors Refer to Power Quality Specifications and Guidelines for Customers available at 9. Power Quality A customer must not use their electric service in such a manner as to cause power quality problems on the EPC system, such as undue interference with another customer's service or undue stress on EPC equipment caused by excessive harmonic distortion, voltage fluctuations or frequency deviations. A customer who causes such power quality problems is responsible for taking the action necessary to resolve them, at the customer's expense and to EPC s satisfaction. All customers connected to the EPC system are responsible for adhering to harmonic and voltage fluctuation limits set out in the EPC document Power Quality Specifications and Guidelines for Customer available at These limits are intended to protect EPC customers from undue interference from other customers' electrical equipment. Electric service may be disconnected if a customer's facilities are operated in a way that causes these limits to be exceeded and results in power quality problems on the EPC system. Protection Coordination The customer is responsible for providing suitable protective equipment that can isolate the customer's system for faults on the customer's equipment. This protection must coordinate with EPC's system protection to ensure that the customer's system is isolated before EPC's protection operates. If the customer s main breaker trip setting is adjustable, the customer must inform EPC if this setting is increased from the maximum value shown on the single line diagram provided to EPC by the customer. 10. Customer Load Balance If a three phase load imbalance caused by customer load distribution is discovered by EPC, the imbalance shall be rectified by the customer at the customer s expense. 11. Impedance Grounded Systems The installation of impedance grounded systems must conform to all relevant and applicable legislation, IEEE Standards, and the AEUC. EPC will provide labeling indicating the presence of an impedance grounded system for the equipment. The 17

19 customer is responsible for installing the label on customer owned equipment and ensuring the customer owned impedance grounding equipment is maintained and operating as designed. 12. Overvoltage Customers using capacitors for power factor correction or harmonic filters must ensure that these devices do not cause overvoltage conditions on the EPC system. 13. Service Installation Route EPC determines the best route for all service installations on public and private property. If the customer requests a route different from that determined by EPC, EPC will, if possible, accommodate the request, provided that the customer agrees to pay EPC all additional costs accruing from the use of the requested route. EPC cannot fulfill a request for a different route if that route is contrary to EPC standards and practices. EPC will determine the service type (overhead or underground) and routing based on engineering design requirements and area development conditions. 14. Single and Three Phase Service Availability EPC will only connect a single phase service from a three phase source when adequate protection and isolation means are in place. If the customer requires a single phase service at a location where only three phase underground distribution is available, the customer is responsible for all costs associated to provide incremental infrastructure, less applicable EPC investment. Alternatively, if a three phase service is required where only single phase distribution is available, the customer is responsible for all costs associated to provide incremental infrastructure, less applicable EPC investment. 15. Dedicated Alternate Service A dedicated alternate service is defined as the utility s reserved capability to supply a specified level of a customer s electrical requirements from a supply different than the customer s normal supply. In order to qualify for a dedicated alternate service, the customer s demand must be 1 MVA or greater. A dedicated alternate service will be provided only under a contract between EPC and the customer. Customers requesting a dedicated alternate service will pay the following costs: The cost of any new distribution facilities, and/or the Replacement Cost New (RCN) of existing distribution facilities, required to provide the dedicated alternate service. See section of the ENMAX Power Corporation Distribution Tariff Terms and Conditions. The cost attributed to the customer will be based on the percentage of the facilities total 18

20 capacity reserved for the alternate service. If the unused capacity of the dedicated alternate service is not required by EPC at the time of construction, then the customer must pay 100% of the construction cost. A one time pre-paid operations and maintenance charge of 20% of the customer s portion of the new construction cost and/or RCN of existing facilities. In addition to the above costs, the customer shall be responsible for any transmission and/or substation related charges that the Alberta Electric System Operator (AESO) or EPC deems necessary. The design and arrangement of both the standard and the dedicated alternate services will be determined by EPC. The customer shall install and maintain an approved primary voltage transfer device. The characteristics, arrangement, and operation of this transfer switch and the associated circuits shall be subject to EPC Engineering approval. The customer shall provide an interlock scheme to ensure EPC's points of delivery cannot be paralleled and shall sign an operating agreement with EPC which details the operations of the transfer switch and associated circuits. 16. Non-dedicated Alternate Facilities A non-dedicated alternate facility is defined as an additional connection point to a customer in addition to the normal source. EPC may invest towards the capital cost of non-dedicated alternate facility as per EPC's investment policy. 17. Line Extensions A line extension is defined as the installation on the existing EPC distribution system of new or additional distribution facilities adequate to serve the customer's additional load requirements in reaching a connection point determined by EPC. Distribution Facilities Distribution facilities are the structures and devices needed to distribute energy at any of the primary or secondary voltages provided by EPC. Distribution facilities must be installed in accordance with applicable laws, codes, and EPC standards and practices. Line Extension Costs The total line extension cost includes labour, material, and equipment involved in the design, installation, and inspection of the line extension. The total cost includes, but is not limited to, the costs of transformers, meters, conductor, permits, tree trimming/removal, EPC indirect charges, and any necessary rearrangement of existing distribution facilities. The total cost includes payments to a third party 19

