Framework for assessing cable car construction investment projects: Examining investment projects in Taiwan

Size: px
Start display at page:

Download "Framework for assessing cable car construction investment projects: Examining investment projects in Taiwan"

Transcription

1 Special Issue Article Framework for assessing cable car construction investment projects: Examining investment projects in Taiwan Advances in Mechanical Engineering 2015, Vol. 7(11) 1 9 Ó The Author(s) 2015 DOI: / aime.sagepub.com Hsin-Lung Liu 1 and Wei-Ling Hsu 2 Abstract The use of low-carbon evaluation indices for tourist attractions facilitates the promotion of low-carbon tourism. However, balancing tourism and environmental considerations has become critical to the development of the tourism market. Compared with road vehicles, cable cars are environmentally friendly, convenient, and economical. This study presents a framework for evaluating cable car development projects on the basis of the following aspects: (a) determining guidelines for cable car stations and route layouts, (b) establishing a logical framework for assessing the feasibility of cable car systems, (c) identifying station assessment items, and (d) evaluating the assessment items for potential routes by applying the analytic hierarchy process. These aspects can facilitate executing thorough and pragmatic assessments of cable car development projects. Keywords Analytic hierarchy process, assessment framework, cable car Date received: 8 September 2015; accepted: 9 November 2015 Academic Editor: Stephen D Prior Introduction In Taiwan, tourism is flourishing and ecotourism is progressively growing, and tour itineraries are increasingly focusing on mountainous and forest regions. Low-carbon tourism is an approach to cultivating sustainable tourism associated with a low-carbon economy. The core value of low-carbon tourism is to provide a highquality tourism experience that ensures that transportation, accommodation, sightseeing, shopping, and entertainment are associated with low-carbon emissions and reducing pollution. The use of low-carbon evaluation indices for tourist attractions facilitates the promotion of low-carbon tourism. 1 However, balancing tourism and environmental considerations has become critical to the development of the tourism market. Compared with road vehicles, cable cars are environmentally friendly, convenient, and economical. Furthermore, cable cars can provide the following services. 1. Transportation alternatives and traffic alleviation. Cable car systems can overcome landscape barriers and directly connect tourist attractions and major transportation hubs. They can also be used to create new transportation routes, 1 Department of Leisure Management, Minghsin University of Science and Technology, Hsinchu, Taiwan, ROC 2 Department of Leisure Management, Yu Da University of Science and Technology, Chaochiao Township, Taiwan, ROC Corresponding author: Wei-Ling Hsu, Department of Leisure Management, Yu Da University of Science and Technology, No. 168, Hsueh-fu Rd., Tanwen Village, Chaochiao Township, Miaoli County 361, Taiwan, ROC. quartback@hotmail.com Creative Commons CC-BY: This article is distributed under the terms of the Creative Commons Attribution 3.0 License ( which permits any use, reproduction and distribution of the work without further permission provided the original work is attributed as specified on the SAGE and Open Access pages ( open-access-at-sage).

2 2 Advances in Mechanical Engineering effectively replacing and sharing the burden of existing roads while expanding the capacity of transportation services. 2. Connection services between recreational hotspots. Cable cars can systematically connect hotspots and recreational resources, thus saving time and travel costs between hotspots, increasing journey flexibility, and diversifying recreational activities. 3. Outdoor scenery and recreation. Introducing cable cars can provide a completely new perspective for viewing scenery and enjoying recreational activities, enabling tourists to appreciate unique natural views and scenery from the air. Therefore, numerous cable car construction plans have been proposed to concurrently develop the tourism market and address environmental protection concerns. Frameworks for assessing cable car construction investment projects involve numerous factors such as construction technology, geology, market conditions, financing, land acquisition, environmental impacts, and traffic. Such frameworks must incorporate diverse assessment factors and evaluate them on a case-by-case basis. In this study, an assessment framework involving several dimensions and indicators was established using case examples, research reports, and expert opinions. Questionnaires were administered to selected experts to determine the weights of the evaluation dimensions and indicators. The results of this study verified the feasibility of this assessment framework and may serve as a reference in assessing the effectiveness of cable car construction projects for relevant government departments in Taiwan. The remainder of this article is organized as follows. Section Principles of selecting cable car stations and route layouts describes the principles of selecting cable car stations and route layouts. Section Framework for assessing cable car investment projects explains the assessment procedure for the cable car investment projects, which involves establishing assessment dimensions, criteria, and weightings through the analytic hierarchy process (AHP). The results of this study can serve as a reference in feasibility assessments of cable car construction projects for relevant government departments in Taiwan. Principles of selecting cable car stations and route layouts This study was conducted based on approximately 40 cable car assessment projects in Taiwan. The four basic principles governing the selection of stations and route layouts are outlined as follows: 1. The target tourist station and its core capacity should be set as the starting station or terminal station of a route. 2. The exterior of cable car starting stations should have ample space to accommodate affiliated facilities as well as be a gathering place for people and cars. 3. The selection of cable car stations should be based on the available transportation hubs and tourist attractions. 4. A direct route should be selected to attain transportation utility and minimize construction costs. Other principles for developing cable car systems are detailed as follows. Principles of land use and development 1. Preserve the connection with natural forests. 2. Consider the flexibility of future tourism development. 3. Construct a high-quality recreational service environment. 4. Increase the number of living and recreational amenities. Principles of station selection 1. Form a coherent transportation system and mitigate new traffic bottlenecks. 2. Exploit the advantages of transfers between different transportation modalities and minimize traffic conflicts during the construction of cable car stations. 3. Consider transit and parking problems when constructing the stations. 4. Ensure that the base station has a flat terrain. 5. Appropriate land of sufficient size in the surroundings of cable car stations for development. In addition to the provision of adequate space for operating, managing, and repairing cable cars, consider allocating space for passenger disembarkation, recreation, and greenery. 6. Consider building a barrier-free space at cable car stations. 7. Consider environmental protection and maintenance of scenic views to minimize the impact on the existing views. 8. Confirm that the base station is geologically safe.

3 Liu and Hsu 3 Principles of route planning Location setup limitations. Avoid establishing routes in the air or on the ground within 4 m of housing facilities, crowded locations, hazardous storage facilities, electrical wires, railways, roads (except for roads with light traffic), rivers, lakes, and swamps. However, exceptions may be allowed when convincing reasons are provided and when protective barriers are installed to prevent falling objects from causing damage. Setup height. For cabins protruding from stations, maintain a minimum distance of 5 m between the cabin and the ground, but ensure that the cabin height is not excessive. Under safe circumstances with protective measures in place, the minimum distance can be reduced to 1.5 m. Inclination of supporting and propulsion cables. The standard inclination angle of supporting and propulsion cables should be lower than 30. If measures are implemented for strengthening cabin and steel cables, a 45 angle can be used. A standard cable inclination should be maintained between the station and the pillar closest to the station to account for the emergency braking requirements of cable cars entering the station. Spacing for safety 1. To ensure safe emergency rescue operations, in principle, a 1-m distance should be maintained on both sides of the cabin (left and right); under special circumstances, a 3-m distance should be maintained between the bottom of the cabins and any obstacle (such as trees). The distance can be shortened to 2 m if no safety concerns exist. 2. Space should be left between the supporting and propulsion cables in both route directions, and the impact of reaction forces should be considered. For operational safety, a cabin sway space (radius 3 0.2) should be provided in both the directions (or 1 m). 3. When a car is on a two-rail section, a 2-m minimum distance should be maintained between the rails to ensure operational safety. Protective measures. When cable car routes cross above roads, protective measures should be installed on the roads. Others 1. Dead ends should be sufficiently avoided in the route layout to ensure an efficient safety monitoring of the entire route. 2. Vegetation and barriers should be removed from cabin routes that are close to the ground or located in regions that may affect the electrical systems of cable cars. Basic pillars and rescue nets should also be cleared accordingly; however, clearing the parts under the protective net is unnecessary. Framework for assessing cable car investment projects According to the preceding basic principles, the framework for assessing cable car investment projects can be divided into the following categories: 1. First, to confirm the characteristic of an investment project (whether for transportation, tourism, or others), a preliminary analysis should be performed to determine whether a particular location should be included in a list of potential stations. Each hotspot within the region should be assessed according to three dimensions namely, the current situation, demand, and social aspects and then be designated as a starting or intermediate station. 2. After the execution of geological, engineering, and land assessments, potential locations for establishing stations are chosen. If a location fails on any of the three dimensions, it is removed from the list of possible locations. 3. The characteristics of the starting station, terminus, or intermediate station for a potential location are considered collectively to form a possible route, and an integrated evaluation is conducted on each possible route. Initial station assessment The initial assessment of potential stations involves conducting a situational evaluation on the three dimensions: (a) current situation (i.e. the current situation of development in the location), (b) demand (i.e. the future direction of development in the location), and (c) social aspects (i.e. the level of support from the public and government regarding the development of the location). Table 1 extrapolates these dimensions. Conducting evaluations according to these three dimensions provides a preliminary understanding of whether a location should be shortlisted as a potential station for assessment and whether the location being assessed can be designated as a starting or intermediate station. After further geological, engineering, and land assessments are conducted, the locations of potential stations are selected, and the stations are connected to create a possible route. This possible route undergoes an integrated assessment and selection, as described in the following section.

