TYPE 4-C TYPE 6 TYPE 7 TYPE 8

Size: px
Start display at page:

Download "TYPE 4-C TYPE 6 TYPE 7 TYPE 8"

Transcription

1

2 ````` Face of Base rad. 42 YPE rad '- unless otherwise shown on plans 9" Slope YPE 2 rad. YPE 2-A rad. Wearing Course Base Course YPE 2-B 0" rad. YPE 3 Sections in Plans 2'- unless otherwise shown on plans Slope Sections in Plans Ashphalt Section in Plans 2 2 0" rad. YPE 3-A 0" rad." Wearing Course ' Base Course YPE 3-B 2'- unless otherwise shown on plans rad. Slope Sections in Plans YPE 4 rad. YPE 4-A rad. Wearing Course Base Course YPE 4-B Section in Plans 2 Section in Plans rad. Earth Material, Item rad Asphalt or Shoulder rad. / Approach Slab Material, Item YPE 4-C rad. YPE 6 6 YPE 7 9" YPE 8 9" Material, Item " rad. rad. Material, Item and concrete bases. NOES GENERAL: his drawing shows alternate types of curb that may be used on various types of pavement. he typical section of the project shows the type to be used, also the thickness of the edge of the pavement or the edge of the curb and gutter section. JOINS: expansion joints shall extend up to the top of the curb and shall be constructed in the curb and gutter section in such a manner that the joint seal will extend the full width of the gutter and into the curb face a sufficient distance to seal the joint to an elevation of a least above the flow line of the gutter. Dowel bars shall be used in the curb and gutter section at expansion joints and to the surface of the pavement. ransverse expansion joint material shall meet the requirements of Item GUER PLAE HICKNESS: hickness of gutter plate "" shall be 9" unless otherwise shown on the plans. OLERANCES: Dimensional tolerances are as follows: - s: 3 to + ". Gutters: 0 to +. LEGEND Expansion joint material and joint sealer are not required for the portion of the curb that is adjacent to a flexible pavement type. Both materials are required, as detailed, for the full height of rigid pavement 2 Butt joints shall be provided between combined curb-and-gutter and new or existing rigid pavements, with tie bars or hook bolts provided at intervals of 5'. See SCD BP-2. for details of tie bars and hook bolts. If the combined curb-and-gutter adjoins a new rigid base or an existing rigid base or pavement that is to be surfaced with bituminous material, a butt joint shall also be provided. However, tie bars or hook bolts shall be omitted when the vertical overlap ("V" in detail below) between the curb-and-gutter and rigid pavement is less than 7". Combined curb-and-gutter V Bituminous Surface Material Rigid HIS DRAWING REPLACES BP-5.DAED RANSPORAION ADMINISRAOR ENGINEER C O NC REE C URBS A ND C O M BINED CURB A ND G UER BP-5.

3 ramp using ype A Use curb ramps with flared sides at locations with wide sidewalks. ramp using ype A2 ramp using ype A wo sets of Double Parallel s are shown. Use curb ramps with returned curbs where buffer is wide enough to accommodate ramp slope. Place on streets having wide turning radius and where sidewalks are narrow. PERPENDICULAR CURB RAMPS PARALLEL CURB RAMPS PREFERRED CONSRUCION PLACEMEN 5'-0" ramp using ype C 5'-0" ramp placement where streets have wide turning radius, and sufficient sidewalks width. COMBINAION CURB RAMPS ENGINEER RANSPORAION ADMINISRAOR NOES GENERAL: his drawing shows curb ramp types details and placement examples for curb ramp construction, including the installation of detectable warnings. ramp types are shown on Sheet 2 and include Perpendicular, Parallel, and Combined types as specified to be constructed in the locations shown on the project plans. ramps added to an existing intersection or walk should be individually detailed on the project plans to assure that the design is appropriate for site constraints and all items can be constructed to ADA standards. he contractor may adjust the placement of curb ramps if existing field conditions warrant with the approval of the Engineer. PAYMEN: Measure and pay for the ramp area within the shaded limits of this drawing as Item 608, Square Foot. his includes the cost of any curb or curb and gutter, detectable warnings, landing areas and any additional materials, installation, grading, forming, and finishing required within the shaded area. Work beyond the shaded ramp/landing area is paid for as curb (609) and walk (608). Removal of existing curb, walk (or existing curb ramps) are paid under Item 202. For at-grade crossing locations where only detectable warnings are required in order to acheive ADA compliance, measure and pay for the strip of detectable warnings as Item 608 Detectable Warning, Square Foot. he work to cast the tiles in place will also require removal of existing pavement (Item 202) to the nearest joint, or if no joint exists, a minimum of 4 feet. 4'-0" Widening (Bypass) When Required Clear Space Cross- ramp using ype A Use this design only for existing walks, and when site Acceptable design on corners with wide constraints prohibit other designs. he diagonal ype turning radius where user is able to D ramp may be constructed as either a Perpendicular, maneuver within crosswalk limits so as not Parallel or Combination curb ramp type. Avoid using to encroach into adjacent traveled lanes. where curb radii are less than 20'-0". PERPENDICULAR RAMPS DIAGONAL RAMP (ype D) ACCEPABLE CONSRUCION PLACEMEN walk Acceptable design for retrofit only where utilities prevent using a preferred layout. HIS DRAWING REPLACES BP-7.DAED NEW C URB RA M PS (w ith D etectable W arnings) BP-7. ````` 3

