1 EECS Electricity for Finland Prepared by Grexel Based on EECS Rules Release 7 Release 1

2 Contents A Introduction... 3 B Background... 3 B.1 Purpose... 3 B.2 Scope... 3 B.3 Roles and Responsibilities within the Domain... 3 B.4 General... 5 C Overview of national legal and regulatory framework... 5 C.1 EECS Certificate systems... 5 C.2 National Electricity Source Disclosure... 7 C.3 National Public Support Schemes... 7 C.4 Major Deviations from the EECS Rules... 8 D Registration... 8 D.1 Registration of participants... 8 D.2 Registration of Production Devices E Certificate Systems Administration E.1 Issuing EECS Certificates E.2 Form E.3 Transferring EECS Certificates E.4 End of life of EECS Certificates E.5 Administration of corrections and errors F Audit of Production Devices F.1 On-site audits F.2 Production Device registration re-check F.3 Production audits G Change Control (see EECS Rules, section L) G.1 Complaints and Disputes G.2 Change requests Annex 1: Contacts List Annex 2: Standard Terms And Conditions Annex 3: Know-Your-Customer Questionnaire Annex 4: Production Device Registration Form Annex 5: Power of Attorney Template Annex 6: Issuing Request Annex 7: Model Cancellation Statement Grexel Systems Oy 2012 Page 2 of 29

3 A Introduction The framework specified in the EECS Rules and the detailed procedures and conditions specified in this have the main objective of ensuring robustness and transparency in the facilitation of the EECS Electricity Scheme for all Scheme Participants. Important contact information is provided in Annex 1. B Background B.1 Purpose B.2 Scope This sets out the procedures, rights and obligations for the administration of EECS within a specific Domain and relating to certain EECS Products. This is made binding between the Scheme Participant and Grexel Systems Ltd. by agreement in the form of the Standard Terms and Conditions. The objective is to ensure an acceptable level of robustness and transparency in the facilitation of the EECS Electricity Scheme for all Scheme Participants. A promotes quality and clarity, as it: makes local rules transparent; provides clear information to all stakeholders (consumers, market parties, other members, government, the EU Commission etc.); facilitates assessment of compliance and permissible variance from EECS Rules; facilitates audit; and translates local rules into a single format and language, supporting each of the above. This sets out the procedures, rights and obligations: which apply to the Domain of Finland and relate to the EECS Electricity Scheme (as defined in section N of the EECS Rules) and the following EECS Products for the purpose of electricity disclosure: o o o o EECS-GO, ICS:RECS, ICS:EKOENERGY, ICS:EECS-DISCLOSURE B.3 Roles and Responsibilities within the Domain The following roles are defined in the Finnish domain Competent Authority By the Act on Verification and Notification of Origin of Electricity (1129/2003), Fingrid Oyj (government controlled transmission system operator in Finland) is the appointed Competent Authority of the Guarantee of Origin system in Finland. Grexel Systems Oy 2012 Page 3 of 29

4 Measurement Body Fingrid also acts as the measurement body in the Finnish EECS scheme. A Measurement Body is an organisation responsible for the collection of metering data relating to the output of the Production Device. Issuing Body and Registry Operator Grexel is responsible for issuing EECS Certificates and operating the EECS scheme in Finland. Grexel acts also as the Registry Operator for the domain Finland. The central registry can be found at: Production Registrar Production Registrars verify Production Device data as part of the registration process when deemed necessary by the Issuing Body. Production Auditor Production Auditors verify production declarations and (where appropriate) consumption declarations made by registrants of Production Devices when deemed necessary by the Issuing Body. The operation of the Production Auditor is under the control of Grexel and the Association of Issuing Bodies. Scheme Participant Scheme participant is an Account Holder or a Registrant of a Production Device on the EECS registration database. Grexel Systems Oy 2012 Page 4 of 29

5 B.4 General The EECS Rules and its subsidiary documents take precedence over this document except as stated in section C.4 of this document. The definitions used in s shall have the meanings ascribed to them in the EECS Rules except as stated in section C.4 of this document. Grexel preserves the operational and standing data as follows: Data Time Medium Standard terms and conditions and its appendices Production Device Registration forms, audit reports and powers of attorney 5 years Electronic Archive 5 years Electronic Archive Meter reading data 2 years Database backups Transaction data 10 years Database backups C Overview of national legal and regulatory framework C.1 EECS Certificate systems For the Finnish Domain, the relevant local enabling legislation is as follows: Issuing of Guarantees of Origin (RES) and electricity disclosure in Finland is implemented by the law: Laki sähkön alkuperän varmentamisesta ja ilmoitamisesta - Act on Verification and Notification of Origin of Electricity (1129/2003) o o Unofficial translation: and by secondary legislation, the government decrees Valtioneuvoston asetus sähkön alkuperän varmentamisesta Government Decree on Verification of Origin of Electricity (1357/2003) o o Unofficial translation: o Valtioneuvoston asetus sähkön alkuperän ilmoittamisesta - Government Decree on Notification of Origin of Electricity (233/2005). o o Unofficial translation: Cogeneration Guarantee of Origin is implemented by governmental decree: Valtioneuvoston asetus sähkön alkuperän varmentamisesta annetun valtioneuvoston asetuksen muuttamisesta (97/2010) o Grexel Systems Oy 2012 Page 5 of 29

6 o Enables issuing of cogeneration GOs. The most relevant aspects of the decree are translated below. These Act and Degrees transpose Article 5 of 2001/77/EC (RES-E Directive), Article 3 of 2003/54/EC (Internal Electricity Market Directive) and Article 5 of 2004/8/EC (Cogeneration Directive). The main provisions defined in 1129/2003 include: 2 : Sets the energy sources and production technologies eligible for receiving Guarantees of Origin to be later defined in governmental decrees. o Later defined as all renewable energy sources (233/2005) and CHP (97/2010) with the exception of auxiliary consumption. 3 : Mandates the TSO Fingrid to issue Guarantees of Origin for all eligible electricity production. The pricing of the service shall be moderate. 4 : Verification of power plants by accredited auditors. 11 : Electricity suppliers need to, in bills and promotional materials, disclose the origin of the supplied electricity. 12 : The Finnish Energy Market Authority is responsible for the supervision of compliance to this act. The main provisions defined in 97/2010 include: 3 (2): A guarantee of origin can be granted for electricity produced from efficient cogeneration of power and heat. 4 : The information content of a guarantee of origin is complemented as follows: o 1: The capacity of the plant in megavolt ampere o 2: Concerning cogeneration GOs: the lower calorific value of fuels, the use purpose of heat as well as the volume of primary energy savings calculated according to Annex II of 2004/8/EC. 5 : The verification of the technology and energy sources of the plant for issuing guarantees of origin is equal to the verification of the plant in the European Energy Certificate System (EECS). The verification of the plant is valid for a maximum of five years. 9 : When requesting issuance of GOs, the holder of the plant must announce to the issuing body: o The quantity and time of electricity production o For cogeneration GOs of auxiliary electricity consumption: the auxiliary electricity consumption and electricity fed into the grid separately o For a plant using multiple energy sources: fuel consumption separated by energy source. Evidence that the Authorised Issuing Body (Member) has been properly nominated as a Competent Authority or has been properly appointed to issue Certificates for an ICS Fingrid Oy is nominated as the issuing body of RES and cogeneration GOs in Finland according to Act on Verification and Notification of Origin of Electricity (1129/2003) ( Grexel has entered into agreement with Fingrid regarding issuing and database administration of EECS-GO Certificates in Finland. According to the agreement, Grexel Systems Oy 2012 Page 6 of 29

7 Fingrid does issue only one Guarantee of Origin per MWh and if an EECS-GO is issued, it shall not issue any other Guarantee of Origin, in paper or any other form, for the same MWh. Grexel is appointed to issue ICS:RECS Certificates by appointment letter from RECS International. C.2 National Electricity Source Disclosure Legislation and regulation: The legislation regarding electricity disclosure implementing Article 3 of 2003/54/EC (Internal Electricity Market Directive) is included in the legislation for issuing Guarantees of Origin. Summary of the disclosure methodology and process: The Act on Verification and Notification of Origin of Electricity (1129/2003) puts electricity suppliers under obligation to disclose in bills and promotional material the contribution of each energy source to the overall fuel mix as well as the reference to statistical information regarding CO2 and radioactive waste content of the electricity. The different energy sources need to be disclosed at a level of: renewable, nuclear and fossil. The Energy Market Authority of Finland is responsible for the supervision of disclosure information. The current compelling regulation does not provide detailed guidance for electricity disclosure. In practice the electricity suppliers use a disclosure recommendation from the Finnish Energy Industries ( for disclosure of electricity from unknown origin ( (only in Finnish)). This mix is based on the Nordic residual mix, calculated by the RE-DISS project. Today, no obligation exists to use this mix and contract based tracking is allowed to be used for explicit tracking. C.3 National Public Support Schemes In the beginning of 2011, the law, which enables feed-in tariff for wind energy, biogas and small-scale (100kW 8 MW) CHP from wood energy, came into force (1396/2010) ( The FIT guarantees a price of /MWh for electricity for 12 years. The windmills will get an elevated price of /MWh during the first 3 years of operation or until the end of 2015, whichever comes first. The feed-in tariff system functions like a premium system, in which producers sell the electricity on the market and receive a bonus for each MWh, which equals the difference between the target price and average price of electricity during the previous three months at the location of the generator. All Production Devices, which use the abovementioned energy sources/technologies and which were installed after the beginning of 2009, are eligible for the FIT system. For plants using forest residuals the support is determined by the average price of CO2 allowances in the Emission Trading System. If the average price of past three months in the three largest CO2 allowance exchanges has been lower than 10, the support is 18 /MWh. If the average price is above 10, the support decreases linearly towards zero (zero is reached at the average price of 23 ). Small CHP plants (capacity between 100 kw and 8 MW) using 100 % forest residuals as fuel source are eligible for the feed-in tariff instead of the forest residual support scheme. Grexel Systems Oy 2012 Page 7 of 29