4 4 Advances in Mechanical Engineering Table 1. Initial assessment of potential stations. Assessment dimension Assessment factor Evidence Current situation Commercial or recreational facilities Tourist characteristics Related recreational and natural resources Number of facilities such as shops selling local specialties, restaurants, accommodation, Chinese pavilions, observation decks, and scenic routes Local tourists, typical domestic travelers, group tourists, tourists from Mainland China, and international tourists For example, hot springs, mountains, forest views, river streams and ecological scenery, lake views, waterfalls, cloud falls, unique animals and plants, geological phenomena, and tea plantations Number of attractions nearby and within walking distance Concentration of tourist attractions Demand Traffic demand Examples include the extent of road damage over time around the location and the level required to repair or replace the railway Economic and tourism Examples include agricultural products, aboriginal culture, development demand community settlements, historical architecture, and forest railways Maintenance demand The frequency of road damage near the location and the number of days required for repairs Social aspects Level of support from local The level of support from local opinion leaders and the public opinion leaders and the public Level of policy support from The level of policy support from public departments public departments Cable car feature comparison Over the past century, the technology for cable car systems has developed rapidly. Most cable cars have been constructed in harsh environments such as cold and snowy ski resorts (e.g. Mt Titlis in Switzerland and Chamonix Valley in France), near great waterfalls in regions that are humid all year, near the sea (e.g. Hong Kong and Singapore), in regions affected by salinity, in foggy regions (Huangshan), or at the edge of deserts (e.g. the Great Wall of China). Japan s Hakone Ropeway is subjected to extreme environmental conditions such as hot springs and snow. To date, all these cable cars have been operated safely. Currently, more than 10,000 cable car systems have been constructed worldwide. These aerial tramways and lifts are called ropeways in Japan. The following sections describe these ropeway systems based on their functionality and type: 2 1. Functionality. A. General ropeways. These ropeway systems are used for conveying passengers or cargo, and their compartments contain locking doors. B. Special ropeways. These ropeway systems are used for conveying passengers only, and their compartments contain open seats. 2. Type. A. Reversible type. Ropeway systems in this category can be divided into mono-, bi-, and multicable (three to five cables) systems depending on the number of cables used. The most common system involves tracks containing three or four cables. A reversible conveyor style entails suspending two compartments to a track rope and using traction and balancing ropes to haul and shuttle the compartments back and forth. B. Continuous type. Ropeway systems in this category are primarily divided into fixedand detachable-grip continuous systems, in which the compartments are suspended from a grip connected to cables. Fixed-grip cable car systems are propelled using a single haul rope affixed to each compartment. Detachable-grip systems suspend each compartment from a haul rope. When a compartment enters or exits the station, the grip that is fastened to the cable automatically holds or releases the haul rope to achieve continuous propulsion. Under normal circumstances, because detachable-grip systems can withstand high-traffic demand and enable rapid propulsion, they have been adopted for ropeways that can accommodate high speeds and a large transportation capacity. Fixed-grip cable cars are primarily used in small-scale transportation. Table 2 details the features of these two types of cable car. Cable car project assessment dimensions and criteria establishment Several studies have investigated numerous cable car plans and concepts proposed in Taiwan. Such studies are summarized as follows.

5 Liu and Hsu 5 Table 2. Cable car feature comparison. Terrain suitable for installation Transportation capacity Compartment space Construction costs Travel safety Reference: XEC Ltd. 3 Continuous type This cable car type requires short distances between support towers, necessitating numerous towers and consequently exerting a greater effect on the landscape. For continuous cable cars, multiple compartments are conveyed, and they need not stop for passengers to alight at each station; therefore, such cars can be used to transport more passengers compared with other car types. The compartment capacity is low and suitable for families or small tourist groups. Long routes increase investment costs. However, because the transportation capacity is increased, the cost per unit transport volume is diminished. If the maintenance, type, and components are standardized for monocable detachable-grip systems, construction costs can be further reduced. Because only one steel cable is used, this type is unsuitable for operation during strong winds. In addition, if accidents occur, executing rescue operations is difficult because the numerous compartments may create obstacles. Reversible type This cable car type does not require short distances between towers, thereby reducing the number of support towers and damage to the landscape; thus, it is suitable for terrains featuring canyons. Operation is based on two-compartment propulsion. At certain speeds, the transportation capacity can be reduced by increasing the route length. Because of its high compartment capacity, each shift cable car has a high transportation capacity; therefore, this type is efficient for group transportation. Long routes reduce investment costs. The reduced transportation capacity increases the cost per unit transportation volume; however, maintenance costs are low. Compartments are heavy and unsuitable for operation during inclement weather. However, if accidents occur, rescue operations can be quickly conducted because of the availability of special equipment. Sun applied the AHP and established a two-layer model structure, which entailed considering 5 evaluation factors and 13 evaluation criteria, for enhancing cable car site selection. The proposed hierarchical evaluation framework was optimized after consulting specialists. A specialist questionnaire was designed on the basis of the hierarchical framework and was used in determining the relative weight of the evaluation factors and criteria. The site selection procedure conducted for the Beitou cable car was adopted to verify the feasibility of applying the AHP in site selection. The proposed hierarchical framework and decision model can be used as a reference for future cable car site selection. 4 Chen 5 also applied the AHP to evaluate the feasibility of constructing a cable car system between Tataka and the main peak of Yushan at the Yushan National Park. Chou studied the feasibility of establishing a high-mountain cable car system and investigated the planning and evaluation procedures conducted for the Nantou cable car line, located in Ren ai Township, Nantou County. A specialist questionnaire was administered in this study, and the AHP was employed to calculate and order the weights of evaluation factors of the cable car construction in Ren ai, Nantou. Moreover, crucial criteria used in establishing the cable car system were compared for providing suggestions for relevant agencies. 6 Ma investigated tourist attitudes toward highmountain cable cars and conducted a case study of the Kukuan and Mt Anma areas. The recreation opportunity spectrum, attitude theory, and relevant studies constituted the theoretical basis of this research. A questionnaire survey was administered to tourists, and independent sample t tests, the chi-square test, one-way analysis of variance, and Duncan s new multiple-range test were used to analyze tourist attitudes toward such cable cars. 7 Tsou adopted social judgment theory (SJC) to analyze cable car construction in Kaohsiung. SJC pertains to the deviation between the subjective perceptions of decision-makers and an objective environment as well as the competing subjective perceptions among decisionmakers.tsou also discussed reasons for cognitive dissonance and examined approaches for reducing cognitive dissonance in public decision-making. Key decisionmaking variables obtained from interviews were implemented in an SJC-based questionnaire to clearly examine the level of cognitive dissonance among decision-makers. This examination was conducted to provide governmental departments with a reference for devising policies and response measures since they face similar disputes. 8 Lin and Chang 9 used a geographic information system to analyze various aspects of site selection for the Beitou cable car system; such aspects included recreational factors, safety, environmental influences, and