4 A A ype A (Perpendicular with flared sides) PERPENDICULAR CURB RAMP DEAILS ype A2 (Perpendicular with returned curb) NOES CONINUED he running slope of the curb ramp shall be a maximum or flatter. In existing sidewalks, where the maximum ramp slope is not feasible due to site constraints (e.g. utility poles or vaults, right-of-way limits) it may be reduced as follows: A) for a rise of, B) 8: for a rise of, C) 6: over a run of 2'-0" for historic areas where a flatter slope is not feasible. o prevent chasing the grade indefinately, the transition from exisiting sidewalk to the shaded curb ramp area is not required to exceed 5 feet in length. While ramps may be skewed to the crosswalk, the entire lower landing area must fall within the cross walk that the ramp serves and cannot be located in the traveled lane of opposing traffic. he counter slope of the gutter or street at the foot of a curb ramp, landing, or blended transitions shall be 20: ot flatter. he bottom edge of the ramp shall change planes perpendicular to the landing. he edge of the curb shall be flush with the edge of the adjacent pavement and gutter and surface slopes that meet grade breaks shall also be flush. ENGINEER RANSPORAION ADMINISRAOR landings shall be 4' x 4' with a or flatter cross slope and running slope. Slope C B C B ype C (Combined with flared sides) COMBINED CURB RAMP DEAILS ype B (Single sided Parallel) PARALLEL CURB RAMP DEAILS ype C2 (Combined with returned curb) ype B2 (Double sided Parallel) D DEECABLE WARNINGS: Install Detectable Warnings on each curb ramp with approved materials, as shown on Sheet 3. Install these proprietary products as per manufacturer's written instructions. DRAINAGE: Contractor is to ensure the base of each constructed curb ramp allows for proper drainage, without exceeding allowable cross slope or ramp slopes. Vertical change in level exceeding " between the ) pavement and gutter, and 2) gutter and ramp, are not allowed. SURFACE EXURE: exture concrete surfaces by coarse brooming transverse to the ramp slopes to be rougher than the adjacent walk. JOINS: Provide expansion joints in the curb ramp as extensions of walk joints and consistent with Item requirements for a new concrete walk. Provide a Item expansion joint filler around the edge of ramps built in existing concrete walks. Lines shown on this drawing indicate the ramp edges and slope changes, and do not necessarily indicate joint lines. Follows Slope of the Grade Break See Sheet 3 for Sections. ype B3 (Single sided Parallel) D HIS DRAWING REPLACES BP-7.DAED NEW C URB RA M PS (w ith D etectable W arnings) BP-7. ````` 2 3

5 ````` Item Wide 20: 2'- Gutter Slope Slope New gutter shown. SECION A-A NORMAL DEAIL See Sheet 2. '- Slope '- SECION D-D See Sheet 2. Slope 2 Wide 4'-0" *Where possible, pour ramp area integral with the curb, otherwise use thick walk. DEECABLE WARNINGS NOES ment or Gutter GENERAL: Detectable Warnings are a distinctive surface pattern of truncated domes which are detectable by cane or underfoot to alert people with vision impairments of their approach to streets and hazardous drop-offs. PLACEMEN: Detectable warnings are to be installed at any location where pedestrians might cross paths with vehicular traffic lanes, such as the base of curb ramps or at blended curbs. A 2 strip of domes is ALIGNMEN: runcated domes should be aligned with the primary direction of the ramp as shown on the DEECABLE WARNING ALIGNMEN Detail. Normally Detail A Remove Saw Cut if is Monolithic with or Gutter to be installed for the full width of the ramp or walk. ypical street corner placement locations are shown on Sheet. he depth of concrete underneath detectable warning products shall be a minimum of. See DEAIL A. the detectable warnings should be flush with the back of the curb, but for skewed conditions see DEECABLE WARNING ALIGNMEN Detail. For non-standard layouts, detectable warning materials may have to be mitered and placed PRODUCS & COLORS: Color of the detectable warnings should contrast with sursegmentally. rounding concrete walk and ramp. Black is not an acceptable color. Approved products and guidance on color may be found on the Office of Roadway Engineering Service's Detectable Warnings Approved List. Install products as per manufacturer's printed instructions. 2 Wide Adjacent to P.C.C. - Material Item with Applied per SCD BP-5. SECION A-A EXISING WALK DEAIL See Sheet '- Surface. 2. Meet " verify slope Walk Use Manufacturer's Written Instructions for Installing Weep Holes, Setting Bed and Grouting Method 0. SQUARE PAERN, PARALLEL ALIGNMEN Item DEAIL A 0.9". HEIGH AND DIAMEER 0.9". Direction of 50% to 65% of Base Diameter 2.. Detectable 2 Wide Warning Plate. 2. RUNCAED DOMES DEAILS Slope '- SECION B-B Depth Varies Slope See Sheet 2. See Sheet 2. RADIAL ALIGNMEN 0.9". Detectable Warnings in Line with runcated Domes Slope Flare Exceeds 5' 2 2 Wide Grade Break Slope '- SECION C-C DEECABLE WARNING ALIGNMEN walk Pave- Sidelanding 4' Clear Space runcated Domes Slope Flare DOME ALIGNMEN ON RADIUSED CURB 2 5' HIS DRAWING REPLACES BP-7.DAED RANSPORAION ADMINISRAOR ENGINEER NEW C URB RA M PS (w ith D etectable W arnings) BP

6 9'-0" 4'- 3'- urnbuckle w/ take-up yp. x Brace Nominal Size russ Rod 7" dia. Wood Post with concrete encasement 3'- thick x ogee washer with nut, either cast or malleable iron, or " x flat steel washer/nut "A" Drain "B" Sloped to END OR CORNER POS ASSEMBLY "C" 2'-0" () "D" "E" Barbed Wire "F" Wire Spacing A B C D E F G H I "G" "H" "I" Ground Line 3'- 2'- Line Post Ground Line Line Post Sloped to Drain Barbed Wire '- LINE POS IN A DIP SECION 2'- Ground Line 9'-0" x Brace 4'- 3'- ` Barbed Wire Nominal Size russ Rod 7" dia. Wood Posts yp. INERMEDIAE ANCHOR POS ASSEMBLY urnbuckle w/ ake-up 3'- ENGINEER RANSPORAION ADMINISRAOR " dia. Wood Post 2'-0" dia. Encasement Required on Corner Assembly Only russ Rods (for ype 47), or Braces (for ype 47RA) YPE 47 FENCE End or corner post and one post of intermediate anchor post assembly 3: Slope or 7" dia. x Wire Braces Fence Fabric END OR CORNER POS ASSEMBLY PLAN VIEW x Wood Braces " Staple 2'-0" () MEHOD OF FASENING FENCE Place wire fabric on this side OP OF POSS WIRE FENCE SPLICE NOES W O VEN W IRE FENCE ````` 9'-0" 4'- 3'- Ground Line 7" dia. Wood Sloped dia. Corner, End, or to Drain Wood Line Post Anchor Post with Encasment amped Earth or Aggregate yp. CORNER, END, OR ANCHOR POS ASSEMBLY ` 2'- 3'- Ground Line Sloped to Drain dia. Wood Line Post with Encasement ` 2'- 3'- LINE POS IN A DIP SECION YPE 47RA FENCE BRACES: in the posts and fastened with 6d nails. POSS: earth or aggregate shall be omitted when wood posts are driven to grade, except for line posts in a dip section. Posts set or driven to within of grade need not be trimmed. FABRIC: may be used in lieu of the method shown, when approved by the Engineer. YPE 47RA FENCE: Wood braces shall be set in notches encasement and tamped Other methods for splicing wire fence ype 47RA shall be used to fence rest areas. Where ypes 47 and 47RA intersect at a corner, the corner assembly shall have all wood braces. Fence shall be paid for as Item Fence, ype 47RA. HIS DRAWING REPLACES F-2.M DAED F-2.

