1 Approaches to Historic Bridge Rehabilitation Case Study #1 Widening the Harrods Creek Arch Bridge Richard Sutherland, P.E. Daryl Carter, P.E. Presenter s Logo 1
2 Case Study #1 Harrods Creek Arch Bridge Widening Completion Date: August, 2010 Cost: $3,400,000 Designer: Stantec Consulting Client/Owner: Louisville Metro Public Works Contractor: MAC Construction & Excavating, New Albany, Indiana 2
3 Harrods Creek Arch Bridge Widening Case Study #1 Located on River Road over Harrods Creek near Prospect, Kentucky, 10 miles northeast of Louisville River Road is a Kentucky Scenic Byway and the bridge is located within the Harrods Creek Historic District Description of Bridge Built circa 1910; grade raised in 1912 Total Length ~ 212 feet Three span, reinforced concrete, filled-spandrel arch 3
4 Significant Issues Associated With Project Bridge became eligible for listing on the National Register of Historic Places after the project began Case Study #1 Widening the bridge from one lane to two while preserving the historic character of the bridge Organized and well-funded opposition 4
5 Case Study # Aerial View Showing Project Setting Existing bridge was bounded by several historic properties and a marina 5
6 Case Study #1 How Significant Issues Were Resolved Adhered to the Section 106 process faithfully Coordinated in advance with the SHPO and FHWA Actively engaged stakeholders inside and outside of the consulting parties meetings Creative design solution 6
7 Case Study #1 Other Significant Issues Associated With Project Widen narrow existing bridge from one lane to two without altering the historic characteristics of the bridge The concrete balustrade railing had to be replicated No new loads could be transmitted onto the existing arches Repair deteriorated areas of the existing arches 7
8 Case Study #1 How Significant Issues Were Resolved Build a new prestressed concrete bridge inside of the existing arches: Remove existing concrete balustrade railings and some of the rubble infill down to the crowns of the existing arch rings Install micropiles by drilling down through the existing infill and pier stems and anchor 12 feet into solid rock Install drilled shafts by similar methods at the abutments Prestressed box beams span over and clear the arch crowns 8
9 Case Study #1 How Significant Issues Were Resolved Prestressed concrete box beams were located between existing spandrel walls The deck is comprised of twenty ~ 32 wide transversely prestressed concrete deck panels, which cantilever out 7-9 beyond the edge of box beams New concrete architectural bridge railing was cast-in-place after erecting the deck panels 9
10 Case Study # Removing Existing Arch Infill It was quickly discovered that the inside faces of the existing spandrel walls were battered 10
11 Case Study # Chipping Inside Face of Spandrel Walls 11
12 Case Study # Setting Prestressed Concrete Box Beams Note tight side clearance between box beams and spandrel walls 12
13 Case Study # Setting Prestressed Deck Panels 13
14 Case Study # Setting the Last of the Deck Panels Stirrup pockets cast into the deck panels for pressure grouting to provide composite action with beams 14
15 Case Study # Chipping Out Bad Concrete in Arch Rings Work was accomplished using a manlift supported on a segmental barge 15
16 Case Study # Formwork for the Epoxy Repair Concrete 16
17 Case Study # Forming for the Architectural Bridge Railing Preformed styrofoam blocks were used for forming the windows 17
18 How was Section 106 handled? Done by consultant Case Study #1 Early coordination with SHPO and FHWA on design concept Proper process helped defeat challenges to project 18
19 Case Study #1 How was Section 4(f) handled? Done as Programmatic 4(f) 4(f) challenged Project met Programmatic guidelines since it was considered a rehabilitation and the impacts met Department of the Interior Standards 19
20 Case Study # Finished Bridge 20
21 Lessons Learned/Conclusions Working on this historic structure required the team to address a unique set of design and construction challenges. Case Study #1 The design concept that was adopted and the technologies employed to widen rehabilitate this structure will provide a comparative baseline for similar projects in the future. Even though the project was initially met with organized opposition, once the project was completed, public feedback indicated that it was perceived as an overall success. 21
Ironton Russell Bridge Project
Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationIntroduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring
Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot
More informationIronton Russell Bridge Project
Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014
More informationMOVABLE SPAN BRIDGES. Bridge of Lions, St. Augustine, Florida
MOVABLE SPAN BRIDGES Bridge of Lions, St. Augustine, Florida Location and Description of Setting: The Bridge of Lions crosses Matanzas Bay (part of the Intercoastal Waterway) and connects the city of St.
