1 APPENDIX G SUMMARY SHEETS OF EMERGING TECHNOLOGY AND DEFORMABLE ELEMENT CONNECTIONS
2
3 NCHRP Connection Evaluations Appendix G G-1 APPENDIX G SUMMARY SHEETS OF EMERGING TECHNOLOGY AND DEFORMABLE ELEMENT CONNECTIONS
4 NCHRP Connection Evaluations Appendix G G-2 Location: Foundation to column Type: Special: Precast segmental column, unbonded PT, mild steel, Title: Connection S-1 elastomeric bearing pad, DE and ED Elastomeric Bearing TRL: Maximum TRL: 6 Source: University of Nevada - Reno TRL Gaps: Levels 3
5 NCHRP Connection Evaluations Appendix G G-3 BACKGROUND Title: Connection S-1 (Elastomeric Bearing) History / Description: An elastomeric bearing pad assembly is cast into footing, using studs. The first column segment is cast in place. Subsequent column segments are precast, stacked on top of one another, and connected with an unbonded PT bar. Seismic performance tested at University of Nevada Reno in shake table tests. References: Motaref et al. (Accepted for publication) Contact Information: Prof. Mehdi Saiidi (University of Nevada Reno) saiidi@unr.edu EVALUATION Constructability: Risk Value: -2 Seismic Performance: Value: +2 Inspectability: Durability: Elastomeric bearing pad assembly needs to be cast into footing and first column segment. Needs to be located accurately and supported rigidly during footing pour. Many extra construction steps compared with CIP Bearing assembly adds to cost. Practical field details for PT anchorage at base of column need to be developed. Erection sequence poses difficulties: either the precast segments must be lowered over the PT bar(s), the PT bar(s) must be threaded blind after segment installation, or a coupler must be used at each interface. The bearing assembly is a critical component. Replacement appears difficult. Energy dissipation, shared by elastomer and mild steel, was comparable to plastic hinge zone with only mild steel and concrete. Lower initial stiffness than conventional CIP concrete column. Low damage in plastic hinge region. Achieved high drift levels with low residual drift. No reinforcement is provided between upper column segments, so segments are held together solely by the clamping force of the PT. Difficult to inspect PT anchors after an earthquake. Inspection and repair of bars passing through bearing would be difficult. PT tendon introduces possibility of corrosion. Time Saving Potential: The many additional steps would slow down construction. Value: -2 TRL Comments: Most experience with high deformations in bearings occurs with isolation bearings in shear. Here the bearings are subjected to rotations. Additional Comments: Specimens with different natural periods were compared on shake table
6 NCHRP Connection Evaluations Appendix G G-4 Location: Foundation to column Type: Special: Precast segmental column with shape memory alloy ED bars Title: Connection S-2 ED and DE Shape Memory Alloy Bars TRL: Maximum TRL: 4 Source: State University of New York - Buffalo TRL Gaps: Level 3
7 NCHRP Connection Evaluations Appendix G G-5 BACKGROUND Title: Connection S-2 (Shape Memory Alloy Bars) History / Description: PT tendons and T-threaded studs for SMA bars are cast into footing. The first column segment placed on the footing. Unbonded SMA bars are screwed into the T-threaded studs in the footing and anchored with a nut to the top of the first segment. Subsequent column segments are placed and clamped to the previous. Analytical testing performed at SUNY Buffalo. References: Roh and Reinhorn (2010) Contact Information: Prof. Andrei Reinhorn (SUNY Buffalo) reinhorn@buffalo.edu EVALUATION Constructability: Risk Value: -2 Seismic Performance: Value: +1 Difficult mechanical connection for SMA bars if they are to be spliced to conventional steel screw lock couplers are an option (see Alam et al. 2008). Need to use a template to align T-thread studs in footing with bar anchorages at top of first segment. Segment clamping mechanism and force transfer is unclear. Practical field details for PT anchorage at base of column need to be developed. Erection sequence poses difficulties: either the precast segments must be lowered over the PT bar(s), the PT bar(s) must be threaded blind after segment installation, or a coupler must be used at each interface. (Estimated) Seismic damage minimized by rounding corners at column base. Segmental column with rigid links concentrates rotation and energy dissipation at base. SMA bars dissipate energy with low residual strains (superelasticity). Energy dissipation is less than conventionally reinforced column. Needs physical testing only studied analytically. Inspectability: Engagement of PT bar nuts/couplers might be difficult to inspect. Durability: Time Saving Potential: Value: -2 Potential water infiltration at clamped joints. Corrosion protection system for PT cables unclear. SMA bars have high corrosion resistance. Many extra pieces to connect (clamp joints, SMA bars, PT). Accurate alignment needed. TRL Comments: SMA is a relatively new and expensive material in earthquake engineering. Additional Comments: Are the #11 bars in the upper segments to be developed to the SMA bars?
