1 FIELD FURNACE REFRACTORIES Pty Ltd. 8 Arnott Place Wetherill Park NSW 2164 Phone: Fax: One Meter Internal Dome Oven AVERAGE GUIDE Quantity Description Unit price Total 192 Tapered Half brick $2.40 $ Fire brick. 230 x 115 x 75mm $3.65 $ Floor tile 50 x 300 x 300mm $16.40 $ High temperature mortar. 25kg bag $46.00 $ Insulation brick (I.F.B) 230 x 230 x 60mm $5.50 $ Ceramic fibre roll 25 x 600 x7200mm 128kg/m3. $ $ Door Arch Brick 230 x 115 x 75/63mm $4.65 $ Door arch brick 230 x 115 x 75/51mm. $4.65 $ Flue arch brick 345 x 115 x 75/51mm. $6.65 $ Flue arch brick 345 x 115 x 75/63mm $6.65 $ Flue brick 345x 115x 75mm $6.65 $ Pallet charge (Refundable on return) $33.00 $33.00 EXTRAS 1 Chimney cap 300 x 300 x 40mm $12.80 $ Hollow Chimney Blocks 240 x 240 x 150mm $16.50 $ Stainless steel ash rake $79.90 $ o C Thermometer (Dial or T-Gun) $72.60 $ Pizza oven 3 piece set + Wall bracket $ $ (Large peel, turning peel and brass brush) 1 Oven door $ BASIC $ COMPLETE $
2 PRODUCT INFORMATION When using high temperature mortar, mix with water only to a trowel able consistency. Soak each brick in water for 10 minutes minimum as this gives a better bond with the mortar. When using ceramic fibre ware long sleeves and a mask in case of allergies or irritation. The render on top of the ceramic fibre blanket should be 20-30mm or thicker to have sufficient strength. Use wire mesh for reinforcing. FORMULA TO BUILD A DOME OVEN All ovens from 1meter to 2meters should never be higher than 540mm from cooking surface. Ovens under 1meter internal should be half their width in height. The door height should be 63% of the ovens height (this is just a guide). WAYS FOR BUILDING A DOME OVEN A wooden template which can be moved around gradually as the dome is created. A 50mm piece of conduit which is secured to the centre of where the oven will sit. Every brick that is laid must touch the end of conduit. By using this method you can create a near perfect dome. The length of the conduit is determined by the size of oven you wish to build e.g., to build a one metre internal oven the conduit must be 500mm long (half the width). TIPS To build a dome oven cut your bricks in half then by having a very thin joint on the inside and opening the joints up at the back, you can create a dome effect. To speed up the heating and slow down the cooling of the oven, cover the dome with ceramic fibre 75mm thick. This prevents massive heat loss, in turn allowing the oven to heat up quicker and stay hot for longer. Building the oven on top of insulation fire brick (I.F.B) also makes the oven more efficient and prevents damage to the concrete slab (cracking and spalling). The flue is placed in front of the oven door, drawing the smoke away from your face. When the oven door is placed up against the door arch sealing the main chamber, this create maximum heat storage with the only loss of heat through the steel plate door (4-6mm preferably). Floor tiles should be placed inside loose so over time with wear and tear, any cracked or broken tiles may be replaced. Ash after a few uses will fill any gaps and act as an expansion joint.
3 This base is a 20mm cement sheet with 2 layers of 75mm Hebel, glued together with Hebel glue. The size of the base is 1500mm in width and 1800mm in length. You may also use a concrete slab 100mm thick minimum. Lay the internal insulation brick in position, note these are not glued or fix into position. Cut and lay the floor tiles on top of the insulation brick When in position grind any high lips down leaving a smooth joint, this will stop the peel catching on any tiles. Your ready to position the door arch template and lay the first corse of insulation brick in the dome.
4 If you build the door arch first it s always good to lay 3 or 4 course s either side for support. By using a length of conduit you re able to build the dome 5 or 6 course high before the bricks start to slide. Measure the width of the opening left in the dome, then by cutting 2 to 3 pieces of wood you can create a plug. By using a level make sure the height of the sand from the floor tile is at the correct height, this is governed by the width of the oven. Once you have the desired height compact and shape the sand, brickie sand is best for this as the clay in it gives a dense and firm surface. Begin to lay the rest the half s cutting the halves when needed. Once you have finished building the dome, leave the brick work for an average of 4 hours. Pull the sand plug out and now you need to clean the inside while it s not rock hard, a scraper, sponge and buck of water is easiest way.
