Introduction. The Need for Wind Energy. Consultation. The Applicant

Size: px
Start display at page:

Download "Introduction. The Need for Wind Energy. Consultation. The Applicant"

Transcription

1 Introduction Peel Wind Farms (UKC) Ltd (Peel) propose to construct a wind farm on an area of land that forms part of the former Asfordby mine and tip site and part of the existing Asfordby Business Park near Melton Mowbray (herein referred to as the site). An application for planning permission has been submitted to Melton Borough Council. RSK Environment Ltd (RSK) has been appointed by Peel to undertake an environmental impact assessment (EIA) for the site, which has been recently restored. The need to undertake EIA is governed by European and UK legislation and is a process by which the likely environmental impacts of certain developments are assessed and presented, to inform the local council before a decision is made on whether or not to grant planning permission. The EIA has been undertaken in accordance with the legislation, but also in accordance with current best practice. This non-technical summary (NTS) reports the findings of the EIA and includes a description of the development and its application, the potential associated environmental impacts, and the measures proposed to mitigate these impacts. The Applicant Peel is part of the Peel Holdings Group and is at the forefront of delivering low carbon energy for the UK. The company s wind portfolio is in excess of 450MW and includes a range of schemes in operation, under construction or in development. The Need for Wind Energy The case for renewable energy electricity generation is made at the international, national and regional levels of government. The proposed Asfordby wind farm would make an important contribution to renewable energy objectives. Using renewable energy sources including wind power offsets greenhouse gas emissions and can help address the effects of climate change. The UK Government has put in place a number of policies (and legally binding targets) both to reduce greenhouse gas emissions and further increase the proportion of the UK s energy that comes from renewable sources. Increasing the use of indigenous sources of energy such as the wind will help the UK become more energy self-sufficient and so further improve the security of supply. The adopted Regional Spatial Strategy for the East Midlands sets a target for the development of onshore wind of 175MW by 2020 and Consultation The planning application was submitted following pre-application discussions with Senior Planning Officers at Melton Borough Council and including a range of key stakeholders and statutory consultees. Local residents have also been consulted. Drop in sessions for the local community and an exhibition of the finalised development proposals were held. Design workshops have taken place and the design evolution has been informed by advice from RSK Group, Parsons Brinkerhoff Ltd, Gifford Ltd, Waterman Boreham Ltd, Hayes McKenzie Partnership Ltd, and Peel. RSK Environment Ltd 1

2 The Asfordby Site Background The site is situated within the Borough of Melton in the County of Leicestershire. To the west of the site are the villages of Saxelbye and Grimston, Asfordby is located to the south, and Ab Kettleby to the north. The Proposed Development The proposed Asfordby wind farm design layout comprises two main clusters of wind turbines, including ancillary infrastructure for nine turbines, designed to have an operational life span of up to 25 years. The site covers approximately 83 ha with the centre of the site at national grid reference (NGR) SK The site is owned by UK Coal, with whom Peel has a joint collaboration partnership. UK Coal also own the Asfordby Business Park that shares part of the site. Asfordby Mine was a large, modern underground Coal Mine operated during the 1990s. The shafts were backfilled and capped on closure of the mine in The wider landscape is dominated by arable fields but also includes villages, woodland, hedgerows and some pasture. Selection Process A range of technical, environmental and land use considerations influenced Peel s selection of the site for a wind farm and the final layout of the development. They also influenced the project scale in terms of height and number of turbines. The detailed design of the proposed wind farm has evolved over approximately 12 months. Such considerations include adequacy of wind resource, proximity to an electricity grid connection point, distance from residential dwellings and ecological resource within the site and nearby. Of particular note is the fact that the site is unallocated within the Melton Local Plan and does not form part of any landscape, ecological or cultural heritage designation. As outlined in detail below, EIA has been adopted in order to demonstrate the absence of significant impacts on the majority of environmental receptors. The adopted Regional Spatial Strategy identifies as a Core Objective the need to maximise the level of renewable energy generation in the region particularly within the area within which the application site is situated. In particular for the Asfordby site selection process, it highlights the potential suitability of former colliery sites for new forms of power generation. Turbine Output Generally wind turbines will operate in wind speeds of approximately 4-25 meters per second. The rated output of the turbines are calculated for a generating capacity of up to 2MW. Turbine Dimensions The tower of Turbine 1 will be 63 metres in height (max referred to as the hub height). Its total height will be 108 metres with the blade in a vertical position. The tower of Turbines 2-9 will be 80 metres (max). Their total height will be 125 metres (max). The diameter of the turbines towers will be 5m at base level (max). Turbine Design The wind turbines will be three bladed, horizontal axis turbines with steel tubular conical towers. The blades will be made from reinforced composite materials such as fibreglass. It is proposed that the nine turbines are to be of a pale grey finish. RSK Environment Ltd 2

