1 Solar ounting Solutions Series 200 Residential Ground ount System Installation anual 2703 Listed PV ounting System

2 An Intro to SnapNrack Series 200 SnapNrack Series 200 PV ounting System offers a lo profile, visually appealing, photovoltaic (PV) module installation system. This innovative system simplifies the process of installing solar PV modules, shortens installation times, and loers installation costs. SnapNrack systems, hen installed in accordance ith this manual, ill be structurally adeuate for the specific installation site and ill meet the local and International Building Code. Systems ill also be bonded to ground, under SnapNrack s UL 2703 Listing. The SnapNrack installation system is a set of engineered components that can be assembled into a ide variety of solar mounting structures. It is designed to be installed by ualified solar installation technicians. With SnapNrack you ill be able to solve virtually any PV module mounting challenge.

3 Table of Contents Step 1: Project Plans Certification Details Series 200 Ground ount Part Details Pre-Installation Reuirements Step 2: Excavation and Pipe Installation Concrete Pier Grade Beam Step 3: Bracing Options Standard Bracing Braced Option Step 4: Rail Installation Installing & Leveling Rails Step 5: odule Installation Attaching odules LPE Installation Step 6: System Ground Grounding Specifications

4 Certification Details SnapNrack Series 200 system has been evaluated by Underriters Laboratories (UL) and Listed to UL Standard 2703 for Grounding/Bonding. Grounding/Bonding The Series 200 system has been designed in compliance ith UL Standard 2703 Section 9.1 Exception, hich permits accessible components that are not part of the fault current ground path to not be electrically bonded to the mounting system. The UL Listing covers bonding for a load rating up to 45 psf. For more details on the integrated grounding functionality see the Grounding Specifications section. This racking system may be used to ground and/or mount a PV module complying ith UL 1703 only hen the specific module has been evaluated for grounding and/or mounting in compliance ith the included instructions. See the Grounding Specifications for the list of modules tested ith the Series 100 system for integrated grounding. Ground Lug has been evaluated to both UL 467 and UL 2703 Listing reuirements. Series 200 has been listed ith the folloing Enphase microinverter models for grounding/bonding: 215, 250 and C250. The Enphase microinverters are certified to be mounted to SnapNrack rail ith the LPE Attachment or to the module frame ith the Enphase Frame ount. When installing the Enphase microinverters per the specifications in the LPE Installation section of this manual, the total roof-mounted PV system is bonded (modules, racking and microinverters) and grounded through the Enphase ground circuit hen the Enphase units are properly grounded through to the service entrance. Therefore, no ground lugs or euipment grounding conductor (EGC) are reuired on the SnapNrack systems. Series 200 has been Listed ith the folloing SolarEdge optimizer models for grounding/bonding: P300 and P350. The SolarEdge optimizers are certified to be mounted to SnapNrack rail ith the LPE Attachment or to the module frame ith the SolarEdge Poer Optimizer Frame-ounted odule Add-On. When installing the SolarEdge optimizers per the specifications in the LPE Installation section of this manual, the total roofmounted PV system is bonded to the optimizer backing plate (modules, racking and optimizers) and grounded through the ground lugs installed on the SnapNrack rail. Therefore, it is not necessary to run an EGC to each SolarEdge optimizer. The mounting system Bonding Listing is only valid hen installed ith a Non-Separately Derived PV system. The PV system is reuired to have a direct electrical connection to another source, such as connecting to the grid via a grid interactive inverter. General System Reuirements SnapNrack engineered systems should only be used ith SnapNrack components and hardare. Any application outside of those specified in this Installation anual and the Structural Engineering Report may void the arranty and structural certification could become invalid. SnapNrack recommends a periodic re-inspection of the completed installation for loose components, loose fasteners, and any corrosion, such that if found, the affected components are to be immediately replaced. 1

5 Part Details Structural Components SnapNrack Ground Rail SnapNrack Pipe Clamp Assembly SnapNrack Adjustable X-End Clamp Assembly SnapNrack Universal End Clamp SnapNrack Ground Rail End Cap SnapNrack id Clamp Kee Klamp Plug End Hollaender Single Socket Tee Hollaender Single Adjustable Socket Tee Hollaender Double Adjustable Socket Tee Hollaender Plug End 2

6 Pre-Installation Reuirements Site Survey ò easure the installation area and develop an accurate draing identifying any obstacles such as buildings, ditches and trees. (If plans are available, check to make sure that the plans match the layout.) ò Revie the shading pattern across the installation area from nearby structures, trees, etc. A shade analysis prior to the design as a part of the standard site analysis is recommended. ò Determine the design ind speed and specific conditions for the site and reference the Configuration Table in the Engineering Letter for your state to determine the maximum alloable rail span and footing spacing for this site. (All engineerings letters are available for donload from.snapnrack.com.) Best Practice: Use only SnapNrack supplied parts for the rail system. ake sure that the SnapNrack components and other products are appropriate for the particular installation and the installation environment. See Appendix A for the list of modules that have been tested ith the Series 200 UL system. Before you dig any holes, contact all utilities in the area to locate any underground lines, pipes, and iring. If you are unsure about the local design ind speed, consult ith the local building jurisdiction. UL Note: The UL Listing covers bonding for a load rating up to 45 psf. These systems have been evaluated by UL for module to system bonding only, to the reuirements of UL Subject Design Note: SnapNrack has a suite of design tools to help configure your PV installation to be an accurate and fast install. Please visit us at:. SnapNrack.com. Safety Guidance Alays ear appropriate OSHA approved safety euipment hen at active construction site Ensure safe installation of all electrical aspects of the PV array. Safety euipment should be checked periodically for ear and uality issues Alays ear proper eye protection 3

7 Pre-Installation Reuirements System Layout 1) Typically most ground mounted arrays are installed in a landscape configuration, ith the long side of the PV modules horizontal and the rails running up the slope. This is different from roof mount installations hich typically are in a portrait configuration ith the long side of the module running up slope and the rails running horizontally. 2) Layout rails so that module frame ends do not overhang mounting rails by more than 25% of total module frame length. Verify that mounting rail spans are in accordance ith the Configuration Table in your state s Engineering Letter. Also, verify that rail ends do not overhang by a distance greater than 30% of the acceptable rail span specified in the same table. 3) Submit array plans to local permitting jurisdiction and proceed ith the layout only hen all permits for the project have been granted by the authority having jurisdiction. Layout Note: odule mid clamps are installed beteen modules in a ro and reuire 0.5 inch of space beteen the modules. X clamps reuire 1.5 inches of extra rail to extend past the end of the module frame. When installing multiple ros of modules, a minimum spacing gap of 1/8 inch should be used beteen columns. Layout rails such that module frame ends do not overhang mounting rails by more than 25% of total module length. Note: All Engineering Letters for each state are available for donload at.snapnrack.com/resources. 4

8 Concrete Pier Reuired Tools ò 12 diameter Excavation Drill Auger ò Portable Band Sa (18 tpi) ò Concrete ixer ò Basic Concrete Tools ò String Line ò Surveying arker Pen or Paint aterials Included e Sched 40 or /2 Pipe / 1.9 outside diameter (Local Supplier) Rebar #4 (Optional) Concrete/Concrete ix Standard Pier Detail 5

9 Concrete Pier INSTALLATION INSTRUCTIONS 1) Prepare to excavate holes by measuring and staking hole locations. Set first stake and run a string perpendicular to true South and set second stake. Stake remaining corners of the array according to the plan layout. Excavate core footings at marked location to the depth indicated in your state s Engineering Letter. Footing size may vary depending on job-specific conditions. All conditions should be revieed by customer s site engineer. 2) Pour mixed concrete into excavated holes. 4) Determine the proper angle for the module array and calculate the length of the vertical posts. Front posts should be maximum 48 above grade tilt angle, tilt angle maximum 48 degrees. Supports vertical pipes at the proper height and angle until the concrete piers are set. Use a string line to ensure alignment of posts. 3) Insert posts into et concrete and move posts up and don to ensure concrete fills inside of posts. Bottom of posts are not in contact ith dirt. Set sonotubes at ground level centered on vertical, and fill ith concrete. Use string line grid and post level to place verticals suare and plumb. (Do not set sonotube in the concrete, as this ill make removal difficult.) Smooth concrete. Install Note: To speed up installations, it is recommended to use a 12-inch poer auger to dig the footings. Before you dig any holes, contact all utilities in the area to locate any underground lines, pipes, and iring. Before concrete completely cures, be sure to make final adjustments to posts. 6

10 Grade Beam Reuired Tools ò Backhoe tractor ith 12 Bucket ò Concrete ixer ò Basic Concrete Tools String Line ò Surveying arker Pen or Paint aterials Included e Sched 40 or /2 Pipe / 1.9 outside diameter (Local Supplier) Rebar #4 2x4 for bracing pipes Grade Beam Foundation Detail Conversion Chart for Pier to Grade Beam Footings 12 diameter Pier Depth 12 ide Grade Beams Depth (in) 18 ide Grade Beams Depth (in) 24 ide Grade Beams Depth (in) 3 ft ft ft ft ft

11 Grade Beam INSTALLATION INSTRUCTIONS 1) Prepare to excavate grade beams by measuring and staking hole locations. Set first stake and run a string perpendicular to true South and set second stake. Stake remaining corners of the array according to the plan layout. Excavate grade beams at marked location to the depth indicated in your state s Engineering Letter. Grade beam size may vary depending on jobspecific conditions. All conditions should be revieed by customer s site engineer. 2) Pour mixed concrete into excavated grade beams. 3) Insert posts into et concrete and move posts up and don to ensure concrete fills inside of posts. Bottom of posts must not be in contact ith dirt. Use string line grid and post level to place verticals suare and plumb. (Do not set sonotubes in the concrete, as this ill make removal difficult.) Smooth concrete. 4) Determine the proper angle for the module array and calculate the length of the vertical posts. Front posts should be maximum 48 above grade tilt angle, tilt angle maximum 48 degrees. Supports vertical pipes at the proper height and angle until the grade beams are set. Use a string line to ensure alignment of posts. Install Note: Before you dig any holes, contact all utilities in the area to locate any underground lines, pipes, and iring. A site specific analysis is reuired hen using a grade beam option at locations ith a design ind speed of 120 mph or higher. 12 Wide Grade Beam Footing Option 18 Wide Grade Beam Footing Option 24 Wide Grade Beam Footing Option 8

12 Standard Bracing Reuired Tools ò Allen Wrench ò Portable Band Sa ò easuring Tape aterials Included e r Sched 40 or /2 Pipe (Local Supplier) Single Socket Tee End Caps Galvanized Spray Socket Tee to Post Horizontal Pipes ith Bracing 9

13 Standard Bracing INSTALLATION INSTRUCTIONS 1) Determine the necessary cross bracing and reuired structural fittings before horizontal pipes are installed. Slide all fittings onto vertical pipes to meet bracing plan. If needed, cross bracing ill be specified on the plans and in the BO (needed if verticals are over 5 ). 2) Determine the reuired number of single socket tees and slide onto the horizontal pipes. Connect designated tees to vertical posts. 3) Set horizontals in place and check for proper leveling and angle (pitch). Use a rail to check along entire length of array for proper pitch. Use existing rigid couplers to connect long pieces together. ake sure to leave some extra on each end in case of errors. Run structural fittings in to place. 4) easure, cut, and install bracing pipes. easure the distance beteen each brace fitting on the vertical posts and then cut to measured length. Once braces are installed, tighten allen scres of fittings. Install Note: The online Configuration Tool estimates the brace lengths (to ensure you purchase enough pipe), but actual field measurements should be taken and used. ake sure verticals are plumb and set before installing cross bracing. Check to make sure that the allen scres on the structural fittings are accessible for tightening. 10

14 Braced Option Reuired Tools ò Allen Wrench ò Portable Band Sa ò easuring Tape aterials Included e r t Sched 40 or /2 Pipe (Local Supplier) Single Socket Tee Sivel Socket Tee End Caps Galvanized Spray 11

15 Braced Option INSTALLATION INSTRUCTIONS 1) Determine the necessary cross bracing and reuired structural fittings before horizontal pipes are installed. Slide all brace fittings onto vertical pipes. If needed, cross bracing ill be specified on the plans and in the BO (needed if verticals are over 5 ). 2) Determine the reuired number of single socket tees and slide onto the horizontal pipe. Connect designated tees to vertical posts. 3) Set horizontals in place and check for proper leveling and angle (pitch). Use a rail to check along entire length of array for proper pitch. Use existing rigid couplers to connect long pieces together. Run structural fittings in to place. 4) easure, cut, and install bracing pipes. easure the distance beteen each brace fitting on the vertical posts and then cut to measured length. Brace E and F are to be attached to the horizontal at 1/3 the distance beteen the to posts. Once braces are installed, tighten allen scres of fittings. Install Note: ake sure verticals are plumb and set before installing cross bracing. ake sure to leave extra length on each end in case of errors. Check to make sure that the allen scres on the structural fittings are accessible for tightening. Online configuration tool estimates brace lengths, but actual field measurements should be taken and used. 12

16 Installing and Leveling Rails Reuired Tools ò Level ò String Line or Spare Rail ò Pitch eter ò Roof Sealant ò 1/2 Socket Wrench ò 5/32 Allen Key ò Torue Wrench aterials Included Ground Rail Pipe Clamp Assemblies Pipe Clamp to Rail Assembly aterials Included - Wire Clips (1) SnapNrack Wire Clip Dimensioned Wire Clip 13

17 Installing and Leveling Rails INSTALLATION INSTRUCTIONS 1) Find center of array and mark edges of each module on the loer horizontal pipe. Determine the distance from the loer horizontal to the edge of the rail. ark all rails at this distance. 2) Place pipe clamps on horizontal rails here markings are placed. Next, place rails here markings are placed. 3) Attach rails ith the pipe clamps by snapping-in the bonding channel nuts to rail. Channel nuts are designed to snap in and out of rail channels. This enables you to uickly assemble systems ithout having to slide inserts from the end of the rail. Then tighten bolts to create a secure attachment to pipes. Pipe clamps torue to 12 ft-lbs. SnapNrack Wire Clip 4) Use a to suare one rail and tighten. Transfer distances from the loer horizontal to the upper horizontal, maintaining a common reference point. Tighten rails at your marks. Double check suareness by checking corner to corner distances (diagonals). If the rails are of eual length, and are parallel, the diagonal distances should be eual. 1) Place all electrical conductors in the bottom of the rail channel. 2) Install the ire clip by snapping it into place on the rail. All electrical conductors are no securely enclosed in the rail. 14

18 Attaching odules Reuired Tools ò Torue Wrench ò 1/2 Socket Wrench aterials Included - Install odule Clamps e r t Pre Installed SnapNrack Pipe Structure Attachments Pre Installed SnapNrack Rails SnapNrack id Clamp Assemblies Install on standing metal seam roofs that SnapNrack the seam End clamp Clamp fits over. Assemblies PV odules id Clamp Assembly Adjustable End Clamp Assembly e r (1) 5/16-18 SS HCS Bolt (1) 5/16 SS Split Lock Washer (1) SnapNrack Bonding id Clamp Install on standing metal seam roofs that (1) the 5/16-18 seam clamp SnapNrack fits over. Channel Nut e r (1) 5/16-18 SS HCS Bolt (1) 5/16 SS Split Lock Washer (1) SnapNrack Self Adjusting Top (1) SnapNrack Self Adjusting Bottom e e r r Universal End Clamp Assembly e r (1) 5/16-18 X 1-1/2 SS HCS Bolt (1) 5/16 X 3/4 SS Flat Washer (1) SnapNrack Universal Wedge (1) SnapNrack Universal Wave e r 15

19 Attaching odules INSTALLATION INSTRUCTIONS SnapNrack id Clamp 1) Snap the preassembled SnapNrack id Clamp s channel nut into the top channel of the rail. 2) Slide the mid clamp flush to the module ith the top lip of the mid clamp over the top edge of the module. Place the next module flush to the other side of the mid clamp. 3) Tighten hardare, torue silver hardare to ft-lbs and black hardare to 8-10 ft-lbs. Adjustable End Clamp Assembly 1) Snap the clamp channel nut into the top channel of the rail. 2) Slide the clamp flush to the edge of the module ith the lip of the top of the end clamp over the top of the module and lip of the bottom of the end clamp under the module. 3) Tighten hardare, torue silver hardare to ft-lbs and black hardare to 8-10 ft-lbs. 16

20 Attaching odules INSTALLATION INSTRUCTIONS SnapNrack Universal End Clamp 1) Slide the preassembled Universal End Clamp (UEC) into the end of the rail. 2) Lift the module and slide the universal end clamp under the module far enough to pass the lip of the bottom edge of the module. 3) Use the pull tab to pull the universal end clamp tight to the end of the rail. 4) Hold and tighten the universal end clamp to ft-lbs. Then install rubber end cap to finish. Install Note: odules need to be grounded separately hen Universal End Clamps are the only type of clamp attaching a module. 17

21 LPE Installation Reuired Tools ò Torue Wrench ò Socket Wrench ò 1/2 Socket aterials Included - LPE Rail Attachment Kit e e (1) 5/16 X 1-1/2 X SS Fender Washer (1) SnapNrack Channel Nut (1) 5/16-18 X 1-1/4 SS Flange Bolt Other Install on standing aterials metal seam Reuired roofs that the seam clamp fits over. (1) LPE Unit BOLT-TO-PLATE BONDING 5/16"-18 SS FLANGE BOLT (TORQUE TO 16 FT-LBS) OUNTING PLATE IN 1/8" THICK SS FENDER WASHER CHANNEL NUT RAIL SS BONDING PIN aterials Install on standing Needed metal seam roofs that the seam clamp fits over. Enphase Frame ount aterials Needed SolarEdge Frame ount Install on standing metal seam roofs that the seam clamp fits over. (1) Enphase icroinverter (1) Enphase Frame ount (1) SolarEdge Optimizer / Frame-ounted odule Add-On SOLAREDGE 18

22 LPE Installation INSTALLATION INSTRUCTIONS - LPE RAIL ATTACHENT 1) Snap the SnapNrack LPE Rail Attachment Kit channel nut into the desired location on the rail here the microinverter ill be installed. 2) Install the microinverter mounting plate onto the bolt of the LPE Rail Attachment Kit, ensuring that the large fender asher is beteen the rail and mounting plate. Install Note: Bolt and ashers may need to be removed and then replaced. 3) Tighten hardare, torue silver hardare to 10 ft-lbs. INSTALLATION INSTRUCTIONS - SOLAREDGE FRAE OUNT 1) Locate the SolarEdge optimizer ith Frame-ounted odule Add- On at a location on the module frame that ill not interfere ith the SnapNrack rail. 2) Install the optimizer mounting plate onto the module frame and tighten hardare to 7 ft-lbs. 3) Connect the module leads to the input connectors on the optimizer. Install Note: Refer to the SolarEdge optimizer Frame-ounted odule Add-On installation guide for additional instructions. 19

23 LPE Installation INSTALLATION INSTRUCTIONS - ENPHASE FRAE OUNT 1) Locate the Enphase Frame ount bracket clamp at a location on the module frame that ill not interfere ith the SnapNrack rail. 2) Slide the microinverter unit onto the bracket clamp, then move it slightly to the left. Install Note: The microinverter mounting flange should be on the outside of the module frame. 3) Tighten hardare to 13 ft-lbs 4) Connect the module leads to the microinverter DC connectors. Install Note: Refer to the Enphase Frame ount installation guide for additional instructions. 20

24 Grounding Specifications System Bonding ethods BONDING ID CLAP ASSEBLY e r SnapNrack id Clamp SnapNrack Adjustable End Clamp SnapNrack Pipe Clamp Hollaendar Pipe Fittings SS BONDING PIN ODULE FRAE RAIL BONDING CHANNEL NUT Note: SnapNrack module clamps contain a SnapNrack Channel Nut ith integral bonding pins in assembly to properly bond the system (except Universal End Clamps). SnapNrack Ground Lug Assembly 21

25 Grounding Specifications Ilsco Lay-in Lug Assembly Ground Path Details X X TO EGC U U X X RAIL PIPE FITTING PIPE CLAP GROUND LUG ODULE CLAP = IDCLAP GROUND PATH EQUIPENT GROUNDING CONDUCTOR X = X-END CLAP U = UNIVERSAL END CLAP 22

26 Grounding Specifications Ground Path Details - SolarEdge X X TO EGC U U X X RAIL PIPE FITTING PIPE CLAP GROUND LUG GROUND PATH EQUIPENT GROUNDING CONDUCTOR SOLAREDGE OPTIIZER ODULE CLAP = IDCLAP X = X-END CLAP U = UNIVERSAL END CLAP 23

27 Grounding Specifications Ground Path Details - Enphase X X TO EGC U U X X RAIL PIPE FITTING PIPE CLAP GROUND PATH EQUIPENT GROUNDING CONDUCTOR ENPHASE ICRO- INVERTER ODULE CLAP = IDCLAP X = X-END CLAP U = UNIVERSAL END CLAP 24

28 Grounding Specifications INSTALLATION INSTRUCTIONS SnapNrack Ground Lug 1) Snap the SnapNrack Ground Lug into the rail channel on one rail per array. Install Note: SnapNrack Ground Lug may be used in top or bottom channel, and may be rotated 90 degrees relative to slot to facilitate running copper across top of rails. 2) Place grounding conductor into slot underneath split ring asher. Install Note: SnapNrack Ground Lug only Listed for use ith 6-12 AWG solid copper conductor. 3) Tighten all hardare to a minimum of 16 ft-lbs. 25

29 Grounding Specifications INSTALLATION INSTRUCTIONS Ilsco Lay-In Lug 1) Drill a 3/8 hole in side of the rail for the Ilsco lug to attach to, place the bolt through the hole, and attach the lug assembly on one rail per array. Install Note: Torue rail connection to 5 ft-lbs. 2) Place grounding conductor into slot. 3) Tighten set scre per Ilsco s recommendation (see belo). Install Note: Torue set scre to 20 in-lbs for #10-#14 solid and stranded copper, 25 in-lbs for #8 stranded copper, and 35 in-lbs for #4-#6 stranded copper. Note: System has been evaluated to a maximum overcurrent device (OCD) protection level of 20 Amps. Universal End Clamp (UEC) does not bond module to rail. Be sure to separately ground any modules that are only secured by UECs, especially during servicing. SnapNrack Ground Lug: torue bolt to 16 ft-lbs. The Ground Lug may be used in top or bottom channel. It may be rotated 90 degrees relative to slot to facilitate running copper across top of rails. Grounding ith a standard Ilsco GBL-4DBT Lug is a listed alternate and reuires drilling of a hole in the rail. Hardare connection to rail: 5 ft-lbs. Torue for lug set scre: #10-#14 solid and stranded copper- 20 in-lbs, #8 stranded copper- 25 inlbs, #4-#6 stranded copper- 35 in-lbs. 26

30 Grounding Specifications Series 200 has been tested ith the folloing UL Listed modules: The Series 200 System employs top-don clamps hich have been evaluated for frame-to-system bonding, at a specific mounting torue and ith the specific modules listed belo. The system has been assessed to a maximum Over-Current Device (OCD) protection level of 20 amps. Hyundai Heavy Industries Co Ltd: HiS-xxxRG Series - HiS-250RG, HiS-255RG, HiS-260RG; HiS-SxxxRG Series - HiS- S260RG, HiS-S265RG, HiS-S270RG; HiS-xxxG Series - HiS-210G, HiS-213G, HiS-215G, HiS-218G, HiS-220G, HiS-223G, HiS-225G, HiS-228G, HiS230G, HiS-233G, HiS-235G, HiS-238G, HiS-240G, HiS-243G, HiS-245G, HiS-248G, HiS-250G, HiS-253G, HiS-255G, HiS-258G, HiS-260G, HiS-263G, HiS-265G, HiS-268G, HiS-270G; HiS-SxxxG Series - HiS-S220G, HiS-S223G, HiS-S225G, HiSS228G, HiS-S230G, HiS- S233G, HiS-S235G, HiS-S238G, HiS-S240G, HiS-S243G, HiS-S245G, HiS-S248G, HiS-S250G, HiS-S253G, HiS- S255G, HiS-S258G, HiS-S260G, HiS-S263G, HiS-S265G, HiS-S268G, HiS-S270G, HiS-S273G, HiS-S275G; all may be folloed by the suffix BK or blank; HiS-SxxxRW Series - HiS-S255RW, HiS-S260RW, HiS-S265RW JA Solar: JAP6-60-xxx/3BB JAP /3BB, JAP /3BB, JAP /3BB, JAP /3BB, JAP /3BB; JA6-60-xxx/SI JA /SI, JA /SI, JA /SI, JA /SI, JA /SI Jinko Solar: JKxxxP-60 JK250P-60, JK255P-60, JK260P-60, JK265P-60; JKxxxP-72 JK305P-72, JK310P-72, JK315P-72, JK320P-72; JKxxx-60 JK255-60, JK260-60, JK265-60, JK270-60, JK275-60; JKxxx-72 JK300-72, JK305-72, JK310-72, JK315-72, JK320-72; JKxxxPP-60 JK255PP-60, JK260PP-60, JK265PP-60, JK270PP-60; JKxxxPP-72 JK305PP-72, JK310PP-72, JK315PP-72, JK320PP-72; JKxxxP-60-V JK255P-60-V, JK260P-60-V, JK265P-60-V, JK270P-60-V; JKxxxP-72-V JK300P-72-V, JK305P-72-V, JK310P- 72-V, JK315P-72-V, JK320P-72-V; JKxxxPP-60-V JK255PP-60-V, JK260PP-60-V, JK265PP-60-V, JK270PP-60-V; JKxxxPP-72-V JK305PP-72-V, JK310PP-72-V, JK315PP-72-V, JK320PP-72-V; JKxxxP/PP-60-V JK270P/PP-60-V; JKxxxP/PP-72-V JK320P/PP-72-V; JKSxxxP JKS255P, JKS260P, JKS265P, JKS270P REC Solar AS: REC214, REC215, REC220, REC225, REC230, REC235, REC240, REC245, REC250, REC255, REC260, REC265, REC270; all folloed by PE, PE(BLK), PE-US, PE-US(BLK), PE Q2 or PE Q3 Renesola Jiangsu Ltd: JCxxx-24/BB Series - JC200-24/Bb, JC205-24/Bb, JC210-24/Bb, JC215-24/Bb, JC220-24/Bb, JC225-24/Bb, JC230-24/Bb, JC235-24/Bb, JC240-24/Bb, JC245-24/Bb, JC250-24/Bb, JC255-24/Bb, JC260-24/ Bb, JC265-24/Bb, JC270-24/Bb Suniva Inc: VX , VX , VX , VX , VX , VX , VX ; VX B1, VX B1, VX B1, VX B1, VX B1, VX B1, VX B1; OPT , OPT , OPT , OPT , OPT , OPT ; OPT B0, OPT B0, OPT B0, OPT B0, OPT B0, OPT B0 Talesun: TP660P-xxx TP660P-240, TP660P-245, TP660P-250, TP660P-255, TP660P-260, TP660P

31 Grounding Specifications Trina Solar Ltd: TS-xxxPD05 TS-215PD05, TS-220PD05, TS-225PD05, TS-230PD05, TS-235PD05, TS-240PD05, TS-245PD05, TS-250PD05, TS-255PD05, TS-260PD05, TS-265PD05; TS-xxxPD05.05 TS-245PD05.05, TS- 250PD05.05, TS-255PD05.05, TS-260PD05.05, TS-265PD05.05; TS-xxxPD05.08 TS-215PD05.08, TS-220PD05.08, TS-225PD05.08, TS-230PD05.08, TS-235PD05.08, TS-240PD05.08, TS-245PD05.08, TS-250PD05.08, TS- 255PD05.08, TS-260PD05.08, TS-265PD05.08; TS-xxxPA05 TS-215PA05, TS-220PA05, TS-225PA05, TS- 230PA05, TS-235PA05, TS-240PA05, TS-245PA05, TS-250PA05, TS-255PA05, TS-260PA05; TS-xxxPA05.05 TS-215PA05.05, TS-220PA05.05, TS-225PA05.05, TS-230PA05.05, TS-235PA05.05, TS-240PA05.05, TS- 245PA05.05, TS-250PA05.05, TS-255PA05.05, TS-260PA05.05; TS-xxxPA05.08 TS-215PA05.08, TS-220PA05.08, TS-225PA05.08, TS-230PA05.08, TS-235PA05.08, TS-240PA05.08, TS-245PA05.08, TS-250PA05.08, TS- 255PA05.08, TS-260PA05.08 Yingli Energy (China) Co Ltd: YLxxxP-29b Series - YL215P-29b, YL220P-29b, YL225P-29b, YL230P-29b, YL235P-29b, YL240P- 29b, YL245P-29b, YL250P-29b, YL255P-29b, YL260P-29b; YLxxxA-29b Series - YL220A-29b, YL225A-29b, YL230A-29b, YL235A-29b, YL240A-29b, YL245A-29b, YL250A-29b, YL255A-29b NRTL Listed PV odules: Canadian Solar: CS6P-xxx-P CS6P-255-P, CS6P-260-P, CS6P-265-P; CS6P-xxx-P-SD CS6P-260-P-SD, CS6P-265-P-SD; CS6Pxxx- CS6P-265-, CS6P-270-; CS6K-xxx- CS6K-270-, CS6K-275-, CS6K-280-; CS6K-xxx-P CS6K-255-P, CS6K- 260-P; CS6K-xxx-P-SD CS6K-260-P-SD, CS6K-265-P-SD; CS6V-xxx- CS6V-215-, CS6V-220-, CS6V-225-; CS6V-xxx-P CS6V-250-P, CS6V-255-P; CS6X-xxx-P CS6X-310-P, CS6X-315-P, CS6X-320-P ET Solar: P660xxxBB P660200BB, P660205BB, P660210BB, P660215BB, P660220BB, P660225BB, P660230BB, P660235BB, P660240BB, P660245BB, P660250BB, P660255BB, P660260BB; P660xxxWB/WW P660200, P660205, P660210, P660215, P660220, P660225, P660230, P660235, P660240, P660245, P660250, P660255, P660260, P660265; all folloed by WB or WW; P660xxxWWG P660240WWG, P660245WWG, P660250WWG; 660xxxBB BB, BB, BB, BB; 660xxxWW WW, WW, WW, WW, WW, WW, WW, WW, WW, WW, WW, WW, WW, WW, WW Hanha Q-Cells: Q.PRO-G4 xxx - Q.PRO-G4 255, Q.PRO-G4 260, Q.PRO-G4 265; Q.PLUS-G4 xxx -Q.PLUS-G4 270, Q.PLUS-G4 275, Q.PLUS-G4 280; Q.PRO BRF-G4 xxx Q.PRO BRF-G4 255, Q.PRO BRF-G4 260, Q.PRO BRF-G4 265; Q.PLUS BRF-G4 xxx Q.PLUS BRF-G4 270, Q.PLUS BRF-G4 275, Q.PLUS BRF-G4 280; Q.PRO BRF-G4.1 xxx Q.PRO BRF-G , Q.PRO BRF-G , Q.PRO BRF-G ; Q.PLUS BRF-G4.1 xxx Q.PLUS BRF-G , Q.PLUS BRF-G , Q.PLUS BRF-G ; Q.PRO-G3 xxx Q.PRO-G3 250, Q.PRO-G3 255, Q.PRO-G3 260, Q.PRO-G3 265; Q.PRO-G2 xxx Q.PRO-G2 215, Q.PRO-G2 220, Q.PRO-G2 225, Q.PRO-G2 230, Q.PRO-G2 235, Q.PRO-G2 240, Q.PRO-G2 245, Q.PRO-G2 250 Hanha SolarOne: HSL60P6-PC-3-245, HSL60P6-PC-3-250, HSL60P6-PC-3-255, HSL60P6-PC-3-260, HSL60P6-PC-3-265, HSL60P6-PC-3-270; all folloed by W or B; HSL60P6-PB-2-230Q, HSL60P6-PB-2-235Q, HSL60P6-PB-2-240Q, HSL60P6- PB-2-245Q, HSL60P6-PB-2-250Q, HSL60P6-PB-2-255Q, HSL60P6-PB-2-260Q, HSL60P6-PB-2-265Q, HSL60P6-PB-2-270Q; HSL60P6-PB-4-230Q, HSL60P6-PB-4-235Q, HSL60P6-PB-4-240Q, HSL60P6-PB-4-245Q, HSL60P6-PB-4-250Q, HSL60P6-PB Q, HSL60P6-PB-4-260Q, HSL60P6-PB-4-265Q, HSL60P6-PB-4-270Q; may be folloed by additional suffixes. JA Solar: JAP6-60-xxx/3BB JAP /3BB, JAP /3BB, JAP /3BB, JAP /3BB, JAP /3BB; JA6-60-xxx/SI JA /SI, JA /SI, JA /SI, JA /SI, JA /SI LG Solar: LGxxxS1C-G4 LG275S1C-G4, LG280S1C-G4, LG285S1C-G4; LGxxxN1K-G4 LG300N1K-G4; LGxxxN1C-G4 LG300N1C-G4, LG305N1C-G4, LG310N1C-G4, LG315N1C-G4, LG320N1C-G4 28

32 Grounding Specifications Solar World: SWxxx-ono (33mm frame, 5 busbar) SW285-ono, SW290-ono, SW295-ono, SW300-ono; SWxxx-ono (33mm frame) SW280-ono, SW285-ono, SW290-ono, SW295-ono; SWxxx-ono Black (33mm frame) SW275-ono Black, SW280-ono Black, SW285-ono Black, SW290-ono Black; SWxxx-Poly (33mm black frame) SW250-ono Black, SW255-ono Black, SW260-ono Black; SW xxx XL ono (33mm frame); SW 320 XL ono, SW 325 XL ono; SW xxx XL ono (33mm frame) SW 340 XL ono, SW 345 XL ono, SW 350 XL ono Suniva Inc: OPTXXX-60-4-YYY; here XXX may be numbers 240 to 270 in increments of 5; here YYY may be 100; OPTXXX YYY; here XXX may be numbers 235 to 265 in increments of 5; here YYY may be 1B0 REC Solar AS: RECxxxPE Series REC214PE, REC215PE, REC220PE, REC225PE, REC230PE, REC235PE, REC240PE, REC245PE, REC250PE, REC255PE, REC260PE, REC265PE, REC270PE; may be folloed by BLK; RECxxxTP Series REC260TP, REC265TP, REC270TP, REC275TP, REC280TP; may be folloed by BLK Talesun: TP660P-xxx TP660P-240, TP660P-245, TP660P-250, TP660P-255, TP660P-260, TP660P-265; TP660P-xxx-B TP660P-250-B, TP660P-255-B; TP660-xxx TP , TP , TP , TP , TP , TP ; TP660-xxx-B TP B, TP B, TP B, TP B, TP B Trina Solar Ltd: TS-xxxPA05 TS-215PA05, TS-220PA05, TS-225PA05, TS-230PA05, TS-235PA05, TS-240PA05, TS-245PA05, TS-250PA05, TS-255PA05, TS-260PA05; TS-xxxPA05.05 TS-215PA05.05, TS-220PA05.05, TS- 225PA05.05, TS-230PA05.05, TS-235PA05.05, TS-240PA05.05, TS-245PA05.05, TS-250PA05.05, TS-255PA05.05, TS-260PA05.05; TS-xxxPA05.08 TS-215PA05.08, TS-220PA05.08, TS-225PA05.08, TS-230PA05.08, TS- 235PA05.08, TS-240PA05.08, TS-245PA05.08, TS-250PA05.08, TS-255PA05.08, TS-260PA05.08, TS-265PA05.08; TS-xxxPD TS-245PD05.002, TS-250PD05.002, TS-255PD05.002, TS-260PD05.002, TS-265PD05.002, TS-270PD05.002, TS-275PD05.002, TS-280PD05.002, TS-285PD05.002, TS-290PD05.002, TS-295PD05.002, TS-300PD05.002, TS-305PD05.002, TS-310PD05.002; TS-xxxPD TS-245PD05.082, TS-250PD05.082, TS-255PD05.082, TS-260PD05.082, TS-265PD05.082, TS-270PD05.082, TS-275PD05.082, TS-280PD05.082, TS- 285PD05.082, TS-290PD05.082, TS-295PD05.082, TS-300PD05.082, TS-305PD05.082, TS-310PD

33 The SnapNrack name and SnapNrack logo are the property of SnapNrack, Inc. All information contained in this document are the property of SnapNrack, Inc. 2016, SnapNrack, Inc. All rights reserved. S200 UL Install anual_v1.14

Solar Mounting Solutions. Series 200 Residential Ground Mount System Installation Manual. snapnrack.com Listed PV Mounting System

Solar Mounting Solutions. Series 200 Residential Ground Mount System Installation Manual. snapnrack.com Listed PV Mounting System Solar ounting Solutions Series 200 Residential Ground ount System Installation anual 2703 Listed PV ounting System An Intro to SnapNrack Series 200 SnapNrack Series 200 PV ounting System offers a low profile,

More information

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual Series 200 UL Introduction Series 200 UL Introduction SnapNrack Series

More information

Solar Mounting Solutions. Series 200 Residential Ground Mount System Installation Manual. snapnrack.com Listed PV Mounting System

Solar Mounting Solutions. Series 200 Residential Ground Mount System Installation Manual. snapnrack.com Listed PV Mounting System Solar ounting Solutions Series 200 Residential Ground ount System Installation anual 2703 Listed PV ounting System An Intro to SnapNrack Series 200 SnapNrack Series 200 PV ounting System offers a low profile,

More information

SunShield and SunShield Plus Awning Systems. SunModo PV Rack Mounting System UL2703 Compliant. 1 P a g e

SunShield and SunShield Plus Awning Systems. SunModo PV Rack Mounting System UL2703 Compliant. 1 P a g e SunModo PV Rack Mounting System UL2703 Compliant 1 P a g e Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety grounding and bonding equipment and

More information

INSTALLATION GUIDE ROOF MOUNT PUB15JUL09. NOTE: Refer to construction drawings for project specific details. Construction drawings have

INSTALLATION GUIDE ROOF MOUNT PUB15JUL09. NOTE: Refer to construction drawings for project specific details. Construction drawings have RM ROOF PUB15JUL09 NOTE: Refer to construction drawings for project specific details. Construction drawings have precedence over these installation guidelines. SYSTEM COMPONENTS 1 TECHNICAL DATA SHEET

More information

SunModo PV Rack Mounting System UL2703 Compliant

SunModo PV Rack Mounting System UL2703 Compliant SunModo PV Rack Mounting System UL2703 Compliant Pub. D10100-V003 Copyright 2017 1 of 29 Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety grounding

More information

GroundTrac. Installation Manual

GroundTrac. Installation Manual APPLICATION: The GroundTrac system is designed with a minimum amount of installed footings at greatly reduced labor. The system integrates with ordinary 1-1/2 schedule #40 galvanized water pipe. This ground

More information

EZ Standing Seam Roof Mounting System. SunModo PV Rack Mounting System UL2703 Compliant. 1 P a g e

EZ Standing Seam Roof Mounting System. SunModo PV Rack Mounting System UL2703 Compliant. 1 P a g e SunModo PV Rack UL2703 Compliant 1 P a g e Please read carefully before installing Product is tested to and recognized to UL 2703 standards for safety grounding and bonding equipment and meets UL 1703

More information

SnapNrackTM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL

SnapNrackTM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL SnapNrackTM PV MOUNTING SYSTEM GROUND MOUNT CODE COMPLIANT INSTALLATION MANUAL Table of Contents 1. INTRODUCTION...2 1.1 Overview of the Ground Mount System...2 1.2 Overview of this manual...3 1.3 Your

More information

GROUND MOUNT INSTALLATION MANUAL

GROUND MOUNT INSTALLATION MANUAL GROUND MOUNT INSTALLATION MANUAL Contents DISCLAIMER 1 CHECKLIST 2 1. ERECT BASe 3 2. CONNECT PIPES 3 3. PLACE RAILS 4 4. SECURE LUGS 4 5. CLAMP MODULES 5 DIAGONAL BRACES (OPTIONAL) 6 UNDER CLAMPS (OPTIONAL)

More information

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED ASSEMBLY ENGINEERING DRAWINGS TERMS AND CONDITIONS

More information

INSTALLATION GUIDE REV2016NOV15 DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISED EQUATIONS - PAGE 1 - ADDITIONAL CHANGES

INSTALLATION GUIDE REV2016NOV15 DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISED EQUATIONS - PAGE 1 - ADDITIONAL CHANGES INSTALLATION GUIDE DOCUMENT REVISION HISTORY - INTERNAL USE ONLY - NOT FOR PUBLIC RELEASE REVISION DATE 2016MAY31 2016OCT17 2016NOV15 Notes / Changes INITIAL RELEASE REVISED EQUATIONS REVISED EQUATIONS

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast Place Modules & Attach Clamps Attach Clamps Module Installation & Wire

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): TABLE OF CONTENTS: System Components System Level Fire Code Compliance Attach Module Clips Locate Array / Set-Up On Roof Module to RM Bay Instructions Module to RM Bay instructions - Cont. Module Clip

More information

SWH Solar Racking Ground Mount Installation Guide

SWH Solar Racking Ground Mount Installation Guide Version 16.02.v1 SWH Solar Racking Ground Mount Installation Guide Installer responsibility The installer is solely responsible for: Complying with all local or national building codes, including any that

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS CROSSRAIL TILT KIT 7 / 0 / 5 TILT FOR LOW-SLOPE AND STEEP-SLOPE ROOFS TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS

More information

STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120

STP Mount Series. Installation Manual. STP-LSCR-MAN 2017 Edition v1.0. For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120 Installation Manual STP-LSCR-MAN 2017 Edition v1.0 For models: STP-SCR/045 STP-SCR/060 STP-SCR/070 STP-LCR/090 STP-LCR/120 Table of Contents Introduction... 1 Customer Support... 1 Tools Required... 2

More information

Unirac Code-Compliant Installation Manual

Unirac Code-Compliant Installation Manual Planning and Assembly Installer responsibility The installer is solely responsible for: Complying with all local or national building codes, including any that may supercede this manual. Ensuring that

More information

Aurora Genmounts Install LT Installation Manual

Aurora Genmounts Install LT Installation Manual Aurora Genmounts Install LT Installation Manual TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PRODUCT OVERVIEW 3.0 TECHNICAL SPECS 4.0 INSTALLER RESPONSIBILITY 5.0 SITE SELECTION 6.0 TOOLS REQUIRED 7.0 COMPONENT

More information

RECOGNIZED COMPONENT Constructional Data Report (CDR)

RECOGNIZED COMPONENT Constructional Data Report (CDR) RECOGNIZED COMPONENT Constructional Data Report (CDR) 1.0 Reference and Address Report Number 102066127MPK-003 Original Standard(s) Address Country Contact Phone FAX Email Mounting Systems, Mounting Devices,

More information

Benefits in Speed and Logistics using the RL System. snapnrack.com

Benefits in Speed and Logistics using the RL System. snapnrack.com Benefits in Speed and Logistics using the RL System snapnrack.com Agenda About SnapNrack Overview of Residential Solar Mounting Systems Benefits of railless systems What you should look for in a railless

More information

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT 2-2012 The PV-Solar Tripod System has been developed as a universal system for tilt solar panel roof-mounting

More information

ASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM. UL 2703 Listed System USA

ASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM. UL 2703 Listed System USA ASSEMBLY INSTRUCTIONS COMMERCIAL ROOF SOLUTIONS D DOME RAILLESS 2 SYSTEM UL 2703 Listed System USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED BONDING AND GROUNDING FIRE RATING

More information

For HatiCon Solar Mounting System only

For HatiCon Solar Mounting System only Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For HatiCon Solar Mounting System only Please read carefully before installing. Burndy LLC. recommends that the sufficient

More information

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT 2-2012 The PV-RoofTopRac System has been developed as a universal system for roof-mounting on pitched roofs.

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): INSTALLATION GUIDE TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast & South Modules Place Modules & Attach Clamps Ballast

More information

moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web:

moment Engineering + Design Warwick Avenue, Suite #C5 Fairfax, VA Phone: Web: CrossRail48SConnector RE: CrossRail48SConnectorEvaluation DesignReferenceDocuments MinimumDesignLoadsforBuildingsandOtherStructures 2010AluminumDesign MetalCurtainWallFasteners Overview Methods&DesignParameters

More information

Descriptive Report and Test Results

Descriptive Report and Test Results Descriptive Report and Test Results MASTER CONTRACT: 266909 REPORT: 700584 Edition 1: August 12, 2016; Project 700584 Albuquerque Prepared by Chase Henson; Reviewed by Ze Guo Contents: Certificate of Compliance

More information

Descriptive Report and Test Results

Descriptive Report and Test Results Descriptive Report and Test Results Edition 1: Edition 2: September 20, 2017; Project 70131735 and 70143126 Albuquerque Issued by Michael Hoffnagle December 6, 2017; Project 70161436 Albuquerque Issued

More information

For Silverback Solar

For Silverback Solar Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For Silverback Solar Please read carefully before installing. Wiley Electronics recommends that the sufficient details of

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): INSTALLATION GUIDE TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast & South Modules Place Modules & Attach Clamps Ballast

More information

Table of Contents: SFUSA Ground Mount Structure Installation Manual

Table of Contents: SFUSA Ground Mount Structure Installation Manual SFUSA Table of Contents: Installer Responsibilities. Pg 2 Certification Details. Pg 2 System Components.. Pg 3 System Layout Planning. Pg 6 Sub-structure assembly Pg 6 Rail Installation.. Pg 7 Solar Module

More information

Adjustable S-Tile Installation Manual

Adjustable S-Tile Installation Manual Adjustable S-Tile Installation Manual Contents Check List SolaRack Components Marking Recommended Spacing Mounting Instructions: Portrait Mounting Instructions: Landscape Grounding & Electrical Diagram

More information

Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850. Rev 1.6, January 2018

Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850. Rev 1.6, January 2018 Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850 Rev 1.6, January 2018 Sales: 740-249-1877 Sales@EcolibriumSolar.com Field Support: 866-488-6794 FieldSupport@EcolibriumSolar.com

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

PITCHED ROOF DESIGN GUIDE A WALKTHROUGH OF THE SOLAR MOUNTING DESIGN PROCESS

PITCHED ROOF DESIGN GUIDE A WALKTHROUGH OF THE SOLAR MOUNTING DESIGN PROCESS PITCHED ROOF DESIGN GUIDE A WALKTHROUGH OF THE SOLAR MOUNTING DESIGN PROCESS TABLE OF CONTENTS BEFORE YOU BEGIN 3 1. DEFINE SITE CONDITIONS 4-5 MEASURE USUABLE SPACE 6-7 DESIGN ARRAY LAYOUT 8-14 GROUND

More information

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For POWER-STRUT Mounting System only Washer, Electrical Equipment Bond WEEB Patent Pending INSTALLATION INSTRUCTIONS For POWER-STRUT Mounting System only Please read carefully before installing. Burndy LLC recommends that the sufficient details

More information

Conergy SunTop IV Price List. Made in. USA & Ontario, CANADA

Conergy SunTop IV Price List. Made in. USA & Ontario, CANADA Conergy SunTop IV Price List The total residential mounting solution Made in USA & Ontario, CANADA Conergy: world s only manufacturer of turn-key solar power system solutions. Conergy s expertise and knowledge

More information

Stealth Residential Roof Mount System Installation Manual

Stealth Residential Roof Mount System Installation Manual www.pvracking.com Stealth Residential Roof Mount System Installation Manual 2703 Listed PV Mounting System Table of Contents OVERVIEW OF COMPONENTS... 3 COMPONENTS... 3 OVERVIEW... 6 PV STEALTH ROOF INSTALLATION...

More information

Composition L-Foot Kit Installation Manual

Composition L-Foot Kit Installation Manual Composition L-Foot Kit Installation Manual Contents Check List SolaRack Components Marking Recomended Spacing Mounting Instructions: Portrait Mounting Instructions: Landscape Grounding & Electrical Diagram

More information

Railed Systems: How to Be Competitive While Still Maintaining Value

Railed Systems: How to Be Competitive While Still Maintaining Value Railed Systems: How to Be Competitive While Still Maintaining Value January 2018 snapnrack.com Agenda About SnapNrack Overview of residential solar mounting systems Benefits of railed systems Key features

More information

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2 Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2 The Solar Tripod System has been developed as a universal system for roof-mounting on flat roofs. The use of patented

More information

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS

INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS INSTRUCTIONS FOR ASSEMBLING NEBS FLOODED RACKS Publication No. US-NEBS-IM-003 September 2013 INSTRUCTIONS for ASSEMBLING NEBS FLOODED RACKS Read all instructions carefully and observe all warnings before

More information

PRODUCT INFORMATION Dero Hoop Rack

PRODUCT INFORMATION Dero Hoop Rack PRODUCT INFORMATION Dero Hoop Rack 2946 Larimer St. Denver, CO 80205 303-295-1100 / 800-373-7693 FAX 303-295-2464 Email info@snyderequipment.com www.snyderequipment.com H O O P R A C K The Hoop Rack is

More information

Sunground. pole Mount System MADE IN ONTARIO

Sunground. pole Mount System MADE IN ONTARIO Sunground pole Mount System Disponible chez / Available at : REMATEK-Energie 514-333-6414 info@rematek-energie.com www.rematek-energie.com MADE IN ONTARIO DESIGN AND AESTHETICS Opsun Structural SOLIDITY

More information

PRG INSTALLATION MANUAL

PRG INSTALLATION MANUAL PRG INSTALLATION MANUAL Table of Contents Table of Contents... 2 1. Safety... 3 Basic Safety Considerations... 3 Warnings... 3 Responsibilities Of The Installer... 3 Responsibilities Of The Operator...

More information

Descriptive Report and Test Results

Descriptive Report and Test Results Descriptive Report and Test Results MASTER CONTRACT: 266909 REPORT: 700584 Edition 1: August 12, 2016; Project 700584 Albuquerque Prepared by Chase Henson; Reviewed by Ze Guo Contents: Certificate of Compliance

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast Place Modules & Attach Clamps Attach Clamps Module Installation & Wire

More information

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV Foundation Manual Part Number: 150002 Version: 1.22 Updated: July 5, 2009 748 S. Meadows Pkwy. A-9, #329 Reno, NV 89521 775-831-9463 www.mariahpower.com July 2009, Mariah Power, All Rights Reserved Dear

More information

The Racking System Designed By Installers for Installers

The Racking System Designed By Installers for Installers The Racking System Designed PV Racking Ground System Installation Instructions Key benefits: Easy installation. No clamps! No more straining to lean over and fasten bolts! Module installation time is far

More information

TABLE OF CONTENTS (CONT):

TABLE OF CONTENTS (CONT): TABLE OF CONTENTS: Tools & Specifications System Components System Level Fire Code Compliance Locate Array & Place Bays Place Ballast Place Modules & Attach Clamps Attach Clamps Module Installation & Wire

More information

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS

ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS US-HXRACK-IM-002 ASSEMBLY INSTRUCTIONS for DATASAFE TM HX and HX FRONT TERMINAL UBC BATTERY RACKS Read all instructions carefully and observe all warnings before installation. See Installation, Operation

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

PRU-D INSTALLATION MANUAL MONO-LEG SYSTEM. PRU-D / Portrait - Revision B July 31 st, 2017 Polar Racking Inc.

PRU-D INSTALLATION MANUAL MONO-LEG SYSTEM. PRU-D / Portrait - Revision B July 31 st, 2017 Polar Racking Inc. PRU-D INSTLLTION MNUL MONO-LEG SYSTEM Table of Contents Table of Contents... 2 1. Safety... 3 Basic Safety Considerations... 3 Warnings and Symbols... 3 Responsibilities of the Installer... 3 Responsibilities

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Southwest Windpower, Inc. 1801 W. Route 66 Flagstaff, Arizona 86001 Phone: (928) 779-9463 Fax: (928) 779-1485 E-mail: info@windenergy.com Web: www.windenergy.com

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

DETAIL INSTRUCTION No. 1

DETAIL INSTRUCTION No. 1 BEFORE BEGINNING INSTALLATION, PLEASE READ THROUGH ALL INSTRUCTIONS. Uncrate shipment and check against packing list to insure all materials are included before beginning installation. If any discrepencies

More information

Installation Instructions

Installation Instructions S o l a r R o o f i n g Installation Instructions Apollo Tile II Installation Instructions Key... 3 Safety Precautions... 3 Installation Limitations... 4 Installation Requirements... 5 Recommended Tools

More information

STRUCTURAL DESIGN CERTIFICATE No: CSM SC Job No: 14S 391

STRUCTURAL DESIGN CERTIFICATE No: CSM SC Job No: 14S 391 Date of Issue: 19/12/2014 3:30 PM STRUCTURAL DESIGN CERTIFICATE No: CSM SC057 2014 Job No: 14S 391 Plant Description: RoofTopRac system solar panel mounting structure with fasteners, Base Rail 40 x 40.

More information

Smarter. Safer. Leaner.

Smarter. Safer. Leaner. Smarter. Safer. Leaner. Fast Installation and Removal Decrease Leading Edge Exposure by 87% OSHA Compliant Versatile and Reusable Use Perimeter Protection Posts During Construction: At Building Perimeter

More information

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785)

Heartland Perma-Column 1841 E 1450 Rd. Lawrence, KS (785) Perma-Column Installation Instructions Unlike any other concrete post-frame foundation system, Perma-Column Precast Concrete Piers use 10,000 psi concrete and our unique Sturdi-Wall Plus wet-set bracket

More information

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual SECURE. UNIVERSAL. MOUNTING Tilt Kit Installation Manual 1.0 INTRODUCTION... 3 2.0 KITS / PRODUCT RANGE... 4 2.1 Leg Kits... 4 2.2 Rail Kits... 4 3.0 PREPARATION FOR INSTALLATION... 5 3.1 Applications...

More information

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver.

Mounting Screw. Channel Filler. Light Angle Adjustable Screw. LED Board Vertical stud and blocking Locking Nose. Driver. The Knife Edge Cove is a modular lighting system consisting of two parts: 1- An aluminum fixture housing extrusion 2- Drop-in lighting modules The fixture will provide a continuous knife edge architectural

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1124 REVISION 3 November 2013 EFFECTIVE DATE November 11,

More information

PRB. Flush Mount Racking System. Installation Manual

PRB. Flush Mount Racking System. Installation Manual PRB Flush Mount Racking System Installation Manual Released 5th April 2015 TABLE OF CONTENTS 1. INTRODUCTION 1.1 Product Overview 1.2 About This Manual 1.3 Product Liability 1.4 Standards Compliance 1.5

More information

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS

ALPINE PATIO COVER INSTALLATION INSTRUCTIONS ALPINE PATIO COVER INSTALLATION INSTRUCTIONS Contact us at: 1-800-851-0865 or www.americana.com Before You Begin: Consult your local building department for any required permits You may be required to

More information

OZARK PATIO COVER INSTALLATION INSTRUCTIONS

OZARK PATIO COVER INSTALLATION INSTRUCTIONS OZARK PATIO COVER INSTALLATION INSTRUCTIONS Contact us at: 1-800-851-0865 or www.americana.com Before You Begin: Consult your local building department for any required permits You may be required to obtain

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x5 PATENTS ARE PENDING Approximate Size 7980303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

ITEM 555 CHAIN LINK FENCING

ITEM 555 CHAIN LINK FENCING ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing

More information

Rack-in-a-BoxTM INSTALLATION MANUAL

Rack-in-a-BoxTM INSTALLATION MANUAL INSTALLATION MANUAL TM 1.0 INTRODUCTION 3 2.0 PRODUCT RANGE 4 2.1 Systems 4 2.2 Accessories 4 3.0 PREPARATION FOR INSTALLATION 5 3.1 Applications 5 3.2 Tools for Installation 5 3.3 Additional Materials

More information

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02

More information

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560 Installation Guide Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560 Rev 1.0, September 2017 Sales: 740-249-1877 Sales@EcolibriumSolar.com Field Support:

More information

Clean Energy Creating A Bright Future

Clean Energy Creating A Bright Future Clean Energy Creating A Bright Future Clean Energy Creating A Bright Future XIAMEN HOPERGY PHOTOVOLTAIC TECHNOLOGY CO.,LTD. ADD: 1001 Unit, No. 2366, Fangzhong Rd, Huli, Xiamen, 361015 P. R. China Tel:+86-592-5689685

More information

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions

C.R. LAURENCE CO., INC. Intelli-Track SPS. Phase One - Installation Instructions Tools and Supplies: C.R. LAURENCE CO., INC. Intelli-Track SPS Phase One - Installation Instructions Ratchet Wrench with 4" Extension 9/16" Open-End Wrench (two required for suspension mounting) 9/16" Hex

More information

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge Assembly Manual 8x9 PATENTS ARE PENDING Approximate Size 7640303 Storage Area Building Dimensions Exterior Dimensions Roof Edge to Roof Edge Interior Dimensions Wall to Wall Sq. Ft. Cu. Ft. Width Depth

More information

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~

Grizzly TM Part Number Spectrum Lane ~ Missoula MT ~ Grizzly TM Part Number 21655 7100 Spectrum Lane ~ Missoula MT 59808 800.791.8056 ~ www.spectrumproducts.com 21655 Man Rev B You have purchased a Spectrum Products Grizzly starting platform. Providing the

More information

rec Peak energy modules

rec Peak energy modules Installation manual rec Peak energy modules For installations according to UL 1703 Contents Table of figures 2 INTRODUCTION 3 How to use THIS MANual 3 YOUR RESPONSIBILITY as AN INSTALLER 3 SUPPORT 3 LIABILITY

More information

Standoff Kit Installation Manual

Standoff Kit Installation Manual Standoff Kit Installation Manual Contents Check List SolaRack Components Marking Recomended Spacing Mounting Instructions: Portrait Mounting Instructions: Landscape Grounding & Electrical Diagram Grounding

More information

Safety on Heights: Our Policy

Safety on Heights: Our Policy 11/17/14 Safety on Heights: Our Policy Only volunteers over the age of 18 are allowed to work on heights of more than six feet off the ground. This includes all work on scaffolds. Only volunteers who are

More information

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP

INSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP INSTALLATION MANUAL B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP H20-RATED B-710 WITH 2 RISERS, RACK SYSTEM AND BOLLARDS B-710 SPLIT LID TRANSITION SUMP SHOWN WITH H20-RATED DIAMOND PLATE LID

More information

The Racking System Designed by Installers for Installers. PV Stealth Roof System Installation Instructions

The Racking System Designed by Installers for Installers. PV Stealth Roof System Installation Instructions PV Stealth Roof System Installation Instructions Key Benefits: Available in Black or Mill finish. Modules can be seated without any bolts, clamps or clips. Module Hold Down Area is more than 10x that of

More information

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions

6x5. Assembly Manual CAUTION. Sharp Edges PATENTS ARE PENDING. Building Dimensions. Approximate Size. Storage Area. Interior Dimensions Assembly Manual 6x5 PATENTS ARE PENDING Building Dimensions Approximate Size Storage Area Exterior Dimensions Interior Dimensions Roof Edge to Roof Edge Wall to Wall Sq. Ft. Cu. Ft. Width Depth Height

More information

GROUND MOUNT INSTALLATION MANUAL

GROUND MOUNT INSTALLATION MANUAL GROUND MOUNT INSTALLATION MANUAL Contents DISCLAIMER 1 RATINGS 2 MARKINGS 2 CHECKLIST 3 1. BUILD BASe 4 2. CONNECT SUBSTRUCTURe 4 3. PLACE RAILS 5 4. SECURE LUGS 5 5. SECURE MODULES 6 ELECTRICAL DIAGRAM

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation procedures

More information

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT

HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT HUMBOLDT COUNTY BUILDING & SAFETY DEPARTMENT CITY OF WINNEMUCCA BUILDING DEPARTMENT FOR PRIVATE THREE-SIDED POST FRAMED (NON-ENGINEERED) OUTBUILDINGS LOCATED ON RESIDENTIAL LOTS ONLY Buildings must meet

More information

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs Photovoltaic mounting systems Assembly Instructions TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs 1 Table of contents 1 Introduction 1.1 Intended use 3 1.2 About the document

More information

Leveling Foot RB210. Leg Extender RLT66

Leveling Foot RB210. Leg Extender RLT66 Landing for Right & Left Turn R342 ITEMS # 0254049, 0254061, 0254072, 0254076, 0016567, 0254099, 0254110, 0054116, 0254117, 0254126, 0254140, 0254150, 0254156 CUSTOM ACCESS RAMP SYSTEM MODELS # R100, R242,

More information

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions Zurn Z874 Trench Drain System Installation Instructions Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you

More information

Zurn Z874. Trench Drain System. Installation Instructions

Zurn Z874. Trench Drain System. Installation Instructions Zurn Z874 Trench Drain System Installation Instructions Z874 Accessories Trench Drain System Below are the components of the Z874-X trench drain typical to an installation. Check your order to verify you

More information

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING!

INSTALLATION GUIDE PLEASE READ ENTIRE INSTRUCTION MANUAL BEFORE PROCEEDING! DURA - TRENCH INSTALLATION GUIDE This guide is intended to aide in the installation of Dura-Trench systems. There are many different applications and situations for the use of this product and the installation

More information

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural cantilever rack design. In addition, it is

More information

PV s Most Versatile Mounting System

PV s Most Versatile Mounting System THE STANDARD IN PV MOUNTING STRUCTURES PV s Most Versatile Mounting System Flush Mount Low Profile High Profile www.unirac.com SolarMount is much more than a product. It s a system of engineered components

More information

ZS880 Linear Shower Drain Installation Instructions

ZS880 Linear Shower Drain Installation Instructions Introduction PATENT PENDING The Zurn ZS880 Stainless Steel Linear Shower Drain incorporates a simple approach to bathroom shower design, when compared to traditional point-drain applications. The linear

More information

Flextray - Accessories

Flextray - Accessories Flextray - 40 Flextray - Protects cable from debris and dust Adds security to cable installation Easy bend-over tabs secure cover to trays Available for 2 (50mm) to 24 (600mm) wide trays Comes in 118 (2997mm)

More information

Descriptive Report and Test Results

Descriptive Report and Test Results Descriptive Report and Test Results Edition 1: August 12, 2016; Project 70072584 Albuquerque Prepared by Chase Henson; Reviewed by Ze Guo Contents: Certificate of Compliance - Page 1 to 2 Supplement to

More information

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010) 1307 West Lehigh Street Bethlehem, PA 18018 610-866-9663 Office info@keycodes.net www.keycodes.net Typical Deck Details Based on the 2009 International Residential Code (Designed and Printed August 2010)

More information

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College SECTION 323113 - CHAIN LINK FENCES AND GATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

INSTALLATION MANUAL KOCH

INSTALLATION MANUAL KOCH INSTALLATION MANUAL KOCH TECHNICAL SYSTEMS GROUP PRE-FAB ACOUSTICAL/THERMAL PANELS AND ENCLOSURES GEORGE KOCH SONS, LLC TECHNICAL SYSTEMS GROUP 10 South Eleventh Avenue Evansville, Indiana 47744 812-465-9600

More information