1 Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division

2 Wastewater Treatment Chesapeake Bay Restoration Water Quality Improve dissolved oxygen (DO) levels Reduce dead zones Increase submerged aquatic vegetation (SAV) Improve marine habitat Factors affecting Chesapeake Bay Water Quality Sediment loading Nutrients Nitrogen and Phosphorus (N and P) loading Wastewater Treatment Plants (point-sources) Reduce levels of N and P through best available technology

3

4 Original facilities constructed in 1907; operational 1912 Today the plant occupies 466-acres and serves 1.3 million people. Among the largest wastewater treatment plants in the mid-atlantic region. Physical, chemical and biological treatment processes 24-hour operation. Can process flows over 400 million gallons per day and handle peak flows up to 800 MGD w/flow equalization after head works upgrade.

5

6 Current permit through the Maryland Department of the Environment (MDE) under the National Pollutant Discharge Elimination System (NPDES) to meet stringent effluent limits (monthly averages): BOD5 10 mg/l Total Suspended Solids 10 mg/l Seasonal ammonia-n 2.0 / 5.7 mg/l (summer/winter) Total nitrogen ( BNR ) 8 mg/l (annual average) Total Phosphorus 0.2 mg/l E.coli (disinfection) 126 MPN/ 100 ml

7 ENR Improvements Biological Nutrient Removal (BNR) (in late 1980 s): Reduce total nitrogen (TN) mg/l 8 10 mg/l Reduce total phosphorus (TP) 4 6 mg/l 0.2 mg/l Enhanced Nutrient Removal (ENR) (in late 2016): Reduce total nitrogen (TN) 8 10 mg/l 3 mg/l Reduce total phosphorus (TP) 0.2 mg/l 0.3 mg/l

8 ENR Improvements Back River WWTP receives about 35,000 lbs. of Nitrogen and 6,000 lbs. of Phosphorus every day with the influent Back River WWTP began nutrient (N and P) reduction in the late 1990 s targeting about 70% reduction of the incoming Nitrogen using Biological Nutrient Removal (BNR) technology More than 90% of the Phosphorus is already being removed through chemical treatment ENR will remove over 90% of the Total Nitrogen

9 ENR Improvements

10

11 PHASED CONSTRUCTION PROGRAM

12 CONSTRUCTION PROGRAM DURATION Started construction in the fall of 2013 Construction completion by end of 2016 Plant must achieve permit compliance by September 2017

13 BENEFITS TO THE COMMUNITY AND BAY Overall cleaner effluent to Back River and the Chesapeake Bay 95% or more of the bio-available nitrogen and phosphorus will be removed this improves the aquatic conditions, with fewer algae blooms and better environment for the fish Baltimore City/County commitment to the State, and the Chesapeake Bay Restoration Program

14 APPROXIMATE CONSTRUCTION COSTS Back River WWTP Upgrade: Phase I - $275 million Phase II - $300 million Patapsco River WWTP Upgrade: Phase I - $115 million Phase II - $145 million Total costs more than ¾ billion dollars Funded in part by the State (about 70%)

15 Patapsco Plant Aerial view

16 Patapsco BAF and De-Nitrification Filter

17 2008 cogeneration facility constructed to reduce the purchase of electrical power by $1.4 million annually by using the methane gas produced at Back River to generate electricity solar array: 4,200 American-made panels, installed at a cost of about $4 million, supply about 5 percent of the energy up to 1,000 kilowatts per hour needed to run the plant.

18 SC-918 Headwork Improvements Screen and Grit Facility improvements New influent wet weather pumping station Peak flow equalization (36 MG storage) to protect downstream treatment processes

19 Very flat slope % to 0.04 % Hydraulic restriction BRWWTP grit tank weir Two primary influences: Contributes to grit and sediment deposition in the Outfall Sewer(s) Reduces conveyance capacity during wet weather events and increases the potential of sanitary sewer overflows (SSOs)

