Westside Restoration. Middle Fork Ranger District
|
|
- Camron Morgan
- 5 years ago
- Views:
Transcription
1 Westside Restoration Middle Fork Ranger District
2 Jim s Creek Savanna Restoration Stewardship Project
3 The Location Oakridge Hills Creek Reservoir Willamette River Jim s Creek (~700 acres)
4 The beginning.. Tim our project planner found a large dead oak and large pine trees with evidence of indigenous use
5 Need for Restoration Oregon white oak snags and live trees in forest and meadows Large live ponderosa pine (cultural trees), some sugar pine
6 Objectives for Monitoring Restoration Objective 1: Analyze current oak-pine distribution, health, and threats to persistence and interpret the results in terms of their implications for restoration actions on the site. Objective 2: Analyze the spatiotemporal patterns of successional change from oak-pine savanna to forest :
7 Plant community composition, structure, including tree age (canopy/ shrub/ ground layers) Environmental and site physiographic factors Soils, soil moisture and other edaphic factors 5 stratified random belt transects totaling 3300 meters in length Ridgeline Willamette River
8 Understory sampled in 2 perpendicular transects within each plot
9 The Process ~2002 Developed loose collaborative group Multiple meetings/field tours Research community (University of Oregon, Dr. Bart Johnson) collaboration with Ecology and Botany : Challenge Cost Share at Jim s Creek Joint Fire Science (broader oak distribution) Developed Restoration Objectives NEPA Implementation Post-Treatment Monitoring and beyond 2017 Complete NEPA for underburn in Jim s Creek.
10 Jim s Creek Project Goals Re-establish the historic condition of an open pine/oak forest with an understory of native grasses and herbs, along with the frequent fire regime that played an important role in maintaining this open forest with a grassy understory. This goal will accomplish a related goals to restore the full suite of plant and animal specific that used this now extinct open forest;
11 Jim s Creek before Restoration
12 Jim s Creek Oak Pine Savanna 100 years ago
13 Jim s Creek Changes
14 Jim s Creek NEPA and Implementation An Environmental Analysis used data on presettlement communities and tree distributions to build a prescription for the 433 acre Jim s Creek site. The prescription: Regardless of age, trees equal to or in excess of 24 inches in diameter at breast height will be retained. Pine and oak trees of any size will be retained, except as noted below. In one 16 acre area centered on the largest meadow, dense young pines encroaching upon the meadow will be thinned. Trees in the 100 year age class greater than 24 inches in diameter that are directly competing with mature pine or oak may also be removed. The spacing of retained trees will be quite variable and may result in creation of small openings up to an acre in size.
15 Project Implementation on ~425 acres:
16 Jim s Creek after Restoration The project was completed with stewardship retained receipts in 2015.
17 Jim s Creek: Before and After
18 Post-treatment questions What is the post-treatment status of the legacy/presettlement trees? Is the post-treatment tree structure and composition moving towards desired condition? Spatial distribution? Is the post-treatment understory moving towards desired condition?
19 Target Tree Survivorship and Health Results showed that careful logging could retain target trees. 90% of oak and ponderosa pine and 95% of Douglas fir target trees were alive after the treatment. Some of these may have died before the logging and some may have died afterwards because of their declining health pre-logging. The highest mortality was seen in 30% of large oaks (over 20 /50cm DBH). Some became snags and others logs. There was very little mechanical damage done to target trees during the timber harvest.
20 Tree Density as a Measurement
21 Q Did groundcover communities respond to restoration treatment? Total native: 378 Total exotic: 68 Total 446 Total native: 860 Total exotic: 283 Total 1,143 Native bunch grasses common to prairie/savanna Native clover forbs Invasive exotic annual grasses Groundcover species counts pre- and post-treatment A Dramatic shift in abundance and composition
22 Summary of projects completed for restoration. Ten million board feet of 110 year old Douglas-fir removed around large pine trees and oaks. Non commercial trees were cut and piled. Some piles remain to be burned in 2014/2015. ~2 miles of road decommissioned. Acorns collected and grown out =300 oaks planted in Jim s Creek area Underburning in the plantation areas and test burn of logging slash.
23 Projects completed with Stewardship Receipts in 2015 Snag creation Invasive plant control Removal of vexar tubing from planted oaks and monitoring of survival. Small tree cutting, piling and burning. Underburning Grass seed collection and grow out.
24 Other projects completed Our collaborators were an important part of this project and we hope this leads to a larger collaboration in the mixed conifer project area that contains other areas like Jim s Creek 5 master s thesis based on monitoring. Volunteer help (oak planting) from Oregon Hunter s Association Pre and Post transects installed by U of O with the ecology and botany program. Wildlife exclosure monitoring Will complete NEPA for underburning in 2017 and hope to burn in 2018.
