1 SECTION AUGER CAST PILES PART 1 - GENERAL 1.1 SECTION INCLUDES: The work covered by these specifications consists of furnishing all labor, equipment and materials for the installation of auger cast piles with working load capacity as detailed in the project geotechnical report. 1.2 RELATED SECTIONS A. Section Application for Payment B. Section Submittals C. Section Testing 1.3 REFERENCES A. ASTM D 1143 Piles Under Static Axial Compressive Load (Standard Loading Procedure) B. ASTM C 150 Portland Cement C. ASTM D 109 Grout Test Cubes D. ASTM C-33 Mineral Aggregates 1.4 SUBMITTALS A. Submit mix design of proposed grout at least 5 days prior to delivery or use at the site. The submittal shall indicate the manufacturer and/or source of all materials and admixtures and the 7-day and 28 day compressive strengths. B. Submit details of the sequence and method of installation at least 5 days prior to the installation of auger cast piles. Approval by the Owner will not relieve the Contractor of his responsibility to install auger cast piles in accordance with these specifications. C. Provide a minimum of 48 hours written notice before the installation begins to the supplier and the Owner. Do not place auger cast piles until all involved parties have been notified. D. Submit details of auger equipment, grout pumping, and continuous mixing equipment at least 5 days prior to installation of auger cast piles. Approval to the Owner will not relieve the Contractor of his responsibility to install auger cast piles in accordance with these specifications. 1.5 PILE TESTING AUGER CAST PILES

2 A. Perform two pile load tests in accordance with ASTM D-1143 using the standard loading procedure as described in section 5.1 of the ASTM specifications. Furnish test pile(s), reaction beam(s), reaction pile(s), calibrated jack(s), personnel, and rigging necessary to perform the tests. B. Owner shall provide an engineer to observe the tests. C. Provide a written report of the pile test results to the Owner and geotechnical engineer within 72 hours of completing the tests. 1.6 QUALITY CONTROL A. Owner shall provide an experienced technician to continuously inspect installation of auger cast piles. 1. Owner s technician shall verify compliance with Specification and communicate anomalous subsurface conditions that may require modification of design to geotechnical engineer and Owner. 2. Contractor shall cooperate fully with technician, geotechnical engineer, and Owner and provide appropriate assistance and access to Work. B. Contractor shall provide a suitable, adequately protected location for temporary storage of test specimens. C. Owner s Testing Lab shall provide containers or storage boxes suitable for protecting test specimens from extremes in temperature or other threats. 1.7 PILE TOLERANCES A. Locate piles as shown on Drawings or as otherwise directed by the Owner. B. Locate center of pile to within three inches of design location. C. Install piles plumb within a tolerance of one inch in ten feet. 1.8 MEASUREMENT AND PAYMENT A. Measurement will be based on Work actually placed and recorded on daily work records signed by Contractor and Owner s Representative. 1. Auger cast piles shall be measured on the total number of planned piles, estimated volume of grout, and the total estimated footage for all piles as shown on the Drawings. 2. Auger cast piles installed in addition to the planned piles shall be measured per actual linear foot installed. 3. Planned auger cast piles not completely installed, thus reducing the linear footage of planned piles, shall be measured per linear foot of planned pile. 4. Load test shall be measured per each test actually completed. AUGER CAST PILES