8 For new technologies (e.g. wood gasifiers) an investment support scheme exists, in which the support decision is taken individually for each plant. A plant can be eligible for both the forest residual support scheme and investment support scheme, but not both for the feed-in tariff and another support scheme. No relation exists between renewable energy support and electricity disclosure. FIT is the financial support and GO is the proof of ownership of generation attributes. The legislation does not set any restrictions for issuing and cancelling Guarantees of Origin from supported electricity generation. C.4 Major Deviations from the EECS Rules D Registration Due to timelines related to closing of national balance settlement, issuing of EECS Certificates is possible at the earliest 5 th of the month after the month following the month of production. This is not in line with C3.4.1 of the EECS Rules but necessary in order to link correction procedures to the correction procedures of the balance settlement. D.1 Registration of participants Applications 1. Any legal person who is not a member of the Association of Issuing Bodies or such member s affiliate or agent can be a participant of the EECS Scheme. An application to become an Account Holder is done by filling out and signing two copies of the Standard Terms and Conditions form found at (Annex 2) and sending those to Grexel. The required attachments of the Standard Terms and Conditions include: a. Contact Information Sheet b. A certified trade registry extract or similar official document stating: i. That the organization is validly existing and founded under the laws of the mother country ii. Name and address of the organization iii. Business ID of the organization iv. Names of authorized signatories 1. The Standard Terms and Conditions should be signed by this/these Signatory/Signatories c. The copy of the passport or other legitimate ID of each signatory of the STC. d. The copy of the passport of the Authorized Person (root user). e. The applicant must also fill in and attach a Know-Your-Customer questionnaire prepared by the AIB (Annex 3). The purpose of this document is to protect the EECS markets from VAT frauds. i. For licensed electricity producers and/or suppliers located in Finland or Sweden, the Know-Your-Customer questionnaire is not required. 2. After receiving all documentation of the applicant, Grexel evaluates whether the application can be accepted. Handling time of properly submitted applications is 5 business days. Reasons for rejection may be a. Required documents are missing or not properly filled / signed b. Grexel has doubts about the expertise and/or aims of the applicant Grexel Systems Oy 2012 Page 8 of 29

9 c. Rejection recommendation by local tax authorities, Fingrid, or the AIB. 3. If the application is accepted, Grexel creates an Account in the CMO.grexel registry for the applicant organization. When the Account is activated, a log-in authorisation Certificate will be sent via to the applicant, awarding full rights to the created Account (root user). The password to install the Certificate will be sent via sms. The applicant organization is then an Account Holder of CMO.grexel and can start operating the Account. One Account Holder organisation can have multiple users, which can be created by the root user of that Account Holder. 4. Grexel signs both copies of the STCs and archives the other and sends the other to the Account Holder to be archived. Grexel holds an Account in the Finnish domain. Grexel may own a Certificate for the below listed purposes, but it reports such activity to the Association of Issuing Bodies: Testing Undisputed debt Own use Resignation The Account Holder must notify Grexel of intent to close its Account in written form. The effective date of closure must not be less than 10 working days from the date of receipt by Grexel. When closing an Account, the Account Holder is responsible for paying any outstanding payments to Grexel. Grexel is not responsible for refunding any already paid fees of the Account Holder such as the yearly fee for Account Holders and Production Devices. Grexel will amend the EECS Registration database to seal that Account as of the effective date on the request or 10 days from the date of receipt by Grexel, whichever is later. Commercial provisions of closing an Account are set in the contract between Grexel and the Account Holder. Maintenance of standing data An Account Holder must notify Grexel without any delay, in writing of any changes due to come into effect that will result, or unplanned changes that have resulted, in the information recorded in the EECS Registration Database in relation to the Account Holder becoming inaccurate. Grexel will amend the EECS registration database accordingly, without delay. Error handling: If Grexel detects errors in the Account Holder information, it will correct them without any delay. The relevant Account Holder will be informed of such actions. Grexel Systems Oy 2012 Page 9 of 29

10 D.2 Registration of Production Devices Process: Responsible Activity Issuing Body (Grexel) Production Registrar Account Holder (Registrant) Owner of PD 1. Fill in PD information in CMO.grexel 2. Include in the application a line diagram of the PD. 4a No 1 3. In case the Registrant or it s affiliate is not the (sole) owner of the PD, it must include a power of attorney signed by (other) owner(s) of the PD. Yes 4b 2 3 4a. Verify the information in the application for registration. 4b. Is physical inspection of the Production Device necessary? Yes 5a. Accredited Production Registrar conducts a physical inspection of the Production Device. 5b. Does the Production Device comply with the law and EECS rules? 6. Send the Producer (or its agent) formal rejection of the application for registration No 5b 5a No 6 7. Activate PD and set next audit date Yes 8. Send the Producer (or its agent) formal approval of the application for registration. 7 8 Offline Process Online process Document Decision Application Account Holders, which aim to register a Production Device, are referred to as registrants. Only the owner of a Production Device, or a Registrant duly authorised by the owner, may register a Production Device, which is located in Finland, into the EECS registration database. Production Devices can only be registered if they meet the qualification criteria for EECS. To be qualified, Production Devices must: be situated in Finland be capable of producing electricity In addition, different EECS products have additional qualification criteria: EECS Product Additional criteria GO GO When relating to energy source When relating to technology ability to produce electricity using renewable energy source(s) capable of Cogeneration and conforming to the definition of a Cogeneration unit in Article 3(l) of the Cogeneration Directive Grexel Systems Oy 2012 Page 10 of 29

11 ICS:RECS ICS:EKOENERGY ICS:EECS-DISCLOSURE and is in accordance with the guidelines established by Annex II (e) of the Cogeneration Directive ability to produce electricity using renewable energy source(s) registration is approved by the Scheme Operator: The Finnish Association for Nature Conservation (FANC) ability to produce electricity using non-renewable energy source(s) 1. Registrant or Registrar must fill-in the following information when registering a Production Device under its Account in the CMO.grexel system: Production Device: Name, address, registrant, start date, commissioning date, installed capacity, earmark name and type, operator, applied EECS schemes and all owners. Codes of all possible Fuels, which can be converted into energy by that Production Device. According to fuel codes in AIB EECS Fact Sheet 5. Technology code of the Production Device according to technology codes in AIB EECS Fact Sheet 5. The Registrant consents to the publication by Grexel of limited data of the Production Device: Name Domain GSRN number Fuel(s) Technology Installed capacity Date of commissioning Location Name and address of operator Support schemes As the Production Device is registered into CMO.grexel, it is assigned a unique identifier, if one has not already been assigned. The identifier consists of a number with 18 numeric characters that also identifies the Domain of origin. GS1/GSRN (Global Service Relational Number) coding is used. The Registrant must warrant that the information provided to Grexel in connection with its application is complete and accurate and that the Production Device meets the qualification criteria for EECS. This is accomplished by printing out a paper Registration Form (Annex 4) and returning it to Grexel signed by properly authorized person. 2. Along with the Registration Form, the Registrant shall also deliver a line diagram representing the Production Device with at least the following information: Connection to grid(s) Location and codes of all output and import meters Location of transformers Location of generation auxiliaries Grexel Systems Oy 2012 Page 11 of 29

12 where there are generating auxiliaries associated with that Production Device, locations and codes of Import Meter(s), which determine the totality of electricity consumption by the Production Device; 3. In case the Registrant or its affiliate does not own more than 90 % of the Production Device, it must include in the application a power(s) of attorney (Annex 5) signed by other owner(s) of the Production Device. Power of Attorney is required from all owners of the PD who own more than 5 % of the PD. The Power of Attorney (PoA) may give the registrant organization the authority to o register the Production Device, and/or; o deliver production declarations for the Production Device, and/or; o claim ownership of GOs issued for the Production Device (aggregation). Aggregation can also be authorized later as a separate process. 4. Grexel verifies the application and determines if an on-site audit is required. Audit may be deemed unnecessary if relevant registration data can be verified using other reliable sources, such sources being for example: Registration for the purpose of emission trading scheme Registration for Finnish government support scheme Registration for the purpose of license to connect to the grid or distribution network 5. If an on-site audit is required, authorized Production Registrar performs it. Production Registrar confirms the registration data by signing the Registration Form printed our from the central registration database Production Registrar may also correct and comment some of the data in the Registration Form. Grexel will amend the data in the registration database before activating the Production Device accordingly. 6. If the Production Device does not satisfy either the Finnish laws or the EECS Rules, Grexel informs the registrant. The rejection notice shall include reasons of the rejection. These reasons might be for example: in relation to that application, the applicant has failed to comply with any requirement of this or the Standard Terms and Conditions; the qualification criteria are not satisfied in respect to that Production Device; there are one or more generating auxiliaries for that Production Device which do not fit with Import Meters; or the Production Registrar is prevented from satisfactorily verifying the application by the applicant or the owner or operator of the relevant Production Device. 7. If the Production Device satisfies both the Finnish laws and the EECS Rules, Grexel activates the Production Device in the registry database and sets next audit date. Grexel Systems Oy 2012 Page 12 of 29

