PG&E Transmission Lines Hazard Tree Removal and Salvage Project

Size: px
Start display at page:

Download "PG&E Transmission Lines Hazard Tree Removal and Salvage Project"

Transcription

1 PG&E Transmission Lines Hazard Tree Removal and Salvage Project Hydrology Effects Analysis Report Zack Mondry, Hydrologist (PH) USFS ACT2 Enterprise Unit

2 Executive Summary Analysis of the proposed Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects action determined that no direct or indirect adverse effects to water quality are expected as a result of the small-scale project if Resource Protection Measures and Best Management Practices are implemented. Because no direct or indirect effects are anticipated there will also be no cumulative effects. Affected Environment Nearly all of the proposed Humboldt/Trinity transmission line hazard tree removal areas occur in the Lower South Fork Trinity River 5 th -field watershed with only approximately 18 acres in the Lower Hayfork Creek 5 th -field watershed (Table 1). At the 7 th -field scale most of the Humboldt/Trinity project acres are contained in the Big Slide Creek-South Fork Trinity River and Upper Eltapom Creek watersheds with additional minor acres occurring in Lower Eltapom and Middle Corral Creeks (Table 1). All of the proposed Bridgeville/Cottonwood transmission line hazard tree removal areas occur in the Middle South Fork Trinity River 5 th -field watershed and are contained in the Cave Creek-Swift Creek 7 th -field watershed (Table 2). Table 1 Humboldt/Trinity project acres by watershed. Humboldt/Trinity Line 5th- Field Projec t 7th- Field Projec t 5th-Field ID Acres Acres 7th-Field ID Acres Acres Lower South Fork Trinity 129, Big Slide Ck-South Fork Trinity 10, River 3 River Lower Eltapom Creek 5, Upper Eltapom Creek 6, Lower Hayfork Creek 142, Middle Corral Creek 8, Table 2 Bridgeville/Cottonwood project acres by watershed. Bridgeville/Cottonwood Line 5th- Project 7th- Project Field Field 5th-Field ID Acres Acres 7th-Field ID Acres Acres Middle South Fork Trinity River 118, Cave Creek-Swift Creek 9, Watershed Existing Conditions The Shasta-Trinity National Forest (herein SHF) employs a cumulative watershed effects (CWE) equivalent roaded area (ERA) model to assess watershed existing conditions and effects of past, present, and reasonably foreseeable activities. Potential hydrologic effects of activities such as timber harvest (including timber harvest plans on private land), thinning and fuels reduction, road construction, highand moderate-severity wildfire, and road decommissioning are incorporated in to the model assessments. Ground disturbing activities are assigned coefficients of disturbance in the ERA model in order to scale the activities to the disturbance created by an equal sized (area) road segment (Haskins 1986). Effects to hydrologic function from vegetation management and wildfire reduce over time based on recovery curves. Roads do not recover naturally over time although their coefficients of disturbance

3 can be reduced if road segments are restored by decommissioning. The SHF has established % ERA thresholds of concern (TOC) for 5 th -field watersheds. A watershed at or above the TOC is interpreted to be at increased risk for adverse effects to water quality. However, exceedance of the TOC does not necessarily manifest as impacts to water quality due to the influence of other variables such as vegetative recovery, storm magnitude and frequency, and sediment routing processes. Tables 3 and 4 display computed watershed % ERA values for the 5 th -field watersheds containing the Humboldt/Trinity and Bridgeville/Cottonwood transmission line hazard tree removal areas (D. Schmerge, Shasta-Trinity National Forest, personal communication). The 2016 % ERA value assesses baseline watershed disturbance levels, and disturbance is forecast through Table 3 Computed % ERA for 5 th -field watersheds containing proposed Humboldt/Trinity hazard tree removal areas. The 2016 value assesses baseline watershed disturbance levels. 5th-Field TOC Equivalent Roaded Area (%) 5th-Field ID Acres (% ERA) Lower South Fork Trinity River 129, Lower Hayfork Creek 142, Table 4 Computed % ERA for the 5 th -field watershed containing proposed Bridgeville/Cottonwood hazard tree removal areas. The 2016 value assesses baseline watershed disturbance levels. 5th-Field TOC Equivalent Roaded Area (%) 5th-Field ID Acres (% ERA) Middle South Fork Trinity River 118, The 5 th -field watersheds remain well below their TOC through the period. Activity acres of the Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects are included in the % ERA values in Tables 3 and 4 and they do not change computed % ERA at this scale. Tables 5 and 6 display % ERA values for the 7 th -field watersheds containing the project areas. The 2016 % ERA value assesses baseline watershed disturbance levels, and disturbance is forecast through Watershed TOC are not established at this scale however, computed % ERA values remain relatively stable for the 5 year period. Table 5 Computed % ERA for 7 th -field watersheds containing proposed Humboldt/Trinity hazard tree removal areas. The 2016 value assesses baseline watershed disturbance levels. 7th-Field Equivalent Roaded Area (%) 7th-Field ID Acres Big Slide Ck-South Fork Trinity River 10, Lower Eltapom Creek 5, Upper Eltapom Creek 6, Middle Corral Creek 8,

4 Table 6 Computed % ERA for the 7 th -field watershed containing proposed Bridgeville/Cottonwood hazard tree removal areas. The 2016 value assesses baseline watershed disturbance levels. 7th-Field Equivalent Roaded Area (%) 7th-Field ID Acres Cave Creek-Swift Creek 9, Activity acres of the Humboldt/Trinity and Bridgeville/Cottonwood Transmission Lines Hazard Tree Removal and Salvage projects are included in the % ERA values in Tables 5 and 6. When the effects of proposed hazard tree removal acres on computed % ERA are isolated they produce a maximum increase of 0.3% in the Lower Eltapom Creek watershed (Table 5) in year-1 after implementation. This value is interpreted to be within the ERA model s level of sensitivity. Riparian Reserves Hydrologic Riparian Reserves Project activities are proposed along roads and transmission line corridors proximate to fish-bearing, permanently flowing nonfish-bearing, and seasonal streams. Riparian Reserves are established for all defined stream channels and unstable landforms in the project area per the Standards and Guidelines of the SHF Land Management Plan (herein LMP). Minimum Riparian Reserve widths are defined based on stream type per the LMP as displayed in Table 3. Table 7 Minimum Riparian Reserve widths based on stream type for the Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects. Fish-bearing streams Permanently flowing non-fishbearing streams Seasonally flowing or intermittent streams A distance equal to the height of 2 site potential trees or 300 feet slope distance (600 feet total, including both sides of the stream channel), whichever is greatest. A distance equal to the height of 1 site potential tree or 150 feet slope distance (300 feet total, including both sides of the stream channel), whichever is greatest. A distance equal to the height of 1 site potential tree or 100 feet slope distance (200 feet total, including both sides of the stream channel), whichever is greatest. A geographic information systems (GIS) analysis of the proposed hazard tree removal areas indicates that about 19 acres and 3 acres of the Humboldt/Trinity and Bridgeville/Cottonwood hazard tree removal areas, respectively, intersect Riparian Reserves. Figures 1 and 2 illustrate the location of the hazard tree areas that intersect Riparian Reserves primarily along fish-bearing and permanently flowing nonfish-bearing stream segments.

