1 ITEM P-156 TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL DESCRIPTION This item shall consist of temporary control measures as shown on the plans or as ordered by the Engineer during the life of a contract to control water pollution, soil erosion, and siltation through the use of silt fence, inlet protection, and other erosion control devices or methods. The temporary erosion control measures contained herein shall be coordinated with the permanent erosion control measures specified as part of this contract to the extent practical to assure economical, effective, and continuous erosion control throughout the construction period. Temporary control may include work outside the construction limits such as borrow pit operations, equipment and material storage sites, waste areas, and temporary plant sites. MATERIALS MATERIALS. Materials for sediment and erosion control shall conform to the Maryland State Highway Administration (SHA) Standard Specifications for Construction and Materials, July 2008 Edition, and in accordance with the details on the construction drawings OTHER. All other materials shall meet commercial grade standards and shall be approved by the Engineer before being incorporated into the project. CONSTRUCTION REQUIREMENTS GENERAL. In the event of conflict between these requirements and pollution control laws, rules or regulations of other Federal, state or local agencies, the more restrictive laws, rules or regulations shall apply. The Engineer shall be responsible for assuring compliance to the extent that construction practices, construction operations and construction work are involved AUTHORITY OF ENGINEER. The Engineer has the authority to limit the surface area of erodible earth material exposed by clearing and grubbing, to limit the surface area P-156-1

2 of erodible earth material exposed by excavation, borrow and fill operations, and to direct the Contractor to provide immediate permanent or temporary pollution control measures to minimize contamination of adjacent streams or other watercourses, lakes, ponds, or other areas of water impoundment CONSTRUCTION DETAILS. The Contractor's attention is directed to GP-7.12 and Section 308 of the SHA Standard Specifications for Construction and Materials. The restrictions contained therein shall be strictly enforced, and the Contractor is cautioned, therefore, to make every effort possible to comply with these regulations. Within 14 days after the Notice of Award, the Contractor shall submit an Erosion and Sediment Control Schedule to the Engineer indicating the sequence of construction and describing the relationship between the implementation and maintenance of control, including temporary and permanent stabilization and the various stages (phases) of soil disturbance and construction. A Notice to Proceed will not be issued until this schedule is received. The sequence of construction shall, at a minimum, include a schedule and time frames for the following activities: a. Clearing for those areas necessary for installation of Perimeter Controls. b. Construction of Controls. c. Remaining clearing. d. Pavement grading and construction. e. Utility installation. f. Final grading and vegetative stabilization. g. Removal of Controls. At the Preconstruction Conference, the Contractor shall present a general overview of how they will handle Erosion and Sediment Control on the Contract. No work shall be started until the Erosion and Sediment Control schedules and methods of operations have been accepted by the Prince George s County Soil Conservation District. This includes both on-site and off-site activities. At least five working days prior to the start of work, the Engineer will initiate and conduct an Erosion and Sediment Control Field Meeting. In addition to the initial Erosion and Sediment Control Field Meeting, periodic in-field P-156-2

3 Erosion and Sediment Control Meetings shall be held during the period of this Construction Contract. The Engineer along with the Prince George s County Soil Conservation District s Inspector and Plan Reviewer and the Contractor shall review and evaluate the effectiveness of practices already installed and shall plan for the installation necessary to control proposed areas of soil disturbances. The MNCPPC is concerned with controlling erosion and sedimentation on construction sites. The Contractor shall provide adequate resources to perform the grading in a timely manner and provide and maintain the proper erosion and sediment control measures. The Engineer or his designee will be the final authority in this determination. All appropriate controls shall be installed prior to any stripping operation. Areas shall be permanently or temporarily stabilized within 72 hours from disturbance. Once the excavation or embankment reaches the bottom of the subgrade (i.e., capping material in place), those areas in which paving will be placed will be exempt from the stabilization requirements. The 3-day requirement means that the stabilization operation is complete or nearing completion. If previously stabilized areas are disturbed by the Contractor's grading operation or other activities not specifically approved by the Engineer, the cost for restabilization will be at the Contractor's expense. The most stringent requirements for stabilization under Excavation, embankment or Stabilization/Limits of Disturbance will be enforced. Disposal of excess earth material on State or Federal property requires MDE approval, otherwise materials shall be disposed of at a location approved by the appropriate local Soil Conservation District for each county or the Baltimore City Department of Public Works. The Contractor shall give particular attention to the project's construction activities that involve erosion and sediment control. The Engineer will strictly enforce erosion and sediment control measures as required by the Plans, Special Provisions, applicable referenced Standards and the Specifications. The Contractor shall become thoroughly familiar with all provisions relative to erosion and sediment control. The Contractor is advised that terminology such as "... prior to, or as soon as practicable," and "... to the extent considered desirable and practicable," shall not be interpreted to preclude or unnecessarily delay the construction or application of erosion and sediment control measures. These terms are intended to state that erosion controls must be applied as soon as it is physically possible within any construction or grading operation which removes natural ground cover or results in any unstabilized soil condition. P-156-3

