1 Annual Environmental Report 2017 Agglomeration Name: Kanturk Licence Register No. D
2 Contents Section 1. Executive Summary and Introduction to the 2017 AER Summary Report on Section 2. Monitoring Reports Summary Summary report on monthly influent monitoring Discharges from the agglomeration Ambient Monitoring Summary Pollutant Release and Transfer Register (PRTR) - report for previous year 7 Section 3. Operational Reports Summary Treatment Efficiency Report Treatment Capacity Report Extent of Agglomeration Summary Report Complaints Summary Reported Incidents Summary Sludge / Other inputs to the WWTP 12 Section 4. Infrastructure Assessments and Programme of Improvements Storm water overflow identification and inspection report Report on progress made and proposals being developed to meet the improvement programme requirements. 14 Section 5. Licence Specific Reports Priority Substances Assessment Pearl Mussels 19 Section 6. Certification and Sign Off 20 Section 7. Appendices 21 Appendix 7.1 Statement of Measures / Improvement Programme 21 Appendix 7.2 Ambient Monitoring 22 2
3 Section 1. Executive Summary and Introduction to the 2017 AER 1.1 Summary Report on 2017 This Annual Environmental Report has been prepared for D , Kanturk, in County Cork, in accordance with the requirements of the wastewater discharge licence for the agglomeration. The agglomeration is served by a wastewater treatment plant with a Plant Capacity PE of The treatment process includes the following: - Preliminary Treatment (Automatic Screening) Secondary Treatment (Conventional Activated Sludge) Nutrient Removal (Ferric Dosing for Phosphorus Removal) The final effluent from the Primary Discharge Point was non-compliant with the Emission Limit Values in The following parameters exceeded the emission limit values in 2017: - Ammonia N (mg/l) 46,780kgs sludge as dewatered cake was removed from the wastewater treatment plant in Sludge was transferred to and Ormonde Organics, Portlaw, Co.Waterford The following improvement works were undertaken in 2017:- The retrofitting of diffused aeration and mixers to the existing Oxidation Ditches in place of the surface rotors to increase the WWTP capacity and address previous Ammonia exceedances was completed in QTR 2 of The installation of four new pumps and associated works at Kanturk Pump Station was also completed during Kanturk WWTP is included in the current Capital Investment Programme 2017 to 2021 (Project Code WWAG0366_002). The need for measures to prevent environmental damage will be reviewed on an annual basis. An Annual Statement of Measures is included in Appendix 7.1 3
4 Section 2. Monitoring Reports Summary 2.1 Summary report on monthly influent monitoring Table 2.1 Influent Monitoring Summary Monthly Influent BOD Monitoring (mg / l) COD (mg / l) SS (mg / l) TP (mg / l) TN (mg / l) Hydraulic Loading (m3/d) Number of Samples Annual Max Annual Mean Other inputs in the form of sludge/leachate are added to the WWTP after the influent monitoring point and are therefore not represented by influent monitoring. Other inputs, where relevant, are detailed in Section 3.6. Significance of results The annual mean hydraulic loading is less than the peak Treatment Plant Capacity as detailed further in Section 3.2 The annual maximum hydraulic loading is greater than the peak Treatment Plant Capacity as detailed further in Section 3.2. The design of the wastewater treatment plant allows for peak values and therefore the peak loads have not impacted on compliant with Emission Limit Values 2.2 Discharges from the agglomeration Table Effluent Monitoring Effluent Monitoring Summary BOD (mg/l) COD (mg/l) TSS (mg/l) Ortho P / MRP (mg/l) 4 Ammoni a N (mg/l) ph (Range) WWDL ELV (Schedule A) to 9 where applicable ELV with Condition to 9 Interpretation included % Reduction (Schedule A) Number of sample results
5 Number of sample results above WWDL ELV Number of sample results above ELV with Condition 2 Interpretation Annual Mean (for parameters where a mean ELV applies) Overall Compliance (Pass/Fail) Pass Pass Pass Pass Fail Pass Significance of results The WWTP was non-compliant with the ELV's set in the wastewater discharge licence. There was 1 exceedance of the ELV for Ammonia N (mg/l). The non-compliance is due to the WWTP being reduced to one treatment stream to allow for the retrofitting of diffused aeration to existing oxidation ditches. The impact on receiving waters is assessed further in Section
6 2.3 Ambient Monitoring Summary Table 2.3. Ambient Monitoring Report Summary Table Ambient Monitoring Point from Irish Grid EPA Feature Bathing Drinking FWPM Shellfish WWDL (or as agreed with EPA) Reference Coding Tool code Water Water Upstream Monitoring Point , IE_SW_18A Downstream Monitoring Point , IE_SW_18A No No No Downstream Monitoring Point #2 Table Ambient Impact Assessment Table Ambient Monitoring Point from WWDL (or as agreed with EPA) Current WFD Status cbod 0-Phosphate (as P) Upstream Monitoring Point Poor Downstream Monitoring Point Good Downstream Monitoring Point #2 Difference between Upstream and Downstream Ammonia (as N) Difference between Upstream and Downstream #2 EQS % of Eqs 48% 83% 27% % of Eqs #2 Nitrogen The results for the upstream and downstream monitoring and/or additional monitoring data sets from Cork County Council are included in Appendix