5 Figure 1 Map of proposed Humboldt/Trinity transmission line hazard tree removal areas and proximate streams and Riparian Reserves. Approximately 19 acres of proposed treatment areas intersect Riparian Reserves (yellow shading). Hyampom Mountain is at the right of the map for reference. Map scale is approximately 1:35,000. Figure 2 Map of proposed Bridgeville/Cottonwood transmission line hazard tree removal areas and proximate streams and Riparian Reserves. Approximately 3 acres of proposed treatment areas intersect Riparian Reserves (yellow shading). South Fork Trinity River is at the center of map for reference. Map scale is approximately 1:15,000. If stream channels are identified in the field that do not appear in the GIS data Riparian Reserves will also be established for the channels per the Standard and Guidelines of the SHF LMP (Table 3).

6 Geologic Riparian Reserves In addition to Riparian Reserves designated for defined stream channels policy also requires Riparian Reserves be established unstable lands. Within the SHF active landslide and inner gorge terranes are considered unstable lands and are designated Riparian Reserves. An assessment of SHF GIS data indicates that only a minor part of the hazard tree removal areas proposed for the Humboldt/Trinity transmission line intersects unstable lands. This preliminary determination should be verified by a project geologist or earth scientist. Aquatic Conservation Strategy Shasta-Trinity National Forest policy under the Northwest Forest Plan requires that the Forest manage the riparian-dependent resources to maintain existing conditions, or implement actions to restore conditions. The SHF must comply with the Aquatic Conservation Strategy (ACS) objectives that are as follows: 1. Maintain and restore the distribution, diversity, and complexity of watershed and landscapescale features to ensure protection of the aquatic systems to which species, populations and communities are uniquely adapted. 2. Maintain and restore spatial and temporal connectivity between watersheds. 3. Maintain and restore the physical integrity of the aquatic system, including shorelines, banks, and bottom configurations. 4. Maintain and restore water quality necessary to support healthy riparian, aquatic, and wetland ecosystems. 5. Maintain and restore the sediment regime under which aquatic ecosystems evolved. Elements of the regime include the timing, volume, rate, and character of sediment input, storage, and transport. 6. Maintain and restore in-stream flows sufficient to create and sustain riparian, aquatic, and wetland habitats, and to retain patterns of sediment, nutrient, and wood routing. The timing, magnitude, duration, and spatial distribution of peak, high, and low flows must be protected. 7. Maintain and restore the timing, variability, and duration of floodplain inundation and water table elevation in meadows. 8. Maintain and restore the species composition and structural diversity of plant communities in riparian areas. 9. Maintain and restore habitat to support well-distributed populations of native plant and invertebrate riparian dependent species. Direct and Indirect Effects Treatments with Potential Impacts Mechanical Treatments The Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects will be implemented with mechanized equipment (skidders or tractors) wherever possible on slopes less than about 40 %. Slash produced by hazard tree removal and salvage operations will be treated at least in part by machine piling and burning or mastication. Total acres of proposed treatment by watershed are displayed in Tables 1 and 2. The potential impacts of mechanical treatments include the following:

7 Water quality pollution by spilled petroleum fuel or lubricants Soil displacement and compaction, and potential associated erosion and sedimentation Erosion and sedimentation from the burned pile areas Riparian Reserves along all perennial (fish-bearing and nonfish-bearing) streams are designated as equipment exclusion zones (EEZ). Hazard trees will be directionally felled towards channels but not removed from perennial nonfish-bearing Riparian Reserves. Hazard trees are allowed to be felled and endlined from the outer half (150 ) of Riparian Reserves along fish-bearing streams. The GIS analysis of proposed activity acres determined that the above-described treatments would occur on the less than 25 acres (see Figures 1 and 2). All activities within Riparian Reserves must not retard or prevent attainment of ACS objectives. Resource Protection Measures Resource protection measures (RPM) for the projects follow those established for the Trinity Post Fire Hazard Reduction and Salvage project that is currently under analysis on the SHF. The primary water quality RPM for the projects is establishment of the EEZ along all defined stream channels (fish-bearing, permanently flowing non-fish-bearing, and intermittent). The following RPM were specified for the Trinity Post Fire Hazard Reduction and Salvage project at the time of this reporting: Riparian Reserve Areas In the Eltapom and Corral planning watersheds, imminent hazard trees/snags would be felled along roads, but no logs would be removed from Riparian Reserves unless the log falls within 200 feet upstream of a culvert and threatens stability of road infrastructure. No treatments beyond mitigating hazard trees (felling and leaving onsite) along any road segment would occur in the East Fork New River planning watershed. Riparian Reserves along perennial flowing streams will be Equipment Exclusion Zones. Trees within 150 feet will be felled towards the stream and left onsite. Trees within the outer 150 feet of fish-bearing stream Riparian Reserves may be removed by endlining to the road if more than 20 tons/acre of LWD occurs. In the outer 150 feet, 20 tons/acre of the largest LWD will be left. In Riparian Reserves where a road runs parallel to a perennial stream and/or bisects the Riparian Reserve by winding in and out, trees uphill of the road may be removed until 20 tons/acre of the largest LWD is left. Equipment used to remove trees from the uphill of the road will remain on the existing roadbed. Riparian Reserves along intermittently flowing streams will be comprised of two zones: the inner Equipment Exclusion Zone (EEZ) and the outer Riparian Reserve treatment zone. When water is flowing within intermittent streams, the EEZ will be 100 feet on each side of the channel. When the stream is not flowing, the EEZ will be 50 feet on each side of the channel. All heavy equipment is excluded from EEZs, except at designated crossings. All EEZs will be identified as "streamside buffer" on project maps. Wetlands (including wet meadows, seeps, fens, and springs), stream inner gorges and unstable land features are also EEZs. Where stream inner gorges are wider than the EEZ, the EEZ is extended to include the entire inner gorge plus the addition of a 50-foot buffer beyond the inner gorge feature. Unstable land features (active landslides) are also protected by a 50 EEZ buffer. Hand treatments are permissible in EEZs up to the high water mark; no green vegetation would be treated. Hand treatments will have limited ground disturbance in the EEZ and will