20 Project Goals and Objectives Provide Influent Pumping Station at the Back River WWTP to: Remove the hydraulic restriction in the Outfall Sewer System Increase hydraulic capacity of the Outfall Sewer System Provide new Head works Facilities with capacity to treat future, model predicted wet weather flows: Coarse Screen Facility Fine Screen Facility Grit Removal Facility Provide Equalization Pumping and Tanks for storage of wet weather flows in excess of the hydraulic and treatment capacities of the headworks facilities and downstream plant processes

21 10 MW Emergency Generators Influent Pumping Station Equalization Pumping Station 16.5 MG Storage Tank Coarse Screen Facility Fine Screen Facility Grit Removal Facility 3 MG Storage Tank

22 QUESTIONS?

23

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility

Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Performance Evaluation of the Moores Creek Advanced Water Resource Recovery Facility Richard W. Gullick, Ph.D. Director of Operations Timothy Castillo Wastewater Manager Presented to the Albemarle County

More information

Operation and Control of Multiple BNR Processes in One WWTP

Operation and Control of Multiple BNR Processes in One WWTP Operation and Control of Multiple BNR Processes in One WWTP CENTRAL PLANT Williamsport Sanitary Authority s Chesapeake Bay and CSO Compliance Program Presented by: Phil Anderson 1 June 24, 2015 Purpose

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits

Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits Town of Robbinsville Constructs Cheoah River BNR Wastewater Treatment Facility to Meet New Nitrogen and Phosphorus Permit Limits NORTH CAROLINA AWWA-WEA SPRING CONFERENCE ASHEVILLE, NORTH CAROLINA APRIL

More information

SMCSD Headworks, Primary and Secondary Treatment Pre-Design

SMCSD Headworks, Primary and Secondary Treatment Pre-Design Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary

More information

COG Region s Potomac Water Quality & Wastewater Treatment Fact Sheet (current draft, as of 7/28/09)

COG Region s Potomac Water Quality & Wastewater Treatment Fact Sheet (current draft, as of 7/28/09) COG Region s Potomac Water Quality & Wastewater Treatment Fact Sheet (current draft, as of 7/28/9) Background: Current Fact Sheet was prepared several years ago to summarize trends for certain water quality

More information

Public Information Meeting Wastewater Master Plan

Public Information Meeting Wastewater Master Plan Public Information Meeting Wastewater Master Plan October 23, 2007 Presentation Outline Introduction and History Break for Questions Wastewater 101 Break for Questions Regulatory Framework Wastewater Master

More information

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project

Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project Borough of Chambersburg Wastewater Treatment Plant Expansion and Upgrade Project Presented by: G. Bryan Salzmann, Esq. Manny Parada, PE Jake Rainwater, PE Beverley Stinson, PhD Don Lavine February 27,

More information

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP ABSTRACT TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP Tim Baldwin, PE, Senior Vice President McKim & Creed, Inc. Pender County s Commerce Park was created as a vehicle to attract

More information

Synergy: Addressing Combined Sewer Overflows and Nitrogen

Synergy: Addressing Combined Sewer Overflows and Nitrogen District of Columbia Water and Sewer Authority Briefing on Synergy: Addressing Combined Sewer Overflows and Nitrogen to Anacostia Steering Committee August 27, 2009 1 Introduction Background Addressing

More information

Page 1 For More Information Call (801)

Page 1 For More Information Call (801) Page 1 Algae Control and Solids Removal A cleaner lagoon or pond is easier than you think 1 Introduction Total suspended solids (TSS) includes all particles suspended in water which will not pass through

More information

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund

Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Design, Construction and Startup of the First Enhanced Nutrient Removal Plant in Maryland Funded by the Chesapeake Bay Restoration Fund Rip Copithorn, Jeff Sturdevant, Vince Maillard GHD Clients People

More information

Addendum I to Request for Qualifications for Large Capital Projects Engineering Services

Addendum I to Request for Qualifications for Large Capital Projects Engineering Services Purchasing Department (O) 864.299.4000 (F) 864.277.5852 561 Mauldin Rd. Greenville, SC 29607 www.rewaonline.org Addendum I to Request for Qualifications for Large Capital Projects Engineering Services