6 6 Advances in Mechanical Engineering Project Characteristic Legal Feasibility Integrated feasibility assessment Financial feasibility assessment Environmental feasibility assessment Social feasibility assessment Transport feasibility assessment Market feasibility assessment Land assessment Assessment of engineering techniques Feasibility of geological environment Initial assessment of station location Many limiting conditions A low degree of compromise Few limiting conditions A high degree of compromise Figure 1. Framework for assessing cable car investment projects. impact on the lives of inhabitants of local communities. Although studies on cable car construction in Taiwan have widely adopted the AHP as an assessment method, they differed substantially in their assessment dimensions and index content. Moreover, these studies have not proposed assessment considerations of domestic cable car construction cases regarding the promotion of public participation, but they have mostly rated possible schemes and assessment indices directly. However, evaluating assessment indices is complex, and directly rating them is difficult. Therefore, in this article, we propose a revision of the hierarchical evaluation framework and a paired comparison to establish a revised evaluation mode. Accordingly, a comprehensive literature review and in-depth interview with experts were conducted. Figure 1 and Table 3 show the cable car assessment dimensions, criteria, and bases. The following sections detail the establishment of the evaluation mode. Integrated assessment and selection of routes Construction of assessment criteria and weightings. The AHP has been used in diverse applications, 10 including the development of transportation strategies In this study, the AHP literature 14,15 was extended by addressing the necessity of prioritizing numerous alternatives exhibiting high heterogeneity. The AHP has many advantages over other analysis methods in that it facilitates simplifying complex decision-making problems by decomposing them into hierarchies, and it is simple enough to be understood by nonprofessionals. Therefore, in this study, we examined the validity of the AHP in evaluating the sustainability of cable car construction projects. Generating priorities through an organized decision-making process entails breaking down a decision into several hierarchies according to the following steps: 1. Define the decision problem. 2. Identify the actors involved. 3. Establish a hierarchical framework. 4. Design a questionnaire: This step enables obtaining a paired comparison matrix A. If n factors are compared, then the number of paired comparisons that must be conducted is n(n 2 1)/2. Because of the reciprocal property of paired comparisons, if the ratio between elements i and j is a ij, then the ratio between elements j and i is 1=a ij. Similarly, the lower triangular matrix of the paired comparison matrix A is the reciprocal of the upper triangular matrix, as shown in equation (1) a 12 a 1n 1=a 12 1 a 2n A = a ij = =a 1n 1=a 2n w 1 =w 1 w 1 =w 2 w 1 =w n w 2 =w 1 w 2 =w 2 w 2 =w n = w n =w 1 w n =w 2 w n =w n ð1þ

7 Liu and Hsu 7 Table 3. Feasibility assessment dimensions and criteria for cable car construction. Dimensions Assessment criteria Assessment Basis E1 Construction technology feasibility E11 Geological conditions Active faults, soil geology, landslides, water and soil conservation, geotechnical engineering, debris flows, and earthquake concerns E12 Terrain conditions Hinterland, slope, hydrology, flooding, and forest physiognomy matters E13 Climate conditions Effects of wind direction and speed, lightning, rainfall, temperature, humidity, and fog E14 Cable car system construction and maintenance Transportation capacity, model type, power load length (span), station configuration, tower height and construction methods, power system, and various maintenance and management concerns E2 Land acquisition feasibility E21 Zoning restrictions Reconstruction zoning plans, land-use regulations, public versus private land, urban versus rural land, land management authorities, property size, land acquisition methods, and land rezoning matters E22 Air rights Whether air rights for the region over which cable car routes span can be obtained E23 Land acquisition costs Land expropriation fees, gratuitous versus nongratuitous appropriation, and compensation for building demolition E3 Traffic feasibility E31 Transportation function Transportation functions, vehicle load capacity, travel time efficiency, and energy savings and carbon reduction concerns E32 Road network integrity Traffic feasibility in addition to railway and roadway integration concerns E33 Disaster relief needs Disaster relief functions E4 Market feasibility E41 Demand and growth Passenger volume and travel appeal E42 Market competition Market competition and investment intentions and investment intentions E5 Legal feasibility E51 Public construction Legality of public construction related regulations, such as the Act for the Promotion of Private Participation in Infrastructure Projects, plan approval, and funding subsidies E52 Economic taxation Legality of economic taxation related regulations, such as land taxes, profit-seeking enterprise income taxes, and provisions related to tax incentives E53 Tourism business activities Legality of regulations relevant to tourism business operations such as designated scenic areas and tourism development regulations E54 Environmental impact assessment Legality of environmental impact assessment regulations, such as the Environmental Impact Assessment Act and the Soil and Water Conversation Act, as well as provisions related to national land restoration, water conservation, and hillside management E6 Social feasibility E61 Public expectations in the region Degree of public anticipation and acceptance, local planning, and socioeconomic development E62 Public-sector policies Master plans and the administrative policies of various public sectors E7 Financial feasibility E71 Investment scale Construction and maintenance costs E72 Return on investment Internal rate of return, net present value, and self-liquidating ratios E8 Environmental feasibility E73 Payback period E81 Effects on the cultural environment E82 Effects on the natural environment E83 Effects on the ecological environment Investment recovery period Effects on the cultural history of the region, lifestyles of the residents, industrial/economic activities of local businesses, and recreation quality Effects on landscape and environmental resources, environmental carrying capacity, noise, hydrology/water quality, land parcel changes, and air quality as well as the prevalence of acute mountain sickness Effects on ecological conservation, environmental sensitivity, and rare flora and fauna; noise pollution should also be considered where w i represents the element weight of i; i =1, 2,..., n and a ij represents the relative importance ratio between elements, i = 1, 2,..., n; j =1, 2,..., n. 5. Calculate the eigenvalue and eigenvector: The geometric mean can be obtained by multiplying elements in every row and then normalizing the value, as expressed in equation (2) W i = P n i = 1 Q n j = 1 Q n j = 1 a ij!1 n!1, i, j = 1, 2,..., n ð2þ n a ij A new eigenvector, Wi 0, is derived by multiplying the paired comparison matrix A with the obtained

8 8 Advances in Mechanical Engineering Table 4. Cable car construction assessment dimension and criteria analysis results. Feasibility analysis dimensions Dimension weight Assessment criteria Assessment criteria Weight E1 Construction technology feasibility E11 Geological conditions E12 Terrain conditions E13 Climate conditions E14 Cable car system construction and maintenance E2 Land acquisition feasibility E21 Zoning restrictions E22 Air rights E23 Land acquisition costs E3 Traffic feasibility E31 Transportation function E32 Road network integrity E33 Disaster relief needs E4 Market feasibility E41 Demand and growth E42 Market competition and investment intentions E5 Legal feasibility E51 Public construction E52 Economic taxation E53 Tourism business activities E54 Environmental impact assessment E6 Social feasibility E61 Public expectations in the region E62 Public-sector policies E7 Financial feasibility E71 The scale of investment E72 Return on investment E73 Payback period E8 Environmental feasibility E81 Effects on the cultural environment E82 Effects on the natural environment E83 Effects on the ecological environment eigenvector W i. Moreover, l max is obtained by dividing every vector of W 9 i by the corresponding original vector W i, and then calculating the arithmetic mean of every derived value l max = 1 W1 0 + W W 0 n ð3þ n W 1 W 2 W n 6. Execute a consistency test: This step involves conducting a consistency test to determine the consistency index (CI), as expressed in equation (4). Saaty suggested that the most satisfactory CI is \0.1 and that the highest allowable bias is CI \0.2; if the CI falls within this range, consistency is ensured. This is expressed as follows CI = l max n n 1 ð4þ Table 4 shows the results of the paired comparisons conducted in this study. The designed survey was completed by 14 experts (10 county government supervisors, 2 township office supervisors, and 2 construction consultancy company supervisors). The survey was used to evaluate the 8 dimensions and 24 evaluation criteria. Integrated assessment and selection When the assessment dimensions and criteria weights determined by the specialists satisfied the consistency requirements, the weights and each scheme were applied in determining the priority index (PI) in every assessment index. The PI was obtained by calculating the weight W i and score X ij of each scheme i derived from each index PI i = Xn j = 1 W j X ij ð5þ The specialists directly rated the score X ij of each scheme i obtained from each index. Because evaluating every assessment index is complex, we proposed conducting a paired comparison of the schemes. The advantage weight of each index was considered its score, and the calculation method was identical to the described weight evaluation method executed using the paired comparison matrix. Conclusion This study adopted a mixed design comprising literature reviews, observations, and interviews. We performed focus-group interviews for qualitatively studying and devising the assessment dimensions. A quantitative multicriteria decision analysis was also conducted. This study primarily focused on evaluating cable car construction schemes in order to establish a hierarchical evaluation framework based on the characteristics of cable car construction assessments in

