1 Knockendurrick Wind Farm Proposal Planning Application and Environmental Statement Non Technical Summary September 2013

2 Energy for everyone s benefit of the proposed site showing 132m turbines. View from Irelandton Moor. INTRODUCTION KNOCKENDURRICK BANKS RENEWABLES This non technical summary summarises the Environmental Statement which accompanies an application for planning permission made to Dumfries and Galloway Council under the Town and Country Planning (Scotland) Act 1997 (as amended), for the construction and operation of a wind farm at Knockendurrick. Banks Renewables is proposing to develop a seven turbine wind farm at Knockendurrick located on Irelandton Moor, north of Twynholm and east of Gatehouse of Fleet in Dumfries and Galloway. If consented the development would utilise the area s exceptionally high wind resource to provide renewable energy to the national grid while at the same time providing positive economic benefits to the local economy. The evolution of the proposed Knockendurrick Wind Farm is the result of an extensive site selection, assessment and design process. It is our view that the final proposal represents the optimal design for the site. (The optimal development being one which considering all environmental factors makes the biggest possible contribution to the Scottish Government s 2020 renewable energy targets). Feedback we have received from local communities, interest groups and statutory agencies has also informed the location, size and design of the proposed wind farm. Banks Renewables Ltd (BRL) is part of the Banks Group, which has been successfully developing a range of energy projects for over 35 years and employs around 420 people in the north of England and Scotland. Banks Renewables provides renewable energy solutions that help meet demand for energy in a sustainable and considerate way. The company s renewable projects throughout the UK are now generating over 100MW of electricity and it is one of the largest and most successful independent renewable energy developers in the country. A further 15 projects with the capacity to generate up to 350MW are at various stages of the development process from initial site feasibility to being fully operational. Want to know more? Log on to The Banks Group is committed to its Development with Care approach and as a result, all of our projects are developed in close consultation with the local communities hosting its sites, as well as carrying out extensive environmental assessments. Banks Group offer a community partnership scheme that invites the local community to engage with and have a stake in the proposed development. This helps to ensure that sites are developed with a sensitivity to the concerns and priorities of local communities. BRL encourage local communities to become actively involved at all stages of the development process. Wind farms in operation Wind farms under construction Wind farms pre-construction Wind farms in planning Wind farms in development Banks offices 02 Banks Renewables Knockendurrick Wind Farm Proposal 03

3 Why wind energy? Why Knockendurrick? It is widely accepted that due to the global issue of climate change there is a pressing need to reduce CO 2 emissions. In support of this the UK government has signed a number of international agreements which are legally binding and require the UK to increase the share of renewables contributing to the countries energy needs to 15% by The Scottish Government have furthered this target and are striving to meet 100% of Scotland s energy needs from renewable sources by Through generating electricity by harnessing the power of the wind as opposed to burning a mix of fossil fuels, the wind farm is expected to provide a potential saving of approximately 755,000 tonnes of carbon dioxide emissions over the 25 year lifetime. WIND SPEEDS ACROSS EUROPE >11.5 m/s m/s m/s m/s <7.0 m/s 10 metres per second = 22 miles per hour Commercial scale wind farms can only be developed in areas where the wind resource can be converted into sufficient electrical output. Wind monitoring at Knockendurrick has proven that the area has an exceptionally good wind resource. The Knockendurrick site is not subject to any international or national landscape, ecological or cultural heritage designations. The environmental statement has demonstrated that the site has suitable highway access and is sufficient distance from settlements and residential properties to ensure that noise and shadow flicker effects are minimised. A detailed mapping exercise for the whole of Dumfries and Galloway was undertaken by the developer to consider the technical, environmental and planning constraints to developing a commercial scale wind farm in the region. This process mirrored a similar process undertaken by Dumfries and Galloway Council which supported the Council s policy for onshore wind in the Dumfries and Galloway Structure Plan and highlighted that the site could be suitable to accommodate commercial scale wind turbines. The map of main constraints to wind energy development used by Banks Renewables to identify the site is reproduced here. Following identification of the area at Knockendurrick, further desk based studies, site visits and landowner discussions confirmed its suitability and availability. The proposed area of turbine development is over 3km from the nearest village and excellent access is provided to the site via the A75 trunk road. The development has been considered against key national, regional and local plan policies (including interim planning policies) and it is the developer s assessment that the proposed wind farm at Knockendurrick would comply with planning policy which promotes renewable energy developments, where environmental effects can be minimised. This is equivalent to the amount of carbon emitted from supplying gridsource electricity to approximately 14,000 homes, or around 17% of the annual domestic consumption in Dumfries and Galloway. 15% UK Government target for the sourcing of renewable energy by 2020 The Scottish Government have set a number of targets in their 2020 Routemap for Renewable Energy, which was issued in One of these targets is to achieve 500 MW of community and locally-owned renewable energy by This wind farm can contribute to the meeting of this target under the offer to communities to take an equity stake of up to 5% in the project. 100% Scottish Government target for the sourcing of renewable energy by MW Scottish Government target for community/locally-owned renewable energy by 2020 Site location 04 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 05