5 You re ready to build the flue arch, there are a couple ways to go about it here are two examples. With the brickwork in the oven complete it s time to insulate the oven, ceramic blanket is the most efficient and cost effective way. Covering the dome with 3 layers of 25mm thick ceramic blanket, with a total thickness of 75mm. Make sure that the joints don t line up, The insulation will reduce the ovens temperature from 400 degrees to 35 degrees. Using bird wire wrap the oven keeping it firm to the ceramic blanket, by not allowing the mesh bulge it will make the render easier to apply. Render the oven 20 to 30mm an easy mix is (1 Bag of cement, 2 bags Sydney sand, 1 bag of brickie sand) you may also add a liquid hardener for superior strength. Make sure the mix is thick and you are able to make a peak from it this will insure sufficient strength, leave the render for 20mins to an hour depending on the weather With a damp sponge rub it back smoothing out trowel marks, where the render meets the flue arch allow 2mm for expansion and contractions of the oven, this will avoid cracking as the blanket will absorb any movement of the brick oven. Your ready now for the first firing.
6 DRYING OUT YOUR OVEN When firing the oven for the first time heat beads are best. It is important to avoid flame impingement to the brick work. Light 3-5kg bag of heat beads outside the oven to avoid the flames touching the brick work. Once lit, using a shovel, toss them in spreading them around the perimeter. After 20minutes you can repeat the process 4 more times, tapping the heat beads with a bar or stick every 30 to 60 minutes will ensure good radiant heat. Allow about 6-8 hours before tossing in the first pieces of wood. Do Not let the oven cool, it is important to reach cooking temperature during the dry out. You are now ready to cook otherwise put the door on and let the oven bake in the retained heat for the next 2 days.
7 TIPS TO MAKING THE DOOR AND FLUE ARCH TEMPLATES To create the wooden templates needed you must first lay the desired shape, (combination of bricks) on top of a sheet of plywood with wooden or plastic packers 5mm thick to mimic the mortar joints. Once the desired shape has been created and checked for alignment and centre, mark the shape out labelling each brick as well as mortar joints on plywood. By placing two pieces of plywood together then cutting it out with a jigsaw will give you matching pieces. Prop up the template with wedges at its base. Once the brick work has dried you can remove the wedges so the template may drop and be removed easily. With the door and flue arch the height can be adjusted by adding or removing standard straights (75mm thick brick). This must be taken into account as each individual tends to make their mortar joints different thickness and this affects the width and height of each arch. Door Arch Flue Arch 51 = 230 x 115 x 75/51mm arch brick 51 = 345 x 115 x 75/51mm arch brick 63 = 230 x 115 x 75/63mm arch brick 63 = 345 x 115 x 75/63mm arch brick The information provided in this pamphlet is for guidance only. FFR shall not be held responsible for any loss, damage or delay arising from its use. The user of this data is required to determine the suitability and accuracy of any information supplied.
8
Instructions on how to install a Pre casted Calabrese oven kit September 2017
Instructions on how to install a Pre casted Calabrese oven kit September 2017 Before you start you will need a roll of chicken wire 5 metres, tie wire and aluminium foil x 3 rolls 1. On your slab roll
More informationASSEMBLING INSTRUCTIONS
wood fire oven ASSEMBLING INSTRUCTIONS YOUR WOOD FIRE OVEN Congratulations On Purchasing A Wood Fire Oven Wood Fire Ovens are the oldest and healthiest form of cooking. It is not just about pizza, you
More informationInstructions for Finishing Heater
RR 5 Shawville Québec J0X 2Y0 Voice 819.647.5092 Fax 819.647.6082 mheat@mha-net.org www.heatkit.com Revised March 8, 2008 Instructions for Finishing Heater Table of Contents General...1 Installing the
More informationSummit Stone. Summit Stone. Summit Stone. Standard Outdoor Fireplace Installation Guidelines. Summit Stone Standard Outdoor Fireplace
1 2 www. w.co coun tymateri rials. s.co m Summit Stone Standard Outdoor Fireplace Installation Guidelines Standard Outdoor Fireplace Installation Guidelines Concrete Pad Preparation Before beginning any