7 Portland Cement " Clear Subbase Material 0.04 Slope 4'-0" Min. Level 4'-0" Min. Bituminous Flexible Base 4'-0" Min. 3'-0" #3 Bar at 3 Center to Center Longitudinally 0.04 Slope CONCREE MEDIANS Varies Median: 4'-0" Min., Corner Island: As Shown on the Plans Base Material ype 6 or ype 2 Min. Portland Cement Portland Cement CONCREE MEDIANS/CORNERS WIH CURB Median Widths 2'-0" and Less Median Widths Over 2'-0" W 0.04W NOES Variable Slope 4: Maximum Widths Over 2'-0" 0.04 VARIABLE GRADE SEPARAION WIH CURB CONCREE MEDIANS & & RAFFIC ISLANDS: ISLANDS: Construct as specified in CMS 609. ANCHORS AND AND GROU: GROU: For median widths of or less, use one line of #3 rebars at 3'-0" on center spacing. SHOULDER WIDH: See Location and Design Manual Volume for shoulder width if not specified in the plans. CONCREE MEDIAN HICKNESS: hickness of the median/nose "" shall be unless otherwise specified in the plans. DISANCE O O BREAK: he Distance o Break "W" shall be 2'- unless otherwise specified in the plans. Median Base Material Subgrade Widths 2'-0" or Less LEGEND Variable Slope 0.04 Minimum 6: Maximum BASE: hickness of the Base shall be and the same material as on adjacent roadway unless otherwise specified in the plans. ISOMERIC ELEVAION OP OP ELEVAION ISOMERIC 0' - ing Limits Bottom of Median or Median 2'- Varies 2'- 0' - ing Limits 0' - ing Limits Edge of Edge of Bottom of 0' - ing Limits OF MEDIAN OR CORNER Normal Section NOSE RAMPING A APPROACH END 0' - ing Limits Median Width Median Corner HIS DRAWING REPLACES RM-3.DAED SDS. SAE OF OHIO DEPARMEN OF RANSPORAION ENGINEER RA FFIC DIVIDERS 7-XX-208 ADMINISRAOR DAE R M-3.

Construct each curb ramp using Type A1 Use curb ramps with flared sides at locations with wide sidewalks. NOTES Construct each curb ramp using Type A2 Construct each curb ramp using Type A1 PERPENDICULAR

More information

OFFICE OF ROADWAY ENGINEERING ROADWAY STANDARD DRAWINGS. Drawing Title PAVEMENT DESIGN FEATURES. Base Pavement BP Asphalt Safety Edge

OFFICE OF ROADWAY ENGINEERING ROADWAY STANDARD DRAWINGS. Drawing Title PAVEMENT DESIGN FEATURES. Base Pavement BP Asphalt Safety Edge OHIO DEPARMEN OF RANSPORAION SANDARD ROADWAY CONSRUCION DRAWINGS OFFICE OF ROADWAY ROADWAY SANDARD DRAWINGS No. Shts. Drawing itle Date DESIGN FEAURES Base BP-. BP-. BP-. BP-. BP-.4 BP-.5 BP-.6 Concrete

More information

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 Web: www.a2gov.org Printed on recycled paper May 17, 2016 Subject:

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Intro. ADA Operations Contact Info

Intro. ADA Operations Contact Info Intro ADA Operations Contact Info Todd Grugel ph: 651-366-3531 email: todd.grugel@state.mn.us Joe Zilka ph: 651-366-3311 email: joseph.zilka@state.mn.us Harvey Unruh ph: 651-216-2912 email: harvey.unruh@state.mn.us

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6 : Curb Ramps 1 [ 4.7.3] Only measure the width of the ramp section of the curb ramp (labeled ramp to the right). The ramp section of a curb ramp is also known as the ramp run. If the curb ramp has flared

More information

Construction Overview. Section 5 Construction Considerations. Curb Ramp Construction. Curb Ramp Construction. Overview.