13 8. When the Production Device is activated, Grexel informs the registrant accordingly. Resignation The Registrant must notify Grexel of intent to deregister their Production Device in writing. Commercial provisions of deregistering a Production Device are set in the contract (Standard Terms and Conditions) between Grexel and the Account Holder. Initial inspection and subsequent audit of Production Devices: If deemed necessary by Grexel, an on-site audit must be performed by an accredited production registrar at the expense of the registrant. Production Devices registration data needs to be checked every five years. Production Devices can also be inspected at a random time, if necessary. Registration data can be checked by an on-site audit by accredited production registrar or Grexel may deem initial or on-site audit unnecessary if relevant Production Device data can be verified using other reliable sources, such as: Registration for the purpose of emission trading scheme Registration for Finnish government support scheme Registration for the purpose of license to connect to the grid or distribution network Maintenance of standing data The Registrant of a Production Device must notify Grexel of any planned changes due to come into effect that will result, or unplanned changes that have resulted, in: the information recorded in the EECS Registration Database in relation to the Production Device becoming inaccurate; or the qualification criteria for the EECS Scheme ceasing to be satisfied with respect to that Production Device. The registrant notifies Grexel of such changes by making the necessary amendments to Production Device information in the central Certificate registry CMO.grexel. On receipt of a change of details notification (following an inspection or otherwise), Grexel will evaluate the impact of the changes on the Qualifying Criteria and respond to the Registrant within 10 working days specifying the decision taken. Grexel may respond to the changes by approving or disapproving them in the central Certificate registry CMO.grexel. Where Grexel becomes aware that a Production Device no longer fulfils, or will no longer fulfil, the qualification criteria, the EECS Registration Database record for that Production Device will be updated to shown that the Production Device no longer qualifies for EECS Scheme Certificates with effect from: (in relation to planned changes notified in advance) the date on which such planned changes are due to come into effect; or (in relation to other changes) as soon as reasonably practicable after becoming so aware. Grexel Systems Oy 2012 Page 13 of 29

14 Error handling If Grexel detects an error in the information of a Production Device in the central registry, it applies the procedures outlined in Chapter D.2.5. Production Devices located on border between domains For the time being, this is not relevant for the Finnish domain. Grexel Systems Oy 2012 Page 14 of 29

15 E Certificate Systems Administration E.1 Issuing EECS Certificates Qualification and EECS Products EECS Certificates can be issued a) in respect of the qualifying energy output of such a Production Device during any period in which it was registered for the purpose of the EECS scheme according to D.2; and b) for a maximum period of 12 months at a time; and c) when issuing request for production that took place previous calendar year was submitted by 5 th of March the following year at the latest; and d) to an Account Holder who does not have any outstanding fees payable to Grexel or its agents in conjunction with EECS Certificates; and e) for EECS products according following additional criteria: EECS Product GO When relating to energy source GO When relating to technology ICS:RECS ICS:EKOENERGY ICS:EECS-DISCLOSURE Additional criteria respective electricity is generated using renewable energy source(s) a) where the Production Device produces High-Efficiency Cogeneration only, the amount of electrical Output produced by that Production b) where the Production Device produces High-Efficiency Cogeneration and electricity which is not High-Efficiency Cogeneration, the amount of eligible generation calculated in accordance with Annexes II and III of the Cogeneration Directive respective electricity is generated using renewable energy sources registration is approved by the Scheme Operator: The Finnish Association for Nature Conservation (FANC) respective electricity is generated using nonrenewable energy source(s) The EECS Scheme Certificates shall be issued in such format as may be determined by AIB from time to time. Grexel Systems Oy 2012 Page 15 of 29

16 Processes: Issue GOs Activity Competent Body (Fingrid Oy) Issuing Body (Grexel) Production Auditor Registrant 1. Issuing request for continuous issuing or relating to a specific time period Collect production data and send to Grexel 2* 3. If the request is for multifuel PD, pumped hydro or cogeneration GOs, has the registrant submitted all required information? 3a. If the request is for cogeneration GOs, fill in cogeneration declaration and send it to Fingrid 3b. If the request is for multifuel PD or pumped hydro, fill in production declaration in CMO.grexel. 3 3a 3b 4. Issue EECS certificates to the account nominated by the registrant. 4 Offline Process Online process Document Decision * Given the current legislation, the registrant has also the possibility to request Finnish national Guarantees of Origin only from Fingrid in paper form. In that case the issuing request is submitted to Fingrid. According to agreement between Grexel and Fingrid, Fingrid only issues one type of Guarantee of Origin for given generated MWh: EECS or Paper. 1. The registrant requests issuance of Certificates. Request may be relating to a specific period consisting of one or several full calendar months or a request for continuous issuing. In case of continuous request, Grexel issues production monthly by one month and 10 business days after the production month. One EECS Scheme Certificate will be issued for each whole one MWh of qualifying energy output of the Production Device. Any identifiable residual kwh will be carried forward to the next issuing period. a. The issuing request can be sent to either Fingrid or Grexel (Annex 6). If the issuing request is sent to Grexel, the registrant authorizes Grexel to request issuance from Fingrid on behalf of the registrant. 2. Fingrid being the measurement body and Competent Authority for Finnish GOs collects production data and sends it to Grexel. 3. If the request is for multi-fuel PD or pumped hydro PD (a), or GOs relating to technology (b) (cogeneration GOs) a. The registrant must fill in production declaration in the CMO.grexel registry b. The registrant must deliver a cogeneration declaration. The format of cogeneration declaration is AIB Cogeneration model Excel workbook found at The model is amended time to time by the AIB. 4. Grexel issues EECS Certificates and deposits them to the Account nominated by the registrant in the CMO.grexel registry. a. One EECS Scheme Certificate will be issued for each whole one MWh of qualifying energy output of the Production Device. Any identifiable residual kwh will be carried forward to the next issuing period. Issuing takes place on 10 th of every month or the next business day. At that time all properly validated and authorized issuing requests are processed. Deadline for delivering issuing request is 5 Finnish business days before issuing date. Issuing can be performed after the closure of the balance settlement of the production Grexel Systems Oy 2012 Page 16 of 29

17 E.2 Form month. Normally balance settlement is closed end of the month following the production moth. Measurement: Only Production Devices that are equipped with metering equipment that complies with the relevant regulations for the trading of generation energy shall be registered. The metering equipment may measure on a scalar basis (meter advance only) or on a period basis (energy measured in units of time) according to the regulations. Fingrid shall issue the Finnish GOs for RES-E and cogeneration for net production according to EU DIRECTIVE 2001/77/EC and Act on Verification and Notification of Origin of Electricity (1129/2003). For the avoidance of doubt, the relevant regulations are the versions of the following agreements and codes presently in force at the time: Agreement between Production Device Owner and Fingrid concerning issuing Finnish GoO for RES-E Electricity Market Act (386/1995) Finnish Energy Industries Recommendation for measuring energy output of Production Device connected to Grid ( ) Energy storage (including pumped storage): Finnish national GOs and other EECS Certificates are always awarded for nett electricity production. The handling of auxiliary consumption as well as energy storage follows the process described in section E.1.2. Combustion fuels (e.g. biomass): Where the Production Device has multiple energy sources, the Production Device Registrant will have to manually report in detail on input factors in the CMO.grexel registry. Request for issuing can be made by sending a formal request to Fingrid or Grexel (Annex 6) If a production declaration is needed, the registrant must fill in production declaration within the CMO.grexel registry If the issuing request is made for cogeneration GOs, the issuing request must be accompanied with a cogeneration declaration in the form of AIB cogeneration model. E.3 Transferring EECS Certificates The Account Holder can get secure electronic access to the Account to make transfers of Certificates to another Account in the same EECS Registration Database or to another EECS Registration Database for EECS Certificates in another Domain through the website CMO.grexel.com. Only persons duly authorized by the Account Holder may request the transfer of EECS Certificates out of that Account Holder s Transferables Account. Authorized persons must be identified on the Account application form (Annexed to STC). Authorized persons can also later be added by the root user(s) of that Account Holder. Only EECS certificates can be transferred to the EECS Registration Database. EECS Products, other than those mentioned in Section B.2, can be transferred into the CMO.grexel registry. Grexel Systems Oy 2012 Page 17 of 29