4 The Contractor is also hereby notified that the Prince George s County Soil Conservation District will conduct frequent field inspections relative to sediment control compliance. If, in their judgment, noncompliance with erosion and sediment control provisions are found, their representative will immediately notify the Engineer relative to corrective action. This corrective action may require a shut-down of construction activities until such time as the noncompliance is satisfactorily corrected, and no claims to the MNCPPC will be entertained because of a shutdown of the grading operations or the entire project SILT FENCE. Silt fence shall be constructed and installed in accordance with the details shown on the plans, and in locations shown on the plans and as specified by the Engineer FILTER SOCK. Filter sock shall be constructed and installed in accordance with the details shown on the plans, and in locations shown on the plans and as specified by the Engineer STABILIZED CONSTRUCTION ENTRANCE. Stabilized construction entrance shall be constructed and installed in accordance with the details shown on the plans, and in locations shown on the plans INLET PROTECTION. Inlet protection shall be of the type indicated on the plans and shall be constructed and installed in accordance with the details shown on the plans. Inlet protection shall be installed in the locations shown on the plans and as specified by the Engineer. METHOD OF MEASUREMENT Measurement for Silt Fence, and filter sock will be made on a linear foot basis, which price shall be full compensation for furnishing, installing, maintenance of, removal of, disposal of, and for all materials, labor, tools, equipment and incidentals necessary to complete the work. All fittings and temporary inlets shall be considered incidental to the pipe installation Measurement for Stabilized Construction Entrance and Standard Inlet Protection will be made on a per each basis. Price and payment shall be full compensation for furnishing, P-156-4

5 installing, maintenance of, removal of, disposal of, and for all materials, labor, tools, equipment and incidentals necessary to complete the work. P-156-5

6 BASIS OF PAYMENT Accepted quantities of temporary water pollution, soil erosion, and siltation control work ordered by the Engineer and measured as provided in paragraph through will be paid for under: Item P Item P Item P Item P Silt Fence per linear foot Filter Sock per linear foot Stabilized Construction Entrance per each Standard Inlet Protection per each END OF ITEM P-156 P-156-6

7 THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK

Town of Fortville Utility Street Standards

Town of Fortville Utility Street Standards Town of Fortville Utility Street Standards SECTION 02101 - TEMPORARY EROSION AND DUST CONTROL PART 1 - GENERAL 1.1 DESCRIPTION A. Temporary Erosion and Dust Control measures must meet the current Town

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 EROSION AND SEDIMENTATION CONTROLS PART 1 - GENERAL 1.01 GENERAL PROVISIONS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL

More information

SWPPP Inspection Procedures and Form 247 Instructions

SWPPP Inspection Procedures and Form 247 Instructions SWPPP Inspection Procedures and Form 247 Instructions 1. Pre-Construction Conference a. A stormwater pollution pre-construction conference shall be held prior to beginning work on each project. b. The

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156

TEMPORARY AIR AND WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL South Terminal C Phase 1 (WS110) Item P-156 ITEM P-156 EROSION, AND SILTATION CONTROL DESCRIPTION 156-1.1 This item shall consist of temporary control measures as shown on the plans or as ordered by the Engineer OAR during the life of a contract

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 901 and replace with the following: SECTION 901 STORMWATER POLLUTION MANAGEMENT

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS

SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS SECTION 10 - ENVIRONMENTAL CONTROLS AT WORK SITE TABLE OF CONTENTS Section Page 10-1 DUST CONTROL...10.1 10-2 AIR POLLUTION CONTROL...10.1 10-3 BURNING...10.1 10-4 EROSION, SEDIMENT, AND WATER POLLUTION