8 not disturb riparian plant species such as big leaf maple (Acer macrophyllum), willow (Salix spp.) and alder (Alnus spp.). When snags are felled within the intermittent stream EEZ, they will be left unless there is a site specific reason for removing them, such as desired coarse woody debris levels are met and heavy fuel loading occurs (greater than 20 tons/acre), or the tree is within 200 feet upstream of a culvert and threatens stability of road infrastructure. Riparian Reserves that are unmapped will be identified and protected, prior to and/or during implementation, in accordance with appropriate protection measures (see Table 7 above). Upon field review, if ephemeral streams show no sign of annual scour or deposition (i.e., upland swales) they do not meet the Forest Plan definition of a seasonal or intermittent channel (they are not Riparian Reserves). Hand piling and pile burning will not occur within the EEZs. However fire may be allowed to back into these areas, providing the fire spread will not cause holding problems. Landings, skid trails and crossings within Riparian Reserve Existing landings within the Riparian Reserve can be reused; however, the area of disturbance will not be increased and these features will be tilled and seeded following use where they do not need to be retained as part of the road system. No new landings will be constructed within the Riparian Reserve. No existing landings within EEZs will be used unless they are connected to a system road. No full bench skid trails will be constructed within the Riparian Reserve. Any intermittent stream equipment crossings (except Forest Service system roads) will be field reviewed and approved by an earth scientist, fish biologist or designee prior to use, and will avoid unstable areas. These features will be rocked crossings designed to maintain fish passage on existing and potential fish-bearing streams. They will be reshaped and stabilized following use. If intermittent stream crossings are left in place for wet weather operations, they will be removed during the following dry season. During construction of temporary stream crossings disturbance to existing live vegetation will be minimized to the maximum extent possible. When the crossing is rehabilitated, fill will be pulled back from the crossing so that the original stream level is re-established when the culvert is removed. Water drafting Water drafting will occur at existing sites with existing access and will be located to minimize adverse effects on stream channel stability, sedimentation and instream flows needed to maintain riparian resources, channel conditions and fish habitat. Water drafting sites that are not within habitat that is accessible to anadromous salmonids will be identified first and will be given priority for use. When needed, water drafting may occur in habitat accessible by anadromous salmonids. In all cases where water drafting occurs within anadromous salmonid habitat, 2001 National Marine Fisheries Service s (NMFS) Water Drafting Specifications will be adhered to. In addition, when drafting water the following rules apply. o Allow drafting from fish bearing streams only where immediate downstream discharge is maintained at 1.5 cubic feet per second (CFS) or greater (and is not greater than 10 percent of the stream flow). o Allow drafting from ephemeral streams, intermittent streams, wetlands or constructed ponds provided that sufficient water quantity and quality remains to support associated wildlife species and riparian values. o Never allow drafting to remove more than 75 percent of constructed pond water.

9 Soils and Hydrology Retain downed logs in decay classes 3 and 4 (Maser and Trappe 1984) for soil fertility purposes whenever possible. Landings and skid trails Mechanical skidding equipment is generally restricted to slopes less than 40 percent. On short steep pitches (less than 45% slope, and less than 100 ft in length), mechanical skidding equipment is restricted to slash covered primary skid trails using flexible track skidders with low ground pressure equipment. Wet weather logging is permitted on soils with compaction hazard rating of moderate or less with restrictions (see Field Guide to Soil Moisture Conditions for Operability of Logging Equipment (Rust 2015) and Shasta-Trinity Wet Weather Soil Compaction Hazard Rating (Rust 2008)). Ground-based mechanical equipment will only operate on fine-textured soils (identified as medium and heavy soils in the Field Guide to Soil Moisture Conditions for Operability of Logging Equipment (Rust 2015)) when the top 8 inches of soil are dry (identified as slightly moist soils in the Field Guide), as evaluated by Forest soil scientist or designee. Areas along roads proposed for treatments that have this soil type will be identified on a map for use by the Timber Sale Administrator. Post-treatment total soil cover should be between 50 and 70 percent averaged across the treatment area on metamorphics with at least 50 percent cover as fine organic matter (duff, litter, plant leaves/needles, fine slash (<3 inch material), etc.). On granitics, soil cover should be greater than 90 percent with at least 50 percent cover as fine organic matter. In some cases in this project area, soil cover has been removed by high intensity fire conditions; in these areas, soil cover will be retained to the extent practicable during implementation and in some cases will be increased by treatments. Areas along roads proposed for treatments that have this soil type will be identified on a map for use by the Timber Sale Administrator. Treatment areas susceptible to logging-based soil displacement (shallow granitic soils) will keep skidders (rubber tired or fixed track) on slopes less than 35%. Avoid displacing topsoil (typically 2 to 4 inches) and exposing erosive subsoils on areas greater than 15 by 15 feet outside of skid trails, unless mulched. Only operate on these soils when soil is no wetter than the moist category identified in the Field Guide to Soil Moisture Conditions for Operability of Logging Equipment (Rust, 2015) down to 8 inches. Areas along roads proposed for treatments that have this soil type will be identified on a map for use by the Timber Sale Administrator. All material will be skidded with one end suspended, where possible. No skid trails will be built on active landslides or inner gorges, and no existing skid trails on active landslides or inner gorges will be used. Reuse existing primary skid trails and landings where available and practical to minimize soil displacement and concentrated surface flow. Skid trails will not run along the axis of intermittent channels or swales. Till (subsoil to 18 inches) all landings identified for rehabilitation, temporary roads, and main skid trails (up to 200 feet entering landings) that have fine textured soils with a wingedsubsoiler following completion of all management activities. Tillage will be completed outside of the tree drip-line so as not to impact root systems. For rocky soil, scarification will be used to restore sites. These areas should be mulched (weed free straw, wood chips or on-site organic material) at a rate of 1.5 to 2 tons per acre (approximately 4 to 6 inches in depth) over a minimum of 75 percent of the exposed soils, where necessary to prevent erosion.

