1 ELECTRICAL INSPECTION BULLETIN (Effective ) Rule Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which standards should be followed and as to if this work is required to be performed under a Wiring Permit and be inspected. The Nova Scotia Electrical Code Regulations requires that all electrical installation, unless exempted, must be performed under a wiring permit and be inspected by the Inspection Department before the equipment is energized. These requirements apply to all customer owned high voltage installations (voltages operating in excess of 750V). In addition to permit and inspections requirements, electrical drawings for high voltage installations must be submitted for review in accordance to Electrical Inspection Bulletin B Documentation must be provided to support cable ampacity ratings by a P.Eng of Record. Request for deviations along with the rationale for the request must be submitted in writing to the Inspection Department at the time drawings are submitted. Customer owned high voltage installations may include but are not limited to overhead and underground cables and conductors, pad mount transformers, transformer banks, outdoor and indoor sub-stations, grounding, enclosed switching cubicles, switchgear, sub-station fences, and other equipment operation in excess of 750 volts. NSPI supply authority must be consulted in all cases prior to any customer s high voltage system being connected or interconnected to NSP s utility system. In addition to meeting the requirement of NSP s supply authority, customer owned installations must comply with the Canadian Electrical Code, Part 1(CEC) and other applicable CSA standards. NSPI utility standards should not be used in designing customer high voltage installations as NSPI utility standards may differ from that of the CEC. Designers and installers must ensure the installation complies with the minimum requirements of the CE Code. Example of one difference is the requirement for disconnecting means for a 3-phase transformer. Utility practice is to install 3 single gang cutouts however CEC rule requires a gang operated switch. High voltage electrical equipment must be approved by a recognized certification agency provided the certification agency has a program to certify the equipment to the appropriate CAN/CSA standard. If the certification agency does not have a program to certify the equipment, the equipment must be built to a recognized CAN/CSA standard. The CSA standards require the equipment to be labeled to the standards it was built to. However electrical equipment built to CAN/CSA C88 does not require the equipment to be labeled. In this case the customer must provide the Inspection Department written documentation from the manufacture indicating the applicable CAN/CSA standard it was built to, and the customer shall install a label on the equipment noting the applicable standard(s). Where a CAN/CSA standard does not exist other standards may be acceptable as would be the case with equipment operating in excess of 46 kv. The customer/ agent shall provide documentation as to the type of equipment and applicable standard it was built to. In addition to the requirements of CEC, installations of overhead and underground systems shall also conform to applicable CSA Part 3 standards. The following table indicates applicable standards for specific high voltage equipment. Prepared by: David Clements Approved by: David Clements Page 1 of 7 New Bulletin February 2009 B

2 High Voltage Equipment Application Equipment Standard (see note 1) Enclosed Switchgear up to Indoors or Outdoors within a Certified to C22.2 No KV fenced station Enclosed Switchgear up to 46KV Outdoors Certified to C22.2 No (Tamperproof Design) Air Cooled Distribution Transformer(Dry Type) up to 46kV Indoors or Outdoors Certified to C22.2 No.47-M90 (R2007) Oil/Liquid Filled Power Transformer Single and Three Phase Oil/Liquid Filled Distribution Transformer (Up to 3MVA) ONAN only Single and Three Phase Liquid Filled Distribution Transformer (Up to 3MVA) LNAN only Low Profile, Single Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 167 KVA) Three Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 3000 KVA) Three Phase, Live-Front, Pad Mounted Distribution Transformer Tamper Resistance Oil/Liquid Filled Tamper Resistant Pad Mount Transformer ONAN and LNAN only Transformer Designation Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Built to CAN/CSA C88-M90 (R2004) Built to CAN/CSA-C Built to CAN/CSA-C Outdoors ( no fence required) Built to CAN/CSA-C Outdoors ( no fence required) Built to CAN/CSA-C Outdoors ( no fence required) Outdoors ( no fence required) ONAN- Oil Filled Natural Cooling LNAN- Flame-retardant Liquid filled natural cooling Built to CAN/CSA C Built to CAN/CSA C88-M90 (R2004) and built to tamperproof requirements in C227.4 Note 1: The information indicated in the equipment standard column shall appear on the equipment. Station Ground Resistance Page 2 of 7 New Bulletin February 2009 B