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

WEFTEC.06. **Cobb County Water System, Marietta, Georgia

WEFTEC.06. **Cobb County Water System, Marietta, Georgia CHEMICALLY ENHANCED PRIMARY TREATMENT FOR A LARGE WATER RECLAMATION FACILITY ON A CONSTRICTED SITE - CONSIDERATIONS FOR DESIGN, START-UP, AND OPERATION ABSTRACT Jeffrey A. Mills, P.E., BCEE,* Roderick

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE

HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE City of Newark, Ohio HIGH RATE TREATMENT AS PART OF THE SOLUTION FOR WET WEATHER FLOWS JUNE 22, 2011 High Rate Treatment Tanks/UV Wet Weather Screen Building JC2/Wet Weather Pump Station Wet Weather Control

More information

Filtrate Treatment Facility Update

Filtrate Treatment Facility Update Nitrogen Removal Technology: Past, Present and Future- Blue Plains Advanced Wastewater Treatment Plant s Current Nutrient Regulation and Nitrogen Removal Processes Filtrate Treatment Facility Update May

More information

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP)

Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) NYWEA-NEWEA Joint Conference June 7, 2016 Presenters: Rodrigo Pena-Lang, PE (D&B Engineers), Magdalena Gasior, PE (D&B Engineers) and Paul D. Smith, PE (NYCDEP) Overview Port Jervis WWTP History Division

More information

and Drinking Water Issues

and Drinking Water Issues Department of the Environment NPDES Discharge Permits and Drinking Water Issues Steve Luckman Municipal NPDES Permits Division sluckman@mde.state.md.us (410) 537-3672 Potomac Drinking Water Source Protection

More information

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF

Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Membrane Bioreactor and High Flow Biological Treatment System for the Cox Creek WRF Thor Young, GHD With Contributions from Vince Maillard, Rip Copithorn, Kristi Perri, and Jeff Sturdevant, GHD Dimitrios

More information

Council of Governments

Council of Governments Metropolitan Washington Council of Governments Anne Arundel County Draft Phase II Watershed Implementation Plan January 18, 2011 Chesapeake Bay TMDL Pollutants of Concern Nitrogen Phosphorus Sediment 2

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants

Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Refinement of Nitrogen Removal from Municipal Wastewater Treatment Plants Prepared for Maryland Department of the Environment Presented by: Gannett Fleming, Inc. Stephen B. Gerlach, PE & Carrie DeSimone

More information

NEWEA 2015 Annual Conference Session 16

NEWEA 2015 Annual Conference Session 16 NEWEA 2015 Annual Conference Session 16 Meeting North Attleborough, MA s 0.1 mg/l Phosphorus Limit with Bio-P and Cloth Media Filters January 27, 2015 Sue Guswa, P.E., Tighe & Bond Merrill Hastings, Town

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

SeRVice: Wastewater Treatment

SeRVice: Wastewater Treatment SeRVice: Wastewater Treatment cutting the cost of compliance INTRODUCTION Smart Technology Solutions New strategies can help water agencies and utilities lower the risks and speed the rewards of innovation

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Anderson Water Pollution Control Plant

Anderson Water Pollution Control Plant City of Anderson Wastewater Division Public Works Director Jeff Kiser Chief Plant Operator Plant Supervisor Operator III Operator I Phil DeBlasio Mike Hansen Tony Hinchliff Vacant Collections Supervisor

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

BIOLOGICAL NUTRIENT REMOVAL STUDY CLEARFIELD WASTEWATER TREATMENT FACILITY FOR CLEARFIELD MUNICIPAL AUTHORITY APRIL 2008

BIOLOGICAL NUTRIENT REMOVAL STUDY CLEARFIELD WASTEWATER TREATMENT FACILITY FOR CLEARFIELD MUNICIPAL AUTHORITY APRIL 2008 BIOLOGICAL NUTRIENT REMOVAL STUDY CLEARFIELD WASTEWATER TREATMENT FACILITY FOR CLEARFIELD MUNICIPAL AUTHORITY APRIL 2008 Table of Contents Transmittal Letter Executive Summary Section 1: Introduction to

