1 LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert Technical Discipline VDOT Materials - Culpeper District Culpeper, Virginia Geotechnical Engineering VDOT (Division) or Company Name Insert Location, Virginia Insert Technical Discipline Responsible for Pages Responsible for Pages 1 to 3 Responsible for Pages Project Description From: 0.09 Miles East of Route 100 To: Route 1070 Project UPC No.: 10049

2 Charles A. Kilpatrick, P.E. Commissioner DEPARTMENT OF TRANSPORTATION 101 Orange Road Culpeper, Virginia March 29, 201 Project: , P101 UPC #: From: 0.09 mi. E. of Rte. 100 To: Rte Length: 0.1 mi. To: Culpeper District Location & Design Subject: Soil Survey Report, Route 1 Schoolhouse Road, This soil survey report is based on a total of seven (7) soil borings performed on March 9, 201. The borings were extended to a maximum depth of.0 feet below existing surface elevations. The purpose of the project is to improve or change the alignment of Route 1 without added capacity. According to Integrated Project Management (IPM) system information, the project is currently scheduled for construction November 201. Soil Description, Groundwater & Observations Below the existing pavement structure, strata described and/or classified as clay (CL) was encountered. Auger refusal, possibly indicating the top of rock, was encountered at boring location B- at approximately 4.0 feet below the existing surface elevation. Groundwater was not encountered. Descriptions of strata are provided on the attached boring logs. Existing Pavement Structure At the boring locations, the existing pavement structure consisted of asphalt concrete layers ranging between 4.0 and.0 inches and underlying base type aggregate ranging between 4.0 and.0 inches. The pavement structure material thicknesses are show on the attached boring logs. WE KEEP VIRGINIA MOVING

3 Soil Survey Report VDOT Project No , P101, UPC# March 29, 201 Page 2 of 3 Pavement Structure Recommendations New Pavement Route 1 Mainline For Surface: Use 1. inches of Asphalt Concrete, Type SM-9.A. For Base: Use 4.0 inches of Asphalt Concrete, Type BM-A. For Subbase: Use. inches of Aggregate Base, Type I, Size No. 21-B. Existing Pavement Route 1 Mainline Mill 1. inches and replace with 1. inches Asphalt Concrete, Type SM-9.A. The AASHTO Guide for Design of Pavement Structures (1993) was used to determine the pavement structure recommendations above (new pavement and overlay). A 20-year design life,,000 psi subgrade resilient modulus, assumed % growth rate and traffic data obtained from VDOT Traffic Engineering Division (Year 2013, Jurisdiction Report 030) were used for calculations of new pavement structure design. A 10-year design life was used for the overlay design. Existing paved shoulder areas that will be exposed to long-term or post-construction mainline traffic should be demolished and replaced with new mainline pavement structure. UD-4 edge-drain and CD-2 under-drain should be constructed per VDOT Road and Bridge Standards with positive drainage to outlet pipes and daylight points. In lieu of edge-drain, pavement structure drainage can be provided by day-lighting the aggregate subbase. For crown sections, edge-drain should be placed along both sides of the pavement structure and along the low side, only, for superelevated sections. Earthwork & Materials Recommendations Regular Excavation & Borrow Soils from the planned regular excavation can be used for fill and backfill. Borrow soils should have a minimum CBR value of.0, maximum Liquid Limit () of 4 and maximum plasticity index of 20. Highly plastic clay was encountered and may need significant manipulation in order to achieve the moisture content(s) required for adequate compaction. It is recommended that the Contractor plan for having equipment available to disc and till the soils. Slopes All cut and fill slopes should be no steeper than a ratio of 2 horizontal to 1 vertical (2H:1V). Shrinkage Estimate Use % shrinkage factor for earthwork volume computations (borrow and regular excavation). Topsoil Use.0-inch depth for calculation of topsoil removal. Ditch lines, and other areas where soil and debris can accumulate, may need to be considered with, or part of, topsoil removal in fill areas. WE KEEP VIRGINIA MOVING