More informationIronton Russell Bridge Project
Construction Update July 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The entails the construction of a cast in place
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationIronton Russell Bridge Project
Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationIronton Russell Bridge Project
Construction Update October 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2015
More informationLRFD Bridge Design Manual Changes
LRFD Bridge Design Manual Changes Dave Dahlberg Bridge Design Manual & Policy Engineer May 17, 2017 Bridge Office mndot.gov/bridge Overview 1) Concrete mix designations 2) Reinforcing bar development and
More informationIronton Russell Bridge Project
Construction Update September 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: September
More informationAPPENDIX G Enviromental Documents
APPENDIX G Enviromental Documents CACHE CREEK APN 060-230-007 LOWREY KATHERINE A ETAL 5.20 ACRES APN 060-230-009 FACCIUTO VINCENT R & VICTORIA 7.78 ACRES APN 060-251-001 LLOYD TRUST ETAL & LLOYD FAM REV
More informationBridge Asset Management City of Battle Creek Planning and Projects
Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.
More informationAGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.
Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE
More informationMILTON-MADISON BRIDGE REPLACEMENT
MILTON-MADISON BRIDGE REPLACEMENT Andy Barber P.E. Kevin Hetrick P.E. 1 Presentation Overview KYTC lead Environmental Study TIGER Grant INDOT lead Design Build solution Bridge Sliding Project Status Questions
More informationNew Haven-Hartford-Springfield High-Speed Intercity Passenger Rail Project
Annual Programmatic Agreement Report New Haven-Hartford-Springfield High-Speed Intercity Passenger Rail Project November 30, 2015 In accordance with the Programmatic Agreement Among the Federal Railroad
More informationIronton Russell Bridge Project
Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails
More informationReplacing the Aging US 52 Mississippi River Bridge
2019 TRANSPORTATION & HIGHWAY ENGINEERING CONFERENCE F. Duncan, PE, G. Hasbrouck, PE and A. Dour, PE Replacing the Aging US 52 Mississippi River Bridge February 26, 2019 Project Overview US 52 / IL 64
More informationPilot Program. A new arch span replaces a historic Iowa bridge and serves as a pilot for a statewide bridge performance-monitoring program.
A new arch span replaces a historic Iowa bridge and serves as a pilot for a statewide bridge performance-monitoring program. Pilot Program By Hussein Khalil, P.E., Aleksander Nelson, P.E., Ahmad Abu-Hawash,
More informationAMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY
More informationMAINTAINING CHARACTER, IMPROVING SAFETY OREGON S STEALTH RAIL PROGRAM
0 MAINTAINING CHARACTER, IMPROVING SAFETY OREGON S STEALTH RAIL PROGRAM Rebecca Burrow, PE Oregon Department of Transportation 00 Fairview Industrial Dr SE. MS # Salem, OR 0 Phone (0) -00; Fax (0) -0;
More informationCanadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION
Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION April 2016 ELLIS Engineering Inc. 214 Martindale Road, Suite 201 St. Catharines, Ontario L2S 0B2 www.ellis.on.ca
More informationREPAIR OF AN 80-YEAR- OLD DRY STACK WALL. Ryan Eaves, E.I.T. Bridge Division Geotechnical Branch
REPAIR OF AN 80-YEAR- OLD DRY STACK WALL Ryan Eaves, E.I.T. Bridge Division Geotechnical Branch October 2015 Project Location Located on Texas 290 90 miles southwest of San Angelo Remote area 10 miles
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights
More informationNorfolk Southern s Online Rebuild of the Coosa River Bridge
Norfolk Southern s Online Rebuild of the Coosa River Bridge Author: Harold Hal E. Lewis, PE, Vice President, HDR Engineering, Inc. 200 West Forsyth Street, Suite 800, Jacksonville, Florida 32202 Telephone:
More informationPARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS
PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for
More informationAccelerated Bridge Construction in USA
Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration
More informationGet In, Get Out, Stay Out!
Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration
More informationWinnipeg River Bridge on PR313 at Lac du Bonnet. June 2014
Winnipeg River Bridge on PR313 at Lac du Bonnet June 2014 Regional Context Local Area Purpose and Need The Winnipeg River Bridge on PR313 was originally constructed in 1930 as a trolley and vehicle bridge.
More informationDESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.
DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change
More informationBonner Bridge Replacement Update:
Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner
More informationSR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA
ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN
More informationSTRUCTURES INSPECTION CERTIFICATION TRAINING COURSE
STRUCTURES INSPECTION CERTIFICATION TRAINING COURSE Code Pre/Route AFE Function Part 0 1000 7116 1174 N Hadley Eisenbeisz Bridge Construction Engineer Rick Brandner Mitchell Area Darrell utter Assistant
More informationABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead
ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***
More informationREHABILITATION PACKAGE 4-a
4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.
More informationClear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School
Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation
More informationOHIO S CONCRETE BRIDGES
Ohio Fulton Road BRIDGE REPLACEMENT by Gregory Kronstain, Ohio Department of Transportation, John Dietrick, Michael Baker Jr. Inc., and Brendan Finn, Cuyahoga County Engineer s Office OHIO S CONCRETE BRIDGES
More informationPHASING CONSIDERATIONS FOR BRIDGES
PHASING CONSIDERATIONS FOR BRIDGES Christopher Miller, P.E. 6/11/18 Table of contents 1 What Not to Do 3 2 Span Arrangement 4-9 3 4 5 6 Superstructure Geometric Considerations Superstructure Structural
More informationCivil Engineering. Civil Engineering Civil engineering is considered to be the oldest field in engineering. still the same: Civil engineering is the.
Civil Engineering NAME: CLASS: Civil Engineering Civil engineering is considered to be the oldest field in engineering. Engineered structures have been found dating back thousands of years like the pyramids
More informationSAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House
SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention
More informationGet Involved Design Public Hearing
Get Involved Design Public Hearing VDOT representatives will review and evaluate Mail comments to Mr. Vicente Valeza at the address John G. Lewis Memorial Bridge any information received as a result of
More informationJeffrey D. Knueppel, P.E. General Manager. Robert L. Lund, Jr., P.E. Assistant General Manager EM&C
Accelerated Design-Build Replacement of SEPTA s Crum Creek Viaduct Jeffrey D. Knueppel, P.E. General Manager Robert L. Lund, Jr., P.E. Assistant General Manager EM&C Key Presentation Take-Aways NEED TO
More informationRt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening
Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction
More informationDESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD
2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location
More informationTilikum Crossing Transit Bridge. Portland, OR
Tilikum Crossing Transit Bridge Portland, OR Technical Information Size of Project: The Tilikum Crossing Transit Bridge is 1,720 ft. long and required 24,000 cy total concrete Strength Requirements: The
More informationMaclay Bridge Preservation Alternatives Analysis
Maclay Bridge Preservation Alternatives Analysis Bitterroot River W of Missoula BR 9032(65) UPN 6296000 August 30, 2018 Maclay Bridge Preservation Alternatives Analysis August 30, 2018 Table of Contents
More informationARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company
James P. Hyland Page 1 ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING Kansas City Terminal Railway Company James P. Hyland, P.E. Senior Bridge Engineer TranSystems Corporation James P. Hyland Page 2
More informationThe Chief Estimator Software. Item Cost Summary Bridge & Overpass Projects
The Chief Estimator Software Item Cost Summary Bridge & Overpass Projects Elevated Transit Guideways Precast Girder Elevated Guideway 10 Abutment Excavation & Backfill 1,500.00 m3 222 10,368 8,634 1,309
More informationDesign and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.
