GIRASSOL FPSO HULL DECK REPAIR BY BONDED REINFORCEMENTS
|
|
- Francis Dominic Foster
- 6 years ago
- Views:
Transcription
1 NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 GIRASSOL FPSO HULL DECK REPAIR BY BONDED REINFORCEMENTS Eduardo LUILA -Total E&P Angola J.P. COURT - COLDPAD
2 Content 1. Introduction 2. Description Block 17 Operations FPSO GIRASSOL 3. Problem Context 4. Repair Methodology Options for Repair Assessment of repair methods ColdShield System Description 5. Conclusion
3 Introduction Localized corrosion identified in main deck of GIRASSOL FPSO exceeding acceptance criteria and requiring repair. Analysis made of repair options showed that Bonded reinforcement Pad is the best alternative, to avoid hot works and reduce impact in production.
4 Description (1/2) Block 17 Operations BLOC 17 : 4 FPSO & offloading buoys Block 17 GIRASSOL DALIA Design Production Capacity: barrels/day Design Production Capacity: barrels/day PAZFLOR CLOV Design Production Capacity: barrels/day Design Production Capacity: barrels/day
5 Description (2/2) Girassol FPSO Girassol FPSO First oil: 2001 Size : 300 m x 60 m x 30 m Storage : barrels Water depth: From 1250 m to 1400 m Design Production Capacity: barrels/day Classification Society: Bureau Veritas
6 Problem Context Localized corrosion on main deck due to coating failure / damage. Some corrosion spots are beyond the acceptance criteria set by per the International Association Classification Societies (IACS). Corrosion spots are either top of cofferdam, crude oil or water ballast tanks. Class recommendation issued to repair the critical corroded spots. Need to minimize production and safety impact of such repair.
7 Options for Repair 3 options for the repair: 1. Weld Build up localized spots 2. Insert plate possible for repair of larger areas 3. Bonded reinforcement Pads (ColdShield)
8 Assessment of repair methods 1. Weld Build up Limited applicability if damage is moderate as per IACS rules. 2. Insert plate Hot works in hydrocarbon tanks Painting repairs inside tanks Safety Application in open sea condition 3. Bonded reinforcement Pads No major constraints and disruption in terms of HSE and production.
9 COLDSHIELD Safe, Reliable & Adapted to Offshore conditions COLDSHIELD = Bonded structural safety reinforcement for FPSO hull Deck Side shell Longitudinal or transverse frames Crude Oil Tanks / Sea Water Ballast Tanks
10 COLDSHIELD Structural reinforcement of corroded hull & deck Base Material (existing) COLDSHIELD Rigid Plate (New) Target Area for Connection (prepared surface) Peripheral Seal Pressure Reduction Control of Internal Atmospheric Parameters Vacuum-Injection Structural Polymer Isolated Internal Volume Attraction Forces Polymer Seal Compression 10
11 COLDSHIELD key take aways Peripheral protection frame ENVELOPPE Compressed Seal Protection Plate Resin Composite REINFORCEMENT Damaged Steel Plate e.g. Corroded FPSO Hull Standard shape 0,5 to 5 m² COLDSHIELD restores Initial Structural Capacity & Protect Against Further Corrosion 10m² = 2 days x 4 pax Or ~150 saved mandays
12 COLDSHIELD Reliabity throughout the life cycle Onsite survey Onshore preparation Offshore Installation Life cycle management Repeatable process whatever weather conditions are Easy access for integrity monitoring Process controlled environment Adequate inspection and repair if needed Full traceability of installation process
13 Conclusions Due to the severity of the localized corrosion main deck needs to be repaired. ColdShield has been jointly developed and validated by TOTAL R&D department & COLD PAD and approved by both BV and ABS as permanent repair methodology. Implementation of ColdShield system on top of Hydrocarbon tanks minimize the hot works and operation disruptions. Intended for permanent installation with an anticipated service life of >10 years A specific life cycle inspection test plan will be implemented (New technology)
Classification of the Largest Ever Floating Storage Regasification Unit
NH GRAND HOTEL KRASNAPOLSKY AMSTERDAM 3-5 APRIL 2017 Classification of the Largest Ever Floating Storage Regasification Unit Philippe CAMBOS Bureau Veritas AGENDA 1. Introduction 2. The project 3. Liquid
More informationOIL PLATFORMS, DESTROYERS AND FRIGATES - CASE STUDIES OF QINETIQ S MARINE COMPOSITE PATCH REPAIRS. Farnborough, Hampshire, GU14 OLX, UK
OIL PLATFORMS, DESTROYERS AND FRIGATES - CASE STUDIES OF QINETIQ S MARINE COMPOSITE PATCH REPAIRS ABSTRACT T J Turton a, J Dalzel-Job b, F Livingstone b a Future Systems Technology, QinetiQ, Cody Technology
More informationContents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book.