9 Liu and Hsu 9 Taiwan. This evaluation framework incorporates diverse assessment factors weighted according to individual case differences. According to the Act for Promotion of Private Participation in Infrastructure Projects and related feasibility studies, the established framework can serve as an assessment scheme in practical applications. In addition, on the basis of the assessment indicators, we derived potential recommendations to conduct paired comparisons and rankings and calculated the scores of the various schemes. This approach avoids appraisal difficulties associated with the direct allocation of scores to various schemes using assessment indicators. We suggest that follow-up studies extend the established framework to analyze the difference in weights associated with assessment dimensions and criteria, which are defined by experts from different units, such as the central government or local government, or experts in different areas. In this study, the relative importance in the pairwise comparison matrix was defined as a crisp value. However, the experts mostly applied semantic expressions in their subjective assessments. Therefore, followup research may consider applying fuzzy semantic expressions. Declaration of conflicting interests The author(s) declared no potential conflicts of interest with respect to the research, authorship, and/or publication of this article. Funding The author(s) received no financial support for the research, authorship, and/or publication of this article. References 1. Cheng Q, Su B and Tan J. Developing an evaluation index system for low-carbon tourist attractions in China a case study examining the Xixi wetland. Tourism Manage 2013; 36: Li C-M. Alpine cable car set up and management case. Taipei, Taiwan: Council for Economic Planning and Development, XEC Ltd. An early stage feasibility assessment of the Alishan cable car. Chiayi, Taiwan: Alishan National Scenic Area Administration, Tourism Bureau, MOTC, Sun WS. Application of AHP analysis on Gondola site selection mode in Beitou cable aerial tramway. Hsinchu, Taiwan: Department of Technology Management, Chung Hua University, Chen Y-f. Yushan Nation Park: the possidility of an air cable car from TATAKA area to Yushan main teak. Chiayi, Taiwan: Department of Tourism Management, Nanhua University, Chou Y-M. The research of the establishment feasibility of cable car in the high mountain area as an example in Nantou County. Taichung, Taiwan: Transportation Technology and Management, Feng Chia University, Ma H-L. A study on visitors attitude towards the development of Alpine Cable Car a case study of Kukuan and Mt. Anma areas. Taichung, Taiwan: College of Construction and Development, Feng Chia University, Tsou T-Y. To analyze the cognitive conflict in public policy decisions illustrated by the construction of cable car in Kaohsiung. Kaohsiung, Taiwan: College of Management, National Sun Yat-sen University, Lin Y-C and Chang K-F. A GIS application study for installation choices of sightseeing Gondola stations in the Yang-Ming mountain areas. J DE LIN Inst Tech 2009; 23: Saaty TL and Shang JS. An innovative orders-ofmagnitude approach to AHP-based multi-criteria decision making: prioritizing divergent intangible humane acts. Eur J Oper Res 2011; 214: Shiau T-A and Liu J-S. Developing an indicator system for local governments to evaluate transport sustainability strategies. Ecol Indic 2013; 34: Shiau T-A. Evaluating sustainable transport strategies for the counties of Taiwan based on their degree of urbanization. Transp Policy 2013; 30: Kolosz B, Grant-Muller S and Djemame K. Modelling uncertainty in the sustainability of Intelligent Transport Systems for highways using probabilistic data fusion. Environ Modell Softw 2013; 49: Saaty TL. Decision making with dependence and feedback: the analytic network process. Pittsburgh, PA: RWS Publications, Saaty TL. Decision-making with the AHP: why is the principal eigenvector necessary. Eur J Oper Res 2003; 145:

ScienceDirect. Analytic Hierarchy Process of Academic Scholars for Promoting Energy Saving and Carbon Reduction in Taiwan

ScienceDirect. Analytic Hierarchy Process of Academic Scholars for Promoting Energy Saving and Carbon Reduction in Taiwan Available online at www.sciencedirect.com ScienceDirect Procedia Environmental Sciences 20 ( 2014 ) 526 532 The 4 th International Conference on Sustainable Future for Human Security, SustaiN 2013 Analytic

More information

RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION

RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION Cheng-I Hou 1, Han-Chen Huang 2*, Yao-Hsu Tsai 3, Chih-Yao Lo 4 1 Department of Leisure Management, Yu Da University of

More information

Apply Fuzzy AHP to the Principal Selection Systems

Apply Fuzzy AHP to the Principal Selection Systems Apply Fuzzy AHP to the Principal Selection Systems Chen Chin Lung Dept. of Ed. Policy and Ad., National Chi Nan University, Taiwan a97070@yahoo.com.tw Sung Fang Chun Dept. of Ed. Policy and Ad., National

More information

Selection of Festival Planners: Application of Modified Delphi Method and Analytic Hierarchy Process

Selection of Festival Planners: Application of Modified Delphi Method and Analytic Hierarchy Process Journal of Social Sciences Original Research Paper Selection of Festival Planners: Application of Modified Delphi Method and Analytic Hierarchy Process 1 Han-Chen Huang, 2 Su-Ling Wu, 3 Pei-Ying Wu and

More information

International Journal of Information Technology and Business Management 29 th March, Vol.35 No JITBM & ARF. All rights reserved

International Journal of Information Technology and Business Management 29 th March, Vol.35 No JITBM & ARF. All rights reserved A STUDY ON THE INDICATOR-WEIGHT EVALUATION OF CITY COMPETITIVENESS IN THE SELECTION OF CONVENTION/EXHIBITION VENUE FOR MICE INDUSTRY DEVELOPMENT: USING TAIPEI CITY AS AN EXAMPLE Mei-Hsien Huang 1, Tracy

More information

E-Commerce Logistics Mode Selection Based on Network Construction

E-Commerce Logistics Mode Selection Based on Network Construction Modern Economy, 2019, 10, 198-208 http://www.scirp.org/journal/me ISSN Online: 2152-7261 ISSN Print: 2152-7245 E-Commerce Logistics Mode Selection Based on Network Construction Hanlin Qian School of Business

More information

Application of the Fuzzy Delphi Method and the Fuzzy Analytic Hierarchy Process for the Managerial Competence of Multinational Corporation Executives

Application of the Fuzzy Delphi Method and the Fuzzy Analytic Hierarchy Process for the Managerial Competence of Multinational Corporation Executives International Journal of e-education, e-business, e-management and e-learning, Vol., No., August 0 Application of the Fuzzy Delphi Method and the Fuzzy Analytic Hierarchy Process for the Managerial Competence

More information

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants International Journal of Engineering Research and Development ISSN: 78-067X, Volume 1, Issue 7 (June 01), PP.4-51 Use of AHP Method in Efficiency Analysis of Existing Treatment Plants Madhu M. Tomar 1,