More informationVento Render Build Manual
Vento Render Build Manual The Stone Bake Oven Company www.thestonebakeovencompany.co.uk 0845 834 0252 info@stoneovenco.co.uk Vento Render Build Manual Stage 1 150 Shuttering Boards Shuttering boards Shuttering
More informationBRICK TANDOOR OVEN. Overview. What you will need JAMIE & JIMMY S FRIDAY NIGHT FEAST SERIES 6
BRICK TANDOOR OVEN JAMIE & JIMMY S FRIDAY NIGHT FEAST SERIES 6 Overview This is a great way to build a tandoor at home, using easy to buy materials. A tandoor is a traditional oven found across Asia, which
More informationRecent Project by William Davenport, Turtlerock Masonry Heat
Recent Project by William Davenport, Turtlerock Masonry Heat Location: Morrisville, VT Project: Smaller contraflow retrofit into renovated and re-insulated VT cape farmhouse. Background: Over the last
More informationD105 PreCut Wood Fired Oven Kit Instructions
D105 PreCut Wood Fired Oven Kit Instructions Firstly, congratulations on the purchase of your D105 PreCut Brick Oven Kit! Our PreCut Brick Oven Kit is the result of years of design and development and
More informationDe Montfort Mark 7 Incinerator (Flatpack)
De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where
More informationGeneral Brick Installation Instructions
Excellent Resource for Clay Paver Installation: http://www.bia.org/resources/clay-brick-pavers/clay-paver-informational- Resources These are general guidelines only. Check your paver manufacturer's recommendations
More informationHeat-Kit System Modular Contraflow Masonry Heater Core
Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual HK-22fo 22 Firebox with Front or Rear Bake Oven AUTHOR NAME Updated on Masonry Stove Builders 25 Brouse Rd., RR 5 Shawville, Quebec
More informationRetaining Wall Products
Retaining Wall Products BCP Building Products 18 Kirkcaldy Street Bathurst NSW 2795 Phone 02 6331 2777 Fax 02 6331 6510 sales@bcpbuildingproducts.com.au www.bcpbuildingproducts.com.au Garden Lockstone
More informationHeat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual
Revised January 11, 2011 Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual HK-22no 22 Firebox RR 5 Shawville Québec J0X 2Y0 Voice 819.647.5092 Fax 819.647.6082 email mheat@heatkit.com
More informationSYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE
SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE HARD SURFACE INSTALLATION You will need: Tape measure Rope or spray paint Weed spray Sharp utility knife and spare blades Synthetic grass adhesive
More informationSummit Stone. Summit Stone. Summit Stone Corner Outdoor Fireplace. Installation Guidelines. Summit Stone. Corner Outdoor Fireplace
1 2 www.countymaterials.com Summit Stone Tumbled Landscape Units Summit Stone Corner Outdoor Fireplace Installation Guidelines 2015 County Materials Corporation Summit Stone Tumbled Landscape Units Summit
More informationA GUIDE TO LAYING ARTIFICIAL GRASS BEFORE 0 %INTEREST* MINIMUM SPEND $499 AFTER
A GUIDE TO LAYING ARTIFICIAL GRASS BEFORE AFTER 0 %INTEREST* MINIMUM SPEND $499 Step 1: Preparation Mark Out Area: Before starting, please note that in order to avoid water pooling on your grass, you will
More informationMake sure you understand the drawing & instructions. Materials and components you will need
Make sure you understand the drawing & instructions We have kept this project as simple as possible - you should be able to complete it in a weekend. Every stage has been illustrated with drawings. All
More informationPlease Note: PhoneStar was previously branded as Phonewell
Soundproofing Floors Timber Joist or Concrete Floors Installation Instructions Acoustic Insulation Please Note: was previously branded as Phonewell There are two options to achieve noise reduction through
More informationHow to construct The Rittman fireplace.
How to construct The Rittman fireplace. Use only the UL-approved Firerock from Unilock. Review and check all components Dry-lay components and plan assembly. Front view of assembled firebox. Main unit
More informationpolitech n Technical sheet Recommended use Materials Substrates
Technical sheet politech n politech n is a two-component polyurethane adhesive for laying tiles on deformable substrates. It does not have solvents in its composition and is thus characterized for its
More informationKILN EFFICIENCY AND INSULATION.