7 Significance of results The WWTP was non-compliant with the ELV s set in the wastewater discharge licence as detailed in Section 2.2. The receiving waters do not meet the EQS required. The discharge from the wastewater treatment plant may be causing an impact on the receiving water in respect of Orthophosphate. 2.4 Pollutant Release and Transfer Register (PRTR) - report for previous year A PRTR is not required as the PE is < 100,000 7
8 Section 3. Operational Reports Summary 3.1 Treatment Efficiency Report cbod (kg/yr) COD (kg/yr) SS (kg/yr) Total P (kg/yr) Total N (kg/yr) Influent mass loading (kg/year) 64, ,914 72,498 1,609 13,587 Effluent mass emission (kg/year) 1,105 8,793 2, ,568 % Efficiency (% reduction of influent load) 98% 94% 97% 90% 52% 3.2 Treatment Capacity Report Table Treatment Capacity Report Summary Hydraulic Capacity Design / As Constructed (dry weather flow) (m3/day) 805 Hydraulic Capacity Design / As Constructed (peak flow) (m3/day) 2,412 Hydraulic Capacity Current loading (m3/day) 1,546 Hydraulic Capacity Remaining (m3/day) 866 Organic Capacity - Design / As Constructed (PE) 4,600 Organic Capacity - Collected Load (PE) 3,472 Organic Capacity Remaining (PE) 1,128 Will the capacity be exceeded in the next three years? ( / No) No 8
9 3.3 Extent of Agglomeration Summary Report In this section Irish Water is required to report on the amount of urban waste water generated within the agglomeration. It does not include any waste water collected and created in a private system and discharged to water under a Section 4 Licence issued under the Water Pollution Acts 1977 (as amended). Table Extent of Agglomeration Summary Report % of P.E. load generated in the agglomeration Load generated in the agglomeration that is collected in the sewer network Load collected in the agglomerations that enters Unknown treatment plant Load collected in the sewer network but discharges Unknown without treatment (includes SWO, EO, and any discharges that are not treated) Estimated / Measured 100% Estimated Estimated Estimated Load generated in the agglomeration that is collected in the sewer network is the total load generated and collected in the municipal network within the boundary of the agglomeration. Load collected in the agglomerations that enters treatment plant is that portion of the previous figure which enters the waste water treatment plant. Load collected but discharged without treatment is that portion of the first figure which is discharged without treatment. 3.4 Complaints Summary A summary of complaints of an environmental nature is included below. Table Complaints Summary Table Number of Nature of Complaint Complaints Number Open Complaints 1 Blocked Sewer 0 1 Number Closed Complaints 9
10 3.5 Reported Incidents Summary A summary of reported incidents is included below. Table Summary of Incidents Incident Incident Description Type (e.g. Noncompliance, Emission, spillage, pollution incident) Non- Compliance Spillage Emission Breach of Ammonia ELV (INCI009126) Discharge of foul sewerage from a manhole at Greenane, Kanturk. Blocked combined sewer downstream of manhole (INCI012245) Curator observed that Screw Lift Pumps were not operating at WWTP and influent was Cause WWTP upgrade required to meet ELV No. of Incidents Recurring Incident (/No) Corrective Action 1 Installation of new aeration system ongoing on site. Blocked sewer 1 No Sewer was jetted on the 7th of June Jetting contractor could not free the sewer and they returned on the morning of 8th of June and freed the sewer. They removed some rags and a piece of plastic pipe. The overflow to the gulley grate stopped once pipe was jetted. Plant or equipment breakdown at WWTP 1 No The pumps at Kanturk Pump Station were switched off immediately to cease the uncontrolled release. Raw sewage was Authorities Contacted. Note 1 Inland Fisheries Ireland Inland Fisheries Ireland Inland Fisheries Ireland Reported to EPA (/No) Closed (/No) No 10
11 observed to discharging to waters via emergency overflow SW002. The failure of the Screw Lift Pumps was as a result of a short in the cabling in the Control Panel. then stored at the pump station pending repairs. Electrical Contractor engaged to carry out necessary repairs and return screw pumps back to normal operation by 11:30 am. Note 1: For shellfish waters notify the Marine Institute (MI) Sea Fisheries Protection Authority (SFPA) Food Safety Authority (FSAI) and An Bord Iascaigh Mhara (BIM). This should also include any other authorities that should be contacted arising from the findings of any Licence Specific Reports also e.g. Drinking Water Abstraction Impact Risk Assessment, Fresh Water Pearl Mussel Impact Assessments etc. Table Summary of Overall Incidents Number of Incidents in Number of Incidents reported to the EPA via EDEN in Explanation of any discrepancies between the two numbers above 11
12 3.6 Sludge / Other inputs to the WWTP Other inputs to the waste water treatment plant are summarised in Table 3.6 below. Table Other Inputs Input Type Quantity P.E. % of load to WWTP Included in Influent Monitoring? (Y/N) Is there a leachate/sludge acceptance procedure for the WWTP? (Y/N) Domestic /Septic 0 m % No No No Tank Sludge Waterworks Sludge 0 m % No No No Industrial / 0 m % No No No Commercial Sludge Landfill Leachate 0 m % No No No (delivered by tanker) Landfill Leachate (delivered by sewer network) 0 m % No No No Other (specify) 0 m % No No No Is there a dedicated leachate/sludge acceptance facility for the WWTP? (Y/N) 12
13 Section 4. Infrastructure Assessments and Programme of Improvements 4.1 Storm water overflow identification and inspection report A summary of the significance and operation is included below. The Stormwater Overflow Assessment was submitted previously in AER 2016 Table SWO Identification and Inspection Summary Report WWDL Name / Code for Storm Water Overflow Irish Grid Ref. SW , No Code , Included in Schedule A4 of the WWDL Significance of the overflow (High/Med/ Low) Compliance with DoEHLG criteria No. of times activated in 2017 (No. of events) Total volume discharged in 2017 (m3) Total volume discharged in 2017 (P.E.) Low Compliant 1 Unknown Unknown No Low Non- Compliant Unknown Unknown Unknown Estimated / Measured data Table SWO Identification and Inspection Summary Report How much sewage was discharged via SWOs in the agglomeration in the year (m3/yr)? How much sewage was discharged via SWOs in the agglomeration in the year (p.e.)? What % of the total volume of sewage generated in the agglomeration was discharged via SWOs in the agglomeration in 2017? Is each SWO identified as non-compliant with DoEHLG Guidance included in the Programme of Improvements? The SWO assessment includes the requirements of relevant WWDL Schedules (/No) Have the EPA been advised of any additional SWOs / changes to Schedules A/C under Condition 1? Unknown Unknown Unknown No 13
14 4.2 Report on progress made and proposals being developed to meet the improvement programme requirements. The Improvement Programme report addresses the Specified Improvement Programmes as detailed in Schedules A3 and C of the WWDL. It should detail other improvements identified through assessments required under the licence. Table Specified Improvement Programme Summary Specified Improvement Programmes Licence Schedule Licence Completion Date Date Expired Recommission the phosphorous removal facility at the WWTP Status of Works % Construction Work Completed Expected Completion Date C 31/01/2013 Completed 100% 31/03/2013 Comments A summary of the status of any improvements identified by under Condition 5.2 is included below. Table Improvement Programme Summary Improvement Identifier / Name Improvement Description Improvement Source WWTP WWTP Upgrade Improved Upgrade Compliance Investigation CI Condition 4 & 5.2 Upgrade of Oxidation Ditches Progress (% complete) Expected Completion Date Comments 0% Unknown Included in Irish Water Investment Plan. Operational Control Incident Reduction 97% Qtr1 of 2018 New aeration system fully operational. Minor snagging outstanding. Upgrade of SW003 0% Unknown 14
15 Table Sewer Integrity Risk Assessment Tool Summary The Improvement Programme Risk Assessment should include an assessment of the Rating (High, integrity of the existing wastewater Medium, Low) works for the following: Risk Assessment Score Reference to relevant section of AER (e.g. Appendix 2 Section 4. Hydraulic Risk Assessment Score High 110 Appendix 7.5 of 2015 AER Environmental Risk Assessment Score Low 208 Appendix 7.5 of 2015 AER Structural Risk Assessment Score High 150 Appendix 7.5 of 2015 AER Operation & Maintenance Risk Assessment Score Low 40 Appendix 7.5 of 2015 AER Overall Risk Score for the agglomeration High 508 Appendix 7.5 of 2015 AER Specified improvements Comment 15
16 Section 5. Licence Specific Reports Licence Specific Reports Summary Table Licence Specific Report Required by Condition 5 in Licence Required in this AER or outstanding from previous AER? Included in this AER? Priority Substances Assessment Required No No AER 2015 Drinking Water Abstraction Not Required Point Risk Assessment Shellfish Impact Assessment Not Required Pearl Mussel Report Required No No AER 2015 Toxicity/Leachate Management Not Required Toxicity of Final Effluent Report Not Required Small Stream Risk Score Not Required Assessment Habitats Impact Assessment Not Required Reference to previous AER containing report or relevant section of this AER Licence Specific Reports Summary of Findings Licence Specific Report Recommendations in Summary of Recommendations in Report Report Priority Substances Assessment Based on the assessment carried out it is not considered that any further sampling or analysis is required. Drinking Water Abstraction Point Risk Assessment Shellfish Impact Assessment Pearl Mussel Report There were no recommendations other than an investigation in relation to overflows and nutrient levels in the discharge with nutrient removal recommended. Note Appropriate Assessment in 2011 determined that significant impacts on margaritifera from the WWTP are unlikely. 16
17 Toxicity/Leachate Management Toxicity of Final Effluent Report Habitats Impact Assessment 17
18 5.1 Priority Substances Assessment The Priority Substance Assessment Report was submitted previously in AER A summary of the significance and operation is included below. Table Priority Substance Assessment Summary Report Does the assessment use the Desk Top Study Method or Screening Analysis to determine if the discharge contains the parameters in Appendix 1 of the EPA guidance? Does the assessment include a review of Trade inputs to the works? Does the assessment include a review of other inputs to the works? Does the report include an assessment of the significance of the results where a listed material is present in the discharge? (e.g. impact on the relevant EQS standard for the receiving water) Does the assessment identify that priority substances may be impacting the receiving water? Does the Improvement Programme for the agglomeration include the elimination / reduction of all priority substances identified as having an impact on receiving water quality? Recommendations Status of any improvement measures required Desk Top Study and Screening Analysis No No Based on the assessment carried out it is not considered that any further sampling or analysis is required. 18