SUMMARY SHEETS OF HYBRID CONNECTIONS
APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-1 APPENDIX E SUMMARY SHEETS OF HYBRID CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix E E-2 Location:
More informationUnbonded Prestressed Columns for Earthquake Resistance
NDOT Research Report Report No. 32-1-83 Unbonded Prestressed Columns for Earthquake Resistance May 212 Nevada Department of Transportation 1263 South Stewart Street Carson City, NV 89712 Disclaimer This
More informationSUMMARY SHEETS OF GROUTED DUCT CONNECTIONS
APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix B B-1 APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix
More informationWhy high seismic zone matters?
Emerging ABC Connection Details for High Seismic Areas Performance and Design of Mechanical Splices (Couplers) M. Saiidi, M. Tazarv, S. Varela, & B. Nakashoji Department of Civil and Environmental Engineering
More informationAccelerated Bridge Construction Developments on the Earthquake Frontier
Accelerated Bridge Construction Developments on the Earthquake Frontier John Stanton University of Washington AASHTO SCOBS meeting Spokane WA, 12 June 2017 Outline ABC in Seismic Regions What are the challenges?
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT Oct. 1, 2015 to December 31, 2015 Period Submitted by M. Saiidi, A. Itani, and A. Mohebbi Department of Civil and Environmental Engineering
More informationSUMMARY SHEETS OF INTEGRAL CONNECTIONS
APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-1 APPENDIX F SUMMARY SHEETS OF INTEGRAL CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix F F-2
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square
More informationSmart materials for accelerated bridge construction in high seismic zones
Smart materials for accelerated bridge construction in high seismic zones M. Saiid Saiidi 1, Sebastian Varela 2, and Mostafa Tazarv 3 1 Professor, Dept. of Civil and Environmental Engineering, University
More informationAnalysis, Design, and Construction of SMA-Reinforced FRP- Confined Concrete Columns
Analysis, Design, and Construction of SMA-Reinforced FRP- Confined Concrete Columns Mostafa Tazarv 1 and M. Saiid Saiidi 2 1 Assistant Professor, Dept. of Civil and Env. Eng., South Dakota State University,
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationPRECAST CONCRETE CONNECTIONS FOR ACCELERATED BRIDGE CONSTRUCTION IN REGIONS OF HIGH SEISMICITY
PRECAST CONCRETE CONNECTIONS FOR ACCELERATED BRIDGE CONSTRUCTION IN REGIONS OF HIGH SEISMICITY SAM WHITE 1, MUSTAFA MASHAL 2, ALESSANDRO PALERMO 2 1 Opus International Consultants, formerly College of
More informationSeismic. Department University
Seismic Performance of Next t Generation Bridge Components for Accelerat ted Bridge Construction (ABC) TEST MODEL: Headedd Couplerr No Pedestal (HCNP) Graduate Assistant: Zachary B. Haber, PhD Student
More informationChapter 2 Notation and Terminology
Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention
More informationApplication of Shape Memory Alloy to Seismic Design of Multi-column Bridge Bents Using Controlled Rocking Approach
Application of Shape Memory Alloy to Seismic Design of Multi-column Bridge Bents Using Controlled Rocking Approach R. Davoudi, M. Khanmohammadi, M. Ghassemieh & S. Rafiee School of Civil Engineering, University