4 125m to tip turbines at Marr Wind Farm 100m to tip turbines at West Durham Wind Farm 100m to tip turbines at West Durham Wind Farm Our proposal KEY FACTS Site Area: In total the application site covers an area of 487 hectares, of which only around 9.4 hectares (2%) will be occupied by the wind turbines and their associated infrastructure, including access tracks. Number of turbines: Seven SITE LOCATION TURBINE DIMENSIONS Rated Output: Each turbine is anticipated to have an installed capacity of 3.4MW giving a total installed capacity for the Wind farm of 23.8MW Turbine Dimensions: Turbines will have a maximum hub height of 80 metres and a maximum height of 132 metres to blade tip. Length of access tracks: 4.1km of existing farm access tracks on site will be used. An estimated 3.4km of new access tracks will be constructed. Life Span: The turbines will be in place for 25 years plus around 10 months for construction and 10 months for decommissioning. Employment Around 30 to 57 people will be employed on site during the construction and decommissioning phases. Site boundary Rotor Blade Nacelle/ Hub Tower approx 80m Maximum total height 132m Vehicle Movements: An average of 67 vehicle movements per day is anticipated during the peak construction period. The number of daily loads will vary considerably over the construction period, with the majority of months having much lower levels of vehicle movements. Transformer Diagram for illustrative purposes only - not to scale 06 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 07

5 SITE LAYOUT 100m to tip turbines at Armistead Wind Farm 125m to tip turbines at Marr Wind Farm Our proposal continued MAIN ELEMENTS Turbines All turbines will be of the same height and specification, with a hub height of approximately 80 metres and a maximum height to blade tip of 132 metres. They will be of a modern three bladed design with tubular steel tower. Each turbine will begin generating power at wind speeds of around 3 4 metres per second (m/s) and would shut down at wind speeds of approximately 25m/s. They will generate power approximately 70-85% of the time. Foundations The turbine foundations are likely to consist of reinforced concrete pads around 2 metres deep. Disturbance to the ground will be minimised and following construction, surface vegetation will be re-established. Wind Monitoring Mast The wind farm s performance will be remotely monitored using an on site meteorological mast which will gather data on wind speeds and direction. The mast would be a free standing steel lattice design and a maximum of 80 metres in height. The temporary mast that is currently erected on the site will be removed prior to operation of the wind farm. Site Compound A temporary site compound will be required during the construction phase for the storage of plant and materials, and to provide site workers with welfare facilities. Access Tracks To access and service the wind turbines, approximately 3.4km of new access tracks will be required. 4.1km of the existing farm tracks will be upgraded. The tracks will typically be 5 metres wide, widening at bends where appropriate. The tracks will link the turbines to the public road network from the A75 via the unnamed road that leads to Irelandton. Traffic Traffic travelling to and from the site will use an agreed route. The preferred access route for turbine delivery is from the A75, and then utilisation a short section of unclassified road until reaction the site entrance onto Irelandton Moor. HGV traffic will not need to pass through communities close to the site. Cabling and Grid Connection Underground cables linking the turbines will generally be laid alongside the access tracks. A control building and on site sub station will be built in a compound area from which electricity generated by the turbines will be fed into the grid. The wind farm will make use of spare capacity on the local electricity transmission system. A preferred grid connection point at the Tongland substation has been identified. 08 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 09