3 B. Payment shall be at the unit prices stated on the Bid Form for Auger Cast Piles. Payment shall constitute full compensation for all labor, materials, grout, tools, and equipment required or specified to complete the work in this Section. 1. Payment of a percentage of the lump sum price on the Bid Form for the planned auger cast piles shall be based on the actual percent of planned piles installed during each billing period. 2. Payment for additional auger cast piles shall be based on the unit price for ADDITIONAL AUGER CAST PILES on the Bid Form. 3. Credit to the Owner for auger cast piles not installed shall be based on the unit price for AUGER CAST PILES NOT INSTALLED on the Bid Form. 4. Payment for Load tests shall be based on the unit price for LOAD TESTS on the Bid Form. 5. No payment shall be made for misplaced, faulty, rejected or otherwise unacceptable piles as defined by the Owner s representative. PART 2 - PRODUCTS 2.1 GROUT MATERIALS A. Portland Cement: Portland Cement shall conform to ASTM C-150. B. Mineral Filler: Mineral Filler shall be finely powdered siliceous material, which possesses the property of combing with lime liberated during the process of Portland Cement hydration. C. Plasticizer: Plasticizer shall be a compound characteristics, which will increase flowability of grout, assist in dispersal of cement grains, and neutralize setting shrinkage of high-strength cement grout. D. Water: Water shall be fresh, clean and free from injurious amounts of sewage, oil, acid, alkali, salts or organic matter. E. Fine Aggregate: Sand shall meet requirements of current ASTM C-33 and the following: Sand shall consist of hard, dense, durable, uncoated rock particles and shall be free from injurious amounts of silt, loam, lumps, soft or flaky particles, shale, alkali, organic matter, mica or other deleterious substances. If washed, washing method shall be such that it will not remove desirable fines, and sand shall subsequently be permitted to drain until the residual freemoisture is reasonably uniform and stable. The sand shall be well graded from fine to coarse, with a fineness modulus between 1.40 and F. Materials shall be stored under cover, on a clean, dry, elevated platform that protects the materials from: precipitation, sunlight, chemicals, flames and sparks, temperatures in excess of 160 F, and physical damage. G. Follow the manufacturer s recommendations regarding handling and storage of the materials. 2.2 HIGH-STRENGTH GROUT AUGER CAST PILES

4 A. Grout used to construct auger cast piles shall consist of a mixture of Portland Cement, mineral filler, plasticizer, sand and water so proportioned and mixed as to provide a grout capable of maintaining the solids in suspension without appreciable water gain, yet which may be pumped without difficulty and which will penetrate laterally and fill voids in the foundation material. B. Grout shall be proportioned to provide a hardened grout having a minimum compressive strength of 4,000 pounds per square inch (PSI) at 28-days. 2.3 GROUTING EQUIPMENT A. Grout pump shall be a positive displacement piston type pump capable of developing pressures at the pump up to 350 PSI. The pump shall be equipped with a suitable gauge to permit verification of pumping pressures. B. Maintain the grouting equipment in a condition so that breakdowns and down time are minimized. Provide for prompt (24 hours or less) replacement of broken down equipment so that Work is not delayed. 2.4 AUGER EQUIPMENT A. Provide a minimum three-inch diameter hole at the bottom of the auger head below the cutting teeth through which high-strength grout shall be pumped during installation of the pile. B. Provide auger flights, from auger head to top of augers, with no gaps or other breaks. C. Provide a middle guide for Auger strings over fifty feet in length. D. Prevent auger cast piling leads from twisting. E. Provide an auger power plant with a minimum torque of 30,000 ft/lbs. F. Maintain the augering equipment in a condition so that breakdowns and down time are minimized. Provide for prompt (24 hours or less) replacement of broken down equipment sot that Work is not delayed. PART 3 - EXECUTION 3.1 INSPECTION A. Examine substrates and installation conditions. Inform the Owner, in writing, of any unsatisfactory conditions. Do not start auger cast pile installation work until unsatisfactory conditions are corrected. 3.2 INSTALLATION AUGER CAST PILES

5 A. Install auger cast piles by rotating a continuous-flight, hollow shaft auger of the proper diameter to obtain the minimum specified shaft diameter into the ground to the specified pile bearing depth. B. Pump a sufficient volume of high-strength grout to fill the resulting hole as the auger is withdrawn. C. Place grout in a manner to prevent hold collapse and to cause grout to penetrate laterally into soft or porous zones of the surrounding soil. D. Place reinforcement steel, if required, while grout is fluid. E. Maintain a positive head of grout of not less than seven feet within the augers during auger withdrawal. F. Piles shall be rejected and replaced if the grout level in any completed pile drops. G. Piles shall be rejected if the augers are withdrawn from a hole for any reason without placing grout. H. Maintain a minimum of six pile diameters center to center between adjacent piles until the grout in the piles has reached 50% of its design compressive strength. I. Position pile installation equipment sufficiently far away from pile locations to prevent squeezing, damage, or distortion of the pile. 3.3 MIXING, PUMPING, AND TESTING HIGH-STRENGTH GROUT A. Use only approved pumping and continuous mixing equipment to prepare and handle grout. Remove any oil or other rust inhibitors from mixing drums and pressure grout pumps. B. Place a volume of grout at least 1.25 times the theoretical volume of the augered hole or the volume placed in the test pile, whichever is greater, in each pile. C. Re-circulate grout through the pump if there is a lapse in installation operations. D. Owner s testing agency shall test grout mix by as follows: 1. Make one set of 2 inches by 2 inches cubes, or one set of 2-inch diameter by 4-inch high cylinders for each day that auger cast piles are installed. 2. A set of cubes/cylinders shall consist of a total of six cubes/cylinders. 3. Test three cubes/cylinders at 7-days and three cubes/cylinders at 28-days. 4. Report results of grout compressive strength tests to Owner and Contractor within 24 hours. 3.4 OBSTRUCTIONS A. Terminate installation of any pile if any obstruction (including, but not limited to buried concrete, boulders, or timbers) is encountered which would prevent properly installing the pile to the depth required, or cause the pile to drift from the required location. AUGER CAST PILES