Table of Preface Acknowledgments How to Use This Book page xv xix xxi 1 Overview of Ship-Shaped Offshore Installations...1 1.1 Historical Overview of Offshore Structure Developments 1 1.1.1 Early History
More informationHull Surveys for Liquefied Gas Carriers
(May 2007) (Rev.1 Nov 2007) (Rev.2 Mar 2009) (Rev.3 July 2011) Hull Surveys for Liquefied Gas Carriers CONTENTS 1. General 1.1 Application 1.2 Definitions 1.3 Repairs 1.4 Thickness measurements and close-up
More informationMireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH
Mireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH FPSO LIFE EXTENSION: OUTLINE INTRODUCTION TOTAL WOLDWIDE FPSO FLEET LIFE EXTENSION CONCLUSIONS 2 INTRODUCTION INTRODUCTION Life extension
More informationON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17)
17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) HOW TO DEVELOP AN ECONOMICAL SMALL CAPACITY FLOATING
More informationFurmanite s engineered composite repair technology
Introducing Furmanite s engineered composite repair technology Dr Paul Hill CEng Director Furmanite Center of Excellence Composite Repairs Corporate Headquarters: Furmanite Worldwide Inc. 2435 North Central
More informationBELZONA COMPOSITE SOLUTIONS. Wrap and Plate Bonding Technology for New Build and Maintenance Situations
BELZONA COMPOSITE SOLUTIONS Wrap and Plate Bonding Technology for New Build and Maintenance Situations NOVEL SOLUTIONS TO AGE-OLD PROBLEMS Plate bonding Asset installation Composite wraps Belzona SuperWrap
More informationPart 0 - Classification and Surveys Classification and Surveys I Classification and Surveys I
This edition of GL rules & guidelines is the latest and current edition. Previous editions of GL rules & guidelines, as well as all DNV GL rules and supporting documents, are available from https://www.dnvgl.com/rules-standards.
More informationOTC Abstract. Introduction
OTC 15315 An Innovative "No Hot Work" Approach to Hull Repair on In-Service FPSOs Using Sandwich Plate System Overlay Stephen J. Kennedy, James Bond, and Dale Braun, Intelligent Engineering Limited; Peter
More informationCorrigenda 1. Rule Editorials
COMMON STRUCTURAL RULES FOR BULK CARRIERS JULY 2012 Corrigenda 1 Rule Editorials Notes: (1) These Rule Corrigenda enter into force on 1st July 2012. (2) These Rule Corrigenda should be read in conjunction
More informationPROTECTING. Pipeline Infrastructure.