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

LAND DISTURBANCE PERMIT

LAND DISTURBANCE PERMIT SPRINGVILLE CITY Application Date: 110 South Main Springville, UT 84663 Permit Number: (801) 491-2780 Caselle #2208 Project Name: Project Address: LAND DISTURBANCE PERMIT Priority Site Owner s Name Phone

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION CITY OF JENKS EARTH CHANGE PERMIT APPLICATION Any applicable State or Federal permits must be attached to this application or must be applied for with copies attached to this application if this permit

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 312500 EROSION AND SEDIMENTATION CONTROL Scope : During construction, temporary and permanent protective structures and measures as detailed in the following paragraphs shall be implemented and

More information

CONSTRUCTION SPECIFICATION FOR DEWATERING

CONSTRUCTION SPECIFICATION FOR DEWATERING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 517 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR DEWATERING TABLE OF CONTENTS 517.01 SCOPE 517.02 REFERENCES 517.03 DEFINITIONS 517.04 DESIGN

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL Section Number Title 801 GENERAL 802 STANDARD METHODS OF EROSION AND SEDIMENT

More information

GRADING, EROSION AND SEDIMENTATION CONTROL

GRADING, EROSION AND SEDIMENTATION CONTROL SECTION 500 GRADING, EROSION AND SEDIMENTATION CONTROL 501 Erosion and Sedimentation Control Plan All engineering plans for projects that propose to construct new, or modify existing drainage facilities,

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Please print or type.

Please print or type. SOIL EROSION AND SEDIMENTATION CONTROL PERMIT APPLICATION 6-18-07 Ann kjjkjkff- ANN ARBOR CHARTER TOWNSHIP 3792 Pontiac Trail, Ann Arbor, Michigan 48105-9656 Phone (734) 663-3418 Website: www.aatwp.org

More information

STANDARD PLAN FOR MINOR EARTH DISTURBANCES

STANDARD PLAN FOR MINOR EARTH DISTURBANCES Allegany Soil Conservation District 12407 Naves Cross Road, NE Cumberland, MD 21502 Phone: 301.777.1747 Fax: 301.777.7632 Permit #: Allegany County City of Cumberland City of Frostburg Other Date: STANDARD

More information

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE

EXIST PIPE 12 FT LANDSCAPING PROPOSED PLAN LEFT EXIST. R/W REPLACE INLET TOP EXIST PIPE EDGE OF PAVEMENT EXIST SIDEWALK PROPOSED SIDEWALK PROPOSED SIDEWALK EXIST PIPE DBI SD 12 FT 12 FT LANDSCAPING LANDSCAPING EXIST DITCH TO BE REMOVED EXISTING PLAN (RIGHT SIDE SHOWN, LEFT SIDE SIMILAR) PROPOSED

More information

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS

2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS 2. Section 2 TW O SECTIONTWO 2.1 MINIMUM WATER QUALITY PROTECTION REQUIREMENTS FOR DEVELOPMENT CONSTRUCTION PROJECTS Unless specifically exempted, all Development Construction Projects will be required

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180 EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: 1-16-07 (Rev 1-15-08) SP1 G180 General Schedule and conduct construction activities in a manner that will minimize soil erosion and the resulting sedimentation

More information

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013

ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 ADDENDUM NO. 1 DATE ISSUED: OCTOBER 29, 2013 BIDDING AND CONTRACT DOCUMENTS FOR THE HORRY COUNTY SOLID WASTE AUTHORITY YARD WASTE MANAGEMENT AND COMPOSTING FACILITY HORRY COUNTY, SOUTH CAROLINA ****************************************************************************************************

More information

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment 1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL

902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL SECTION 902 TEMPORARY EROSION AND SEDIMENT CONTROL 902.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT

CCU Engineering Specifications. Section PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT CCU Engineering Specifications Section 002310 PIPE REMOVAL, DISPOSAL, ALTERATION, MODIFICATION OR PIPE ABANDONMENT Effective Date: Nov. 1st, 2011 Page 1 of 5 PART 1 - GENERAL The following specification

More information

ITEM P-152 EXCAVATION AND EMBANKMENT DESCRIPTION

ITEM P-152 EXCAVATION AND EMBANKMENT DESCRIPTION ITEM P-152 EXCAVATION AND EMBANKMENT DESCRIPTION 152-1.1 This item covers excavation, removal, disposal, placement, and compaction of all materials within the limits of the work required to construct new