6 B. Immediately notify Owner. C. Backfilled hole with grout and install a replacement pile only if directed by Owner. 3.5 PILE TOPS A. Place metal sleeves of the proper diameter around top of pile where pile cutoff is near the ground surface or above the bottom of the excavation. B. No piles shall be dipped greater than twelve inches. END OF SECTION AUGER CAST PILES

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000

STANDARD SPECIFICATION Section Auger-Grout Injected Piles Civil Engineering Group Revised: August, 2000 DIVISION 2: SITE WORK SECTION 02320 AUGER-GROUT INJECTED PILES STANDARD SPECIFICATION PART 1 GENERAL 1.0 DESCRIPTION OF WORK This work shall include all excavation, concrete, equipment and accessories

More information

B. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings.

B. The Pile Contractor shall furnish and place all reinforcing steel, dowels, and anchor bolts as shown on the drawings. SECTION 31 63 16 AUGER CAST GROUT PILES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division- 01 Specification

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 63 16 (November 2008) ----------------------------- Preparing Activity: USACE Superseding UFGS-31 63 16 (October 2007) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

SECTION DUCTILE IRON PILES

SECTION DUCTILE IRON PILES SECTION 31 66 13 DUCTILE IRON PILES PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents. B.

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving.

SECTION PORTLAND CEMENT CONCRETE PAVEMENT. All subsurface utilities must be inspected, tested, and accepted prior to any paving. SECTION PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

Typical Specifications of Compaction Grouting Scope

Typical Specifications of Compaction Grouting Scope Typical Specifications of Compaction Grouting Scope This section covers compaction with Sand/Cement/Flyash grout including the installation of injection pipes. Compaction grouting is sometimes referred

More information

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS SECTION 31 63 29 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION

STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION Section 67.0 Knoxville, Tennessee March 2013 1. Description STANDARD SPECIFICATION FOR MICROPILE CONSTRUCTION a) This work shall consist of constructing micropiles as shown on the Contract plans in accordance

More information

CHAPTER 2 - FOUNDATIONS

CHAPTER 2 - FOUNDATIONS CHAPTER 2 - FOUNDATIONS 2-1 This Page Left Intentionally Blank 2-2 CHAPTER 2--FOUNDATIONS Section 2.1 Site Evaluations 2.1.1 Subsurface Investigation 2.1.1.1 Coordination 2.1.1.2 Utilities 2.1.2 Soil Borings

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

C. Installers licensed by the Geopier Foundation Company, Inc. (www.geopier.com) will be accepted as approved installer.

C. Installers licensed by the Geopier Foundation Company, Inc. (www.geopier.com) will be accepted as approved installer. SPECIFICATION FOR RAMMED AGGREGATE PIER SYSTEMS AND RIGID INCLUSION FOUNDATION PART 1: GENERAL REQUIREMENTS 1.01 Description Work shall consist of designing, furnishing and installing Rammed Aggregate

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items:

B. Extent of the Work: The Work specified in this Section shall include, but is not limited to, the following principal items: RIVERSIDE MEDICAL CENTER EAST EXPANSION KANKAKEE, ILLINOIS SECTION 02382 - DRILLED PIERS PART 1 - GENERAL 1.01 DESCRIPTION OF WORK A. Work Included: Provide all labor, materials, equipment, transportation

More information

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled.

Drilling of grout holes will be measured for payment on the basis of the linear feet of holes actually drilled. I - Measurement and payment Mobilization and Demobilization: Payment will be made for costs for assembling all plant and equipment at the site preparatory to initiating the work and for removing it there

More information

CEMENT STABILIZED SAND

CEMENT STABILIZED SAND Section 02321 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Cement stabilized sand material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. No separate payment will be made for Work performed under this

More information

Section TUNNEL GROUT. A. Mix design requirements, testing, furnishing, and production of grout for:

Section TUNNEL GROUT. A. Mix design requirements, testing, furnishing, and production of grout for: Section 02431 PART 1 GENERAL 1.01 SUMMARY This Section includes: A. Mix design requirements, testing, furnishing, and production of grout for: 1. Pressure grouting of bolted liner plates for shafts 2.