25 Products/Next Steps Using information in planning for larger Rigdon Dry Forest restoration effort
26 Lesson s Learned Jim s Creek was our first Stewardship Project Stewardship receipts were not available until the logging was completed. We needed to spend project dollars to complete some restoration goals within the necessary timeframes. Extensions given to the logging companies meant the project took years longer than expected. We did not collect any KV for the area and Stewardship dollars can t be used for salary so we are needing to use project dollars to fund our days.
27 Surprise, surprise! Staged treatment made post-treatment sampling challenging: need to be flexible with personnel and funding sampling can t be too onerous. Pilot underburn surprisingly expands! Planned and executed follow-up burn before we could posttreatment sample. Planting oak close to the road. Strong line of communication with District/implementers. You can t always tease apart all the potential factors creating different conditions be willing to lump or have some level of uncertainty.
28 Post Treatment 2016 Wind Storm during the winter of Did the treatment cause this? Was it detrimental?
29 Approx 600 trees were blown over Because more trees were left during the restoration treatment to allow for mortality the blowdown brought the area closer to pre settlement tree densities.
30 Trees that could be removed from the road were taken for aquatic restoration in a nearby stream.
31 Our collaborators were an important part of this project and we have just begun a collaborative process in the 25,000 acre mixed conifer project area that contains other areas like Jim s Creek. We hope lessons learned here will help us implement the next projects in this forest type.
32 Meadow Restoration These meadows varied from dry to mesic to wet. Work was done using force account crews and by Northwest Youth Corps. The project was done in a couple of phases and multi funded using Botany program dollars, PAYCO, Challenge Cost Share with the fuels and wildlife programs and Rocky Mountain Elk Foundation Grants. Partners: Oregon Hunters s Association, RMEF, Native Plant Society, Northwest Youth Corps.
33 Mule Meadow Oak meadow close to Oakridge. Smoke management and perception issues. An easy to implement burn but socially complicated.
34
35 Grass Mtn. Prescribed Burn
36 Quail Meadow Knobcone Pine Restoration
37 Cedar Meadows Small cedar encroaching on this dry site needle grass meadow will be cut and then the meadow will be burned.
38 Cedar Meadows Scattered trees made it possible to get better consumption of the grass.
39 Big Pine Opening Small conifers were cut and burned. More mid size pine were killed than originally intended. Fuels personnel would like to try burning and then assessing if additional cutting needs to be done.
40 Lesson s Learned Calapooya Divide Meadow Restoration It is difficult to plan prescribed fire treatments because they are weather and personnel dependent. Funding in a fiscal year is difficult. Multi source funding was necessary to complete. Using a combination of contract, force account, volunteers and NWYC was logistically complicated but an effective way to get work done. Restoration of meadows that are just beginning to be encroached by trees is more cost effective than working on meadows with 100 year old trees. Some cut trees can be used for special forest products (cedar and fir boughs)
Appendix A: Vegetation Treatments
Appendix A: Vegetation Treatments In general, the proposed actions for the Light Restoration project focuses on establishing the composition, structure, pattern, and ecological processes necessary to make
More informationOutlook Landscape Diversity Project
Appendix D. Vegetation Landscape Diversity Project Prepared by: Lisa Helmig Forest Silviculturist for: Middle Fork Ranger District Willamette National Forest June 1, 2015 Appendix D Table 1 Integrated
More informationOak Flats Restoration Project Scoping Notice May 5, 2010
United States Department of Agriculture Forest Service Diamond Lake Ranger District, Umpqua National Forest 2020 Toketee Ranger Station Road Idleyld Park, Oregon 97447 (541) 498-2531 FAX 498-2515 Oak Flats
More informationWildlife Conservation Society Climate Adaptation Fund 2014 Restoring Oak Resilience at the Table Rocks, Rogue River Basin, Oregon FACT SHEET
Wildlife Conservation Society Climate Adaptation Fund 2014 Restoring Oak Resilience at the Table Rocks, Rogue River Basin, Oregon FACT SHEET Project Overview Oak ecosystems in the Pacific Northwest exist
More informationFY2012 biophysical accomplishments FY2012 economic impacts Five year comparison of economic data New projects approved for FY2013 FY2012
FY2012 biophysical accomplishments FY2012 economic impacts Five year comparison of economic data New projects approved for FY2013 FY2012 implementation monitoring Discussion of FY2012 multiparty monitoring