4 Soil Survey Report VDOT Project No , P101, UPC# March 29, 201 Page 3 of 3 Rock Auger refusal was encountered at boring location B- at approximately 4.0 feet below the existing surface elevation and may indicate the tope of rock. Based on comparison of the planned cut depths with the auger refusal elevation, rock excavation is not anticipated. Auger refusal was not encountered at any of the other boring locations. Unsuitable Subgrade Soil material unsuitable for proposed subgrade was not encountered within the borings. Source of Materials Aggregates Two sources for aggregate material, located within the Culpeper District and near to the project location, are provided below along with recent test results data of selected products. Luck Stone Bealton Aggregate Base Material, Type I, Size No. 21-A maximum dry density 13. lbs. /cu. ft. at 4.% optimum moisture content. Aggregate Base Material, Type I, Size No. 21-B maximum dry density 11.9 lbs. / cu. ft. at 4.7% optimum moisture content. Vulcan Materials - Warrenton Aggregate Base Material, Type I, Size No. 21-A maximum dry density lbs. / cu. ft. at.9% optimum moisture content. Aggregate Base Material, Type I, Size No. 21-B maximum dry density 13.3 lbs. / cu. ft. at.% optimum moisture content. For Open-Graded Aggregate, Size No. 7, a unit weight of 10.0 lbs. / cu. ft. is recommended for quantity calculations. Matthew G. Moore. P.E. Geotechnical/Pavement Engineer Culpeper District Materials Attachments: Boring Logs (7 Pages) Boring Location Plan (2 Pages) WE KEEP VIRGINIA MOVING

5

6

7 LEGEND Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / 29 Red to brown, LEAN CLAY, contains aggregate, very stiff, moist CL 2.2 / 290. Red to brown, LEAN CLAY, hard, moist CL Boring terminated at 3.7 feet ,P101,R201,C01 STATION: SURFACE ELEVATION: 29 ft B-1 OFFSET: ' Right of CL FINES CONTENT -#200 (%) SPT_LOGB:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-1

8 LEGEND ,P101,R201,C01 STATION: SURFACE ELEVATION: 29.0 ft Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / Brown, LEAN CLAY, contains aggregate, hard, moist CL 1. / 29.2 Brown, LEAN CLAY, very hard, moist CL B-2 OFFSET: ' Left of CL 11.4 FINES CONTENT -#200 (%) / SAME, CL / 4.7 Boring terminated at 4.7 feet SPT_LOGB:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-2

9 LEGEND Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / 30.2 Brown, LEAN CLAY, contains aggregate, stiff, moist CL / SAME, CL 3. / 302. SAME, very stiff CL Boring terminated at.0 feet ,P101,R201,C01 STATION: SURFACE ELEVATION: 30.0 ft B-3 OFFSET: ' Right of CL FINES CONTENT -#200 (%) SPT_LOGB:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-3

10 LEGEND Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / Brown to gray, LEAN CLAY, contains aggregate base, stiff, moist CL / 30 SAME, CL Boring terminated at 4.0 feet ,P101,R201,C01 STATION: SURFACE ELEVATION: 30.0 ft B-4 OFFSET: ' Left of CL 1. FINES CONTENT -#200 (%) SPT_LOGB:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-4

11 LEGEND ,P101,R201,C01 STATION: 304+ SURFACE ELEVATION: 30 ft Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / 30 Brown to gray, LEAN CLAY, contains aggregate base, very stiff, moist CL B- OFFSET: ' Left of CL FINES CONTENT -#200 (%) / 300. SAME, hard CL Boring terminated at 3.7 feet Auger refusal at 4.2 feet. SPT_LOGB:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-

12 LEGEND Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / 29. Brown, LEAN CLAY, contains aggregate base, very stiff, moist CL 2.2 / 297. SAME, very hard CL ,P101,R201,C01 STATION: SURFACE ELEVATION: ft B- OFFSET: ' Right of CL Boring terminated at 4.2 feet SPT_LOG:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-