KILN EFFICIENCY AND INSULATION. Anthony Obiy Etuokwu Department of Fine and Industrial Arts, Niger Delta University, Wilberforce Island, Bayelsa State. etuokwutony@yahoo.com Introduction The kiln is an
More informationRECOMMENDED STANDARDS for the INSTALLATION of WOODBURNING STOVES
RECOMMENDED STANDARDS for the INSTALLATION of WOODBURNING STOVES Prepared By Office of State Fire Marshal Maine Office of Energy Resources 52 State House Station 55 Capital Street Augusta, ME 04333 Augusta,
More informationCONSTRUCTION PROCESS OF A FUEL EFFICIENT KILN
CONSTRUCTION PROCESS OF A FUEL EFFICIENT KILN 1 EDITOR Conor Fox CONTIBUTORS Elizabeth Nyirenda Cristel Chong Christa Roth Hellen Owala DESIGN AND LAYOUT Marcelo Lima Charles Banda ILLUSTRATIONS Hendie
More informationContraflow Heater Core 22 firebox with replaceable liner Front White Bake Oven
Revised, July 10, 2008 Contraflow Heater Core 22 firebox with replaceable liner Front White Bake Oven Assembly Drawings Material List for core...2 Masonry:...2 Hardware:...2 Hardware sources:...2 Setting
More informationbt-3000 n Technical Sheet Recommended use Materials Substrates
Technical Sheet bt-3000 n bt-3000 n is a type D2 dispersion adhesive, as per EN 12004, for laying all kinds of ceramic tiles on indoor walls. This adhesive is served ready-to-use and does not need any
More informationBRANZ Appraisal Certificate # 461 (2010) Internal wet areas.
SPECIFICATION FOR PROTECTO WRAP AFM-WM FOR INTERNAL WET AREAS BRANZ Appraisal Certificate # 461 (2010) Internal wet areas AFM/WM INTERNAL 0104 Page 1 AFM-WM INTERNAL SPECIFICATION PRODUCT DESCRIPTION Anti
More informationRoth Compact system. German quality since Installation 1/6
Roth Compact system Installation German quality since 1947 1/6 Installation, Roth Compact system Description The Roth Compact system is specially developed for the installation of underfloor heating where
More informationCF-2100 SERIES FIREPLACES
The Ultimate in Radiant Heating Systems CF-2100 SERIES FIREPLACES INSTALLATION MANUAL October, 2005 Crossfire Fireplaces 249 Bridge Street West, P.O. Box 121 Campbellford, Ontario, Canada K0L 1L0 Tel:
More informationInstallation Guidelines Plibrico. Plastic Refractories. Technical Bulletin
Technical Bulletin Plibrico Plibrico plastic refractories are stiff, moist, putty-like materials. Plibrioc plastics are available with two different bonding systems: clay/air bond plastics and chemically
More informationVitripiazza Installation Guide
Vitripiazza Installation Guide Italian vitrified porcelain paving A. Planning and Sub base Once you ve decided where your patio is going, draw a detailed plan to scale on graph paper. Put in all the dimensions
More informationPre-build: TOOLs & Materials
Pre-build: TOOLs & Materials ITEM a. Builder s square b. Brick bolster c. Bricks d. Builder s bucket e. Mortar trowel f. Mason's string g. Square-nosed spade h. Spirit level i. Tape measure j. kg hammer
More informationcl stuk Technical Sheet Recommended use Materials Substrate
Technical Sheet cl stuk cl-stuk is a latex which, mixed with cement-based grouts such as colorstuk n, reduces water absorption and enhances mechanical resistance and deformability. Specially recommended
More informationSTONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick
Please note these tips are guides only and should be used in addition to the relevant Australian Standards for trade practices. Note that installation may vary from site to site with varying conditions
More informationPART A: JOB PROCDRE FOR PLASTERING
PART A: JOB PROCDRE FOR PLASTERING 1. SCOPE: The scope of this procedure shall apply to all cement plaster finishes to column, ceilings, walls and similar surfaces on backgrounds met with such as brick,
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10
CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances
More informationTECHNICAL INFORMATION CEMSCREED 5
TECHNICAL DATA SHEET CEMSCREED 5 Ver May 2016 TECHNICAL INFORMATION CEMSCREED 5 Product Data Sheet No. 110/03 INTRODUCTION Tarmac Cemscreed 5 is a rapid drying floor screed developed by Tarmac to fulfil
More informationFence Stone. Self locating Wall System
Fence Stone Self locating Wall System Between wall panels End of walls at gate openings etc Internal & external right angles Do it yourself No bricklaying skills required Attractive & efficient For fences
More informationINSTALLATION INSTRUCTIONS LAMINATE