More informationAppendix A (Project Specifications) Patton Mill Fuel Break Project
Appendix A (Project Specifications) Patton Mill Fuel Break Project I. Proposed Actions: A. Construct a Fuel Break (approximately 5 miles, about 120 acres): The fuel break is located along a segment of
More informationSouthern Rowe Mesa Restoration Project. Scoping Report
Southern Rowe Mesa Restoration Project Scoping Report Purpose and Need The purpose of this project is to promote a mosaic of healthy forest stands and natural grasslands on approximately 17,500 acres on
More informationTHE PATH FORWARD I. VISION
THE PATH FORWARD I. VISION Our vision within the Four Forests Restoration Initiative essentially mirrors that outlined in the Statewide Strategy for Restoring Arizona s Forests. We expect that landscape-scale
More informationReading Project Noxious Weed Risk Assessment Hat Creek Ranger District Lassen National Forest April 3, 2013
Reading Project Noxious Weed Risk Assessment Hat Creek Ranger District Lassen National Forest April 3, 2013 Prepared By: /s/ Tim Kellison Date: 05-31-2013 Tim Kellison Assistant Forest Botanist Reviewed
More informationUsing Fire in Support of Traditional Foods: Mt. Huckleberry Case Study
Using Fire in Support of Traditional Foods: Mt. Huckleberry Case Study LIBBY NELSON, SENIOR ENVIRONMENTAL POLICY ANALYST, TREATY RIGHTS OFFICE, TULALIP TRIBES, ROSS FENTON, FORESTER AND PROJECT MANAGER,
More informationDear Interested Party:
United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest 420 Barrett Street Dillon, MT 59725 406 683-3900 File Code: 1950 Date: June 7, 2011 Dear Interested Party: Thank
More informationATTACHMENT 4: DESCRIPTION OF TREATMENT TYPES MESABI PROJECT
ATTACHMENT 4: DESCRIPTION OF TREATMENT TYPES MESABI PROJECT Treatment Description Photo Example Create young forest with harvest Primary Treatments Two Age Cut Harvest is designed to maintain and regenerate
More informationSILVICULTURE SILVICULTURE 10/8/2018. Ecological forestry (Ecosystem management)
SILVICULTURE SILVICULTURE Dave Peterson University of Washington School of Environmental and Forest Sciences Thanks to Kristi McClelland, Boyd Evison, and Greg Ettl Silviculture The science and art of
More informationENVIRONMENTAL ASSESSMENT
DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT and Non-Significant Forest Plan Amendment No. 46 FOR THE JIM S CREEK SAVANNA RESTORATION PROJECT ENVIRONMENTAL ASSESSMENT USDA Forest Service Willamette
More informationRapid River Prescribed Burn Program New Meadows Ranger District Payette National Forest
2001 Rapid River Prescribed Burn Program New Meadows Ranger District Payette National Forest Prescribed Burn Program Overview Rapid River Overview RMEF Contributions and Benefits Rapid River Fire Ecology
More informationNez Perce National Forest Moose Creek Ranger District
United States Department of Agriculture Forest Service Nez Perce National Forest Moose Creek Ranger District 831 Selway Road Kooskia, ID 83539 208 926-4258 TTY 208 926-7725 File Code: 1950 Date: Dec 30,
More informationAppendix J. Forest Plan Amendments. Salvage Recovery Project
Forest Plan Amendments Salvage Recovery Project APPENDIX J Lynx and Old Growth Forest Plan Amendments CHANGES BETWEEN DRAFT EIS AND FINAL EIS Changes in Appendix J between the Draft and Final EIS include:
More informationWildlife Survey and Manage Species Compliance Statement and Effects Analysis
Outlook Landscape Diversity Project Wildlife Survey and Manage Species Compliance Statement and Effects Analysis The Northwest Forest Plan was amended with standards and guidelines for conducting project
More informationUpdate on the Four Forest Restoration Initiative: Creating Resilient Forests for the 21 st Century
Update on the Four Forest Restoration Initiative: Creating Resilient Forests for the 21 st Century 6 TH WINTER WATERSHED CONFERENCE LCRP RC&D 30 JAN 1 FEB 2013 EDWARD SMITH THE NEED Departure from historical
More informationChapter 1: Purpose and Need for Action and Proposed Action
Chapter 1: Purpose and Need for Action and Proposed Action Introduction The Goosenest Ranger District of the Klamath National Forest (KNF) is proposing a habitat restoration project on 2,226 acres in a
More informationTelegraph Forest Management Project
Telegraph Forest Management Project Black Hills National Forest Northern Hills Ranger District Lawrence and Pennington Counties, South Dakota Proposed Action and Request for Comments March 2008 Table of
More informationForsythe II Multiparty Monitoring Group Field Trip Units 5, 7, 8, 24, and a December 9, 2017
Forsythe II Multiparty Monitoring Group Field Trip Units 5, 7, 8, 24, and 89 101a December 9, 2017 Attendees Alex Markevich Brett Wolk (CFRI) Heather Bergman (Peak Facilitation) Jody Jahn (CU) Joseph J.