3 Testing/Commissioning of High Voltage Stations and Unit Substations In order to ensure compliance with Section 36 of the CEC and in particular rule (4), (Station ground resistance) after completion of construction equipment shall not be energized until a testing/commissioning report on the complete installation is provided to NSPI s Chief Electrical Inspector, an electrical inspection has been completed by the Inspection Department and all applicable checklists (attachments 1-3) have been submitted with the commissioning report. The testing /commissioning report is to be completed by an acceptable independent agency other than the installing electrical contractor. The report submitted by the agency must indicate that the High Voltage installation has been successfully tested in accordance with requirements of Section 36 of the CEC and that the installation is ready to be energized. Where an installation falls under the station exemption rule (36-306), the consultant must demonstrate to the Inspection Department that the potential rise of the station shall not exceed the values specified in Table 52 during the lifetime of the station. The testing / commissioning report must include (but not limited) to the following: (1) Operation of all isolating and disconnecting means; (2) Operation of all required interlocks between fuse compartments, load breaking or isolating means; (3) CAN/CSA standard that transformer(s) are built to; (4) Calculation of step and touch voltages and ground resistance test; (5) Protection coordination study; (6) Visual inspection of grounding conductors and ground connections (7) Confirmation that that all test are completed and the complete installation complies with the CEC and station is ready to be energized. (8) Indication that all equipment is rated to withstand the maximum available fault levels The design of the station ground electrode can be found in CEA Report 249 D541 Simplified Rules for Grounding Customer-Owned High Voltage Substations or IEEE Standard No. 80 Guide for Safety in AC Substation Grounding Acknowledgements: References to equipment standards provide by Canadian Standards Association (CSA) Information contained in checklist provided by City of Vancouver Electrical Inspection Department Page 3 of 7 New Bulletin February 2009 B

4 ATTACHMENT #1 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency GENERAL CHECKLIST FOR H.V. UNIT SUBSTATION Project Name: Plans Review Number: ITEM NO. DESCRIPTION REFERENCES Conformance to (Applicable CEC Rules, NS the referenced Power Electrical Inspection requirements Bulletins, NS Power Authority Directives) Yes No (a) H.V. Station Ground Resistance Report (See Attachment 2) 2 H.V. Equipment approval Clearance and spacing of live parts ; ; ; Tables 30, 31,32,33,34 & 35 4 Operation of H.V. switches ; Interlocks ; Switch, fuse, and breaker ratings ; ; Transformer overload and overheating protection (a) Relay and tripping device settings (b) Transformer core temperature device Installation integrity: (a) Insulation (b) Torqued as per installation spec. s (c) Stand-off supports and bushings 9 Interconnection between pieces of electrical equipment assembled on site is in conformance with the shop drawings and in accordance with the CE Code Part I 10 Tested H.V. Station (Unit Substation) is ready to be energized Additional Comments: As per shop drawings Shop drawings of unit substation; CE Code, Part I NS Power Bulletin Testing Agency: Name: Signature: Address: Telephone: Facsimile: P.Eng. Affix Professional Seal Page 4 of 7 New Bulletin February 2009 B

5 ATTACHMENT #2 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency or by the Professional Engineer responsible for the design of the H.V. installation. (P.Eng. of record) Note 2: Completed report to be provided as part of Attachment 1 (Item 1) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: HIGH VOLTAGE STATION GROUND RESISTANCE REPORT Testing Agency: Item Requirements of Table 52 1 Type of Soil (specify): 2 Measured Resistance of the station Ground Electrode 3 Calculated Step Voltage at the HV station 4 Calculated Touch Voltage at the HV station Conformance with applicable requirements of Table 52 Yes No Company Name: (if other than the testing agency): Name: P.Eng. Signature: Date: Address: Telephone: Affix Professional Seal Facsimile: Page 5 of 7 New Bulletin February 2009 B