18 The initiation of transfers is done in the CMO.grexel registry by the selling Account Holder. The transfer of Certificates and the confirmation of that transfer are automated. After the Account Holder has initiated the transfer, the system instantly displays a message of whether or not the initiation has been successful. In transfers between two accounts in registries operated by Grexel, the certificates are automatically transferred to the receiving account if the initiation of the transfer is successful. If the initiation of the transfer is not successful, the certificates do not leave the Account of the original Account Holder. In transfers between Accounts in two different registries, the success of the transfer is subject to the verification process of the AIB HUB and the receiving registry. If the transfer is not successful, the certificates are returned to the Account of the original Account Holder. In transfers between Accounts in two different registries, Grexel will cooperate with other Members of the EECS scheme to amend its own, or the other Members Account Holder information. Administration of malfunctions, corrections and errors. The issuing body Grexel has the right to perform corrective actions such as withdrawal or transfer of Certificates in the registry where Certificates have been erroneously issued or transferred. Where it is impossible to transfer for technical reasons, this can be overcome by cancelling Certificates for use in another domain, with the agreement of the importing issuing body. Any such cancellations are notified to the importing issuing body and the AIB Secretariat. E.4 End of life of EECS Certificates Account Holders possessing Certificates in the CMO.grexel registry, can perform cancellations by executing the transaction in the registry. The Account Holder must specify the Certificates to be cancelled as well as the country of consumption, cancellation purpose, usage category, name, type and location of beneficiary and related consumption period. EECS domains to which a secure electronic transfer of certificates is possible are not included in the list of country of consumption, which prevents ex-domain cancellations from Finland to these domains. The cancellation of Certificates is automated. Certificates can only be cancelled once. Cancelled Certificates are removed from transferrables account by changing their status to cancelled so they do not appear in any Account of the registry after the Cancellation. The Account Holder performing the cancellation has full access to see the details of the cancellation, which are printable in CMO.grexel or they can order an official Cancellation Statement from Grexel. Having performed a cancellation, the Account Holder receives a confirmation of the success or failure of the cancellation instantly in the CMO.grexel registry. Expiry According to Act on Verification and Notification of Origin of Electricity (1129/2003), Guarantees of Origin do not expire in Finland. The same rule applies to all EECS Certificates. Grexel Systems Oy 2012 Page 18 of 29

19 Withdrawal Grexel may withdraw an EECS Certificate held in a Transferables Account on its EECS Registration Database at the request of the Account Holder of that Account, or otherwise in accordance with the provisions of the EECS scheme, thereby cancelling it. Forms: A cancellation statement can be printed out from the registry by the Account Holder organization which has performed the cancellation. An official paper version of the cancellations statement can also be ordered from Grexel (see example in Annex 7). E.5 Administration of corrections and errors In the event that it transpires that the data in any EECS Certificate is inaccurate (whether or not through an act or omission of the Registrant of the originating Production Device): a. Grexel shall (provided that such EECS Certificates are, at the time of such Withdrawal, in the Transferables Account of that Registrant) Withdraw those Certificates; and b. The Registrant shall pay Grexel the cost of securing the agreement of another Account Holder to the Withdrawal of EECS Certificates of the same type from that other Account Holder s Transferables Account, so that, as far as reasonably practicable, EECS Certificates are withdrawn with a volume and a financial value which make good the discrepancy. c. In case the Certificates are no longer in the Finnish domain, Grexel will cooperate with other Issuing Bodies to withdraw the erroneous Certificates. Grexel may also alter a EECS Certificates held in its EECS Registration Database so as to rectify an error which occurred prior to its transfer into the Account in which it is held at such time, provided: a. the Account Holder has agreed to such alteration; b. it is reasonably satisfied that any unjust enrichment of a EECS Scheme Participant as a consequence of such error has, to the extent reasonably practicable, been nullified; c. it is reasonably satisfied that the alteration itself does not give rise to undue enrichment of the Account Holder. F Audit of Production Devices F.1 On-site audits On-site audits of Production Device data can be deemed unnecessary if relevant registration data can be verified using other reliable sources, such as: Registration for the purpose of emission trading scheme Registration for Finnish government support scheme Registration for the purpose of license to connect to the grid or distribution network The Registrant, either as the owner or on behalf of the owner and operator of the Production Device, must permit Grexel, or a Production Registrar as its agent, to Grexel Systems Oy 2012 Page 19 of 29

20 access the Production Device or records associated with it, its energy output and sources of energy. Registrants must report any changes to standing data of a Production Device under D.2.5, but deviations from registered data are also sought in the Production Device audit. This is especially important regarding changes in ownership structures and metering. If a Production Device fails to pass the requirements of the audit or the registration information has changed significantly, Certificates will not be issued before corrective actions have been performed. F.2 Production Device registration re-check Relevant registration data is re-checked every 5 years. All Production Devices can also be audited at a random time. F.3 Production audits Production audits are performed on random basis. The Production Auditor will receive information about the issued EECS Certificates from Grexel and the registered information relating to the Production Device for the period being reviewed. The Production Auditor will compare the issued number of Certificates with data from other sources, such as: Confirmed used fuel Accounting statement for the purpose of Emission Trading System Verified report for the purpose of Feed-in Tariff In case of windmills, installed capacity and estimated full load hours The Production Auditor will report any discrepancies from the registered information to Grexel as soon as possible. Production Registrars are accredited by the Energy Market Authority. Production audits can be performed by Production Registrars, or other auditors accredited by Grexel. G Change Control (see EECS Rules, section L) G.1 Complaints and Disputes Grexel will endeavour to deal with complaints received as soon as possible and within a period of 20 business days. Treatment of the complaint and disputes will be made in accordance with the general rules of commercial law. G.2 Change requests An Account Holder may propose a modification to this ; Such a proposal will include a detailed description, including an exact specification of any proposed modification of this and be passed in writing to Grexel. On receipt of such a request, Grexel will: Respond to the request within 5 working days, describing the procedures to be followed, and estimating when a reply can be expected; Grexel Systems Oy 2012 Page 20 of 29

21 Consult with the other EECS Account Holders within Finland; Decide whether the request and its consequences are in its opinion reasonable; If the proposal leads to the modification of the or if it is otherwise seen important to disseminate, inform the EECS Account Holders within Finland the outcome of this decision. Grexel may make such modifications to this as are in its opinion necessary to the effective and efficient operation of the market. Any modifications to this are subject to approval by the AIB that such changes do not conflict with the Rules of the Association of Issuing Bodies (AIB) for The European Energy Certification System. Implementation of modifications will be notified by to the Account Holder and will take effect on publication of the documentation on the website Grexel Systems Oy 2012 Page 21 of 29

22 Annex 1: Contacts List Competent Authority & Measurement Body Fingrid Oyj, Pentti Säynätjoki, P.O. Box 530, FI Helsinkin Finland, , Authorised Issuing Body Grexel, Marko Lehtovaara, Hermannin Rantatie 8 FI Helsinki Finland, , marko.lehtovaara@grexel.com, Central Monitoring Office (CMO) Grexel, Marika Timlin, Hermannin Rantatie 8 FI Helsinki Finland, , marika.timlin@grexel.com, Registry support Grexel, Marika Timlin, Hermannin Rantatie 8 FI Helsinki Finland, , marika.timlin@grexel.com, Production Registrars See list at ICS:EKOENERGY Scheme Operator The Finnish Association for Nature Conservation (FANC). Contact: Steven Vanholme, , steven.vanholme@sll.fi Measurement Body Fingrid Oyj, Pentti Säynätjoki, P.O. Box 530, FI Helsinkin Finland, , pentti.sayntajoki@fingrid.fi, Grexel Systems Oy 2012 Page 22 of 29

23 Annex 2: Standard Terms And Conditions See separate document: Standard Terms and Conditions. Annex 3: Know-Your-Customer Questionnaire See separate document: KnowYourCustomerGrexel Annex 4: Production Device Registration Form Registrant of the Production Device Production Device Registration form Name: Street: Postal Code: City: Country: Contact Person: Phone: Fax: Ownership share: Operator of Production Device Name: Street: Postal Code: City: Contact Person: Phone: Fax: Country: Registrar of the Production Device Name: Street: Postal Code: Contact Person: Phone: Fax: City: Country: Owner of the Production Device (if not registrant) Name: Street: Postal Code: Contact Person: Phone: Fax: Grexel Systems Oy 2012 Page 23 of 29

24 City: Country: Ownership share: Owner of the Production Device Name: Street: Postal Code: City: Country: Contact Person: Phone: Fax: Ownership share: Production Device information Name: Street: Postal Code: GSRN: Installed Capacity, MW Date of Commissioning: City: Country: Finland Issuing Body: Grexel Finland Latitude Coordinate Code Longitude Radioactive waste produced Meter Information Production Device is connected directly to the grid: Grid Area Gross/Net measurement Meter Code: [filled by Fingrid] Grid Reference: [filled by Fingrid] Calculation Formula Metering Description Fuels (codes according to AIB EECS Fact Sheet 5) Burning value, GJ/ton Technology Public Support Schemes Grexel Systems Oy 2012 Page 24 of 29