Construction Overview. Section 5 Construction Considerations. Curb Ramp Construction. Curb Ramp Construction. Overview. Construction Overview Section 5 Construction Considerations Fall, 2017 Ann Johnson, PE Services Brady Rutman, SRF Consulting Group Overview Pedestrian Standard Plans Grade Breaks s Removals Curb & Gutter

More information

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS CONCRETE SIDEWALKS AND DRIVEWAYS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary

More information

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section

SECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section 02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01

More information

SECTION RIGID PAVEMENT

SECTION RIGID PAVEMENT SECTION 02750 PART 1 GENERAL RIGID PAVEMENT 1.1 SUMMARY A. Section Includes: 1. Concrete sidewalks. 2. Concrete stair steps. 3. Concrete integral curbs gutters. 4. Concrete parking areas and roads. B.

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3 CITY OF TORONTO TS 3.70 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS 3.70.01 SCOPE...3 TS

More information

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS

CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS December 2012 CW 3240 RENEWAL OF EXISTING CURBS TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications... 1 1.4 Referenced Standard

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 13 13 CONCRETE PAVING A. Extent of concrete curbs, walks, and paving as show on drawings B. Earthwork and prepared sub-base C. Concrete and related materials

More information

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS

County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS County of Sacramento Standard Construction Specifications January 1, 2008 TECHNICAL PROVISIONS SECTION 27 CURBS, GUTTERS, SIDEWALKS, AND DRAINAGE STRUCTURES 27-1 GENERAL Concrete curbs, gutters, sidewalks,

More information

SECTION 502 CONCRETE ITEMS

SECTION 502 CONCRETE ITEMS SECTION 502 CONCRETE ITEMS I. GENERAL 1.1 DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services; and shall

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage.

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS. A. Formwork complete with shoring, bracing and anchorage. SECTION 02528 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.01 WORK INCLUDED A. Formwork complete with shoring, bracing and anchorage. B. Concrete reinforcement complete with required supports,

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL 13686.00 CONCRETE WALKS AND CURBS 033015-1 1.1 RELATED DOCUMENTS: SECTION 033015 CONCRETE WALKS AND CURBS PART 1 - GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans. SECTION 1400 - CONCRETE PAVEMENT 1401 SCOPE. This section governs the furnishing of all labor, equipment, tools, and materials and the performance of all work necessary to construct concrete pavement.

More information

PERMEABLE PATH PAVING

PERMEABLE PATH PAVING SAWCUT CONTROL JOINT: 1 WIDE x 1" DEEP SIGN B: R5-1 24" (1 REQ'D) SIGN C: R5-11 24"x 1 (1 REQ'D) PADOT STANDARD SIGNAGE INSTALL PER PADOT SPECIFICATIONS. HIGH INTENSITY PRISMATIC SIGN ON 0.080" THICK ALUMINUM

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 351 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK TABLE OF CONTENTS 351.01 SCOPE 351.02 REFERENCES 351.03 DEFINITIONS 351.04 DESIGN

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3

CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3 CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION...7-1 Section 7 Roadway GENERAL REQUIREMENTS...7-1 I. TYPICAL SECTION...7-1 7.1 LANE WIDTHS...7-1 7.2 SHOULDER WIDTHS...7-1 7.3 CROSS SLOPE...7-2 7.4 CURB AND UNDERDRAINS...7-2 7.5 SIDEWALKS AND DRIVEWAYS...7-2

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721

B STEEL BEAM GUIDE RAIL - OPSS.PROV 721 B721-2 - - OPSS.PROV 721 721-2.1 GENERAL Steel beam guide rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 350 MARCH 1998 CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE 350.01 SCOPE 350.02 REFERENCES 350.03 DEFINITIONS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 DECEMBER 1990 CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.05 MATERIALS TABLE OF CONTENTS

More information

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018

DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 DIVISION 4.3 CITY OF SARNIA CONCRETE SIDEWALKS, CURBS AND DRIVEWAYS STANDARDS 2018 1 CONCRETE MATERIALS, CONSTRUCTION METHODS AND TESTING PROCEDURES A. MATERIALS... 3 1. CONCRETE FOR SIDEWALK AND CURBS

More information

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER

PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light

More information

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.