Design and Construction of the SH58 Ramp A Flyover Bridge over IH70 Gregg A. Reese, PE, CE, Summit Engineering Group, Inc., Littleton, CO ABSTRACT: The SH58 Ramp A bridge in Golden, CO is the latest on
More informationMICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA. Casey Garneau 1
MICROPILE FOUNDATIONS FOR RECONSTRUCTION OF HISTORIC LA LOMA BRIDGE IN PASADENA, CALIFORNIA ABSTRACT: Casey Garneau 1 The historic La Loma Bridge, which crosses the Arroyo Seco in Pasadena, California,
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017
AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.:
More informationDundas Street Crossing of Sixteen Mile Creek A Field Spliced, Post-tensioned Precast Concrete Girder Bridge
Dundas Street Crossing of Sixteen Mile Creek A Field Spliced, Post-tensioned Precast Concrete Girder Bridge Matthew Bowser, EIT, McCormick Rankin Corporation Scott Leitch, P.Eng., McCormick Rankin Corporation
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson
More informationWinona Bridge Work Package #6. Options Overview
Winona Bridge Work Package #6 Bridge No. 5900 (Existing Bridge) Approach Span Reconstructions Options Overview May 29, 2016 Background The scope of work on the Winona Bridge project consists of new Bridge
More informationSweet Creek Road Retaining Wall Replacement. Mapleton, OR
Sweet Creek Road Retaining Wall Replacement Mapleton, OR Technical Information Project Completion Date: April 30, 2013 Project Location: Mapleton, OR Size of Project: 15,000 SF, 870 CY Concrete Strength
More informationSR 7 Emergency Bridge Repairs During Design
2016 Purdue Road School March 9, 2016 SR 7 Emergency Bridge Repairs During Design SR 7 Emergency Bridge Repairs During Design Two SR 7 Bridge projects, both of which experienced failures during the design
More informationThe bridge over the Georges River at Alfords Point has been duplicated with a new incrementally launched bridge.
The Design and Construction of Alfords Point Bridge Mark Bennett, Senior Bridge Engineer (New Design) RTA Harry Cheung, Project Engineer, RTA Trung Doan Project Engineer, RTA Synopsis The bridge over the
More informationTable of Contents. ACKNOWLEDGEMENTS...ii LIST OF FIGURES...xii LIST OF TABLES...xv LIST OF SYMBOLS...xvi CHAPTER 1:ABOUT THIS STUDY...
ACKNOWLEDGEMENTS...ii LIST OF FIGURES...xii LIST OF TABLES...xv LIST OF SYMBOLS...xvi CHAPTER 1:ABOUT THIS STUDY... 1 1.1 THESIS STATEMENT... 1 1.2 INTRODUCTION... 1 1.3 RESEARCH OBJECTIVES... 3 1.4 RESEARCH
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications
More information2014 HDR, all rights reserved.