INSTALLATION INSTRUCTIONS LAMINATE DROP LOCK GENERAL INSTRUCTIONS FOR LAMINATE HARDWOOD FLOORING ACCLIMATION Acclimation is a recommended procedure prior to installation of laminate flooring either on
More informationEstufa Chida 1.2 EN Estufa Chida. Designed for communities & families in Central-America
Estufa Chida Designed for communities & families in Central-America Introduction The wood fired stove Estufa Chida is for people who like to make tortillas and are using several pots to cook inside the
More informationCHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES
CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances
More informationBuilding Construction 14. Dr Nabil El-Sawalhi Associate professor Engineering Projects Management
Building Construction 14 Dr Nabil El-Sawalhi Associate professor Engineering Projects Management Plaster Plaster is a wet mixed material applied to internal walls as a finish to fill in any irregularities
More informationSelf Locating Wall System
From... Self Locating Wall System For fences from low gardens to 2.2 metres high The revolutionary new DIY fence system incorporating purpose made pier blocks for: v Between wall panels v End of walls
More informationInstallation manual Number TV 02/2016 HE floor coverings Date Pages 5. Tarkett Vinisin Branch of Kalush
Tarkett Vinisin Branch of Kalush Installation manual Number TV 02/2016 HE floor coverings Date 06-2016 Pages 5 Requirements related to the background When installing flexible floor coverings it is very
More informationx 5 1 / 2 Philadelphia Brick Trowel
Masonry Masonry To order London Pattern Brick Trowel 636002 10 x 4 5 / 8 London Brick Trowel 636004 11 x 4 3 / 4 London Brick Trowel 636006 12 x 4 7 / 8 London Brick Trowel Philadelphia Pattern Brick Trowel
More informationHardscaping Installation Manual
Hardscaping Installation Manual INDEX Installation of Pavers... 1 Installation of Meshed Flagstone... 2 Installation of Veneer Stone... 3 Sand Set Installation of Pavers 1. Preparing the ground Mark your
More informationARTEX AND PLASTER. 2 - Choosing the right product
ARTEX AND PLASTER Proper plastering is not easy. But DIY plasters are designed with ease of use in mind, and Artex TM is no more difficult to apply than thick paint. It is best to wear gloves when mixing
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR ANGLE-TO-ANGLE FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s
More informationSingle-skin, externally reinforced, brick tank. Instructions for manufacture
Single-skin, externally reinforced, brick tank Instructions for manufacture Development Technology Unit School of Engineering University of Warwick Coventry CV4 7AL Tel: +44 (0)1203 522339 Fax: +44 (0)1203
More informationMethod Statement. For RSA Cement Renders Over Masonry Substrates
Method Statement RSA Masonry Renders, Traditional Render and EP Render are all suitable for application over correctly prepared clay bricks and concrete blocks PREPARATION Cleaning:- Ensure all surfaces
More informationTECHNICAL INFORMATION SCREED
TECHNICAL DATA SHEET SCREED Ver Nov 2015 TECHNICAL INFORMATION SCREED Product Data Sheet No. 110/01 INTRODUCTION Tarmac ready-to-use cement sand levelling screed is a correctly proportioned factory produced
More informationGROUND THAWING & CONCRETE CURING REFERENCE GUIDE.
GROUND THAWING & CONCRETE CURING REFERENCE GUIDE www.heat-king.ca TABLE OF CONTENTS Principles of Ground Thawing 2 Ground Thawing Illustration 3 Principles of Concrete Curing 5 Slab on Grade Illustration
More informationThe Otji-Toilet self builder manual The Clay House Project Otjiwarongo
- - The Otji-Toilet self builder manual The Clay House Project Otjiwarongo - 2 - The Otji-Toilet self builder set Your self builder set consists of following material 1 Lid box with following parts a)
More informationEasy to cut with every tile layer s everyday tools.
Data sheet Profile for trimming stair steps. It substitutes the traditional step ceramic piece by a combination of ceramic tile and profile. Metallic profiles that cover the non-glazed edge of the tile,
More informationSTONEWRAP MANUFACTURED STONE VENEER - LUXURY MANUFACTURED STONE
STONEWRAP MANUFACTURED STONE VENEER - LUXURY MANUFACTURED STONE Stonewrap manufactured stone is produced by replicating natural stone. They are lighter in weight in comparison to natural stone. Due to
More informationFireplace. Opening. Old. Opening up an old fireplace is like striking gold in your very own home.