More informationTRANSPORTATION RESEARCH BOARD. Seismic Design and Accelerated Bridge Construction. Wednesday, July 11, :00-4:00 PM ET
TRANSPORTATION RESEARCH BOARD Seismic Design and Accelerated Bridge Construction Wednesday, July 11, 2018 2:00-4:00 PM ET The Transportation Research Board has met the standards and requirements of the
More informationProject Title: Mechanical Bar Splices for Accelerated Bridge Construction of Columns
MPC-511 May 5, 2016 Project Title: Mechanical Bar Splices for Accelerated Bridge Construction of Columns University: Principal Investigators: PI: Mostafa Tazarv, PhD Assistant Professor Department of Civil
More informationSummary of Comments on Dissertation-Sarira.pdf
Abstract Precast construction systems are an excellent alternative for accelerated bridge construction in congested areas and environmentally sensitive regions because y minimize traffic delays and construction
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationIn-plane testing of precast concrete wall panels with grouted sleeve
In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT January 1, 2017 to March 31, 2017 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square
More informationAnalytical Investigations and Design Implications of Seismic Response of a 2-Span ABC Bridge System
Analytical Investigations and Design Implications of Seismic Response of a 2-Span ABC Bridge System Quarterly Progress Report For the period ending February 28, 2018 Submitted by: PI- M. Saiidi and A.
More informationControlled damage precast connections for Accelerated Bridge Construction in regions of high seismicity
Controlled damage precast connections for Accelerated Bridge Construction in regions of high seismicity S. White & A. Palermo Department of Civil and Natural Resources Engineering, University of Canterbury,
More informationPRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION
PRELIMANARY INVESTIGATION OF SMA-BASED RECENTERING BEAM- COLUMN CONNECTION M.S. Speicher 1, R. DesRoches 2, and R.T. Leon 3 1 Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Georgia Institute
More informationPRECAST CONCRETE CONNECTIONS - US PRACTICE
PRECAST CONCRETE CONNECTIONS - US PRACTICE Larbi Sennour, PhD, SE President Consulting Engineers Group, Inc. SPEAKERS Precast Connections 3 General Types Wet Connections Semi Dry Dry Wet System - Definition
More informationCyclic Tests on Prefabricated Bridge Piers
Cyclic Tests on Prefabricated Bridge Piers *Chang-Su Shim 1), Sang-Yong Lee 2), Sung-Jun Park 2), and Chandara Koem 2) 1), 2) Department of Civil Engineering, Chung-Ang University, Seoul 156-756, Korea
More informationSEISMIC DESIGN OF PRECAST PIERS WITH POCKET CONNECTIONS, CFRP TENDONS AND ECC/UHPC COLUMNS
International Journal of Bridge Engineering (IJBE), Special Issue 2017, pp. 99-123 SEISMIC DESIGN OF PRECAST PIERS WITH POCKET CONNECTIONS, CFRP TENDONS AND ECC/UHPC COLUMNS Alireza Mohebbi 1, M. Saiid
More informationTECHNICAL MANUAL. Bolted Column Connection (for Seismic applications) Seismic-proof Application of Bolted Connections
TECHNICAL MANUAL Bolted Column Connection (for Seismic applications) Seismic-proof Application of Bolted Connections Version: PEIKKO GROUP 09/2016 Bolted Column Connection For seismic applications Ductile
