TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement
|
|
- Jemimah O’Brien’
- 5 years ago
- Views:
Transcription
1 TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Elizabeth Falls Hydro Limited Partnership and Saskatchewan Power Corporation - Tazi Twé Hydroelectric Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment and Stewardship Branch
2 TABLE OF CONTENTS Acronyms... Preface.... ii iii Environmental Assessment and Review Process Introduction. 1 Submission of the Environmental Impact Statement... 2 Technical Review Public Review... 3 Ministerial Decision... 3 Summary of Proposed Project... 3 Alternatives Considered Technical Review Comments Introduction Public, First Nations and Metis Engagement Feedback and Response Biophysical Impacts... 6 Terrestrial Environment Water and Aquatic Environment Atmospheric and Acoustic Environment Residual and Cumulative Effects Effects of the Environment Heritage and Socio-Economic Considerations Heritage Resources Cultural Considerations Socio-Economic Considerations Decommissioning, Reclamation and Abandonment Plan.. 16 Conclusions Invitation to comment. 17 Contact 18 i
3 Acronyms BLFN CEAA COSEWIC DTC EASB EFHLP EIA EIS the Act FNCIDA the Minister the ministry the Project proponent SARA SaskPower SEARP TOR TRC VC Black Lake First Nation Canadian Environmental Assessment Agency Committee on the Status of Endangered Wildlife in Canada Crown s Duty to Consult Environmental Assessment and Stewardship Branch Elizabeth Falls Hydro Limited Partnership Environmental Impact Assessment Environmental Impact Statement The Environmental Assessment Act (Saskatchewan) Federal First Nation Commercial Industry Development Act Saskatchewan Minister of the Environment Saskatchewan Ministry of Environment Tazi Twé Hydroelectric Project Elizabeth Falls Hydro Limited Partnership and SaskPower Species at Risk Act Saskatchewan Power Corporation Saskatchewan Environmental Assessment Review Panel (technical reviewers) Terms of Reference Technical Review Comments Valued Components ii
4 Preface This document is provided by the Environmental Assessment and Stewardship Branch (EASB) of the Saskatchewan Ministry of Environment (the ministry) as supporting information for the public review of the Black Lake First Nation (BLFN) and Saskatchewan Power Corporation (SaskPower, the proponent) environmental impact statement (EIS) for the proposed Tazi Twé Hydroelectric Project (the Project). BLFN s interest in the Project is being held through their development arm, Elizabeth Falls Hydro Limited Partnership (EFHLP). The proponent is proposing a 50 megawatt (MW) water diversion-type electrical generating station located on the Black Lake First Nation Chicken Indian Reserve #224, adjacent to the Fond du Lac River and approximately 25 km west of the northern hamlet of Stony Rapids. Water from Black Lake will be diverted through a water intake structure and power tunnel to the powerhouse before being released into the Fond du Lac River upstream of Middle Lake. The purpose of the Project is to help meet the growing industrial and residential demands on the far north electrical transmission and generation system. The anticipated life of the Project is approximately 100 years. The Project is subject to an environmental impact assessment under The Environmental Assessment Act (Saskatchewan). This document has four major sections: The first section provides an overview of the provincial environmental assessment and review process. It outlines the events and activities that led to the EIS being released for public review and describes how the public can provide comments to the Minister of Environment (the Minister) on the proposed Project. The second section provides a brief summary of the Project. This summary is intended to provide information to assist the reader in deciding whether they are interested in finding out more about the Project. It is not intended to be a full representation of the Project. Interested readers should visit a review centre to read the EIS for the Project (locations are listed in Section 4). The third section of the document provides the ministry s evaluation of the proponent s conclusions regarding the predicted impacts of the proposed Project, the effectiveness of any identified mitigative measures and any follow-up requirements that would be placed on the proponent by the Minister, should the Project be approved. The fourth section presents the conclusions reached by the ministry and invites the public to comment. The Minister, when making the final decision regarding the environmental acceptability of the proposed Project, considers both the public s comments and Technical Review Comments (TRC). iii
5 1. Environmental Assessment and Review Process Introduction The Environmental Assessment Act (the Act) in Saskatchewan requires the proponent of a project that has been deemed a development pursuant to section 2(d) of the Act to conduct an Environmental Impact Assessment (EIA). The EIA provides information needed by the Minister responsible for the Act to determine whether, from an environmental perspective, a proposed project should be allowed to proceed and, if so, under what conditions. As part of the environmental assessment process, a proponent is required to prepare an EIS that documents the assessment and conclusions on the potential environmental effects of a proposed project. The EIS also describes the measures a proponent plans to take to reduce negative effects and enhance positive environmental impacts. Once completed, the EIS undergoes both a technical and public review prior to a decision being made by the Minister regarding the project. The EIA review process provides a broad understanding of potential environmental impacts associated with a project and the measures proposed to mitigate their effects. The purpose of the environmental assessment and review process is to ensure that adequate environmental safeguards are in place before a development is allowed to proceed and that it proceeds in a manner understood and broadly accepted by the public. These safeguards may arise out of the actual design and nature of the proposed project or, should the project receive approval under the Act, as a result of ongoing regulatory involvement by government agencies. In addition to the Act, this Project may be subject to other provincial and federal Acts and regulations. In December 2015, the provincial and federal governments and Black Lake First Nation began formal negotiations in order to establish a Tripartite Agreement and draft First Nation Commercial Industrial Development Act (FNCIDA) Regulations. The intent of the FNCIDA Regulations is to ensure that certain provincial laws apply as federal law to the project, within the limits of federal constitutional authority, and that the province can effectively regulate project activities on federal lands. Provincial legislation and regulations integrated into the FNCIDA regulations include: The Environmental Management and Protection Act, 2010; The Environmental Management and Protection (Saskatchewan Environmental Code Adoption) Regulations; The Hazardous Substances and Waste Dangerous Goods Regulations; The Water Power Act; The Water Power Regulations; and, The Water Security Agency Act. 1
6 Additional provincial legislation including: The Fisheries Act (Saskatchewan), 1994; The Forest Resource Management Act; and The Wildlife Act, 1998 may also apply to address off-reserve impacts. Submission of the Environmental Impact Statement On January 14, 2013 the EASB received a proposal from the proponent for the Tazi Twé Hydroelectric Project. The proposal underwent screening to determine whether or not the Project was a development under the Act which included a technical review by the Saskatchewan Environmental Assessment Review Panel (SEARP). Following technical review of the proposal, the Project was determined to be a development under Section 2(d) of the Act due to potential impacts on fish and wildlife and their habitats in and around Black Lake, Fond du Lac River and Middle Lake. The proponent was advised on February 27, 2013 that the Project is a development and an EIA was required, with findings of the EIA to be detailed in an EIS for submission to the ministry for review. The Canadian Environmental Assessment Agency (the Agency) determined that a federal assessment was also required for the Project. Subsequent to public notification of the EIA in March 2013, the proponent submitted a Terms of Reference (TOR). The TOR outlined specific studies that would be conducted to obtain information on the potential impacts of the Project and documented in the EIS. The TOR was reviewed by SEARP and was accepted as final on August 7, The EASB concluded that the proposed Project would impact access to areas where First Nations and Métis communities are known to practice traditional uses triggering the Crown s duty to consult (DTC). Potentially impacted First Nations and Métis communities were notified of the EIA and the DTC requirement on April 10, The proponent was directed to meet with potentially affected First Nation and Métis communities to inform them about the Project and solicit feedback on the potential impacts on the resources required to hunt, fish and trap for food and carry out traditional land use activities. Technical Review The EIS was received in February 2014 and reviewed by provincial technical reviewers to ensure that potential environmental issues (including biophysical, social and economic) had been identified and adequately addressed. The technical review identified several environmental and technical issues that required revisions and additional clarification before the EIA process could proceed to the public review phase. A revised EIS was subsequently submitted 2