13 LEGEND ,P101,R201,C01 STATION: 30+0 SURFACE ELEVATION: ft Date(s) Drilled: 3/9/201-3/9/201 NOT ENCOUNTERED DURING DRIING FIELD DESCRIPTION OF 0.0 / / / Brown, LEAN CLAY, contains aggregate base, hard, moist CL B-7 OFFSET: ' Left of CL / SAME, CL / SAME, CL Boring terminated at 4. feet SPT_LOG:ROUTE 1 SCHOOLHOUSE RD.GPJ: :01212:3/30/1 REMARKS: Rig Type: CME-4C. Copyright 201, Commonwealth of Virginia B-7

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Special Provisions for Pavement Open Cuts

Special Provisions for Pavement Open Cuts 1. All patches are to be replaced in accordance with the following requirements and as shown in Figure 1. 2. All Excavations or Open Cuts shall comply with OSHA Technical Manual, Chapter 2, Title Excavation:

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION EXCAVATION, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SCOPE Work of this Section shall include all labor, materials, equipment, plant and incidentals required to complete all excavation, backfilling and compacting as indicated on the Drawings

More information

March 10, 2017 SITE AND PROJECT INFORMATION

March 10, 2017 SITE AND PROJECT INFORMATION March 10, 2017 Derek Hawkes, PE NASH COUNTY 120 W. Washington Street - Suite 2004 Nashville, NC 27856 Re: Report of Subsurface Investigation Middlesex Corporate Park, Lot 3 Middlesex, North Carolina GeoTechnologies

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT PROJECT MINECRAFT ACCESS ROAD BOYDTON PLANK ROAD DINWIDDIE COUNTY, VIRGINIA JOB NUMBER: 37775.003 PREPARED FOR: DINWIDDIE COUNTY PO BOX 70 DINWIDDIE COUNTY, STATE 23841

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT 58.6 ROAD (KIMBALL CREEK) 58.9 ROAD TO 58.7 ROAD MESA COUNTY, COLORADO February 9, 2018 Prepared By: Prepared For: Mr. Eric Krch, P.E. SGM, Inc. 744 Horizon Court, Suite

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma 10-2-2017 October 2, 2017 ADDENDUM NO. 1, Project: Owner: Architect: TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma Moore

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report In-Place Soil Survey North Western Road From West Hall of Fame Avenue to West Lakeview Road Stillwater, Oklahoma June 18, 2 Terracon Project No. 36622 Prepared for: Olsson

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

SECTION 14 EMBANKMENT

SECTION 14 EMBANKMENT SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No.

REPORT OF SUBSURFACE EXPLORATION. Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC GeoTrack Project No. 3620 Pelham Road, PMB #292 Phone: 8643290013 Greenville, SC 296155044 FAX: 8643290014 REPORT OF SUBSURFACE EXPLORATION Burn and Rescue Facility Spartanburg County Emergency Services Academy Duncan, SC

More information

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form.

B. The Bidder shall acknowledge receipt of this Addendum in the appropriate space on the Bid Form. City of Casper Baler Building / MRF Expansion DOCUMENT 9113 ADDENDUM.1 ADDENDUM NUMBER: 1.2 PROJECT INFORMATION A. Project Name: Baler Building / MRF Expansion B. Owner: City of Casper C. Architect: Hein

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.

More information

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No.

REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. REPORT OF LIMITED SUBSURFACE AND EXISTING PAVEMENT EVALUATION Melrose Street Reconstruction Winston-Salem, North Carolina S&ME Project No. 1583-12-129 Prepared for: City of Winston-Salem Engineering 100

More information

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis. PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI

Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI Washtenaw Community College Design & Construction Facilities Management 4800 East Huron River Drive Ann Arbor, MI 4810-4800 GEOTECHNICAL INVESTIGATION FOR Proposed Pavement Rehabilitation Parking Lots

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4

TABLE OF CONTENTS. Background of Existing Facility 3. Proposed Work 4 TABLE OF CONTENTS SECTION PAGE Background of Existing Facility 3 Proposed Work 4 Objective of this Report 4 Required Data 4 Pavement Design Procedure 5 Other Data Requirements 7 Pavement Structures 8 Pavement

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

ADDENDUM NO. 1. Clarification/Question/Answer/Updated Plan Sheets

ADDENDUM NO. 1. Clarification/Question/Answer/Updated Plan Sheets ADDENDUM NO. 1 DATE: July 20, 2016 INVITATION FOR BID: IFB K160021767 Bellemeade Park Pedestrian Trails and Bridge Project (UPC 107531) DATED: June 28, 2016 RECEIPT DATE: July 28, 2016 @ 2:30 P.M. OPENING

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062.