PROTECTING Pipeline Infrastructure. RADIUS SUBTERRA Utilising our vast experience and specialist proven technologies in pipeline rehabilitation and protection, we provide clients with the safest and most
More informationSafety of bulk carriers - prime concern of the maritime community
Safety of bulk carriers - prime concern of the maritime community D. Beghin Bureau Veritas, Paris, France ABSTRACT Further to the severe damages which occurred in the recent years on bulk carriers, the
More informationHull damage experience in CSR tankers
MARITIME Hull damage experience in CSR tankers TSCF SBM, Busan October 2016 Ivar Håberg Senior Principle Surveyor, DNV GL SAFER, SMARTER, GREENER Using data to identify improvement opportunities for the
More informationTechnical Information
Subject Format Revision of Condition Evaluation Report (CER) To whom it may concern Technical Information No. TEC-1092 Date 17 November 2016 When Special is carried out for ships applying Enhanced Program(ESP),
More informationInformation Paper on Oil Tanker In-Service Structural Survey Regimes
Tanker Structure Co-operative Forum Information Paper on Oil Tanker In-Service Structural Survey Regimes SUMMARY This paper reviews the current regime of inspection requirements for oil tankers including
More informationINSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP)
INSPECTION GRADING CRITERIA FOR THE ABS HULL INSPECTION AND MAINTENANCE PROGRAM (HIMP) OUR MISSION The mission of ABS is to serve the public interest as well as the needs of our members and clients by
More informationHull Surveys for General Dry Cargo Ships
(June 2002) Hull Surveys for General Dry Cargo Ships CONTENTS 1. General 1.1 Application 1.2 Definitions 1.3 Repairs 2. Special Survey 2.1 Schedule 2.2 Scope 2.2.1 General 2.2.2 Dry Dock Survey 2.2.3 Tank
More informationFatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France
Fatigue strength of knuckle joints - a key parameter in ship design D. Beghin Marine Division, Bureau Veritas, Paris, France Abstract Structural integrity of knuckle joints in inner hull for double hull
More informationRak Production Technology of Concrete Structures (2015) Concrete Reinforcement
Rak-82-2121 Production Technology of Concrete Structures (2015) Concrete Reinforcement 09.10.2015 1 Learning Outcomes To acquaint the student with concrete reinforcement 2 Reinforcement The of concrete
More informationImpact of Harmonized CSR for oil tanker
Impact of Harmonized CSR for oil tanker UnChul Choi Hundai Heavy Industries Co., Ltd, Ulsan, Korea Abstract This paper covers the design experience for oil tankers designed by the Harmonized
More informationCAPABILITY STATEMENT. Tank Repair
CAPABILITY STATEMENT Tank Repair page 1 of 7 Introduction Eptec is a specialist industrial contractor in Asset Preservation and Rehabilitation. Our expertise is engineered solutions using resin technology
More informationShipRight Notice for. Linked Supporting Services Anti-Corrosion System Notation, July Issue date: September 2014
ShipRight Notice for Linked Supporting Services Anti-Corrosion System Notation, July 2012 The status of this Rule set is amended as shown and is now to be read in conjunction with this and prior Notices.
More informationUse of Underwater Dry Welding for In Situ Repair to Offshore Structures. Elleftheria Deligeorges; Jai Tulsi
Use of Underwater Dry Welding for In Situ Repair to Offshore Structures Elleftheria Deligeorges; Jai Tulsi engineering@neptunems.com 11/03/2015 In Situ Welding Steel Structures Suitability of Repair Methods
More informationContents EN 14015:2004 (E) page
Contents page Foreword... 11 1 Scope... 12 2 Normative references... 13 3 Terms, definitions, symbols and abbreviations... 15 3.1 Terms and definitions... 15 3.2 Symbols... 19 3.3 Abbreviations... 21 4
More informationHull Structure Assessments of the U.S. Coast Guard's High Endurance Cutters, Application of Reliability Methodology to Aging Ship Structure
Hull Structure Assessments of the U.S. 's High Endurance Cutters, Application of Reliability Methodology to Aging Ship Structure 1 Introduction Objective Approach Required Input Desired Outcomes Discussion
More informationInsulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):
SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society
More informationGUIDANCE FOR CHECKING THE STRUCTURE OF BULK CARRIERS
INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T1/2.01 MSC/Circ.1117 24 June 2004 GUIDANCE FOR CHECKING THE STRUCTURE OF BULK
More informationUse of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above
(1978) (Rev.1 1980) (Rev.2 1996) (Rev.3 May 2002) Rev.4 July 2003) (Rev.5 Sept 2007) (Rev.6 May 2010) (Rev.7 Apr 2013) (Rev.8 Dec 2015) (Rev.9 July 2018) Use of Steel Grades for Various Hull Members -
More informationMICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER
MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER INSTITUTE OF PETROLEUM MICROBIALLY-INFLUENCED CORROSION IN DOUBLE-HULL TANKERS A SCOPING PAPER March 2001 Published by The Institute
More informationContents EN :2008+A1:2011 (E) Page
Contents Page Foreword... 9 Introduction... 10 1 Scope... 11 2 Normative references... 12 2.1 General... 12 2.2 Constituent products... 12 2.2.1 Steels... 12 2.2.2 Steel castings... 14 2.2.3 Welding consumables...