7 and following additional technical review, was judged to contain adequate information to proceed with public review. This TRC document has been prepared pursuant to Section 11 of the Act and is meant to assist the public and government decision-makers in their review by summarizing the information within the EIS. The TRC represent a summary evaluation of the proponent s EIS. In preparing the TRC, the ministry focuses on those factors that are considered to be of primary significance with respect to the proposed Project and the environment in the Project area. Public Review The public is invited to comment on the Project EIS during the public review period from December 10, 2016 to January 13, Pursuant to Section 12 of the Act, both the EIS and TRC are made available for public inspection for a period of not less than 30 days. During the 30 day review period, members of the public may make written submission to the ministry regarding the EIA and information provided in the EIS and associated documents. Interested readers should visit a review centre or the ministry website (saskatchewan.ca/environmentalassessment) to review the EIS for the Project (locations are listed in Section 4). Ministerial Decision The Minister considers both the public and technical review comments when making a decision. Information generated during the public and technical reviews of the EIS will be submitted to the Minister for consideration. The Minister, under Section 15 of the Act, may give ministerial approval to proceed with the development, with any terms and conditions that the Minister considers necessary or advisable, or the Minister may refuse to approve the development as proposed and will provide reasons for the decision. 2. Summary of Proposed Project Information in this section is taken from the Project EIS and is neither comprehensive nor inclusive of the information contained in that document. Please refer to the Executive Summary and the EIS main document, appendices, annexes and addendums for complete information. The Project would be located on the Black Lake First Nation Chicken Indian Reserve #224, adjacent to the Fond du Lac River between Black Lake and Middle Lake. The proponent is proposing to construct a 50 MW water diversion type generation station which would operate for approximately 100 years. 3
8 The scope of the Project includes: diversion of approximately 190 m 3 /s, from an annual discharge of 305 m 3 /s into the Fond du Lac River, to the powerhouse with the remaining water flowing down the Fond du Lac River; a water intake located in Black Lake, approximately 2.95 km of tunnel excavated through rock to the powerhouse, and a tailrace (water spillway) extending for approximately 1.1 km from the powerhouse to the Fond du Lac River; and, ancillary developments including a construction camp, powerhouse infrastructure, access road, a bridge across the Fond du Lac River connecting the Project site to Highway 905, and a submerged rock weir in the Fond du Lac River at the outlet of Black Lake to maintain water levels and fish habitat in Black Lake. Water management at the site during construction and operation would ensure protection of water resources by employing a surface water collection system. In addition, all water collected will be analyzed before it is discharged into the Fond du Lac River. Alternatives Considered Alternatives considered for the Project are presented in Section 4.0 of the EIS. This section discusses the consideration of alternatives related to several Project components including: types of electrical facilities (dam and spillway, purchased power, transmission pathway to the north, diesel generation, wind and hydro); water intake, water tunnel and surge facility location; power generation capacity and turbine selection; tailrace channel location; dam vs. submerged weir at the Black Lake outlet; waste rock disposal areas; and others. In determining the preferred alternatives, consideration was given to both the economic, technical and environmental factors. SaskPower opted for a hydroelectric facility with submerged weir over conventional aboveground dam construction, and water supply via tunnel. The Project includes a 50 megawatt water diversion design where water from Black Lake will be diverted through a water intake structure and power tunnel to the power station before being released into the Fond du Lac River upstream of Middle Lake. Additional benefits of the submerged weir at the Black Lake outlet to Fond du Lac River include maintaining water levels in Black Lake during Project operations while facilitating safe downstream passage for all fish species. 4
9 3. Technical Review Comments Introduction The intent of the technical review phase of the environmental assessment and review process is to give provincial subject matter experts from across multiple government agencies and ministries an opportunity to examine the EIS to: develop their opinions about how adequately the environmental issues related to the Project have been characterized and addressed; and, determine whether the information provided is sufficiently complete and technically accurate enough to support the public review phase of the process. The technical review of the EIS identified issues related to potential environmental impacts and proposed environmental management that required clarification. These issues were addressed with additional information and the results were presented in the final EIS submission. Upon further review, the final EIS was considered to contain adequate information to proceed with public review. Release of the EIS for public review indicates all significant information requirements in the EIS have been addressed. Any remaining issues identified during technical review could be addressed through regulatory and permitting activities or terms and conditions that may be imposed in a decision made pursuant to the Act, if the Project is approved. In general, the proponent has addressed the significant issues raised during review of the initial EIS submissions. Further refinement of Project technical details would be developed in conjunction with regulators at the time of permitting and licensing should the development receive ministerial approval. Public, First Nations and Métis Engagement Feedback and Response Section 6 and Appendices 6.1 to 6.5 of the EIS provides details on the proponent s engagement with the public, and First Nation and Métis communities. The proponent initiated engagement activities in June 2010 to provide information about the Project through various media, open houses, site tours, workshops and a webpage. The proponent submitted additional stakeholder engagement records for activities conducted since the submission 5
10 of the EIS in February 2014 which can be found in Addendum III, Attachment M of the EIS. The proponent conducted meetings with First Nation and Métis communities to gather information on the potential of the project to impact Treaty or Aboriginal rights. Concerns raised by First Nation and Métis communities centered around the potential impacts to aquatic habitat or fishery resources used to exercise Treaty and Aboriginal rights and practice traditional uses in lakes and rivers in the project area. Other concerns raised included flooding, water levels and aesthetics of river flows, waste rock storage piles, impacts to a local fishing camp, impacts to water quality, potential impacts of the Project on surrounding communities, noise associated with the Project, impacts to heritage sites and job opportunities. Project specific concerns raised during engagement and consultation activities were addressed by the proponent during meetings and have been documented in the EIS. Further opportunities for participation in the environmental assessment process will be provided during the review period of the EIA. The Crown is committed to fulfilling its duty to consult obligations with potentially affected First Nations and Métis communities as described in the province s First Nations and Métis Consultation Policy Framework. Consultation activities would also continue as required through the subsequent licensing and permitting phase by the responsible branch/agency, should the Project proceed to that stage. Biophysical Impacts The proponent has evaluated the possible impacts of the Project on the biophysical environment, possible mitigation measures that could be employed to eliminate or mitigate (reduce) the impacts and any residual effects that might remain after mitigation is in place. The environmental assessment methodology used to analyze project-related effects and determine the significance of these effects is described in Section 7 of the EIS. In undertaking the EIS, valued components (VCs) were identified to facilitate the assessment and interpretation of potential effects associated with the proposed Project. These VCs (hydrology, terrestrial habitat, etc.) were chosen, in part, through the proponent s engagement activities with government officials, the public and First Nation and Métis communities. Within selected VCs are various endpoints (assessed and measured) which identified key properties of VCs requiring protection and quantifiable measures of potential changes associated with the Project. From this information, significant residual impacts of the Project on VCs are predicted. A list of VCs can be found in Section 7 of the EIS. 6