More informationDamage Mitigation in Reinforced Concrete Shear Walls Detailed with SMA and SFRC
Proceedings of the 3 rd International Conference on Civil, Structural and Transportation Engineering (ICCSTE'18) Niagara Falls, Canada June 10 12, 2018 Paper No. 103 DOI: 10.11159/iccste18.103 Damage Mitigation
More informationEquivalent viscous damping of SMA bar connectors in post-tensioned segmental bridge Piers
Equivalent viscous damping of SM bar connectors in post-tensioned segmental bridge Piers H. Roh and J.S. Lee Hanyang University, Korea.M. Reinhorn University at uffalo-the State University of New York,
More informationEXPERIMENTAL TESTING OF EMULATIVE FULLY PRECAST CONCRETE BRIDGE BENT IN SEISMIC REGIONS
EXPERIMENTAL TESTING OF EMULATIVE FULLY PRECAST CONCRETE BRIDGE BENT IN SEISMIC REGIONS Mustafa Mashal 1, Alessandro Palermo 2 ABSTRACT: Concrete bridge bent also known as multi-column pier support is
More informationQUASI-STATIC CYCLIC TESTS OF HALF-SCALE FULLY PRECAST BRIDGE BENTS INCORPORATING EMULATIVE AND POST- TENSIONED LOW DAMAGE SOLUTIONS
QUASI-STATIC CYCLIC TESTS OF HALF-SCALE FULLY PRECAST BRIDGE BENTS INCORPORATING EMULATIVE AND POST- TENSIONED LOW DAMAGE SOLUTIONS Mustafa MASHAL 1, Alessandro PALERMO 2, and Zeinab CHEGINI 3 ABSTRACT
More informationSelf-Centering Bridge Piers with Structural Fuses
Self-Centering Bridge Piers with Structural Fuses Mark C. Currie Department of Civil, Construction, and Environmental Engineering Iowa State University 176 Town Engineering Ames, IA 511 mcurrie@iastate.edu
More informationTESTS ON A POST TENSIONED MOMENT RESISTING CONNECTION FOR PRECAST CONCRETE STRUCTURES
TESTS ON A POST TENSIONED MOMENT RESISTING CONNECTION FOR PRECAST CONCRETE STRUCTURES Tuğrul Tankut, Uğur Ersoy, Seval Pınarbaşı Middle East Technical University Ersin Arıoğlu, Ezel Özdil, Müfit Yorulmaz
More informationIntroductory Chapter
Introductory Chapter Asian Concrete Model Code 2014, Introductory Chapter TABLE OF CONTENTS DEFINITIONS...3 1 INTRODUCTION... 8 1.1 SCOPE... 8 1.2 DOCUMENT ORGANISATION... 8 1.3 GENERAL PRINCIPLES... 8
More informationPrecast Columns with Mechanically Spliced Connections for Accelerated Bridge Construction in Seismic Zones. Zachary B. Haber 1
Precast Columns with Mechanically Spliced Connections for Accelerated Bridge Construction in Seismic Zones Abstract Zachary B. Haber 1 In recent years, a number of laboratory and analytical studies have
More informationSeismic. L: Grouted. Department University
eismic Performance of Next t Generation Bridge Components for Accelerat ted Bridge Construction (ABC) TET MODEL L: Grouted Couplerr No Pedestal (GCNP) Graduate Assistant: Zachary B. Haber, PhD tudent P.
More informationBS EN :2004 EN :2004 (E)
Contents List 1. General 1.1 Scope 1.1.1 Scope of Eurocode 2 1.1.2 Scope of Part 1-1 of Eurocode 2 1.2 Normative references 1.2.1 General reference standards 1.2.2 Other reference standards 1.3 Assumptions
More informationQuasi-static cyclic tests of Emulative Precast Segmental Bridge Piers (E-PSBP)
Quasi-static cyclic tests of Emulative Precast Segmental Bridge Piers (E-PSBP) M. Mashal, S. White, & A. Palermo Department of Civil and Natural Resources Engineering, University of Canterbury, Christchurch.