10 Minimize soil erosion by water-barring skid trails. Install waterbars on contour at major breaks in slope along the skid trails. New landings will be located on gentle slopes (<20%) to minimize earthwork, and will avoid unstable areas, steep slopes below landslide benches, and slope positions where they could deliver sediment to streams. Cuts and fills would not exceed 5 feet in height, unless field reviewed and approved by an earth scientist beforehand. Pull organic materials out of fill slope of landings to prevent collapse. Landings will have natural, non-constructed designs. If non-constructed design is not feasible, landings will be constructed to adequately drain through crowned surface and directed drainage with catchment structures (rock armoring and/or silt fences with straw bales may be used as necessary). All new landing fill slopes and access road fill slopes (>100 sq. ft.) would be mulched initially, and then the mulch would be maintained throughout the life of the project; mulch may be weed-free straw, or landing slash. Areas with new road and landing fill will be rehabilitated after treatments are complete. New landings will occur in areas that are generally open or fire deforested, whenever possible. General road measures Purchaser or contractor-utilized roads rutted by purchaser/contractor operations shall be spot rocked or otherwise suitably repaired. Drainage structures shall be protected or repaired as necessary. Road surfaces expected to be used during wet weather, in areas crossing serpentine soils, should be rocked to prevent roadbed deformation (rutting) during wet conditions. Dispose of unsuitable slide and excess fill in stable, non-floodplain sites. Fill material will be inspected by a botanist, weed specialist, or designee prior to moving for presence of noxious weeds. If noxious weeds are present, they will be treated prior to moving the fill, and the disposal site will be monitored in the future and treated as necessary. Best Management Practices As with the RPM, Best Management Practices (BMP) for the transmission line hazard tree removal projects follow those established for the Trinity Post Fire Hazard Reduction and Salvage project. The following BMP with their associated objectives are prescribed from the National Core BMP Technical Guide (2012): Veg-2. Erosion Prevention and Control Objective: Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources by implementing measures to control surface erosion, gully formation, mass slope failure, and resulting sediment movement before, during, and after mechanical vegetation treatments. Veg-3. Aquatic Management Zones Objective: Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources when conducting mechanical vegetation treatment activities in the AMZ. Veg-4. Ground-Based Skidding and Yarding Operations

11 Objective: Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources during ground-based skidding and yarding operations by minimizing site disturbance and controlling the introduction of sediment, nutrients, and chemical pollutants to waterbodies. Veg-6. Landings Objective: Avoid, minimize, or mitigate adverse effects to soil, water quality, and riparian resources from the construction and use of log landings. Road-10. Equipment Refueling and Servicing Objective: Avoid or minimize adverse effects to soil, water quality, and riparian resources from fuels, lubricants, cleaners, and other harmful materials discharging into nearby surface waters or infiltrating through soils to contaminate groundwater resources during equipment refueling and servicing activities. Please refer to the Trinity Post Fire Hazard Reduction and Salvage project Environmental Impact Statement and the National Core BMP Technical Guide for specific BMP practices to be undertaken. No Effect Analysis No direct, indirect, or cumulative adverse effects to water quality are anticipated from implementation of the Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects. The analysis supporting this determination is based on the scale of the proposed activities and prescribed RPM and BMP. Scale of Disturbance The Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage projects should have little to no influence on water quality because of the limited total activity acres (Tables 1 and 2). The maximum treatment acres (108 acres) will occur in the Upper Eltapom Creek 7 th - field watershed (6,836 acres) comprising approximately 1.5 % of the total watershed area. Cumulative Watershed Effects Because no direct or indirect adverse effects to water quality are expected from implementation of the Humboldt/Trinity and Bridgeville/Cottonwood Transmission Line Hazard Tree Removal and Salvage project no adverse cumulative effects are anticipated. Computations in the SHF ERA model indicate that the entire acreage of the projects is undetectable when modeling at the 5th-field watershed scale and within model sensitivity at the 7th-field watershed scale (Tables 3 and 4). Activity acres of the transmission line hazard tree removal projects do not change computed % ERA at these scales. References Haskins, D.M A Management Model for Evaluating Cumulative Watershed Effects. California Watershed Management Conference, November 18-20, West Sacramento, California. Schmerge, D Shasta-Trinity National Forest, South Fork Management Unit. USDA National Best Management Practices for Water Quality Management on National Forest System Lands, Volume 1: National Core BMP Technical Guide. USDA Forest Service, National Headquarters. Washington, DC.

Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations

Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations Mixed Conifer Working Group Meeting April 15, 2011 Water and Soil Resource Management Considerations It is difficult to tie watershed health directly to mixed-conifer forests. Watersheds encompass a variety

More information

Appendix A (Project Specifications) Patton Mill Fuel Break Project

Appendix A (Project Specifications) Patton Mill Fuel Break Project Appendix A (Project Specifications) Patton Mill Fuel Break Project I. Proposed Actions: A. Construct a Fuel Break (approximately 5 miles, about 120 acres): The fuel break is located along a segment of

More information

The Science Behind Forest Riparian Protection in the Pacific Northwest States By George Ice, Summer 2004

The Science Behind Forest Riparian Protection in the Pacific Northwest States By George Ice, Summer 2004 The Science Behind Forest Riparian Protection in the Pacific Northwest States By George Ice, Summer 2004 Riparian buffers, streamside management zones, and similar measures are essential parts of forest

More information

TIERING DOCUMENTATION FORM FOR PRE-COMMERCIAL THIN AND RELEASE/FUELS HAZARD REDUCTION ON THE KLAMATH NATIONAL FOREST

TIERING DOCUMENTATION FORM FOR PRE-COMMERCIAL THIN AND RELEASE/FUELS HAZARD REDUCTION ON THE KLAMATH NATIONAL FOREST TIERING DOCUMENTATION FORM FOR PRE-COMMERCIAL THIN AND RELEASE/FUELS HAZARD REDUCTION ON THE KLAMATH NATIONAL FOREST Ranger District: Salmon Ranger District Date Prepared: 7/11/2011 Project Name: Knownothing

More information

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

Figure 1. Proposed vegetation management activities in Alternative 4 for the Butler Hollow Project area. A-1

Figure 1. Proposed vegetation management activities in Alternative 4 for the Butler Hollow Project area. A-1 APPENDIX A Maps Figure 1. Proposed vegetation management activities in Alternative 4 for the Butler Hollow Project area. A-1 APPENDIX A Maps Figure 2. Proposed prescribed fire management activities in

More information

Juncrock Timber Sale Draft Environmental Impact Statement. Appendix G Soils

Juncrock Timber Sale Draft Environmental Impact Statement. Appendix G Soils Juncrock Timber Sale Draft Environmental Impact Statement Appendix G Soils Soil Condition Monitoring on the Barlow Ranger District of the Mt. Hood National Forest 1999 The Barlow Ranger District conducts

More information

Alabama s Best Management Practices

Alabama s Best Management Practices Alabama s Best Management Practices Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

Appendix A: Best Management Practices for Water Quality Protection

Appendix A: Best Management Practices for Water Quality Protection Plan-2. Project Planning and Analysis Use the project planning, environmental analysis, and decision making processes to incorporate water quality management BMPs into project design and implementation.