25 EECS schemes GO ICS:RECS Trading Scheme Trading Scheme Further information provided with this registration form: Auditor notes: By undersigning this registration form the Registrant also reaffirms the relevant requirements of the including: The Registrant is either the owner of the Production Device or is authorised by the owner of the Production Device, which is the object of this registration form to so register the Production Device for one or several EECS Schemes in Finland. The electrical energy produced by the Production Device is produced according to the Qualifying Criteria set out in the respective Section of the for any of the relevant EECS Schemes in Finland and will in addition be supported by such other criteria as may be from time to time prescribed by the scheme authority responsible for the Domain within which the Production Device lies. The Registrant will claim Certificates only for electricity from qualifying fuel sources which has not been sold or otherwise consumed as electricity associated with one or several attributes of electricity generation covered by any of the EECS Schemes without the use of the corresponding EECS Certificates (including such consumption by autoproducers and electricity for which other evidence of the production of electricity from qualifying energy sources has been issued). The information given in this registration form is truthful and exhaustive. Any planned changes concerning the information given in this registration form will be announced in advance to the Issuing Body. Any unplanned changes will be announced to the Issuing Body at the first possible occasion. The owner of the Production Device and the Registrant as his agent accept the possibility of unannounced visits to their own control and auditing premises and/or the premises of the Production Device, as prescribed in the for EECS Certificates in Finland Registrant Production Registrar Place: Date: Place: Date: Signature Signature Name in print: Name in print: Title: Title: Grexel Systems Oy 2012 Page 25 of 29

26 Annex 5: Power of Attorney Template Power of Attorney To whom it may concern, In relation to the EECS Certificates in Domain Finland. We [Name of the owner of the Production Device], [Address and business ID of the owner] hereby give [Name of the empowered organization] [Address and business ID of the empowered organization] the Power of Attorney to Act on our behalf as the registrant of perform any subsequent work and activity needed for registration of request the issuance of EECS Certificates for deliver production declarations for receive issued EECS Certificates on our behalf for be the sole point of contact for Grexel regarding Mark X if true The Production Device [Name, Address, and GSRN (when available) of the Production Device] This Power of Attorney is valid from day Month year Until further notice by [Name of the owner] [Name of the owner] Place : Date : (Signature) Name : Position : Grexel Systems Oy 2012 Page 26 of 29

27 Annex 6: Issuing Request Request to Issue EECS Certificates Name of Account Holder Name of Production GSRN of Production Monthly Device Device issuing X Start month Model PD X Member code (30X ) Issuing for specific period Stop monthly issuing X Model PD By signing this form I confirm and accept that: I have right to request issuing specified above On our behalf, Grexel has the right to request the issuance of Finnish national Guarantees of Origin and to deliver meter readings specified above from Fingrid Standard issuing fees of Fingrid and Grexel will be charged The information in appended declaration is correct may be subject to audit before or after issuing Date Signature Name Position Appendices Cogeneration Declaration (print-out from AIB cogeneration model) Fuel declaration License to issue ICS:EKOENERGY from FANC Grexel Systems Oy 2012 Page 27 of 29

28 Annex 7: Model Cancellation Statement Cancellation Statement With this Cancellation Statement the indicated Certificates are no longer tradable. Onward sale of this Cancellation Statement is prohibited. Transaction Type: Cancel Transaction Date: :38:54 Transaction Number: Transaction status: Completed From To Name of Account Holder: Power Company Limited Name of Beneficiary: Beneficiary Limited Account: FI-Power Company Limited Cancellation Purpose: Electricity disclosure Domain: Finland Consumption Period: to Street: Kukkakatu 8 Country of Consumption: Finland Postal Code and City: Helsinki Location of Beneficiary: Example Road 4, Helsinki Country: Finland Usage Category: Disclosure Type of Beneficiar y: Energy supplier Total GO: Total MWh: Certificate Number (From - To) Volume Domain Fuel, Technology Issuing Date Productio n Period Production Device (GSRN, installed capacity, name) Trading scheme s Support Schemes To Finland F , T To MW Production Device 1 GO Investment and production support Grexel Systems Oy 2012 Page 28 of 29

Country profiles: Finland

Country profiles: Finland Country profiles: Finland Last updated: 20/02/2014 1 Implementation of Tracking Systems 1.1 Electricity Disclosure Electricity disclosure in Finland is implemented by the law Laki sähkön alkuperän varmentamisesta

More information

EECS Electricity Domain Protocol. for Czech Republic

EECS Electricity Domain Protocol. for Czech Republic EECS Electricity for Czech Republic Prepared by OTE, a.s. Based on EECS Rules Release 7 v5 Release 3 - September 2016 Document Control Version Date Originator Reviewers 1 November 2013 OTE, a.s. Remco

More information

Country profiles: Sweden

Country profiles: Sweden Country profiles: Sweden Last updated: 20/02/2014 1 Implementation of Tracking Systems 1.1 Electricity Disclosure Electricity disclosure in Sweden is implemented by the law Ellag - Electricity Act (1997:857).

More information

Country profile: Austria

Country profile: Austria Country profile: Austria Last updated: 23/04/2015 1 Implementation of Tracking Systems As electricity tracking system Austria uses electricity disclosure, which provides consumers with details about the

More information

Country profiles: Italy

Country profiles: Italy Country profiles: Italy Last updated: date (31/05/2015) 1 Implementation of Tracking Systems 1.1 Electricity Disclosure Obligation to disclose was transposed through the Decree-Law No.73 of 18 th June

More information

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office

Auctions preparation, course, wins. Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office Katarzyna Szwed Lipińska, counsellor at law Director, Department of Support Systems Energy Regulatory Office Warsaw, March 2015 Installations subject to the auction procedure: existing including modernised

More information

State aid SA /N FI Fixed operating aid for power plants using renewable energy sources

State aid SA /N FI Fixed operating aid for power plants using renewable energy sources EUROPEAN COMMISSION Brussels, 22.03.2011 C (2011) 1951 PUBLIC VERSION WORKING LANGUAGE This document is made available for information purposes only. Subject: State aid SA. 32470 2011/N FI Fixed operating

More information

Country profiles: Czech Republic

Country profiles: Czech Republic Country profiles: Czech Republic Last updated: date (30/06/2015) 1 Implementation of Tracking Systems In Czech Republic, the market is fully liberalised since 2006. Numerous suppliers are present on the

More information

APPLICATION PACK FOR THE ECOLABEL

APPLICATION PACK FOR THE ECOLABEL APPLICATION PACK FOR THE ECOLABEL PART 1: Guidance notes ISSUED BY: Insert name of Competent Body and contact details (address, telephone and fax numbers, Email address) Date of issue: Page 1 of 12 Introduction

More information

REGULATION FOR PRODUCTION CONTROL OF PERSONAL

REGULATION FOR PRODUCTION CONTROL OF PERSONAL Page 1 of 6 INDEX 1 PURPOSE AND PREMISE... 2 2 ENTRUSTMENT OF ASSIGNMENT... 2 3 INSPECTION OPERATIONAL ACTIVITY... 2 3.1 Methodology... 2 3.1.1 Sampling... 2 3.1.2 Verifica della omogeneità della produzione...

More information

where implicit capacity allocation methods are applied, national regulatory authorities may decide not to apply Articles 8 to 37.

where implicit capacity allocation methods are applied, national regulatory authorities may decide not to apply Articles 8 to 37. System Operator's METHODOLOGY OF GAS TRANSMISSION CAPACITY ALLOCATION AND CONGESTION MANAGEMENT PROCEDURE AND STANDARD TERMS FOR ACCESSING THE CROSS-BORDER INFRASTRUCTURE 30 th June 2017 1. General provisions...

More information

GENERAL TERMS AND CONDITIONS

GENERAL TERMS AND CONDITIONS GENERAL TERMS AND CONDITIONS I. Subject of the General Terms and Conditions MADWIRE, s. r. o., with registered office at Šoltésovej 14, 811 08 Bratislava, Company ID: 47 436 310, Tax Identification Number:

More information

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18

PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 PRE-QUALIFICATION FOR PROVISION OF TEAM BUILDING CONSULTANCY SERVICES TENDER NO. KPPF /HRA-B/1-A/22/17-18 (JAN 2017 DEC 2018) PRE QUALIFICATION DOCUMENT Stima Plaza, Kolobot Road, P.O. Box 1548-00600 Nairobi,

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

Supply of Office Furniture, Fittings, Furnishings & other Equipments.

Supply of Office Furniture, Fittings, Furnishings & other Equipments. The Kenya Power & Lighting Co. Ltd. The Kenya Power & Lighting Co. Ltd. Central Office P.O. Box 30099 Nairobi, Kenya Telephone 254-02-3201 000/3201 323 Fax No. 254-02-310336 or 3753833 Website: www.kplc.co.ke

More information

Unofficial Translation This translation is for convenience of those unfamiliar with Thai language Please refer to the Thai official version

Unofficial Translation This translation is for convenience of those unfamiliar with Thai language Please refer to the Thai official version Unofficial Translation This translation is for convenience of those unfamiliar with Thai language Please refer to the Thai official version Notification of the Electronic Transactions Commission Re: Rules,

More information

ORGANIC CERTIFICATION PROCESS IN NON-EU COUNTRIES

ORGANIC CERTIFICATION PROCESS IN NON-EU COUNTRIES TS01(EC)v09en ORGANIC CERTIFICATION PROCESS IN NON-EU COUNTRIES 1 Contents 1. ECOCERT: EXPERT SERVICES FOR THE ORGANIC SECTOR... 3 2. ORGANIC PRODUCTION REGULATIONS... 3 3. THE INSPECTION AND CERTIFICATION

More information

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010

PRE-QUALIFICATION OF SUPPLIERS PROVISION OF FUMIGATION, SANITATION AND SANITAL DISPOSAL SERVICES TENDER NO.KPLC1/5BC/9A/PT-ST/113/2010 The Kenya Power & Lighting Co. Ltd. The Kenya Power & Lighting Co. Ltd. Central Office P.O. Box 30099 Nairobi, Kenya Telephone 254-02-3201 000/3201 323 Fax No. 254-02-310336 or 3753833 Website: www.kplc.co.ke

More information

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS Program Guide TABLE OF CONTENTS Introduction... 2 Purpose... 2 About CHP... 2 Program Description... 2 Call for CHP Projects... 3 Participant Webinar...