21 for easements or URWs. Customers are responsible for all line extension costs, less the applicable EPC investment. In addition, any payments to a third party for easements, URWs, or other costs, shall be the responsibility of the customer. Route EPC will determine the route of all line extensions. If the customer requests a route different from that determined by EPC, EPC may accommodate the request provided that the following are met: 1) the customer pays EPC all additional costs resulting from the use of the requested route 2) the route is not contrary to EPC standards and practices, and 3) the route is accepted by City of Calgary Line Assignment. Overhead Standard New Development Feeders are constructed to an overhead standard. Customers have the option of funding the incremental cost for an underground feeder. If the construction of overhead facilities is not deemed feasible due to restrictions or conflicts imposed by existing development or EPC construction standards, then the customer will be accountable for the cost for any incremental facilities necessary. Existing Development Customers requesting existing overhead facilities to be placed underground must fund the entire cost of rebuilding the existing overhead facilities underground. 18. Optional Facilities EPC s investment will not apply to facilities requested by the Customer that are, in the opinion of EPC, beyond what is required to provide safe, reliable and economic service consistent with current EPC standard practice or are expected to cause increased operation and maintenance expenses to EPC. Additional facilities requested by the Customer that are also useful to EPC may be eligible for investment at EPC's discretion. 19. Temporary Facilities Requested services that are deemed temporary by EPC will require the customer to pay EPC's total cost of installation and removal of the service, less the value of the salvageable material. 20

22 When a commercial or residential development is not immediately adjacent to EPC s permanent supply infrastructure, EPC reserves the right to provide temporary supply infrastructure, at the cost of the customer, in such a way to maintain supply integrity and security. EPC may augment this temporary infrastructure to maintain adequate supply at the customer s expense. EPC also reserves the right to utilize such temporary infrastructure to supply adjacent developments similarly located at a distance from EPC's permanent supply facilities. 21

23 Section Four: Disconnection and Reconnection of Service 1. Disconnection Refer to Section 18.6 De-Energization of Service in the ENMAX Power Corporation Distribution Tariff Terms and Conditions. 2. Reconnection EPC will reconnect the service when all corrections to those conditions identified in Section 18.6 De-Energization of Service in the ENMAX Power Corporation Distribution Tariff Terms and Conditions are implemented to the satisfaction of EPC and the customer s facilities are approved by The City of Calgary or other responsible authority. A current permit for reconnection will not be required when the service has been cut off or had a current limiting device applied for non-payment or a change of occupant, provided that there have been no alterations or additions since the issuance of the most recent permit. See Re-Energization of Service in the ENMAX Power Corporation Distribution Tariff Terms and Conditions for more information. 22

24 Section Five: Service Characteristics 1. Steady State Voltage Variation Limits EPC will, within the scope of the ENMAX Power Corporation Distribution Tariff Terms and Conditions, endeavour to maintain the steady state voltage at the service entrance at a level within the limits presented below. Note: Steady state is any condition on EPC's system that lasts for longer than one minute. Table 4 is an overview of the voltage variation limits at the service entrance as per the Canadian Standards Association CAN3-C235. Table 4: Voltage Variation Limits at Service Entrances Voltage Variation Limits at Service Entrance Nominal System Voltages Extreme Operating Conditions Normal Operating Condition Voltages Extreme Operating Conditions Single Phase 120/ / / / /254 Three Phase 4 Wire 120/208Y 277/480Y 110/ / / / / / / / /600Y 306/ / / /635 Voltages within the indicated limits for normal operating conditions do not require improvement or corrective action. Voltages outside the indicated limits for normal operating conditions, but within the indicated limits for extreme operating conditions will require improvement or corrective action on a planned basis, but not necessarily on an immediate basis. Voltages outside the indicated limits for extreme operating conditions require improvement or corrective action on an emergency basis. The urgency for such action will depend on factors such as location, nature of the load or circuit involved, extent to which limits are exceeded (with respect to voltage levels and duration), and other such factors. EPC is responsible to resolve voltage conditions outside the indicated limits above and will develop a plan and cover the costs for any corrective action required. 23

25 2. Frequency The Alberta Interconnected System operates at a nominal frequency of 60 hertz. 3. Power Quality Refer to EPC s Power Quality Specifications and Guidelines for Customer document available at 4. Service Interruption and Shortage of Supply EPC will exercise reasonable diligence and care to deliver a continuous and sufficient supply of electric energy to the customer, but does not guarantee continuity or sufficiency of supply. Apportionment of Supply During Time of Shortages In the event of a shortage of electrical energy supply, EPC will apportion the supply in the manner that in EPC s judgement is the most reasonable under the prevailing conditions. Emergency Load Control Whenever instability or cascading outages could result from actual or expected transmission overloads, other contingencies, or whenever such conditions exist in the system of another company with which EPC's system is interconnected, EPC will take reasonable steps as the time available permits to maintain system stability. Such steps shall include but are not limited to the reduction or interruption of service to one or more customers. 5. Restoration Priorities During a major outage due to events such as a major storm, EPC will utilize a priority system for service restoration. Restoration procedures are designed to get the greatest number of customers back in service as quickly as possible with special consideration given to customers that are essential to public welfare (e.g. hospitals). 24