3 The Proposed Wind Farm Layout and Associated Infrastructure RSK Environment Ltd 3

4 Turbine Foundations Each turbine will be supported on a reinforced concrete foundation. The dimensions of the turbine foundations is proposed to be (circular) 20 m diameter (approx). The thickness of the foundation is typically 2.5m at the centre. At this stage it is assumed that piled foundations will be required. Wind Monitoring Mast The proposed Asfordby wind farm will include one permanent anemometer (met) mast (maximum 80m in height) within the site boundary to provide on-going monitoring of the wind conditions during operation of the wind farm. The met mast will be a free-standing galvanised steel lattice tower construction measuring the same height at the turbine hubs and requiring a concrete foundation. Access Tracks Access tracks to each turbine will be required for construction and maintenance purposes. Existing access tracks will be utilised wherever possible and upgraded to the required standard. Approximately 1.96 km of access tracks will be upgraded. Approximately 2.98 km of new tracks will be constructed. Both upgraded and newly constructed tracks shall be 5 metres in width (increasing to 11 metres at passing places). The renewable electricity from the wind turbines will feed into the local distribution network where it can provide local support to the power supplies in the area. The details of the grid connection have not yet been confirmed although two viable options have been identified. It is proposed to install a cable from a primary substation, potentially Melton Mowbray or Old Dalby, to an intake substation at the site. Business Park Compound During the construction period, a temporary site compound will be established in the Asfordby Business Park. The compound area shall be 3500m 2 in area, situated on an existing area of hard standing. It will contain areas for temporary portacabins and welfare facilities for staff, parking for construction staff and storage areas for construction materials and components. The compound will be fully decommissioned within 12 months of ceasing commercial operation. Construction Facts In terms of job creation, approximately 30 people will be employed to construct the proposed Asfordby wind farm. The local economy may be further supported by sourcing of construction materials (i.e. aggregates) from local companies. It is anticipated that construction will require approximately months to complete. The anticipated sequence of events for the construction programme is as follows: Cabling and Grid Connection The power generated by the wind turbines will be carried through 33Kv underground electricity cables that will connect each turbine to a common substation. The cables will be laid in trenches approximately 1m wide and 1m deep and, as far as possible, be routed to follow the access tracks. Construction of temporary site compound; Construction and upgrade of site access tracks and crane pads; Installation of turbine foundations; Erection and commissioning of turbines; Re-instatement works, including removal of temporary construction works; On-site habitat creation and enhancement will be undertaken to compensate for the loss of habitats of low nature conservation value. RSK Environment Ltd 4

5 Environmental Impacts Land Use and Tourism Whilst land take associated with the turbines and infrastructure will result in the loss of agricultural land, once the wind farm is operational, normal farming practices will resume. Whilst research indicates that wind farms do not generally result in material negative impacts upon tourism, the turbine layout has been designed to minimise visual impact. Public Paths Where Public Rights of Way (ProW) coincide with access tracks to the proposed Asfordby wind farm, these will be upgraded and will benefit from the long-term maintenance associated with the operation of the wind farm. In addition, the upgraded tracks will be supplemented by hedge planting which will improve the setting of the routes. The alignment of access tracks has been selected to minimise severance with respect to agricultural operations. This has been achieved through the routeing of the majority of the tracks in alignment with field edges or making use of existing farm tracks. Telecommunications and Shadow Flicker Wind turbines can cause interference to television signals. Digital TV reception is known to be more resistant to the effects of reflection from turbines and, given that will not be fully operational before 2014; deterioration in BBC services will not be significant. Peel are committed to monitoring and overcoming where necessary any potential effects relating to interference. Peel is committed to ensuring that the occurrence of shadow flicker is completely avoided. This will be achieved by fitting, as standard, a photocell to the turbine tower, which monitors the intensity of sunlight. The Software within the Supervisory Control System of each individual turbine will be programmed with the times each day shadow flicker may in theory occur. During this period the turbine(s) will automatically shut down if there is sufficient light intensity, as measured by the photocell, to create a shadow flicker effect. Aviation It has been established the proposed Asfordby wind farm would have an impact on the primary surveillance radar at RAF Cottesmore and East Midlands Airport, which requires mitigation. Both the MOD and East Midlands Airport have agreed that any mitigation strategy which removes the wind turbine cluster from their respective radar screens would be considered acceptable. The MOD and East Midlands Airport have indicated that use of a mitigation strategy involving in-fill radar is the preferred solution. Discussions with NERL are ongoing. Whilst there is no need to install avoidance lighting on any of the turbines, the CAA will require the structures to be charted on civil aviation maps. RSK Environment Ltd 5