11 Sections 8 to 10, Annexes II to IV, and Addendum II and III of the EIS provide a discussion of various biophysical components of the environment and includes discussions of: the study area considered for each component; baseline information; environmental effects of the Project; residual effects analysis; discussion of uncertainty associated with conclusions; and proposed follow-up and monitoring programs to verify predictions and ensure effectiveness of design features of the Project. Terrestrial Environment The EIS includes discussion of potential impacts of the Project on the terrestrial environment including terrain and soil, vegetation and wildlife. Terrain and Soils The land cover surrounding the Fond du Lac River is primarily bedrock. The Project is situated on a transitional area between the boundaries of two Ecoregions that are separated by the Fond du Lac River; the Athabasca Plain Ecoregion and the Tazin Lake Upland Ecoregion. The Athabasca Plain Ecoregion is on the west side of the Fond du Lac River where landscapes formed on flatlying sandstone bedrock and sandy glaciofluvial deposits. The Tazin Lake Upland Ecoregion is on the east side of the river where ancient Precambrian (metamorphic) rocks rise more than 100 m above the surrounding terrain. A detailed discussion of soils can be found in Section 13 and Annex IV of the EIS. Waste rock will be produced from excavation of the water intake, power tunnel, powerhouse and tailrace channel. Clean waste rock removed from excavations can be used in other areas of construction with the remaining excavated rock deposited in waste rock disposal areas. Waste rock excavated from the power tunnel will be checked for acid rock drainage and metal leaching potential prior to placement in a permanent waste rock disposal area. A Waste Rock Management Plan can be found in Addendum II, Attachment A of the EIS. A geochemical baseline study is presented in Appendix 9.1 and borehole data is in Addendum II, Attachment R of the EIS. The baseline study found no significant potential for acid generation and no indication of uranium mineralization or the potential for leaching of elevated uranium concentrations from the waste rock. Clearing of the Project site is required for the construction of the water intake, powerhouse, tailrace channel, access road, bridge, construction camp, contractor laydown area, five waste rock disposal areas, and three settling ponds. Site clearing, contouring, and excavation during construction have the 7
12 potential to allow soil erosion to occur. The proponent will develop an erosion and sediment control plan based on industry standard best management practices. A detail Weed Management Plan will also be developed under the Weed Control Act (2010). The draft erosion and sediment control plan and Weed Management Plan is located in Addendum II, Attachment A of the EIS. Section of the EIS provides information on the proposed 2.95 km long tunnel and surge facility to convey water from Black Lake to the power house. It is anticipated that the tunnel will be constructed using a drill-and-blast method. The surge facility will be incorporated into the Project conveyance system to maintain surge protection to the turbines and regulate tailrace flow to the Fond du Lac River. Vegetation Section 3.8, Section 14 and Annex IV of the EIS includes discussion of potential impacts of the Project on vegetation. No Committee on the Status of Endangered Wildlife in Canada (COSEWIC), Species at Risk Act (SARA), or The Wildlife Act listed plant species were observed during the 2010 and 2012 field surveys. Some vegetation will be directly impacted by the Project but the proponent has committed to minimizing vegetation clearing to the extent possible. Section 14 provides an assessment of the impacts of the Project on wetland vegetation communities. The wetlands occurring on the east side of the Fond du Lac River are small (less than 1-2 hectares) and are largely forested swamps with little free surface water. The proponent has committed to avoiding wetlands wherever possible during Project construction. If infrastructure siting and Project construction cannot be planned to avoid these areas, site-specific pre-disturbance surveys will be completed to determine the area of wetlands potentially affected, the wetland type and appropriate mitigation. Wildlife and Wildlife Habitat Descriptions of wildlife and wildlife habitat are provided in Section 3.8, Section 15, Annex IV and Addendum II, Attachment L of the EIS. Twenty-eight provincially or federally listed species have the potential to occur in the Project area. Four provincially tracked species, Bald eagle (Haliaeeyus leucocephalus), sandhill crane (Grus Canadensis), Tundra swan (Cygnus columbianus) and trumpeter swan (Cygnus buccinators); two COSEWIC species, Horned grebe (Podiceps auritus) and wolverine (Gulo gulo); and one SARA-listed species: olive-side flycatcher (Contopus coopen) were observed during wildlife baseline surveys in
13 Minor impacts to wildlife will largely be due to sensory disturbance during construction and operation of the Project. Wildlife habitat and much of the landscape in the Project area has been previously disturbed by fire. Impacts from construction will be limited in duration and are not expected to result in significant adverse impacts to wildlife populations or wildlife health. During Project operations, the tailrace channel, water in-take, surge facility and powerhouse structure will be fenced to prevent wildlife from entering the areas. The Project area is part of the historic Beverly/Ahiak and Bathurst caribou herd winter migration range. The proponent conducted surveys and collected local traditional knowledge which indicated that woodland caribou are not currently found in the area and the Beverly/Ahiak and Bathurst caribou herds have not been observed over-wintering in the area for at least 30 years. The Project is located outside of the northern boundary of the SK-1 woodland caribou conservation unit as outlined in the federal recovery strategy for Woodland Caribou. The proponent has committed to developing a caribou protection plan and will continue to engage with community members from Black Lake and personnel from the ministry in the Stony Rapids area to determine the location of caribou herds relative to the Project location and develop mitigation measures if required, to minimize impacts. Technical Review Findings on the Terrestrial Environment In the EIS, the proponent presents a detailed evaluation of potential impacts, potential mitigation measures and a commitment to carry out monitoring and adaptive management should wildlife issues arise. Reviewers are generally satisfied with the assessments conducted to characterize Project impacts to the terrestrial environment. Water and Aquatic Environment Ground and Surface Water Quality Assessment of potential impacts to ground and surface water can be found in Sections 9, 10 and 11, Annex II and III, and Addendum II of the EIS. Site waste water consists of waste rock runoff, groundwater inflows during construction of the power tunnel, and site runoff water which will be collected in the settling ponds. Explosives will be used during the construction phase (power tunnel and terrace) of the Project and has the potential to change surface water and sediment quality in nearby waterbodies. In addition, waste rock runoff and groundwater inflows to the settling ponds may contain residue from the use of explosives. Modelling was conducted to predict the potential effects of project activities and settling pond discharge on the water quality of the Fond du Lac River. The surface water quality assessment in the EIS takes 9
14 into account maximum groundwater concentrations based on the site specific groundwater sampling conducted in No parameters of potential concerns are anticipated in the Fond du Lac River as a result of settling pond discharge. Water in the settling ponds will be pumped to the Fond du Lac River after the water has been tested to confirm it meets Saskatchewan discharge criteria. Should water quality issues be detected during testing, additional treatment will be required prior to discharge to ensure protection of surface water quality. The proponent will refine the Water Quality Monitoring Program, located in Addendum II of the EIS, to help confirm protection of water quality in the Fond du Lac River during the permitting phase of the project. The program will also monitor groundwater inflow into the power tunnel during construction for quality and quantity. A summary of baseline water quality data can be found in Addendum II, Attachment Q of the EIS. Aquatic Habitat Section 12.0 of the EIS discusses potential effects of the Project on aquatic habitat including impacts to water levels, flow in the Fond du Lac River, water temperature, and impacts of the proposed weir. To maintain the water level in Black Lake, the natural flow from Black Lake to Fond du Lac River will be restricted by a submerged weir. The weir will be constructed of clean excavated rock and will span the Fond du Lac River at the Black Lake outlet. It is designed to maintain the water level in Black Lake and the uppermost section of the Fond du Lac River. The submerged weir will be designed to facilitate fish passage and flow velocities will not exceed swimming thresholds of fish species. In-water works will be completed in accordance with conditions outlined in a Fisheries and Oceans Canada Authorization and Aquatic Habitat Protection Permits. Addendum III, Attachment F provides information on river 2D modeling and water level simulation results. The proposed Project includes a water intake to direct water into the power tunnel from Black Lake. Constructing a shallow intake near the surface of the lake was preferred because it is expected to keep water temperature through the tunnel and tailrace similar to those found in the Fond du Lac River and reduces the entrainment of deep-water species such as lake trout and cisco. Discussion of the intake and fish screen is presented in Addendum II, Attachment D of the EIS. Proposed mitigation for impacts to fish habitat during in-water works include: implementation of an erosion and sediment control plan, fish salvage activities, site water management plan, and a pumphouse screen to prevent entrainment of fish. Fish habitat monitoring activities will be implemented to determine the effectiveness of the proposed mitigation including acoustic monitoring at the 10