6 100m to tip turbines at Armistead Wind Farm Benefits of the project The development will make a significant contribution to the local community; economically, socially and environmentally, in addition to assisting to meet the Scottish Government s renewable energy targets. 100m to tip turbines at West Durham Wind Farm Establish a community benefits package, based upon 3% of the gross annual revenues generated by the wind farm over its lifetime, underwritten by minimum payments 5,000 per megawatt installed per annum. Based on estimated energy prices and wind speeds, BRL estimate that the 3% share in the annual gross revenue could equate to approximately 6.5 million over the 25 year life span of this development. This fund is to be reinvested into the surrounding area and will be used to finance projects identified by, and proposed within, the local community. An opportunity for the communities to purchase up to 5% equity in the proposed renewable generation capacity. This 5% purchase option, if exercised, would also make an important contribution towards the Scottish Governments target of 500MW of community owned renewable energy by Reduce greenhouse gas emissions by harnessing power from the wind to generate electricity equivalent to the annual requirements of approximately 14,000 homes* Making a contribution to the recently increased Scottish Government target of 100% of Scotland s electricity consumption produced from renewable sources by Improvements to the Heritage Path footpath network including installation of interpretation boards improving public access to the countryside and understanding of the area. Possible support for the Galloway Red Kite Trail. On average of 57 people employed during construction. BRL also commits, ahead of planning determination, to agree with Dumfries and Galloway Council a minimum percentage of the total capital construction value of the project which will be spent locally via local contractors and businesses. 10 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary * Figures are approximate and based on site specific wind data and an average annual household electricity consumption of 3300kWh/yr 11

7 Visual assessment The following pages show what the Knockendurrick wind farm could look like from a selection of viewpoints, which have been agreed with Scottish Natural Heritage. They have been produced by professional landscape architects in accordance with the latest Landscape Institute guidelines. They show seven turbines, 132 metres to tip. Further visualisations accompany the full planning application, please see the back page for details of where they can be viewed. View from: A75 Twynholm Junction View from: Gatehouse of Fleet 12 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 13

8 Visual assessment continued View from: Rutherfords Monument View from: A75 Balannan Junction 14 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 15

9 Visual assessment continued View from: Kirkcudbright View from: Kirkcudbright Lifeboat Station 16 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 17

10 Visual assessment continued View from: Sandgreen View from: Borgue Church 18 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 19

11 Visual assessment continued View from: Bridge of Dee View from: A75 Laggan 20 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 21

12 Environmental effects The information below summarises the findings of the assessments of the predicted environmental effects of the proposed Knockendurrick Wind Farm as described in detail in the Environmental Statement. LANDSCAPE AND VISUAL IMPACT The detailed landscape and visual assessment contained within the Environmental Statement covers a study area extending out 35km from the proposed turbines. The assessment notes that one inevitable consequence of constructing wind turbines is that they will be visible over a relatively large area. Their scale and man-made appearance mean that they will not naturally fit in with the rural landscape. It is however recognised that certain types of landscape are more capable of accommodating wind turbines than others. The local landscape has been identified as having some capacity for wind farm development. The site is not within an area designated for its landscape value. The nearest landscape designations within the study area to the application site are the Fleet Valley National Scenic Area, the East Stewartry Coast NSA and the Galloway Coast Regional Scenic Area. The closest turbine to the NSA would be 2.8km distance. The assessment notes that although much of the Fleet Valley NSA is indicated as having theoretical visibility of the proposed wind turbines, in practice the extensive tree cover within the NSA and in the areas separating the wind farm site from the NSA, the presence of buildings obstructing views, and localised variations in topography, will reduce the extent to which the proposed development would be visible from the NSA. There would therefore be much less scope for adversely affecting the special qualities of the area, than might be assumed. The landscape and visual impact assessment has identified a range of both landscape and visual effects. The assessment concludes that the proposed development will not have an adverse effect on the special qualities of the designated landscapes within the study area and that the wind farm has been designed to relate well to the local landscape character and respect its scale. With the exception of one viewpoint (of the 30 used in the assessment), it has been assessed that there would be no significant effects on landscape character or visual amenity beyond two kilometres of the site. For the nearest settlements to the development, Gatehouse of Fleet, Twynholm and Kirkcudbright, the assessment concludes that significant effects would occur for a few areas in these settlements, but that the majority of areas within the settlements will not have significant effects as there would be no visibility of the proposed turbines. Accordingly, the overall impact on these settlements is not significant. Of the 20 residential properties within two kilometres of the nearest wind turbine, six have been assessed as being likely to experience potentially significant effects. However the assessment has concluded that there would be no overbearing effect on the visual amenity at any of those properties. The landscape assessment notes that the area around the proposed wind farm has already been utilised for wind turbine developments with several farm scale turbines which have been consented but not constructed in the area. As a result, a cumulative assessment was carried out to assess the landscape impact from the addition of Knockendurrick to the area. The assessment has concluded that the cumulative landscape and visual effects, arising from the addition of the development to the other operational and approved wind turbines, will be not significant. It should be remembered that the significant visual effects of the development are reversible. Upon decommissioning the wind farm, the turbines would be dismantled and removed and the site restored. The landscape and visual impact assessment concluded that in landscape and visual terms, the site is a suitable location for a wind farm development. ECOLOGY AND ORNITHOLOGY A number of ecology and ornithology surveys were carried out on the proposed development site in order to gain a full understanding of the ecology and ornithology of the site and the sensitivity of species in the area. The site does not lie within any statutory nature conservation designations. The closest such sites are the Laughenghie and Airie Hills SSSI approximately 3.4km from the site and the Galloway Oak Woods Special Area of Conservation (SAC) combined with the Killiegowan Wood SSSI approximately 4.6km west of the site. The layout of the site took account of the results of the ecological surveys for bats, Great Crested Newts, Natterjack Toad, Otter, Water Vole, Badger, Reptile and fish throughout the design process. Measures were included within the design to minimise potential impacts upon key habitats. This included the design of the turbine and access track layout to avoid the most sensitive/important habitats within the survey area, and the implementation of stand-off distances of at least 50m between the blade tips and the top of features found to be used by bats. Potential effects on birds arising from the construction and operation of the wind farm are predicted to be negligible. An ecologist will monitor all construction works undertaken during the bird breeding season (March to August) to ensure that disturbance to breeding birds is minimised by the implementation of a Breeding Bird Protection Plan. Based on the surveys and assessment completed, it is not considered that the proposals will result in significant impacts upon any features of ecological and ornithological value within the site; predicted impacts are considered to be of no more than minor significance upon the habitats and protected species which have been shown to be present, either through the construction/decommissioning or operational phases. CULTURAL HERITAGE An archaeological and cultural heritage assessment has been carried out. The assessment looked at the potential for direct effects (physical) and indirect effects (setting) on known features of historical importance. A cumulative assessment on the setting of cultural heritage resources of the development in combination with other wind energy developments was also carried out. It was identified that there is one scheduled ancient monument within the site boundary and no listed buildings, historic parks and garden or conservation areas. Direct effects of minor significance have been predicted for two features within the application site and negligible significance for two other features within the site. These effects are not considered to be significant. Archaeological mitigation measures will be undertaken to offset these predicted direct effects. The completion of the programme of archaeological mitigation works will compensate for the loss of the archaeological resource that will occur as a result of the construction of the development. An indirect effects of moderate significance on the scheduled cairn at Cairntosh Hill has been identified. It is not however considered that the development would unacceptably diminish the ability to appreciate this feature or the cultural heritage resource within the study area. 22 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 23

13 Noise Other considerations The development is located within a relatively rural location where existing background noise levels are low to moderate. The predominant noise sources in the area are wind induced noise (wind passing through vegetation and around buildings), distant and local road traffic noise, agricultural noise and birdsong. CONSTRUCTION The construction noise assessment concluded that construction noise levels would be within acceptable guidelines and there will be no significant effects. All predictions assume that all plant is operating in full operational mode on the access tracks and within the site itself to provide a worst case scenario, whereas, in reality only a proportion of the plant may be operating. OPERATION Consultation was undertaken with the Environmental Health Department at Dumfries and Galloway Council in order to agree the approach to the noise assessment and the noise monitoring locations. 11 properties were identified as locations to measure background noise levels. For all properties predicted operational noise levels for the Knockendurrick Wind Farm would be within noise limits. The cumulative noise assessment has taken into account noise that would be generated by the consented wind turbines at farms nearby. Cumulative effects would lead to an increase in noise levels at some properties. However, predicted cumulative operational noise levels and measured background noise levels indicate that for dwellings neighbouring the Development, cumulative wind turbine noise will meet the noise criteria government guidance (ETSU-R-97); therefore, the operational noise effects are deemed not significant There are a range of turbine models that may be appropriate for the Development. If the wind farm receives consent, further data will be obtained from the supplier for the final choice of turbine model to demonstrate compliance with the noise limits derived. TRAFFIC AND TRANSPORT The Knockendurrick site is very well situated in relation to the A75 which can accommodate wind farm construction traffic, with only a short distance to site after leaving this road. An assessment of the effects due to increased traffic as a result of the construction of the development has been undertaken. The maximum impacts are predicted to occur in month five of the construction programme when an average of 38 Heavy Good Vehicle (HGV) movements plus 24 car and light van movements are predicted per day. The number of daily loads will vary considerably over the construction period, with the majority of months having much lower levels of vehicle movements. Impacts are predicted to be greatest on the section of the short section of C class road in the vicinity of the site entrance. However, with the implementation of mitigation measures which would include an appropriate traffic management plan, it is not predicted that any significant effects would be experienced. Vehicle movements resulting from management and maintenance of the development during operation would be low in volume and have no significant effects. Effects as a result of the decommissioning of the development are anticipated as being less than during construction and would not be significant. GROUND CONDITIONS AND HYDROLOGY An assessment of the likely effects on ground conditions, underlying geology, hydrology and hydrogeology has been undertaken. Potential effects have been mitigated through design of the development, which maximises the use of existing access tracks and avoids sensitive areas as far as possible. The length of required access tracks and number of watercourse crossings have been minimised as far as possible. In addition, careful management of construction and operation works in line with an environmental management plan and a construction method statement would mean that the development would result in no significant effects to ground conditions or hydrology. PEAT STABILITY Shallow peat deposits were identified across the site, and the site design avoided these as far as possible. Within the developable area of the site, peat probing was carried out to ascertain the likely effects on peat stability. Where they were found they were generally to a depth of less than 0.2m. One area of deep peat was identified within the site boundary. This area is unaffected by the proposed development. A preliminary peat slide risk assessment was carried out in line with best practice guidance that concluded that conditions conducive to peat instability are very unlikely to be present. No significant effects are anticipated. SHADOW FLICKER Under certain combinations of weather conditions, times of year and geographical position, the sun may pass behind the rotor of a wind turbine casting a shadow over the windows of nearby properties that appears from within the property to flick on and off when the blades rotate. This effect is known as shadow flicker. Under worst case conditions, and not taking into account periods when climatic conditions prevent shadows being cast or any intervening vegetation or structures, it is predicted that the maximum occurrence of shadow flicker would be 11.2 hours per year at one property. In reality, taking into account factors that limit occurrence, this figure is predicted to be around 3.2 hours per year. No significant effects are predicted. Should shadow flicker be found to cause a nuisance during operation of the development measures would be incorporated by the applicant that reduce the occurrence of shadow flicker at the affected property. 100m to tip turbines at West Durham Wind Farm 24 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 25