More informationAppendix A Silvicultural Prescription Matrix Spruce Beetle Epidemic and Aspen Decline Management Response
Appendix A Silvicultural Prescription Matrix Spruce Beetle Epidemic and Aspen Decline Management Response Treatment objectives within the matrix are a combination of objectives for silvicultural, fuels,
More informationWalla Walla Ranger District
United States Department of Agriculture Forest Service Walla Walla Ranger District 1415 West Rose Walla Walla, WA 99362 509-522-6290 File Code: 1950 Date: September 30, 2014 Dear Forest User: The Walla
More informationRe: Initial Comments on the Mount Laguna and Pine Valley Community Defense and Healthy Forest Restoration Project
Marian Kadota Adaptive Management Services Enterprise Team U.S. Forest Service 1072 Casitas Pass Road #288 Carpinteria, CA 93013 mkadota@fs.fed.us Re: Initial Comments on the Mount Laguna and Pine Valley
More informationAppendix J-1 Marking Guidelines Alternative 4 GTR 220
Appendix J-1 Marking Guidelines Alternative 4 GTR 220 General Principles The Alternative 4 of the KREW Project is implementing the landscape, ecological vision of An Ecosystem Management Strategy for Sierran
More informationWILLOW BASIN WILDLAND URBAN INTERFACE FUELS TREATMENT PROJECT Manti-La Sal National Forest Moab Ranger District
WILLOW BASIN WILDLAND URBAN INTERFACE FUELS TREATMENT PROJECT Manti-La Sal National Forest Moab Ranger District Proposed Actions: The Moab/Monticello Ranger District on the Manti-La Sal National Forest
More informationDecision Memo Young Stand Density Management and Conifer Pruning
Decision Memo Young Stand Density Management and Conifer Pruning Purpose and Need USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane and Douglas Counties, OR T17S-T25S and
More informationREFORESTATION AFTER HARVEST
REFORESTATION AFTER HARVEST You will be harvesting some timber. Do you need to plan to reforest the area? The purpose of the reforestation rules is to establish standards to ensure the timely replacement
More informationDear Interested Party,
United States Department of Agriculture Forest Service Gunnison Ranger District 216 N Colorado St. Gunnison, CO 81230 Voice: 970-641-0471 TDD: 970-641-6817 File Code: 1950-1/2430 Date: June 8, 2010 Dear
More informationPrescribed Fire Prescription 1. MP: 43 ac UB: 167 ac Landings: 21
Appendix A: Proposed Thinning and Prescribed Fire Treatments This appendix contains parameters and prescriptions applicable to proposed commercial and non-commercial thinning treatments and prescribed
More informationPrescribed Fire Prescription 1. MP: 43 ac UB: 167 ac Landings: 21
Appendix A: Proposed Thinning and Prescribed Fire Treatments This appendix contains parameters and prescriptions applicable to proposed commercial and non-commercial thinning treatments and prescribed
More informationBoulder Ranger District
United States Department of Agriculture Forest Service Boulder Ranger District 2140 Yarmouth Avenue Boulder, CO 80301-1615 Voice: (303) 541-2500 Web: www.fs.usda.gov/arp Fax: (303) 541-2515 File Code:
More informationFile Code: 1950 Date: March 22, 2011
United States Department of Agriculture Forest Service Mt. Hood National Forest Barlow Ranger District 780 NE Court Street Dufur, OR 97021 541-467-2291 FAX 541-467-2271 File Code: 1950 Date: March 22,
More informationForest Restoration and Fire Prevention in the Lake Tahoe Basin
Forest Restoration and Fire Prevention in the Lake Tahoe Basin Legislative Committee for the Review and Oversight of the Tahoe Regional Planning Agency (TRPA) and the Marlette Lake Water System January
More informationAcres within Planning Area. Total Acres Burned
Calf-Copeland Project Description Figure 1: Dead sugar pine in the Calf-Copeland planning area. Sugar pine grow best in open conditions. In the absence of fire disturbance, high densities of Douglas-fir
More informationOpportunity to Provide Scoping Comments