Section CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis. PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

SECTION MINOR CONCRETE

SECTION MINOR CONCRETE SECTION 03300 - MINOR CONCRETE CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And Payment...

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

SECTION CONCRETE CURB AND GUTTER, SIDEWALKS, AND DRIVEWAYS

SECTION CONCRETE CURB AND GUTTER, SIDEWALKS, AND DRIVEWAYS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 32 13 00 CONCRETE CURB AND GUTTER, SIDEWALKS AND DRIVEWAYS A. This work includes all preparation, forming, concrete production and placement, finishing, jointing,

More information

IIS03_04 RS-3 REVISED NOTE 7 REMOVED STATEMENT IN ASPHALT CONCRETE PAVEMENT THAT IS BEEN IN PLACE MORE THAN ONE YEAR.

IIS03_04 RS-3 REVISED NOTE 7 REMOVED STATEMENT IN ASPHALT CONCRETE PAVEMENT THAT IS BEEN IN PLACE MORE THAN ONE YEAR. PAGE INTERIM STANDARD REVISION 304.02 IIS03_04 RS-3 REVISED NOTE 7 REMOVED STATEMENT IN ASPHALT CONCRETE PAVEMENT THAT IS BEEN IN PLACE MORE THAN ONE YEAR. 304.03 IIS03_05 RS-4 REVISED NOTE 4 REMOVED STATEMENT

More information

ITEM 555 CHAIN LINK FENCING

ITEM 555 CHAIN LINK FENCING ITEM 555 AFTER MARCH 1, 2012 CHAIN LINK FENCING 555.1 Description. This item shall govern for furnishing the quantities of chain link fencing and gates as shown on the plans, including all posts, bracing

More information

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements...

SECTION CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES. Part 1 - General Work Included Related Requirements... SECTION 02530 CURB RAMPS AND OTHER MINOR CONCRETE FACILITIES CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Inspection And Tests... 1 1.04 Quality Assurance...

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Construction joints or planes of weakness 6'-0" ctrs. or less. Type 1 Curb Ramps (Typical) TYPICAL PLAN. Landing

Construction joints or planes of weakness 6'-0 ctrs. or less. Type 1 Curb Ramps (Typical) TYPICAL PLAN. Landing Note to Designer: Placing newly constructed curb ramps through curb radii should be avoided wherever practicable. The use of Paralel Curb Thru Curb Radius (lt. Type 2) should be avoided wherever practicable.

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.40 November 2009 CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE INDEX TS 3.40.01 SCOPE... 3 TS 3.40.02 REFERENCES... 3 TS 3.40.03

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 13 14 CONCRETE PAVEMENT FOR VEHICULAR AREAS PART 1 GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for forming and placing reinforced concrete curbs and vehicular pavement

More information

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS PART 1 - GENERAL 1.01 SUMMARY A. Section Includes furnishing and installing chain-link fabric fence, gate, and appurtenances. 1.02

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

CITY OF OKANOGAN 5TH AVENUE RECONSTRUCTION TIB NO.: 6-E-881(008)-1 CITY OFFICIALS. Jon K. Culp Mayor

CITY OF OKANOGAN 5TH AVENUE RECONSTRUCTION TIB NO.: 6-E-881(008)-1 CITY OFFICIALS. Jon K. Culp Mayor OKANOGAN COUNTY WASHINGTON NUE RECONSTRUCTION TIB NO.: 6-E-881(008)-1 CITY OFFICIALS Jon K. Culp Mayor Lisa Bauer Eric Lind Kristina McIntosh Patricia Stanton City Council Wayne Turner Craig Attwood Clerk-Treasurer

More information

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS

CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS December 2012 CW 3620 INSTALLATION OF UNDERGROUND TRAFFIC SIGNAL SERVICES TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions Specifications...