26 Section Six: Primary Metered Areas kv and 25 kv Service Area Single electrical services exceeding 2MVA in connected load must be primary metered. EPC will give consideration to supply large customer loads with multiple services and transformers. See Section Three - 1. Number of Services. The following is required for primary metered services: When the service consists of two sources of supply, the main breakers must be interlocked to ensure EPC's points of delivery cannot be paralleled. The customer shall provide an interlock scheme and the customer shall sign an operating agreement with EPC which details the operation of the transfer device and associated circuits. The customer shall submit a copy of their high voltage switchgear shop dwgs for EPC review and acceptance. These drawings should be submitted for review prior to fabrication of the switchgear. The customer's switchgear shall have a fault current interrupting capability as designated by EPC Engineering. The customer shall install suitable protection relaying to coordinate with EPC's system. The customer must provide a protection and coordination study which must be approved by EPC Engineering prior to energization. The customer shall ensure that CSA approved grounding facilities exist in the incoming high voltage supply compartment and metering compartment that meets EPC requirements. The customer shall provide suitable enclosures for EPC's current transformers (CTs), potential transformers (PTs), and revenue meter. For detailed metering information refer to the EPC Metering Standard which can be found at The customer is responsible for the installation and maintainence of their high voltage switchgear and all customer owned distribution equipment. The transformer(s) may be owned by the customer or leased. The customer high voltage switchgear must be located such that adequate working clearance is provided to ensure EPC can safely operate/maintain their equipment (i.e. incoming high voltage cables and metering equipment). The customer's electrical installation must be approved by City of Calgary Electrical Inspection prior to energization of the service by EPC. 25

27 Section Seven: Specific Requirements for URD Developments 1. URD Servicing In accordance with a City of Calgary bylaw, an underground electrical system shall be mandatory, except as otherwise authorized by the approving authorities. It may be either a modified underground system (i.e. main feeder overhead) or a total underground system at the Developer s option. Servicing shall be from the front street or lane only and the design shall be the most economical and efficient. 2. Pre-Installed Road Crossing Ducts The Developers, may at their option, install road crossing ducts for the use of EPC, communications and gas installations in advance of the usual construction period for these facilities. If the Developer chooses to do so, then the following conditions must be met: Duct requirements must be obtained from EPC and the communication and gas utilities before any ducts are installed. The ducts must be installed in accordance with the current City of Calgary specification regarding pre-installed road crossing ducts. Inspection will be performed by EPC personnel to ensure compliance with EPC standards and specification regarding depth, cover, and compaction. If the installation of the road crossing duct does not meet specifications, the Developer shall be responsible for the costs of repairing or replacing the road crossing. EPC or their subcontractor shall notify the Developer or their agent of all incorrect road crossings. 3. Modified Underground System The following conditions shall apply only to a modified underground system: The Developer shall provide a URW alignment with twenty four (24) hour vehicle access adjacent to the main overhead feeder. When the subdivision plan requires the use of an anchor for the overhead pole system not adjacent to a lot line, an underground span shall be installed instead of the overhead span. In such event, the Developer shall pay the difference in cost between the underground span and the overhead 26

28 span. The Developer shall be notified of this requirement, if any, at the time of circulation of the tentative plan and shall be given the opportunity to revise the plan of the subdivision so as to avoid, if possible, the installation of such underground span. Where within any portion of the subdivision the use of side yard easements or a street front main feeder is required due to the subdivision design, the main feeder shall be placed underground. The Developer shall pay the difference in cost between the underground and overhead feeder. If possible, EPC and the Developer will attempt to ensure that the subdivision can accommodate the overhead main feeder. 4. Total Underground System Where the main feeder is placed underground at the request of the Developer, the Developer shall pay the actual cost of the underground feeder less EPC s allowance for an overhead feeder. 5. Sites Requiring Three Phase Power Commercial development, apartment, multi-family residence and school sites which require three phase power may not necessarily be serviced by the most economical routing of the three phase main feeder. Where the three phase source is not immediately adjacent to these sites, infrastructure will be provided to these sites at an additional cost to the Developer at the time of the initial servicing of the subdivision. 6. Conditions of Standard Subdivision, Detached and Semi-detached Dwelling Units See Section Conditions of Standard Subdivision Detached and Semidetached Dwelling Units in ENMAX Power Corporation Distribution Tariff Terms and Conditions. 7. Conditions for Non-Standard Subdivision The cost to the Developer shall be the actual cost of construction, less the EPC non-standard residential investment level. 27

29 Section Eight: Responsibilities for Supplying Services 1. Responsibilities for Supplying Services Based on the distribution system in the area and the customer electrical service requirements, one of the following supply methods will be provided to the customer: overhead single or three phase secondary metered service (Table 5) underground single phase secondary metered service (Table 6) underground three phase secondary metered service (Table 7) underground three phase primary metered service (Table 8) The following tables provide details of the activities for which EPC and the customer are responsible. The activities notes are for general guidelines only and may not cover all project requirements. Cost accountability for these activities will be determined at the design stage of a project. Table 5: Responsibilities for Supplying Overhead Single or Three Phase Secondary Metered Services Responsibilities for Supplying Overhead Single or Three Phase Secondary Metered Services Activity EPC Customer Installing civil structures Install service pole(s) outside of private property. Install service pole(s) on private property, if required Installing electrical equipment Maintaining distribution system Install single span of service conductors to customer service mast and make connections to customer secondary Repair or replace primary voltage conductors and single span of secondary service as required. Repair metering equipment, as required. If requested by customer, replace metering equipment at customer s expense. Install additional spans of service conductor if required. Install all necessary electrical equipment including meter base to receive service. Obtain electrical permit from The City of Calgary or other responsible authority. Maintain the service entrance equipment in a safe condition. Repair or replace customer service pole(s) as required. Maintain proper clearances from EPC facilities. Exercise reasonable care to protect metering equipment. 28