More information

QP 02 Audit and Certification Procedure

QP 02 Audit and Certification Procedure 1. AUDIT PROGRAMME [9.1.1] The audit programme shall be conducted in stages within a 3-year certification cycle as follows; Initial audit: Two stage process Surveillance audit: Conducted in the first and

More information

Application Guide. Ver 1.5

Application Guide. Ver 1.5 Renewable Application Guide Ver 1.5 IMPORTANT NOTICE SEI shall bear no responsibility for the quality, specification or standard of the product or its suitability for the application for which it is installed,

More information

SAI Global Full Service Team

SAI Global Full Service Team General information regarding elements of the certification process is described below. A degree of flexibility and options in the certification process are available so please feel free to contact us

More information

EECS Electricity Domain Protocol. for Switzerland

EECS Electricity Domain Protocol. for Switzerland EECS Electricity for Switzerland Prepared by Swissgrid Ltd Based on EECS Rules Release 7 Release 1 February 2013 Contents A Introduction... 3 B Background... 3 B.1 Purpose... 3 B.2 Scope... 4 B.3 Roles

More information

8.1. GENERAL RULES OF CAPACITY BOOKING

8.1. GENERAL RULES OF CAPACITY BOOKING 8.1. GENERAL RULES OF CAPACITY BOOKING (a) Pursuant to the provisions of the Gas Supply Act and the Implementation Decree the free capacities of the natural gas network may and shall be offered to network

More information

Relevant changes will be made to corresponding sections of OA and RAA.

Relevant changes will be made to corresponding sections of OA and RAA. PJM Interconnection - Intra-PJM Tariffs - OPEN ACCESS TRANSMISSION TARIFF PJM OPEN ACCESS TRANSMISSION TARIFF Relevant changes will be made to corresponding sections of OA and RAA. Effective Date: 9/17/2010

More information

Version 2 November Code of Practice. Consignment Based Conformity Assessment (CBCA) Services

Version 2 November Code of Practice. Consignment Based Conformity Assessment (CBCA) Services Code of Practice Consignment Based Conformity Assessment (CBCA) Services November 2012 PREFACE Many developed countries have strong National Standards and Technical Regulations supported internally with

More information

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES PECO is offering cash incentives for qualified Combined Heat and Power (CHP) technology projects 1 to encourage the development of projects that improve

More information

A GUIDE TO THE GB RENEWABLE HEAT INCENTIVE SCHEME.

A GUIDE TO THE GB RENEWABLE HEAT INCENTIVE SCHEME. A GUIDE TO THE GB RENEWABLE HEAT INCENTIVE SCHEME 1. What is the Renewable Heat Incentive Scheme ("RHI")? The RHI is a scheme to encourage the take up of renewable heat technologies such as biomass boilers,

More information

CGMES Conformity Assessment Framework

CGMES Conformity Assessment Framework CGMES Conformity Assessment Framework Version 2 For conformity assessment of the applications supporting IEC specifications TS 61970-600-1 and 61970-600-2 16 October 2017 Table of Contents 1. Definitions...

More information

REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION. 17 June 1999 No VIII-1234 Vilnius. (As last amended on 3 June 2014 No XII-903)

REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION. 17 June 1999 No VIII-1234 Vilnius. (As last amended on 3 June 2014 No XII-903) REPUBLIC OF LITHUANIA LAW ON PUBLIC ADMINISTRATION 17 June 1999 No VIII-1234 Vilnius (As last amended on 3 June 2014 No XII-903) CHAPTER I GENERAL PROVISIONS Article 1. Purpose of the Law This Law shall

More information

Traction Electricity Rules. for the purposes of calculating the Traction Electricity Charge:

Traction Electricity Rules. for the purposes of calculating the Traction Electricity Charge: Traction Electricity Rules Explanatory Note These Traction Electricity Rules set out: for the purposes of calculating the Traction Electricity Charge: (i) provisions relating to the calculation of Traction

More information

EMISSIONS TRADING REGULATION

EMISSIONS TRADING REGULATION Province of Alberta ENVIRONMENTAL PROTECTION AND ENHANCEMENT ACT EMISSIONS TRADING REGULATION Alberta Regulation 33/2006 With amendments up to and including Alberta Regulation 175/2017 Office Consolidation

More information

the rules which apply where metered data is missing or not supplied to Network Rail within the prescribed time;

the rules which apply where metered data is missing or not supplied to Network Rail within the prescribed time; Traction Electricity Rules Explanatory Note These Traction Electricity Rules set out: for the purposes of calculating the Traction Electricity Charge: (i) (ii) the process for collecting electricity consumption

More information

COMMUNICATIONS WITH THE INTERNATIONAL BUREAU

COMMUNICATIONS WITH THE INTERNATIONAL BUREAU GUIDE TO THE INTERNATIONAL REGISTRATION OF MARKS B.I. 1 PART B PROCEDURE CHAPTER I: GENERAL INTRODUCTION This Chapter is concerned with procedural matters which are of interest both to applicants and holders

More information

Terms and conditions

Terms and conditions Terms and conditions 1. Introductory provisions BitPanther s.r.o., Roľnícka 374, 831 07 Bratislava, registered in the Bratislava I District Court Commercial Register, Section: Sro, file number: 70963/B,

More information

Section IV. Bidding Forms

Section IV. Bidding Forms Section IV. Bidding Forms 1-1 Section IV. Bidding Forms Table of Forms Letter of Bid... 3 Form of Bid Security (Bank Guarantee)... 6 Form of Bid Security (Bid Bond)... 7 Form of Bid-Securing Declaration...

More information

GRENLEC s Renewable Standard Offer

GRENLEC s Renewable Standard Offer GRENLEC s Renewable Standard Offer Version: 1.1 Last Updated: September 10 th, 2011 This document provides as a general overview of the Customer-owned Renewable Generation Standard Offer, for the purchase

More information

SAFECAP PRIVACY POLICY STATEMENT

SAFECAP PRIVACY POLICY STATEMENT SAFECAP Safecap Investments Limited PRIVACY POLICY STATEMENT This Document on Privacy Policy Statement and Regulatory Protections is effective from 29 January, 2017 and shall remain effective until a more

More information

L 360/64 Official Journal of the European Union

L 360/64 Official Journal of the European Union L 360/64 Official Journal of the European Union 19.12.2006 COMMISSION REGULATION (EC) No 1875/2006 of 18 December 2006 amending Regulation (EEC) No 2454/93 laying down provisions for the implementation

More information

PRODUCT DISCLOSURE STATEMENT FOR THE THIRSTY CAMEL CARD

PRODUCT DISCLOSURE STATEMENT FOR THE THIRSTY CAMEL CARD PRODUCT DISCLOSURE STATEMENT FOR THE THIRSTY CAMEL CARD Issued by LiquorSmart Pty Ltd (ABN 45 089 797 491) of 8/161 Ward Street, North Adelaide SA 5006 trading as Thirsty Camel Effective Date 1 st May

More information

REDUCE REUSE RECYCLE RECOVER. Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO

REDUCE REUSE RECYCLE RECOVER. Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO REDUCE REUSE RECYCLE RECOVER Calculation and Payment of the Waste Disposal Levy GUIDANCE FOR WASTE DISPOSAL FACILITY OPERATORS VERSION TWO Disclaimer While every effort has been made to ensure that this

More information

Building Standards Customer Journey

Building Standards Customer Journey Building Standards Customer Journey Are you doing building work or home improvements? If so, this guide is for you. Building Standards Customer Journey Contents 2 Contents Building Standards Customer Journey

More information

Section 3 Company Organisation and Certification Procedures

Section 3 Company Organisation and Certification Procedures OF&G ORGANIC STANDARDS AND CERTIFICATION MANUAL 3.0 Contents Page The describe how the company is structured and administered, and explains the certification procedures, the complaints procedures and the

More information

INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM

INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM KINGDOM OF SAUDI ARABIA INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM COMPREHENSIVE PROCEDURES and GUIDELINES INTERNATIONAL CONFORMITY CERTIFICATION PROGRAM COMPREHENSIVE PROCEDURES AND GUIDELINES November

More information

QUALITY AGREEMENT. The following Agreement has been concluded between

QUALITY AGREEMENT. The following Agreement has been concluded between QUALITY AGREEMENT The following Agreement has been concluded between LLC LABORATORIES The contract laboratory and service provider 1625 Trinity Dr., Unit 11 Mississauga, Ontario Canada L5T 1W9 Hereinafter

More information

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0

ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT. Version 3.0 ISCC 204 AUDIT REQUIREMENTS AND RISK MANAGEMENT Version 3.0 II Copyright notice 2016 ISCC System GmbH This ISCC document is protected by copyright. It is freely available from the ISCC website or upon