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2006 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories. SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

1.02 RELATED WORK: Refer to the following sections for related work:

1.02 RELATED WORK: Refer to the following sections for related work: SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN

More information

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS

CITY OF WINDSOR STANDARD SPECIFICATIONS JULY 2012 S-31 KEYHOLE EXCAVATION TABLE OF CONTENTS TABLE OF CONTENTS 31.01. SCOPE OF WORK... 1 31.02. REFERENCES... 1 31.03. DEFENITIONS... 1 31.04. MATERIALS... 2 31.05. EQUIPMENT... 3 31.06. CONSTRUCTION... 4 31.07. QUALITY ASSURANCE... 6 31.08. MEASUREMENT

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Design guidance and a description of Steel Beam Guide Rail systems, including various types and treatments, are provided in the Roadside Design Manual (RDM). 721-2.2

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 3 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS AFTER FEBRUARY 1, 2010 ITEM 530 CONCRETE CURB, GUTTER, CURB AND GUTTER SIDEWALKS AND DRIVEWAYS 530.1 Description. This item shall govern for curb, gutter, combined curb and gutter, sidewalks and/or driveways,

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 772 NOVEMBER 2017 (Formerly OPSS 772, November 2012) Note: The PROV published in November 2017 replaces OPSS 772 COMMON, November 2012 with no technical

More information

Civil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 353 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1124 REVISION 3 November 2013 EFFECTIVE DATE November 11,

More information

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS SECTION 32 05 23 PART 1 - GENERAL 1.1 DESCRIPTION A. This section shall cover site work concrete constructed upon the prepared subgrade and in conformance with the lines, grades, thickness, and cross sections

More information

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas 78207-3188 Main 210-335-6700 DRIVEWAY APPROACH SPECIFICATIONS Curbed Streets Residential Applicability: All

More information

SECTION UNIT MASONRY

SECTION UNIT MASONRY SECTION 04200 UNIT MASONRY A. ACCEPTABLE MANUFACTURERS 1. Sound Absorptive Masonry Units: 12 inch wide Soundblox type RSC/RF as manufactured by the Proudfoot Company, Monroe, CT. 2. Concrete Masonry Units:

More information

SECTION CONCRETE PAVING

SECTION CONCRETE PAVING SECTION 32 13 13 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for providing portland cement concrete work and all other incidental concrete improvements for the project

More information

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST

NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INST NOTE: 1) PRIOR TO BEGINNING WORK TRANSFER RIM ELEV. FROM MH K1 TO A TEMPORARY BENCH MARK FOR USE AS CONTROL DURING CONSTRUCTION. 2) CONTRACTOR TO INSTALL MANHOLE LIDS FLUSH WITH EXISTING GROUND SURFACE.

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 353 NOVEMBER 2016 CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS TABLE OF CONTENTS 353.01 SCOPE 353.02 REFERENCES 353.03 DEFINITIONS

More information

CONCRETE CURB AND GUTTER

CONCRETE CURB AND GUTTER USE APWA STD. PLAN 205 TYPE A. ADJUST DIMENSIONS FOR A 2% SLOPE. 6" 6" 1'-4" 3" NOTES: 1. FLATTEN GUTTERS AT ADA RAMP LOCATIONS. GUTTERSLOPES MAY BE REDUCED BETWEEN RAMPS AS WELL AS AT CURB RAMPS WHERE

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS

CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS CITY OF TORONTO STANDARD CONSTRUCTION SPECIFICATIONS FOR ROADS TS 3.80 November 2010 CONSTRUCTION SPECIFICATION FOR CONCRETE UNIT PAVERS INDEX TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS 3.80.03

More information

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems. The Most Advanced Name in Water Management Solutions TM The most cost-effective slotted and trench surface drain systems. A sensible alternative to metal and concrete Since 1987, Duraslot surface drains

More information

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015

Designer Supplement: AS-2-15 Approach Slab Installation January 16, 2015 1 Overview: The purpose of Standard Bridge Drawing, AS-2-15, is to address details of approach slabs not previously addressed in the AS-1-81 Standard Bridge Drawing. Specifically, the drawing was initiated

More information

B STEEL BEAM GUIDE RAIL - OPSS 552

B STEEL BEAM GUIDE RAIL - OPSS 552 B552-2 - - OPSS 552 552-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

B STEEL BEAM GUIDE RAIL - OPSS 721

B STEEL BEAM GUIDE RAIL - OPSS 721 B721-2 - - OPSS 721 721-2.1 GENERAL Steel Beam Guide Rail (SBGR) is a semi-rigid barrier system which restrains and redirects vehicles by a combination of beam bending (W-shaped steel section), tension,

More information

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings

Engineering & Construction Services Division Standard Drawings for Road Works. T No. Revision T No. Revision Remarks All T- drawings Engineering & Construction Services Division Standard Drawings for Road Works Revision No. 9 November 4 All T- drawings New title block for each drawing is now standardized. Revision numbers now added

More information

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems.

