1 UNDERGROUND ELECTRICAL PART 1 GENERAL 1.1 SECTION INCLUDES: A. The work specified in this section consists of furnishing and installing underground utilities using the method of installation commonly referred to as directional boring. This work shall include all supervision, services, equipment, materials, labor, area restoration, environmental protection and incidentals for the complete and functional installation of the directional bore duct as shown in the Contract Documents. A #2 AWG solid copper counterpoise conductor shall be installed with and external to the directional bore duct. Quantity of counterpoise shall be per the details. #2 AWG solid copper counterpoise shall be paid for by the linear foot in accordance with Item L RELATED DOCUMENTS AND SECTIONS: A. Item L-110; Airport Underground Electrical Duct Banks and Conduits. B. Section 555; Directional Bore - FDOT Specifications for Road and Bridge Construction. 1.3 SUBMITTALS: A. Work Plan: Prior to beginning work, the Contractor shall submit to the Engineer a general work plan outlining the procedure and schedule to be used to execute the work task. Plan shall document the thoughtful planning required to successfully complete the work. B. Demonstration of compliance with Item L-110 and FDOT Section 555. C. Equipment: Contractor shall submit specifications on directional drilling equipment to be used in the work to ensure that the equipment will be adequate to complete the project. D. Material: Specifications on material to be used shall be submitted to Engineer. Material shall include the pipe, conduit, fittings, splicing/coupling method, means of transition from HDPE to PVC and any other item, which is to be an installed component of the project. L-110S
2 1.4 WARRANTY: A. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for a period of twelve (12) months from final acceptance by the Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner's discretion, with no additional cost to the Owner. PART 2 EQUIPMENT REQUIREMENTS 2.1 GENERAL: A. The directional drilling equipment shall consist of a directional drilling rig of sufficient capacity to perform the bore and pullback the pipe, a drilling fluid mixing and delivery system of sufficient capacity to successfully complete the crossing, a guidance system to accurately guide boring operations and trained and competent personnel to operate the system. All equipment shall be in good, safe operating condition with sufficient supplies, materials and spare parts on hand to maintain the system in good working order for the duration of the project. 2.2 GUIDANCE SYSTEM: A. The guidance system shall be of a proven type and shall be setup and operated by personnel trained and experienced with this system. The Operator shall be aware of any magnetic anomalies and shall consider such influences in the operation of the guidance system if using a magnetic system. B. The locating and tracking system must provide information on: 1. Clock and pitch information. 2. Depth. 3. Transmitter temperature. 4. Battery status. 5. Position (X,Y). 6. Azimuth, where direct overhead readings (walkover) are not possible (i.e. subaqueous or limited access transportation facility). 7. Ensure proper calibration of all equipment before commencing directional drilling operation. C. Take and record alignment readings or plot points such that elevations on top of and offset dimensions from the center of the product to a permanent fixed feature are provided. Such permanent fixed feature must have prior approval of the Engineer. Provide elevations and dimensions at all bore alignment corrections (vertical and horizontal) with a maximum distance of 5 feet between points. Provide additional points when requested by the Engineer. Provide a L-110S
3 2.3 CONDUIT/DUCT: sufficient number of elevations and offset distances to accurately plot the vertical and horizontal alignment of the installed product. A. The directional bore conduit/duct shall be Carlon Electrical UL Listed Schedule 80 minimum standard dimensional ratio (SDR) 11, suitable for placement with directional boring under pavement or accepted equivalent. All duct connections shall be made by electrofusion coupling splicing, 8 minimum length Morris Compression coupling, or accepted equivalent. B. Splices and couplings shall be permitted only where connection to conventionally installed ducts or manholes are required. C. The HDPE duct shall be properly reamed prior to assembly. 2.4 CONCRETE: A. Concrete shall be P-610 or FDOT Class II concrete with 1 inch maximum size coarse aggregate (FDOT #57 stone) with a minimum 28 day compressive strength of 3,400 PSI or equivalent. Where reinforced duct banks are specified, reinforcing steel shall conform to ASTM A 615 Grade 60. Concrete and reinforcing steel are incidental to the installation/construction of which they are a component part. B. High early strength P-610 concrete will be required for use with ducts, conduits, base cans and other work as directed by the Engineer, in existing operational areas and within the safety areas of operational pavement to comply with the project phasing and scheduling requirements and where the pavement is required to open to aircraft at the end of the designated work period. The extra cost for the high early strength P-610 concrete shall be considered incidental to the respective installation/construction of which it is a component part. 2.5 COPPER COUNTERPOISE WIRE A. The 2 AWG solid copper counterpoise wire shall comply with Item L-108. The 2 AWG solid copper counterpoise wire shall be installed with and externally to the directionally bored duct. PART 3 EXECUTION 3.1 GENERAL: A. The Engineer shall be notified 48 hours in advance of starting work. The Directional Bore shall not begin until the Engineer is present at the job site and agrees that proper preparations for the operation have been made. The L-110S