More informationTECHNICAL SPECIFICATION DANTECO HERMANNS. CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device
TECHNICAL SPECIFICATION DANTECO HERMANNS CONTAINER FOR BULK POWDER Equipped with HERMANNS Aeration and Conveyance Device 6058(20') x 2438(8') x 2591(8'6") MODEL NO. : CX09-20SNX1 SPEC. NO : CX09-20SNX1-S3
More informationIMO ANY OTHER BUSINESS. Verification of technical standards for ship construction. Submitted by the United Kingdom
INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 48th session Agenda item 24 DE 48/INF.6 17 December 2004 ENGLISH ONLY ANY OTHER BUSINESS Verification of technical standards
More informationMSC Guidelines for Review of Structural Plans for Wooden Vessels
K. B. Ferrie, CDR, Chief, Hull Division References: a. Lloyd s Register Rules and Regulations for the Classification of Yachts and Small Craft (Amended to 1983) b. 1943 ABS Rules for Building and Classing
More informationComposite Solutions for the Automotive Industry
Composite Solutions for the Automotive Industry 2 COMPOSITE SOLUTIONS FOR THE AUTOMOTIVE INDUSTRY Reduce weight. Reduce costs. Increase quality. Henkel offers composite solutions for the automotive industry.
More informationViega Seapress. The Press System Especially for Shipbuilding.
Viega Seapress The Press System Especially for Shipbuilding. Viega A better Idea! Some things last Even more than 115 years later. At Viega, innovation and entrepreneurial vision are now more alive than
More informationCOMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS. By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK
COMPOSITES - CASE STUDIES OF PIPELINE REPAIR APPLICATIONS By Andrew J. Patrick, Clock Spring Company, L.P., Huntingdon, UK ABSTRACT Composite repairs have been utilised within the transmission pipeline
More informationCathodic Protection Electrolytic Antifouling
Cathodic Protection Electrolytic Antifouling CATHWELL AS Cathodic Protection Electrolytic Antifouling Business concept Cathwell AS is specialized in providing solutions for cathodic protection and water
More informationNEW DESIGN OF SUEZMAX CLASS TANKER PRESENTED BY : HYUNDAI HEAVY INDUSTRIES CO., LTD.
NEW DESIGN OF SUEZMAX CLASS TANKER PRESENTED BY : HYUNDAI HEAVY INDUSTRIES CO., LTD. AT TANKER STRUCTURE CO-OPERATIVE FORUM 2000 SHIPBUILDERS MEETING TOKYO, OCTOBER 2000 ABSTRACT NEW DESIGN OF SUEZMAX
More informationMadewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)
Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 Product Guide Specification SECTION 03935 RESTORATION MORTAR AND EPOXY
More informationTRELLINE. hoses. TRELLINE hoses Catalogue TRELLEBORG FLUID HANDLING SOLUTIONS
EN TRELLINE hoses TRELLINE hoses Catalogue www.trelleborg.com/oilandmarinehoses TRELLEBORG FLUID HANDLING SOLUTIONS Trelleborg group, leader in polymer solutions Trelleborg is a world leader in engineered
More informationREBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH
Guide for Rebuilding Vessels Less Than 90 Meters (295 Feet) in Length and Barges of Any Length GUIDE FOR REBUILDING VESSELS LESS THAN 90 METERS (295 FEET) IN LENGTH AND BARGES OF ANY LENGTH NOVEMBER 2014
More informationMadewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)
Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 PART 1 GENERAL Product Guide Specification SECTION 03935 SPRAYABLE MICROSILICA
More informationSTEEL BARGES 1991 RULES FOR BUILDING AND CLASSING. NOTICE NO. 8 September The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2003.