6 ATTACHMENT #3 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer responsible for the design of the H.V. installation (P.Eng. of record) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: Item No. 1 DESCRIPTION Horizontal clearance of H.V. conductors from adjacent structures; guarding 2 Service raceways, including drainage and pull box facilities 3 Working space; entrance to and exit from 4 Space for service and distribution equipment REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) ; ; Table ; 6-300; ; ; 2-310; Table ; ; Access to nameplates and parts requiring maintenance Presence of other than electrical equipment (a) Dielectric liquid-filled equipment, indoors ; ; (b) Dielectric liquid-filled equipment, outdoors ; ; Illumination of equipment 2-314; Warning notices Electrical equipment service room/vault (a) Location (b) Construction / (c) Door Swing (d) Fire alarm system devices (Smoke detectors if not sprinklered) (3)(b) (e) Adjacent Hazardous Areas (5) (f) If sprinklered, adequate protection for electrical ; (5) equipment Ventilation (a) Proof that the system is adequate and suitable for the (6); 2-318; purpose Appendix B (b) Intake location Conformance to the referenced requirements Yes No N/A Page 6 of 7 New Bulletin February 2009 B

7 Item No. DESCRIPTION REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) Conformance to the referenced requirements Yes No N/A Grounding and bonding requirements CEC Section 10 (a) Station ground electrode ; (b) Connections to the station ground electrode (5); ; Appendix B (i) Method of connection (as specified by the design professional) ; ; Appendix B (ii) Conductor sizes (as specified by the design CEC Table 51 professional) (c) If a ground bus (pad) for testing purposes is installed: (i) Accessibility (ii) Conductors marked for testing purposes (7); (d) If a gang-operated switch is installed: (i) Operating shaft grounded (1)(a) or (b) (ii) 1.2 m x 1.8 m gradient control mat (iii) positioned for vertical or horizontal operation (iv) connection of the mat by two separate conductors (size and method of connection as specified by the design engineer) (e) If a metallic fence is installed: (i) located minimum 1 m inside perimeter of station ground electrode area (ii) connections to the fence L.V. breakers and fuses: Section (a) Size/trip setting Accepted Plans and Specifications (b) Interrupting capacity ; ; 14 Ground Fault protection or indicator ; (2) 15 L.V. metering sockets NS Power Metering Standards 16 Other (Please specify) Additional Comments: Company Name: Name: Signature: Address: Telephone: Facsimile: P.Eng. Affix Professional Seal Page 7 of 7 New Bulletin February 2009 B

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

ELECTRIC METERING GENERAL

ELECTRIC METERING GENERAL 1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for

More information

ELECTRICAL BULLETIN

ELECTRICAL BULLETIN PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE

More information

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.

6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

LIGHTING RETROFIT CONFORMANCE REPORT

LIGHTING RETROFIT CONFORMANCE REPORT LIGHTING RETROFIT CONFORMANCE REPORT Date Contractor Permit Number Business Owner Site Address Program Type Fixture Type Quantity Voltage Amperage Max Wattage Bulletin Requirements YES / NO Requirements

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION SPECIFICATION EO- 4035 REVISION 12 OCTOBER, 2006 OPERATION AND MAINTENANCE

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.

SERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance. SERVICE ENTRANCES 3.01 POINT OF ENTRANCE General Service The customer, or the customer s electrician, should provide OPPD with a site plan, load schedule, and voltage requirements when requesting service.

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.

FIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements. FIELD TEST AND OPERATIONAL CHECK SECTION 16080 PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Refer to Section 16010, Electrical General Requirements. 1.2 WORK INCLUDED A. General Scope: 1. The Contractor

More information

Technical Guideline for. Section 8. Inspection and Approval of Construction

Technical Guideline for. Section 8. Inspection and Approval of Construction Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

Manitoba Electrical Code

Manitoba Electrical Code THE MANITOBA HYDRO ACT (C.C.S.M. c. H190) Manitoba Electrical Code Regulation 76/2018 Registered June 15, 2018 Adoption of Canadian Electrical Code, Part I, 24th edition 1 Subject to section 3 and the

More information

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 )

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 ) Scope This document covers the installation and inspection requirements for Street and that are installed and maintained within the jurisdiction of the Nova Scotia Power Incorporated (NSPI) inspection

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality.