4 Engineer s approval for beginning the installation shall in no way relieve the Contractor of the ultimate responsibility for the satisfactory completion of the work as authorized under the Contract. 3.2 BORING PATH REPORT: A. Furnish a bore path report to the Engineer within seven days of the completion of each bore path. Include the following in the report: 1. Location of project and financial project number including the permit number when assigned. 2. Name of person collecting data, including title, position and company name. 3. Investigation site location (Contract plans station number or reference to a permanent structure within the project right-of-way). 4. Identification of the detection method used. 5. Elevations and offset dimensions as required in B. Provide as-built plans to the Engineer in accordance with FDOT SPLICING, COUPLING AND TERMINATION: A. The HDPE duct shall relax for 48 hours after installation prior to splicing, coupling or termination. B. Only Engineer accepted methods shall be used to splice, couple or terminate the HDPE or PVC duct. C. All splicing, coupling and termination of HDPE or PVC ducts shall be performed and completed in strict accordance with the manufacturer s instructions and recommendations. PART 4 METHOD OF MEASUREMENT 4.1 METHOD OF MEASUREMENT: A. The items described in this item are incidental to other items and shall not be measured for payment. L-110S
5 PART 5 BASIS OF PAYMENT 5.1 BASIS OF PAYMENT: A. No direct payment shall be made for the work described in this item. All directional bore costs shall be considered incidental to the respective L-108 or L- 110 specification items. END OF L-110S
6 PAGE INTENTIONALLY LEFT BLANK L-110S
SPECIAL SPECIFICATION 6666 Charter Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6666 Charter Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Charter Communications,
More informationSECTION LIGHTNING PROTECTION SYSTEM
SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION
SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the
More informationSPECIAL SPECIFICATION 6664 Level (3) Communications System
2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,
More informationSPECIAL SPECIFICATION 6658 Time Warner Communications System
2004 Specifications CSJ 1200-05-014 1. Description. SPECIAL SPECIFICATION 6658 Time Warner Communications System A. This Item will govern the installation of all facilities belonging to Time Warner Cable
More informationDIVISION 300 TRENCHING SECTION 308 BORING AND JACKING 2.2 STEEL CASING PIPE
SECTION 308 BORING AND JACKING PART 2 MATERIALS 2.2 STEEL CASING PIPE E. Casing pipe length shall conform to City of Meridian Standard Drawing SW1 Casing Length Requirements. 2.4 CARRIER PIPE SKIDS A.
More informationSECTION GRAVITY WASTEWATER LINES
SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS
More informationUNIVERSITY OF MISSOURI Hydronic Energy Distribution 2016 Q1
GENERAL: The scope of this document is to provide instruction for the installation and testing of chilled water piping installed for the University of Missouri. DESIGN GUIDELINES: 1. Materials 1.1. Pipe
More informationNew Conduit Specification
New Conduit Specification Combines Portions of Sections 715, 783 & 992 into New Section 630. Coordinated Effort Between Traffic Operations, ITS, Lighting, Construction, and Industry New Conduit Specification
More informationSPECIAL SPECIFICATION 6623 Multi-Duct Conduit System
2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor
More informationSECTION HORIZONTAL DIRECTIONAL DRILLING
SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using
More informationREVISION OF SECTION 623 IRRIGATION SYSTEM GENERAL
623.01 SUMMARY: GENERAL Section Includes: Landscape irrigation system as shown on the drawings for complete coverage to landscape areas. Furnish design for layout, pipe sizing, valving and head types and
More informationSUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION POLYETHYLENE PRESSURE PIPE
SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 33 11 13.24 POLYETHYLENE PRESSURE PIPE PART 1 GENERAL... 2 1.1 Description... 2 1.2 Reference Specification... 2 1.3
More informationAPPENDIX A MEASUREMENT AND PAYMENT
P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged
More informationSECTION 1 GENERAL NOTES
ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS
More informationTS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE
TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION
More informationSECTION GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide labor, materials, equipment, and incidentals as shown, specified, and
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More information7/17/2017 Page 1 of 5
HORIZONTAL DIRECTIONAL DRILLING AND BORING PART 1.0 GENERAL 1.1 DESCRIPTION This section covers the work necessary for the installation of conduit duct banks by directionally controlled horizontal drilling
More information2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum
D E N V E R I N T E R N A T I O N A L A I R P O R T CONTRACT NO. 201208796 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following Contract Documents issued
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationSECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.
SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationThe work required for this project includes, but is not limited to, the following items, not listed in order of execution.
ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special
More informationCity of Thomasville Water, Sewer & Natural Gas Specifications
SECTION 02235 HORIZONTAL DIRECTIONAL DRILLING (HDD) PART 1 GENERAL 1.01 SCOPE The work specified in this section consists of furnishing and installing underground utilities using the horizontal directional
More informationSUPPLEMENTAL TECHNICAL SPECIFICATION
July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft
More informationSECTION 02215BP TRENCHING AND BACKFILLING
SECTION 02215BP TRENCHING AND BACKFILLING This page is intentionally left blank. Fluor-B&W Portsmouth, LLC (FBP) SITE PREPARATION INFRASTRUCTURE PHASE 1 SPECIFICATION COVER SHEET Client: U.S. Department
More informationSECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS
SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.
More informationMATERIAL ALLOWANCES AND UNIT PRICES
PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationREGIONAL CONSTRUCTION STANDARDS
REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright
More informationC. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.
SECTION 01400 QUALITY CONTROL SERVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification
More informationSPECIAL SPECIFICATION Thermal Integrity Profiler (TIP) Wire Cable Testing of Drilled Shafts
SAMPLE SPECIFICATION FOR TESTING FOUNDATIONS With the Thermal Integrity Profiling Wire Cable System Note: This sample specification contains recommended or typical quantities in parenthesis, in the format
More informationSECTION GRAVEL PACKED WATER WELL
SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationEast US Route 36 Sewer Extension Addendum #1
East US Route 36 Sewer Extension Addendum #1 To: All Bidders From: Tyler Bumbalough, City Engineer Date: May 22, 2014 Re: Horizontal Directional Drilling Alternate #1; Soil Boring Report for Pump Station;
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all
More informationBi-Directional Static Load Testing of Drilled Shafts
Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,
More informationSpecification Lightning Protection Systems
Specification Lightning Protection Systems General: Summary A) This Section specifies the lightning protection system for the building(s) or structure(s). This system provides safety for the building and
More informationSECTION DRILLED CONCRETE PIERS AND SHAFTS
1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of
More informationSpecial Specification 6357 Windstream Telecommunication System
Special Specification Windstream Telecommunication System 1. DESCRIPTION This Item will govern the installation of all facilities belonging to Windstream Communications, hereinafter referred to as Windstream.
More informationNorth End and South End Section Hauled Wastewater Receiving Facilities Page 1 Bid Opportunity No
Hauled Wastewater Receiving Facilities Page 1 Part 1 General 1.1 SECTION INCLUDES.1 Materials and installation for sewage force mains. 1.2 RELATED SECTIONS.1 CW 2110 Watermains and all specifications referenced
More informationSection 70 Airport Transformer Vault and Vault Equipment (FAA L-109)
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item
More informationHORIZONTAL BORING HORIZONTAL BORING. Underground Electric Distribution Standards I. GENERAL
I. GENERAL I.1. I.2. I.3. Driven or bored casing pipe provides an effective housing for duct. Its use is required in situations where open cutting is not permitted such as crossings under railroads and
More informationCONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION
CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION INDEX SECTION 1 GENERAL PROVISIONS... 1-1 1.0 GENERAL... 1-1 SECTION 2 - PRESTRESSED CONCRETE
More informationDESCRIPTION. S-PAPI-1.3. Contractor shall be present and make adjustments as necessary during the FAA Flight Check. EQUIPMENT AND MATERIALS
Item S-PAPI Precision Approach Path Indicator DESCRIPTION S-PAPI-1.1. This item shall consist of providing, installing or relocating PAPI systems of all types, styles, classes and options furnished and
More informationDEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe
Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS
ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.