RULES FOR BUILDING AND CLASSING STEEL BARGES 1991 NOTICE NO. 8 September 2002 The following Rule Changes are EFFECTIVE AS OF 1 JANUARY 2003. SECTION 7 PART B MAIN FRAMING TANK BARGES 7B.3 Double Skin Tank
More informationNot Repeating the Past - A Case Study of Fatigue Fracture in Midship Cargo Tanks
Not Repeating the Past - A Case Study of Fatigue Fracture in Midship Cargo Tanks Ryan Salamati ABS, Hamburg Germany Dr. Michael B. Kennedy Hellespont Ship Management GmbH & Co. KG, Hamburg Germany Abstract
More informationRULES PUBLICATION NO. 62/P HULL SURVEYS OF GENERAL DRY CARGO SHIPS July
RULES PUBLICATION NO. 62/P HULL SURVEYS OF GENERAL DRY CARGO SHIPS 2017 July Publications P (Additional Rule Requirements) issued by Polski Rejestr Statków complete or extend the Rules and are mandatory
More informationLNG Carriers Ship Life Extension. Ed Waryas. Lloyd s Register North America, Inc.
LNG Carriers Ship Life Extension Ed Waryas Lloyd s Register North America, Inc. Longevity Study - Outline Owners Records Classification Records Ship inspection RAM Study Structural Integrity Analysis Owner
More informationImplementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO
INNOVATIVE MARITIME SOFTWARE Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO Kevin Brunn, Head of Clients & Markets, Maritime Software, DNV GL Tanker
More informationHow Passive Fire Protection (PFP) Works
Objectives How passive fire protection (PFP) works Testing and certification requirements for epoxy PFP Main factors that determine PFP thickness Advantages of Pyroclad X1 Estimating a project Sample specification
More informationReview of ASME Guidance Articles on Repair Strategies
Review of ASME Guidance Articles on Repair Strategies Clay Rodery BP Chemicals Technology & Engineering Member/ASME Post Construction Standards Committee ASME PCC-2: Repair of Pressure Equipment and Piping
More informationFatigue Life Extension Procedure by Ultrasonic Peening. Luis Lopez Martinez LETS Global Version 2 July 2010
Delegation of The Netherlands IIW Doc. XIII-2316-10 Commission XIII Working Group 2 Fatigue Life Extension Procedure by Ultrasonic Peening Luis Lopez Martinez LETS Global Version 2 July 2010 Abstract The
More informationExternal Reinforcement System
(Revised October 2013) Specifications of SMC Water Tank Product External Reinforcement System DOHA INDUSTRY CO., LTD. Table of Contents 1. General Matters A. Scope of Application B. Product Requirements
More informationFixed covers are dished upward and anchored to the top of the tank wall.
Steel digester covers are either fixed or floating: Fixed covers are dished upward and anchored to the top of the tank wall. Floating type covers move vertically in the tank and are designed to float either
More informationEQUIPMENT DESIGN LECTURE TANKS, VESSELS & DRUMS - MECHANICAL DESIGN
EQUIPMENT DESIGN LECTURE 12-13 TANKS, VESSELS & DRUMS - MECHANICAL DESIGN ١ ٢ ٣ LIQUID STORAGE TANKS : Vertical cylindrical tanks, with flat bases and conical roofs, are universally used for the bulk storage
More informationDOUBLE WALLED PIPING SYSTEMS
DOUBLE WALLED PIPING SYSTEMS The design and construction of a double wall pipe is more complex than a single wall pipe because of the additional pipe, associated welds and tie in procedures. There are
More informationBridge Preservation Beyond the Short Term
Bridge Preservation Beyond the Short Term Anwar S. Ahmad, P.E. Bridge Preservation Engineer Federal Highway Administration Louisiana Transportation Conference Baton Rouge, LA January 12, 2011 Presentation
More informationABS TECHNICAL PAPERS 2003 ASSESSMENT OF CORROSION RISKS TO AGING SHIPS USING AN EXPERIENCE DATABASE
Proceedings of OMAE 2003 22 nd International Conference on Offshore Mechanics and Arctic Engineering 8-13 JUNE 2003, CANCUN, MEXICO OMAE2003-37299 ASSESSMENT OF CORROSION RISKS TO AGING SHIPS USING AN