2014 HDR, all rights reserved. That s No Ordinary Bridge Ben Zeman, P.E. Lance Peterman, P.E.,S.E. Caahlen McAtee, P.E. 2014 HDR, all rights reserved. Presentation Outline Project Overview Design Behavior
More informationCity of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River
5525 Merle Hay Road Suite 200 Johnston, IA 50131 Main 515.278.2913 + Fax 515.278.1846 H R G R E E N. C O M City of Des Moines Activity ID: 01-2015-008 Bridge Rehabilitation: Court Avenue over the Des Moines
More informationAASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded
AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded MANAGEMENT Bridge Preservation 1) Will your state adopt the national MAP-21 bridge performance
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: VDOT Modifications to the AASHTO LRFD Bridge Design Specifications, 8 th
More informationRed Wing Bridge Alternates
Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for
More informationINSPECTION AND LOAD RATING OF P-T SEGMENTAL BRIDGES. Elias Ajami, PE Illinois Tollway Brett Sauter, PE, SE Ciorba Group
INSPECTION AND LOAD RATING OF P-T SEGMENTAL BRIDGES Elias Ajami, PE Illinois Tollway Brett Sauter, PE, SE Ciorba Group PRESENTATION SUMMARY 1. About the Illinois Tollway 2. Project Location and Information
More informationTraffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))
11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of
More informationChapter 4 Bridge Program Drawings
Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles
More informationDesign of the IL 127 Kaskaskia River Bridge Illinois Transportation and Highway Engineering Conference February 24, 2015 University of Illinois at
Design of the IL 127 Kaskaskia River Bridge February 24, 2015 University of Illinois at Urbana-Champaign Project Overview PTB 155, Item 58 Phase II Engineering Services IDOT District 8 Modjeski and Masters,
More informationSCHEME COMPARISONS OF NANPAN RIVER GRAND BRIDGE ON RAILWAY FROM YUNNAN TO GUANGXI
SCHEME COMPARISONS OF NANPAN RIVER GRAND BRIDGE ON RAILWAY FROM YUNNAN TO Xu Yong, Chen Kejian, Ren Wei, Hu Jintao, He Tingguo & You Lihui China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan
More informationCFRP Strengthening of KY 583 Over the Bluegrass Parkway Bridge in Hardin Country
Transportation Kentucky Transportation Center Research Report University of Kentucky Year 2017 CFRP Strengthening of KY 583 Over the Bluegrass Parkway Bridge in Hardin Country Abheetha Peiris Issam E.
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationKIEWIT FOUNDATIONS CO.
KIEWIT FOUNDATIONS CO. KIEWIT ADVANTAGE LOCAL CONTRACTOR, EXPANSIVE REACH With a strong local presence, access to a vast network of resources throughout North America and a focus on self-performing work,
More information3.6 Construction Methods
Exhibit 144: Birchmount Stop Layout West Don River Bridge - Girders are adequate to accommodate LRT right-of-way and required deck widening. Supplementary support or deck strengthening may be required
More informationMEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:
2001 North Main St, Ste 360, Walnut Creek, CA 94596 Ph: 925-944-5411 ; Fax: 925-944-4732 MEMORANDUM To: Ed Byrne From: Moffatt & Nichol Date: April 3, 2006 Subj: Wharf J-10 Evaluation of Structure for
More informationLearning Objectives. A Brief History
Slide 1 Precast Structures and Frames Miles L. Blackman, P.E. Slide 2 Learning Objectives Discuss precast concrete characteristics, advantages and benefits, typical construction methods and construction
More informationProject Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information
Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your
More informationThe New Jersey Historic Bridge Database
The New Jersey Historic Bridge Database Based on survey data and recommendations prepared by A.G. Lichtenstein & Associates, Inc. For The New Jersey Department of Transportation Bureau of Environmental
More informationUNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY
UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2441 CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY OCTOBER 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY
More informationJane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions
Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions Scott Eshleman, P.E., S.E, CVS, Stanley Consultants Keith Sargent, P.E., Thomas Engineering Group, LLC February
More informationSociety of Women Engineers Region H Conference
Society of Women Engineers Region H Conference Faith Duncan, PE & Greg Hasbrouck, PE Replacing the Aging US 52 Mississippi River Bridge February 27, 2016 Project Overview US 52 / IL 64 over the Mississippi
More informationABC Technology and Steel Bridges
ABC Technology and Steel Bridges Accelerated Bridge Construction (ABC) Technologies C. C. Fu, Ph.D., P.E. Director/Research Professor Bridge Engineering Software & Technology (BEST) Center Department of
More informationEconomical Design / Case Studies
Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of
More informationSpecification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010
Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications
More informationClinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting
Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process
More informationConstruction Report. Owner: City of Kissimmee. Project Manager: John Tulak. Prepared By: Infrastructure Engineers, Inc.