More information

Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry

Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry 4.1 Introduction During the past decade with increasing environmental concerns, a consensus, the

More information

USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS

USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS Hsin-Pin Fu, Department of Marketing and Distribution Management, National Kaohsiung First University of Science and

More information

A Study of Key Success Factors when Applying E-commerce to the Travel Industry

A Study of Key Success Factors when Applying E-commerce to the Travel Industry International Journal of Business and Social Science Vol. 3 No. 8 [Special Issue - April 2012] A Study of Key Success Factors when Applying E-commerce to the Travel Industry Yang, Dong-Jenn Associate Professor

More information

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools 5 MCDM Methods 5.1 INTRODUCTION The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools for analyzing complex real problems due to their inherent ability to judge different

More information

PRIORITISATION OF ROAD CORRIDORS BY DEVELOPING COMPOSITE INDEX

PRIORITISATION OF ROAD CORRIDORS BY DEVELOPING COMPOSITE INDEX ISSN (Online) : 2319-8753 ISSN (Print) : 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology An ISO 3297: 2007 Certified Organization, Volume 2, Special Issue

More information

The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the Selection of Best Water Supply Source for Benin City

The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the Selection of Best Water Supply Source for Benin City Nigerian Journal of Environmental Sciences and Technology (NIJEST) www.nijest.com Vol 1, No. 1 March 2017, pp 169-176 The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the

More information

Evaluation of Urban Rail Transit Planning

Evaluation of Urban Rail Transit Planning First International Conference on Economic and Business Management (FEBM 2016) Evaluation of Urban Rail Transit Planning Musheng Tian School of Mathematics and Physics, China University of Geosciences,

More information

Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process

Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process Proceedings of IOE Graduate Conference, 2016 pp. 239 244 Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process Rojan Shrestha 1, Shree Raj Sakya 2 1,2 Department of Mechanical

More information

An Approach of Contractor Selection By Analytical Heirarchy Process

An Approach of Contractor Selection By Analytical Heirarchy Process An Approach of Contractor Selection By Analytical Heirarchy Process Multi Criteria Decision Making System Meghalkumar I Zala (PG Student) Master of Engineering in Construction Eng. & Management Birla Vishvakarma

More information

Knowledge-Based Systems

Knowledge-Based Systems -Based Systems 22 (2009) 363 367 Contents lists available at ScienceDirect -Based Systems journal homepage: www.elsevier.com/locate/knosys An measurement model for knowledge management Yuan-Feng Wen *

More information

Research on Security Assessment Model of Water Supply System Based on Leakage Control

Research on Security Assessment Model of Water Supply System Based on Leakage Control Available online at www.sciencedirect.com Procedia Environmental Sciences 11 (2011 ) 749 756 Research on Security Assessment Model of Water Supply System Based on Leakage Control Li Hong wei¹, Li Yan jing

More information

Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning

Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning J. Farhan & T. F. Fwa Department of Civil Engineering, National University of Singapore, Singapore ABSTRACT: In pavement management,

More information

Article Railway Continuous Prestressed Concrete Bridge Design in Ballastless Track Turnout Zones

Article Railway Continuous Prestressed Concrete Bridge Design in Ballastless Track Turnout Zones Article Railway Continuous Prestressed Concrete Bridge Design in Ballastless Track Turnout Zones Wen-Kuei Hsu 1, *, Neng-Hao Shih 2, and Yu-Lin Lee 3, 1 Southern Region Engineering Office, Railway Reconstruction

More information

The Application of Factor Analysis in Construction Project Post-evaluation Hai Yan Zhang 1, a,jin Wei Zhao2,b

The Application of Factor Analysis in Construction Project Post-evaluation Hai Yan Zhang 1, a,jin Wei Zhao2,b International Forum on Energy, Environment Science and Materials (IFEESM 2017) The Application of Factor Analysis in Construction Project Post-evaluation Hai Yan Zhang 1, a,jin Wei Zhao2,b 1 Building And

More information

RECONFIGURING STRATEGY POLICY PORTFOLIOS FOR TAIWAN S TOURISM INDUSTRY DEVELOPMENT WITH A NOVEL MODEL APPLICATION

RECONFIGURING STRATEGY POLICY PORTFOLIOS FOR TAIWAN S TOURISM INDUSTRY DEVELOPMENT WITH A NOVEL MODEL APPLICATION RECONFIGURING STRATEGY POLICY PORTFOLIOS FOR TAIWAN S TOURISM INDUSTRY DEVELOPMENT WITH A NOVEL MODEL APPLICATION by Horng, Jeou-Shyan De Lin Institute of Technology, Taipei, Taiwan E-mail: t10004@ntnu.edu.tw

More information

COMPARISON OF THE COMPETITIVENESS OF PEONY INDUSTRIAL CLUSTERS BETWEEN HEZE AND LUOYANG, CHINA

COMPARISON OF THE COMPETITIVENESS OF PEONY INDUSTRIAL CLUSTERS BETWEEN HEZE AND LUOYANG, CHINA International Journal of Economics, Commerce and Management United Kingdom Vol. IV, Issue 2, February 2016 http://ijecm.co.uk/ ISSN 2348 0386 COMPARISON OF THE COMPETITIVENESS OF PEONY INDUSTRIAL CLUSTERS

More information

Approaches of Setting SAIDI Target Value for Taiwan Power System

Approaches of Setting SAIDI Target Value for Taiwan Power System Approaches of Setting SAIDI Target Value for Taiwan Power System S. C. Hsu*, F. C. Lu**, S. L. Chen*, Y. F. Chuang***, C. M. Lin*** and Mark Lauby**** This paper presents a method for setting the annual

More information

RAINWATER HARVESTING AN ALTERNATE WATER RESOURCES IN TAIWAN

RAINWATER HARVESTING AN ALTERNATE WATER RESOURCES IN TAIWAN RAINWATER HARVESTING AN ALTERNATE WATER RESOURCES IN TAIWAN Kwong Fai Andrew Lo Immediate Past President, International Rainwater Catchment Systems Association (IRCSA) Department of Natural Resources Chinese

More information

Vision, Goals, and Metrics. Draft

Vision, Goals, and Metrics. Draft Vision, Goals, and Metrics Draft July 28, 2014 WHY MOUNTAIN ACCORD? Mountain Accord is a collaborative effort that will make critical, integrated decisions regarding the future of Utah's Central Wasatch

More information

EXPLORING THE INTERMODAL PASSENGER TRANSFER OF A HIGH SPEED RAIL SYSTEM

EXPLORING THE INTERMODAL PASSENGER TRANSFER OF A HIGH SPEED RAIL SYSTEM EXPLORING THE INTERMODAL PASSENGER TRANSFER OF A HIGH SPEED RAIL SYSTEM Assistant Professor Department of Transportation and Communication Management Science National Cheng Kung University No.1, University

More information

Design and key technology of coal mine safety monitoring system based on analytic hierarchy process (AHP) 1

Design and key technology of coal mine safety monitoring system based on analytic hierarchy process (AHP) 1 Acta Technica 62 No. 1A/2017, 179 190 c 2017 Institute of Thermomechanics CAS, v.v.i. Design and key technology of coal mine safety monitoring system based on analytic hierarchy process (AHP) 1 Gao Xiaoxu

More information

Presentation Program Outline

Presentation Program Outline Presentation Program Outline MASTERPLAN PROCESS EFFECTIVE PLANNING ELEMENTS DECISION MAKING PROCESS ANALYTICAL HIERARCHY PROCESS (AHP) HOW TO APPLY AHP SIMPLE EXAMPLE CASE STUDY APPLICATION WHDS MDP Decision

More information

Sustainable development through desert tourism planning: a SWOT approach

Sustainable development through desert tourism planning: a SWOT approach Sustainable Tourism IV 59 Sustainable development through desert tourism planning: a SWOT approach M. Sabokkhiz & S. Sabokkhiz University of Isfahan, College of Engineering, Department of Surveying and

More information

International Journal of Science and Research (IJSR)