More information

National Science Foundation Ministry of Science, Technology & Research

National Science Foundation Ministry of Science, Technology & Research 1 National Science Foundation Ministry of Science, Technology & Research BIDDING DOCUMENT PROCUREMENT OF IBM SPSS STASTICAL SOFT WARE NATIONAL COMPETITIVE BIDDING Minimum Specifications requested by NSF

More information

Policy for integrity and marketing activities. Latest update: 21 May General

Policy for integrity and marketing activities. Latest update: 21 May General Policy for integrity and marketing activities Latest update: 21 May 2018 1. General At Dustin, we want you to feel safe when you provide us with your personal data. This privacy policy describes how we

More information

Online Store Application Form

Online Store Application Form Online Store Application Form You need to be a Lincoln Sentry Account holder to place orders using the online store website. Please provide your existing Lincoln Sentry account number. Submit the completed

More information

Invitation For Expression Of Interest For Providing Project Management Consultancy Services At Vidyasagar Industrial Park at Kharagpur In West Bengal

Invitation For Expression Of Interest For Providing Project Management Consultancy Services At Vidyasagar Industrial Park at Kharagpur In West Bengal Invitation For Expression Of Interest For Providing Project Management Consultancy Services At Vidyasagar Industrial Park at Kharagpur In West Bengal INTRODUCTION West Bengal Industrial Development Corporation

More information

AGENDA March 26, :30 P.M. City Council Chambers

AGENDA March 26, :30 P.M. City Council Chambers 03-26-12 Committee of the Whole Meeting http://www.darien.il.us/government/minutes/2012/council/120326/age... 1 of 1 1/19/2015 9:26 PM AGENDA March 26, 2012 6:30 P.M. City Council Chambers 1. CALL TO ORDER

More information

CORPORATE GOVERNANCE STATEMENT 2018

CORPORATE GOVERNANCE STATEMENT 2018 CORPORATE GOVERNANCE STATEMENT 2018 About the management Fellow Finance Plc is a Finnish limited liability company. The responsibilities and obligations of the company s management bodies are determined

More information

EYNSFORD PARISH COUNCIL

EYNSFORD PARISH COUNCIL EYNSFORD PARISH COUNCIL FINANCIAL REGULATIONS These Financial Regulations were adopted by the Council at its Meeting held on 20 September 2007, last amended on 20 th July 2017. 1. GENERAL 1.1 These financial

More information

to the general terms and conditions for access to the natural gas storage facilities operated by innogy Gas Storage NWE GmbH (igsnwe)

to the general terms and conditions for access to the natural gas storage facilities operated by innogy Gas Storage NWE GmbH (igsnwe) Annex Balancing, Version of 01/12/2016 Annex: Balancing to the general terms and conditions for access to the natural gas storage facilities operated by innogy Gas Storage NWE GmbH (igsnwe) 1 Allocation

More information

Capacity Booking Platform Regulation

Capacity Booking Platform Regulation Capacity Booking Platform Regulation Operational Rules of the Regional Booking Platform Version 1.6. Applicable from 1 October 2018 FGSZ Zrt. 1 Table of Contents Preamble... 5 1. Definitions... 5 2. General

More information

Regulations Regarding Participation of Stationary Technological Installations in the Emission Allowance Trading Scheme of the European Union

Regulations Regarding Participation of Stationary Technological Installations in the Emission Allowance Trading Scheme of the European Union Republic of Latvia Cabinet Regulation No. 769 Adopted 13 November 2012 Regulations Regarding Participation of Stationary Technological Installations in the Emission Allowance Trading Scheme of the European

More information

RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS

RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS RULES FOR THE ISSUE OF CERTIFICATION OF SUSTAINABILITY OF BIOFUELS AND BIOLIQUIDS, FOOD AND FEED, TECHNICAL/CHEMICAL AND BIOENERGY APPLICATIONS In force as from 08/09/2015 RINA Services S.p.A. Via Corsica,

More information

Guidelines. on imports of organic products into the European Union

Guidelines. on imports of organic products into the European Union EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Directorate H. Sustainability and quality of agriculture and rural development H.3. Organic farming 15.12.2008 Guidelines on

More information

Semiconductor Integrated Circuits Layout-Design Rules, 2001

Semiconductor Integrated Circuits Layout-Design Rules, 2001 Semiconductor Integrated Circuits Layout-Design Rules, 2001 Government of India Ministry of Information Technology Notification New Delhi, the 10 th December, 2001 TABLE OF CONTENTS Page Chapter I: Preliminary

More information

Below is a brief description of the main regulatory measures that affected the Company in 2010.

Below is a brief description of the main regulatory measures that affected the Company in 2010. Attachment Regulatory framework Below is a brief description of the main regulatory measures that affected the Company in 2010. Presidential Decrees appointing special Commissioners for works on the national

More information

INSTRUCTIONS TO TENDERERS

INSTRUCTIONS TO TENDERERS INSTRUCTIONS TO TENDERERS INVITATION TO TENDER FOR THE APPOINTMENT OF A PR AGENCY ON A PROJECT BASIS TO BRAND, POSITION AND PUBLICISE THE ASIA PACIFIC BREWERIES FOUNDATION SIGNATURE ART PRIZE 2014 FOR

More information

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement

The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison. NAFTA Chapter 10: Government Procurement The North-Atlantic Free Trade Agreement and the Trans-Pacific Partnership: Side-by-Side Comparison NAFTA Chapter 10: Government Procurement Chapter Ten: Government Procurement Chapter Fifteen: Government

More information

Electricity Supply Agreement

Electricity Supply Agreement Electricity Supply Agreement 1. General 1.1 Mazoon Electricity Company SAOC (the Supplier) shall on or from the Start Date, subject to the satisfactory completion of a Supply Application Form, provide

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

EURASIAN ECONOMIC COMMISSION COUNCIL

EURASIAN ECONOMIC COMMISSION COUNCIL EURASIAN ECONOMIC COMMISSION COUNCIL Working translation: DECISION October 9, 2014 No.94 Minsk On the Regulation on the Harmonized Procedure of Joint On-Site Inspections and of Taking Samples of Goods

More information

Renewable Heat Incentive Guidance Volume One: Eligibility and how to apply

Renewable Heat Incentive Guidance Volume One: Eligibility and how to apply Promoting choice and value for all gas and electricity customers Renewable Heat Incentive Guidance Guidance Reference: 147/11 Contact: RHI Operational Team Publication date: 10 November 2011 Team: New

More information

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents 2012R1024 EN 17.06.2014 002.001 1 This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents B REGULATION (EU) No 1024/2012 OF THE EUROPEAN

More information

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a COUNCIL REGULATION COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.01.2001 COM(2000) 536 final 2000/0232 (ACC) Proposal for a COUNCIL REGULATION on procedures to facilitate the issue of movement certificates EUR.1, the

More information

Completion instructions Comprehensive guarantee authorisation (CGU) and Deferment of payment authorisation (DPO)

Completion instructions Comprehensive guarantee authorisation (CGU) and Deferment of payment authorisation (DPO) 1 (5) 1. APPLICATION Enter the name and code of authorisation(s) applied for: comprehensive guarantee CGU, Deferment of payment DPO. 2. APPLICANT S DETAILS 1.1 Application type Enter the type of application:

More information

TruckSafe Operator Business Rules and Code of Conduct

TruckSafe Operator Business Rules and Code of Conduct Operator Business Rules and Code of Conduct Contents 1.0 Business Rules and Code of Conduct 3 2.0 Decision Making Bodies 4-6 3.0 Purpose 6 4.0 How the Rules will be amended 6 5.0 Introduction 6 6.0 Entry

More information

Dr. Ram Manohar Lohiya National Law University, Lucknow

Dr. Ram Manohar Lohiya National Law University, Lucknow Dr. Ram Manohar Lohiya National Law University, Lucknow Short-term tender notice For empanelment of advertising agencies Tender is invited from reputed Indian Newspaper Society (INS) accredited advertising

More information

Foreword. BABT 340 The Production Quality Certification Scheme for Manufacturers

Foreword. BABT 340 The Production Quality Certification Scheme for Manufacturers BABT 791 A Guide to the TUV SUD BABT Implementation of Module D (Production Quality Assurance) and Module E (Product Quality Assurance) of the Marine Equipment Directive A Certification Body of TÜV SÜD

More information

Rules for Ship Recycling Management System Certification

Rules for Ship Recycling Management System Certification Rules for Ship Recycling Management System Certification Effective from July 1 st 2009 RINA Società per azioni Via Corsica, 12-16128 Genova - Italy Tel.: +39 01053851 - Fax: +39 0105351000 www.rina.org

More information

MEMORANDUM OF UNDERSTANDING BETWEEN THE SINGLE RESOLUTION BOARD AND THE EUROPEAN CENTRAL BANK IN RESPECT OF COOPERATION AND INFORMATION EXCHANGE

MEMORANDUM OF UNDERSTANDING BETWEEN THE SINGLE RESOLUTION BOARD AND THE EUROPEAN CENTRAL BANK IN RESPECT OF COOPERATION AND INFORMATION EXCHANGE MEMORANDUM OF UNDERSTANDING BETWEEN THE SINGLE RESOLUTION BOARD AND THE EUROPEAN CENTRAL BANK IN RESPECT OF COOPERATION AND INFORMATION EXCHANGE MEMORANDUM OF UNDERSTANDING BETWEEN THE SINGLE RESOLUTION