More information

Wet Weather Planning for Wastewater Treatment Plants

Wet Weather Planning for Wastewater Treatment Plants Wet Weather Planning for Wastewater Treatment Plants June 23, 217 Peak Flow Management: Collection vs. Treatment Collection System Peak Flow Management Single 24 hour design storm I/I reduction SSO elimination

More information

Oxidation Ditch Technologies

Oxidation Ditch Technologies Oxidation Ditch Technologies OXIDATION DITCH TECHNOLOGIES Brush Aerators (Rotors) With over 80 installations in the United States, wastewater treatment facilities can rely on Kruger s extensive biological

More information

Activated Sludge Process Control: Nitrification

Activated Sludge Process Control: Nitrification Activated Sludge Process Control: Nitrification 60 th Annual KWWOA Conference, Session 1: April 11, 2017 Dan Miklos, Senior Associate, Midwest Region, Hazen and Sawyer Agenda Overview of the Utopia Plant

More information

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below:

Palmer Wastewater Treatment Plant Environmental Impacts. A summary of the impacts of this treatment alternative are listed below: 6.1.3 Environmental Impacts A summary of the impacts of this treatment alternative are listed below: 1. The Matanuska River will receive treated effluent as it currently does. 2. Effluent quality would

More information

Masses at Massillon: IFAS for Industrial Loads and Nutrient Removal

Masses at Massillon: IFAS for Industrial Loads and Nutrient Removal OWEA Annual Conference, Sandusky, OH, Wednesday, June 24, 3:00-3:45 PM Masses at Massillon: IFAS for Industrial Loads and Nutrient Removal Kristin Waller, O Brien & Gere Kristin.Waller@obg.com #obgpresents

More information

City of Ames. Water Pollution Control. Long Range Facility Plan

City of Ames. Water Pollution Control. Long Range Facility Plan City of Ames Water Pollution Control Long Range Facility Plan Introduction Over 25 years ago, the City of Ames last completed a Wastewater Facility Plan. That Facility Plan prompted design and construction

More information

Pamela Reitsma Environmental Scientist Narragansett Bay Commission

Pamela Reitsma Environmental Scientist Narragansett Bay Commission Pamela Reitsma Environmental Scientist Narragansett Bay Commission Narragansett Bay Commission Narragansett Bay Commission (NBC) is a quasi-state agency which oversees the two largest WWTFs in Rhode Island:

More information

East Coast P Removal Technology Performance Summary

East Coast P Removal Technology Performance Summary East Coast P Removal Technology Performance Summary Charles B. Bott Hampton Roads Sanitation District NonReactive Phosphorus Workshop Spokane, Washington August 11 12, 2009 Acknowledgements Numerous slides

More information

Oxidation Ditch Technologies WATER TECHNOLOGIES

Oxidation Ditch Technologies WATER TECHNOLOGIES Oxidation Ditch Technologies WATER TECHNOLOGIES Oxidation Ditch Technologies Brush Aerators (Rotors) With over 80 installations in the United States, wastewater treatment facilities can rely on Kruger

More information

An Evaluation of Nitrogen Loading into Upper Narragansett Bay

An Evaluation of Nitrogen Loading into Upper Narragansett Bay An Evaluation of Nitrogen Loading into Upper Narragansett Bay NEWEA Conference January 26, 2010 Catherine Walker & Christine Comeau Narragansett Bay Commission Providence, RI Narragansett Bay Commission

More information

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity

Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity CSWEA 2013 Comparison of Three Wet Weather Flow Treatment Alternatives to Increase Plant Capacity Don Esping, Denny Parker, Jose Jimenez, Fenghua Yang, Tim Bate, Steve Arant May 16 2013 Milwaukee MSD South

More information

Public Information Meeting Wastewater Master Plan Facilities Plan Update June 23, 2010

Public Information Meeting Wastewater Master Plan Facilities Plan Update June 23, 2010 Public Information Meeting Wastewater Master Plan - 201 Facilities Plan Update June 23, 2010 Agenda Introduction Wastewater Master Plan Background Completed Projects Projects Concurrent with the WMP Master

More information

PROJECT AND REFUNDING REVENUE BONDS (WASTEWATER PROJECTS)