More information

SUMMARY OF CUMULATIVE WATERSHED EFFECTS PROCESS

SUMMARY OF CUMULATIVE WATERSHED EFFECTS PROCESS SUMMARY OF CUMULATIVE WATERSHED EFFECTS PROCESS KLAMATH NATIONAL FOREST PREPARED BY: ANGIE BELL, FOREST GEOLOGIST 12 OCTOBER 2012 INTRODUCTION The Klamath National Forest currently utilizes three separate

More information

Fire Management CONTENTS. The Benefits of Guidelines...3 Considerations...4

Fire Management CONTENTS. The Benefits of Guidelines...3 Considerations...4 Fire Management CONTENTS Fire Management 1 Introduction...3 The Benefits of Guidelines...3 Considerations...4 Planning...5 Burn Plan Development...5 Operational Activities...8 Pre-Ignition Activities...8

More information

APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA

APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA Development of design criteria for aquatic and riparian species and habitats with treatments proposed within occupied or suitable

More information

Appendix A: Best Management Practices for Water Quality Protection

Appendix A: Best Management Practices for Water Quality Protection Appendix A: Best Management Practices for Water Quality Protection Plan-2. Project Planning and Analysis Use the project planning, environmental analysis, and decision making processes to incorporate water

More information

FOSTER FIRS FOREST HEALTH AND FUELS REDUCTION PROJECT HYDROLOGY REPORT. May 27, Steve G. Markman, Hydrologist Eldorado National Forest

FOSTER FIRS FOREST HEALTH AND FUELS REDUCTION PROJECT HYDROLOGY REPORT. May 27, Steve G. Markman, Hydrologist Eldorado National Forest FOSTER FIRS FOREST HEALTH AND FUELS REDUCTION PROJECT HYDROLOGY REPORT May 27, 2015 Meadow and forest adjacent to road 09N14. Anderson Canyon. Steve G. Markman, Hydrologist Eldorado National Forest EXECUTIVE

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

Funding Guidelines State Fiscal Year 2016

Funding Guidelines State Fiscal Year 2016 State Fiscal Year 2016 Water Quality Financial Assistance Centennial Clean Water Program Clean Water Act Section 319 Program Stormwater Financial Assistance Program Washington State Water Pollution Control

More information

Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration. Katie Ross-Smith Jennifer Hammond

Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration. Katie Ross-Smith Jennifer Hammond Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration Katie Ross-Smith Jennifer Hammond Outline > Background California riparian communities Riparian

More information

Water Resources Program.

Water Resources Program. POCKET GUIDE Water Resources Program http://tfsweb.tamu.edu/bmp Texas Forestry Best Management Practices Pocket Guide August 2017 This guide was financed in part (60%) by a 319 (h) grant from the U.S.

More information

Scientific Literature Review of Forest Management Effects on Riparian Functions for Anadromous Salmonids

Scientific Literature Review of Forest Management Effects on Riparian Functions for Anadromous Salmonids Scientific Literature Review of Forest Management Effects on Riparian Functions for Anadromous Salmonids Presentation to: The California State Board of Forestry and Fire Protection Prepared by: Mike Liquori

More information

Forest Recreation Management

Forest Recreation Management Forest Recreation Management 1 Forest Recreation Management Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...4 Planning...5 Construction of Recreation Areas...6 Protecting Cultural

More information

Best Management Practices (BMPs)

Best Management Practices (BMPs) Appendix B Best Management Practices (BMPs) Prepared by: Rebecca Quinones, Tom Laurent and Polly Haessig Best Management Practices (BMPs) are measures certified by the State Water Quality Board and approved

More information

East Fork Illinois River Channel and Floodplain Restoration Project

East Fork Illinois River Channel and Floodplain Restoration Project East Fork Illinois River Channel and Floodplain Restoration Project Wild Rivers Ranger District, Rogue River-Siskiyou National Forest /s/ Joni D. Brazier Date: February 20, 2015 Joni D. Brazier, Forest

More information

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014 MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341 Adopted April 24, 2014 Effective June 6, 2014 EROSION CONTROL RULE 1. POLICY. It is the policy of

More information

Appendix B Adaptive Management Strategy

Appendix B Adaptive Management Strategy Adaptive Management Strategy This appendix identifies the adaptive management strategy that would be implemented as part of the proposed action. This strategy and the processes contained and described

More information

Code of Practice For Timber Management Operations In Riparian Areas

Code of Practice For Timber Management Operations In Riparian Areas Code of Practice For Timber Management Operations In Riparian Areas Original document produced in 1991 Queen s Printer for Ontario Document amended in April 1998 consistent with Term and Condition 76 in

More information

Appendix B Best Management Practices

Appendix B Best Management Practices Appendix B Best Management Practices Forest management and associated road building in the steep rugged terrain of forested mountains has long been recognized as sources of non-point water quality pollution.

More information

Stafford Salvage and Restoration Project Fisheries MIS Report

Stafford Salvage and Restoration Project Fisheries MIS Report Stafford Salvage and Restoration Project Fisheries MIS Report 1. Introduction The purpose of this report is to evaluate and disclose the impacts of the Stafford Salvage and Restoration Project (the Project)

More information

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA)

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA) MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA) IN THE CARMEL RIVER CHANNEL, SUMMER AND FALL 2014 SELECTIVE

More information

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS I. Site Information A. Location (Include site map of harvest area)

More information

Mike Liquori Principal, Sound Watershed.

Mike Liquori Principal, Sound Watershed. Mike Liquori Principal, Sound Watershed www.soundwatershed.com ~101 M acres 16.6 M ac of public and privately owned commercial timberland 9.3 M ac public ownerships 7.3 M ac privatelyowned timberland

More information

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Erosion and Sediment Control Plan for a Timber Harvesting Operation 3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name

More information

Green Thunder Regeneration and Commercial Thinning Harvest FINDING OF NO SIGNIFICANT IMPACT (FONSI)

Green Thunder Regeneration and Commercial Thinning Harvest FINDING OF NO SIGNIFICANT IMPACT (FONSI) U.S. Department of Interior Bureau of Land Management Roseburg District, Oregon Green Thunder Regeneration and Commercial Thinning Harvest FINDING OF NO SIGNIFICANT IMPACT (FONSI) The Swiftwater Field

More information

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA

Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA Attachment C Applicant s Proposed Mitigation Statement Alaska DOT&PF Northern Region Pilot Station Airport Relocation Project POA-2004-1223 Introduction This mitigation statement was prepared as an attachment