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality. ELECTRICAL INSPECTION BULLETIN (Effective 2012-10-01) Rule 30-1000 Installation and Inspection Requirements for Street and Roadway Lighting Systems Scope This document covers the installation and inspection

More information

NEC 2017 Code Changes Chapter 1 - General

NEC 2017 Code Changes Chapter 1 - General NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers

More information

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS

BULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS SaskPower Electrical Inspections BULLETIN 01-2017 February 15, 2017 TO: LICENSED ELECTRICAL CONTRACTORS ELECTRICAL CONSULTANTS AND ENGINEERS SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS,

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General

More information

MATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT

MATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 244 NOVEMBER 204 MATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 244.0 SCOPE 244.02 REFERENCES 244.03 DEFINITIONS - Not Used 244.04

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

16300 HIGH VOLTAGE DISTRIBUTION

16300 HIGH VOLTAGE DISTRIBUTION 16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

Duke Energy Carolinas Distribution Construction Standards Reference Guide

Duke Energy Carolinas Distribution Construction Standards Reference Guide Duke Energy Carolinas Distribution Construction Standards Reference Guide The Duke Energy Carolinas (DEC) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Access

More information

Metering Requirements 750 Volts or Less

Metering Requirements 750 Volts or Less SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL SYSTEM OF UNITS 3.1 Definitions

More information

LOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D

LOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D SECTION 16428D (26 24 13.01) LOW VOLTAGE SWITCHBOARDS TYPE POW-R-LINE C 600 VAC MAXIMUM PART 1 GENERAL 1.01 SCOPE A. The contractor shall furnish and install where indicated on the drawings a dead front

More information

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS

MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...

DIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES... DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design. Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 13 01 (August 2013) --------------------------- Preparing Activity: NAVFAC NEW UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

METERING INSTALLATION

METERING INSTALLATION 4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive

More information

Reference Information:

Reference Information: Solar PV Simplified Standard Permit Application Requirements For: Central/String Inverter(s) & Micro-Inverter(s) Systems for One and Two Family Dwellings SCOPE: Use this application only for utility-interactive

More information

Metering Requirements 750 Volts or Less

Metering Requirements 750 Volts or Less SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL SYSTEM OF UNITS 3.1 Definitions

More information

SERVICES - SERVICE EQUIPMENT- PANELBOARDS

SERVICES - SERVICE EQUIPMENT- PANELBOARDS NO: D-E3 101110 1 THIS DIRECTIVE SUPERSEDES DIRECTIVES D-E3 070302 5 & D-E3 070302 6 SERVICES - SERVICE EQUIPMENT- PANELBOARDS This Directive is being issued by a provincial safety manager pursuant to

More information

SECTION LOW-VOLTAGE SWITCHGEAR

SECTION LOW-VOLTAGE SWITCHGEAR PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-33 77 19.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-33 77 19.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.

Ontario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by. /0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements

More information

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

56-SDMS-01 REV. 01 SPECIFICATIONS FOR 56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES

More information

OVERHEAD SERVICES - SECONDARY

OVERHEAD SERVICES - SECONDARY OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...

More information

a) Line and load compartments must be separated by a stable barrier.

a) Line and load compartments must be separated by a stable barrier. 1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer

More information

SECTION GROUNDING

SECTION GROUNDING SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment

More information

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network

Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Electricity Specification 220 Issue 3 December 2016 Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Contents 1 Introduction

More information

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February

Electric Service Requirements. Residential Overhead. Engineering Specification T002. February Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL

More information

METERING INSTALLATIONS (GENERAL REQUIREMENTS)

METERING INSTALLATIONS (GENERAL REQUIREMENTS) 1. METER SOCKETS Meter sockets are supplied and installed by the customer or an electrical contractor. The meter socket shall be mounted so the socket jaws are in true horizontal and vertical planes and

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

SECTION FIELD PANELS

SECTION FIELD PANELS Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

ENMAX POWER CORPORATION. Requirements for Distribution Wires Access

ENMAX POWER CORPORATION. Requirements for Distribution Wires Access ENMAX POWER CORPORATION Requirements for Distribution Wires Access December 7, 2016 Table of Contents Foreword 4 Section One: Making an Application for New Services, Upgrades or Changes 6 1. New Connections

More information

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.