6 Noise An assessment of the predicted noise levels from the proposed turbines has been undertaken in accordance with the government s guidance on calculation and assessment of noise from wind farms (The assessment and rating of noise from wind farms, ETSU-R-97). Baseline noise levels were measured at 8 locations, agreed with the local council as being representative of the nearest residential locations to the proposed turbines. Archaeology and Cultural Heritage Desk-based assessment, walkover and geophysical surveys have identified that there is limited potential for archaeological remains within the majority of the site due to past site use. However, infrastructure could potentially impact on previously unrecorded archaeological remains in limited areas where geophysical survey has identified probable archaeological deposits. The proposed turbine locations have been assessed not to have a significant effect at these locations. The night-time assessment shows that the predicted turbine noise levels, at the nearest residential locations to the site, are below the night time noise limits under all wind conditions. The daytime assessment shows that the predicted turbine noise levels, at the nearest residential locations to the site, are below the lower daytime noise limits under all wind conditions. The assessment showed that even applying worst case scenario assumptions, the predicted level of noise during construction activity (access track formation, construction of turbine bases and erection of turbines) will be significantly below the permitted maximum and thus within acceptable limits. To mitigate any, currently uncertain, archaeological impacts a programme of archaeological trial trenching will be undertaken to inform final mitigation stages. Archaeological mitigation will include adequate provision for post excavation assessment, analysis and publication of results. It is proposed that an archaeological watching brief is undertaken during construction in order to safeguard against the potential for impacts to previously unrecorded archaeological remains. No significant indirect visual impacts on buried and upstanding archaeological and cultural heritage sites within the wider vicinity of the proposed Asfordby wind farm were identified. RSK Environment Ltd 6

7 Traffic and Transportation Alternative transport modes and routes have been considered for the transportation of turbine components, plant machinery and construction materials to the site. It was determined that road transport would be the most feasible for abnormal and normal vehicles, with the preferred route for both being the A46, A606 and St Bartholomew s Way in proximity to the site. Police escorts and delivery programme are timed to cause minimal disruption. The main phase of the development in transportation terms (the delivery of materials for construction by normal vehicles) will last only six months. The maximum amount of traffic associated with the construction would occur in Months 1 and 2. During Months 3, 4, 5 and 6 vehicle numbers significantly reduce. A peak of 72 HGV movements per day has been calculated. Transportation impacts could include mud/debris being deposited onto the highway. The impacts associated with traffic from the construction of the proposed Asfordby wind farm are short term and can be managed and monitored. RSK Environment Ltd 7

8 Geology, Soils & Contamination Site investigation works will be undertaken prior to construction to determine the type and nature of the soils within the site. This will provide information on how best to design the access roads and turbine foundations. Management of dust generation during construction will be carried out by damping down construction areas. Dust is unlikely to affect any nearby properties. All excavated soils will be assessed for their suitability for re-use and where necessary, they will be removed from site for safe disposal. Landscape and Visual Impact Mitigation of the potential landscape and visual effects of the proposed Asfordby wind farm is embedded within its proposed siting, layout and design following an iterative assessment and layout refinement process. The aim of this process is that the proposed wind farm will not, on the whole, have significant impacts on landscape character or visual amenity. Whilst it forms part of the general countryside, the proposed Asfordby wind farm will not be located within Green Belt. Furthermore, it is not located within or close to a National Park or Area of Outstanding Natural Beauty. A detailed assessment of the potential impact of the development on landscape character and visual amenity both individually and cumulatively with other existing or proposed wind farm developments has been implemented at 23 consultee-agreed viewpoint locations. No significant impacts on landscape character are predicted. However, some significant visual effects are predicted to occur when the wind farm is viewed from 5 out of the 23 viewpoints and from some residential properties. This is entirely normal for a commercial scale wind farm development. These effects would be localised (within 2km). Hydrology and Flood Risk A Flood Risk Assessment has been completed and demonstrated the site to be in Flood Zone 1 and so at low risk of flooding. A Sustainable Urban Drainage Strategy forms part of the development comprising of swales and detention basins and this will minimise the risk of the development giving rise to flooding off-site. Careful management of construction works will ensure that the proposed development will not have significant impacts on watercourses or ground water. An Environmental Management Plan will be produced which will detail the practices that must be undertaken during construction to avoid environmental impacts. With regard to effects on residential properties mitigating factors, include intervening distance (the properties are all located at least 600 metres from the nearest turbine and in some instances up to 1km), the orientation of properties relative to the turbines, partial screening and perceived visual separation provided by prevailing topography, existing woodland belts and tree plantations and the limited quality and value of views into the site from the south. The assessment undertaken also concludes that the wind farm would, in the majority of views, have a reasonably balanced and cohesive appearance and would relate well to the subtle landforms of the topography. Watercourses will be bridged or culverted (by the installation of pipes) and ramped over where necessary to allow uninterrupted flow of water within the watercourse and a continuous running track for vehicles. RSK Environment Ltd 8