More information

APPENDIX 2 BEST MANAGEMENT PRACTICES. Rustler Vegetation Management Project Rogue River-Siskiyou National Forest

APPENDIX 2 BEST MANAGEMENT PRACTICES. Rustler Vegetation Management Project Rogue River-Siskiyou National Forest APPENDIX 2 BEST MANAGEMENT PRACTICES Rustler Vegetation Management Project Rogue River-Siskiyou National Forest Introduction Various issues related to site productivity, water quality, are identified in

More information

Agency Organization Organization Address Information. Name United States Department of Agriculture

Agency Organization Organization Address Information. Name United States Department of Agriculture Logo Department Name United States Department of Agriculture Agency Organization Organization Address Information Forest Service Pacific Northwest Region 1220 SW Third Avenue (97204) P.O. Box 3623 Portland,

More information

Chapter FISH AND WILDLIFE HABITAT CONSERVATION AREAS

Chapter FISH AND WILDLIFE HABITAT CONSERVATION AREAS Chapter 18.24 FISH AND WILDLIFE HABITAT CONSERVATION AREAS Sections: 18.24.010 Designation of fish and wildlife habitat conservation areas. 18.24.020 Report Additional requirements for habitat conservation

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT, FINDING OF NO SIGNIFICANT IMPACT, and DECISION RECORD 1 ENVIRONMENTAL ASSESSMENT EA Number: OR-080-05-10 BLM Office: Marys Peak Resource Area, Salem District Office 1717 Fabry

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

Level 1 Consultation Project Information Form or No Effect BA Fisheries Resources Klamath National Forest

Level 1 Consultation Project Information Form or No Effect BA Fisheries Resources Klamath National Forest Level 1 Consultation Project Information Form or No Effect BA Fisheries Resources Klamath National Forest Project Name: Humbug OHV Reroute PIF Date: _3/23/2011 Project Leader: _Kevin Walton Ranger District(s):

More information

APPENDIX F LIVESTOCK MANAGEMENT TOOLS

APPENDIX F LIVESTOCK MANAGEMENT TOOLS APPENDIX F LIVESTOCK MANAGEMENT TOOLS Management of livestock grazing has always been a fluid process that requires the flexibility to address resource issues/concerns as they occur, there is not a one

More information

Appendix B - Best Management Practices (BMPs)

Appendix B - Best Management Practices (BMPs) Appendix B - Best Management Practices (BMPs) Best Management Practices (BMPs) are the standard operating procedures used for the protection of water quality. They are not intended as mitigation measures.

More information

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,

More information

PACIFIC REGION LOGGING PRACTICES

PACIFIC REGION LOGGING PRACTICES Illustration 1 Page 1. PACIFIC REGION LOGGING PRACTICES OBJECTIVES The purpose of these guidelines is to maximize forest resource utilization on Indian lands within the Pacific Regional Office's jurisdiction,

More information

Appendix E Post-Sale Activities

Appendix E Post-Sale Activities Appendix E Post-Sale Activities Post-Sale Activities The following projects would be funded with KV money if available. The projects have been selected based on a preliminary sale area boundary. If the

More information

Ursus Vegetation Management Project Deschutes National Forest Service Bend/Ft. Rock Ranger District

Ursus Vegetation Management Project Deschutes National Forest Service Bend/Ft. Rock Ranger District Ursus Vegetation Management Project Deschutes National Forest Service Bend/Ft. Rock Ranger District Biological Evaluation of Aquatic Threatened, Endangered, and Sensitive Species and Specialist Report

More information

Minnesota Logger Education Program s Minnesota Master Logger Certification Program

Minnesota Logger Education Program s Minnesota Master Logger Certification Program Minnesota Logger Education Program s Minnesota Master Logger Certification Program Program Participant Responsibility Areas Include: Area One: Area Two: Area Three: Area Four: Area Five: Area Six: Area

More information

McD s Placer #1. Plan of Operations for Placer Mining Claim. Hydrology Report

McD s Placer #1. Plan of Operations for Placer Mining Claim. Hydrology Report McD s Placer #1 Plan of Operations for Placer Mining Claim Hydrology Report David Schmerge Shasta Trinity National Forest West Zone Hydrologist September, 2016 1 PROJECT DESCRIPTION Placer exploration

More information

Mr. Steve Beverlin Description of the Proposed Actions

Mr. Steve Beverlin Description of the Proposed Actions Mr. Steve Beverlin 2 1. Description of the Proposed Actions The MNF is proposing to restore the ecological structure and function of forest ecosystems within the Project area landscape to improve forest

More information

TOWN OF SMYRNA Water Quality Buffer Zone Policy

TOWN OF SMYRNA Water Quality Buffer Zone Policy TOWN OF SMYRNA Water Quality Buffer Zone Policy Section I - Description A water quality buffer zone (a.k.a. a riparian zone) is a strip of undisturbed native (indigenous) vegetation, either original or

More information

DECISION MEMO PROJECT NAME: CLARK CREEK BLOWDOWN USDA FOREST SERVICE IDAHO PANHANDLE NATIONAL FOREST BONNERS FERRY RANGER DISTRICT

DECISION MEMO PROJECT NAME: CLARK CREEK BLOWDOWN USDA FOREST SERVICE IDAHO PANHANDLE NATIONAL FOREST BONNERS FERRY RANGER DISTRICT United States Department of Agriculture Forest Service Idaho Panhandle National Forests Bonners Ferry Ranger District 6286 Main Street Bonners Ferry, ID 83805 (208) 267-5561 File Code: 1950 Date: July

More information

Riparian Conservation Objective Consistency Analysis for French Fire Recovery and Reforestation Project March 2015

Riparian Conservation Objective Consistency Analysis for French Fire Recovery and Reforestation Project March 2015 Riparian Conservation Objective Consistency Analysis for French Fire Recovery and Reforestation Project March 2015 Prepared by: /s/ Keith Andrew Stone March 6, 2015 Keith Andrew Stone Date District Hydrologist,

More information

(1) Crossings are not to be made at the points of origin, intersection, or terminus of linear site features.