30 Table 6: Responsibilities for Supplying Underground Single Phase Secondary Metered Services Responsibilities for Supplying Underground Single Phase Secondary Metered Services Activity EPC Customer Installing civil structures Installing electrical equipment Maintaining distribution system Install pullboxes, transformer pads, ducts for primary cables and 3 rd Party Utility ducts. Install any ductwork that may be located inside of a URW on private property. Install transformers and primary voltage cables. For residential single-family and semi-detached bareland condominiums, install secondary voltage service cables to the customer s property line. Leave the service coil for the customer s contractor to install to the meter base. Maintain transformer, primary voltage cables, as well as secondary voltage cables on public lands or within a URW. Repair metering equipment, as required. If requested by customer, replace metering equipment at customer s expense. Install secondary and 3 rd Party Utility ducts on private property and outside of URWs. Install all electrical equipment including meter base necessary to receive service. Install secondary duct and service cable to meter base and make connection. Make provision for metering installation. Obtain electrical permit from The City of Calgary or other responsible authorities. Maintain the service entrance equipment in a safe condition. Maintain secondary cable on private property that is outside the URW. Maintain proper clearances from EPC facilities so as not to interfere with the proper and safe operation of these facilities. Exercise reasonable care to protect metering equipment. 29

31 Table 7: Responsibilities for Supplying Underground Three Phase Secondary Metered Services Responsibilities for Supplying Underground Three Phase Secondary Metered Services Activity EPC Customer Installing civil structures Installing electrical equipment Maintaining distribution system Install pullboxes, transformer pads, switching cubicle base, ducts for primary cables and 3 rd Party Utility ducts. Install any ductwork that may be located inside of a URW on private property. Install primary voltage cables, switching cubicles and transformers. Install overhead pole lines as required. Maintain pullboxes, primary duct, transformer pads, transformer and primary voltage cables. Repair metering equipment, as required. If requested by customer, replace metering equipment at customer s expense. Install secondary and 3 rd Party Utility ducts on private property and outside of URWs. Install all necessary electrical equipment including meter base to receive service. Install secondary voltage cables. Make provision for metering installation. Obtain electrical permit from The City of Calgary or other responsible authorities. Maintain service entrance equipment in a safe condition. Maintain secondary ducts and secondary voltage cables, including mitigating concerns relating to water ingress into facilities. Maintain proper clearances from EPC facilities. Exercise reasonable care to protect metering equipment. 30

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

CUSTOMER SERVICE POLICIES

CUSTOMER SERVICE POLICIES Resolution U-10670 Effective December 18, 2013 Section Title Page No. 1.0 Statement of General Policy... 2 2.0 Electrical Service... 3 2.1 Electrical Service Availability and Characteristics... 3 2.2 Large-Load

More information

Member Service Electric Wiring Guidelines

Member Service Electric Wiring Guidelines Member Service Electric Wiring Guidelines Table of Contents A. Definitions... 2 B. Member Service Wiring Guidelines... 2 C: Meter located on the house from an underground source - pad transformer or j-box....

More information

ELECTRICAL SERVICE EXTENSION POLICY

ELECTRICAL SERVICE EXTENSION POLICY I. OBJECTIVE A. To provide a fair and consistent method of extending, upgrading and downgrading power lines and other service facilities within the Mason County PUD No.1 (PUD 1) service area. B. To encourage

More information

Electric Service Handbook

Electric Service Handbook Electric Service Handbook Revised August 2017 Contact Information Telephone (253): Electrical Inspection Office 502-8277 7:30 am - 4:30 pm Electrical Inspectors Area Map on Website 7:30 am - 8:30 am Automated

More information

Technical Requirements for Distributed Generation Connection

Technical Requirements for Distributed Generation Connection Technical Requirements for Distributed Generation Connection Distributed Generation Connection Requirements SECTION 1: INTRODUCTION 1.1 General Purpose This document defines the requirements for connecting

More information

POTOMAC ELECTRIC POWER COMPANY

POTOMAC ELECTRIC POWER COMPANY POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission

More information

Information Document Service Proposals and Cost Estimating ID # R

Information Document Service Proposals and Cost Estimating ID # R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an Information Document

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 24700-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 22993-E Rule 16 Sheet 1 Applicability: This rule is applicable to both

More information

METERING GUIDE PART 1 METERING GENERAL

METERING GUIDE PART 1 METERING GENERAL 1 METERING GUIDE PART 1 METERING GENERAL 2 METERING GUIDE 1 INTRODUCTION 3 PURPOSE OF THIS GUIDE 3 METERING GENERAL 4 ELECTRICITY SUPPLY - INDUSTRY PLAYERS 4 1.1.2 Generators 4 1.1.3 Networks 4 1.1.4 Retailers

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

Basic Service. This Section provides information regarding a. Introduction

Basic Service. This Section provides information regarding a. Introduction Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.