More informationUsing advanced technologies to reduce costs and improve quality & safety Vicky J. Machera Director Southern Europe, Maritime Software
Using advanced technologies to reduce costs and improve quality & safety Vicky J. Machera Director Southern Europe, Maritime Software Tanker Operator Conference April 3 rd 2012 Athens www.gl-maritime-software.com
More informationPOST CONSTRUCTION COMMITTEE ASME (PCC-2) REPAIR AND TESTING
POST CONSTRUCTION COMMITTEE ASME (PCC-2) REPAIR AND TESTING Contents of this presentation: Scope, organization, and intent ASME PCC Organization Subcommittee ASME PCC-2 Integrating Standards for Inspection
More informationBondstrand Marine Piping Systems
Bondstrand Marine Piping Systems Bondstrand Marine Pipe Systems Historically, ship owners have faced the grim reality of continuously replacing most metal piping because of severe corrosion. This results
More informationW-17 Clad Steel Plate
Guideline No.W-17(201510) W-17 Clad Steel Plate Issued date: 20 th October 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains technical requirements, inspection
More informationInformation Paper on Cargo Tank Corrugated Bulkhead Damages of Double Hull Tankers
Tanker Structure Co-operative Forum Information Paper on Cargo Tank Corrugated Bulkhead Damages of Double Hull Tankers SUMMARY The paper reviews current corrugated bulkhead design practise and provides
More informationContainer Securing Devices
STANDARD FOR CERTIFICATION No. 2.23 Container Securing Devices JULY 2011 The content of this service document is the subject of intellectual property rights reserved by Det Norske Veritas AS (DNV). The
More informationPRESENT STATUS AND FUTURE DEVELOPMENT FOR THE DESIGN AND CONSTRUCTION OF DOUBLE HULLS TANKERS
PRESENT STATUS AND FUTURE DEVELOPMENT FOR THE DESIGN AND CONSTRUCTION OF DOUBLE HULLS TANKERS PRESENTED BY: MITSUBISHI HEAVY INDUSTRIES, LTD. AT TANKER STRUCTURAL CO-OPERATIVE FORUM 2000 SHIPBUILDERS MEETING
More informationFATIGUE ASSESSMENT OF BILGE KNUCKLEJOINT OF VLCC ACCORDING TO JTP/JBP RULES
FATIGUE ASSESSMENT OF BILGE KNUCKLEJOINT OF VLCC ACCORDING TO JTP/JBP RULES 1. DESCRIPTION OF TEST AND EXPERIMENTAL RESULTS The model was a bilge knuckle section for a double hull VLCC in approximately
More informationGS-Hydro Non-Welded Piping Solutions for Offshore
GS-Hydro Non-Welded Piping Solutions for Offshore Customer environment Customers GS-Hydro s non-welded piping systems are used in a number of applications in the offshore market. Drilling packages, ring
More informationTRELLINE hoses. Catalogue 2012
EN TRELLINE hoses Catalogue 2012 Trelleborg group, leader of elastomers Trelleborg is a global industrial group whose leading positions are based on advanced polymer technology and in-depth applications
More informationAB-1020 EP Dust Free Vacuum Blast Machine
AB-1020 EP Dust Free Vacuum Blast Machine This compact electric-pneumatic driven injection vacuum blasting machine with an average blasting pattern of 16 mm width, is excellent to apply for blast cleaning
More informationGuideline for Ultrasonic Thickness Measurements of ships classed with Det Norske Veritas
Guideline for Ultrasonic Thickness Measurements of ships classed with Det Norske Veritas Det Norske Veritas MTPNO864 September 2004 1 Table of content 1. Objective and applicability 3 2. Terms and abbreviations
More informationFor Bridge Decks, Buildings and Construction.
For Bridge Decks, Buildings and Construction www.stirlinglloyd.com INNOVATION AND EXPERIENCE Since 1970 Stirling Lloyd has been involved in the development, manufacture and application of specialist membrane
More informationRULES FOR THE CLASSIFICATION OF SHIPS
RULES FOR THE CLASSIFICATION OF SHIPS 2013 Part 2 - HULL Amendments No. 1 CROATIAN REGISTER OF SHIPPING Hrvatska (Croatia) 21000 Split Marasovićeva 67 P.O.B. 187 Tel.: (...) 385 (0)21 40 81 11 Fax.: (...)