(1) Crossings are not to be made at the points of origin, intersection, or terminus of linear site features. Table A. Management requirements to reduce or prevent adverse effects by Forbestown Project. Air Quality Air Quality Air Quality Specific mitigations for prescribed burning including: number of acres burned

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Wildfire Recovery PROTECTING YOUR PROPERTY FROM SOIL EROSION

Wildfire Recovery PROTECTING YOUR PROPERTY FROM SOIL EROSION Wildfire Recovery PROTECTING YOUR PROPERTY FROM SOIL EROSION WILDFIRE RECOVERY: PROTECTING YOUR PROPERTY FROM SOIL EROSION The environmental impacts of a wildfire go far beyond burnt trees. The potential

More information

Santa Ana Hazardous Fuels Reduction Project Design Criteria

Santa Ana Hazardous Fuels Reduction Project Design Criteria Santa Ana Hazardous Fuels Reduction Project Design Criteria Front Country Ranger District, San Bernardino National Forest San Bernardino County, California September 16, 2010 DESIGN CRITERIA Various measures

More information

ELDORADO NATIONAL FOREST AMADOR RANGER DISTRICT AMADOR HIGH COUNTRY ROUTES PROJECT

ELDORADO NATIONAL FOREST AMADOR RANGER DISTRICT AMADOR HIGH COUNTRY ROUTES PROJECT ELDORADO NATIONAL FOREST AMADOR RANGER DISTRICT AMADOR HIGH COUNTRY ROUTES PROJECT HYDROLOGY REPORT October 29, 2015 (Revised December 22, 2015) Steve Markman, Hydrologist Left photo. The Carson Emigrant

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

Chapter 5: Water Quality Buffer Requirements

Chapter 5: Water Quality Buffer Requirements Chapter 5: Water Quality Buffer Requirements 5.1 Introduction Water quality buffer requirements apply to all new land development or redevelopment containing streams or other water bodies such as ponds,

More information

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008)

CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008) Section I - Description CITY OF SPRING HILL Water Quality Buffer Zone Policy (Adopted April 22, 2008) A water quality buffer zone (a.k.a. a riparian zone) is a strip of undisturbed native (indigenous)

More information

GREAT LAKES REGIONAL MICHIGAN MASTER LOGGER FIELD AUDIT FORM. Field Verifier s I.D. #: Acres: Sale #:

GREAT LAKES REGIONAL MICHIGAN MASTER LOGGER FIELD AUDIT FORM. Field Verifier s I.D. #: Acres: Sale #: Applicant s I.D. #: Date Audited: Field Verifier s I.D. #: Acres: Sale #: 1 The purpose of this form is to document an applicant s compliance in specific areas of responsibility and with performance standards

More information

RIPARIAN AREAS REGULATION

RIPARIAN AREAS REGULATION Definitions and interpretation RIPARIAN AREAS REGULATION 1 (1) In this regulation: Act means the Fish Protection Act; active floodplain means an area of land that supports floodplain plant species and

More information

Mechanical Site Preparation

Mechanical Site Preparation Mechanical Site Preparation 1 Mechanical Site Preparation Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...5 Design Outcomes To Maintain Soil Productivity...6 Planning...7 Planning

More information

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017 Applicant s Proposed Mitigation Statements Seward Highway -, POA 2013-448, Turnagain Arm Phase 1 May 2017 Avoidance The project is geographically constrained by Turnagain Arm tidal mudflats on one side

More information

Final Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District

Final Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District Final Decision Memo Murphy Meadow Restoration Project USDA Forest Service Willamette National Forest McKenzie River Ranger District T19S, R5E, Sec. 23, 24. Lane County Oregon BACKGROUND The Murphy Meadow

More information

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW CITY OF NEW WESTMINSTER Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW WHEREAS the City may preserve, protect, restore and enhance the natural environment near streams that support fish habitat from

More information

Appendix B. WOODPECKER DESIGN CRITERIA

Appendix B. WOODPECKER DESIGN CRITERIA Appendix B. WOODPECKER DESIGN CRITERIA Species Mitigation Measures Virginia round-leaf birch (Betula uber) Due to the proximity of these 4 plantations of the federally threatened Virginia round-leaf birch,

More information

U.S. Forest Service Burned Area Emergency Response (BAER) Program

U.S. Forest Service Burned Area Emergency Response (BAER) Program U.S. Forest Service Burned Area Emergency Response (BAER) Program Pre and Post Wildfire Conference Sacramento, CA Feb. 10, 2010 Brent Roath, Regional Soil Scientist/BAER Coordinator USFS, Pacific Southwest

More information

BMP No. 1 Access Roads, Skid Trails, and Landings

BMP No. 1 Access Roads, Skid Trails, and Landings BMP No. 1 Access Roads, Skid Trails, and Landings The purpose of this BMP is to minimize soil erosion and protect nearby water bodies from sediments from the construction, use, maintenance, and retirement

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

Nez Perce National Forest Moose Creek Ranger District

Nez Perce National Forest Moose Creek Ranger District United States Department of Agriculture Forest Service Nez Perce National Forest Moose Creek Ranger District 831 Selway Road Kooskia, ID 83539 208 926-4258 TTY 208 926-7725 File Code: 1950 Date: Dec 30,

More information

Soil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest

Soil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest Soil Resources Analysis Hurricane Ivan-RCW Expansion Project Conecuh National Forest Current Conditions of Soil Resources: The project area is wide spread across the forest, the result of a large scale

More information

Aquatic Conservation Strategy Report

Aquatic Conservation Strategy Report United States Department of Agriculture Forest Service June 2017 Aquatic Conservation Strategy Report Horse Creek Community Protection and Forest Restoration Project Happy Camp/Oak Knoll Ranger District,

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

North Fork Blackfoot Trail Bridges Project

North Fork Blackfoot Trail Bridges Project North Fork Blackfoot Trail Bridges Project Soils Report Prepared by: Claire Campbell Lolo National Forest Soil Scientist for: Seeley Lake Ranger District Lolo National Forest June 1, 2017 In accordance

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008

DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 USDA Forest Service, Mt. Hood National Forest Hood River Ranger District Hood River County, Oregon Flooding in the fall of 2006 caused significant

More information

Riparian Forest Ecology & Management. Derek Churchill, Nov 8, 2014

Riparian Forest Ecology & Management. Derek Churchill, Nov 8, 2014 Riparian Forest Ecology & Management Derek Churchill, Nov 8, 2014 Outline 1. Importance of Riparian Zones 2. Watersheds & Stream Type 3. Forest Stream Interactions 4. Riparian forest types & development

More information

Managing Forests for Water Quality: Streamside Management Zones

Managing Forests for Water Quality: Streamside Management Zones Ron Gropp 1 Managing Forests for Water Quality: Streamside Management Zones Barbara Daniels, Darren McAvoy, Mike Kuhns, Ron Gropp 06/01/2004 This fact sheet describes what the streamside management zone

More information

Maintaining & Enhancing Soil Health

Maintaining & Enhancing Soil Health Maintaining & Enhancing Soil Health 5 Forest Operations Manual The Conservation Forestry Program Maintaining & Enhancing Soil Health 5 C H A P T E R 3. 1 Fo re s t Ba n k Ph i l o s o p h y 5. 1 T he Na