More information

Customer Connection Guide. Document number SOP Issue number 9 Status Approver

Customer Connection Guide. Document number SOP Issue number 9 Status Approver Customer Connection Guide Document number SOP 11-4013 Issue number 9 Status Approver Approved T Hallam Date of approval 4/8/2014 Table of Contents 1 SUMMARY OF RESPONSIBILITIES... 4 1.1 OUR RESPONSIBILITIES...

More information

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems SUBCHAPTER 9 NET METERING AND INTERCONNECTION STANDARDS FOR CLASS I

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax

Residential Engineering P.O. Box 430 Memphis, TN (Deliveries at 5791 Summer Trees Memphis, TN 38134) (901) / (901) Fax MEMPHIS LIGHT, GAS, AND WATER DIVISION Application for Utility Services for Residential Subdivisions Residential Engineering P.O. Box 430 Memphis, TN 38101-0430 (Deliveries at 5791 Summer Trees Memphis,

More information

Charging Arrangements for New Connection Services

Charging Arrangements for New Connection Services Charging Arrangements for New Connection Services 2018-2019 About South East Water Developer Services Developer Services Department For any new connections requests or issues please contact our Developer

More information

DISTRIBUTION NETWORK OPERATOR CONNECTION CHARGING METHODOLOGY

DISTRIBUTION NETWORK OPERATOR CONNECTION CHARGING METHODOLOGY DISTRIBUTION NETWORK OPERATOR CONNECTION CHARGING METHODOLOGY Prishtina 2017 Contents 1. Purpose... 4 1.1 Scope... 4 1.2 Definitions and Terms... 4 2. Introduction and Background... 7 2.1 Legal and Regulatory

More information

Distribution System Design General Requirements

Distribution System Design General Requirements Electricity Policy Document 279 Issue 7 September 2017 Distribution System Design General Requirements Contents 1 Introduction 2 Scope 3 Definitions 4 General Requirements 5 Documents Referenced 6 Keywords

More information

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 1 st October 2017 Version 1.

STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM. Effective from 1 st October 2017 Version 1. STATEMENT OF CHARGES FOR CONNECTION TO NORTHERN IRELAND ELECTRICITY NETWORKS DISTRIBUTION SYSTEM Effective from 1 st October 2017 Version 1.3 DOCUMENT CHANGE CONTROL SHEET Document Control Document Version

More information

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703)

Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA Phone (703) Gainesville Technical Center 5399 Wellington Branch Drive Gainesville VA 20155 Phone (703) 754-6750 Work Request # UNDERGROUND DISTRIBUTION FACILITIES AGREEMENT (FOR COMMERCIAL CUSTOMER) Developer/Builder/Owner

More information

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES

COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES COMMISSIONERS OF PUBLIC WORKS of the CITY OF CHARLESTON, SOUTH CAROLINA DEVELOPMENT POLICIES TABLE OF CONTENTS DEFINITIONS WATER POLICIES Water System Extensions.... W88001 Water System Activation / Service

More information

Electric Service Standards

Electric Service Standards Electric Service Standards Ordinance No. 066, 2016 Utilities Customer Service Office 117 N. Mason Street Fort Collins, CO 80524 Phone: (970) 212-2900 Fort Collins Utilities 700 Wood Street P.O. Box 580

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

Article 10 - ADMINISTRATIVE SECTION

Article 10 - ADMINISTRATIVE SECTION Article 10 - ADMINISTRATIVE SECTION 10.1 TITLE These Administrative Regulations along with the requirements included in the 2005 Edition of the National Electrical Code (NFiPA-70-2005) as approved by the

More information

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM

AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM AGREEMENT FOR CONNECTION TO [EASTERN /LONDON / SOUTH EASTERN] POWER NETWORKS PLC S DISTRIBUTION SYSTEM BETWEEN AND (1) [Eastern / London / South Eastern] Power Networks plc Company Number [02366906 / 03929195

More information

Electric Service Handbook

Electric Service Handbook R E S I D E N T I A L Electric Service Handbook 2015 Building or remodeling a home in Clark County? This handbook provides information regarding current Clark Public Utilities standards and requirements

More information

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11 Underground Residential Distribution (URD) Index General Discussion... 1-2 Description... 3-7 Drawings (Available

More information

Section 2: Underground

Section 2: Underground Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,

More information

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections. Village of Vernon Hills Community Development Department 290 Evergreen Drive, Vernon Hills, IL 60061 Phone 847-367-3704 - Fax 847-367-2541 - http:// www.vernonhills.org FENCES This hand out is for REFERENCE