9 Ecology The site does not form part of any statutory or non-statutory ecological designations; and there will be no direct or indirect impacts on the identified Sites of Special Scientific Interest, or Sites of Nature Conservation Interest. through settlement lagoons prior to being released into any natural watercourses. Finally, fencing will be erected to exclude a small population of Great Crested Newts from the works area, and habitat will be subsequently reinstated. Habitat Most of the habitats to be lost within the site are of limited value and include improved grassland, arable, ruderals on disturbed ground, semi mature plantation woodland, young plantation woodland species, poor thorn hedgerows, recently planted tree whips on disturbed ground and rough grassland. The loss of plantation woodland and hedgerows will be compensated through habitat improvement and creation elsewhere on the site. The development will therefore have a positive impact overall on such habitats. Where 7 m sections of hedge are removed to make way for access tracks at least 14 m of that hedge will be either gapped up or improved with a species rich scrub mix. Fauna The impact of construction on breeding and wintering birds can be minimised through a range of mitigation measures such as ground clearance only taking place outside breeding bird season, the provision of compensatory planting such as hedgerows, and the deployment of construction management techniques to minimise dust emissions. There will be no significant impacts on birds. The wind farm has been designed such that all parts of the turbines are over 50 metres away from habitat features suitable for commuting and foraging bats by careful positioning or habitat manipulation, as per Natural England Guidance. The maximum height that Common Pipistrelle bats were observed during survey work was 12m and of tree top foraging. This is lower than the blade sweep height and therefore outside the collision risk zone. There will be no significant impacts on bats. Where an effect on badgers is expected during construction or decommissioning, setts will be closed. Further mitigation includes avoidance of night-time working and site traffic speed limits. In order to avoid sedimentation or pollution into stream courses, potentially affecting Water Vole habitat, surface water from the roads and tracks used during construction will be collected by a separate drainage system and the water will pass RSK Environment Ltd 9

10 Cumulative Impacts Cumulative impacts are those that may result from the combined or incremental effects of future activities (i.e. those developments currently in planning and not included as part of the baseline). While a single activity may itself result in an insignificant impact, it may, when combined with other impacts (significant or insignificant) in the same geographical area and occurring at the same time, result in a cumulative impact that is significant. The cumulative assessment has not identified any significant potential cumulative impacts with other commercial scale wind energy developments either consented or proposed in the wider area. The principal cumulative effect would be combined visibility of Asfordby and Queniborough Wind Farms in some views along the Wreake Valley from the southern fringes of the Wolds. This visual effect would not be significant. Were all currently consented and proposed developments to proceed, the introduction of the development at Asfordby would not alter the perception of the landscape as one with infrequent wind farms. Benefits The proposed Asfordby wind farm will provide enough energy to power approximately 8,500 homes, equivalent to approximately 33 % of the households in Melton Mowbray. As well as helping to make the UK more energy selfsufficient, this electricity would be generated without greenhouse gas emissions or other harmful waste products. This would offset the release of 20,340 tonnes of carbon dioxide per year when comparing it with fossil fuel generation. Peel has agreed to establish a community fund, which the local community can use in ways to benefit the community as a whole. A community benefit fund is an established mechanism that enables energy companies to provide direct benefits to local communities affected by developments such as wind farms throughout the life of a scheme. The community benefit fund is established outside the planning process and can only materialise if the scheme is granted planning permission, constructed and operated. The use of the fund will be established through consultation with the local community. Suggestions for the use of a potential fund could include purchasing and operating an electric school bus, a new community hall, youth recreational facilities or a new swimming pool. RSK Environment Ltd 10

11 Conclusions An application for a wind farm at the former Asfordby mine site has been proposed following identification of the site as an economically, environmentally, and logistically viable location. The iterative design process has involved consultation with statutory consultees, and workshops with local interest groups and the local community. Technical construction details have been refined to best suit the site. Considerations have thus been assessed according to benefits of wind energy production as compared with a range of identified environmental and non-policy effects. These are reported in the Environmental Statement along with a detailed description of the proposal. The EIA has demonstrated the absence of significant impacts on the overwhelming majority of environmental receptors and the important contribution, which the development would make to towards meeting national and regional targets for renewable energy generation. In addition, the detailed design and EIA assessment process will ensure that any adverse effects would be fully mitigated or minimised. It has been demonstrated that the proposed development will, drawing upon the experience of Peel as an experienced wind farm developer, deliver socio-economic benefits to the local area and wider region both directly and indirectly during both the construction and operation of the wind farm development. RSK Environment Ltd 11

Ironstone Quarry Wind Energy Project Environmental Statement

Ironstone Quarry Wind Energy Project Environmental Statement Ironstone Quarry Wind Energy Project Environmental Statement Non Technical Summary April 2011 Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate a four turbine

More information

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary 22871-G8.indd greec01 Dec 2009 December 2009 Based upon the Ordnance Survey Map with the permission of the Controller of Her Majesty

More information

Seneca Wind Cluster. Non Technical Summary May 2013 SENECA GLOBAL ENERGY

Seneca Wind Cluster. Non Technical Summary May 2013 SENECA GLOBAL ENERGY Seneca Wind Cluster Non Technical Summary May 2013 SENECA GLOBAL ENERGY Non-Technical Summary This document presents a Non Technical Summary (NTS) of the Environmental Statement (ES), which has been submitted

More information

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT HIBERNIAN WIND POWER LIMITED Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY September 2003 Report P04E311A-R2 Stephen Court, 18/21 St. Stephen's Green,