More informationRetrofit Measures for Superstructures, Bearings, and Seats
Retrofit Measures for Superstructures, Bearings, and Seats Presented by Richard V Nutt Elements to be Retrofitted Bridge Decks and Girders Bearings, Anchorages and Pedestals Expansion Joints 1 Elements
More informationLarge-scale Cyclic Loading Test on a Multi-Spiral Stirrup Bridge Pier Constructed by Automated Method
Large-scale Cyclic Loading Test on a Multi-Spiral Stirrup Bridge Pier Constructed by Automated Method H.H. Hung & P.H. Wang National Center for Research on Earthquake Engineering, Taipei, Taiwan Y.L. Yin
More informationComparison of performance of shape memory alloy reinforced bridge piers with conventional bridge piers using incremental dynamic analysis
Southern Cross University epublications@scu 23rd Australasian Conference on the Mechanics of Structures and Materials 2014 Comparison of performance of shape memory alloy reinforced bridge piers with conventional
More informationTECHNICAL MANUAL. HPKM Column Shoe Reliable Bolted Column Connections. Version: PEIKKO GROUP ACI-M 01/2017 Designed according to ACI 318M-11
TECHNICAL MANUAL Column Shoe Reliable Bolted Column Connections Version: PEIKKO GROUP -M 01/2017 Designed according to 318M-11 Column Shoe For bolted column connections Full-Scale tested & approved connection
More informationHYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS
HYBRID MOMENT FRAMES AND UNBONDED PT SHEAR WALLS Opportunities Resulting From Recent ACI 318 Code Changes and the Work of ACI ITG s 1 and 5 Neil M. Hawkins, Professor Emeritus, University of Illinois PTI
More informationQuasi-static cyclic testing of half-scale fully precast bridge substructure system in high seismicity
Quasi-static cyclic testing of half-scale fully precast bridge substructure system in high seismicity M. Mashal & A. Palermo Department of Civil and Natural Resources Engineering, University of Canterbury,
More informationLRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1
LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,
More informationEXPERIMENTAL INVESTIGATION OF INNOVATIVE BRIDGE COLUMNS FOR A RESILIENT BRIDGE INFRASTRUCTURE. Bora Gencturk 1, Farshid Hosseini 2
EXPERIMENTAL INVESTIGATION OF INNOVATIVE BRIDGE COLUMNS FOR A RESILIENT BRIDGE INFRASTRUCTURE Abstract Bora Gencturk 1, Farshid Hosseini The ductile behavior of engineered cementitious composites (ECC),
More informationPrecast concrete is significantly being used in earthquake
Structural Connections for Precast Concrete Buildings - Review of Seismic and Other Design Provisions in Various International Codes - An Overview 1 2 C.A Prasad 1, Pavan Patchigolla 2 1 Director, METEY
More informationTAB.3 13 Post Tensioning Terminology (PTT)
TAB.3 13 Post Tensioning Terminology (PTT) PTI Technicical Advisory Board Page 0 of 34 The following Post-Tensioning Terminology (PTT) document contains the consensus definitions for terms relating to
More informationSeismic Low Damage Technologies for Bridges in New Zealand
Seismic Low Damage Technologies for Bridges in New Zealand From Research to Practice Sam White Opus International Consultants Peter Routledge Opus International Consultants Alessandro Palermo University
More informationTECHNICAL MANUAL. HPKM Column Shoe. Reliable Bolted Column Connections
TECHNICAL MANUAL Column Shoe Reliable Bolted Column Connections Version: PEIKKO GROUP 05/2014 Column Shoe For bolted column connections System benefits The stiff ness of Peikko s column connection is verifi
More informationLARGE-SCALE TESTING OF LOW-DAMAGE SUPERSTRUCTURE CONNECTIONS IN PRECAST BRIDGES Z CHEGINI 1 ; A PALERMO 1
LARGE-SCALE TESTING OF LOW-DAMAGE SUPERSTRUCTURE CONNECTIONS IN PRECAST BRIDGES Z CHEGINI 1 ; A PALERMO 1 1 Department of Civil and Natural Resources Engineering, University of Canterbury, NZ SUMMARY Prefabrication
More informationSHAKE TABLE EXPERIMENTS OF PRECAST, PRETENSIONED BRIDGE
SHAKE TABLE EXPERIMENTS OF PRECAST, PRETENSIONED BRIDGE Abstract Islam Mantawy 1, Travis Thonstad 2, David Sanders 3, John Stanton 4 and Marc Eberhard 4 This paper describes the verification by shake-table
More informationInternational Workshop SMART MATERIALS AND STRUCTURES
Cansmart 2008 International Workshop SMART MATERIALS AND STRUCTURES 23-24 October 2008, Montreal, Quebec, Canada EXPERIMENTAL INVESTIGATION ON THE SEISMIC PERFORMANCE OF SMA-FRP RC SMART BEAM-COLUMN JOINT
More informationFlorida DOT efforts toward improving Post Tension Durability
Florida DOT efforts toward improving Post Tension Durability By William Nickas 1 (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHTS RESERVED Page 1 of 73 Post-Tensioning Strategies Enhanced PT Systems
More informationNCHRP Project Michael Culmo, PE CME Associates, Inc.
NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT
More informationDESIGN AND CONSTRUCTION OF BRIDGE COLUMNS INCORPORATING MECHANICAL BAR SPLICES IN PLASTIC HINGE ZONES
Report No. CCEER 5-07 DESIGN AND CONSTRUCTION OF BRIDGE COLUMNS INCORPORATING MECHANICAL BAR SPLICES IN PLASTIC HINGE ZONES Mostafa Tazarv M. Saiid Saiidi A report submitted to the Accelerated Bridge Construction
More informationBridge PBEE Overview & Pilot Next Generation Bridge Studies
Bridge PBEE Overview & Pilot Next Generation Bridge Studies Kevin Mackie Central Florida BozidarStojadinovic UC Berkeley AdyAviram UC Berkeley PEER Annual Meeting San Francisco, CA 2009/10/15 Next Generation
More informationMATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1210 NOVEMBER 2016 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.04
More informationABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017
ABC-UTC Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC ABSTRACT March, 2017 Accelerated Bridge Construction (ABC) is a method of bridge construction designed
More informationSouthern Cross Hospitals Ltd Endoscopy Consultants PRESSS Building
ENG.HAV.0001.1 Southern Cross Hospitals Ltd Endoscopy Consultants PRESSS Building Gary Haverland BE (Civil)(Hons) Director / Senior Engineer Structex, Christchurch ENG.HAV.0001.2 ENG.HAV.0001.3 ENG.HAV.0001.4
More informationStudy on Seismic Performance of Damage-Protected Precast Frame
6 th International Conference on Advances in Experimental Structural Engineering 11 th International Workshop on Advanced Smart Materials and Smart Structures Technology August 1-2, 2015, University of
More informationLarge-scale testing of low-damage superstructure connections in precast bridges
Proceedings of the Tenth Pacific Conference on Earthquake Engineering Building an Earthquake-Resilient Pacific 6-8 November 2015, Sydney, Australia Large-scale testing of low-damage superstructure connections
More informationLATERAL LOAD BEHAVIOR OF UNBONDED POST-TENSIONED HYBRID COUPLED WALLS. Qiang SHEN Graduate Research Assistant. Yahya C. KURAMA Assistant Professor
LATERAL LOAD BEHAVIOR OF UNBONDED POST-TENSIONED HYBRID COUPLED WALLS Qiang SHEN Graduate Research Assistant Yahya C. KURAMA Assistant Professor University of Notre Dame, Civil Engineering and Geological
More informationSHAKE TABLE TESTS OF RC FRAME WITH SHAPE MEMORY ALLOY BRACING BARS
4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Paper No. 90 SHAKE TABLE TESTS OF RC FRAME WITH SHAPE MEMORY ALLOY BRACING BARS Wen-I Liao 1 and Y. L. Mo 2 ABSTRACT
More informationMATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 1210 NOVEMBER 2014 MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS 1210.04
More informationHybrid System Using Precast Prestressed Frame with Corrugated Steel Panel Damper
Journal of Advanced Concrete Technology Vol. 7, No. 3, 297-36, October 29 / Copyright 29 Japan Concrete Institute 297 Scientific paper Hybrid System Using Precast Prestressed Frame with Corrugated Steel
More informationBasic quantities of earthquake engineering. Strength Stiffness - Ductility
Basic quantities of earthquake engineering Strength Stiffness - Ductility 1 Stength is the ability to withstand applied forces. For example a concrete element is weak in tension but strong in compression.