Notice of Proposed Action Opportunity to Provide Scoping Comments Almanor Ranger District Lassen National Forest Tehama County, California Comments Welcome The Almanor Ranger District of the Lassen National
More informationUmpqua National Forest
United States Department of Agriculture Forest Service Umpqua National Forest Tiller Ranger District 27812 Tiller Trail Highway Tiller, Oregon 97484 (541) 825-3100 Fax 825-3110 Dear Interested Citizen,
More informationBUCK 13 TIMBER SALE ENVIRONMENTAL ASSESSMENT EA# OR
BUCK 13 TIMBER SALE ENVIRONMENTAL ASSESSMENT EA# OR-014-07-02 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT LAKEVIEW DISTRICT - Klamath Falls Resource Area ABSTRACT: The following
More informationCHAPTER 1 - PURPOSE & NEED
CHAPTER 1 - PURPOSE & NEED BACKGROUND The need for action in the Falls Meadowbrook area is based upon the results of the following analyses: The 2004 Potamus Watershed Analysis An analysis of the existing
More informationNew Mexico Forest Restoration Principles
New Mexico Forest Restoration Principles Preamble These principles were collaboratively developed by a team of dedicated professionals representing industry, conservation organizations, land management
More informationBig Hill Insect and Disease Project Proposed Action
Big Hill Insect and Disease Project Proposed Action Project Background and 2014 Farm Bill The Big Hill Insect and Disease project on the Challis-Yankee Fork Ranger District of the Salmon-Challis National
More informationForest Stewardship Plan
Forest Stewardship Plan Effective plan date: June 1, 2002 Forestry is the art and science of managing forest lands and their related resources, including trees and other plants, animals, soil, water, and
More informationFrontenac State Park Management Plan Amendment
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp Frontenac State Park
More informationSierra Nevada Forest Plan Amendment Volume 1, Summary, Chapters 1 & 2
reader's guide Sierra Nevada Forest Plan Amendment Table of Contents Sierra Nevada Forest Plan Amendment Volume 1, Summary, Chapters 1 & 2 TABLE OF CONTENTS The Table of Contents is divided into 3 Sections.
More informationNew Mexico Forest Restoration Principles Preamble Participants Principles Collaborate Reduce the threat of unnatural crown fire.
New Mexico Forest Restoration Principles Preamble These principles were collaboratively developed by a team of dedicated professionals representing industry, conservation organizations, land management
More informationWalton Lake Restoration Project
Walton Lake Restoration Project Fire and Fuels Specialist Report, February 2017 Ochoco National Forest Lookout Mtn. Ranger District Barry Kleckler Fuels Specialist, Prairie Division, Central Oregon Fire
More informationPea Ridge Battlefield Prescribed Burning. Introduction. Prescribed burns involve the burning of controlled areas as a means of improving ecology and
Jocee Norton Bethany Hollis Macey Brooks Rebecca Krein Empacts Project Cecil 4/15/14 Pea Ridge Battlefield Prescribed Burning Introduction Prescribed burns involve the burning of controlled areas as a
More informationForsythe II Project Proposed Action
The Boulder Ranger District (BRD) of the Arapaho and Roosevelt National Forests (ARNF) is proposing management activities on 3,901 acres of National Forest System (NFS) lands within the Forsythe II project
More informationRed Pine Management Guide A handbook to red pine management in the North Central Region
Red Pine Management Guide A handbook to red pine management in the North Central Region This guide is also available online at: http://ncrs.fs.fed.us/fmg/nfgm/rp A cooperative project of: North Central
More informationForest Characteristics. Integrating Forest Management and Wildlife. Effects of Silvicultural Practices. Management of Succession
Forest Characteristics Integrating Forest Management and Wildlife Site descriptors such as aspect, elevation, and soil types Site Index a way of describing the productivity of the site Sam Jackson Nov.