More information

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS

ON THERMAL ENERGY. Based on Article 65 (1) of the Constitution of the Republic of Kosovo, LAW ON THERMAL ENERGY CHAPTER I GENERAL PROVISIONS LAW No. No. 05/L 05/L -058-052 ON ON INDUSTRIAL THERMAL ENERGY DESIGN LAW No. 05/L -052 ON THERMAL ENERGY Assembly of the Republic of Kosovo, Based on Article 65 (1) of the Constitution of the Republic

More information

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS

TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS TORONTO TRANSPORTATION January 2012 TS 801 ELECTRICAL WORK - GENERAL TABLE OF CONTENTS 1. DRAWINGS TTD 801.001 ELECTRICAL ABBREVIATIONS AND SYMBOLS TTD 801.005 ELECTRICAL LEGEND I TTD 801.006 ELECTRICAL

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

CHAPTER 5 METERING REQUIREMENTS

CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS CHAPTER 5 METERING REQUIREMENTS 5.1 General 1. All installations connected to, or intended to be connected to HK Electric s supply of electricity must comply with HK Electric

More information

PUBLIC WIFI FROM EE SOLUTION TERMS

PUBLIC WIFI FROM EE SOLUTION TERMS 1. Interpretation 1.1 The Public WiFi from EE Solution (referred to in these Solution Terms as "Public WiFi" or the "Solution") is provided in accordance with the Customer s Agreement with EE. 1.2 Solution

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

Standard TPL Transmission System Planning Performance Requirements

Standard TPL Transmission System Planning Performance Requirements A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon

More information

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission:

Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Building Permit Applications for new home construction will not be accepted unless the following documentation is included at the time of submission: Copy of Alberta Government s New Home Registration

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS

Rule 21 Sheet 1 GENERATING FACILITY INTERCONNECTIONS Southern California Edison Revised Cal. PUC Sheet No. 31574-E Rosemead, California Cancelling Revised Cal. PUC Sheet No. 30685-E Rule 21 Sheet 1 A. Applicability 1. This Rule describes the Interconnection,

More information

Energy Delivery Service Guide

Energy Delivery Service Guide Energy Delivery Service Guide Connecting to Gainesville Regional Utilities TM M o r e t h a n E n e rg y. January 17, 2018 Volume 1, Issue 36 TM . A reference guide for planning and designing electric

More information

(Condensed from National Electric Code)

(Condensed from National Electric Code) WIRING, SPECIFICATIONS, INSPECTION, AND METER INSTALLATION PROCEDURES FOR RESIDENTIAL CUSTOMERS SERVED BY SOUTHWEST ARKANSAS ELECTRIC COOPERATIVE CORPORATION Effective April 1, 1974 Revised February 3,

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on December

More information

Electrical Networks Principles and Performance

Electrical Networks Principles and Performance Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT

More information

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY

REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY REQUIREMENTS FOR WORK WITHIN ROAD RIGHTS-OF-WAY IN UNION COUNTY The requirements contained herein are established to provide for orderly and systematic use of the county road rights-of-way within Union

More information

Hydro One Brampton Networks Incorporated

Hydro One Brampton Networks Incorporated Hydro One Brampton Networks Incorporated Guide to Appendices. Appendix 1: Methodology and Assumptions for an Economic Evaluation. Hydro One Brampton recovers its costs for expansions to its distribution

More information

The Corporation of The City of London

The Corporation of The City of London The Corporation of The City of London Legislative Health and Safety Requirements The following is a health and safety guide for those providing a tender to assist in determining legislative health and

More information

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments Rule 007 Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments This rule as amended was approved by the Alberta Utilities Commission on June

More information

DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT

DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT DIEMERSFONTEIN WINE & COUNTRY ESTATE BUILDING CONTRACTORS CODE OF CONDUCT 1. CODE OF CONDUCT AGREEMENT The building contractor is a builder/contractor ( the contractor ) appointed by the owner ( the employer

More information

Conditions of Service

Conditions of Service NIAGARA PENINSULA ENERGY INC Conditions of Service Version 8 SUMMARY OF CHANGES Version Description Date Draft Version Initial Draft August 11, 2008 Version 2 Update of section 2.3.7.5.1 Service Changeover

More information

Drainage By-law. WM-4 Consolidated as of April 18, 2011

Drainage By-law. WM-4 Consolidated as of April 18, 2011 Drainage By-law WM-4 Consolidated as of April 18, 2011 As Amended by By-law No. Date Passed at Council WM-4 September 20, 1993 WM-4-95001 September 18, 1995 WM-4-96002 August 6, 1996 WM-4-97003 May 5,

More information

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows: SECTION 9. COMMERCIAL WIND ENERGY FACILITIES 9.1 Purpose. The purpose of this Section 9 of the Zoning Bylaw is to provide by special permit for the construction and operation of commercial wind facilities

More information

Public Utility District Number 1 of Snohomish County

Public Utility District Number 1 of Snohomish County Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation

More information

Welcome to Douglas County PUD

Welcome to Douglas County PUD Welcome to Douglas County PUD We are committed to providing the best possible utility services at the lowest possible cost consistent with sound business principles. To better serve you, please fill out

More information

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL 0 3000 AMPERES AT SINGLE-PHASE, 3 WIRE THREE-PHASE, 4 WIRE 120/240 VOLTS 120/240 VOLTS * 240/480 VOLTS 277/480 VOLTS Y 120/208 VOLTS 120/208

More information

Underground commercial and industrial or rural subdivisions (vacant lots - no development)

Underground commercial and industrial or rural subdivisions (vacant lots - no development) Ausgrid 2017-2018 Connection Charges Price List - Summary Ausgrid Connection Charges Price List This document is an extract of Ausgrid Connection Policy Connection Charges. It outlines the connection charges

More information

THE POTOMAC EDISON COMPANY Electric P. S. C. Md. No. 53 Fifth Revision of Original Page No. 28 Canceling Fourth Revision of Original Page No.