2014 Construction Report Fall Report Owner: City of Kissimmee Project Manager: John Tulak Prepared By: Infrastructure Engineers, Inc. Prime Contractor: Gibbs and Register, Inc. Engineer: VHB, Inc. 1 of
More informationThe Pattullo Bridge Emergency Repair. David Woolford, P.Eng., TransLink Darryl Matson, P.Eng., Buckland & Taylor Ltd.
The Pattullo Bridge Emergency Repair David Woolford, P.Eng., TransLink Darryl Matson, P.Eng., Buckland & Taylor Ltd. Paper prepared for presentation at the Bridges in a Climate of Change (B) Session of
More informationDeep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project
Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October
More informationCochran Mill Road Bridge over Tuscarora Creek
Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure
More informationIndiana ABC Experience
Introduction to the Milton-Madison Bridge Project Anne Rearick, PE INDOT Bridge Director Kevin Hetrick, PE INDOT Project Manager 10/14/2014 Slide 1 Indiana ABC Experience 2003 Bridge slide CSX RR over
More informationSHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015
SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER
More informationApril 19, 2017 Vicente Valeza, P.E. NOVA District Senior Structural Engineer (703)
UPC 110498 Rehabilitation of John G. Lewis Memorial Bridge on Route 673 (Featherbed Lane) over Catoctin Creek Loudoun County, VA 5th Stakeholder Meeting April 19, 2017 Vicente Valeza, P.E. NOVA District
More informationVirginia Concrete Conference March, Open Spandrel Concrete Arches New and Old
Virginia March, 2006 Open Spandrel Concrete Arches New and Old Introduction William M. (Bill) Davidge IV, P.E. Vice President - Wiley & Wilson, Inc. Education B.S. Civil Engineering - 1973 University of
More informationDESIGN, CONSTRUCTION AND STRUCTURAL HEALTH MONITORING OF A STEEL ARCH BRIDGE
DESIGN, CONSTRUCTION AND STRUCTURAL HEALTH MONITORING OF A STEEL ARCH BRIDGE HUSSEIN KHALIL, PE ALEKSANDER NELSON, PE AHMAD ABU-HAWASH BRENT PHARES, PHD TERRY WIPF, PHD BIOGRAPHY Hussein Khalil is a Vice
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More informationSOUTH MEDFORD INTERCHANGE BRIDGES
Eleven bridges were required for the project THe I-5 south medford Interchange by Keith Kaufman, Knife River Corporation Northwest and Daniel J. McIntier, formerly with H.W. Lochner Inc. Interstate 5 is
More informationFast Track Railway Bridge Design & Construction in Remote Location Lessons Learned in. Labrador
Fast Track Railway Bridge Design & Construction in Remote Location Lessons Learned in Labrador Christophe Deniaud, Ph.D., P.Eng. Lead Railway Bridge Engineer, AECOM 17007-107 Avenue Edmonton, Alberta,
More informationCOUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE. Conference Center at the Maritime Institute Anne Arundel County, Maryland
COUNTY ENGINEERS ASSOCIATION OF MARYLAND SPRING 2016 CONFERENCE Conference Center at the Maritime Institute Anne Arundel County, Maryland Thursday, April 28, 2016 Two bridges in Two Months - Accelerated
More informationCONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017
AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074
More informationS.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017
S.P. 2710-47 TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017 Outline o o o o o o o o o o Introductions Disclaimers Ground Rules Project Overview Consultant Contracts CMGC RFP
More informationSchnabel Foundation Company
Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.
More information