More information2015 Insect and Disease Update for Rocky Mountain. Region
2015 Insect and Disease Update for Rocky Mountain Bob Cain USDA Forest Service State and Private Forestry and Tribal Relations Forest Health Protection Region Mountain Pine Beetle Spruce beetle Douglas-fir
More informationElkhorn Project Proposed Action
Elkhorn Project Proposed Action PROJECT LOCATION The Elkhorn project area is defined by the Cache la Poudre River and Highway 14 to the south, the Manhattan Road (CR 69) to the east, the Deadman Road to
More informationMountain Shadows June 23, 2012
FIREWISE PRINCIPLES Mountain Shadows June 23, 2012 Fire Behavior and Firewise: 1) You can t change the topography ; 2) Everybody talks about the weather, but nobody does anything about it ; ----Mark Twain
More information2 August Peter Morrison Pacific Biodiversity Institute
Recommendations for Wildfire Risk Management and Historic Structure Preservation in the Polallie-Cooper Planning Area and Adjacent Sites on the Mt. Hood National Forest 2 August 2004 Peter Morrison Pacific
More informationRegeneration / Young Stand Models
Many of the standard growth and yield models that are currently in use start with stands that have passed the regeneration phase of development (i.e., they start with stands with ages of 15 or 20 years
More informationFile Code: 1950 Date: December 7, Dear Friend of the Forest:
United States Department of Agriculture Forest Service Chattahoochee-Oconee National Forests Oconee Ranger District 1199 Madison Road Eatonton, GA 31024 (706) 485-3180 File Code: 1950 Date: December 7,
More informationROCK CREEK FUELS AND VEGETATION PROJECT FORESTED VEGETATION ANALYSIS Karl Fuelling 9/18/2015
ROCK CREEK FUELS AND VEGETATION PROJECT FORESTED VEGETATION ANALYSIS Karl Fuelling 9/18/2015 CURRENT CONDITIONS The vegetation analysis for the Rock Creek project has been done using Arcmap with Vegetation,
More informationAlternatives, including the Proposed Action
Environmental Assessment II. Alternatives, including the Proposed Action This chapter describes and compares the alternatives considered for the Chalk Parker Biodiversity Enhancement Project. It includes
More information/s/ Richard F Davis Dead Wood Habitat Snags and Down Wood
Dead Wood Effects for the Outlook Landscape Diversity Project Environmental Analysis, Middle Fork Ranger District, Willamette National Forest. Prepared by Richard F Davis, Wildlife Biologist, Middle Fork
More informationGoosenest Late Successional Reserve Southeast Habitat Restoration Environmental Assessment
U.S. Department of Agriculture Forest Service, Pacific Southwest Region Klamath National Forest, Goosenest Ranger District Goosenest Late Successional Reserve Southeast Habitat Restoration Environmental
More informationHISTORICAL SAVANNA STRUCTURE AND SUCCESSION AT JIM S CREEK, WILLAMETTE NATIONAL FOREST, OREGON JONATHAN WILLIAM DAY A THESIS
HISTORICAL SAVANNA STRUCTURE AND SUCCESSION AT JIM S CREEK, WILLAMETTE NATIONAL FOREST, OREGON by JONATHAN WILLIAM DAY A THESIS Presented to the Department of Geography and the Graduate School of the University
More informationFire, Fuels & Hazard Reduction Around Your Home & Woodlands
Fire, Fuels & Hazard Reduction Around Your Home & Woodlands Stephen A. Fitzgerald Extension Silviculture & Fire Specialist Director of CoF Research Forests Presentation will cover Historic wildfire patterns
More informationThe Galton Project Kootenai National Forest. The Galton Project
Introduction The Galton Project The Fortine Ranger District of the Kootenai National Forest is in the early stages of developing a project entitled Galton, named for the mountain range dominating the eastern
More informationFile Code: 1950 Date: September 13, 2017
United States Department of Agriculture Forest Service Darby-Sula Ranger District 712 N. Main Street Darby, MT 59829 406-821-3913 File Code: 1950 Date: September 13, 2017 The Bitterroot National Forest
More informationEVALUATION OF A MOUNTAIN PINE BEETLE INFESTATION IN SECOND-GROWTH PONDEROSA PINE ON THE CROW INDIAN RESERVATION, MONTANA, 1979 ABSTRACT
EVALUATION OF A MOUNTAIN PINE BEETLE INFESTATION IN SECOND-GROWTH PONDEROSA PINE ON THE CROW INDIAN RESERVATION, MONTANA, 1979 by K. E. Gibson, M. D. McGregor, and J. E. Dewey 1/ ABSTRACT The mountain
More informationAquatic Conservation Strategy Objective Report
United States Department of Agriculture Forest Service March 2015 Aquatic Conservation Strategy Objective Report Westside Fire Recovery project Salmon/Scott River and Happy Camp/Oak Knoll Ranger Districts
More informationHyde Park Hyde Park Wildland Urban Interface Project. Scoping Information February 2017
Introduction The Santa Fe National Forest is working as part of the Greater Santa Fe Fireshed Coalition (GSFF) to change conditions across a landscape critical to the vitality of our communities. The GSFF
More informationActions Considered for Cumulative Effects
Westside Fire Recovery Project Final Envrionmenal Impact Statement Actions Considered for Cumulative Effects Appendix C: Actions Considered for Cumulative Effects Current and future foreseeable actions
More informationTreatment/Project Area: Blanco Basin