More informationABS TECHNICAL PAPERS 2003 ESTIMATION OF CORROSION RATES OF STRUCTURAL MEMBERS IN OIL TANKERS
Proceedings of OMAE 2003 22 nd International Conference on Offshore Mechanics and Arctic Engineering 8-13 JUNE 2003, CANCUN, MEXICO OMAE2003-37361 ESTIMATION OF CORROSION RATES OF STRUCTURAL MEMBERS IN
More informationCTS1 TANK SEALS LIQUID MOUNTED PRIMARY SHOE PLATE SEAL. Features
CTS1 LIQUID MOUNTED PRIMARY SHOE PLATE SEAL The CTS1 liquid mounted shoe plate seal has been developed into a market leading efficient and reliable shoe plate seal, often replacing outdated shoe plate
More informationFibaRoll as the best solution for corrosion protection & prevention
FibaRoll as the best solution for corrosion protection & prevention FibaRoll What is it? UV curing Glass Reinforced Polymer (GRP) Supplied in rolls 0.6m/1m x 10m FibaRoll FibaRoll cures with sunlight or
More informationSteel Tank Structures. By Eric MacFarlane, SE, PE, LEED AP
Steel Tank Structures By Eric MacFarlane, SE, PE, LEED AP Presentation Topics: 1. What is a Tank? 2. Tank Dimensional Characteristics. 3. Tank Operational Characteristics. 4. Tank Component Parts (Tank
More informationYOUR SINGLE-SOURCE INDUSTRIAL SERVICE PROVIDER
BUSINESS OVERVIEW 2 AND BUSINESS PHILOSOPHY Southey is a leader in providing fabric maintenance, insulation, repair and maintenance services to clients throughout Africa and the Middle East. These services
More informationZ10.2 Z10.2. Hull Surveys of Bulk Carriers
1992 (Rev.1 1994) (Rev.2 1994) (Rev.3 1995) (Rev.4 1996) (Rev.5 1996) (Rev.6 1996) (Rev.7 1997) (Rev.8 April 1998) (Rev.9 July 1999) (Rev.10 Sept. 2000) (Rev.10.1 Sept. 2000) (Rev.11 Nov. 2000) (Rev.11.1
More informationGuideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013
Guideline on Türk Loydu Hull Inspection and Maintenance Program-Grading for Findings During Inspections 2013 This latest edition incorporates all rule changes. The latest revisions are shown with a vertical
More informationPulsed Eddy-Current (PEC) Inspection through Insulation
INDUSTRIAL SERVICES WHITE PAPER PULSED EDDY CURRENT Pulsed Eddy-Current (PEC) Inspection through Insulation Method statement of an advanced non-destructive testing technique for inspection through insulation.
More informationCathodic Protection Electrolytic Antifouling
Cathodic Protection Electrolytic Antifouling CATHWELL AS Cathodic Protection Electrolytic Antifouling Business concept Cathwell specialises in design, manufacture and supply of systems for cathodic protection
More informationDevelopment of Corrosion-resistant Steels and their Application to Crude Oil Tankers
Development of Corrosion-resistant Steels and their Application to Crude Oil Tankers Taizo Yoshida Jun Kato Minoru Ito Seiji Nishimura Kazuyuki Kashima NYK Line NYK Line Nippon Steel & Sumitomo Metal Corporation
More informationStructural. Lubron. Self-Lubricating PTFE Resin Slide Bearings. Lubron Bearing Systems. Bearings to move the world.