More information

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd Toddleburn Wind Farm Environmental Statement Non-technical Summary I & H Brown Toddleburn Ltd July 2004 Introduction I & H Brown Toddleburn Ltd proposes to develop a wind farm near Oxton, in the Scottish

More information

Non Technical Summary February Hook Moor. Wind Farm Proposals

Non Technical Summary February Hook Moor. Wind Farm Proposals Non Technical Summary February 2008 Hook Moor Wind Farm Proposals 03 Introduction Hook Moor Banks Developments has prepared proposals for the Hook Moor Wind Farm. Located north of Micklefield on the eastern

More information

Garvagh Glebe Wind Energy Project County Leitrim

Garvagh Glebe Wind Energy Project County Leitrim HIBERNIAN WIND POWER LIMITED & COILLTE Garvagh Glebe Wind Energy Project County Leitrim ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY March 2003 Report P04J004 R3 Stephen Court, 18/21 St. Stephen's

More information

Filey FAS. Presentation to Planners. Stewart Rowe

Filey FAS. Presentation to Planners. Stewart Rowe Filey FAS Presentation to Planners Stewart Rowe 15.2.2016 History of Flooding There is a long history of flooding in Filey caused by extreme rainfall events. These rainfall events have resulted in widespread

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Linfairn Wind Farm Addendum Chapter A3: Project Description

Linfairn Wind Farm Addendum Chapter A3: Project Description A3. PROJECT DESCRIPTION 3.1 Introduction This chapter provides a description of the changes to the Project since the ES was published. An outline Construction Environmental Management Plan (CEMP) is included

More information

HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA NHR-01

HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA NHR-01 HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA006631-NHR-01 Not to Scale HAY CLOSE FARM WIND FARM NON TECHNICAL SUMMARY OF THE Environmental Statement

More information

14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER

14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER Knockskae Wind Farm Environmental Statement Volume 2 Main Report 14-1 14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER 14.1 Introduction 14.1.1 This Chapter has been prepared by. It identifies and

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Harbourcross Wind Farm Environmental StatementPl. Non-Technical Summary

Harbourcross Wind Farm Environmental StatementPl. Non-Technical Summary Harbourcross Wind Farm Environmental StatementPl April 2013 1 Introduction 1.1 Harbourcross Wind Farm Limited (the Applicant) is seeking planning permission for a proposed wind farm, referred to as Harbourcross,

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Knockendurrick Wind Farm Proposal

Knockendurrick Wind Farm Proposal Knockendurrick Wind Farm Proposal Planning Application and Environmental Statement Non Technical Summary September 2013 Energy for everyone s benefit of the proposed site showing 132m turbines. View from

More information

Bodelith Isaf Wind Farm Non Technical Summary

Bodelith Isaf Wind Farm Non Technical Summary 1 Bodelith Isaf Wind Farm Non Technical Summary 1.1 Introduction This document is the Non Technical Summary (NTS) prepared to accompany the submission of the planning application for the proposed Bodelith

More information

Sandy Knowe Wind Farm. Non-Technical Summary Addendum

Sandy Knowe Wind Farm. Non-Technical Summary Addendum Sandy Knowe Wind Farm Non-Technical Summary Addendum Sandy Knowe Wind Farm Ltd November 2013 SANDY KNOWE WIND FARM ii NON-TECHNICAL SUMMARY Contents 1 Background 1 2 Availability of the ES Addendum 2 3

More information

WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY S T E P H E N S O N H A L L I D A Y

WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY S T E P H E N S O N H A L L I D A Y S T E P H E N S O N H A L L I D A Y ENVIRONMENTAL PLANNING - LANDSCAPE ARCHITECTURE WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY MARCH 2007 WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT

More information

19. INTERACTION OF IMPACTS

19. INTERACTION OF IMPACTS 19. INTERACTION OF IMPACTS 19.1 INTRODUCTION In addition to the requirement to describe the likely significant effects of the proposed development on the different elements of the environment, it is also

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

Welcome to Hoolan Energy s public exhibition for our wind farm proposal

Welcome to Hoolan Energy s public exhibition for our wind farm proposal WELC ME Welcome to Hoolan Energy s public exhibition for our wind farm proposal This exhibition contains information about our plans for a wind development, including visualisations, potential access routes

More information

Welcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm.

Welcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm. Welcome Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm. Update: In 2011 Cornwall Council s Planning Committee granted permission

More information

Fermanagh and Omagh District Council

Fermanagh and Omagh District Council Fermanagh and Omagh District Council Planning Committee Meeting 9 April 2015 Report by Principal Planning Officer K/2014/0186/F: Proposed installation of a wind turbine on a tubular tower with a blade

More information

Birneyknowe Wind Farm Proposal

Birneyknowe Wind Farm Proposal Birneyknowe Wind Farm Proposal Planning Application and Environmental Statement Non Technical Summary April 2014 Energy for everyone s benefit Image shows 100m to tip turbines at West Durham Wind Farm

More information

GROUSEMOUNT WIND FARM County Kerry

GROUSEMOUNT WIND FARM County Kerry GROUSEMOUNT WIND FARM County Kerry ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 - NON-TECHNICAL SUMMARY & EIS TEXT ESB WIND DEVELOPMENT Report No. QR-320171-11-GK0715-R01 ESB WIND DEVELOPMENT LIMITED GROUSEMOUNT

More information

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Scira Offshore Energy Limited 9 April 2009 9R8482 SHERINGHAM SHOAL OFFSHORE WIND

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY CONTENTS Purpose of this Report... 1 The Application Submission Package... 1 Location of the Wind Farm... 1 The Proposed Development... 2 Construction Operations... 2 The EIA Process... 3 Landscape and

More information

VIRIDOR WASTE MANAGEMENT LTD

VIRIDOR WASTE MANAGEMENT LTD VIRIDOR WASTE MANAGEMENT LTD Proposed re-phasing of landfilling operations; amended restoration levels and aftercare scheme; and provision of a new waste reception building with associated site infrastructure

More information

30A RULES FOR RENEWABLE ENERGY GENERATION

30A RULES FOR RENEWABLE ENERGY GENERATION 30A RULES FOR RENEWABLE ENERGY GENERATION Policies 16A.4.1 Activities Tables 30A.1 Subdivision Activities Activity Status The operation and maintenance of existing renewable energy generation facilities

More information

WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM

WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM BRAINT WIND FARM: OUR PROPOSALS 1 2 3 Site Layout WEST COAST ENERGY IS PLEASED TO PRESENT ITS PROPOSALS FOR A WIND FARM ON ANGLESEY Ynys Môn Wind Energy

More information

Environmental Statement Volume 1. Non-Technical Summary. Land south of Pendown Farm Cornwall

Environmental Statement Volume 1. Non-Technical Summary. Land south of Pendown Farm Cornwall Environmental Statement Volume 1 Land south of Pendown Farm Cornwall August 2012 1. INTRODUCTION 1.1. Windberry Energy Operations Limited has submitted a planning application to Cornwall Council (CC) for

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 12 th June 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0558/F Full Application

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

Photomontages SECTION 10

Photomontages SECTION 10 Photomontages SECTION 10 10.1 Photomontages Photomontages have been prepared by Truescape Visual Communication to illustrate the likely location of the Collector Wind Farm turbines following construction.

More information

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION Force 9 Energy is seeking to develop a 5 turbine wind farm 1.5km to the east of Auldgirth, approximately 15km north of Dumfries. It is bounded to the north

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT IN SUPPORT OF THE PROPOSED ERECTION OF A SINGLE WIND TURBINE WITH MAXIMUM BLADE TIP HEIGHT OF 67M, FORMATION OF NEW VEHICULAR ACCESS, ACCESS TRACK AND ASSOCIATED INFRASTRUCTURE

More information

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition and Stronelairg s Overview SSE Renewables SSE Renewables is the renewable energy development division of SSE. The company is responsible for the development of onshore and offshore wind farms in the UK,

More information

INTRODUCTION Purpose of this EIA Report The Applicant Site Description Overview of the Proposed Development...

INTRODUCTION Purpose of this EIA Report The Applicant Site Description Overview of the Proposed Development... 1. INTRODUCTION Purpose of this... 1-2 The Applicant... 1-2 Site Description... 1-3 Overview of the Proposed Development... 1-3 EIA Process... 1-5 Structure of the... 1-6 The Environmental Impact Assessment

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 1 NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 Position Statement Status The purpose behind this Position

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

Where is the Proposal?

Where is the Proposal? Where is the Proposal? Hapsford Solar Farm Proposed Layout The Hapsford Solar Farm is located on land south of Junction 14 of the M56 near Hapsford and lies to the west of the A5117. The site is located

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

Proposed 40m high 250kw wind turbine to provide electricity for farm yard with excess exported to grid

Proposed 40m high 250kw wind turbine to provide electricity for farm yard with excess exported to grid Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 6 th April 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: J/2012/0377/F Full Proposed 40m

More information

Limestone Quarry Wind Farm Non-technical summary

Limestone Quarry Wind Farm Non-technical summary Limestone Quarry Wind Farm Non-technical summary Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate an eight turbine wind farm at one of its quarry sites in West

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007 Wytch Farm Pipeline Refurbishment Project Environmental Statement Non-Technical Summary November 2007 Location map 0 1 2 3 4 5 kilometres Development area Introduction BP Exploration Operating Company

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Park Spring Wind Farm Non-Technical Summary

Park Spring Wind Farm Non-Technical Summary Park Spring Wind Farm Prepared for EDF Energy Renewables Endeavour House Victory Way Doxford Business Park Sunderland SR3 3XL Prepared by Parsons Brinckerhoff Amber Court William Armstrong Drive Newcastle

More information

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent FAO Mr Keith Welford Department of Energy & Climate Change 3 Whitehall Place London SW1A 2AW 18th October 2016 By Email Only : keith.welford@decc.gsi.gov.uk Dear Mr Welford, Heckington Fen Onshore Wind