GEOTECHNICAL ENGINEERING REPORT. KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas. Project No. D16G1696. KU No. Lz_n/11062. GEOTECHNICAL ENGINEERING REPORT KU Parking Lot 300E Southeast of Lied Center Lawrence, Kansas April 1, 2016 Prepared for: University of Kansas Bartlett & West Prepared by: GeoSource, LLC April 1, 2016

More information

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager May 1, 213 THE CORRADINO GROUP 455 N.W. 97 th Avenue Miami, Florida 33178 Attention: Mr. Carlos E. Verson, P.E. Project Manager Re: Report of Geotechnical Engineering Services - Roadway Soil Survey Bird

More information

A Simplified Pavement Design Tool TxAPA Annual Meeting Danny Gierhart, P.E. Senior Regional Engineer Asphalt Institute.

A Simplified Pavement Design Tool TxAPA Annual Meeting Danny Gierhart, P.E. Senior Regional Engineer Asphalt Institute. A Simplified Pavement Design Tool 2016 TxAPA Annual Meeting Danny Gierhart, P.E. Senior Regional Engineer Asphalt Institute www.pavexpressdesign.com What are some methods people use to decide how thick

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

MATERIALS DIVISION MEMORANDUM SIGNATURE:

MATERIALS DIVISION MEMORANDUM SIGNATURE: MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Notice of Revision to Materials Division s Manual of Instructions Chapter VI SPECIFIC SUBJECT: Incorporation of a new section titled as Project Selection

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT INNSBROOK DOMINION BOULEVARD OUTPARCEL 4101 DOMINION BOULEVARD HENRICO COUNTY, VIRGINIA JOB NUMBER: 36310 PREPARED FOR: BELLEAU WOOD DEVELOPMENT P.O. BOX 2022 BURLINGTON,

More information

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION

APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION APPENDIX A REPORT OF GEOTECHNICAL EXPLORATION THIS PAGE IS INTENTIONALLY LEFT BLANK Report of Geotechnical Exploration Proposed Stormwater Drainage Improvements (Segments B-F) Governor Road, La Honda Drive,

More information

Report of Geotechnical Study

Report of Geotechnical Study Report of Geotechnical Study Baltimore Sun Consolidation Baltimore, Maryland F&R Project No. 75V0084 Prepared For: 901 Dulaney Valley Road, Suite 801 Towson, MD 21204 Prepared By: Froehling & Robertson,

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

Northern Colorado Geotech

Northern Colorado Geotech GEOTECHNICAL ENGINEERING REPORT PROPOSED RESIDENTIAL DEVELOPMENT MORGAN COUNTY ROADS AND P WIGGINS, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 07- JANUARY 9, 06 Prepared for: Town of Wiggins 0 Central

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Caswell County Public Library Yanceyville, North Carolina June 15, 2017 Project No. 75175054 Revised Prepared for: Gunn Memorial Public Library Yanceyville, North Carolina

More information

Preliminary Geotechnical Report

Preliminary Geotechnical Report Preliminary Geotechnical Report Trunk Highway 101 from Pioneer Trail to Lyman Boulevard Chanhassen, Minnesota SEH No. CHANH 114382 March 14, 2011 Table of Contents Certification Page Table of Contents

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

Sacramento Modesto Roseville Pleasanton. Jeff Black, PE Blackwater Consulting Engineers, Inc. 605 Standiford Ave., Suite N Modesto, CA 95350

Sacramento Modesto Roseville Pleasanton. Jeff Black, PE Blackwater Consulting Engineers, Inc. 605 Standiford Ave., Suite N Modesto, CA 95350 Sacramento Modesto Roseville Pleasanton December, 01 File Number: 1-19.1 Jeff Black, PE Blackwater Consulting Engineers, Inc. 605 Standiford Ave., Suite N Modesto, CA 9550 Subject: Mr. Black, GEOTECHNICAL