15 water intake and tailrace outlet, spawning surveys, mark-recapture population estimates, and temperature/ice monitoring. The ministry, Water Security Agency and Fisheries and Oceans Canada approval of the plan would be required before the proponent can obtain the necessary permits to begin construction. In response to requests by the local public, a modelling exercise was completed and presented at community meetings in Black Lake on October 29, 2013 and Stony Rapids on October 30, The model showed what the river would look like under three (400 m 3 /s, 210 m 3 /s, and 40 m 3 /s) reduced flow conditions at five locations. No concerns were raised after the presentation. Materials from the meetings can be found in Appendix 6.3, Appendix 10.2 and Addendum III of the EIS. Technical reviewers had concerns regarding the formation of frazil ice due to the change in Fond du Lac River flows. For frazil ice to form, an area of very cold open water must be cooled further by air temperature. Although frazil ice formation is considered likely to occur, fish of all life stages are expected to be capable of avoiding areas where frazil ice forms. Information on potential effects to fish and fish habitat that could result from frazil ice and anchor ice formation conditions in the Fond du Lac River can be found in Addendum II of the EIS. Surface ice conditions during Project operations are presented in Appendix 12.1, Addendum II and Addendum III of the EIS. Potential effects of ice formation on fish and fish habitat will be controlled through implementation of an adaptive management approach. Ice conditions will be monitored and, if effects to fish populations are identified, contingency mitigation measures would be developed and implemented based on consultation with regulators. Monitoring activities for assessing potential temperature effects and effects from ice formation during winter are describe in more detail in the Fisheries Offsetting Plan presented in Addendum II, Attachment E of the EIS. Technical Review Findings on the Aquatic Environment Regulators reviewing the EIS indicated that, should the Project be approved, a more detailed water quality monitoring plan would be required prior to construction. Additionally, due to uncertainties around the predicted impacts of water diversion on Fond du Lac River flows, aquatic habitat would also be included in the biophysical monitoring and mitigation plan required by the ministry prior to construction. Technical reviewers are otherwise satisfied by the assessment of the Project s potential impacts on water quality and aquatic habitat and the mitigations proposed to prevent or minimize impacts. 11
16 Atmospheric and Acoustic Environment Air Emissions Airborne emissions would be generated during construction, operation and decommissioning of the Project. The anticipated level and concentration of air emissions from the Project are discussed in Section 8, Annex I and Appendix 8.1, 8.2 and 8.3 of the EIS. The proponent undertook dispersion modelling to assess a worst case scenario related to impacts of the Project on air quality. Air parameters studied included particulate matter, nitrogen oxide (NO x ) and sulphur dioxide (SO 2 ) as the primary indicators of air quality relevant to this Project. Particulate matter of 10 microns (PM 10 ) would be generated by construction activities including clearing, earth-moving, blasting, crushing, road building, road traffic and maintenance throughout the proposed three to four year construction period. Particles larger than PM 2.5 tend to be removed from the air relatively quickly by gravitational settling. Blasting also produces small amounts of SO 2 and NO x which may have potential to cause the acidification of soils and wetlands however the EIS shows the deposition of fugitive dust is not expected to lead to the acidification of soil and wetlands in the project area. Results from air dispersion modelling indicate all modelled parameters were lower than the provincial Ambient Air Quality Objectives. Upon completion of construction, the generation of PM 10 will significantly reduce, with the exception of small amounts generated by the movement of local traffic on unpaved roads. Although modelling indicates ambient concentrations of dust are acceptable, the proponent will install monitoring stations to monitor PM 10 emissions from above ground drilling and blasting during construction activities. Other mitigation proposed to minimize air emissions include: ensuring diesel-powered equipment is running efficiently; enforcing speed limits to reduce dust; applying water as a dust suppressant; not idling vehicles; and revegetating stripped areas and stockpiles where possible. Noise Noise produced throughout the Project construction phase would be similar to mining noise resulting from crushing, hauling and waste rock disposal. The total noise levels from construction activities were used to assess the noise effect. Construction activities will occur over a four year period, with varying levels of activities throughout each year. Results of the noise assessment are located in Section and , and Appendices 8.1 and 8.3 of the EIS. 12
17 These results predict that while construction noise at all receptors in the local area will be audible, they will not result in effects that produce changes to health and well-being and it is not anticipated that the construction noise will result in a nuisance for the people living in the area. Impacts to wildlife would also be expected to be minimal given the attenuation of most sounds with distance from source. The powerhouse will be located in a deep cut in the bedrock and insulated which will reduce noise emissions from the building during operation. Animals quickly become accustomed to new sounds as long as they are not accompanied by other sensory disturbances. It is unlikely that noise from the Project would cause significant disruption to humans and wildlife during construction and operation of the Project. Although blasting is not accounted for in the modelling or proposed monitoring, it would occur only intermittently and both the noise and vibration would be expected to attenuate substantially over distance. Additionally, blasting would only occur during the day. The detailed Blasting Plan is presented in Addendum II, Attachment A of the EIS. Technical Review Findings on the Atmospheric and Acoustic Environment Technical reviewers are satisfied with the assessment of the Project s potential for impacts due to noise and emissions and with the mitigations proposed to prevent or minimize impacts. Residual and Cumulative Effects Section 7 of the EIS presents the proponent s analysis of the cumulative effects of residual impacts of the Project. Details regarding residual effects can be found in the relevant portions of Section 7 and 8 of the EIS and are discussed in previous sections of this document. Cumulative effects may be associated with future activities such as exploration, utilities, access and potential expansion of other industrial development in the Athabasca region. For example, impacts could include: direct habitat disturbance; water quality and quantity effects from new industrial development; and threats to public safety and wildlife from increased traffic. Actions proposed to minimize cumulative impacts on the land include utilizing existing access roads and disturbed areas whenever possible and reclaiming disturbed sites once work is completed. Technical Review Findings on Residual and Cumulative Effects Given the uncertainties associated with predicting cumulative impacts, particularly for activities undertaken by individuals or companies other than 13