THE POTOMAC EDISON COMPANY Electric P. S. C. Md. No. 53 Fifth Revision of Original Page No. 28 Canceling Fourth Revision of Original Page No. Fifth Revision of Original Page No. 28 Fourth Revision of Original Page No. 28 NET ENERGY METERING RIDER AVAILABILITY This Rider is available to all Customers who own and operate a biomass, solar, fuel

More information

Customer charter for electricity networks.

Customer charter for electricity networks. Customer charter for electricity networks. MAINTAINING OUR ELECTRICITY NETWORK IN SUMMER. Who does this Customer Charter cover? This ActewAGL Customer Charter covers customers who are connected to the

More information

LOT GRADING GUIDELINES

LOT GRADING GUIDELINES LOT GRADING GUIDELINES RESIDENTIAL PROPERTIES The Drainage Bylaw 16200 came into effect on June 1, 2013 replacing previous versions of the Surface Drainage Bylaw 11501. This Bylaw requires that all single

More information

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES

CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. CONSULTING ENGINEER S LAND DEVELOPMENT FIELD SERVICES GUIDELINES CITY OF LETHBRIDGE INFRASTRUCTURE SERVICES DEPT. Approved: April 1999 Amended: January 2003 Amended: April 2009 Amended: January 2011 Amended: March 2013 Amended: May 2014 Amended: 2016 CITY OF LETHBRIDGE

More information

GV 001 Equipment Bases and Enclosures General Information

GV 001 Equipment Bases and Enclosures General Information Eq u ip me n tba s e s a n d En c lo s u re s Ge n e ra lin fo rma tio n E n g in e e r :R.An th o n GV0 0 1 Ap p r o v e r :Jo s h u a Jo n e s Ap r 1 7 2 0 Ap r1 7 GV 001 Equipment Bases and Enclosures

More information

Engineering Recommendation G81 - Part 4: Design and Planning

Engineering Recommendation G81 - Part 4: Design and Planning PRODUCED BY THE ENGINEERING DIRECTORATE OF THE ENERGY NETWORKS ASSOCIATION Engineering Recommendation G81 - Part 4: Design and Planning Issue 2 Amendment 1 January 2008 Framework for design and planning

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

COMMERCIAL CONDUIT RULES AND REGULATIONS

COMMERCIAL CONDUIT RULES AND REGULATIONS Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATIONS S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies B - 1 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

PRIMARY LINE EXTENSION

PRIMARY LINE EXTENSION PRIMARY LINE EXTENSION Installation of new electric service to an empty parcel/lot or extending a transformer to within 150' of proposed meter location. This includes installing a permanent branch, addition,

More information

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types Large Basic Service Introduction This Section applies to members requiring new Large Basic electric service installations, greater than 400 amps single phase and greater than 50kW three phase. This Section

More information

REQUEST FOR ELECTRIC SERVICE Residential

REQUEST FOR ELECTRIC SERVICE Residential This form should be completed if you are applying to have new electric facilities installed on your property for the purpose of providing electric service to a permanent or seasonal residential dwelling,

More information

Microgrids in New England Technical Challenges & Opportunities

Microgrids in New England Technical Challenges & Opportunities Microgrids in New England Technical Challenges & Opportunities October 10, 2012 Agenda I. What is a Microgrid? Examples Elements to Consider II. Why a Microgrid? Improved Reliability Utility Guiding Principals

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Tree Protection Policy

Tree Protection Policy Appendix F Tree Protection Policy The following is according to the City of Hamilton s special provision SP-97. General Tree Protection shall be in accordance with OPSS 801 as amended by this special provision.

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014

Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 Requirements for Transmission System Interconnections to Generation, Transmission and End-User Facilities Revised June 10, 2014 1040 O Street, P.O. Box 80869 p: 402.475.4211 Lincoln, NE 68501-0869 www.les.com

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

Electricity Supply Agreement

Electricity Supply Agreement Electricity Supply Agreement 1. General 1.1 Mazoon Electricity Company SAOC (the Supplier) shall on or from the Start Date, subject to the satisfactory completion of a Supply Application Form, provide

More information

CITY OF BURNABY BYLAW NO *******

CITY OF BURNABY BYLAW NO ******* Burnaby Tree Bylaw Page 1 CITY OF BURNABY BYLAW NO. 10482 (Consolidated for convenience with Bylaw No. 10759, 10891, 10917, 10963, 10968, 11189, 11331, 11485, 11670, 11846, 12035, 12191, 12298, 12377,

More information

All service lines shall conform to the following requirements:

All service lines shall conform to the following requirements: 505 WATER SERVICE INSTALLATION 505.1 DEFINITION A service line is comprised of the piping and related appurtenances including the connection installed from the Des Moines Water Works water main to the

More information

Specification for the Installation of Low Voltage Internal Mains and Services

Specification for the Installation of Low Voltage Internal Mains and Services 1. SCOPE This specification details the requirements for New Build and Remedial LV internal mains and services work, including the quality of materials, the installation methodology and general procedures

More information

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018

Public Utility District Number 1 of Snohomish County. Facility Connection Requirements February 9, 2018 Public Utility District Number 1 of Snohomish County Facility Connection Requirements February 9, 2018 1 Revision History: Number Date Description By Reviewed by Approved by: Original Sept. 29, 2011 Document

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

You are also similarly responsible for any part crossing any neighbouring land, including any length of private service pipe in the public highway.

You are also similarly responsible for any part crossing any neighbouring land, including any length of private service pipe in the public highway. Shared supply or lead water pipe replacement connections guidance notes Up to 25mm diameter supplies Introduction Our aim is to deliver an excellent standard of service. In order for us to do this and

More information

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification. SECTION 26 05 02 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Work Included: Furnish all labor, material, services and skilled supervision necessary for the construction, erection, installation,

More information

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 December 2017

Policy for determining capital contributions on Vector s electricity distribution networks. From 1 December 2017 Policy for determining capital contributions on Vector s electricity distribution networks From 1 December 2017 Pursuant to: Electricity Distribution Information Disclosure Determination 2012 1 Table of

More information

Supply to Rancho De Viti Investments Corporation at Maranitawa - Ba (Scheme No. G52/07)

Supply to Rancho De Viti Investments Corporation at Maranitawa - Ba (Scheme No. G52/07) MR 96/2015 Supply to Rancho De Viti Investments Corporation at Maranitawa - (Scheme No. G52/07) Notes: 1. Safety Plan to be included in tender bid. 2. Lineman and Trainee Lineman/Line worker Certificate

More information

Requirements For Electric Service Informational Booklet

Requirements For Electric Service Informational Booklet Vermont Electric Cooperative, Inc. Attn: Engineering 42 Wescom Road Toll Free: 1-800-832-2667 ext. 1117 Johnson, VT 05656-9717 Telephone: 802-635-2331 ext. 1117 www.vermontelectric.coop Fax: 802-635-4210

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

Standard connections for water, sewerage and electricity supply

Standard connections for water, sewerage and electricity supply Pilbara electricity and water services Standard connections for water, sewerage and electricity supply Introduction Rio Tinto is committed to providing safe, reliable electricity, water and sewerage services,

More information

Vegetation Management Plan

Vegetation Management Plan Vegetation Management Plan TABLE OF CONTENTS SECTION TITLE PAGE NUMBER 1. INTRODUCTION 2 2. SAFETY 3 3. RELIABILITY 3 4. VEGETATION MANAGEMENT GUIDELINES 4 5. NEW RIGHT OF WAY GUIDELINES 6 6. VEGETATION

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON. REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the

More information

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES SECTION 1601 Wind Energy Installation In any zoning district, a conditional use permit or building permit may be granted to allow a wind energy conversion

More information

MEMORANDUM. Authority and Restrictions under Proposed O.R.C regarding Small Cell Facilities and Wireless Support Structures in the Public Way

MEMORANDUM. Authority and Restrictions under Proposed O.R.C regarding Small Cell Facilities and Wireless Support Structures in the Public Way MEMORANDUM TO: FROM: Ohio Municipal Corporations Lindsay Miller DATE: January 17, 2018 RE: Authority and Restrictions under Proposed O.R.C. 4939 regarding Small Cell Facilities and Wireless Support Structures

More information

SCHEDULE SS STANDBY SERVICE

SCHEDULE SS STANDBY SERVICE SCHEDULE SS STANDBY SERVICE SHEET NO. 69 A. APPLICABILITY: Applicable to customers with alternate regular source(s) of energy other than electricity from the Company when such sources are connected to

More information

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014

Transmission Competitive Solicitation Questions Log Question / Answer Matrix Delaney to Colorado River 2014 No. Comment Submitted ISO Response Date Q&A Posted 1 Can the CAISO provide a line rating methodology (similar to a NERC FAC-008 standard) or include a requirement of using any The ISO does not provide

More information

THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL

THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL THE LEGISLATIVE FRAMEWORK FOR MUNICIPAL PLANNING, SUBDIVISION, AND DEVELOPMENT CONTROL Alberta Municipal Affairs February 1997 Updated March 2002 1.0 INTRODUCTION The authority for municipal planning,

More information

Trico Electric Cooperative, Inc. Interconnection Requirements. For. Distributed Generation

Trico Electric Cooperative, Inc. Interconnection Requirements. For. Distributed Generation Version Dated May 5, 2017 Trico Electric Cooperative, Inc. Interconnection Requirements For Distributed Generation TRICO ELECTRIC COOPERATIVE, INC. INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION

More information

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit 7.1 E-Permit and U-Permit Permit Description and Purpose The Excavation Permit (E-Permit) and the Utility Permit (U-Permit) are issued to allow construction,

More information