Structural Lubron TR Lubron Bearing Systems Bearings to move the world. LUBRON TR slide bearings offer a simple and economic solution for most moderate load bearing requirements. LUBRON TR slide bearings
More informationSUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)
PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney
More informationRISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS. Braemar Engineering
RISKS ASSOCIATED WITH THE MARINE ASPECTS OF LNG FPSOs (FLOATING PRODUCTION, STORAGE AND OFFLOAD) UNITS Agenda Introduction to LNG what is it, what are the risks, what are the myths? Introduction to FLNG
More informationACI MANUAL OF CONCRETE PRACTICE-2009
ACI MANUAL OF CONCRETE PRACTICE-2009 The ACI Manual of Concrete Practice is a six-part compilation of current ACI standards and committee reports. -ACI117-06 to ACI224.3R-95(08) Part 2-ACI 225-99(05) to
More informationVERTEX. different. Molded Fiberglass Composite Shelters
VERTEX Molded Fiberglass Composite Shelters different Vertex shelters are unique: joint-less molded fiberglass outer and inner shells with a foamed-in-place polyurethane foam core between, to produce the
More informationFIRST JACK-UP RIG LOAD-OUT IN VIET NAM
FIRST JACK-UP RIG LOAD-OUT IN VIET NAM Ngo Tuan Dung Petrovietnam Marine Shipyard Joint Stock Company (PV Shipyard) Summary This paper presents the design concept and operation results of load-out for
More informationFIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection
FIRETEX Hydrocarbon Series Epoxy Passive Fire Protection FIRETEX Epoxy Passive Fire Protection Systems Steelwork, New Construction and Maintenance World class epoxy passive fire protection solutions With
More informationFIRETEX Hydrocarbon Series. Epoxy Passive Fire Protection
FIRETEX Hydrocarbon Series Epoxy Passive Fire Protection FIRETEX Epoxy Passive Fire Protection Systems Steelwork, New Construction and Maintenance World class epoxy passive fire protection solutions With
More informationISO Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers
INTERNATIONAL STANDARD ISO 16145-3 First edition 2012-10-01 Ships and marine technology Protective coatings and inspection method Part 3: Cargo oil tanks of crude oil tankers Navires et technologie maritime
More informationUse of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above
(1978) (Rev.1 1980) (Rev.2 1996) (Rev.3 May 2002) Rev.4 July 2003) (Rev.5 Sept 2007) (Rev.6 May 2010) (Rev.7 Apr 2013) (Rev.8 Dec 2015) Use of Steel Grades for Various Hull Members - Ships of 90 m in Length
More informationEnhance Oil, Chemicals, LPG and LNG transfer and production. using innovative and field proven Trelleborg bonded hose solutions
EN Enhance Oil, Chemicals, LPG and LNG transfer and production using innovative and field proven Trelleborg bonded hose solutions Trelleborg group, leader of elastomers For over 100 years, Trelleborg is
More informationEnvironmental concerns include the presence of oxygen, moisture (water), contact with dissimilar metals, and chemicals.
Construction Concern: Corrosion Article and photos by Gregory Havel May 9, 2018 Corrosion of a metal can be defined as its degrading from a reaction with its environment. This degradation can cause weakening
More informationApprenticeship Training Standard. Schedule of Training. Composite Structures Technician. Trade Code: 267G
Apprenticeship Training Standard Schedule of Training Composite Structures Technician Trade Code: 267G Development Date: February 2000 NOTICE OF COLLECTION OF PERSONAL INFORMATION 1. At any time during
More informationA. Prepare formwork shop drawings using qualified professional engineer. Include detail of fabrication, assembly, and support of formwork.
DIVISION 03 CONCRETE 03 0100 MAINTENANCE OF CONCRETE 03 0505 UNDER SLAB VAPOR BARRIER A. Sheet vapor retarder shall be polyethylene sheet, ASTM D 4397, 10 mils thick minimum. Consult with Facilities Management
More informationPROTECTIVE COATINGS SIGMAZINC ZINC PRIMER RANGE PRODUCT LINE SERVING EUROPE, MIDDLE EAST AND AFRICA.
PROTECTIVE COATINGS SIGMAZINC ZINC PRIMER RANGE PRODUCT LINE SERVING EUROPE, MIDDLE EAST AND AFRICA www.sigmacoatings.com/protective SIGMAZINC ZINC PRIMER RANGE PPG PROTECTIVE & MARINE COATINGS UNRIVALLED
More informationHull Survey for New Construction
(July 2006) (Rev.1 Mar 2007) (Corr.1 Oct 2007) (Rev.2 Apr 2009) (Corr.1 August 2012) Hull Survey for New Construction 1. Scope The scope of this UR includes the following main activities: 1.1 Examination
More informationHot Dip Galvanized Case Study No. 21 Eskom Coastal Sub-station
The Application Eskom have since the early seventies specified hot dip galvanizing for their electrical power distribution transmission lines throughout South Africa. Hot dip galvanizing has become the
More informationDIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS
DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION 20 05 80 PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete vibration isolation system to isolate motorized equipment, piping,
More information2016 CDM Smith All Rights Reserved July 2016 SECTION STEEL ROOF DECK
PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 31 23 STEEL ROOF DECK A. Furnish all labor, materials, equipment and incidentals required and install steel roof deck complete as shown on the Drawings and
More information