19 5.4 Pearl Mussels The Pearl Mussel Measures Report was submitted previously in AER A summary of the significance and operation is included below. Table Pearl Mussel Measures Summary Report Is a progress report on implementation of the findings of Pearl Mussel Protection Measures report required in the 2017 AER (or outstanding from previous AER)? Is there a Pearl Mussel Protection Measures Report for the receiving water body? Include hyperlink to internet location of report Does this report identify measures relevant to discharges from the waste water works as having a potential impact on the Pearl Mussel habitat? List measures relevant to discharges from the waste water works Recommendations Does the Improvement Programme for the agglomeration include any procedural and/or infrastructural works to reduce the impacts of discharge on pearl mussel habitat / populations? Condition 5 Improvement Programme reference Status of any improvement measures required 0Mussel%20Plans%20March%202010/Second%20Draft%20of%20Allow%20Sub- Plan%20March.2010.pdf This plant can impact two pearl mussel populations - Allow & Munster Blackwater. It requires investigation in relation to overflows and nutrient levels in the discharge with nutrient removal recommended. The aim is to reduce the overall nutrient, organic and sediment loads in the Munster Blackwater catchment. There were no recommendations other than an investigation in relation to overflows and nutrient levels in the discharge with nutrient removal recommended. Note Appropriate Assessment in 2011 determined that significant impacts on margaritifera from the WWTP are unlikely. Complete 19
20 Section 6. Certification and Sign Off Table Summary of AER Contents Does the AER include an executive summary? Does the AER include an assessment of the performance of the Waste Water Works (i.e. have the results of assessments been interpreted against WWDL requirements and or Environmental Quality Standards)? Is there a need to advise the EPA for consideration of a technical amendment / review of the licence? List reason e.g. additional SWO identified Is there a need to request/advise the EPA of any modifications to the existing WWDL? Refer to Condition 1.7 (changes to works/discharges) & Condition 4 (changes to monitoring location, frequency etc.) List reason e.g. failure to complete specified works within dates specified in the licence, changes to monitoring requirements Have these processes commenced? (i.e. Request for Technical Amendment / Licence Review / Change Request) Are all outstanding reports and assessments from previous AERs included as an appendix to this AER? Ensure the following reports are included SWO at Pump Station is not included in WWDL No No Declaration by Irish Water The AER contains the following: Introduction and background to 2017 AER. Monitoring Reports Summary. Operational Reports Summary. Infrastructural Assessment and Programme of Improvements. Licence specific reports Certification and Sign Off Appendices I certify that the information given in this Annual Environmental Report is truthful, accurate and complete: Signed: Date: 28/02/2018 Michael O'Leary Acting Head of Environmental Regulation 20
21 Section 7. Appendices Appendix 7.1 Statement of Measures / Improvement Programme The retroffitting of diffused aeration and mixers to the existing Oxidation Ditches in place of the surface rotors to increase the WWTP capacity and address previous Ammonia exceedances was completed in QTR 2 of The installation of four new pumps and associated works at Kanturk Pump Station was also completed during The following works are included in the current Capital Investment Programme 2017 to 2021Reduce the forward feed rate from the terminal pumping station to reduce hydraulic overloading at the WWTP. In order to reduce unscreened overflows from the pumping station relocation of the inlet screen, from the WWTP to terminal PS, and modifying the PS layout to accommodate the screen. The need for measures to prevent environmental damage will be reviewed on an annual basis. 21
22 Appendix 7.2 Ambient Monitoring Upstream Date Ammonia Ortho P BOD Total N D.O. (% D.O. ph (mg/l) Temp ( C) (mg/l) (mg/l) (mg/l) (mg/l) Sat) (mg/l) 07/02/ /03/ /04/ /05/ /06/ /07/ /08/ /09/ /10/ /11/ Mean %ile Downstream Date Ammonia Ortho P BOD Total N D.O. (% D.O. ph (mg/l) Temp ( C) (mg/l) (mg/l) (mg/l) (mg/l) Sat) (mg/l) 07/02/ /03/ /04/ /05/ /06/ /07/ /08/ /09/ /10/ /11/ Mean %ile
Annual Environmental Report 2017
Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on
More informationAnnual Environmental Report 2017
Annual Environmental Report 2017 Agglomeration Name: Borris Licence Register No. D0248-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.
More informationAnnual Environmental Report 2017
Annual Environmental Report 2017 Agglomeration Name: Ardfert Licence Register No. D0282-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section
More informationAnnual Environmental Report 2017
Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.
More informationAnnual Environmental Report 2017
Annual Environmental Report 2017 Agglomeration Name: Ballybay Licence Register. D0207-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.