More information

DIVISION 300 TRENCHING SECTION 308 BORING AND JACKING 2.2 STEEL CASING PIPE

DIVISION 300 TRENCHING SECTION 308 BORING AND JACKING 2.2 STEEL CASING PIPE SECTION 308 BORING AND JACKING PART 2 MATERIALS 2.2 STEEL CASING PIPE E. Casing pipe length shall conform to City of Meridian Standard Drawing SW1 Casing Length Requirements. 2.4 CARRIER PIPE SKIDS A.

More information

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method

Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Non-destructive Testing of Installed Soil Nails Using Sonic Echo Test Method Specifications for Grouting Mixtures and Procedures for Soil Nail Installations Research Project Number 0-4484 Research Product

More information

SECTION CONTROLLED LOW STRENGTH MATERIAL

SECTION CONTROLLED LOW STRENGTH MATERIAL SECTION 03300 CONTROLLED LOW STRENGTH MATERIAL PART 1 GENERAL 1.1 DESCRIPTION A. This Section specifies Controlled Low Strength Material (CLSM) to be used as described in this specification, including

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION

CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION CONSTRUCTION SPECIFICATIONS FOR ALABAMA STATE PORT AUTHORITY MCDUFFIE TERMINALS CONVEYOR 44 PILING INSTALLATION INDEX SECTION 1 GENERAL PROVISIONS... 1-1 1.0 GENERAL... 1-1 SECTION 2 - PRESTRESSED CONCRETE

More information

SPECIAL SPECIFICATION 4492 Tie Back Anchors

SPECIAL SPECIFICATION 4492 Tie Back Anchors 2004 Specifications CSJ 0504-02-022 SPECI SPECIFICATION 4492 Tie Back Anchors 1. Description. This Item shall govern for the installation of tie-back anchors in place, with grouting as required in accordance

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

Helical Pile/Anchor Deep Foundation MODEL SPECIFICATION

Helical Pile/Anchor Deep Foundation MODEL SPECIFICATION 1 GENERAL REQUIREMENTS 1.1 The work covered by this section includes the furnishing of all labour, materials, and equipment for the construction of the helical piles/anchors as specified within the Contract

More information

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures

CONTINUOUS FLIGHT AUGER (CFA) PILES QC/QA PROCEDURES. Preferred QC/QA Procedures Preferred QC/QA Procedures The Federal Highway Administration (FHWA) has provided QC/QA guidance for this technology as noted below. The reference document also contains information about construction

More information

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS

ITEM NN17 - DRILLED SHAFTS ITEM NN17 - DRILLED SHAFTS (LOW OVERHEAD CLEARANCE) ITEM TRIAL SHAFTS DESCRIPTION A. General. This work shall consist of furnishing the materials and installing drilled shafts at the locations, dimensions, and batters shown on the contract plans or where ordered by the Engineer

More information

Implementation of this Special Provision requires a complete understanding of the following documents:

Implementation of this Special Provision requires a complete understanding of the following documents: VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR Quality Assurance/Quality Control (QA/QC) for the Construction of Deep Foundation Systems for Design-Build and PPTA Contracts November 10, 2009

More information

SECTION MORTAR

SECTION MORTAR PART l - SCOPE SECTION 04100 - MORTAR A. This Section includes all labor, materials, equipment, and related items required for the work of mortar as shown on the Drawings and specified herein. The work

More information

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout.

SECTION NONPRESTRESSED ROCK ANCHORS. 1. Placing drawings. 2. Bar details. 3. Manufacturer s data, and recommendations for grout. SECTION 02261 NONPRESTRESSED ROCK ANCHORS PART 1 GENERAL 1.1 THE REQUIREMENT A. The Work in this Section consists of all construction operations relating to designing, furnishing, and installing, complete

More information

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION

OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION Supplemental Specification 901-S-803-1 LFRD Driven Pile Specifications. DATE: May 24, 2010 OFFICE OF STATE AID ROAD CONSTRUCTION MISSISSIPPI DEPARTMENT OF TRANSPORTATION SUBJECT: LRFD Driven Pile Specifications

More information

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR QUALITY CONTROL AND ACCEPTANCE OF PORTLAND CEMENT CONCRETE RCOC/CONST:SH/JO PAGE 1 OF 9 a. Description. This special provision establishes Portland

More information

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification

More information

WATER LINE IN TUNNELS

WATER LINE IN TUNNELS Section 02517 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings that

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing

More information

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years.