18 the proponent, reviewers are satisfied with the assessment of cumulative effects presented in the EIS. Effects of the Environment The proponent considered how environmental events could potentially adversely affect the proposed Project. The assessment included consideration of potential short-term events, seasonal events and long-term events. Events considered include storms, extreme snowfall, extreme temperatures, high winds, fires, seismic events, seasonal events (low and high precipitation) and climate change. Climate change impacts are difficult to predict. A warmer, cooler, wetter or drier climate could influence the intensity of environmental events. The magnitude of these changes is beyond the ability of the proponent to predict. The assessment results presented indicate that considering mitigations, contingency plans and designs for each environmental event, impacts of the environment on the Project are sufficiently reduced. Additionally, conservatism incorporated into the design criteria help to address potential long-term changes in the intensity of events. The complete discussion of potential environmental effects and how they may affect the proposed Project can be viewed in Section 5.11 and Appendix 5.2 of the EIS. Technical Review Findings on the Effect of the Environment on the Project Technical reviewers are satisfied by the assessment of the potential for the environment to impact the Project and the mitigations proposed to prevent or minimize impacts. Heritage and Socio-Economic Considerations Heritage Resources The proponent s assessment of possible impacts to heritage resources is presented in Section 16, Annex V and Appendix 16.1 of the EIS. Potential effects on heritage resources are limited to direct disturbance and loss of archaeological sites during Project construction activities. An archaeological site inventory database and literature search, elder interviews, and field assessment were carried out as part of baseline studies to determine if heritage resources were present in the heritage sensitive areas of the Project footprint. A historic Dené cemetery is within 60 m of the existing road extending north 14
19 towards the proposed submerged weir structure. The proponent s proposed mitigation measures are flagging off or barricading access to avoid this cemetery in the event that any road upgrade activities are planned. The Heritage Conservation Branch agreed with the findings and recommendations outlined in the baseline assessments and have no concerns with the Project proceeding. Clearance letters under Section 63 of The Heritage Property Act have been provided to the proponent for the Project. Cultural Considerations The Project is located on the Chicken Indian Reserve #224 which has been set aside for the exclusive use and benefit of the members of BLFN. Off-reserve impacts of the Project (e.g. changes to flows in Fond du Lac River) are not expected to significantly impact the ability of First Nations and Métis people to hunt, fish and trap for food or carry out traditional land use activities beyond the Project footprint. A discussion on current land and resource use is presented in Section 17 of the EIS. The proponent has formed a Project advisory committee with equal representation from the EFHLP and SaskPower. This committee will meet and review, on a regular basis, all aspects and the status of the Project including environmental, engineering and construction activities, and community matters that relate to the completion and operation of the Project. Technical Review Findings on Cultural Considerations Technical reviewers agreed with the proponent s conclusion that additional discussions with impacted First Nations and Métis communities should be undertaken throughout all phases of the project to further examine and address the cultural impacts of the Project. Socio-Economic Considerations The socio-economic environment and the detailed assessment of potential effects to residents in the Project area are discussed in Section 19 and Annex VI of the EIS. The development of the Project would bring economic benefits to the province through taxes, water power rental revenue, employment and business opportunities. BLFN would also experience economic benefits through the revenue generated by water power rental fees. The proposed Project would create both positive and negative impacts on the social and economic fabric of the area. The proponent estimated the Project will cost approximately $500 million and will generate 450 total person-years of employment during construction for four years and six to eight person-years during operation. The construction phase of the Project will provide local economic and employment opportunities for northern Saskatchewan 15
20 companies and residents. Conversely, the skilled labour pool may be strained trying to fill the demand for workers. As mitigation, the proponent has committed to addressing the shortage of qualified labour locally through preemployment training programs, on-the-job training, and strategies to retain employees. The analysis of residual effects on infrastructure and community services considers potential changes to health care, childcare, education services and facilities, traffic volume, and quality and development of infrastructure. Based on the proponent s conclusions there is no significant adverse effect on infrastructure and community services anticipated to result from the Project. After construction, new infrastructure such as roads, as well as improvement to existing roads and other facilities, will benefit the BLFN community. Another post-construction benefit for the local residents that have completed the education and training program is that their skills can be used to seek employment opportunities elsewhere in the Athabasca Basin. Larger scale benefits from the Project include increasing the production of renewable energy in Saskatchewan, as well as enhancing the supply and reliability of electrical energy transmission in northern Saskatchewan. Technical Review Findings on Socio-Economic Considerations Technical reviewers were satisfied that the proponent adequately examined and addressed the socio-economic impacts of the Project. Decommissioning, Reclamation and Abandonment Plan Section 5.7 and Addendum II, Attachment A of the EIS includes a conceptual decommissioning and reclamation plan for the Project site. The proponent indicates progressive reclamation practices will take place as Project components are completed or no longer needed. Final decommissioning will be done in compliance with federal and provincial acts, regulations, and standards applicable at the time, and in consultation with the BLFN. Major steps at the conclusion of the Project will include the dismantling of physical structures at the core facilities, removal of the submerged weir at the outlet of Black Lake, infilling the upstream and downstream ends of power tunnel to prevent access, contouring the tailrace channel and powerhouse, and reclamation of other disturbed areas. A detailed plan for decommissioning, reclamation and abandonment and financial assurance will be developed in consultation with regulatory agencies during permitting if the proposed Project receives ministerial approval under the Act. 16
21 The main objective of the Project-specific decommissioning and reclamation plan will be to return lands disturbed by the Project activities to a condition that is physically stable, safe, environmentally sustaining and consistent with the land use and landscape of the day. Progressive reclamation is fundamental to the Project s decommissioning and reclamation plan, whereby any disturbed area that is no longer in use will be reclaimed as soon as possible and to the extent practical. As a result, decommissioning and reclamation activities will occur throughout the operational life of the Project. Technical Review Findings on Decommissioning, Reclamation and Abandonment Plan Technical reviewers were generally satisfied with the proponent s conceptual program for decommissioning, reclamation and abandonment. If the Project is approved, the ministry would require a detailed, comprehensive decommissioning and reclamation plan prior to the beginning of construction. This detailed plan would be reviewed every five years during operations and refined to ensure appropriate considerations have been integrated into decommissioning and reclamation activities. 4. Conclusion Members of the Saskatchewan Environmental Assessment Review Panel (technical reviewers) and the ministry conclude that the proponent has undertaken sufficient studies and provided adequate information about the proposed Project such that the EIS can be made available for public review. Invitation to Comment The public is invited to review the proponent s EIS and the TRC and provide their comments no later than January 13, Public is invited to comment on the Project EIS during the public review period from December 10, 2016 to January 13, The EIS and TRC are being made available for review at the administrative offices of: Stony Rapids; Black Lake First Nation; Fond du Lac First Nation; the Environmental Assessment and Stewardship Branch, the Legislative Library in Regina; and on the ministry website at Saskatchewan.ca/environmentalassessment. Written comments received during the public review of the EIS and TRC will be considered by the Minister of Environment when he makes his decision under Section 15(1) of The Environmental Assessment Act to either: (a) give ministerial approval to proceed with the development and impose any terms and conditions that he considers necessary or advisable; or 17
22 (b) refuse to approve the development. Contact For more information, please contact: Alvin Yuen Senior Environmental Assessment Administrator Environmental Assessment and Stewardship Branch Saskatchewan Ministry of Environment 3211 Albert Street REGINA SK S4S 5W6 Phone: ; Fax: environmental.assessment@gov.sk.ca 18
Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.
Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION
More informationTECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project
TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Rio Tinto Uranium Corp. Roughrider Advanced Exploration Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment
More informationTazi Twé Hydroelectric Project. Environmental Assessment Report
Tazi Twé Hydroelectric Project Environmental Assessment Report July 2015 Cover photo credited to Ross Phillips, Golder Associates Ltd. Her Majesty the Queen in Right of Canada, represented by the Minister
More informationAND WHEREAS the Minister is satisfied that all the requirements of the Act have been met, including those required of Premier Tech;
PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT PREMIER TECH HORTICULTURE LTD. SMOKEY RIDGE PEAT HARVESTING PROJECT WHEREAS
More informationTECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Karnalyte Resources Inc. Wynyard Carnallite Project
TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Karnalyte Resources Inc. Wynyard Carnallite Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment Branch December,
More informationREASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT
REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT SASKATCHEWAN WATER CORPORATION BUFFALO POUND NON-POTABLE WATER SUPPLY SYSTEM EXPANSION PROJECT Introduction
More informationBERGER PEAT MOSS LIMITED
BERGER PEAT MOSS LIMITED Terms of Reference for the Big River Peat Harvest Project Submitted to: Ministry of Environment Environmental Assessment and Stewardship Branch 3211 Albert Street, 4th Floor Regina,
More informationMay 8, 2017 EASB File #: Transaction #:
Ministry of Environment Environmental Assessment and Stewardship Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 May 8, 2017 EASB File #: 2016-022
More informationTECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Fortune Minerals Limited. Saskatchewan Metals Processing Plant
TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Fortune Minerals Limited. Saskatchewan Metals Processing Plant Near Langham, Saskatchewan Prepared by Saskatchewan Ministry of Environment
More informationMINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc.
MINISTERIAL APPROVAL UNDER THE ENVIRONMENTAL ASSESSMENT ACT RABBIT LAKE SOLUTION PROCESSING PROJECT Cameco Corporation and AREVA Resources Canada Inc. REASONS FOR DECISION Introduction Section 16(1) of
More informationTechnical Review Comments. Environmental Impact Statement for the Rabbit Lake Solution Processing Project. submitted by:
Saskatchewan Environmental Impact Assessment Technical Review Comments Environmental Impact Statement for the submitted by: Cameco Corporation and AREVA Resources Canada Inc. Environmental Assessment Branch
More informationComprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:
Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment
More informationTECHNICAL PROPOSAL GUIDELINES FOREWORD
FOREWORD This document is intended for use by proponents prior to contacting the Ministry of Environment (the ministry) about an approval under The Environmental Assessment Act. It is aimed at helping
More informationDecember 2, 2016 EAB File #: Transaction #:
Ministry of Environment Environmental Assessment and Stewardship Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 December 2, 2016 EAB File #:
More informationAmisk Hydroelectric Project Update
Amisk Hydroelectric Project Update AHP Development Corporation (AHP) is providing an update on the Amisk Hydroelectric Project ( Amisk /the Project ). Amisk is a proposed run-of-river hydroelectric project,
More informationShell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More information1.0 Information Requests and Responses: Canadian Environmental Assessment Agency
March 6, 2015 Mr. Kamran Faisal Mr. Alvin Yuen Canadian Environmental Assessment Agency Environmental Assessment Applications Unit 425, 10115 100 A Street 3211 Albert Street Edmonton, Alberta Regina, Saskatchewan
More informationCanada. Record of Proceedings, Including Reasons for Decision. Cameco Corp_o_ra_ti_o_n. Proponent
Canadian Nuclear Safety Commission Commission canadienne de sorete nucleaire Record of Proceedings, Including Reasons for Decision Proponent Cameco Corp_o_ra_ti_o_n _ Subject Comprehensive Study Report
More informationOctober 2, 2015 EAB File #: Transaction #:
Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: 306.787 5971 Fax: 306 787 0930 October 2, 2015 EAB File #: 2015-013 Transaction
More informationPROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(a) THE ENVIRONMENTAL ASSESSMENT ACT
PROVINCE OF SASKATCHEWAN MINISTRY OF ENVIRONMENT MINISTERIAL CHANGE APPROVAL PURSUANT TO SECTION 16(2)(a) THE ENVIRONMENTAL ASSESSMENT ACT MOSAIC POTASH ESTERHAZY K3 TO K2 CONVEYOR PROJECT WHEREAS: A.
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More informationThe following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:
TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management Plans for
More informationPreliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and
Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationThe following potential environmental receptors and impacts form the basis of TRCA s review under Ontario Regulation 166/06 and the Fisheries Act:
Interim TRCA Technical Guidelines for the Development of Environmental Management Plans for Dewatering September 2013 Rationale: The Technical Guidelines for the Development of Environmental Management
More informationEnvironmental Performance Report Guideline EPB 453
Environmental Performance Report Guideline September 2013 EPB 453 Ministry of Environment TABLE OF CONTENTS 1 DEFINITIONS 3 2 INTRODUCTION 5 2.1 Purpose 5 2.2 Legislation 5 2.2.1 Environmental Assessment
More informationTECHNICAL REVIEW COMMENTS on the Environmental Impact Statement. Yancoal Canada Resources Co., Ltd. Southey Project
TECHNICAL REVIEW COMMENTS on the Environmental Impact Statement Yancoal Canada Resources Co., Ltd. Southey Project Prepared by Saskatchewan Ministry of Environment Environmental Assessment Branch TABLE
More informationTerms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report
The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO
More informationBACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the
BACKGROUND INFORMATION for the INITIAL FEDERAL PUBLIC COMMENT PERIOD on the Comprehensive Study pursuant to the Canadian Environmental Assessment Act of the Ajax Mine Project Kamloops, British Columbia
More informationMactaquac Project. Final Comparative Environmental Review (CER) Report. August 2016
Mactaquac Project Final Comparative Environmental Review (CER) Report August 2016 Prepared For: New Brunswick Power Corporation P.O. Box 2040, 515 King Street Fredericton, NB E3B 5G4 Prepared By: Stantec
More informationNoront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017
Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern
More informationMagino Project Environmental Impact Statement. Technical Support Document Draft Fish Habitat Compensation Plan
Magino Project Environmental Impact Statement Technical Support Document 20-14 Rev. No. Revision Date Approved 0 Document issued for EIS Table of Contents SECTION 1.0 INTRODUCTION... 1 SECTION 2.0 BACKGROUND...
More informationDecember 21, 2015 EAB File #: Transaction #: Re: Rush Lake Commercial Phase 2 SAGD Project at NE W3M
Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 December 21, 2015 EAB File #: 2015-018 Transaction
More informationJuly 23, 2014 EAB File #: Transaction #: Brad Hannan Ministry of Highways and Infrastructure 1630 Park Street REGINA SK S4N 2G1
Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 July 23, 2014 EAB File #: 2014-013 Transaction
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationReasons for Ministers Decision
In the matter of the Environmental Assessment Act S.B.C. 2002, c. 43 (Act) and In the matter of an Application for an Environmental Assessment Certificate (Application) by Teck Coal Limited (Proponent)
More informationEXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan
EXECUTIVE SUMMARY The consultative process was initiated in April 2000 and completed in November 2001. The consultative process follows the steps outlined in the 1996 provincial government Water Use Plan
More informationto Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street, 1 st Floor Quebec, Quebec G1K 3X2
Decision Statement Issued under Section 54 of the Canadian Environmental Assessment Act, 2012 to Nemaska Lithium Inc. c/o Guy Bourassa President and Chief Operating Officer 450 De la Gare-du-Palais Street,
More informationThe Halifax Harbour Solutions Project Provision of Sewage Treatment
The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised
More informationActivities that may Require Permit/Approval. Permit/Approval Required Electrical Safety Authority. Approval (CAA) process.