More informationAnnual Environmental Report 2015
Annual Environmental Report 2015 Agglomeration Name: Licence Register. D0063-01 Blessington Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 1 Section
More informationGuidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences
Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Environmental Protection Agency An Ghníomhaireacht um Chaomhnú Comhshaoil P.O. Box 3000, Johnstown
More informationAnnual Environmental Report 2015
Annual Environmental Report 2015 Agglomeration Name: Licence Register Banteer and Environs. D0448-01 Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report
More informationAnnual Environmental Report 2014
Annual Environmental Report 2014 Agglomeration Name: Ballyroan Licence Register No. D0385-01 Table of Contents Section 1. Executive Summary and Introduction to the 2014 AER 1 1.1 Summary report on 2014
More informationAnnual Environmental Report 2015
Annual Environmental Report 2015 Agglomeration Name: Belturbet Licence Register No. D0084-01 Table of Contents Section 1. Executive Summary and Introduction to the 2015 AER 1 1.1 Summary report on 2015
More informationDelvin Wastewater Treatment Plant
Delvin Wastewater Treatment Plant WWDL No. D0267-01 ANNUAL ENVIRONMENTAL REPORT 2011 County Buildings Mullingar Co. Westmeath Phone: 04493-32000 Fax: 04493-42330 Delvin Waste Water Discharge Licence (EPA
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationCastleisland Waste Water Treatment Plant. Annual Environmental Report. Page 1 of 36
Water Services Dept. Castleisland Waste Water Treatment Plant Annual Environmental Report 2013 Licence Type: Waste Water Discharge Licence Licensee: Kerry County Council Licence Register Number: D0180-01
More information2. Discharges to waters
There are 8 discharge points from the agglomeration. The primary discharge (SW001 Note 1 ) occurs into the Folly Stream, which discharges into Lough Leane (1km downstream of the WWTP outfall). There are
More informationAnnual Environmental Report 2014
Annual Environmental Report 2014 Agglomeration Name: Ringsend Licence Register No. D0034-01 Preface This 2014 Annual Environmental Report is made up of 5 parts dealing specifically with each functional
More informationCHARLEVILLE AND ENVIRONS AGGLOMERATION ANNUAL ENVIRONMENTAL REPORT
CHARLEVILLE AND ENVIRONS AGGLOMERATION ANNUAL ENVIRONMENTAL REPORT 14 th MARCH 2011 31 st DECEMBER 2011 CORK COUNTY COUNCIL WATER SERVICES ORIGINAL Environmental Protection Agency P.O. Box. 3000, Johnstown
More informationThe licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.
Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not
More informationTralee Waste Water Treatment Plant
Water Services Dept. Tralee Waste Water Treatment Plant Annual Environmental Report 2013 Licence Type: Waste Water Discharge Licence Licensee: Kerry County Council Licence Register Number: D0040-01 Agglomeration
More informationTUAM WASTE WATER DISCHARGE LICENCE APPLICATION
GALWAY COUNTY COUNCIL TUAM WASTE WATER DISCHARGE LICENCE APPLICATION NOTICE RESPONSE REGULATION 18(3)(B) July 2009 Report Conlrol Sheet FORM 214 Rev 000 Ryan Hanley conruhing engineers IS0 9001 2000 Quality
More informationThis report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27
This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/2014 16:27 OFFICE OF CLIMATE, LICENSING & RESOURCE USE. INSPECTORS REPORT ON A WASTE WATER DISCHARGE
More informationWaste Water Incidents
Waste Water Incidents Guidance for Irish Water on the types of incidents that should be reported to the EPA Definition: The following shall constitute an incident for the purpose of the licence or certificate:
More informationAgglomeration: Cork City Annual Environmental Report 2010
Comhairle Cathrach Chorcaí CORK CITY COUNCIL Agglomeration: Cork City Annual Environmental Report 2010 Licence Register Number: D0033-01 Licensees: Cork City Council and Cork County Council 12/6/2011 Contents
More informationAgglomeration: Cork City Annual Environmental Report 2011
Cork City Agglomeration 2011 Comhairle Cathrach Chorcaí CORK CITY COUNCIL Agglomeration: Cork City Annual Environmental Report 2011 Licence Register Number: D0033-01 Licensees: Cork City Council and Cork
More informationWaste Water Discharge. Licence Application. for. Portrane Donabate Rush Lusk Agglomeration.
Waste Water Discharge Licence Application for Portrane Donabate Rush Lusk Agglomeration. Attachment A1: Non-Technical Summary. WWDL_Application Portrane Donabate Rush Lusk: Section A1 Non Technical Summary
More informationOFFICE OF CLIMATE, LICENSING & RESOURCE USE.