A. Installer Qualifications: A firm shall have a minimum of five projects successfully constructed in the last ten (10) years. NORWOOD HALL EXTERIOR RESTORATION MISSOURI S&T ISSUED FOR BID SECTION 316300 - BORED PILES PART 1 - GENERAL 1.1 SUMMARY A. Section includes resistance piers, couplings, and brackets. 1.2 ACTION SUBMITTALS

More information

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors

SPECIAL SPECIFICATION 4401 Prestressed Ground Anchors 2004 Specifications CSJ 0581-02-121 & 0200-11-100 SPECI SPECIFICATION 4401 Prestressed Ground Anchors 1. Description. Install post-tensioned permanent ground anchors in place, with grouting as required

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE 44-1 44-1.01 Description 44-1 44-1.02 Materials 44-1 44-1.03 Proportions 44-1 44-1.04

More information

ITEM NO SLIPLINING GROUT

ITEM NO SLIPLINING GROUT 1101.1 DESCRIPTION ITEM NO. 1101 SLIPLINING GROUT Place grout in the annular space between the sliplining pipe and the host sewer. Completely fill the annular space without deflecting the pipe. Test grout

More information

Section CEMENT STABILIZED SAND

Section CEMENT STABILIZED SAND PART 1 GENERAL 1.01 SECTION INCLUDES Cement stabilized sand material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. Section 02321 1. No separate payment will be made for Work performed under this Section.

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL

SECTION XXXXX STONE COLUMNS PART 1 - GENERAL SECTION XXXXX STONE COLUMNS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division 01

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DRILLED SHAFTS 1.0 DESCRIPTION This work shall consist of furnishing all materials and labor necessary for conducting an Osterberg Cell (O-cell)

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS

SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS SPECIFICATION FOR PREFABRICATED VERTICAL DRAINS 1.0 GENERAL The work covered under this specification includes the installation of prefabricated vertical drains at the locations shown on the plans and

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

Tolerances- Section

Tolerances- Section Tolerances- Section 346-6.4 Do not add water to delivered concrete when it is within the target Range for slump 1 346-6.4 Tolerances: Meet the following tolerances from target values for plastic concrete

More information

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers.

SECTION STEEL H PILES. A. Section includes steel H piles embedded into drilled concrete piers. SECTION 31 62 16 STEEL H PILES PART 1 - GENERAL 1.01 SCOPE OF WORK A. Section includes steel H piles embedded into drilled concrete piers. B. Furnish all labor, materials, equipment and incidentals required

More information

Section WATER LINE IN TUNNELS

Section WATER LINE IN TUNNELS PART 1 GENERAL 1.01 SUMMARY Section 02517 This Section includes handling, transporting, and installing water line in primary liner tunnels, including invert cleanup and blocking and water line in casings

More information

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

SPECIFICATION FOR JET GROUTING

SPECIFICATION FOR JET GROUTING SPECIFICATION FOR JET GROUTING 1.0 GENERAL The Specialist Contractor shall construct jet grout columns of nominal diameter and spacing as specified in the drawing(s) to the requirements of the Contract.

More information

Florence County Government

Florence County Government Florence County Government Procurement Department April 29, 2016 ADDENDUM NO.1- CONSTRUCTION OF A BOARDWALK AND FISHING PIERS AT LAKE CITY PARK PROJECT (BID NO. 35-15/16) The following changes shall be

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items: ITEM 431 PNEUMATICALLY PLACED CONCRETE 431.1. Description. This Item shall govern for furnishing and placing of "Pneumatically Placed Concrete" for encasement of designated structural steel members, the

More information

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS

SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS SECTION 44 SHOTCRETE, CAST CONCRETE CHANNEL LINING, AND GROUTED COBBLE TABLE OF CONTENTS Section Page 44-1 SHOTCRETE... 44.1 44-1.01 Description... 44.1 44-1.02 Materials... 44.1 44-1.03 Proportions...