More informationDIVISION 33 UTILITIES SPECIFICATION : HORIZONTAL DIRECTIONAL DRILLING
1.1 DESCRIPTION DIVISION 33 UTILITIES SPECIFICATION 330523: HORIZONTAL DIRECTIONAL DRILLING PART 1.0 GENERAL 1.1.1 The directional drilling method is a multi-stage process that involves site preparation
More informationSECTION 8 SEPARATION OF LINES
SECTION 8 SEPARATION OF LINES 8.01 INDEX 8.01 INDEX 8.02 PURPOSE 8.03 DEFINITIONS 8.04 SEWER SEPARATION 8.05 NON-POTABLE SEPARATION 8.06 REFERENCES 8.02 PURPOSE This section states the requirements and
More informationPUBLIC WORKS DEPARTMENT GENERAL NOTES
PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard
More informationSPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System
2004 Specifications CSJ 6185-04-001 SPECIAL SPECIFICATION 7441 Remove Components of Existing Traffic Management System 1. Description. Remove existing surveillance cabinets, intermediate amplifier cabinets,
More information[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]
SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated
More informationSUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS
I. SCOPE OF WORK SUBSURFACE ROTARY DRILLING INVESTIGATION SPECIFICATIONS The Department of Environmental Protection, Bureau of Abandoned Mine Reclamation requires a contractor to conduct subsurface rotary
More informationNon-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method
Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product
More informationSECTION CONCRETE FORMWORK AND ACCESSORIES
SECTION 03100 CONCRETE FORMWORK AND ACCESSORIES Part 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for construction and removal of forms for the containment of concrete to
More informationZG Scope. 2 Applicable Documents. 3 General. 4 Stock Item Numbers. Padvault Single-Phase Residential, 2.1 PacifiCorp Material Specifications
1 Scope This specification outlines the minimum requirements for a 48 48 padvault for single-phase primary service. Single-phase transformers and sectionalizers (elbow switched cabinets) can be mounted
More informationSPECIAL SPECIFICATION 5170 Install Weigh-In-Motion (WIM) Equipment
2004 Specifications CSJ 0197-03-056 SPECIAL SPECIFICATION 5170 Install Weigh-In-Motion (WIM) Equipment 1. Description. Install, commission, and calibrate State furnished Weigh-In-Motion equipment in a
More informationSPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings
1993 Specifications CSJ 0144-01-060 SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings 1. General. (1) Scope. This Section includes the furnishing, installation, and subsequent
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SPUN CONCRETE POLE AND DRILLED SHAFT FOUNDATION
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SPUN CONCRETE POLE AND DRILLED SHAFT FOUNDATION ITS:CLC 1 of 7 APPR:LWB:DBP:08-01-13 FHWA:APPR:09-23-13 a. Description. This work consists of
More informationSECTION 2831 ITEM F-162 CHAIN-LINK FENCES
SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details
More informationStainless Steel Aeration Equipment Specification
Section 15 Stainless Steel Aeration Equipment Specification Part 1 - General 1.01 Description A. Scope of Work 1. Furnish, install and test aeration system including air mains, drop pipes, valves, expansion
More informationSECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)
PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationSECTION 920 SANITARY AND STORM SEWER MANHOLES
SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C
More informationSECTION DUCTILE IRON PILES
SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.