This report has been cleared for Submission to the Board by the Programme Manager Frank Clinto Signed:. x G DatedWQTfa ~ OFFICE OF CLIMATE, LICENSING & RESOURCE USE. *na7&t&mdllmcwm To: From: DIRECTORS
More informationComhairle Contae Choreai Cork County Council
Comhairle Contae Choreai Cork County Council Halla an Chontae, Corcaigh, Eire. Fon: (021) 4276891 Faics: (021) 4276321 Suiomh Greasain: www.corkcoco.ie County Hall, Cork, Ireland. TeL (021) 4276891 F=
More informationAnnual Environmental Report
Annual Environmental Report For Waste Water Discharge Licence D0208-01 Dungloe Agglomeration Licensee Donegal County Council Contents; 1.0 Introduction and Summary 2.0 Monitoring Report 3.0 Operational
More informationAnnual Environmental Report. For. Skerries Balbriggan Agglomeration, Waste Water Discharge Licence No. D
Annual Environmental Report For Skerries Balbriggan Agglomeration, Waste Water Discharge Licence No. D0023-01 2011 Annual Environmental Report Skerries Balbriggan 2011 - Rev 2 Page 1 of 22 Table of Contents
More informationOFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH
This report has been cleared for submission to Director/Board by Breen Higgins. Grainne Power, 03/11/2015 14:44 OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH INSPECTORS REPORT ON A WASTE WATER DISCHARGE
More information1 Discharges from agglomerations with
P rl e wa Environmental 'r 60- I.r If *r("rrrl.l, This report has been cleared for submission to the Board by the Karen Creed. SignedmL- Protenan ( A~~~~ -h,p0 Date,cl!Id/, OFFICE OF CLIMATE, LICENSING
More informationWaste Water Discharge Licence Attachments
Kilkenny County Council Water Services Authority County Hall, John Street, Kilkenny Tel: 056 7794050 Fax: 056 7794069 E-mail: waterservices@kilkennycoco.ie Webpage: www.kilkennycoco.ie WS - Water Quality
More informationI/ From: Marian Doyle Environmental Licensing Programme I/ Date: 1 Ot February I
1 To: DIRECTORS I/ From: Marian Doyle Environmental Licensing Programme I/ Date: 1 Ot February 20 1 1 I RE: Application for a Waste Water Discharge Licence from Longford County Council, for the agglomeration
More informationWASTE WATER DISCHARGE (AUTHORISATION) REGULATIONS 2007, AS AMENDED WASTEWATER DISCHARGE LICENCE
HEADQUARTERS JOHNSTOWN CASTLE ESTATE COUNTY WEXFORD, IRELAND PHONE: +353-53-9160600 FAX: +353-53-9160699 WASTE WATER DISCHARGE (AUTHORISATION) REGULATIONS 2007, AS AMENDED WASTEWATER DISCHARGE LICENCE
More informationAttachments A.1 B.3. Consent of copyright owner required for any other use. For inspection purposes only. EPA Export :23:41:07
Attachments A.1 B.3 Attachment A.1 - Non-Technical Summary Attachment B.1 - Drawing - Agglomeration Boundary Attachment B.2 - Drawing - WWTP Site Plan Attachment B.2.1 - Drawing - WWTP Primary Discharge
More informationEPA Export :23:27:55. For inspection purposes only. Consent of copyright owner required for any other use.
Finnea Agglomeration Wastewater Treatment Plant Waste Water Certificate of Authorisation Application (Register Number A0068-01) Regulation 24 Compliance Requirements County Buildings Mullingar Co. Westmeath
More information2017 Annual Performance Report
Newcastle Water Pollution Control Plant The Regional Municipality of Durham Newcastle Water Pollution Control Plant Environmental Compliance Approval (ECA): 3-2189-87-946 Dated July 26, 1994 Amendments:
More informationMUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN WEST LORNE WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-442-9-938 Prepared by: Table of Contents Section 1: Overview...
More informationAttachment N o F Control & Monitoring
Attachment N o F Control & Monitoring Attachment F1: Treatment, Abatement and Control Systems Air There is no treatment or abatement systems required for the minor air emission points or the potential
More informationINFRASTRUCTURE & OPERATION
SECTION C: INFRASTRUCTURE & OPERATION Advice on completing this section is provided in the accompanying Guidance Note. C.1 Operational Information Requirements Provide a description of the plant, process
More informationChapter 6 Objective: Protect and Enhance the Environment
Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes
More informationGalway County Council Comhairle Chontae na Gaillimhe
Galway County Council Comhairle Chontae na Gaillimhe Annual Environmental Report (AER) 2011 Galway County Council Aras an Chontae Prospect Hill Galway Tuam Waste Water Discharge Licence Granted on the
More informationRE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System
14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant
More informationCork County Council. Wastewater Discharge Licence Application under S.I 684 of 2007 Regulations. Scheme/Agglomeration: Macroom
Cork County Council Wastewater Discharge Licence Application under S.I 684 of 2007 Regulations Scheme/Agglomeration: Macroom Submission Date: 22 nd September 2008 EPA Export 26-07-2013:02:18:49 Macroom
More informationWASTE WATER DISCHARGE LICENCE INSPECTORS REPORT D
This Report has been cleared for submission to the Board by Dr. Karen Creed, Senior Inspector Signed: 06/08/2013 U D0026-01 Mew (inlbkdl OFFICE OF CLIMATE, LICENSING & 1 RESOURCE USE. WASTE WATER DISCHARGE
More informationMallow Attachment 5. Assimilative Capacity Calculations
Mallow Attachment 5 Assimilative Capacity Calculations a) Mass Balance Equation for Orthophosphate: Gauge number 18055, upstream location of discharge. Median flow of River (station n. 18055) = 20.627
More informationCarlow County Council
Carlow County Council WASTEWATER DISCHARGE LICENCE APPLICATION FOR THE AGGLOMERATIO OF CARLOW TOWN AND ENVIRONS AND SECTIONS OF GRAIGUECULLEN IN COUNTY LAOIS WASTEWATER DISCHARGE LICENCE APPLICATION NON-TECHNICIAL
More informationETHANOL DOSING OPTIMISATION IN BIOREACTOR. Blake Schneider. Blake Schneider, Duty Operator, Thakshila Balasuriya, Process Engineer, City of Gold Coast
ETHANOL DOSING OPTIMISATION IN BIOREACTOR Paper Presented by: Blake Schneider Authors: Blake Schneider, Duty Operator, Thakshila Balasuriya, Process Engineer, City of Gold Coast 39th Annual WIOA Queensland
More informationIroquois Wastewater Treatment Plant 2016 Annual Performance Report
Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed
More informationSummerhill. Waste Water Works
Summerhill Waste Water Works Annual Environmental Report For EPA Waste Water Discharge Licence D0259-01 01/01/2013 to 31/12/2013 2 Table of Contents Section 1: Introduction & Background...5 Section 1.1:
More informationMUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT
MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:
More information2017 Performance Report for Bobcaygeon Waste Water Treatment Facility
2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:
More informationThe licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.
Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not
More informationBRACEBRIDGE WASTEWATER TREATMENT
2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.
More informationLagoons Operation and Management in New Brunswick
Lagoons Operation and Management in New Brunswick Lagoons Provide secondary treatment to domestic wastewater by the action of bacteria stabilizing the organic matter in the wastewater. Benefits of lagoons:
More information3) Din Daeng WWTP. Outline of the Project. Appendix 2-9
3) Din Daeng WWTP Outline of the Project 1. Start of operation 2004 2. Treatment area: 37 km 2 3. Served population: 1,080,000 persons 4. Treatment process: Activated Sludge with Nutrient, (Nitrogen and
More informationMUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT
MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...
More information2017 Annual Performance Report
2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive
More informationThe licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.
Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not
More informationWaste Water Discharge
Environmental Protection Agency An Ghnfomhakacht urn Chaomhnl Comhshaoii Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland Waste Water Discharge Certificate of Authorisation Certificate
More informationDundalk Wastewater Treatment Plant
Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant
More informationAPPLICATION FOR WASTE WATER DISCHARGE LICENCE. REPLY TO REGULATION 18(3)(b) NOTICE
CORK COUNTY COUNCIL WESTERN DIVISION WATER SERVICES APPLICATION FOR WASTE WATER DISCHARGE LICENCE DUNMANWAY REPLY TO REGULATION 18(3)(b) NOTICE 3/6/09 EPA Export 26-07-2013:13:55:05 Comhairle Contae Chorcaí
More informationTALBINGO WASTEWATER TREATMENT PLANT UPGRADE. Kay White
TALBINGO WASTEWATER TREATMENT PLANT UPGRADE Paper Presented by: Kay White Authors: Kay White, Senior Process Engineer, Tanya Luo, Graduate Civil Engineer, Li Lern Lau, Process Engineer, SMEC Australia
More informationMasses at Massillon: IFAS for Industrial Loads and Nutrient Removal
OWEA Annual Conference, Sandusky, OH, Wednesday, June 24, 3:00-3:45 PM Masses at Massillon: IFAS for Industrial Loads and Nutrient Removal Kristin Waller, O Brien & Gere Kristin.Waller@obg.com #obgpresents
More informationEnvironmental Protection Agency Licence Reg. No. D Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland
Environmental Protection Agency Licence Reg. No. D0003-01 This licence was amended on 16/12/2016 under Regulation 33 of the Waste Water Discharge (Authorisation) Regulations 2007, as amended. The details
More informationANNEX C INFRASTRUCTURE & OPERATION
ROSCOMMON COUNTY COUNCL MONKSLAND WASTEAWATER DSCHARGE LCENCE ANNEX C NFRASTRUCTURE & OPERATON Roscommon County Council WWD Application Attachment to Form C1.1 Design Criteria The Monksland WWTP is situated
More informationWastewater Treatment Works and Collections System Annual Report Year 2005 General Information
Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:
More informationKerry Ingredients (Ireland) Limited Rathgoggan Middle, Charleville, Co Cork
Kerry Ingredients (Ireland) Limited Rathgoggan Middle, Charleville, Co Cork Industrial Emissions Licence Reg No. P0386-03 Proposed Upgrade to WWTP Discharge Arrangements Impact Assessment - Additional
More informationCopies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100
MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033
More informationEnvironmental Protection Agency An Ghnlomhaimcht um Chaomhnci tomhshaoil. Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland
Environmental Protection Agency An Ghnlomhaimcht um Chaomhnci tomhshaoil Headquarters P.O. Box 3000 Johnstown Castle Estate County Wexford Ireland WASTE WATER DISCHARGE LICENCE TECHNICAL AMENDMENT B Licence
More informationNorth Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of
North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide
More informationAdditional Information Requirements for Wastewater Treatment Projects
Version 04-11-25 Page 1 of 6 Additional Information Requirements for Wastewater Treatment Projects Pursuant to Section 5(2) of the Environmental Impact Assessment Regulation of the Clean Environment Act,
More informationBaltimore City Department of Public Works
Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water
More informationWastewater Treatment Systems, Wastewater Issues and Permits
Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife
More informationDetermination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters
PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT
More informationCHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS
CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.