10.0 Table 10-1 represents a preliminary list of anticipated permits and approvals required to implement the Project and additional details regarding each anticipated permit/approval including the agency
More informationManitoba s Submission Guidelines for Peatland Management Plans
Manitoba s Submission Guidelines for Peatland Management Plans Peatland Management Guidebook Forestry and Peatlands Branch Manitoba Sustainable Development First Published: September 2017 Review by: 2022
More informationThe Project. Federal Regulatory Approvals and Involvement
Government of Canada Response to the Report of the Joint Federal-Provincial Review Panel for Nalcor s Lower Churchill Generation Project in Newfoundland and Labrador The Project Nalcor Energy proposes
More informationManitoba s Submission Guidelines for Peatland Recovery Plans
Manitoba s Submission Guidelines for Peatland Recovery Plans Peatland Management Guidebook Forestry and Peatlands Branch Manitoba Sustainable Development First Published: September 2017 Review by: 2022
More informationHIGHWAY 905 ALL WEATHER ROADWAY STONY RAPIDS TO LAKE ATHABASCA NEAR FOND DU LAC
PROJECT-SPECIFIC GUIDELINES FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT AND CANADIAN ENVIRONMENTAL ASSESSMENT ACT COMPREHENSIVE STUDY SCOPING DOCUMENT HIGHWAY 905 ALL WEATHER ROADWAY STONY
More informationENVIRONMENTAL SCREENING REPORT
ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling
More informationAppendix D. Fisheries and Oceans Canada (DFO) Letter of Advice
The City of Winnipeg Bid Opportunity No. 851-2017 Template Version: C420170317 - RW Appendix D Fisheries and Oceans Canada (DFO) Letter of Advice Fisheries and Oceans Canada Pêches et Océans Canada 103-1800
More informationManitoba s Submission Guidelines for Peatland Recovery Plans
Manitoba s Submission Guidelines for Peatland Recovery Plans Peatland Management Guidebook Forestry and Peatlands Branch Manitoba Sustainable Development First Published: September 2017 Review by: 2022
More informationGuidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories
DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines
More informationDraft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project
Draft Environmental Impact Statement Guidelines for the Environmental Assessment of the Sydney Tar Ponds and Coke Ovens Sites Remediation Project Table of Contents 1. BACKGROUND...5 1.1 CONTEXT...5 2.
More informationPROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT
PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED
More informationMap. Map 1. Mackenzie River Basin Transboundary Sub basins
Contents Map... 1 Background... 2 Why are the Bilateral Agreements important?... 2 How has the public and Aboriginal governments been engaged and consulted throughout the negotiation of Bilateral Agreements?...
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 NOVEMBER 2012 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationDoig River First Nation ~56 Rose Prairie, B.C. VOC 2HO Ph: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78
Doig River First Nation ~56 Rose Prairie, B.C. VOC 2HO Ph: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78 November 16, 2015 Shauna Sigurdson, Regional Director, Prairie and Northern Region Canadian Environmental
More information1.0 Information Requests and Responses: Canadian Environmental Assessment Agency
September 22, 2014 Mr. Kamran Faisal Mr. Alvin Yuen Canadian Environmental Assessment Agency Environmental Assessment Applications Unit 425, 10115 100 A Street 3211 Albert Street Edmonton, Alberta Regina,
More informationD EROSION AND SEDIMENT CONTROL. Table of Contents
Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2
More informationREASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(A) THE ENVIRONMENTAL ASSESSMENT ACT
REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(A) THE ENVIRONMENTAL ASSESSMENT ACT STAR DIAMOND CORPORATION STAR-ORION SOUTH DIAMOND PROJECT Introduction The Environmental Assessment
More informationELECTRICAL TRANSMISSION LINES & SUBSTATIONS
TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction
More informationSUMMARY OF COMMENTS/RECOMMENDATIONS
SUMMARY OF COMMENTS/RECOMMENDATIONS PROPONENT: 6409840 Manitoba Ltd. (Tritec Concrete) PROPOSAL NAME: Tritec Concrete Concrete Batch Plant CLASS OF DEVELOPMENT: 1 TYPE OF DEVELOPMENT: Manufacturing - CLIENT
More informationT a b l e o f C o n t e n t s
T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2
More informationDraft Mine Closure Plan. 17 October 2018 Longlac & Geraldton
Draft Mine Closure Plan 17 October 2018 Longlac & Geraldton Project Update Federal EA Decision report was issued on October 1 st and Provincial Report is expected to be issued Oct 22 nd Federal approval
More informationFebruary 15, Mr. Kyle Stanfield Prodigy Gold Incorporated Box 209, 3 Dree Road Dubreuilville, ON P05 1BO
Environmental Assessment Canadian Agency Agence canadienne devaluation environnementale Ontario Regional Office Bureau regional de Ontario 55 St. Clair Avenue East, 55, avenue St-Clair est, Room 907 bureau
More informationManagement of Uranium Mine Waste Rock and Mill Tailings. Support Document to DIS-10-01
Management of Uranium Mine Waste Rock and Mill Tailings Support Document to DIS-10-01 March 2010 i Introduction SUPPORT DOCUMENT: DISCUSSION PAPER ON THE MANAGEMENT OF URANIUM MINE WASTE ROCK AND MILL
More informationEnvironmental Impact Statement for the Slave Falls Tramway Conversion Project
Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT
More informationSMALL HYDRO DEVELOPMENT BUILDING POSITIVE RELATIONSHIP WITH FIRST NATIONS STAKEHOLDERS- OUTLOOK FROM SASKATCHEWAN,CANADA
SMALL HYDRO DEVELOPMENT BUILDING POSITIVE RELATIONSHIP WITH FIRST NATIONS STAKEHOLDERS- OUTLOOK FROM SASKATCHEWAN,CANADA ABSTRACT Ranjith (Ran) Narayanasamy M.Eng, P.Eng, MBA, SaskPower, Regina, Canada
More informationDecember 2012 PROJECT DESCRIPTION - EXECUTIVE SUMMARY. Elizabeth Falls Hydroelectric Project REPORT. Report Number: /DCN-051
PROJECT DESCRIPTION - EXECUTIVE SUMMARY Elizabeth Falls Hydroelectric Project REPORT Report Number: 10-1365-0004/DCN-051 EXECUTIVE SUMMARY 1.0 INTRODUCTION 1.1 Project overview The proposed Elizabeth Falls
More informationPROJECT BRIEF for the John Hart Generating Station Replacement Project
PROJECT BRIEF for the John Hart Generating Station Replacement Project Issue Date: March 13, 2012 TABLE OF CONTENTS John Hart Generating Station Replacement Project Page ii of 17 1. INTRODUCTION... 3 1.1
More informationAppendix B. Commitments made in the Approved Terms of Reference
Appendix B Commitments made in the Approved Terms of Reference Approved Terms of Reference Requirements and How They Were in the 1. The study area considered for the new landfill footprint at the West
More informationTABLE OF CONTENTS. Page
TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing
More informationOptions Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach. T.L. Yankovich and A. Klyashtorin
Options Evaluation for Remediation of the Gunnar Site Using a Decision-Tree Approach T.L. Yankovich and A. Klyashtorin Some Relevant Concepts and Terminology: In general, orphaned or abandoned mines can
More informationFebruary Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.
Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE
More informationJanuary 17, 2017 EASB File #: Transaction #: Re: SaskWater Buffalo Pound Non-Potable Water Supply System Pipeline
Ministry of Environment Environmental Assessment and Stewardship Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 January 17, 2017 EASB File
More informationCEF. Cumulative Effects Framework. Interim Policy. for the Natural Resource Sector. October Cumulative Effects Framework
CEF Cumulative Effects Framework Cumulative Effects Framework Interim Policy for the Natural Resource Sector October 2016 Policy Approval The Cumulative Effects Framework Interim Policy is approved for
More informationPHYSICAL ENVIRONMENT MONITORING P LAN DRAFT
Aquatic Effects Monitoring Plan PHYSICAL ENVIRONMENT MONITORING P LAN DRAFT October 2012 POINTE DU BOIS SPILLWAY REPLACEMENT PROJECT Physical Environment Monitoring Plan DRAFT Report Prepared for October
More informationFINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED
FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED UTS ENERGY CORPORATION/TECK COMINCO LIMITED FRONTIER OIL SANDS MINE PROJECT Approximately 60 km from Fort McKay, Alberta
More informationReview of the Class Environmental Assessment for Waterpower Projects Ontario Waterpower Association
Ministry of the Environment Review of the Class Environmental Assessment for Waterpower Projects Ontario Waterpower Association Review prepared pursuant to subsection 7(1) of the Environmental Assessment
More informationDraft Air Quality & Odour Net Effects Analysis & Comparative Evaluation Report
Clean Harbors Canada Inc. Lambton Landfill Expansion Environmental Assessment Draft Air Quality & Odour Net Effects Analysis & Prepared By: JANUARY, 2014 Executive Summary Two expansion alternatives were
More informationPort Granby Project ENVIRONMENTAL ASSESSMENT STUDY REPORT EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Introduction Low-level radioactive waste and associated marginally contaminated soils at Port Granby are part of historical industrial activities in the Port Hope area. Since the 1930s,
More informationC&B Alberta Solar Development ULC
Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by
More information6 Risk assessment methodology
Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management
More informationEAST-WEST TIE TRANSMISSION PROJECT
Connecting Ontario s Northwest What s Inside? Answers to On: NextBridge Infrastructure and the East-West Tie Project Electricity in Northern Ontario Land issues Routing Project approval process Health
More informationCEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E
Ambassador Bridge Enhancement Project CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT Replacement Span and Plaza Expansion APPENDIX E DRAFT EROSION AND SEDIMENT
More informationAppendix M. Criteria, Measures and Indicators for Effects Assessment
Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,
More informationInformation Requirements Table for Liquid Waste
Applicant Summary Tracking # Authorization # Applicant / Facility Name Ministry of Environment Prepared by: Title Date The Information Requirements Table (IRT) for Liquid Waste is a tool used by Ministry
More informationGoffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION
Goffs Quarry Environmental Assessment OVERVIEW FOR CONSULTATION April 2018 AGENDA Introductions Goffs Update - 2017 Environmental Assessment Process Overview of the undertaking Valued Environmental Components
More informationElko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights
Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights 7 April 2005 B Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights Elko Project
More informationIrish Water VARTRY WATER SUPPLY UPGRADE PROJECT. EIS Screening Report
Irish Water VARTRY WATER SUPPLY UPGRADE PROJECT IRISH WATER Vartry Water Supply Upgrade Project Environmental Impact Assessment Screening Report Nicholas O Dwyer Ltd Consulting Engineers Nutgrove Office
More information3.0 APPROACH AND METHODOLOGY
3.0 APPROACH AND METHODOLOGY The EIA will be completed to meet the requirements as set out in the Environmental Impact Assessment Guidelines and Procedures for Barbados, 1998 and the Thermal Power Guidelines
More informationEnvironmental Assessment Approval
Environmental Assessment Approval Approval Date: Original Dated April 20, 2012 Trimper Sand and Gravel Pit Expansion Ivan H. Trimper Construction Ltd., Proponent Annapolis County, Nova Scotia The Trimper
More informationWelcome to the Boulevard Lake Dam Class Environmental Assessment. Public Information Session #1. June 14, 2016
Welcome to the Boulevard Lake Dam Class Environmental Assessment Public Information Session #1 June 14, 2016 Boulevard Dam - Overview Built approximately 100 years ago Owned and operated by the City of
More information6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION
6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts
More informationSUMMARY OF COMMENTS/RECOMMENDATIONS
SUMMARY OF COMMENTS/RECOMMENDATIONS PROPONENT: Cyr Construction 1998 Ltd. PROPOSAL NAME: Concrete Batch Plant CLASS OF DEVELOPMENT: 1 TYPE OF DEVELOPMENT: Concrete Batch Plant CLIENT FILE NO.: 5523.00
More informationTABLE OF CONTENTS TABLE OF FIGURES TABLE OF TABLES 2. REGULATORY PROCESS Impact Assessment Process Permits and Licences...2.
TABLE OF CONTENTS PAGE 2. REGULATORY PROCESS...2.1 2.1 Impact Assessment Process...2.1 2.1.1 Mackenzie Valley Resource Management Act... 2.1 2.1.2 Taltson Expansion Project and Impact Assessment Process...
More informationGENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 185 NOVEMBER 2012 GENERAL SPECIFICATION FOR TEMPORARY FLOW CONTROL FOR CONSTRUCTION IN WATERBODIES TABLE OF CONTENTS 185.01 SCOPE 185.02 REFERENCES
More information10. GREENHOUSE GASES EAST-WEST TIE TRANSMISSION PROJECT AMENDED ENVIRONMENTAL ASSESSMENT REPORT
10. GREENHOUSE GASES This section describes and summarizes an assessment of the effects of the East-West Tie Transmission Project (the Project) on gases. Greenhouse gases (GHGs) have the potential to affect
More informationAPPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval
APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic
More informationCHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR
GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS WATER RESOURCES MANAGEMENT DIVISION Water Investigations Section
More informationOperational Policy Statement
Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i
More informationNote: This is a draft document and does not represent a position or decision by government. Part 2: Policy for Cumulative Effects Management
Cumulative CEF DRAFT Effects Policy (April, 2016) Framework Part 2: Policy for Cumulative Effects Management Preamble This is a draft natural resource sector policy being shared for the purpose of gaining
More informationTable of Contents. Nov. 2008
Nov. 2008 What is involved? Electrical loads in Yukon are increasing. By 2011, Yukon Energy expects to need additional renewable power to help minimize the use of diesel to generate electricity. As outlined
More informationAPPENDIX D EA Conditions Review D-1: Federal EA Conditions Review D-2: Provincial EA Conditions Review
APPENDIX D EA Conditions Review D-1: D-2: Provincial EA Conditions Review Côté Gold Project Environmental Effects Review Report September 2018 EA: EA 05-09-02; EAIMS: 13022; CEAA: 80036 D-1: CÔTÉ GOLD
More information