More informationPRECAST PRESTRESSED PORTAL FRAMES WITH CORRUGATED STEEL PANEL DAMPERS
PRECAST PRESTRESSED PORTAL FRAMES WITH CORRUGATED STEEL PANEL DAMPERS Yuki TANAKA 1, Yukako ICHIOKA 2, Susumu KONO 3, Yoshihiro OHTA 4 and Fumio WATANABE 5 1 Graduate Student, Dept. of Architecture and
More informationDevelopment and Seismic Evaluation of Pier Systems w/pocket Connections and Advanced Materials in Plastic Hinges
Development and Seismic Evaluation of Pier Systems w/pocket Connections and Advanced Materials in Plastic Hinges Test Model: Precast square columns with UHPC and ECC in plastic hinge zone and pocket connection
More informationCONTENT. Introduction to Self-Centering Earthquake Resisting Systems. Andre Filiatrault, Ph.D., Eng. 1. Introduction
Introduction to Self-Centering Earthquake Resisting Systems Andre Filiatrault, Ph.D., Eng. 1 CONTENT 1. Introduction 2. Behavior of Self-centering Systems 3. Dynamic Response of MDOF Self-centering Systems
More informationPOST-TENSIONED CONNECTION SYSTEMS FOR SEISMIC-RESISTANT STEEL FRAMES
POST-TENSIONED CONNECTION SYSTEMS FOR SEISMIC-RESISTANT STEEL FRAMES A.. Introduction The failure of welded connections in steel moment frames during recent earthquakes has led to a renewed interest in
More informationSpecial Provision No. 109S17 June 2017
AMENDMENT TO OPSS 905, NOVEMBER 2014 Special Provision No. 109S17 June 2017 OPSS 905, November 2014 Construction Specification for Steel Reinforcement for Concrete is deleted in its entirety and replaced
More informationACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE FROM RESEARCH TO PRACTICE
ACCELERATED BRIDGE CONSTRUCTION IN WASHINGTON STATE FROM RESEARCH TO PRACTICE by Bijan Khaleghi 1, Eric Schultz 2, Stephen Seguirant 3, Lee Marsh 4, Marc Eberhard 5 and John Stanton 5. ABSTRACT The Federal
More informationDESIGN OF SELF-CENTERING MOMENT RESISTING FRAME AND EXPERIMENTAL LOADING SYSTEM
DESIGN OF SELF-CENTERING MOMENT RESISTING FRAME AND EXPERIMENTAL LOADING SYSTEM 1. Abstract Scott Swensen The University of Utah REU Institution: Lehigh University REU Advisors: Dr. Richard Sause and Dr.
More informationMATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 1210 NOVEMBER 2014 MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS 1210.04
More informationBehavior of Segmental Precast Post-Tensioned Bridge Pier
IJIRST International Journal for Innovative Research in Science & Technology Volume 2 Issue 11 April 2016 ISSN (online): 2349-6010 Behavior of Segmental Precast Post-Tensioned Bridge Pier Sachin V Ingalkar
More informationHISTORICAL REVIEW OF MASONRY STANDARDS IN NEW ZEALAND
New Zealand Masonry Standards Page 1 HISTORICAL REVIEW OF MASONRY STANDARDS IN NEW ZEALAND Prepared by Peter C Smith and Jonathan W Devine of Spencer Holmes Ltd for the ROYAL COMMISSION OF INQUIRY BUILDING
More informationFeasibility and Detailing of Post-tensioned Timber Buildings for Seismic Areas
Feasibility and Detailing of Post-tensioned Timber Buildings for Seismic Areas T. Smith, S. Pampanin, A. Buchanan, M. Fragiacomo, University of Canterbury, Christchurch, New Zealand. 2008 NZSEE Conference
More informationA precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability
A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability John Stanton Marc Eberhard University of Washington PCI Fall Convention 15 Sept 2009, San Antonio, TX.
More informationCONTENT. Self-Centering Earthquake Resisting Systems. Andre Filiatrault, Ph.D., Eng. 1. Introduction
Self-Centering Earthquake Resisting Systems Andre Filiatrault, Ph.D., Eng. 1 CONTENT 1. Introduction 2. Behaviour of Self-centering Systems 3. Dynamic Response of MDOF Self-centering Systems 4. Ancient
More informationMATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1210 NOVEMBER 2008 MATERIAL SPECIFICATION FOR DECK JOINT ASSEMBLIES TABLE OF CONTENTS 1210.01 SCOPE 1210.02 REFERENCES 1210.03 DEFINITIONS 1210.04
More informationCONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS
October 12-17, 28, Beijing, China CONTINUITY OF PRECAST BRIDGE U-GIRDERS CONNECTED TO A CAST-IN-PLACE SUBSTRUCTURE SUBJECTED TO SEISMIC LOADS K.L. Almer 1 and D.H.Sanders 2 1 Graduate Research Assistant,
More informationRESILIENT INFRASTRUCTURE June 1 4, 2016
RESILIENT INFRASTRUCTURE June 1 4, 2016 PERFORMANCE ASSESSMENT OF THREE-STORY SHAPE MEMORY ALLOY REINFORCED CONCRETE WALLS Emad A. Abraik Ph.D. Candidate, Western University, Canada Maged A. Youssef Professor,
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationModelling of post-tensioned precast reinforced concrete frame structures with rocking beam-column connections
Modelling of post-tensioned precast reinforced concrete frame structures with rocking beam-column connections H.A. Spieth, A.J. Carr, A.G. Murahidy, D. Arnolds, M. Davies, J.B. Mander University of Canterbury,
More informationSUNSHINE SKYWAY BRIDGE
SUNSHINE SKYWAY BRIDGE Retrofit of the Post-Tensioned Precast Transition Pier Columns on the Sunshine Skyway Bridge Presented by: Antonio Ledesma, P.E. May 7, 2012 SUNSHINE SKYWAY BRIDGE, FLORIDA Presentation
More informationA PRE-TENSIONED, ROCKING BRIDGE BENT FOR ABC IN SEISMIC REGIONS.
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska A PRE-TENSIONED, ROCKING BRIDGE BENT FOR ABC IN SEISMIC REGIONS. John
More informationExperimental study on bending behavior of prefabricated dry connection wall
Experimental study on bending behavior of prefabricated dry connection wall *Xiang-Guo Wu 1) and Xinlei Xia 2) 1),2) Key Lab of Structures Dynamic Behavior and Control of the Ministry of Education, Harbin
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel
More informationSimplicity of design Ease of precasting Speed of erection BOLTED COLUMN CONNECTIONS
Simplicity of design Ease of precasting Speed of erection CONNECTIONS ALL PRECAST FRAME CONNECTIONS FROM PEIKKO WHAT IS A CONNECTION? TO SHOE ANCHOR BOLT TO BEAM A BOLTED CONNECTION consists of column
More informationDIVISION: CONCRETE SECTION: POST-TENSIONED CONCRETE REPORT HOLDER: GENERAL TECHNOLOGIES, INC.
0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-2515 Reissued 02/2016 This report is subject to renewal 02/2018. DIVISION: 03 00
More informationCONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS
More informationECONOMICAL DESIGN OF EARTHQUAKE-RESISTANT BRIDGES
ISET Journal of Earthquake Technology, Paper No. 453, Vol. 42, No. 1, March 2005, pp. 13-20 25th ISET Annual Lecture ECONOMICAL DESIGN OF EARTHQUAKE-RESISTANT BRIDGES Mahesh Tandon Tandon Consultants Pvt.
More informationDEVELOPMENT OF ACCELERATED BRIDGE CONSTRUCTION DETAIL FOR SEISMIC REGIONS. W. Phillip Yen 1 and Amjad Aref 2
DEVELOPMENT OF ACCELERATED BRIDGE CONSTRUCTION DETAIL FOR SEISMIC REGIONS Abstract W. Phillip Yen 1 and Amjad Aref 2 This paper provides an overview of current research in development of the seismic detailing
More informationDESIGN AND CONSTRUCTION OF HEAVY INDUSTRIAL ANCHORAGE FOR POWER-PLANTS
DESIGN AND CONSTRUCTION OF HEAVY INDUSTRIAL ANCHORAGE FOR POWER-PLANTS Peter J. Carrato, William F. Brittle Bechtel Power Corporation, USA Abstract Fossil fueled power-plant projects provide many design
More informationSelf-centering bridge pier columns with structural fuses