More information

Nuijamiestentie 7, Helsinki

Nuijamiestentie 7, Helsinki General Name of the registry Controller Data Protection Officer Purpose of processing Legal basis of processing This privacy notice presents the information about this data register to the data subjects

More information

EHPA regulations for granting the international quality label for electrically driven heat pumps

EHPA regulations for granting the international quality label for electrically driven heat pumps EHPA regulations for granting the international quality label for electrically driven heat pumps Version 1.6 Release 16.02.17 European Heat Pump Association Rue d Arlon 63-67 B-1040 Brussels www.ehpa.org

More information

FSC Directive on Chain of Custody Evaluations. Last Updated: 12 July 2010

FSC Directive on Chain of Custody Evaluations. Last Updated: 12 July 2010 Forest Stewardship Council FSC DIRECTIVE FSC-DIR-20-011 EN FSC Directive on Chain of Custody Evaluations Last Updated: 12 July 2010 FSC International Center GmbH Charles-de-Gaulle-Strasse 5 53113 Bonn

More information

Business Energy Rebates Application

Business Energy Rebates Application Business Energy Rebates Application Business Energy Rebates make it easy and affordable for you to select energy efficient products for your business. In-store and mail-in rebates are available for energy

More information

Customs-related aspects of the Rotterdam Convention Switzerland s experience. Secretariat of the Rotterdam Convention. Switzerland s experience

Customs-related aspects of the Rotterdam Convention Switzerland s experience. Secretariat of the Rotterdam Convention. Switzerland s experience ROTTERDAM CONVENTION Case study on the Customs-related aspects of the Rotterdam Convention Switzerland s experience 1 Secretariat of the Rotterdam Convention TABLE OF CONTENTS 1.0 BACKGROUND. page 1 2.0

More information

Jammu and Kashmir State Electricity Regulatory Commission

Jammu and Kashmir State Electricity Regulatory Commission DRAFT NOTIFICATION INVITING OBJECTIONS / COMMENTS /SUGGESTIONS Jammu and Kashmir State Electricity Regulatory Commission NOTIFICATION (Draft) No: JKSERC/ Dated: Jammu, In exercise of the power conferred

More information

Rules of Accreditation. for Advertising Agencies. August 2010

Rules of Accreditation. for Advertising Agencies. August 2010 for Advertising Agencies August 2010 LIST OF CONTENTS Clauses Page no. Interpretation 3 The Print Media Accreditation Authority 4 1 Conditions for Accredited Agency 5 2 Application for Accreditation 6

More information

Invitation to tender. Provision of External Audit Services

Invitation to tender. Provision of External Audit Services Invitation to tender for the Provision of External Audit Services Tender return date: 10.00 am on 2 nd May 2017 Return to: Enquiries to: Address: Clerk to the Corporation Alison Rowland (arowland@sussexcoast.ac.uk)

More information

GOPRO, INC. CORPORATE GOVERNANCE GUIDELINES. (Adopted May 1, 2014 and effective as of GoPro, Inc. s initial public offering; revised August 4, 2015)

GOPRO, INC. CORPORATE GOVERNANCE GUIDELINES. (Adopted May 1, 2014 and effective as of GoPro, Inc. s initial public offering; revised August 4, 2015) GOPRO, INC. CORPORATE GOVERNANCE GUIDELINES (Adopted May 1, 2014 and effective as of GoPro, Inc. s initial public offering; revised August 4, 2015) The following corporate governance guidelines have been

More information

Electric Supply Enrollment Form

Electric Supply Enrollment Form Electric Supply Enrollment Form Date of Enrollment: Customer Information Name: Customer Number: Street Address: City: State: Zip: Phone #: Email Address: By initialing here, Customer consents to receive

More information

Chapter 5 - Additional rules for the certification programs: Global Organic Textile Standard (GOTS) and TE Standards (CCS, OCS, GRS and RCS)

Chapter 5 - Additional rules for the certification programs: Global Organic Textile Standard (GOTS) and TE Standards (CCS, OCS, GRS and RCS) Chapter 5 - Additional rules for the certification programs: Global Organic Textile Standard (GOTS) and TE Standards (CCS, OCS, GRS and RCS) TABLE OF CONTENTS ARTICLE 5.1 SAMPLES FOR GOTS & TE STANDARDS...

More information

Lacey Act Due Care Certification of Compliance

Lacey Act Due Care Certification of Compliance 1511 Wisconsin Avenue, NW Washington, DC 20007 Telephone 202-338-3131 Email info@capitalmarketspartnership.com Web www.capitalmarketspartnership.com www.laceyduecare.com Lacey Act Due Care Certification

More information

Everything Online Green Aug 2019

Everything Online Green Aug 2019 Everything Online Green Aug 2019 Tariff terms and conditions About your tariff Everything Online Green Aug 2019 prices are fixed until 31 st August 2019. You ll pay a daily standing charge and unit rate

More information

Renewable energy policy database and support RES-LEGAL EUROPE

Renewable energy policy database and support RES-LEGAL EUROPE Renewable energy policy database and support RES-LEGAL EUROPE National profile: Finland Client: DG Energy Contact author: Mari Tepp, policy@eclareon.com Berlin, 29 April 2013 eclareon GmbH Luisenstraße

More information

2.1 Applicant details The applicant is the company or person who applies for the authorisation.

2.1 Applicant details The applicant is the company or person who applies for the authorisation. 1 (8) 2. APPLICANT DETAILS 1. APPLICATION The name of the authorisation and code to be entered: Inward processing IPO, outward processing OPO, end use EUS, temporary admission TEA, private customs warehouse

More information

Application for registration of manufacturers and treatment providers for solid wood packaging material intended for export.

Application for registration of manufacturers and treatment providers for solid wood packaging material intended for export. Application for registration of manufacturers and treatment providers for solid wood packaging material intended for export. The completed application form and supporting documents must be couriered (not

More information

Forestry Training and Education Ireland Ltd

Forestry Training and Education Ireland Ltd Forestry Training and Education Ireland Ltd 1 Forestry Training and Education Ireland Ltd Invitation to Tender: Provision of Forestry Training, Assessment and Certification (Ref No :FTEI TENDER 07/10-001

More information

The Electricity (Capacity) Market Rules

The Electricity (Capacity) Market Rules Article 1. Scope of Activity Unofficial translation The Electricity (Capacity) Market Rules Chapter I General Provisions These Rules regulate: a) Functioning of Electricity and Guaranteed Capacity Market

More information

Terms and Conditions for Listing a PV Module on CEC Approved Product List

Terms and Conditions for Listing a PV Module on CEC Approved Product List Terms and Conditions for Listing a PV Module on CEC Approved Product List Definitions: Applicant means the company or individual, applying to the CEC to have products included on the CEC list of compliant

More information

INSPECTION PROCESS INPUTS TECHNICAL STANDARD INSPECTION PROCESS. Inputs suitable for use in Organic Agriculture

INSPECTION PROCESS INPUTS TECHNICAL STANDARD INSPECTION PROCESS. Inputs suitable for use in Organic Agriculture Version: 04 Page: 1/6 INSPECTION PROCESS Inputs suitable for use in Organic Agriculture 1. INSPECTION STEPS 2. GLOSSARY 3. PROCESS OF HANDLING DEVIATIONS AND NON COMPLIANCES Page: 2/6 1/ INSPECTION STAGES

More information

STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU.

STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU. STARHUB'S DATA PROTECTION POLICY PLEASE READ THESE TERMS CAREFULLY AS THEY MAY HAVE IMPORTANT CONSEQUENCES FOR YOU. ABOUT THESE TERMS & CONDITIONS This is StarHub's data protection policy for all our customers

More information

Special terms and conditions of the Ilmoita service and the Valtti card Version Scope

Special terms and conditions of the Ilmoita service and the Valtti card Version Scope Special terms and conditions of the Ilmoita service and the Valtti card Version 1.2.2019 1. Scope These special terms and conditions apply to the Ilmoita service and the Valtti card service (the Services

More information

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units pproval of rvc upplrsno. 2.9 STANDARD FOR CERTIFICATION Approval Programmes Approval of Service Suppliers No. 413 Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile

More information

ID number of the applicant: Co-generation plant ID: Responsible person: 1. Responsible person

ID number of the applicant: Co-generation plant ID: Responsible person: 1. Responsible person Guarantees of Origin of Electricity from High Efficiency Co-Generation and Electricity, Heating and, or Cooling from Renewable Energy Sources Regulations S.L. 423.38 APPLICATION FOR GUARANTEES OF ORIGIN

More information

Surveillance and CoP clearance

Surveillance and CoP clearance INFORMATION for MANUFACTURERS regarding: Surveillance and CoP clearance EC Directives and ECE Regulations Vehicle Category L, M, N, O, T, separate technical units, systems and components. INFORMATION for

More information

PRIVACY NOTICE (applicable from May 25th 2018)

PRIVACY NOTICE (applicable from May 25th 2018) PRIVACY NOTICE (applicable from May 25th 2018) The protection of your personal data is important to the BNP Paribas Group. This Privacy Notice provides you with detailed information relating to the protection

More information