Treatment/Project Area: Blanco Basin rev. 4/15/11 Geographic Area - Bounded on north by watershed divide between Rito Blanco and Rio Blanco (Blue Mtn and Winter Hills make up western half of divide), the
More informationDECISION RECORD for the Rattlesnake Negotiated Timber Sale (Reference:
DECISION RECORD for the Rattlesnake Negotiated Timber Sale (Reference: Bly Mtn. / Swan Lake / Rattlesnake Reservoir Forest Health and Woodland Treatments Environmental Assessment #OR014-99-6) Introduction
More information1792/5400 (OR-120) Umpqua River Sawyer Rapids EA OR Purdy Creek DM OR120-TS Dear Citizen:
United States Department of the Interior BUREAU OF LAND MANAGEMENT COOS BAY DISTRICT OFFICE 1300 AIRPORT LANE, NORTH BEND, OR 97459 Web Address: http://www.blm.gov/or/districts/coosbay E-mail: OR_CoosBay_Mail@
More informationForsythe II Project. September 2015
Forsythe II Project September 2015 The Boulder Ranger District (BRD) of the Arapaho and Roosevelt National Forests is proposing vegetation treatments on 3,840 acres of National Forest System (NFS) lands
More information3.14 VISUAL RESOURCE (SCENERY)
3.14 VISUAL RESOURCE (SCENERY) 3.14.1 INTRODUCTION The Lower West Fork analysis area lies in the Bitterroot Mountain Range and is bisected by the West Fork Road (State Highway 473). The Lower West Fork
More informationForest Resources of the Black Hills National Forest
United States Department of Agriculture Forest Service Rocky Mountain Research Station August 22 Forest Resources of the Black Hills National Forest Larry T. DeBlander About the author Larry T. DeBlander
More informationStand Dynamics and Health. Helping Your Woods Grow. For most of us this is our goal. Traditional Land Knowledge. Forest Function and Wildlife Habitat
Helping Your Woods Grow the art and science of silviculture Stand Dynamics and Health Kristi McClelland, King County DNRP Forester http://cru.cahe.wsu.edu/cepublications/eb2000/eb2000.pdf Photo by John
More informationAppendix F. Contributions from Others
Contributions from Others 1. Proposed Project (scoping) Comment Summary and Forest Service Responses Reference to the preliminary analysis (PA) is included in the response column, where applicable. Table
More informationReduce Hazardous Fuels in the McKenzie Bridge Wildland-Urban Interface (WUI)
The McKenzie River Ranger District is proposing to provide a sustainable supply of timber products, reduce hazardous fuels in the McKenzie Bridge Wildland-Urban Interface (WUI), and actively manage stands
More informationApplegate Adaptive Management Area. Rogue River-Siskiyou National Forest
Applegate Adaptive Management Area Rogue River-Siskiyou National Forest Josephine County Applegate Watershed Fun Facts 493,000 Acres (770 sq. miles) 262,400 Acres in Jackson County 172,800 Acres in Josephine
More information5/23/2013 Draft dbh between trees with and without nest cavities was not influenced by thinning treatment (Table 4) nor tree kill treatment.
5/23/213 Draft Wildlife Use of Created Snags in Young Conifer Stands Authors: Joan Hagar (for publication will add Barry Schreiber, Penny Harris, and Cheryl Friesen) INTRODUCTION The importance of snags
More informationGlass Angel Restoration Project
U S D A F O R E S T S E R V I C E Glass Angel Restoration Project Okanogan and Wenatchee National Forest Naches Ranger District 10237 U.S. Highway 12 Naches, WA 98937 509-6 5 3-1 4 0 0 The Proposal The
More informationDeveloping forestry practices. Managing for Timber and Wildlife Diversity NATIONAL WILD TURKEY FEDERATION PRE-HARVEST PLANNING:
Managing for Timber and Wildlife Diversity by Joe McGlincy NWTF WILDLIFE BULLETIN NO.15 RON BRENNEMAN NATIONAL WILD TURKEY FEDERATION Developing forestry practices that could potentially benefit all wildlife
More informationA Pictorial Comparison of Seasonal Timing and Frequency of Prescribed Fire in Longleaf Pine Stands
FORESTRY & WATER RESOURCES A Pictorial Comparison of Seasonal Timing and Frequency of Prescribed Fire in Longleaf Pine Stands When using prescribed fire in longleaf pine stands, land managers should consider
More informationFire Danger Rating Areas
Fire Danger Rating Areas Timber West This area is the Douglas-fir/Ponderosa Pine forest of the CAL FIRE Direct Protection Area in Trinity County. It is in the Interior Conifer Q81 st Planning Belt. The
More informationAppendix E Post-Sale Activities
Appendix E Post-Sale Activities Post-Sale Activities The following projects would be funded with KV money if available. The projects have been selected based on a preliminary sale area boundary. If the
More informationWILLAMETTE NATIONAL FOREST Middle Fork Ranger District
WILLAMETTE NATIONAL FOREST Middle Fork Ranger District SUPPLEMENTAL INFORMATION REPORT FOR WILDLIFE ENVIRONMENTAL ANALYSIS Outlook Landscape Diversity Project (OLDP) June 02, 2016 PREPARED BY: /s/ Joanne
More informationVestal Project Proposed Action Hell Canyon Ranger District Black Hills National Forest April 2011
Vestal Project Proposed Action Hell Canyon Ranger District Black Hills National Forest April 2011 Introduction: The Vestal Project area is located surrounding the city of Custer, South Dakota within Custer
More informationRestoring The North Shore Forest. Welcome!