PROJECT AND REFUNDING REVENUE BONDS (WASTEWATER PROJECTS) CITY OF BALTIMORE (MAYOR AND CITY COUNCIL OF BALTIMORE) ANNUAL DISCLOSURE UPDATES TO CERTAIN FINANCIAL AND OPERATING DATA February 28, 2018 PROJECT AND REFUNDING REVENUE BONDS (WASTEWATER PROJECTS) SERIES

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2016 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2016 Annual Report Table of Contents Wastewater Treatment Plant

More information

Comparative Study on Total Suspended Solids and Nutrients of the Las Vegas Wash Between the Demonstration Weir and its Terminus at the Las Vegas Bay

Comparative Study on Total Suspended Solids and Nutrients of the Las Vegas Wash Between the Demonstration Weir and its Terminus at the Las Vegas Bay Comparative Study on Total Suspended Solids and Nutrients of the Las Vegas Wash Between the Demonstration Weir and its Terminus at the Las Vegas Bay Delta September 2006 Comparative Study on Total Suspended

More information

Presentation Outline

Presentation Outline Presentation Outline Nitrification/denitrification refresher Treatment technologies available for nitrification and BNR/ENR What is the problem? BNR/ENR VPDES permitting Causes of reduced BNR performance

More information

Module 1: Introduction to Wastewater Treatment Answer Key

Module 1: Introduction to Wastewater Treatment Answer Key Module 1: Introduction to Wastewater Treatment Answer Key What are some examples of different interest s various audiences may have? Officials of regulatory agencies or other operators would want to be

More information

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010

Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP PNCWA 2010 Post-Aerobic Digester with Bioaugmentation Pilot Study City of Meridian, ID WWTP by: William Leaf Adrienne Menniti Bruce Johnson CH2M HILL, Inc. Clint Dolsby Tracy Crane City of Meridian October 26, 21

More information

Dipankar Sen, PhD, PE Santa Clara Valley Water District Professor, Virginia Tech Civil & Env Engr

Dipankar Sen, PhD, PE Santa Clara Valley Water District Professor, Virginia Tech Civil & Env Engr Dipankar Sen, PhD, PE Santa Clara Valley Water District Professor, Virginia Tech Civil & Env Engr Outline Changes in wastewater in our industry How it affects the wastewater treatment plant Advanced Wastewater

More information

Upgrade of an Oxidation Ditch Using Bio-Mass Carriers

Upgrade of an Oxidation Ditch Using Bio-Mass Carriers Upgrade of an Oxidation Ditch Using Bio-Mass Carriers Nir Assulin and Yigal Master Aqwise - Wise Water Technologies Ltd. The Problem Oxidation ditches (OD) are very popular wastewater treatment processes

More information

Efficient Design Configurations for Biological Nutrient Removal

Efficient Design Configurations for Biological Nutrient Removal Efficient Design Configurations for Biological Nutrient Removal A Case Study: Upper Blackstone Water Pollution Abatement District Jane E. Madden, P.E., BCEE August 30, 2017 UBWPAD Wastewater Treatment

More information

Septic System Impacts on Stormwater and Impaired Waterbodies. December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech

Septic System Impacts on Stormwater and Impaired Waterbodies. December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech Septic System Impacts on Stormwater and Impaired Waterbodies December 8, 2016 Tim Denison, Johnson Engineering Marcy Frick, Tetra Tech Presentation Overview Charlotte County: Many areas adjacent to impaired

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2014 Annual Report Jim Ellis Public Works Manager Dundalk Wastewater Treatment Plant 2014 Annual Report Table of Contents Wastewater Treatment Plant

More information

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City

More information

2012 Nutrient Regulations Update

2012 Nutrient Regulations Update 2012 Nutrient Regulations Update OWEA Government Affairs Workshop March 1, 2012 Guy Jamesson, PE, BCEE Malcolm Pirnie, The Water Division of ARCADIS Imagine the result Agenda Nutrient impacts Nutrient