More information

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows:

ITEM 416 DRILLED SHAFT FOUNDATIONS Materials. All materials shall conform to the requirements of the pertinent items as follows: ITEM 416 DRILLED SHAFT FOUNDATIONS 416.1. Description. This Item shall govern for the construction of foundations consisting of reinforced concrete drilled shafts and/or nonreinforced concrete drilled

More information

DIVISION 7 STRUCTURES

DIVISION 7 STRUCTURES DIVISION 7 STRUCTURES Section 701. PORTLAND CEMENT CONCRETE FOR STRUCTURES 701.01 Description. Proportion structural concrete according to this section for the various grades of concrete required on the

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 63 29 (November 2014) ----------------------------- Preparing Activity: NASA Superseding UFGS-31 63 29 (May 2009) UNIFIED FACILITIES GUIDE SPECIFICATIONS References

More information

Final Estimates Level 2

Final Estimates Level 2 Florida Department of TRANSPORTATION Final Estimates Level 2 Module 6: Structures 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 6 1 6-1 Module Content Concrete Structures Bridges Substructure

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

SPECIFICATION 1035 M

SPECIFICATION 1035 M MAY 1984 SPECIFICATION 1035 M SPECIFICATIONS FOR UNDERWATER CONCRETE 1035. 1. DESCRIPTION The work will consist of the mixing of concrete in accordance with the "Specifications for Reinforced Concrete",

More information

SECTION PRECAST CONCRETE COVER SYSTEM

SECTION PRECAST CONCRETE COVER SYSTEM SECTION 13500 PRECAST CONCRETE COVER SYSTEM PART 1 GENERAL 1.1 SYSTEM DESCRIPTION A. Design Criteria: 1. Precast manufacturer shall be responsible for structural design of individual precast components,

More information

Following are key codes & standards to remember for Civil Estimators to prepare the tender/bid proposal in correct manner.

Following are key codes & standards to remember for Civil Estimators to prepare the tender/bid proposal in correct manner. CODES & STANDARDS FOR ON-SITE TESTING LABORATORY Following are key codes & standards to remember for Civil Estimators to prepare the tender/bid proposal in correct manner. Codes & Standards are published

More information

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section

SECTION SUBSURFACE INVESTIGATION. 1. Protection of the environment; Section 02011-1 of 5 SECTION 02011 SUBSURFACE INVESTIGATION 02011.01 GENERAL A. Description Subsurface investigation shall include, but not necessarily be limited to, drilling test holes (in rock), auguring holes,

More information

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,

More information

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK SECTION 06610 STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK PART 1 GENERAL 1.1 SUMMARY A. A. This Section includes the requirements for furnishing and installing all Structural Reinforced

More information

32.02 RESPONSIBILITIES OF THE TESTING AGENCY

32.02 RESPONSIBILITIES OF THE TESTING AGENCY 32.2 RESPONSIBILITIES OF THE TESTING AGENCY 32.2.1 General All materials and operations shall be tested in accordance with these Specifications and as directed by the Project Manager. Agencies testing

More information

PCC Pavement Mix Proportioning and Strength

PCC Pavement Mix Proportioning and Strength Supplemental Technical Specification for PCC Pavement Mix Proportioning and Strength SCDOT Designation: SC-M-501 (03/08) 1. SCOPE 1.1. This supplemental technical specification describes materials and

More information

WYOMING DEPARTMENT OF TRANSPORTATION. SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE

WYOMING DEPARTMENT OF TRANSPORTATION. SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE SS-500G Page 1 of 18 This supplementary specification supplements, amends,

More information

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS

SECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

PERFORMANCE-RELATED SPECIAL PROVISION FOR HIGH PERFORMANCE CONCRETE MIX DESIGNS FOR CONCRETE SUPERSTRUCTURE (Tollway)

PERFORMANCE-RELATED SPECIAL PROVISION FOR HIGH PERFORMANCE CONCRETE MIX DESIGNS FOR CONCRETE SUPERSTRUCTURE (Tollway) PERFORMANCE-RELATED SPECIAL PROVISION FOR HIGH PERFORMANCE CONCRETE MIX DESIGNS FOR CONCRETE SUPERSTRUCTURE (Tollway) Effective: October 12, 2012 Revised: June 14, 2013 DESCRIPTION This work consists of