More information

Appendix D: A selection of slides from presentations at local Community Council meetings

Appendix D: A selection of slides from presentations at local Community Council meetings Appendix D: A selection of slides from presentations at local Community Council meetings Hill of Ochiltree Wind Farm Public Consultation Pre-Application Consultation Report Facilitating Change (UK) Limited

More information

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new

More information

Ardley Waste Management Facility. Non Technical Summary

Ardley Waste Management Facility. Non Technical Summary Non Technical Summary CONTENTS 1.0 Introduction 2.0 Site Description 3.0 The Development 4.0 Alternatives 5.0 Potential Environmental Effects 6.0 Conclusions 1.0 Introduction 1.1 The Applicant 1.2 The

More information

APPROVAL OF PLANNING PERMISSION

APPROVAL OF PLANNING PERMISSION Town and Country Planning Act 1990 APPROVAL OF PLANNING PERMISSION Name and Address of Applicant Name and Address of Agent (if any) Next Generation Limited Axiom House Station Road Stroud Gloucestershire

More information

Wether Hill Windfarm Extension Volume 1: Non-Technical Summary

Wether Hill Windfarm Extension Volume 1: Non-Technical Summary Wether Hill Windfarm Extension Volume 1: November 2015 www.scottishpowerrenewables.com Preface This document is the of the Environmental Statement (ES) and has been prepared to accompany the planning application

More information

2. Approach to EIA and project design

2. Approach to EIA and project design 11 2. Approach to EIA and project design 2.1 EIA process Overview of EIA 2.1.1 EIA should be a systematic process that must be followed for certain types of project before a decision can be made on development

More information

DEUCHRIES WIND FARM Environmental Statement

DEUCHRIES WIND FARM Environmental Statement DEUCHRIES WIND FARM Environmental Statement Volume 4: ES Non-Technical Summary September 2012 NON TECHNICAL SUMMARY Introduction (Force 9 Energy) and EDF Energy Renewables (EDF) are jointly seeking planning

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6

More information

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F)

PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) PROPOSED EXTENSIONS OF EXISTING SAND AND GRAVEL WORKINGS ON TO LAND WEST OF ALDBOROUGH ROAD NORTH (PHASE E) AND WEST OF HAINAULT ROAD (PHASE F) 1 Introduction This briefing note summarises some of the

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY INTRODUCTION 1. This document comprises a Non Technical Summary (NTS) and has been prepared by (SLR) on behalf of SITA UK (the applicant). 2. The NTS is part of a package of documents being submitted to

More information

Foel Trawsnant Wind Farm Non Technical Summary

Foel Trawsnant Wind Farm Non Technical Summary 1 Foel Trawsnant Wind Farm Non Technical Summary 1.1 Introduction This document is the Non Technical Summary (NTS) prepared to accompany the submission of the planning application for the proposed Foel

More information

Wicklow Wind Energy Strategy

Wicklow Wind Energy Strategy Wicklow County Development Plan 2016-2022 Appendix 6 Wicklow Wicklow Wicklow County Development Plan 2016-2022 Appendix 6 2 1. Introduction Wicklow County Council recognises the need to reduce dependence

More information

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS

More information

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Environmental Statement Regulation 19 Submission (3a) Other Information

More information

GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate

GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate Sustainability Objective 1. To provide a mix of sustainably designed new housing to provide everybody in South East Lincolnshire

More information

Prepared by:... Checked by:...

Prepared by:... Checked by:... Hameldon Hill Wind Farm Extension Volume 4 - Non Technical Summary Submitted on behalf of RWE NPower Renewables Limited to Burnley Borough Council December 2009 Prepared by:... Checked by:... Mark Herod

More information

A site visit to establish the scale of development suitable for your site

A site visit to establish the scale of development suitable for your site Wind Feasibility Study Our wind feasibility study comprises the following: A site visit to establish the scale of development suitable for your site Advice on whether a planning application is likely to

More information

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016

Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary. July 2016 Energy from Waste Facility Environmental Statement Volume 1: Non-Technical Summary July 2016 This Environmental Statement has been prepared by Turley Planning on behalf of This is Protos with contributions

More information

*Illustration only. Mynydd y Gwrhyd Solar Farm Design and Access Statement. Reference: E05419

*Illustration only. Mynydd y Gwrhyd Solar Farm Design and Access Statement. Reference: E05419 *Illustration only Mynydd y Gwrhyd Solar Farm Design and Access Statement Reference: E05419 Version 3 January 2019 CONTENTS Contents i 1.1 PURPOSE OF THIS STATEMENT... 2 1.2 GENERAL DESIGN PRINCIPLES...