More information

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax

GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota Phone Fax GEOTEK ENGINEERING & TESTING SERVICES, INC. 909 East 50 th Street North Sioux Falls, South Dakota 57104 Phone 605-335-5512 Fax 605-335-0773 September 8, 2016 City of Viborg 101 N. Main Street 57070 Attn:

More information

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY

GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA JANUARY GEOTECHNICAL INVESTIGATION I-15 SIGN BRIDGES LAS VEGAS EA 73171 JANUARY 06 MATERIALS DIVISION STATE OF NEVADA DEPARTMENT OF TRANSPORTATION MATERIALS DIVISION GEOTECHNICAL SECTION GEOTECHNICAL REPORT I-15

More information

Chapter 6 Geotechnical Exploration and Report

Chapter 6 Geotechnical Exploration and Report H:\mydocs\U30006.DOC 02/01/07 Section Topic Page 6.1 General 6.1 6.2 When Required 6.1 6.3 Soil Exploration 6.1 6.4 Report 6.2 H:\mydocs\U30006.DOC 02/01/07 6.1 General The geotechnical exploration and

More information

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light 100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida

More information

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I.

EEI PROJECT NUMBER 5891G-NC PREPARED FOR: HILCO LTD 1435 US HIGHWAY 285 N KINSTON, NC SUBMITTED BY: MATTHEW C. KIRCHNER, E.I. SUMMARY REPORT OF GEOTECHNICAL SUBSURFACE EXPLORATION AND ENGINEERING EVALUATION PROPOSED PINEY GROVE NURSING & REHABILIATION CENTER EXPANSION 728 PINEY GROVE RD KERNERSVILLE, NORTH CAROLINA EEI PROJECT

More information

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA 0 0 0 0 SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA Mohamed Elfino, Ph.D., P.E. * Assistant State Materials

More information

Mi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o rnia 94947

Mi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o rnia 94947 April 8, 2010 File: 739-17bltr.doc CSW/Stuber-Stroeh Engineering Group 45 Leveroni Court Novato, CA 94949 Mi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

ARTICLE 500 PAVEMENT DESIGN

ARTICLE 500 PAVEMENT DESIGN ARTICLE 500 PAVEMENT DESIGN SEC. 500.1 PAVEMENT TYPES Street pavement sections shall be either flexible type with an asphalt concrete surface or rigid type consisting of a Portland Cement Concrete section

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

Soil Survey Summary Report

Soil Survey Summary Report Soil Survey Summary Report Benton Boulevard Extension Pooler, Chatham County, Georgia February, 206 Terracon Project No. ES5553 Prepared for: McGee Partners, Inc. Atlanta, Georgia Prepared by: Terracon

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18-2 18-2 ROADWAY EXCAVATION... 18-2 18-2.01 General... 18-2 18-2.02 Unsuitable Roadway Excavation and Backfill... 18-2 18-2.03 Surplus

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 1500 Madison, Mississippi Report No.

Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 1500 Madison, Mississippi Report No. January 29, 19 Mr. Cliff Bates, VP of Development The Park Companies 124 One Madison Plaza, Suite 0 Madison, Mississippi 391 Report No.180667 Geotechnical Exploration The Park at Barton Residential Community

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL... 18.1 18-2 ROADWAY EXCAVATION... 18.1 18-2.01 General... 18.1 18-2.02 Unsuitable Roadway Excavation and Backfill... 18.1 18-2.03 Surplus

More information

CHAPTER 3 CONSTRUCTION AND TESTING OF SUBGRADE

CHAPTER 3 CONSTRUCTION AND TESTING OF SUBGRADE CHAPTER 3 CONSTRUCTION AND TESTING OF SUBGRADE WHAT IS SUBGRADE? SUBGRADE EMBANKMENT FOUNDATION The top surface of an embankment or cut section, shaped to conform to the typical section upon which the

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

Materials and Surfacing - Organization and Functions

Materials and Surfacing - Organization and Functions Materials and Surfacing - Organization and Functions Organization & Functions Page 1 Materials and Surfacing. Organization: Chief Materials and Surfacing Engineer 1. Materials 2. Pavement Design 3. Surfacing

More information

Plotted By: WAP04107$ COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY TOWN OF DUMFRIES

Plotted By: WAP04107$ COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION PLAN AND PROFILE OF PROPOSED STATE HIGHWAY TOWN OF DUMFRIES 8 90 9 0 0 0 0 0 9/8/08 8:08: AM d9090.dgn Plotted By: WAP007$ FEDERAL AID SHEET FOR INDEX OF SHEETS SEE SHEET B VIRGI N IA FHWA DATA E0 STP-A0 ( ) 000 - - 9 THIS WAS DEVELOPED UTILIZING THE DEPARTMENT'S

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

SECTION EROSION CONTROLS

SECTION EROSION CONTROLS SECTION 31 25 13 EROSION CONTROLS PART 1 GENERAL 1.1 SUMMARY A. Section Includes installing, maintaining and removing: 1. Silt Fence. 2. Temporary Construction Entrances. 3. Diversion Channels. 4. Sediment

More information

SUBSURFACE INVESTIGATION

SUBSURFACE INVESTIGATION ARKANSAS DEPARTMENT OF TRANSPORTATION SUBSURFACE INVESTIGATION STATE JOB NO. CA03 FEDERAL AID PROJECT NO. 9991 HWY. 67 HWY. 141 (WIDENING) (S) STATE HIGHWAY 412 SECTION 7 & 8 IN LAWRENCE & GREENE COUNTY

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

November 14, Robert Peccia & Associates, Inc. PO Box 5653 Helena, MT Mr. Bill Burkland, P.E.

November 14, Robert Peccia & Associates, Inc. PO Box 5653 Helena, MT Mr. Bill Burkland, P.E. November 14, 2018 Robert Peccia & Associates, Inc. PO Box 63 9604 Attention: Subject: Gentlemen: Mr. Bill Burkland, P.E. bill@rpa-hln.com Final Report of Geotechnical Investigation Upgrades to Taxiways

More information

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER:

GEOTECHNICAL ENGINEERING STUDY. MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: GEOTECHNICAL ENGINEERING STUDY MERIWETHER LEWIS ELECTRIC COOPERATIVE BUILDING Houston/Stewart County Industrial Park AG & E FILE NUMBER: 016-043 Prepared By American Geotechnical & Environmental, Inc.

More information

SECTION VIII GEOTECHNICAL ENGINEERING REPORT

SECTION VIII GEOTECHNICAL ENGINEERING REPORT SECTION VIII GEOTECHNICAL ENGINEERING REPORT Copyright 2014 GFAC ENGINEERING INC. Page i of vi July 31, 2014 GEOTECHNICAL ENGINEERING REPORT PROPOSED SUBDIVISION STREETS AND DETENTION BASIN WEST SILOAM

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Prepared for: Precision Approach Engineering, Inc. Corvallis, Oregon January 16, 2017 Professional Geotechnical Services Foundation Engineering, Inc. GEOTECHNICAL INVESTIGATION

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS 1. GENERAL CONDITIONS...1 3. DESCRIPTION...1 5. MATERIALS...1 5.1 General...1 5.2 Handling and Storage of Materials...1 5.3 Testing and Approval...1 5.4

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT

PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT PARKING LOTS 4, 7, AND 8 RECONSTRUCTION REPORT Converse Project No. 15-81-177-01 Prepared For: David Evans and Associates, Inc. 17782 17th Street, Suite 200 Tustin, California 92780 Prepared By: 10391

More information

REVISED REPORT OF GEOTECHNICAL EXPLORATION. Proposed Dollar Tree East 17 th Street and Old Greenbrier Road Springfield, Tennessee.

REVISED REPORT OF GEOTECHNICAL EXPLORATION. Proposed Dollar Tree East 17 th Street and Old Greenbrier Road Springfield, Tennessee. REVISED REPORT OF GEOTECHNICAL EXPLORATION Proposed Dollar Tree East 17 th Street and Old Greenbrier Road Springfield, Tennessee Prepared for: Mr. K. Scott Brown Clark, Geer, Latham & Associates, Inc.

More information