More information

SECTION 552 HELICAL ANCHORS AND HELICAL PILES

SECTION 552 HELICAL ANCHORS AND HELICAL PILES SECTION 552 HELICAL ANCHORS AND HELICAL PILES DESCRIPTION 552.01 This work pertains to furnishing and installing helical anchors and helical piles shown in the Contract in accordance with the Drawings

More information

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08

Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Minimum Guidelines for the Design and Use of Underpins When Performing Foundation Stabilization and/or Supplementation UP-08 Table of Contents 1. Title 2. Designation 3. List of Figures 4. Scope 5. Referenced

More information

SECTION GROUT. A. American Society for Testing and Materials (ASTM):

SECTION GROUT. A. American Society for Testing and Materials (ASTM): SECTION 03600 GROUT PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-In-Place Concrete. 2. 03600 - Grout. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. C109-95

More information

SUPPLEMENTAL TECHNICAL SPECIFICATION

SUPPLEMENTAL TECHNICAL SPECIFICATION July 14, 2015 HIGH STRAIN DYNAMIC LOAD TESTING OF DRILLED SHAFTS 1.0 GENERAL This work shall consist of performing high-strain dynamic testing using a drop weight loading system on a test drilled shaft

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA April 15, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04

More information

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply:

This specification refers to the latest (current) edition of the following: For the purposes of this specification the following definitions apply: APPENDIX I SPECIFICATION FOR UNSHRINKABLE FILL MT 13.10.01 SCOPE This Specification covers the requirements for the supply of all materials, labour ad equipment necessary for the placing of Unshrinkable

More information

Construction Specification 62 Grouted Rock Riprap

Construction Specification 62 Grouted Rock Riprap Construction Specification 62 Grouted Rock Riprap 1. Scope The work consists of furnishing, transporting, and the installation of grouted rock riprap revetments and blankets, including filter or bedding

More information

Construction Specification for Unshrinkable Fill

Construction Specification for Unshrinkable Fill Engineering and Construction Services Division Standard Specifications for Road Works TS 13.10 April 2014 for Table of Contents TS 13.10.01 SCOPE... 2 TS 13.10.02 REFERENCES... 2 TS 13.10.03 DEFINITIONS...

More information

SECTION STEEL PIPE PILING

SECTION STEEL PIPE PILING SECTION 02460 STEEL PIPE PILING PART 1 GENERAL 1.1 SCOPE A. The work covered by this Section includes the furnishing of all materials, equipment, labor, and incidentals necessary for furnishing and installing

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 321610 - CURBING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies requirements for furnishing and installing all types of curbing including the following: granite curb, concrete and bituminous

More information

Multi-Institutional Academic Health Science & Research Center Evansville, IN

Multi-Institutional Academic Health Science & Research Center Evansville, IN SECTION 316317 RAMMED AGGREGATE PIERS PART 1 - GENERAL REQUIREMENTS 1.1 DESCRIPTION Work shall consist of designing, furnishing and installing Rammed Aggregate Pier foundations to the lines and grades

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

TECHNICAL SPECIFICATIONS SHALLOW SOIL MIXING CONSTRUCTION. (In-Place Wall, In-Situ Stabilization, In-Situ Fixation, ph Adjustment of Soil)

TECHNICAL SPECIFICATIONS SHALLOW SOIL MIXING CONSTRUCTION. (In-Place Wall, In-Situ Stabilization, In-Situ Fixation, ph Adjustment of Soil) TECHNICAL SPECIFICATIONS SHALLOW SOIL MIXING CONSTRUCTION (In-Place Wall, In-Situ Stabilization, In-Situ Fixation, ph Adjustment of Soil) (This technical specification is to be used to guide the writer

More information

Pennoni Associates, Inc.

Pennoni Associates, Inc. in Bethlehem, Pennsylvania, USA has demonstrated proficiency for the testing of construction materials and has conformed to the requirements established in AASHTO R 18 and the AASHTO Accreditation policies

More information

Admixtures-Section 924

Admixtures-Section 924 Admixtures-Section 924 - Qualified Products List - Types include: - Air Entraining - Water-Reducing (Type A) - Accelerating (Type C) - Water-Reducing & Retarding (Type D) - Water-Reducer & Accelerating

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Construction Specification 14 Pressure Grouting

Construction Specification 14 Pressure Grouting Construction Specification 14 Pressure Grouting 1. Scope The work consists of drilling grout holes, exploratory holes, and check holes; pressure testing, pressure washing, and injecting suspension grout

More information