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

2015 Spring Conference

2015 Spring Conference 2015 Spring Conference Meeting Strict Summer Permit Requirements on Day One: Start-up of the Western Wake Regional Water Reclamation Facility Chris White, PE April 13, 2015 Acknowledgements Town of Cary

More information

Duffin Creek Water Pollution Control Plant Technical Information

Duffin Creek Water Pollution Control Plant Technical Information Duffin Creek Water Pollution Control Plant Technical Information Plant History The Duffin Creek Water Pollution Control Plant (WPCP) is located on the northern shore of Lake Ontario in the City of Pickering

More information

THE ROLE OF MEMBRANE BIOREACTORS IN ADDRESSING CHESAPEAKE BAY CHALLENGES. Introduction. Chesapeake Bay Water Quality Challenges

THE ROLE OF MEMBRANE BIOREACTORS IN ADDRESSING CHESAPEAKE BAY CHALLENGES. Introduction. Chesapeake Bay Water Quality Challenges THE ROLE OF MEMBRANE BIOREACTORS IN ADDRESSING CHESAPEAKE BAY CHALLENGES Zohreh Movahed, WATEK Engineering Corporation, 604 S. Frederick Ave, Suite 309, Gaithersburg, MD 20877, zmovahed@watek.com, (240)

More information

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES

SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES SIMPLE and FLEXIBLE ENERGY SAVINGS And PERFORMANCE ENHANCEMENT for OXIDATION DITCH UPGRADES Oxidation ditches are very popular wastewater treatment processes for small to medium sized municipalities that

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant

UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant TECHNICAL MEMORANDUM UDWQ POTW Nutrient Removal Cost Impact Study: Analysis of Tremonton City Wastewater Treatment Plant PREPARED FOR: PREPARED BY: COPIES: Utah Division of Water Quality CH2M HILL DATE:

More information

DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER

DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT CAPACITY ASSURANCE REPORT UPDATE DRAFT SUBMITTED TO: TOWNSHIP OF LONG HILL PREPARED BY: KLEINFELDER FEBRUARY 2018 LONG HILL TOWNSHIP WASTEWATER TREATMENT PLANT

More information

Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP

Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP Utilization of Dynamic Modeling to Evaluate and Design Secondary Clarifiers for the Muddy Creek WWTP Michael D. Parker, PE Co-Authors: Joe Rohrbacher, PE Alonso Griborio, PE PhD Presented by Joe Rohrbacher,

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

CLR Process. Vertical Loop Configuration

CLR Process. Vertical Loop Configuration CLR Process Vertical Loop Configuration Vertical Configuration System Flexibility Parallel Operation Raw wastewater and return activated sludge are introduced at a single point in each standard CLR basin.

More information

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis

ENHANCING THE PERFORMANCE OF OXIDATION DITCHES. Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ENHANCING THE PERFORMANCE OF OXIDATION DITCHES Larry W. Moore, Ph.D., P.E., DEE Professor of Environmental Engineering The University of Memphis ABSTRACT Oxidation ditches are very popular wastewater treatment

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

SEWPCC Upgrading/Expansion Conceptual Design Report. SECTION 6 - Process Flow Diagram / Mass Balance. Table of Contents

SEWPCC Upgrading/Expansion Conceptual Design Report. SECTION 6 - Process Flow Diagram / Mass Balance. Table of Contents SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 6 - Process Flow Diagram / Mass Balance Table of Contents 6.0 PROCESS FLOW DIAGRAM AND MASS BALANCE...6.1 6.1 INTRODUCTION TO THE PROCESS FLOW

More information

Building a Phase III WIP for Wastewater, Stormwater & Septic Systems

Building a Phase III WIP for Wastewater, Stormwater & Septic Systems Building a Phase III WIP for Wastewater, Stormwater & Septic Systems Agriculture Leadership Roundtable Double Tree by Hilton, Annapolis July 25, 2018 Greg Busch gregory.busch@maryland.gov Presentation

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters

Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 (formerly referenced by 08-01) Determination of Treatment Requirements for Municipal and Private Sewage Treatment Works Discharging to Surface Waters PROCEDURE F-5-1 DETERMINATION OF TREATMENT