Opening up an Opening up an old fireplace is like striking gold in your very own home. In addition to a glowing, warmer, more welcoming living room, you are creating a much healthier and more invigorating
More information1850 x 40/50mm Raised Shower Tray Kit
Installation Instructions 850 x 40/50mm Raised Shower Tray Kit Parts Supplied Description Qty Shower Tray Shower Tray Extension Parts Required (Fitting Kit) Materials Required Description Qty Description
More informationDeltaTrayTamar PCS. Installation Guide for Centre and Offset Drain. INSTALLING DELTATRAY tamar A PCS GUIDE TO CREATING THE PERFECT WETROOM
INSTALLING DELTATRAY tamar DeltaTrayTamar Installation Guide for Centre and Offset Drain PCS High Performance Construction Products A PCS GUIDE TO CREATING THE PERFECT WETROOM INSTALLING DELTATRAY TAMAR
More informationMASONRY CHIMNEY CHECKLIST FOR WEATHER RESISTANCE
MASONRY CHIMNEY CHECKLIST FOR WEATHER RESISTANCE Cap 1. For maximum weather resistance, a chimney cap should extend beyond the chimney walls and incorporate a drip feature at its edge. This prevents water
More informationSummer DIY Braai Materials
Summer DIY Braai Its that time of the year again when the air gets filled up with the great smell of boerewors and chops. A braai offers us the opportunity to enjoy the company of family and friends in
More informationLAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING
LAMINATE GENERAL INSTALLATION INSTRUCTIONS FOR DROP LOCK FLOORING WARNING Prior to installation, please ensure that the product received is the correct style and color as well as to the customer s satisfaction.
More informationcolorstuk 2-12 Ceramic tiles with relief to be covered with grouting material.
Technical Sheet colorstuk 2-12 colorstuk 2-12 is a type CG 2 fine grain grouting material as per EN 13888, for grouting joints from 2 to 12 mm. It is easy to apply, resistant and color stable, and it is
More informationINSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS
INSTALLATION INSTRUCTIONS FOR WICANDERS 2G FLOORS GENERAL INFORMATION Wicanders 2G floors are intended for indoor use only. Please read the following instructions before installation. Store planks at room
More informationTechnical Manual Section 8 Rapid Drying Lightweight Screeds
Uniclass L5371:P224 EPIC E451:X223 CI/SfB (-A) (23) Pq7 Technical Manual Section 8 Rapid Drying Lightweight Screeds Introduction 2 General 2 Application 3 Density 5 Hardening and drying times 5 Thermal
More information28 BELGIAN WEDGE FIRE RING
28 BELGIAN WEDGE FIRE RING SKU: 198-920 Approximate Weight: 895 lbs Approximate Size: ft. 6 in. Ext. 2 ft. 4 in. Intr. 10-1/2 in. H www.midwestmanufacturing.com BELGIAN WEDGE BLOCKS KIT MATERIALS Color
More informationHOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION GTEC MOISTURE AND VAPOUR BOARD WITH PLASTERBOARD
HOW TO: BOARD ROOMS WITH HIGH HUMIDITY AND CONDENSATION WITH PLASTERBOARD GTEC MOISTURE AND VAPOUR BOARD 3 MOISTURE AND HUMIDITY Kitchens, utility rooms and cloak rooms are areas of high humidity, modern
More informationInstallation Instructions. Important. Recommended Tools. Palladium Rigid Sheet/Rubrail or Palladium G2 Sheet/Rubrail. Storage
Important Storage Flat sheet - Store Palladium Rigid Sheet in a clean, dry, interior area at temperatures between 50 F and 95 F [10-35 C]. Keep out of direct sunlight. Make sure sheet is well supported.
More informationHow to build 4 DIY projects with. AB Courtyard
How to build 4 DIY projects with AB Courtyard RECOMMENDED FOR Curved Wall Circular Wall Straight Wall Fences Bench Seat AB Courtyard FEATURES > Double sided free-standing wall > Build directly onto existing
More informationInstallation Guide Wall Panels
Installation Guide Wall Panels Jointless or Dry-Stacked Installation (Read Prior to installation) The MStone system is a jointless / dry-stacked installation where panels and corners fit tightly together
More informationOLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. RobinsonBrick.com
OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide RobinsonBrick.com OLD BRICK ORIGINALS THIN BRICK VENEER Page 2 INTRODUCTION Check local building codes for proper installation guidelines
More informationTHERMAL INSULATION SYSTEM
opuscolo Kibitherm_EN.FH10 27-06-2007 20:14 Pagina 1 Contents KIBITHERM: a certified system...page 5 Why insulate with KIBITHERM...page 6 KIBITHERM performance features...page 7 How to apply KIBITHERM...page
More informationThanks for purchasing ARTO high fired terracotta tiles, handmade in Southern California since 1966, and available both glazed and unglazed.
ARTO Brick and California Pavers 15209 S. Broadway St. Gardena, CA 90248-1823 Phone: (310) 768-8500 Fax: (310) 768-8544 www.arto.com Thanks for purchasing ARTO high fired terracotta tiles, handmade in
More informationCAST STONE WALL SQUARE FIRE PIT KIT INSTALLATION GUIDELINE
CAST STONE WALL SQUARE FIRE PIT KIT INSTALLATION GUIDELINE IMPORTANT: BE SURE TO READ ALL SAFETY GUIDELINES BEFORE INSTALLING OR USING YOUR EP HENRY FIRE PIT. THE WALL BLOCK AND CAPS OF THE EP HENRY FIRE
More informationConfined masonry. An illustrated guide for masons. This manual explains this technique. Confined masonry. RC frames. Columns first, walls after
S D C Confined masonry An illustrated guide for masons This manual explains this technique RC frames Columns first, walls after Confined masonry Walls first, columns after 1. Site selection and form of
More informationINSTALLATION GUIDE 5 EASY STEPS TO PLACE & QUIET. Primary Acoustics ) ) ) ) ) \ \ \ \ \
INSTALLATION GUIDE 5 EASY STEPS TO PLACE & QUIET ) ) ) ) ) \ \ \ \ \ LLC 2801 Sisson Street Baltimore, Md 21211-2902 866/388-8833 Fax: 410/338-1124 410/338-1122 Copyright 2012. All Rights Reserved. Trademarks
More informationSpecial tools and occupational health and safety
ß 000 Brick trowel, Berlin model Special tools and occupational health and safety S-neck, lacquered beechwood handle. DIN 440 A. 000 Blade length Blade width 000 200 180 101 001-002 Brick trowels S-neck,
More informationSealArm Tape TPE. Building & Joint Sealants T E C H N I C A L D A T A S H E E T. Uses. Features and Benefits
Product Description is a high performance Joint Tape system for expansion, it can be used for connection joints as well as for cracks, when fixed to the joint, allows irregular and high movement in more
More informationpro-telo wood Data sheet Recommended use: Materials Substrates Features
Data sheet pro-telo wood Wood and chromed brass decorative profile for ceramic wall tiles. Available in 15 and 25 cm planks, it can be used for decorating walls and floors. Excellent solution for designing
More information1-2-3MORTAR Modified Portland cement based mortar, to be used to adhere any prefabricated construction elements
1-2-3MORTAR Modified Portland cement based mortar, to be used to adhere any prefabricated construction elements Data Sheet DESCRIPTION 1-2-3MORTAR is a ready to use commercial grade mason mix used for
More informationInsulation Adhesive The fast and reliable solution for bonding insulation materials
Insulation Adhesive The fast and reliable solution for bonding insulation materials Icopal Insulation Adhesive Icopal Insulation Adhesive offers optimum application properties and ensures perfect results.
More informationBRIKslice Guidelines First published April this update Nov 2015
July 2014 BRIKslice Guidelines Page 1 BRIKslice Guidelines First published April 2003 - this update Nov 2015 This document is not designed to be an installation manual for every situation, as the BRIKslice
More informationCONCRETE BLOCK MASONRY
CONCRETE BLOCK MASONRY CONTENT Introduction Types Manufacturing process Properties Advantages Introduction These are the concrete blocks either hollow or solid. A hollow unit is that unit which has core
More informationFIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board
THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board + Euroclass A1 Non-combustible FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD Magply Fire PASSIVE FIRE
More informationcolorstuk especial n
Technical Sheet colorstuk especial n colorstuk especial n is a type CG 2, very fine grain grouting material as per EN 13888, for grouting joints up to 4 mm. Its formula includes ultrafine aggregates, which
More informationTriton DCI Decoupling Mat
1 Triton DCI Decoupling Mat Advanced Decoupling Mat with Superior Performance Lightweight waterproof underlayment Mortar Lock Mesh system for one pass mortar application, provides enhanced adhesion between
More informationReal Stone Cladding mm sandstone ashlar. Thin Sandstone Ashlar Catalogue
12 15 20 mm sandstone ashlar Thin Sandstone Ashlar Catalogue 12 15 20 mm ashlar 1 SANDSTONE ASHLAR 12 15 20 MM Ashlar sandstone is the most desired and expensive stone finish for any facade. It is now
More informationFLOORING INSTALLATION INSTRUCTIONS
FLOORING INSTALLATION INSTRUCTIONS This instruction manual defines the process to properly install RealStone Thin Veneer flooring based on standard stone installation practices. Like all construction processes
More informationIn-Floor Heating System. Installation Guide
In-Floor Heating System Installation Guide CONTENTS TOOLS & MATERIALS REQUIRED FOR INSTALLATION............ 3 STEP 1 Ensure the installation surface is smooth and clean......... 4 Compatible sub-floors
More informationREF : WEBSITE06. Tuesday, 12 January 2016
REF : WEBSITE06 Tuesday, 12 January 2016 GENERAL SPECIFICATION FOR FIXING WHITE OR LIGHT-COLOURED MARBLE, TRAVERTINE OR GRANITE TILES ONTO INTERIOR RENDERED WALLS, AND ONTO INTERIOR SURFACE BEDS AND SUSPENDED
More informationL. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only*
L. W. Mountain, Inc. Floating Glue Installation Instructions *For use with engineered floors only* Inspect the job site carefully before you begin the installation. Some conditions require specific installation
More informationcolorstuk 0-4 Technical Sheet Recommended use Materials Substrates Characteristics
Technical Sheet colorstuk 0-4 colorstuk 0-4 is a type CG 2 fine grain grouting material as per EN 13888, for grouting joints up to 4 mm. It is easy to apply, resistant and color stable, and it is specially
More informationREF : WEBSITE08. Monday, 12 December 2011
REF : WEBSITE08 Monday, 12 December 2011 GENERAL SPECIFICATION FOR INSTALLING UNDER TILE HEATING ELEMENTS AND FIXING GLAZED CERAMIC FLOOR TILES OR PORCELAIN TILES ON INTERIOR SURFACE BEDS OR SUSPENDED
More informationSubstation #9 Instructions for Assembly of the HO scale kit. v1.1
Substation #9 Instructions for Assembly of the HO scale kit. v1.1 Kit Contents: 26 each.090" Acrylic parts 2 each.060" Acrylic parts 1 each.060" Acrylic parts sheet 1 each.020" Adhesive backed styrene
More informationSystem Recommendation SR0618
Ardex Australia Pty Ltd ABN 82 000 550 005 Unit 7, 20 Powers Road, Seven Hills NSW 2147 Australia Telephone + 61 2 9851 9100 Facsimile +61 2 9838 7970 www.ardexaustralia.com System Recommendation SR0618
More informationHeat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual
Revised September 7, 2000 Heat-Kit System Modular Contraflow Masonry Heater Core Assembly Manual HK-22no 22 Firebox, no bakeoven Custom: top left exit, reduced height, clearance for beam on right RR 5
More informationFIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board
THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board + Euroclass A1 Non-combustible FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD MAGPLY FIRE PROTECTION BOARD
More informationThermMAT. Please read these instructions in conjunction with the Guarantee Card enclosed with your ThermFloor heating system.
Installation Instructions ThermMAT ThermMAT is suitable for a wide range of floor coverings ceramic, slate, terracotta, porcelain, marble, stone or limestone. A ThermMAT electrical underfloor heating system
More informationAppendix 4. Bills of Quantities
Appendix 4. Bills of Quantities 201 A4.1 Deep trench latrines Partitions of local materials 1m apart Timber foot rests and floor plates Lightweight timber frame Excavated soil (used for back-fill) Plastic
More informationINSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS
INSTALLATION METHODS ENGINEERED FLOORING FLOATING, GLUED-DOWN OR NAILED INSTALLATION METHODS BEFORE THE INSTALLATION ENGINEERED HARDWOOD FLOOR INSTALLATION: It is important to account for a 5% surplus
More informationRetaining Walls. Made Easy
Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting
More informationFERROCEMENT WATER TANKS
FERROCEMENT WATER TANKS Action Sheet 21 What is this Action Sheet about? This Action Sheet describes how to build ferrocement water tanks. Take advice from an engineer or other experienced person if necessary,
More information