More informationChapter 6 Objective: Protect and Enhance the Environment
Chapter 6 Objective: Protect and Enhance the Environment 55 Irish Water Water Services Strategic Plan - October 2015 Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner
More informationCharacteristics and performance of small and medium wastewater treatment plants in Greece
(Initial page layout) Characteristics and performance of small and medium wastewater treatment plants in Greece E. Gavalakis*, P. Poulou** and A. Tzimas* * EMVIS Consultant Engineers SA, 21 Paparrigopoulou
More informationInnovative technology for phosphate removal from dewatered sludge supernatant
Innovative technology for phosphate removal from dewatered sludge supernatant Frank Gnanam, Business Manager Virotec Global Solutions Pty Ltd Peter Reberger, Plant Manager EGL Management Services Pty Ltd
More informationTWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT
TWO YEARS OF BIOLOGICAL PHOSPHORUS REMOVAL WITH AN ADVANCED MSBR SYSTEM AT THE SHENZHEN YANTIAN WASTEWATER TREATMENT PLANT Chester Yang, Ph.D., Gaowei Gu, Baowei Li, Hongyuan Li, Wanshen Lu, Lloyd Johnson,
More informationFacility Information Summary AER Reporting Year
1 Facility Information Summary AER Reporting Year 2016 Licence Register Number P0690-02 Name of site C&F Automotive Ltd T/A Iralco Site Location Collinstown, Mullingar, Co Westmeath NACE Code 2561 Class/Classes
More informationWEAO STUDENT DESIGN COMPETITION 2019 PROJECT STATEMENT
Water Environment Association of Ontario Young Professionals Committee and Student Design Competition Sub-Committee and the Ontario Ministry of the Environment and Climate Change in Collaboration with
More informationGeorgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017
Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power
More informationGuidance for Licensees/CoA holders on filling out the necessary information on the Incident Report Form on EDEN/ALDER
Guidance for Licensees/CoA holders on filling out the necessary information on the Incident Report Form on EDEN/ALDER The aim of this guidance document is to provide guidance to licensees/coa holders on
More informationLETTERFRACK WASTEWATER TREATMENT WORKS WASTEWATER DISCHARGE CERTIFICATE OF AUTHORISATION APPLICATION
LETTERFRACK WASTEWATER TREATMENT WORKS WASTEWATER DISCHARGE CERTIFICATE OF AUTHORISATION APPLICATION IRISH WATER MAY 2017 This is a draft document and is subject to revision. Waste Water Discharge Certificate
More informationBitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT
Bitterroot River Nutrient TMDL Technical Report WASTEWATER TREATMENT Prepared By: Watershed Management Section Montana DEQ April 9, 2010 Technical Advisory Group Draft 1.0 INTRODUCTION This is a technical
More informationThis document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works
This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationSewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions
Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The
More informationMidleton Agglomeration. Annual Environmental Report
Annual nvironmental Report 2013 Midleton Agglomeration Annual nvironmental Report 1 st January 2013 31st December 2013 Cork County Council Water Services Zone 3 Issue 1 nvironmental Protection Agency P.O.
More informationCase Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.
Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.
More informationFeel free to contact me should you require any additional information regarding the report. I can be reached at
February 28, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Glencoe Wastewater Treatment Plant The Ontario Clean Water Agency is the Operating
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationIrish Water. Performance Assessment Report - developed to comply with CER decision ref: CER /16 / 308
Irish Water Performance Assessment Report - developed to comply with CER decision ref: CER /16 / 308 Q2 2017 1. Introduction 3 2. Executive Summary 4 3. Performance Assessment 7 3.1 Customer Service 7
More information1 None. c----- Y. Dr Thomas McLoughlin REPORT ON A WASTE WATER DISCHARGE CE APPLICATION. To: DIRECTORS..
This report has been cleared for Submission totheboard y DrKa Creed Signed: c----- Y Y - I I I L I 1 Y, LICENSING & RESOURCE USE. CTOI CE APPLICATION REPORT ON A WASTE WATER DISCHARGE - To: From:.......
More informationMEETING COLUMBUS S TREATMENT LIMITS
MEETING COLUMBUS S TREATMENT LIMITS EVEN WHEN WET WEATHER CHANGES THEM Improving Quality of Life AGENDA CEPT Background CEPT Preliminary Testing CEPT Design and Construction CEPT NPDES Permit Modification
More informationCASE STUDY: BREAKTHROUGH CENTRATE TREATMENT AT REDCLIFFE WASTE WATER TREATMENT PLANT
2007 Virotec International plc All rights reserved. A COMMERCIAL APPLICATION OF VIROSEWAGE TECHNOLOGY CASE STUDY: BREAKTHROUGH CENTRATE TREATMENT AT REDCLIFFE WASTE WATER TREATMENT PLANT We had documented
More information10. WATER AND EFFLUENT
10. WATER AND EFFLUENT 10.1 General This Chapter addresses the issues of water quality and aqueous emissions associated with the proposed development and includes an assessment of their potential impact
More informationCITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014
CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY
More informationCASE STUDY: ROYAL AUSTRALIAN AIR FORCE BASE, AMBERLEY SEWAGE TREATMENT PLANT
2007 Virotec International plc All rights reserved. A COMMERCIAL APPLICATION OF VIROSEWAGE TECHNOLOGY CASE STUDY: ROYAL AUSTRALIAN AIR FORCE BASE, AMBERLEY SEWAGE TREATMENT PLANT The ViroSewage Technology
More information