8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered. 2012 Edition Redbook 8.0 REVENUE METERING 8.1 INTRODUCTION The purpose of this section is to outline requirements of the Customer, as set forth herein by LIPA, as they pertain to Electric Revenue Metering

More information

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2008 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

INFORMATION BULLETIN

INFORMATION BULLETIN APPROVAL OF MANUFACTURED HOMES & FACTORY-BUILT STRUCTURES (RELOCATABLE AND NON-RELOCATABLE) The following bulletin provides guidance on the application Electrical Safety Regulation, Section 21. This information

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 1200 - MEDIUM-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Page 1 of 5 REFERENCE Denver Building and Fire Code (DBC) Section 131, International Residential Code (IRC) Section M2301, the National Electrical Code (NEC) Articles 690 & 705 PROCEDURE The procedure

More information

Delaware State University

Delaware State University Delaware State University University Area Responsible: Risk and Safety Management Policy Number and Name: 7-04: Electrical Safety Policy Approval Date: 7/28/11 Revisions: 8/7/2013 Reviewed: 7/26/2013 Related

More information

Indianapolis Power & Light Company

Indianapolis Power & Light Company Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis

More information

Capital Projects Group Transfer Switch Specification

Capital Projects Group Transfer Switch Specification Capital Projects Group Specification Specification 26 36 23 Revision 0 Date: August 2018 Specification Specification 26 36 23 Publication Date: August 2018 COPYRIGHT 2018 Metrolinx, an Agency of the Government

More information

SECTION PART 1 GENERAL

SECTION PART 1 GENERAL SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only ************************************************************************** USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 25 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS-26 13 00.00

More information

SECTION MEDIUM VOLTAGE TRANSFORMERS

SECTION MEDIUM VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

OPERATING PROCEDURE NO. 310

OPERATING PROCEDURE NO. 310 OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction

8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction 8. 8.1 Introduction The purpose of this section is to outline requirements of the customer, as set forth herein by PSEG Long Island, as they pertain to Electric Revenue Metering at Primary and Secondary

More information

Small Scale Solar Permit Application

Small Scale Solar Permit Application Town of Berne Small Scale Solar Permit Application Town of Berne PO Box 57 Berne, NY 12023 (518) 872-1448 2/14/18 PROJECT ELIGIBILITY FOR PERMITTING PROCESS By submitting this application, the applicant

More information

NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS

NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS May, 2017 NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS Preface The Utility Services Requirements

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

NY State Unified Solar Permit

NY State Unified Solar Permit VILLAGE OF FARMINGDALE NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal authorities that adopt the unified permit

More information

Metering Requirements 750 Volts or Less

Metering Requirements 750 Volts or Less SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE Metering Requirements 750 Volts or Less INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL

More information

NY State Unified Solar Permit

NY State Unified Solar Permit PERMIT APPLICATION NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal authorities that adopt the unified permit

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement Draft 11/17/08 Utility transformer issues began surfacing last year with questions of enforcement responsibilities due to utility

More information

POWER TRANSFORMER INSTALLATION

POWER TRANSFORMER INSTALLATION Project Procedure POWER TRANSFORMER INSTALLATION No.: P-6.2-8-1 07/20/2011 PAGE 1 OF 6 1.0 PURPOSE The purpose of this procedure is to ensure that power transformer installations are accomplished in compliance

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning

Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Version:- 2.0 Date of Issue:- Sept 2013 Page 1 of 10 Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Framework for design and planning, materials specification,