International Journal of Science and Research (IJSR) 1 Xidian University, School of Economics & Management, No. 2 South Taibai Road, Xi an, Shaanxi, China Risk Evaluation of Inter-Enterprise Cooperative R&D Projects Zhan Ying Abstract: Under the background

More information

Group Decision Support System for Multicriterion Analysis A Case Study in India

Group Decision Support System for Multicriterion Analysis A Case Study in India Group Decision Support System for Multicriterion Analysis A Case Study in India K. Srinivasa Raju Department of Civil Engineering, S.E.S.College of Engineering, Kopargaon 423 603, Maharashtra, India D.Nagesh

More information

Research on the Evaluation of the New Energy Auto Industry Innovation System

Research on the Evaluation of the New Energy Auto Industry Innovation System Management Science and Engineering Vol. 5, No. 4, 2011, pp. 1-6 DOI:10.3968/j.mse.1913035X20110504.171 ISSN 1913-0341[Print] ISSN 1913-035X[Online] www.cscanada.net www.cscanada.org Research on the Evaluation

More information

A study on Supply Chain issues of Indian Railway in Samastipur division using AHP technique

A study on Supply Chain issues of Indian Railway in Samastipur division using AHP technique A study on Supply Chain issues of Indian Railway in Samastipur division using AHP technique Saurabh Bhardwaj 1, C.S. Jawalkar 2 1,2 Department of Production and Industrial Eng., PEC University of Technology,

More information

Risk Evaluation of Railway Coal Transportation Network Based on Multi Level Grey Evaluation Model

Risk Evaluation of Railway Coal Transportation Network Based on Multi Level Grey Evaluation Model IOP Conference Series: Earth and Environmental Science PAPER OPEN ACCESS Risk Evaluation of Railway Coal Transportation Network Based on Multi Level Grey Evaluation Model To cite this article: Wei Niu

More information

Transportation Problems and Issues Excerpts from WWW Links

Transportation Problems and Issues Excerpts from WWW Links Transportation Problems and Issues Excerpts from WWW Links Reference Bok, D. (2018). Transportation policy and planning. https://www.hks.harvard.edu/courses/transportation-policy-and-planning Transportation

More information

The Importance-Weights Determination of the Safety Factors of Fishing Ports in Zhuhai via the AHP Method

The Importance-Weights Determination of the Safety Factors of Fishing Ports in Zhuhai via the AHP Method Advances in Computer Science Research, volume nd International Conference on Computer Engineering, Information Science & Application Technology (ICCIA 0) The Importance- Determination of the Safety Factors

More information

Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast

Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast Journal of Electrical Engineering 5 (2017) 151-156 doi: 10.17265/2328-2223/2017.03.005 D DAVID PUBLISHING Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast Blagoja Stevanoski and Natasa

More information

A feasibility evaluation on the outsourcing of quality testing and inspection

A feasibility evaluation on the outsourcing of quality testing and inspection Available online at www.sciencedirect.com International Journal of Project Management 27 (2009) 89 95 www.elsevier.com/locate/ijproman A feasibility evaluation on the outsourcing of quality testing and

More information

Analytical hierarchy process (AHP) approach to the selection of heritage building element

Analytical hierarchy process (AHP) approach to the selection of heritage building element Analytical hierarchy process (AHP) approach to the selection of heritage building element Siti Nor Fatimah Zuraidi 1, Mohammad Ashraf Abdul Rahman 2, Zainal Abidin Akasah 3 1,2 Facutly of Engineering Technology,

More information

A study of quantity control over hillside development in Taipei County area

A study of quantity control over hillside development in Taipei County area A study of quantity control over hillside development in Taipei County area T.-Y Hsiao &Y-H.YU Graduate Institute of Environmental Engineering, National Taiwan University, Taipei Taiwan. Abstract Hillsides

More information

The Research of Internet Information Services on the Impact of Tourism Decision-Making

The Research of Internet Information Services on the Impact of Tourism Decision-Making Send Orders for Reprints to reprints@benthamscience.ae 84 The Open Cybernetics & Systemics Journal, 25,, 84-845 Open Access The Research of Internet Information Services on the Impact of Tourism Decision-Making

More information

Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management

Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management Chun-Min Su, Cheng-Tsair Yang and Jiunn-Haur Shaw Center for Measurement Standards/ITRI, Taiwan NCSLI 2011, National

More information

MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process

MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process Business Intelligence and Decision Making Professor Jason Chen The analytical hierarchy process (AHP) is a systematic procedure

More information

Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach

Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach Dr. Lamay Bin Sabir Assistant Professor, Al-Barkaat Institute of Management Studies, Aligarh +91-9045968133 Abstract In

More information

An Analytical Tool For Assessing The Performance Of The Emergency Preparedness Machine

An Analytical Tool For Assessing The Performance Of The Emergency Preparedness Machine An Analytical Tool For Assessing The Performance Of The Emergency Preparedness Machine Davide Manca, Sara Brambilla, Simona Caragliano Dipartimento di Chimica, Materiali e Ingegneria Chimica Giulio Natta

More information

Analysis and Design of the Logistics System for Rope Manufacturing Plant

Analysis and Design of the Logistics System for Rope Manufacturing Plant Analysis and Design of the Logistics System for Rope Manufacturing Plant Xue Sun 1,2,*, Chao-Chin Wu 3, and Liang-Rui Chen 2 1 College of Urban Rail Transit and Logistics, Beijing Union University, Beijing,

More information

Research on the Cross-cultural Marketing Strategy of China s Tourism Enterprises *

Research on the Cross-cultural Marketing Strategy of China s Tourism Enterprises * Available online at www.sciencedirect.com Procedia Environmental Sciences 12 (2012 ) 1110 1115 2011 International Conference on Environmental Science and Engineering (ICESE 2011) Research on the Cross-cultural

More information

Post-disaster Relocating Plan for Aboriginal Tribes After Chi-Chi Earthquake

Post-disaster Relocating Plan for Aboriginal Tribes After Chi-Chi Earthquake Post-disaster Relocating Plan for Aboriginal Tribes After Chi-Chi Earthquake P.C. Shao 1 and E. Tarumi 2 1 Assistant Professor, Dept. of Land Management and Development, Chang Jung University, Chinese

More information

Design and analysis of application engineering talent cultivation based on AHP and QFD. Yanchun Xia

Design and analysis of application engineering talent cultivation based on AHP and QFD. Yanchun Xia International Conference on Management Science, Education Technology, Arts, Social Science and Economics (MSETASSE 2015) Design and analysis of application engineering talent cultivation based on AHP and

More information

The construction technology of Chongqing Chaotianmen Bridge

The construction technology of Chongqing Chaotianmen Bridge The construction technology of Chongqing Chaotianmen Bridge Zhongfu Xiang School of Civil Engineering & Architectures, Chongqing Jiaotong University, Chongqing, China Wei Xu China zhongtie major bridge

More information

SELECTION OF RAIL IMPROVEMENT PROJECTS USING THE ANALYTIC NETWORK PROCESS (ANP)

SELECTION OF RAIL IMPROVEMENT PROJECTS USING THE ANALYTIC NETWORK PROCESS (ANP) SELECTION OF RAIL IMPROVEMENT PROJECTS USING THE ANALYTIC NETWORK PROCESS (ANP) J. Montesinos-Valera. P. Aragonés-Beltrán. J.P. Pastor-Ferrando. Department of Engineering Projects Universidad Politécnica

More information

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE *

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE * 2017 3rd International Conference on Applied Mechanics and Mechanical Automation (AMMA 2017) ISBN: 978-1-60595-479-0 Application of AHP in Education Legislation Project Ying-ying YAO and Yong-sheng GE

More information

Flooding Vulnerability Assessment A Case Study of Hou-Jing Stream in Taiwan

Flooding Vulnerability Assessment A Case Study of Hou-Jing Stream in Taiwan Flooding Vulnerability Assessment A Case Study of Hou-Jing Stream in Taiwan Doi:10.5901/mjss.2013.v4n10p513 Abstract Meng-Ru Tsay Department of Urban Planning, National Cheng Kung University, Tainan City