14 Other considerations continued AVIATION The aviation assessment has considered the potential impacts on both civil and military aviation interests. The development has potential to impact on the civilian air traffic control radar at Lowther Hill and Great Dun Fell which are the responsibility of National Air Traffic Services En-route Ltd (NATS). Discussions between the applicant and NATS are ongoing and NATS has indicated that the implementation of a solution involving the upgrading of these radars has potential to resolve the issue. The application site lies within Military Low Flying Area 16 and (when active) Tactical Training Area 20T. These areas cover large tracts of central and southern Scotland including Dumfries and Galloway, Scottish Borders and South and East Ayrshire. It is highly likely that the MoD will request that some or all of the turbines be fitted with appropriate aviation lighting (which may be infra red, and therefore invisible to the naked eye). In accordance with guidance in this respect and the recommendations of the aviation assessment the applicant is maintaining a dialogue with representatives of the MoD in relation to this matter with a view to agreeing an appropriately worded planning condition. EXISTING INFRASTRUCTURE The presence of existing infrastructure such as service pipes and cables, TV transmission, mobile telephone networks and electromagnetic paths were considered and consultation with relevant bodies including Atkins, JRC and Ofcom revealed no existing infrastructure or objections. PUBLIC ACCESS There is a single Heritage Path within in the Application Site. It is proposed that appropriate sign posting will be agreed with the Council to inform users of both the Heritage Path and the proposed development s access track of Health and Safety requirements during construction. In response to feedback from local residents it is proposed that the condition of this path will be improved and interpretation material provided thereby improving public access to the countryside. Looking at the wider footpath network in the area, the applicant is also examining opportunities to support the continued work of the RSPB and the Galloway Red Kite Trail centred on the River Dee Valley to the north east of the application site. 100m to tip turbines at Armistead Wind Farm Conclusions Commercial scale wind turbines have similar effects wherever they are located because of their inherent nature of the technology and the type of sites which are suitable or their operation. Mitigation measures have been put forward where appropriate for construction, operation and decommissioning phases to ensure that any adverse effects are minimised. The Environmental Impact Assessment has demonstrated that the development would have some localised significant impacts on the landscape character and visual amenity within two kilometres of the development, as would be expected from this type of development. With the exception of one viewpoint, it has been assessed that there would be no significant effects on landscape character or visual amenity beyond three kilometres of the site. The site design was amended to avoid adverse impacts to the environment. Turbine locations were revised to ensure the special qualities of the Fleet Valley National Scenic Area were maintained. The cumulative impact assessment which considered the impact of Knockendurrick Wind Farm in combination with other consented, operational wind turbine developments concluded that there would be no additional significant effects. 100m to tip turbines at West Durham Wind Farm The proposal for a wind farm at Knockendurrick has been subject to extensive site identification and design process involving consultation with statutory consultees, local interest groups and the local community. Environmental constraints and considerations have been taken into account in the site layout and design process. This has enabled most potentially significant effects to be avoided. Further measures to prevent or reduce any remaining significant environmental effects are described in detail within the Environmental Statement. The environmental studies concluded that mitigation would be required to reduce the potential ecological impact on species within the site during construction and onsite archaeology. However, with the successful deployment of mitigation, the potential impacts will be reduced to an acceptable level. The proposed development would represent an important environmental benefit in the generation of electricity from a renewable energy source that will reduce or avoid the use of fossil fuels through the displacement of electricity generated from renewable energy. The proposed development would generate enough electricity for 17% of Dumfries and Galloway s households. The proposed development will also lead to some beneficial effects in relation to its employment creation during construction. It also will deliver significant local environmental and economic benefits by improving the local footpath network and providing the opportunity for local communities to benefit from investment in new renewable generating capacity. 26 Banks Renewables Knockendurrick Wind Farm Proposal Non Technical Summary 27

15 Further information Further information regarding the wind farm can be obtained from Dumfries and Galloway Council at the following address where the environmental statement and accompanying documents are available for review: Dumfries and Galloway Council Development Management Kirkbank English Street Dumfries DG1 2HS CD copies (at a cost of 5) of the application can be obtained by contacting Banks Renewables on the details shown below Banks Renewables, 2nd Floor, Block C, Brandon Gate, Leechlee Road, Hamilton, Lanarkshire ML3 6AU T: W: E: knockendurrick@banksgroup.co.uk HJB/BA796/120. Published September Printed on paper from sustainable sources. The Banks Group Ltd All rights reserved. This publication includes mapping data licenced from Ordnance Survey. Crown copyright Licence number: AL

14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER

14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER Knockskae Wind Farm Environmental Statement Volume 2 Main Report 14-1 14 INFRASTRUCTURE, TELECOMMUNICATIONS & SHADOW FLICKER 14.1 Introduction 14.1.1 This Chapter has been prepared by. It identifies and

More information

Sandy Knowe Wind Farm. Non-Technical Summary Addendum

Sandy Knowe Wind Farm. Non-Technical Summary Addendum Sandy Knowe Wind Farm Non-Technical Summary Addendum Sandy Knowe Wind Farm Ltd November 2013 SANDY KNOWE WIND FARM ii NON-TECHNICAL SUMMARY Contents 1 Background 1 2 Availability of the ES Addendum 2 3

More information

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary

GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary 22871-G8.indd greec01 Dec 2009 December 2009 Based upon the Ordnance Survey Map with the permission of the Controller of Her Majesty

More information

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT

Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT HIBERNIAN WIND POWER LIMITED Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY September 2003 Report P04E311A-R2 Stephen Court, 18/21 St. Stephen's Green,

More information

Non Technical Summary February Hook Moor. Wind Farm Proposals

Non Technical Summary February Hook Moor. Wind Farm Proposals Non Technical Summary February 2008 Hook Moor Wind Farm Proposals 03 Introduction Hook Moor Banks Developments has prepared proposals for the Hook Moor Wind Farm. Located north of Micklefield on the eastern

More information

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION

BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION BLACKWOOD WIND FARM WELCOME TO OUR EXHIBITION Force 9 Energy is seeking to develop a 5 turbine wind farm 1.5km to the east of Auldgirth, approximately 15km north of Dumfries. It is bounded to the north

More information

Birneyknowe Wind Farm Proposal

Birneyknowe Wind Farm Proposal Birneyknowe Wind Farm Proposal Planning Application and Environmental Statement Non Technical Summary April 2014 Energy for everyone s benefit Image shows 100m to tip turbines at West Durham Wind Farm

More information

Ironstone Quarry Wind Energy Project Environmental Statement

Ironstone Quarry Wind Energy Project Environmental Statement Ironstone Quarry Wind Energy Project Environmental Statement Non Technical Summary April 2011 Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate a four turbine

More information

Welcome to Hoolan Energy s public exhibition for our wind farm proposal

Welcome to Hoolan Energy s public exhibition for our wind farm proposal WELC ME Welcome to Hoolan Energy s public exhibition for our wind farm proposal This exhibition contains information about our plans for a wind development, including visualisations, potential access routes

More information

Seneca Wind Cluster. Non Technical Summary May 2013 SENECA GLOBAL ENERGY

Seneca Wind Cluster. Non Technical Summary May 2013 SENECA GLOBAL ENERGY Seneca Wind Cluster Non Technical Summary May 2013 SENECA GLOBAL ENERGY Non-Technical Summary This document presents a Non Technical Summary (NTS) of the Environmental Statement (ES), which has been submitted

More information

Garvagh Glebe Wind Energy Project County Leitrim

Garvagh Glebe Wind Energy Project County Leitrim HIBERNIAN WIND POWER LIMITED & COILLTE Garvagh Glebe Wind Energy Project County Leitrim ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY March 2003 Report P04J004 R3 Stephen Court, 18/21 St. Stephen's

More information

WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY S T E P H E N S O N H A L L I D A Y

WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY S T E P H E N S O N H A L L I D A Y S T E P H E N S O N H A L L I D A Y ENVIRONMENTAL PLANNING - LANDSCAPE ARCHITECTURE WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY MARCH 2007 WITHERNWICK WIND FARM ENVIRONMENTAL STATEMENT

More information

HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA NHR-01

HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA NHR-01 HAY CLOSE FARM WIND FARM ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY JULY 2014 REPORT NO: 0005-UA006631-NHR-01 Not to Scale HAY CLOSE FARM WIND FARM NON TECHNICAL SUMMARY OF THE Environmental Statement

More information

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 1 NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 Position Statement Status The purpose behind this Position

More information

Rampion Offshore Wind Farm Frequently Asked Questions (FAQs)

Rampion Offshore Wind Farm Frequently Asked Questions (FAQs) Rampion Offshore Wind Farm Frequently Asked Questions (FAQs) February 2012 Q: Why renewable energy? A: Renewable energy involves generating electricity from natural sustainable energy sources, which do

More information

Wether Hill Windfarm Extension Volume 1: Non-Technical Summary

Wether Hill Windfarm Extension Volume 1: Non-Technical Summary Wether Hill Windfarm Extension Volume 1: November 2015 www.scottishpowerrenewables.com Preface This document is the of the Environmental Statement (ES) and has been prepared to accompany the planning application

More information

A site visit to establish the scale of development suitable for your site

A site visit to establish the scale of development suitable for your site Wind Feasibility Study Our wind feasibility study comprises the following: A site visit to establish the scale of development suitable for your site Advice on whether a planning application is likely to

More information

Appendix D: A selection of slides from presentations at local Community Council meetings

Appendix D: A selection of slides from presentations at local Community Council meetings Appendix D: A selection of slides from presentations at local Community Council meetings Hill of Ochiltree Wind Farm Public Consultation Pre-Application Consultation Report Facilitating Change (UK) Limited

More information

Energy for everyone s benefit

Energy for everyone s benefit Lethans & High Cumnock Wind Farm Proposals Keeping you involved We invite you to public exhibitions on: Tuesday 12th June 2012 Dumfries Arms Hotel 54 Glaisnock Street, Cumnock Wednesday 13th June 2012

More information

Environmental Statement Volume 1. Non-Technical Summary. Land south of Pendown Farm Cornwall

Environmental Statement Volume 1. Non-Technical Summary. Land south of Pendown Farm Cornwall Environmental Statement Volume 1 Land south of Pendown Farm Cornwall August 2012 1. INTRODUCTION 1.1. Windberry Energy Operations Limited has submitted a planning application to Cornwall Council (CC) for

More information

ABERARDER WIND FARM. Environmental Statement Volume I Non-Technical Summary

ABERARDER WIND FARM. Environmental Statement Volume I Non-Technical Summary ABERARDER WIND FARM Environmental Statement 2014 Volume I CONTENTS Preface... 2 Introduction... 4 Site Location... 5 Development Plan Policy... 7 Environmental Sensitivity... 9 Site Construction & Decommissioning...

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 12 th June 2017 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0558/F Full Application

More information

Linfairn Wind Farm Addendum Chapter A3: Project Description

Linfairn Wind Farm Addendum Chapter A3: Project Description A3. PROJECT DESCRIPTION 3.1 Introduction This chapter provides a description of the changes to the Project since the ES was published. An outline Construction Environmental Management Plan (CEMP) is included

More information

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd

Toddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd Toddleburn Wind Farm Environmental Statement Non-technical Summary I & H Brown Toddleburn Ltd July 2004 Introduction I & H Brown Toddleburn Ltd proposes to develop a wind farm near Oxton, in the Scottish

More information

19. INTERACTION OF IMPACTS

19. INTERACTION OF IMPACTS 19. INTERACTION OF IMPACTS 19.1 INTRODUCTION In addition to the requirement to describe the likely significant effects of the proposed development on the different elements of the environment, it is also

More information

INTRODUCTION Purpose of this EIA Report The Applicant Site Description Overview of the Proposed Development...