More information

15A NCAC 02B.0238 NEUSE RIVER BASIN-NUTRIENT SENSITIVE WATERS MANAGEMENT STRATEGY: AGRICULTURAL NITROGEN REDUCTION STRATEGY The following

15A NCAC 02B.0238 NEUSE RIVER BASIN-NUTRIENT SENSITIVE WATERS MANAGEMENT STRATEGY: AGRICULTURAL NITROGEN REDUCTION STRATEGY The following 15A NCAC 02B.0238 NEUSE RIVER BASIN-NUTRIENT SENSITIVE WATERS MANAGEMENT STRATEGY: AGRICULTURAL NITROGEN REDUCTION STRATEGY The following requirements apply to all persons in the Neuse River Basin who

More information

Larimer County Land Use Code Section 5.8: Rural Land Use Process

Larimer County Land Use Code Section 5.8: Rural Land Use Process Larimer County Land Use Code Section 5.8: Rural Land Use Process 5.8.6 PRINCIPLES D. Development Standards 3. Engineering Standards and Guidelines for Roads and Drainage The following Standards and Guidelines

More information

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) / Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE

More information

Operating and Reclamation Plan

Operating and Reclamation Plan Operating and Reclamation Plan For sites in sensitive locations, additional information may be required. If more space is needed, attach additional sheets or use the blank sheet provided at the end of

More information

1792/5400 (OR-120) Umpqua River Sawyer Rapids EA OR Purdy Creek DM OR120-TS Dear Citizen:

1792/5400 (OR-120) Umpqua River Sawyer Rapids EA OR Purdy Creek DM OR120-TS Dear Citizen: United States Department of the Interior BUREAU OF LAND MANAGEMENT COOS BAY DISTRICT OFFICE 1300 AIRPORT LANE, NORTH BEND, OR 97459 Web Address: http://www.blm.gov/or/districts/coosbay E-mail: OR_CoosBay_Mail@

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

Appendix A. M9 Sanitation and Salvage Proposed Action

Appendix A. M9 Sanitation and Salvage Proposed Action Proposed actions Appendix A M9 Sanitation and Salvage Proposed Action Sanitation/Salvage Timber harvest: o 250 acres of salvage of dead and dying trees as well as sanitation harvest of stands to residual

More information

Appendix C2 Stormwater Pollution Prevention Plan Framework

Appendix C2 Stormwater Pollution Prevention Plan Framework Appendix C2 Stormwater Pollution Prevention Plan Framework THIS PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS C2.1 Introduction... C2-1 C2.2 Purpose... C2-2 C2.3 Notification Requirements and Implementation...

More information

Soils Introduction Issue Statement:

Soils Introduction Issue Statement: Soils This environmental assessment incorporates by reference (as per 40 CFR 1502.21) the Soils specialists report and other technical documentation used to support the analysis and conclusions of this

More information

Section 6: Stormwater Improvements

Section 6: Stormwater Improvements Section 6: Stormwater Improvements A major objective of this study was to identify opportunities for improvements to address the widespread water quality impairments caused by stormwater runoff in the

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

General Construction

General Construction General Construction Terms and Conditions: 1. Flagging sensitive areas. The action area will be flagged to identify sensitive resource areas, such as the extent of herbicide buffers, areas below ordinary

More information

3.28 RESEARCH NATURAL AREAS

3.28 RESEARCH NATURAL AREAS 3.28 RESEARCH NATURAL AREAS Introduction Research Natural Areas (RNAs) are areas designated, in perpetuity, for non-manipulative research and educational purposes, as well as to help maintain ecological

More information

Appendix D: Analysis for Detrimental Soil Disturbance and Total Soil Resource Commitment. Becker Integrated Resource Project

Appendix D: Analysis for Detrimental Soil Disturbance and Total Soil Resource Commitment. Becker Integrated Resource Project Appendix D: and Total Soil Resource Commitment Becker Integrated Resource Project This page intentionally left blank Appendix D Detrimental Disturbance (USDA Forest Service 2010a, p. GL-10) Detrimental

More information

Upper Umpqua Watershed Plan DECISION RECORD

Upper Umpqua Watershed Plan DECISION RECORD SECTION - BACKGROUND Introduction U.S. Department of Interior Bureau of Land Management Roseburg District, Oregon Upper Umpqua Watershed Plan DECISION RECORD This Decision Record adopts a scaled back version

More information

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL CHAPTER 3 EROSION AND SEDIMENT CONTROL Section 300 General Summary All projects constructed within the Town of Essex shall be constructed in strict accordance with

More information

Appendix E. Best Management Practices

Appendix E. Best Management Practices Appendix E. Best Management Practices INTRODUCTION The Forest Service is required by law to comply with water quality standards developed under authority of the Clean Water Act. The Environmental Protection

More information

Camp Lick Project Soil Report

Camp Lick Project Soil Report Prepared by: Robert "Hersh" McNeil Soil Scientist for: Blue Mountain Ranger District National Forest June 8, 2017 In accordance with Federal civil rights law and U.S. Department of Agriculture (USDA) civil

More information

TRESTLE FOREST HEALTH PROJECT HYDROLOGY REPORT. October 10, Steve G. Markman, Hydrologist

TRESTLE FOREST HEALTH PROJECT HYDROLOGY REPORT. October 10, Steve G. Markman, Hydrologist TRESTLE FOREST HEALTH PROJECT HYDROLOGY REPORT October 10, 2014 Steely Fork Cosumes River, a perennial stream in the project area. Steve G. Markman, Hydrologist EXECUTIVE SUMMARY This report analyzes the

More information

1. NWPs 29 and 39 are revoked for activities located in the Primary or Secondary Zone of the Legal Delta.

1. NWPs 29 and 39 are revoked for activities located in the Primary or Secondary Zone of the Legal Delta. Final Sacramento District Nationwide Permit (NWP) Regional Conditions for California, excluding the Lake Tahoe Basin (Effective March 19, 2017 until March 18, 2022) A. Revoked NWPs 1. NWPs 29 and 39 are

More information

1. NWPs 29 and 39 are revoked for activities located in the Primary or Secondary Zone of the Legal Delta.

1. NWPs 29 and 39 are revoked for activities located in the Primary or Secondary Zone of the Legal Delta. Final Sacramento District Nationwide Permit (NWP) Regional Conditions for California, excluding the Lake Tahoe Basin (Effective March 19, 2017 until March 18, 2022) A. Revoked NWPs 1. NWPs 29 and 39 are

More information