More information

A Strategic Model for Cleaner Production Implementation In a Paper Making Mill

A Strategic Model for Cleaner Production Implementation In a Paper Making Mill A Strategic Model for Cleaner Production Implementation In a Paper Making Mill P. Ghorbannezhad, M. Azizi, M. Layeghi* Department of Wood & Paper Science & Technology University of Tehran E-mail: Payam.gs2008@gmail.com

More information

Tourism Informatization Research under the Mode of Internet of Things. Gangzhi Guo

Tourism Informatization Research under the Mode of Internet of Things. Gangzhi Guo 6th International Conference on Machinery, Materials, Environment, Biotechnology and Computer (MMEBC 2016) Tourism Informatization Research under the Mode of Internet of Things Gangzhi Guo School of Culture

More information

A Study of Visitors, on Destination Image, Environmental Perception, Travel Experiences and Revisiting Willingness in Xinshe Leisure Agriculture Park

A Study of Visitors, on Destination Image, Environmental Perception, Travel Experiences and Revisiting Willingness in Xinshe Leisure Agriculture Park A Study of Visitors, on Destination Image, Environmental Perception, Travel Experiences and Revisiting Willingness in Xinshe Leisure Agriculture Park Chu-Chu, Liao Abstract The main purpose of this study

More information

Avalon Airport Rail Link. Community and Stakeholder Issues and Ideas Report Understanding what s important. December 2011

Avalon Airport Rail Link. Community and Stakeholder Issues and Ideas Report Understanding what s important. December 2011 Avalon Airport Rail Link Community and Stakeholder Issues and Ideas Report Understanding what s important 6 December 2011 1. 1. Introduction The Victorian Government committed $3 million in the 2011-12

More information

Proposal for using AHP method to evaluate the quality of services provided by outsourced companies

Proposal for using AHP method to evaluate the quality of services provided by outsourced companies Available online at www.sciencedirect.com ScienceDirect Procedia Computer Science 55 (2015 ) 715 724 Information Technology and Quantitative Management (ITQM 2015) Proposal for using AHP method to evaluate

More information

Submitted to the Grand Rapids Community College Provost and AGC Executive Committee.

Submitted to the Grand Rapids Community College Provost and AGC Executive Committee. Oscar Neal Fall 2012 Sabbatical Report Submitted to the Grand Rapids Community College Provost and AGC Executive Committee. The main objective of my sabbatical was to complete my dissertation proposal

More information

Introduction. Analytical Hierarchy Process. Why AHP? 10/31/2011. The AHP is based on three principles: Decomposition of the decision problem

Introduction. Analytical Hierarchy Process. Why AHP? 10/31/2011. The AHP is based on three principles: Decomposition of the decision problem Introduction A multi-criteria decision making process. Analytical Hierarchy Process The analytical hierarchy process (AHP) is a comprehensive, logical and structured framework. 56:134 Process Engineering

More information

Mountain Transportation Study

Mountain Transportation Study EXECUTIVE SUMMARY Salt Lake County and its study partners including the Utah Department of Transportation (UDOT), the Utah Transit Authority (UTA), the United States Forest Service (USFS), Salt Lake City,

More information

Gyeong-Seok Byun Korea Institute of Civil Engineering and Building Technology (KICT) Corresponding Author Gyeong-Seok Byun

Gyeong-Seok Byun Korea Institute of Civil Engineering and Building Technology (KICT) Corresponding Author Gyeong-Seok Byun International Journal Of Engineering Research And Development e- ISSN: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 14, Issue 7 (July Ver. I 2018), PP.78-84 Information Provision Service Improvement

More information

A Decision Support System for Performance Evaluation

A Decision Support System for Performance Evaluation A Decision Support System for Performance Evaluation Ramadan AbdelHamid ZeinEldin Associate Professor Operations Research Department Institute of Statistical Studies and Research Cairo University ABSTRACT

More information

Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change

Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change 1. Background and rationale Mountains exist in many regions of the world and are home to a significant fraction of the world

More information

Selection of medical waste logistic firms by using AHP-TOPSIS methodology

Selection of medical waste logistic firms by using AHP-TOPSIS methodology Selection of medical waste logistic firms by using AHP-TOPSIS methodology GULCIN BUYUKOZKAN and FETHULLAH GOCER Industrial Engineering Department, Galatasaray University, 34349 Ortakoy, Istanbul, TURKEY

More information

Introduction of Taoyuan Aerotropolis. Economic Development Bureau, Taoyuan County Government

Introduction of Taoyuan Aerotropolis. Economic Development Bureau, Taoyuan County Government Introduction of Taoyuan Aerotropolis Economic Development Bureau, Taoyuan County Government About Taoyuan 2 Area 1,220 km 2 Population Mayor Boroughs 2.05 million Wu, John Chih-Yang 5 cities, 8 townships

More information

Earthquake Damage Assessment System for New Taipei City

Earthquake Damage Assessment System for New Taipei City Earthquake Damage Assessment System for New Taipei City * Chia-Chuan Hsu 1) and Yu-Chi Sung 2) 1) Bridge Division, NCREE, Taipei 10668, Taiwan 2) Department of Civil Engineering, NTUT, Taipei 10608, Taiwan

More information

Article 7. COMMERCIAL AND MIXED USE ZONES

Article 7. COMMERCIAL AND MIXED USE ZONES COMMERCIAL AND MIXED USE ZONES 24-21 Article 7. COMMERCIAL AND MIXED USE ZONES Sections: 24-21 Purpose of the Commercial and Mixed Use s 24-22 Land Use Regulations for Commercial and Mixed Use s 24-23

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Section 3: 2020 Plan for Henderson County AGRICULTURE ELEMENT. Introduction

Section 3: 2020 Plan for Henderson County AGRICULTURE ELEMENT. Introduction AGRICULTURE ELEMENT Introduction Henderson County has a long history of agricultural production, and agriculture is highly valued by urban residents and rural communities. It joins tourism, retirement,

More information

Application of a quantification SWOT analytical method

Application of a quantification SWOT analytical method Mathematical and Computer Modelling 43 (2006) 158 169 www.elsevier.com/locate/mcm Application of a quantification SWOT analytical method Hsu-Hsi Chang, Wen-Chih Huang Department of Harbor and River Engineering,

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation

More information

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies

Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka 11.1 Issues, Objectives and Policies . Business and Industrial Areas Queenstown, Frankton, Arrowtown and Wanaka.1 Issues, Objectives and.1.1 Resources, Activities and Values Business activities occur throughout the commercial, service and

More information

2013, IJARCSSE All Rights Reserved Page 392

2013, IJARCSSE All Rights Reserved Page 392 Volume 3, Issue 11, November 2013 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Risk Analysis

More information

Decision Science Letters

Decision Science Letters Decision Science Letters 2 (213) 35 311 Contents lists available at GrowingScience Decision Science Letters homepage: www.growingscience.com/dsl Evaluation of university performance using BSC and ANP Ali

More information

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT Saleh Abu Dabous and Sabah Alkass Department of Building, Civil and Environmental Engineering, Concordia University, Rm: EV-6139 1455 de Maisonneuve,

More information

The Evaluation of the Organizational Performance with Fuzzy Analytic Hierarchy Process- Take the Semiconductor Industry in Taiwan as Example

The Evaluation of the Organizational Performance with Fuzzy Analytic Hierarchy Process- Take the Semiconductor Industry in Taiwan as Example The Evaluation of the Organizational Performance with Fuzzy Analytic Hierarchy Process- Take the Semiconductor Industry in Taiwan as Example Chen Iong- Rong, Ph.D. candidate of Business School, Fu Jen

More information

Management Science Letters

Management Science Letters Management Science Letters 1 (2011) 29 40 Contents lists available at GrowingScience Management Science Letters homepage: www.growingscience.com/msl Designing fuzzy expert system for creating and ranking

More information

Application of system dynamics with GIS for assessing traffic emission management policy

Application of system dynamics with GIS for assessing traffic emission management policy Application of system dynamics with GIS for assessing traffic emission management policy L. Chen and W.-L. Yang Department of Water Resources & Environmental Engineering, Tamkang University, Tam-Shui,

More information

Keywords- AHP, Operating System, MCDM, Linux, Mac, Windows.