The Most Advanced Name in Water Management Solutions TM. The most cost-effective slotted and trench surface drain systems. The Most Advanced Name in Water Management Solutions TM The most cost-effective slotted and trench surface drain systems. A sensible alternative to metal and concrete Since 1987, Duraslot surface drains

More information

Construction Specification for Concrete Bus Pad

Construction Specification for Concrete Bus Pad Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION

More information

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS

UNIFORM STANDARD DRAWINGS CLARK COUNTY AREA, NEVADA YEAR 2015 REVISIONS , NEVADA YEAR 2015 REVISIONS SECTION TITLE AND REVISIONS SUMMARY EFFECTIVE DATE 217.S2 "Residential Curb and Gutter, R-Type" - New drawing to accommodate ADA requirements. 223 "Residential Driveway" -

More information

Report Title: Testing Different Materials for Tactile Walking Surface Indicators Pilot Project Evaluation Report

Report Title: Testing Different Materials for Tactile Walking Surface Indicators Pilot Project Evaluation Report Report Title: Testing Different Materials for Tactile Walking Surface Indicators Pilot Project Evaluation Report Prepared by Pedestrian Projects, Transportation Services, City of Toronto on March 28, 2014

More information

IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction

IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures for

More information

Intersection Joint Layout

Intersection Joint Layout Intersection Joint Layout Designers and contractors should outline an intersection layout while developing project plans. The initial plan view of an intersection provides the best birds-eye view for seeing

More information

Construction Specification for Concrete Unit Pavers

Construction Specification for Concrete Unit Pavers Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS

More information

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT

2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT 2003 SPECIFICATIONS SECTION 501 DIVISION 500 RIGID PAVEMENT SECTION 501 PORTLAND CEMENT CONCRETE PAVEMENT 501.01 GENERAL. This item consists of constructing a concrete pavement (with or without reinforcement)

More information

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following: CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION

Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION GENERAL ITEMS SUBGRADE Prior to pouring concrete all subgrades must be wetted and compacted. All formwork

More information

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows:

1. Payment for concrete sidewalks is on square foot basis. a. Limits for measurement for trench excavation as follows: Section 02775 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Reinforced concrete sidewalks. B. Wheelchair ramps. C. Reinforced slope paving. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL

CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.MUNI 721 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR STEEL BEAM GUIDE RAIL AND CABLE GUIDE RAIL TABLE OF CONTENTS 721.01 SCOPE 721.02 REFERENCES 721.03

More information

POST FRAME BUILDING STANDARDS

POST FRAME BUILDING STANDARDS CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3

More information

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION

Section 7 Roadway GENERAL REQUIREMENTS I. TYPICAL SECTION Section 7 Roadway GENERAL REQUIREMENTS... 7-1 I. TYPICAL SECTION... 7-1 7.1 LANE WIDTHS... 7-1 7.2 SHOULDER WIDTHS... 7-1 7.3 CROSS SLOPE... 7-2 7.4 CURB AND UNDERDRAINS... 7-2 7.5 SIDEWALKS AND DRIVEWAYS...

More information

RESTORATION SPECIFICATION

RESTORATION SPECIFICATION In proposed subdivision roadways where other utilities are present, the design plans should illustrate all possible utility line conflicts (crossings). During design and construction, care shall be utilized

More information

Construction Specification for Concrete Curb and Concrete Curb and Gutter

Construction Specification for Concrete Curb and Concrete Curb and Gutter Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 September 2017 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03

More information

CONCRETE BARRIER R-49-G TYPE A BARRIER MICHIGAN DEPARTMENT OF TRANSPORTATION 20'-0" MAXIMUM BETWEEN JOINTS 8'-0" TAPERED SECTION (SEE NOTES)

CONCRETE BARRIER R-49-G TYPE A BARRIER MICHIGAN DEPARTMENT OF TRANSPORTATION 20'-0 MAXIMUM BETWEEN JOINTS 8'-0 TAPERED SECTION (SEE NOTES) - SPLIT 8'-0" TAPERED SECTION A B 40" A B " EXPANSION JOINT AT BEGINNING AND END OF SPLIT SECTIONS SEE EXPANSION JOINT DETAIL PLAN CONSTRUCTION STATIONING SHALL BE PLACED ON BOTH SIDES OF THE BARRIER.

More information