Restoring The North Shore Forest Welcome! A bit about this evening History and current condition of North Shore Vegetation Info on North Shore Forest Collaborative How you can help make a difference on
More informationTIERING DOCUMENTATION FORM FOR PRE-COMMERCIAL THIN AND RELEASE/FUELS HAZARD REDUCTION ON THE KLAMATH NATIONAL FOREST
TIERING DOCUMENTATION FORM FOR PRE-COMMERCIAL THIN AND RELEASE/FUELS HAZARD REDUCTION ON THE KLAMATH NATIONAL FOREST Ranger District: Salmon Ranger District Date Prepared: 7/11/2011 Project Name: Knownothing
More informationSequoia National Forest, California; Summit Fuels Reduction and Forest Health. Notice of intent to prepare an environmental impact statement.
This document is scheduled to be published in the Federal Register on 09/16/2015 and available online at http://federalregister.gov/a/2015-23236, and on FDsys.gov [3410-11-P] DEPARTMENT OF AGRICULTURE
More informationECOLOGY: EFFECTS OF FIRE ON VEGETATION
ECOLOGY: EFFECTS OF FIRE ON VEGETATION Steve Acker Northwest Oregon Ecology Program, US Forest Service General concepts 2017 fires in McKenzie watershed Effects on individual organisms: 1) damage 2) top-kill
More information2018 Arkansas State Wildlife Grant Pre-proposal
2018 Arkansas State Wildlife Grant Pre-proposal EXPANDING PINE FLATWOODS HABITAT RESTORATION AT LONGVIEW SALINE NATURAL AREA TO BENEFIT SPECIES OF GREATEST CONSERVATION NEED Project Summary High priority
More informationPHOTO GUIDE FOR APPRAISING DOWNED WOODY MASTICATED FUELS IN INTERIOR PONDEROSA PINE FORESTS ON THE COLORADO FRONT RANGE
PHOTO GUIDE FOR APPRAISING DOWNED WOODY MASTICATED FUELS IN INTERIOR PONDEROSA PINE FORESTS ON THE COLORADO FRONT RANGE PART ONE OF A FOUR-PART SERIES ON INTERIOR PONDEROSA PINE, GAMBEL OAK, MIXED CONIFER
More informationCATEGORICAL EXCLUSION WORKSHEET: RESOURCE CONSIDERATIONS
CATEGORICAL EXCLUSION WORKSHEET: RESOURCE CONSIDERATIONS Developed Recreation/Trails, Wilderness & Roadless Jasper Mountain Priest Lake Ranger District Idaho Panhandle National Forest Description of the
More informationNational Forests in North Carolina Croatan National Forest Croatan Ranger District
United States Department of Agriculture Forest Service National Forests in North Carolina Croatan National Forest Croatan Ranger District 141 East Fisher Avenue New Bern, NC 28560-8468 252-638-5628 File
More informationPROPOSED ACTION Rancheria Forest Restoration Project
PROPOSED ACTION Rancheria Forest Restoration Project USDA Forest Service Sequoia National Forest Kern River Ranger District P.O. Box 9 105 Whitney Road Kernville, CA 93238 Contact: Penelope Shibley, District
More informationWillamette National Forest Sweet Home Ranger District
Forest Service Willamette National Forest Sweet Home Ranger District File Code: 1950 4431 Highway 20 Sweet Home, OR 97386 Tel (541) 367-5168 FAX (541) 367-2367 Date: December 16, 2015 Dear Interested public,
More informationProject Name: Gerber Stew Stewardship Contract CX Log #: OR-014 CX Chase Mtn./ Upper Bear Valley Plantation Thinnings
Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) Project Name: Gerber
More informationBarry Wynsma U.S. Forest Service, Retired Evergreen Magazine Columnist (Evergreenmagazine.com) Smallwood 2012 Flagstaff, Arizona May 2, 2012
Barry Wynsma U.S. Forest Service, Retired Evergreen Magazine Columnist (Evergreenmagazine.com) Smallwood 2012 Flagstaff, Arizona May 2, 2012 Small Trees, Small Machines Big Opportunity It s Hard to be
More informationATTACHMENT C. Implementation Strategy
UPPER APPLEGATE ROAD HAZARDOUS FUEL REDUCTION PROJECT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ATTACHMENT C Implementation Strategy I. Introduction This Project Implementation Strategy has
More information