Keywords- AHP, Operating System, MCDM, Linux, Mac, Windows. Volume 4, Issue 5, May 2014 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Operating System

More information

Key Knowledge Generation Publication details, including instructions for author and Subscription information:

Key Knowledge Generation Publication details, including instructions for author and Subscription information: This article was downloaded by: Publisher: KKG Publications Registered office: 18, Jalan Kenanga SD 9/7 Bandar Sri Damansara, 52200 Malaysia Key Knowledge Generation Publication details, including instructions

More information

AN ANALYSIS OF DEVELOPING LOGISTICS STRATEGY OF CONVENTIONAL RAILWAY COMPANY: A CASE STUDY OF TAIWAN RAILWAY ADMINISTRATION

AN ANALYSIS OF DEVELOPING LOGISTICS STRATEGY OF CONVENTIONAL RAILWAY COMPANY: A CASE STUDY OF TAIWAN RAILWAY ADMINISTRATION AN ANALYSIS OF DEVELOPING LOGISTICS STRATEGY OF CONVENTIONAL RAILWAY COMPANY: A CASE STUDY OF TAIWAN RAILWAY ADMINISTRATION Yung-Hsiang CHENG Assistant Professor Department of Logistics Management National

More information

Weighted Summation (WSum)

Weighted Summation (WSum) Table of Contents Weighted summation...1/6 1 Introduction...1/6 2 Methodology...1/6 3 Process...1/6 3.1 Value functions and standardization methods...2/6 3.2 Weighting methods...2/6 4 Review...3/6 4.1

More information

SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5

SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5 SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5 Understanding the needs of users and customers, Introduce IT technologies to make railways more attractive Y. Perréal, Thales Transportation

More information

An Empirical Research of the Performance Evaluation Index of Synergic Supply for the Rural Public Goods

An Empirical Research of the Performance Evaluation Index of Synergic Supply for the Rural Public Goods Proceedings of the 7th International Conference on Innovation & Management 107 An Empirical Research of the Performance Evaluation Index of Synergic Supply for the Rural Public Goods Wang Dawei, Mo Dongyan

More information

The Analytic Hierarchy Process Based Supplier Selection Approach for Collaborative Planning Forecasting and Replenishment Systems

The Analytic Hierarchy Process Based Supplier Selection Approach for Collaborative Planning Forecasting and Replenishment Systems The Analytic Hierarchy Process Based Selection Approach for Collaborative Planning Forecasting and Replenishment Systems Rajesh A. Kubde Associate Professor, Mechanical Engineering Department. Prof. Ram

More information

Humanities and Social Sciences

Humanities and Social Sciences Humanities and Social Sciences 2016; 4(2): 34-41 http://www.sciencepublishinggroup.com/j/hss doi: 10.11648/j.hss.20160402.13 ISSN: 2330-8176 (Print); ISSN: 2330-8184 (Online) Effectiveness Evaluation of

More information

Evaluation index system for positive operation of water conservancy projects

Evaluation index system for positive operation of water conservancy projects Water Science and Engineering, 2009, 2(4): 110-117 doi:10.3882/j.issn.1674-2370.2009.04.011 http://kkb.hhu.edu.cn e-mail: wse@hhu.edu.cn Evaluation index system for positive operation of water conservancy

More information

Human Resource Development Project for Seismic Engineering and Construction of Buildings I. Project Outline II. Result of the Evaluation

Human Resource Development Project for Seismic Engineering and Construction of Buildings I. Project Outline II. Result of the Evaluation Internal Ex-Post Evaluation for Technical Cooperation Project Country Name People Republic of China I. Project Outline Background Objectives of the Project Activities of the project conducted by China

More information

Research on Comprehensive Evaluation Index System of Software Outsourcing Personnel Training Jingxian Wang

Research on Comprehensive Evaluation Index System of Software Outsourcing Personnel Training Jingxian Wang 2nd International Conference on Education, Management and Information Technology (ICEMIT 2015) Research on Comprehensive Evaluation Index System of Software Outsourcing Personnel Training Jingxian Wang

More information

Product quality evaluation system based on AHP fuzzy comprehensive evaluation

Product quality evaluation system based on AHP fuzzy comprehensive evaluation Journal of Industrial Engineering and Management JIEM, 2013 6(1):356-366 Online ISSN: 2013-0953 Print ISSN: 2013-8423 http://dx.doi.org/10.3926/jiem.685 Product quality evaluation system based on AHP fuzzy

More information

THE REGION S PLAN POLICY FRAMEWORK. August 2015

THE REGION S PLAN POLICY FRAMEWORK. August 2015 THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,

More information

A CHOICE OF A PERSPECTIVE SYSTEM FOR VIBRATION ISOLATION IN CONDITIONS OF VARYING ENVIRONMENT 1

A CHOICE OF A PERSPECTIVE SYSTEM FOR VIBRATION ISOLATION IN CONDITIONS OF VARYING ENVIRONMENT 1 ISAHP 2001, Berne, Switzerland, August 2-4, 2001 A CHOICE OF A PERSPECTIVE SYSTEM FOR VIBRATION ISOLATION IN CONDITIONS OF VARYING ENVIRONMENT 1 Alexander Andreichicov and Olga Andreichicova Volgograd

More information

WHAT WE HEARD. Phase 1 Engagement Swartz Bay Terminal Development Planning. What we heard. In collaboration with

WHAT WE HEARD. Phase 1 Engagement Swartz Bay Terminal Development Planning. What we heard. In collaboration with WHAT WE HEARD Phase 1 Engagement Swartz Bay Terminal Development Planning What we heard In collaboration with Phase 1 Engagement 1 Content 4 Overview 5 What We Did 6 What We Heard 6 Better Food Services

More information

4.10 LAND USE ENVIRONMENTAL SETTING

4.10 LAND USE ENVIRONMENTAL SETTING 4.10 LAND USE 4.10.1 ENVIRONMENTAL SETTING The proposed Project consists of construction and operation of two 8-inch crude oil pipelines (within one trench) and equipment for storage and pumping from the

More information

EXPERIMENTAL STUDY ON LOAD CAPACITIES OF ISOLATED HEAVY-DUTY SCAFFOLDS USED IN CONSTRUCTION

EXPERIMENTAL STUDY ON LOAD CAPACITIES OF ISOLATED HEAVY-DUTY SCAFFOLDS USED IN CONSTRUCTION Advanced Steel Construction Vol. 10, No. 3, pp. 248-273 (2014) 248 EXPERIMENTAL STUDY ON LOAD CAPACITIES OF ISOLATED HEAVY-DUTY SCAFFOLDS USED IN CONSTRUCTION Jui-Lin Peng 1,*, Chung-Ming Ho 2, Chenyu

More information

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY International Journal of Decision Making in Supply Chain and Logistics (IJDMSCL) Volume 2, No. 1, January-June 2011, pp. 15-23, International Science Press (India), ISSN: 2229-7332 VENDOR RATING AND SELECTION

More information

RFID ADOPTION MODEL FOR TAIWAM S LOGISTICS SERVICE PROVIDERS

RFID ADOPTION MODEL FOR TAIWAM S LOGISTICS SERVICE PROVIDERS ADOPTION MODEL FOR TAIWAM S LOGISTICS SERVICE PROVIDERS Ling-Lang Tang *, Wei-Chen Tsai Graduate School of Management, Yuan Ze University 135, Yuan-Tung Road, Chung-Li, Taoyuan, 320, Taiwan, R.O.C. *Corresponding

More information