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

Rural Living Environment

Rural Living Environment 1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities

More information

Carscreugh Renewable Energy Park Non-Technical Summary. April 2006

Carscreugh Renewable Energy Park Non-Technical Summary. April 2006 Carscreugh Renewable Energy Park Non-Technical Summary April 2006 PREFACE An Environmental Statement has been prepared to accompany a planning application to Dumfries and Galloway Council for the proposed

More information

LINE ONE LINE TWO LINE THREE

LINE ONE LINE TWO LINE THREE LINE ONE LINE TWO LINE THREE Environmental Statement Volume 1: Non-Technical Summary Prepared by This document has been prepared by Limited for the sole use of our client (the Client ) and in accordance

More information

Ackers Adventure, Golden Hillock Road, Sparkbrook, Birmingham, B11 2PY. Erection of a 22m high (ground to blade tip) wind turbine

Ackers Adventure, Golden Hillock Road, Sparkbrook, Birmingham, B11 2PY. Erection of a 22m high (ground to blade tip) wind turbine Committee Date: 20/03/2014 Application Number: 2013/08552/PA Accepted: 27/11/2013 Application Type: Full Planning Target Date: 22/01/2014 Ward: South Yardley Ackers Adventure, Golden Hillock Road, Sparkbrook,

More information

BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT

BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT FCC Environment Ltd [3512084A] [Final] Brogborough Wind Energy Development Prepared for FCC Environment Ltd Ground Floor West 900 Pavilion

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

M6 Junctions 16 to 19 Smart Motorway. Environmental Assessment Report Non-Technical Summary. FINAL, Rev.0. October 2014

M6 Junctions 16 to 19 Smart Motorway. Environmental Assessment Report Non-Technical Summary. FINAL, Rev.0. October 2014 M6 Junctions 16 to 19 Smart Motorway Environmental Assessment Report FINAL, Rev.0 October 2014 CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT OVERVIEW... 1 1.2 NEED FOR THIS ENVIRONMENTAL ASSESSMENT REPORT...

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 4 th July 2018 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0558/F Full Application

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

ABERARDER WIND FARM. Environmental Statement Volume I Non-Technical Summary

ABERARDER WIND FARM. Environmental Statement Volume I Non-Technical Summary ABERARDER WIND FARM Environmental Statement 2014 Volume I CONTENTS Preface... 2 Introduction... 4 Site Location... 5 Development Plan Policy... 7 Environmental Sensitivity... 9 Site Construction & Decommissioning...

More information

LINE ONE LINE TWO LINE THREE

LINE ONE LINE TWO LINE THREE LINE ONE LINE TWO LINE THREE Hill of Braco Wind Farm Environmental Statement Volume 1: Non Technical Summary January 2013 Preface This Environmental Statement (ES) re ports the results of an Environmental

More information

@symmetrywigan. Delivering a modern logistics hub for Wigan. symmetryparkwigan.co.uk

@symmetrywigan. Delivering a modern logistics hub for Wigan. symmetryparkwigan.co.uk Delivering a modern logistics hub for Wigan Welcome to the symmetry park Wigan consultation event where you can find out about our plans to develop a new strategic logistics scheme at Junction 25 of the

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

High Pressure Natural Gas Pipeline Pembroke Refinery. Environmental Statement Non-technical Summary

High Pressure Natural Gas Pipeline Pembroke Refinery. Environmental Statement Non-technical Summary High Pressure Natural Gas Pipeline Pembroke Refinery Environmental Statement Non-technical Summary July 2010 1. Introduction 1.1 Overview 1. Chevron Limited (Ltd) is seeking detailed planning permission

More information

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 8 Energy Efficiency, and Renewable Energy 157 8 ENERGY EFFICIENCY AND RENEWABLE ENERGY 8.1 Background The development of renewable energy sources is a priority

More information

Wether Hill Windfarm Extension

Wether Hill Windfarm Extension Wether Hill Windfarm Extension May 2013 May 2013 Wether Hill Windfarm Extension page i 1. Introduction 6 1.1 Background 6 1.2 The Applicant 6 1.3 Purpose of the Document 7 1.4 Structure 8 1.5 Terminology

More information

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH DRD ROADS SERVICE, SOUTHERN DIVISION Environmental Statement, Volume 1 November 2005 Non Technical Summary i Introduction The Department for Regional

More information

Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland

Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland Kathy Dale EnviroCentre Limited Summary Scotland s renewables targets

More information

Kelmarsh Wind Farm Environmental Statement. Non-Technical Summary February 2010

Kelmarsh Wind Farm Environmental Statement. Non-Technical Summary February 2010 Kelmarsh Wind Farm Environmental Statement Non-Technical Summary E.ON Climate and Renewables (EC&R) Kelmarsh Wind Farm Non Technical Summary Entec UK Limited Copyright and Non-Disclosure Notice The contents

More information

Gores Wind Farm. Environmental Statement. Volume 1 - Written Text

Gores Wind Farm. Environmental Statement. Volume 1 - Written Text Gores Wind Farm Environmental Statement Volume 1 - Written Text Prepared By West Coast Energy Limited Mynydd Awel Mold Business Park Maes Gwern Mold CH7 1XN VOLUME ONE - WRITTEN TEXT CHAPTER ONE - INTRODUCTION

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd