1 ELECTRICAL INSPECTION BULLETIN (Effective ) Rule Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which standards should be followed and as to if this work is required to be performed under a Wiring Permit and be inspected. The Nova Scotia Electrical Code Regulations requires that all electrical installation, unless exempted, must be performed under a wiring permit and be inspected by the Inspection Department before the equipment is energized. These requirements apply to all customer owned high voltage installations (voltages operating in excess of 750V). In addition to permit and inspections requirements, electrical drawings for high voltage installations must be submitted for review in accordance to Electrical Inspection Bulletin B Documentation must be provided to support cable ampacity ratings by a P.Eng of Record. Request for deviations along with the rationale for the request must be submitted in writing to the Inspection Department at the time drawings are submitted. Customer owned high voltage installations may include but are not limited to overhead and underground cables and conductors, pad mount transformers, transformer banks, outdoor and indoor sub-stations, grounding, enclosed switching cubicles, switchgear, sub-station fences, and other equipment operation in excess of 750 volts. NSPI supply authority must be consulted in all cases prior to any customer s high voltage system being connected or interconnected to NSP s utility system. In addition to meeting the requirement of NSP s supply authority, customer owned installations must comply with the Canadian Electrical Code, Part 1(CEC) and other applicable CSA standards. NSPI utility standards should not be used in designing customer high voltage installations as NSPI utility standards may differ from that of the CEC. Designers and installers must ensure the installation complies with the minimum requirements of the CE Code. Example of one difference is the requirement for disconnecting means for a 3-phase transformer. Utility practice is to install 3 single gang cutouts however CEC rule requires a gang operated switch. High voltage electrical equipment must be approved by a recognized certification agency provided the certification agency has a program to certify the equipment to the appropriate CAN/CSA standard. If the certification agency does not have a program to certify the equipment, the equipment must be built to a recognized CAN/CSA standard. The CSA standards require the equipment to be labeled to the standards it was built to. However electrical equipment built to CAN/CSA C88 does not require the equipment to be labeled. In this case the customer must provide the Inspection Department written documentation from the manufacture indicating the applicable CAN/CSA standard it was built to, and the customer shall install a label on the equipment noting the applicable standard(s). Where a CAN/CSA standard does not exist other standards may be acceptable as would be the case with equipment operating in excess of 46 kv. The customer/ agent shall provide documentation as to the type of equipment and applicable standard it was built to. In addition to the requirements of CEC, installations of overhead and underground systems shall also conform to applicable CSA Part 3 standards. The following table indicates applicable standards for specific high voltage equipment. Prepared by: David Clements Approved by: David Clements Page 1 of 7 New Bulletin February 2009 B
2 High Voltage Equipment Application Equipment Standard (see note 1) Enclosed Switchgear up to Indoors or Outdoors within a Certified to C22.2 No KV fenced station Enclosed Switchgear up to 46KV Outdoors Certified to C22.2 No (Tamperproof Design) Air Cooled Distribution Transformer(Dry Type) up to 46kV Indoors or Outdoors Certified to C22.2 No.47-M90 (R2007) Oil/Liquid Filled Power Transformer Single and Three Phase Oil/Liquid Filled Distribution Transformer (Up to 3MVA) ONAN only Single and Three Phase Liquid Filled Distribution Transformer (Up to 3MVA) LNAN only Low Profile, Single Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 167 KVA) Three Phase Tamper Resistant Pad Mount Transformer with Separable Insulated Connectors (Up to 27.6/16.8 kv) (Up to 3000 KVA) Three Phase, Live-Front, Pad Mounted Distribution Transformer Tamper Resistance Oil/Liquid Filled Tamper Resistant Pad Mount Transformer ONAN and LNAN only Transformer Designation Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Outdoors within fenced in station, or indoor within a vault Built to CAN/CSA C88-M90 (R2004) Built to CAN/CSA-C Built to CAN/CSA-C Outdoors ( no fence required) Built to CAN/CSA-C Outdoors ( no fence required) Built to CAN/CSA-C Outdoors ( no fence required) Outdoors ( no fence required) ONAN- Oil Filled Natural Cooling LNAN- Flame-retardant Liquid filled natural cooling Built to CAN/CSA C Built to CAN/CSA C88-M90 (R2004) and built to tamperproof requirements in C227.4 Note 1: The information indicated in the equipment standard column shall appear on the equipment. Station Ground Resistance Page 2 of 7 New Bulletin February 2009 B
3 Testing/Commissioning of High Voltage Stations and Unit Substations In order to ensure compliance with Section 36 of the CEC and in particular rule (4), (Station ground resistance) after completion of construction equipment shall not be energized until a testing/commissioning report on the complete installation is provided to NSPI s Chief Electrical Inspector, an electrical inspection has been completed by the Inspection Department and all applicable checklists (attachments 1-3) have been submitted with the commissioning report. The testing /commissioning report is to be completed by an acceptable independent agency other than the installing electrical contractor. The report submitted by the agency must indicate that the High Voltage installation has been successfully tested in accordance with requirements of Section 36 of the CEC and that the installation is ready to be energized. Where an installation falls under the station exemption rule (36-306), the consultant must demonstrate to the Inspection Department that the potential rise of the station shall not exceed the values specified in Table 52 during the lifetime of the station. The testing / commissioning report must include (but not limited) to the following: (1) Operation of all isolating and disconnecting means; (2) Operation of all required interlocks between fuse compartments, load breaking or isolating means; (3) CAN/CSA standard that transformer(s) are built to; (4) Calculation of step and touch voltages and ground resistance test; (5) Protection coordination study; (6) Visual inspection of grounding conductors and ground connections (7) Confirmation that that all test are completed and the complete installation complies with the CEC and station is ready to be energized. (8) Indication that all equipment is rated to withstand the maximum available fault levels The design of the station ground electrode can be found in CEA Report 249 D541 Simplified Rules for Grounding Customer-Owned High Voltage Substations or IEEE Standard No. 80 Guide for Safety in AC Substation Grounding Acknowledgements: References to equipment standards provide by Canadian Standards Association (CSA) Information contained in checklist provided by City of Vancouver Electrical Inspection Department Page 3 of 7 New Bulletin February 2009 B
4 ATTACHMENT #1 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency GENERAL CHECKLIST FOR H.V. UNIT SUBSTATION Project Name: Plans Review Number: ITEM NO. DESCRIPTION REFERENCES Conformance to (Applicable CEC Rules, NS the referenced Power Electrical Inspection requirements Bulletins, NS Power Authority Directives) Yes No (a) H.V. Station Ground Resistance Report (See Attachment 2) 2 H.V. Equipment approval Clearance and spacing of live parts ; ; ; Tables 30, 31,32,33,34 & 35 4 Operation of H.V. switches ; Interlocks ; Switch, fuse, and breaker ratings ; ; Transformer overload and overheating protection (a) Relay and tripping device settings (b) Transformer core temperature device Installation integrity: (a) Insulation (b) Torqued as per installation spec. s (c) Stand-off supports and bushings 9 Interconnection between pieces of electrical equipment assembled on site is in conformance with the shop drawings and in accordance with the CE Code Part I 10 Tested H.V. Station (Unit Substation) is ready to be energized Additional Comments: As per shop drawings Shop drawings of unit substation; CE Code, Part I NS Power Bulletin Testing Agency: Name: Signature: Address: Telephone: Facsimile: P.Eng. Affix Professional Seal Page 4 of 7 New Bulletin February 2009 B
5 ATTACHMENT #2 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer of the Testing/Commissioning Agency or by the Professional Engineer responsible for the design of the H.V. installation. (P.Eng. of record) Note 2: Completed report to be provided as part of Attachment 1 (Item 1) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: HIGH VOLTAGE STATION GROUND RESISTANCE REPORT Testing Agency: Item Requirements of Table 52 1 Type of Soil (specify): 2 Measured Resistance of the station Ground Electrode 3 Calculated Step Voltage at the HV station 4 Calculated Touch Voltage at the HV station Conformance with applicable requirements of Table 52 Yes No Company Name: (if other than the testing agency): Name: P.Eng. Signature: Date: Address: Telephone: Affix Professional Seal Facsimile: Page 5 of 7 New Bulletin February 2009 B
6 ATTACHMENT #3 to NS Power Electrical Inspection Bulletin Note 1: To be completed by the Professional Engineer responsible for the design of the H.V. installation (P.Eng. of record) GENERAL CHECKLIST FOR H.V. SERVICE Project Name: Plans Review Number: Item No. 1 DESCRIPTION Horizontal clearance of H.V. conductors from adjacent structures; guarding 2 Service raceways, including drainage and pull box facilities 3 Working space; entrance to and exit from 4 Space for service and distribution equipment REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) ; ; Table ; 6-300; ; ; 2-310; Table ; ; Access to nameplates and parts requiring maintenance Presence of other than electrical equipment (a) Dielectric liquid-filled equipment, indoors ; ; (b) Dielectric liquid-filled equipment, outdoors ; ; Illumination of equipment 2-314; Warning notices Electrical equipment service room/vault (a) Location (b) Construction / (c) Door Swing (d) Fire alarm system devices (Smoke detectors if not sprinklered) (3)(b) (e) Adjacent Hazardous Areas (5) (f) If sprinklered, adequate protection for electrical ; (5) equipment Ventilation (a) Proof that the system is adequate and suitable for the (6); 2-318; purpose Appendix B (b) Intake location Conformance to the referenced requirements Yes No N/A Page 6 of 7 New Bulletin February 2009 B
7 Item No. DESCRIPTION REFERENCES (applicable CEC Rules, NS Power Inspection Bulletin and Supply Authority Directives, Dept. of Labour & Workforce Development Bulletins) Conformance to the referenced requirements Yes No N/A Grounding and bonding requirements CEC Section 10 (a) Station ground electrode ; (b) Connections to the station ground electrode (5); ; Appendix B (i) Method of connection (as specified by the design professional) ; ; Appendix B (ii) Conductor sizes (as specified by the design CEC Table 51 professional) (c) If a ground bus (pad) for testing purposes is installed: (i) Accessibility (ii) Conductors marked for testing purposes (7); (d) If a gang-operated switch is installed: (i) Operating shaft grounded (1)(a) or (b) (ii) 1.2 m x 1.8 m gradient control mat (iii) positioned for vertical or horizontal operation (iv) connection of the mat by two separate conductors (size and method of connection as specified by the design engineer) (e) If a metallic fence is installed: (i) located minimum 1 m inside perimeter of station ground electrode area (ii) connections to the fence L.V. breakers and fuses: Section (a) Size/trip setting Accepted Plans and Specifications (b) Interrupting capacity ; ; 14 Ground Fault protection or indicator ; (2) 15 L.V. metering sockets NS Power Metering Standards 16 Other (Please specify) Additional Comments: Company Name: Name: Signature: Address: Telephone: Facsimile: P.Eng. Affix Professional Seal Page 7 of 7 New Bulletin February 2009 B
ELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 Labour and Advanced Education ELECTRICAL BULLETIN 2012-01 From: David MacLeod,C.E.I.,P.Eng. Pg 1 of 8 Provincial Chief Electrical Inspector Date : March 1, 2012
More informationSECTION SECONDARY UNIT SUBSTATIONS
SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,
More informationPLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
More informationINDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1
INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions
More informationELECTRIC METERING GENERAL
1.0 INDEX 1.0 INDEX 2.0 SCOPE 3.0 GENERAL REQUIREMENTS 4.0 EQUIPMENT 5.0 METER REQUIREMENTS 6.0 METER FACILITIES 7.0 ELECTRICAL CONNECTIONS 2.0 SCOPE This guide covers general requirements and codes for
More informationELECTRICAL BULLETIN
PO Box 697 Halifax, Nova Scotia B3J 2T8 ELECTRICAL BULLETIN 2015-01 From: David MacLeod, C.E.I., P.Eng. Pg. 1 of 7 Provincial Chief Electrical Inspector Date: March 10, 2015 Subject: Adoption of the 2015
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationELECTRICAL SAFETY Information Bulletin
ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 5 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 6 Services and service equipment Rule 6-102 Number of supply services permitted Row housing
More informationSECTION SECONDARY UNIT SUBSTATIONS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 11 16 SECONDARY UNIT SUBSTATIONS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 48-05 Van Dam Street Long Island City, NY 11101 ELECTRIC METER SHOP DEPARTMENT METER ENGINEERING SPECIFICATION MES-350 REVISION 3 June 2016 EFFECTIVE DATE
More information6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4.
6. SECONDARY SERVICES (under 600 volts) 6.1 AVAILABILITY For the electrical characteristics of available secondary services see Section 3.4. 6.2 OVERHEAD SERVICES Wiring of any premises for connection
More informationB. Provide liquid-filled secondary substation transformers as indicated on drawings.
SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED
More informationLIGHTING RETROFIT CONFORMANCE REPORT
LIGHTING RETROFIT CONFORMANCE REPORT Date Contractor Permit Number Business Owner Site Address Program Type Fixture Type Quantity Voltage Amperage Max Wattage Bulletin Requirements YES / NO Requirements
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION SPECIFICATION EO- 4035 REVISION 12 OCTOBER, 2006 OPERATION AND MAINTENANCE
More informationA. Section includes busway and fittings including plug-in units.
SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationSERVICE ENTRANCES. OPPD S Electrical Service Designer (ESD) shall designate the Point Of Entrance.
SERVICE ENTRANCES 3.01 POINT OF ENTRANCE General Service The customer, or the customer s electrician, should provide OPPD with a site plan, load schedule, and voltage requirements when requesting service.
More informationSECTION BUSWAYS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and
More informationSECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V
SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals
More informationLow Voltage Switchgear Construction Checklist (under 500 kva)
Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationFIELD TEST AND OPERATIONAL CHECK SECTION A. Refer to Section 16010, Electrical General Requirements.
FIELD TEST AND OPERATIONAL CHECK SECTION 16080 PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. Refer to Section 16010, Electrical General Requirements. 1.2 WORK INCLUDED A. General Scope: 1. The Contractor
More informationTechnical Guideline for. Section 8. Inspection and Approval of Construction
Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer
More informationHouston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER
PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage
More informationSECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number
MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and
More informationManitoba Electrical Code
THE MANITOBA HYDRO ACT (C.C.S.M. c. H190) Manitoba Electrical Code Regulation 76/2018 Registered June 15, 2018 Adoption of Canadian Electrical Code, Part I, 24th edition 1 Subject to section 3 and the
More informationELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 )
Scope This document covers the installation and inspection requirements for Street and that are installed and maintained within the jurisdiction of the Nova Scotia Power Incorporated (NSPI) inspection
More informationImportant Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008
Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:
More informationPoint Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear
Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment
More information4. GENERAL REQUIREMENTS
4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall
More information4. GENERAL REQUIREMENTS
4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall
More informationMunicipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality.
ELECTRICAL INSPECTION BULLETIN (Effective 2012-10-01) Rule 30-1000 Installation and Inspection Requirements for Street and Roadway Lighting Systems Scope This document covers the installation and inspection
More informationNEC 2017 Code Changes Chapter 1 - General
NEC 2017 Code Changes Chapter 1 - General Changes from the 2014 code are highlighted in yellow. ARTICLE 110 - Requirements for Electrical Installations Part I. General 110.1 Scope. This article covers
More informationBULLETIN SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS, AND ELECTRIC SERVICE REQUIREMENT CHANGES OR ADDITIONS
SaskPower Electrical Inspections BULLETIN 01-2017 February 15, 2017 TO: LICENSED ELECTRICAL CONTRACTORS ELECTRICAL CONSULTANTS AND ENGINEERS SUBJECT: GENERAL BULLETIN, 2015 SASK INTERPRETATIONS CORRECTIONS,
More informationPRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION
PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the
More informationSERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES
SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General
More informationMATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 244 NOVEMBER 204 MATERIAL SPECIFICATION FOR POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 244.0 SCOPE 244.02 REFERENCES 244.03 DEFINITIONS - Not Used 244.04
More informationSECTION LOW-VOLTAGE TRANSFORMERS
PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not
More information16300 HIGH VOLTAGE DISTRIBUTION
16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
More informationDuke Energy Carolinas Distribution Construction Standards Reference Guide
Duke Energy Carolinas Distribution Construction Standards Reference Guide The Duke Energy Carolinas (DEC) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. Access
More informationMetering Requirements 750 Volts or Less
SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL SYSTEM OF UNITS 3.1 Definitions
More informationLOW-VOLTAGE SERVICE ENTRANCE SWITCHBOARDS SECTION D
SECTION 16428D (26 24 13.01) LOW VOLTAGE SWITCHBOARDS TYPE POW-R-LINE C 600 VAC MAXIMUM PART 1 GENERAL 1.01 SCOPE A. The contractor shall furnish and install where indicated on the drawings a dead front
More information1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:
SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More informationMANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS
DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS SAFETY Subject: DESIGN, MAINTENANCE AND INSPECTION OF SECONDARY ELECTRICAL DISTRIBUTION SYSTEMS ISSUE DATE: 5/1/90 EFFECTIVE DATE: 2/4/92 REVIEW DATE:
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More informationUNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Medium Voltage Switchgear. Basis of Design.
Basis of Design This section applies to the design and selection of medium voltage switchgear, primarily for use in substations. Design Criteria 13.8kV equipment shall be 15kV class, 4.16kV and 2.4kV equipment
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-26 13 01 (August 2013) --------------------------- Preparing Activity: NAVFAC NEW UNIFIED FACILITIES GUIDE SPECIFICATIONS References are in agreement with UMRL dated
More informationSECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC
PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED
More informationMETERING INSTALLATION
4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions
More informationSECTION ENCLOSED BUS ASSEMBLIES
SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationInspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)
TOOLKIT DOCUMENT #7 Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan) This document has two sections. Neither section is all-inclusive
More informationReference Information:
Solar PV Simplified Standard Permit Application Requirements For: Central/String Inverter(s) & Micro-Inverter(s) Systems for One and Two Family Dwellings SCOPE: Use this application only for utility-interactive
More informationMetering Requirements 750 Volts or Less
SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL SYSTEM OF UNITS 3.1 Definitions
More informationSERVICES - SERVICE EQUIPMENT- PANELBOARDS
NO: D-E3 101110 1 THIS DIRECTIVE SUPERSEDES DIRECTIVES D-E3 070302 5 & D-E3 070302 6 SERVICES - SERVICE EQUIPMENT- PANELBOARDS This Directive is being issued by a provincial safety manager pursuant to
More informationSECTION LOW-VOLTAGE SWITCHGEAR
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 23 00 LOW-VOLTAGE SWITCHGEAR SPEC WRITER NOTE: This specification is not for general use. Use Section 26 24 13, DISTRIBUTION SWITCHBOARDS for most applications.
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-33 77 19.00 40 (August 2016) --------------------------------- Preparing Activity: NASA Superseding UFGS-33 77 19.00 40 (August 2013) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationOntario ENGINEERING STANDARD SPECIFICATION 1/10 REV. ELECTRICAL DISTRIBUTION HIGH VOLTAGE SUBSTATION GROUNDING AND BONDING. Approved by.
/0 Rev Description Revision by Approved by Issue Date YYYY/MM/DD New Format Replaces 5322-0.0. T.C. 206/02/09 T.C. 206/03/02 206/03/02 2/0.0 PURPOSE This specification describes the minimum requirements
More information56-SDMS-01 REV. 01 SPECIFICATIONS FOR
56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES
More informationOVERHEAD SERVICES - SECONDARY
OVERHEAD SERVICES - SECONDARY Contents - Overhead Services... O-1 General Requirements for Overhead Service... O-2 Names of Parts for Overhead Service... O-3 Service Attachment on an Unguyed Service Mast...
More informationa) Line and load compartments must be separated by a stable barrier.
1.00 GENERAL 1.01 The electric utility shall furnish and connect all meters, instrument transformers, test switches, and meter control wiring necessary to complete the meter installation. 1.02 The customer
More informationSECTION GROUNDING
SECTION 16450 GROUNDING PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies general grounding and bonding requirements of electrical and telecommunication installations for personnel safety, equipment
More informationPre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network
Electricity Specification 220 Issue 3 December 2016 Pre-commissioning Requirements for Independent Connection Providers Requiring New Assets to be Connected to the 11/6.6kV Network Contents 1 Introduction
More informationElectric Service Requirements. Residential Overhead. Engineering Specification T002. February
Electric Service Requirements Residential Overhead Engineering Specification T002 February 2017 0362-16 ENG. SPEC. T002 REV. 3 RESIDENTIAL OVERHEAD INSTALLATIONS page 1 of 12 Table of Contents 1 GENERAL
More informationMETERING INSTALLATIONS (GENERAL REQUIREMENTS)
1. METER SOCKETS Meter sockets are supplied and installed by the customer or an electrical contractor. The meter socket shall be mounted so the socket jaws are in true horizontal and vertical planes and
More informationSection 7: Specifications
Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required
More informationEFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,
TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.
More informationSECTION FIELD PANELS
Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.
More informationThe Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999
CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March
More informationENMAX POWER CORPORATION. Requirements for Distribution Wires Access
ENMAX POWER CORPORATION Requirements for Distribution Wires Access December 7, 2016 Table of Contents Foreword 4 Section One: Making an Application for New Services, Upgrades or Changes 6 1. New Connections
More information8.1.2 Under no circumstances shall a service entrance be left unmetered. Notify the Company if an unmetered service is encountered.
2012 Edition Redbook 8.0 REVENUE METERING 8.1 INTRODUCTION The purpose of this section is to outline requirements of the Customer, as set forth herein by LIPA, as they pertain to Electric Revenue Metering
More informationEFFECTIVE DATE: July 1, 2008, unless a later date is cited at the end of a section. [ NMAC - Rp,
TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2008 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.
More informationINFORMATION BULLETIN
APPROVAL OF MANUFACTURED HOMES & FACTORY-BUILT STRUCTURES (RELOCATABLE AND NON-RELOCATABLE) The following bulletin provides guidance on the application Electrical Safety Regulation, Section 21. This information
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationSECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE
METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 1200 - MEDIUM-VOLTAGE TRANSFORMERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY
Page 1 of 5 REFERENCE Denver Building and Fire Code (DBC) Section 131, International Residential Code (IRC) Section M2301, the National Electrical Code (NEC) Articles 690 & 705 PROCEDURE The procedure
More informationDelaware State University
Delaware State University University Area Responsible: Risk and Safety Management Policy Number and Name: 7-04: Electrical Safety Policy Approval Date: 7/28/11 Revisions: 8/7/2013 Reviewed: 7/26/2013 Related
More informationIndianapolis Power & Light Company
Indianapolis Power & Light Company Electric Service and Meter Manual The Electric Service & Meter Manual is not copyrighted and permission is hereby given to reproduce this document. However, the Indianapolis
More informationCapital Projects Group Transfer Switch Specification
Capital Projects Group Specification Specification 26 36 23 Revision 0 Date: August 2018 Specification Specification 26 36 23 Publication Date: August 2018 COPYRIGHT 2018 Metrolinx, an Agency of the Government
More informationSECTION PART 1 GENERAL
SECTION 16060 GROUNDING AND BONDING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Grounding of electrical systems and equipment and basic requirements for ground for equipment, circuits, and systems.
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************
USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 25 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS-26 13 00.00
More informationSECTION MEDIUM VOLTAGE TRANSFORMERS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationOPERATING PROCEDURE NO. 310
OPERATING PROCEDURE NO. 310 Related Operating Procedures: 310A; 310B; 310C; 310D SUBJECT: Conditions of Service Issued: February 10, 2014 Revised: March 28, 2016 OBJECTIVE: To establish the rules, regulations
More informationSECTION BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies
More information8. REVENUE METERING. Operational Excellence Model. 8.1 Introduction
8. 8.1 Introduction The purpose of this section is to outline requirements of the customer, as set forth herein by PSEG Long Island, as they pertain to Electric Revenue Metering at Primary and Secondary
More informationSmall Scale Solar Permit Application
Town of Berne Small Scale Solar Permit Application Town of Berne PO Box 57 Berne, NY 12023 (518) 872-1448 2/14/18 PROJECT ELIGIBILITY FOR PERMITTING PROCESS By submitting this application, the applicant
More informationNOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS
NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS May, 2017 NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS Preface The Utility Services Requirements
More informationUNDERGROUND SERVICES SECONDARY
Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-
More informationNY State Unified Solar Permit
VILLAGE OF FARMINGDALE NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal authorities that adopt the unified permit
More informationMetering Requirements 750 Volts or Less
SECTION 1 - SCOPE 1.1 Toronto Hydro Requirements 1.2 Ontario Electrical Safety Code SECTION 2 - PURPOSE Metering Requirements 750 Volts or Less INDEX SECTION 3 - DEFINITIONS, PUBLICATIONS AND THE INTERNATIONAL
More informationNY State Unified Solar Permit
PERMIT APPLICATION NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal authorities that adopt the unified permit
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement Draft 11/17/08 Utility transformer issues began surfacing last year with questions of enforcement responsibilities due to utility
More informationPOWER TRANSFORMER INSTALLATION
Project Procedure POWER TRANSFORMER INSTALLATION No.: P-6.2-8-1 07/20/2011 PAGE 1 OF 6 1.0 PURPOSE The purpose of this procedure is to ensure that power transformer installations are accomplished in compliance
More informationSECTION ENCLOSED BUS ASSEMBLIES
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the
More informationNorthern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning
Version:- 2.0 Date of Issue:- Sept 2013 Page 1 of 10 Northern Powergrid Appendix B for ENA Engineering Recommendation G81 Part 4: Design and Planning Framework for design and planning, materials specification,
More information