More informationSection 2: Underground
Section 2: Underground GENERAL INSTALLATION REQUIREMENTS FOR UNDERGROUND FACILITIES Underground electric service and meter location will be established by NHEC upon site visit. In some instances the type,
More informationBest Management Standards / Specifications. For Concrete Slab Raising. Prepared in conjunction with the Concrete Repair Association
For Concrete Slab Raising Prepared in conjunction with the Concrete Repair Association DETAILED SPECIFICATIONS 1. Description: 2. Slab Raising: These specifications cover the furnishing, boring, drilling,
More information17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS
17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain
More informationSpecial Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control
Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of
More informationSpecial Specification 6016 Intelligent Transportation System (ITS) Multi-Duct Conduit
Special Specification Intelligent Transportation System (ITS) Multi-Duct Conduit 1. DESCRIPTION 2. MATERIALS Furnish and install Intelligent Transportation System (ITS) multi-duct conduit identified for
More informationSECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION
SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)
More informationTECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:
TECHNICAL SPECIAL PROVISION FOR 1001 WATER DISTRIBUTION SYSTEM FINANCIAL PROJECT ID: 200105-7-52-01 The official record of this Technical Special Provision is the electronic file signed and sealed under
More informationREGIONAL CONSTRUCTION STANDARDS Proposed Revision Form
Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning
More informationSECTION PACKAGE BOOSTER PUMP STATIONS
SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to
More informationCITY OF UNION, OREGON TECHNICAL SPECIFICATIONS SECTION 9 UNDERGROUND UTILITIES
A. GENERAL 1. Scope. These specifications cover the installation of the utility systems and appurtenances for the electrical power, telephone, gas, and television as shown in the Drawings. The Work includes,
More informationCONDUITS AND FITTINGS
CONDUIT AND FITTINGS Rigid Steel Conduit 3801 Rigid PVC Conduit 3803 HDPE Conduit 3803 Flexible Non Metallic Liquid Tight Conduit Type LFNC-B 3804 PVC Coated Urethane Lined Galvanized Rigid Steel Conduit
More informationITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:
ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract apply to this Section. 1.2 SUMMARY A. This Section
More informationLantz-Boggio Architects, P.C LBA Project No
SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely
More informationSECTION 552 HELICAL ANCHORS AND HELICAL PILES
SECTION 552 HELICAL ANCHORS AND HELICAL PILES DESCRIPTION 552.01 This work pertains to furnishing and installing helical anchors and helical piles shown in the Contract in accordance with the Drawings
More informationSECTION SHEET PILES. A. This section covers the contract item Sheet Piles. This work includes:
SECTION 02250 SHEET PILES PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Sheet Piles. This work includes: 1. Furnishing, coating, and installing steel sheet piles for the working
More informationSoil Improvement by Compaction Grouting
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction
More informationSample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP)
September 2016 Sample Specifications for Testing Foundations with the Thermal Integrity Profiler (TIP) Note: This sample specification contains recommended or typical quantities in parenthesis, in the
More informationSECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.
SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with
More information1993 SPECIFICATIONS CSJ SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK
1993 SPECIFICATIONS CSJ 581-1-95 SPECIAL SPECIFICATION ITEM 4110 CONCRETE ENCASED DUCT BANK 1. DESCRIPTION. This Item shall govern for the furnishing and installation of all materials and equipment for
More informationRFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered
RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater
More informationSECTION GROUNDING AND BONDING
SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and
More informationSECTION MINOR CONCRETE
SECTION 03300 - MINOR CONCRETE CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And Payment...
More informationSECTION SINGLE-PLY ROOFING SYSTEM
PART 1 - GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals required to provide single-ply adhered roofing system. 1.02 COORDINATION A. The Contractor
More informationSECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
SECTION 401 PIPE AND FITTINGS PART 2 MATERIALS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS A. PVC Pressure Pipe sizes 4 inch through 12 inch: ANSI/AWWA C 900 1. DR18 B. PVC Pressure Pipe sizes 14 inch
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6
1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of
More informationCHAPTER 11 CONDUITS AND FITTINGS
CONDUITS AND FITTINGS CHAPTER 11 CONDUITS AND FITTINGS The standards and requirements for conduits and fittings used for traffic control signal and lighting systems are presented in this chapter. 11.1
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationSECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.
SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section
More informationCONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS
Underground Electric Distribution Standards I. SCOPE This section includes the standards for concrete, reinforcing steel, formwork, concrete placement, curing, and construction joints. Concrete work for
More informationSECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.
SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES
More informationSpecifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums
Specifications for Electrical Underground Distribution Systems from Overhead Transformation, Apartments & Condominiums Specification DDS-3 OH Revision 10, March 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS
More information