More information

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116

Chapter 4 TMACOG Areawide Water Quality Management 208 Plan 4-116 Fremont Facility Planning Area Designated Management Agency Responsibilities: Fremont: Owns and operates the wastewater treatment plant, and sanitary sewers within its corporate limits. Sandusky Township

More information

Volume 4 Final Facility Plan for the West and East Wastewater Treatment Plants. May 31, 2013

Volume 4 Final Facility Plan for the West and East Wastewater Treatment Plants. May 31, 2013 Volume 4 Final Facility Plan for the est and East astewater Treatment Plants May 31, 2013 Revised to include a Negotiated Plan and Resubmitted June 9, 2017 City County Administration Building 1 Martin

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Introduction The City of Terre Haute has developed a (CSO LTCP), which describes the measures they will take to reduce the combined sewer overflows and improve water quality in the Wabash

More information

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng

Review of WEFTEC 2016 Challenge & Overview of 2017 Event. Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Review of WEFTEC 2016 Challenge & Overview of 2017 Event Malcolm Fabiyi, PhD, MBA Spencer Snowling, PhD. P.Eng Agenda Review 2016 Challenge Provide overview of updates to 2017 event Frequency WEFTEC Scores

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library

Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject. Public Meeting June 4, 2013 South Omaha Public Library Improvements to the Missouri River Wastewater Treatment Plant- Schedule BProject Public Meeting June 4, 2013 South Omaha Public Library Agenda Welcome and Introductions CSO Program Overview Missouri River

More information

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed

Palmer Wastewater Treatment Plant 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7 Alternative 7: Upgrade Existing Lagoons with New Percolation Bed 6.7.1 Description This alternative considers expanding the capacity of the existing lagoon treatment facility and changing the discharge

More information

OWEA Annual Technical Conference and Exhibition Upgrading WRFs for Biological Nutrient Removal. June 25, 2015

OWEA Annual Technical Conference and Exhibition Upgrading WRFs for Biological Nutrient Removal. June 25, 2015 OWEA Annual Technical Conference and Exhibition Upgrading WRFs for Biological Nutrient Removal June 25, 2015 Agenda Permitting and Planning BNR Overview Case Example Innovative Approaches Proactive Participation

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program WWTP OPERATIONS PROGRAM Updated December 2015 Table of Contents WWTP Operations Program 2015 List of Tables... 2 Program Summary and Intent... 3 Operations Plan... 3 Process Control

More information

Sustaining Our Water Resources Public Health. April 27, 2011

Sustaining Our Water Resources Public Health. April 27, 2011 Sustaining the the Bay Bay Environmental Environmental Health Health Sustaining Our Water Resources Public Health Sustaining i i Our Our County Economic i Health Health lh IMPLEMENTATION: 2011 and Beyond

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

Dundalk Wastewater Treatment Plant

Dundalk Wastewater Treatment Plant Township of Southgate Dundalk Wastewater Treatment Plant 2017 Annual Report Staff Report PW2018-010 - Dundalk Wastewater Treatment Plant 2017 Annual Report Moved by Councillor Pallister, Seconded by Councillor

More information

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016

Bloomingdale WWTF Private/Public Partnership Works. Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Bloomingdale WWTF Private/Public Partnership Works Bob Wilcox, PE Fleis & VandenBrink May 10, 2016 Outline Background Need for the Project Biofilm Technologies The Project Performance Background Project

More information

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013

Wastewater Treatment Plant Facility Plan Update City Project # City of Liberty, Missouri May 6, 2013 Wastewater Treatment Plant Facility Plan Update City Project #11-013 City of Liberty, Missouri May 6, 2013 Background 2 HDR Begins Feasibility Study to Evaluate Construction of a New Wastewater Treatment

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

Enhanced Nitrogen Removal Using Upflow Biological Filtration

Enhanced Nitrogen Removal Using Upflow Biological Filtration Enhanced Nitrogen Removal Using Upflow Biological Filtration November 30, 2005 B. Stitt, G. Welch Presentation Outline Background Need for Project CT General Permit Evaluation of Alternatives Project Delivery

More information