More information

Module 4 Regulatory requirements for Land Disturbing Activities

Module 4 Regulatory requirements for Land Disturbing Activities Module 4 Regulatory requirements for Land Disturbing Activities MODULE 4 REGULATORY REQUIREMENTS FOR A LDA Module 4a Overview MODULE 4A REGULATORY REQUIREMENTS FOR A LDA ESC Regulations Overview 1990 First

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

Construction Application for Permit (CAP) Instructions

Construction Application for Permit (CAP) Instructions Construction Application for Permit (CAP) Instructions A CAP is required to be completed and submitted to the Wayne Soil & Water Conservation District (SWCD) office for non-farm, earth-disturbing activities

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include

More information

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES DIVISION OF ENGINEERING & CONSTRUCTION MANAGEMENT PLAN REVIEW DEPARTMENT WASHINGTON COUNTY SOIL CONSERVATION DISTRICT 1260 Maryland Avenue, Suite 101 Hagerstown, MD 21740 Telephone: (301) 797-6821, Ext.

More information

ITEM 750 ROCK FILTER DAMS

ITEM 750 ROCK FILTER DAMS AFTER MARCH 1, 2012 ITEM 750 ROCK FILTER DAMS 750.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control rock filter dams utilized during construction

More information

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

SECTION TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration

More information

Construction Specification for General Excavation

Construction Specification for General Excavation Engineering & Construction Services Division Standard Specifications for Road Works TS 2.10 September 2018 for General Excavation Table of Contents TS 2.10.01 SCOPE... 2 TS 2.10.02 REFERENCES... 2 TS 2.10.03

More information

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS

WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS WATER CONSTRUCTION STANDARDS AND COMPATIBLE UNITS City Utilities of Springfield, Missouri REVISED: 06/18/2018 **DISCLAIMER** IT IS THE RESPONSIBILITY OF THE END USER OF THIS WATER STANDARDS BOOK TO MAKE

More information

1.2 REGULATORY REQUIREMENTS

1.2 REGULATORY REQUIREMENTS Table 1.1. Soil textural classes and general terminology used in soil descriptions (Source: US Environmental Protection Agency 1977). Name Texture Basic soil textural common class names Sandy soils Coarse

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

Residential Site Soil Erosion and Sedimentation Control Permit Application

Residential Site Soil Erosion and Sedimentation Control Permit Application Residential Site Soil Erosion and Sedimentation Control Permit Application Kent County Road Commisson Permit No. Exp. Date 1500 Scribner Avenue NW Grand Rapids, MI 49504 Permit Fee Paid (616) 242-6920

More information

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative

Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Model Poultry Burial E&S Plan (7-2-15) 1. GENERAL INFORMATION Name of project Name of person responsible Erosion and Sedimentation Pollution Control (ESPC) Plan Narrative Address Phone number Municipality

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER

CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR STORMWATER Tavares, Florida Jones Edmunds & Associates, Inc. Project No. 06806-012-01 CONSTRUCTION SPECIFICATION MANUAL TECHNICAL STANDARDS FOR

More information

SECTION EROSION AND SEDIMENTATION CONTROLS

SECTION EROSION AND SEDIMENTATION CONTROLS SECTION 312500 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections within DIVISION 01 - GENERAL REQUIREMENTS which are hereby made

More information

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required. Overview of Section 9 9.0 The GESC Permit Section provides a description of the Small Utility GESC Permit Program. Step 1. Determine if a GESC Permit is Applicable and if a Project Specific GESC Plan is

More information

SECTION EROSION AND SEDIMENTATION CONTROL

SECTION EROSION AND SEDIMENTATION CONTROL SECTION 02160 EROSION AND SEDIMENTATION CONTROL PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The Contractor shall be held to have read all Bidding Requirements; all of the General Conditions and Supplementary

More information

Title 26 DEPARTMENT OF THE ENVIRONMENT

Title 26 DEPARTMENT OF THE ENVIRONMENT Title 26 DEPARTMENT OF THE ENVIRONMENT Subtitle 17 WATER MANAGEMENT Chapter 01 Erosion and Sediment Control Authority: Environment Article, 4-101, Annotated Code of Maryland.01 Definitions. A. (text unchanged)

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 901 and replace with the following: SECTION 901 STORMWATER POLLUTION MANAGEMENT

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Sheet 1 of 7 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 2015 EDITION Delete SECTION 901 and replace with the following: SECTION 901 STORMWATER POLLUTION MANAGEMENT

More information

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS ARTICLE 6 EXCAVATION OF MINERAL MATERIALS SECTION 1. PURPOSE All excavations, extraction of materials and minerals, open pits and impounding of waters hereafter established or enlarged shall conform to

More information

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO.

SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. SOUTH GRANVILLE WATER AND SEWER AUTHORITY GENERAL DESCRIPTION OF COST ITEMS AND BID ITEMS FOR H STREET BY-PASS WATERLINE CONTRACT NO. 2017-1 43 SOUTH GRANVILLE WATER AND SEWER AUTHORITY H STREET BY-PASS

More information

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of

More information

Drainage District(s):

Drainage District(s): APPLICANT: APPLICATION FOR APPROVAL OF CONSTRUCTION ACROSS ESTABLISHED SAC COUNTY DRAINAGE DISTRICTS AND ESTABLISHED MULTI-COUNTY DRAINAGE DISTRICTS Name of Individual or Company Street Address or P. O.

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis. ESTIMATE OF QUANTITIES Bid Item Number Item Quantity Unit 009E0010 Mobilization Lump Sum LS 120E0100 Unclassified Excavation, Digouts 100 CuYd 260E1030 Base Course Salvaged 2,351.0 Ton 270E0040 Salvage

More information

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR PROJECT BEING DEVELOPED

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Soil Erosion and Sedimentation Control Compliance Form

Soil Erosion and Sedimentation Control Compliance Form Town of Southern Pines Soil Erosion and Sedimentation Control Compliance Form Tracts Less than Thirty-Thousand Square Feet (30,000 SF) Residential and Commercial This compliance form shall be prominently

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES

VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES S107J31-1215 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR VPDES CONSTRUCTION ACTIVITIES October 26, 2015 SECTION 106 CONTROL OF MATERIAL Section 106.08 Storing Materials of the Specifications

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

REQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE

REQUEST FOR BIDS CULVERT REPLACEMENT PROJECT FREEPORT, MAINE REQUEST FOR BIDS 1. RECEIPT OF BIDS The Town of Freeport will receive sealed Bids, clearly marked and addressed to: Bid for Culvert Replacement Project 2015-1, Freeport Town Engineer, Town Hall, 30 Main

More information

CHAPTER 6 - How to Prepare a SWPPP

CHAPTER 6 - How to Prepare a SWPPP All construction sites which disturb an area of 1 acre or more, currently need a UPDES permit from the State of Utah. As a condition of the permit, a Stormwater Pollution Prevention Plan (SWPPP) must be

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Re: Erosion Control Report and Drawings Requirements Accompanying Document

Re: Erosion Control Report and Drawings Requirements Accompanying Document Re: Erosion Control Report and Drawings Requirements Accompanying Document This document was created to help engineers and other design staff to better understand, meet and exceed the erosion control requirements

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS I. Site Information A. Location (Include site map of harvest area)

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

Overview of Section 2

Overview of Section 2 Overview of Section 2 2.0 Section 2 addresses Steps 1 through 3 of the GESC Permit Process: Step 1. Confirm that a Temporary Batch Plant, Standard GESC, Annual Maintenance GESC, or Small Utility GESC Permit

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ *THE BELOW NOTES ARE EXAMPLES OF COMMONLY USED IN SE&SC PLAN APPLICATIONS THE NOTES MAY BE EDITED AS APPROPRIATE FOR

More information

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value

Table 1: Minimum Perimeter Control Performance Requirements. Physical Property* Test Method Required Value Supplemental Technical Specification for PERIMETER CONTROL SCDOT Designation: SC-M-815-17 (08/13) 1.0 Perimeter Control This Supplemental Technical Specification maybe used as an alternative to Sections

More information

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion

City of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal

More information

SECTION 18 - EARTHWORK TABLE OF CONTENTS

SECTION 18 - EARTHWORK TABLE OF CONTENTS SECTION 18 - EARTHWORK TABLE OF CONTENTS Section Page 18-1 GENERAL...18.1 18-2 ROADWAY EXCAVATION...18.1 18-2.01 General...18.1 18-2.02 Unsuitable Roadway Excavation and Backfill...18.1 18-2.03 Surplus

More information

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 02315-1 PART 1 GENERAL 1.1 Description of Work.1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto. 1.2 Related

More information