INTRODUCTION Purpose of this EIA Report The Applicant Site Description Overview of the Proposed Development... 1. INTRODUCTION Purpose of this... 1-2 The Applicant... 1-2 Site Description... 1-3 Overview of the Proposed Development... 1-3 EIA Process... 1-5 Structure of the... 1-6 The Environmental Impact Assessment

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM

WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM WEST COAST ENERGY PROPOSAL FOR BRAINT WIND FARM BRAINT WIND FARM: OUR PROPOSALS 1 2 3 Site Layout WEST COAST ENERGY IS PLEASED TO PRESENT ITS PROPOSALS FOR A WIND FARM ON ANGLESEY Ynys Môn Wind Energy

More information

Overview. Tangy III Wind Farm Proposal. SSE Renewables. Site location. This exhibition

Overview. Tangy III Wind Farm Proposal. SSE Renewables. Site location. This exhibition Overview SSE Renewables SSE Renewables is the renewable energy division of SSE plc. It is responsible, on behalf of SSE Generation Limited, for the development and construction of SSE group s renewable

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

VIRIDOR WASTE MANAGEMENT LTD

VIRIDOR WASTE MANAGEMENT LTD VIRIDOR WASTE MANAGEMENT LTD Proposed re-phasing of landfilling operations; amended restoration levels and aftercare scheme; and provision of a new waste reception building with associated site infrastructure

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

LINE ONE LINE TWO LINE THREE

LINE ONE LINE TWO LINE THREE LINE ONE LINE TWO LINE THREE Environmental Statement Volume 1: Non-Technical Summary Prepared by This document has been prepared by Limited for the sole use of our client (the Client ) and in accordance

More information

Proposed 40m high 250kw wind turbine to provide electricity for farm yard with excess exported to grid

Proposed 40m high 250kw wind turbine to provide electricity for farm yard with excess exported to grid Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 6 th April 2016 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: J/2012/0377/F Full Proposed 40m

More information

Environmental Statement South Kyle Wind Farm August 2013

Environmental Statement South Kyle Wind Farm August 2013 19 AVIATION, RADAR, INFRARED LIGHTING AND ELECTROMAGNETIC INTERFERENCE (EMI)... 2 19.1 Aviation and Radar... 2 19.1.1 Executive Summary... 2 19.1.2 Introduction... 2 19.1.3 Approach... 3 19.1.4 Potential

More information

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition

Overview. Bhlaraidh and Stronelairg wind farm proposals. SSE Renewables. Site locations. This exhibition and Stronelairg s Overview SSE Renewables SSE Renewables is the renewable energy development division of SSE. The company is responsible for the development of onshore and offshore wind farms in the UK,

More information

Environmental Impact Assessment

Environmental Impact Assessment The Project Hoben International Ltd proposes to develop a single 500kW wind turbine at their Manystones Lane site near Brassington. The turbine will be located approximately 350m to the south east of the

More information

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 8 Energy Efficiency, and Renewable Energy 157 8 ENERGY EFFICIENCY AND RENEWABLE ENERGY 8.1 Background The development of renewable energy sources is a priority

More information

Harbourcross Wind Farm Environmental StatementPl. Non-Technical Summary

Harbourcross Wind Farm Environmental StatementPl. Non-Technical Summary Harbourcross Wind Farm Environmental StatementPl April 2013 1 Introduction 1.1 Harbourcross Wind Farm Limited (the Applicant) is seeking planning permission for a proposed wind farm, referred to as Harbourcross,

More information

Carscreugh Renewable Energy Park Non-Technical Summary. April 2006

Carscreugh Renewable Energy Park Non-Technical Summary. April 2006 Carscreugh Renewable Energy Park Non-Technical Summary April 2006 PREFACE An Environmental Statement has been prepared to accompany a planning application to Dumfries and Galloway Council for the proposed

More information

Bodelith Isaf Wind Farm Non Technical Summary

Bodelith Isaf Wind Farm Non Technical Summary 1 Bodelith Isaf Wind Farm Non Technical Summary 1.1 Introduction This document is the Non Technical Summary (NTS) prepared to accompany the submission of the planning application for the proposed Bodelith

More information

Fermanagh and Omagh District Council

Fermanagh and Omagh District Council Fermanagh and Omagh District Council Planning Committee Meeting 9 April 2015 Report by Principal Planning Officer K/2014/0186/F: Proposed installation of a wind turbine on a tubular tower with a blade

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY CONTENTS Purpose of this Report... 1 The Application Submission Package... 1 Location of the Wind Farm... 1 The Proposed Development... 2 Construction Operations... 2 The EIA Process... 3 Landscape and

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

Derry City and Strabane District Council Planning Committee Report

Derry City and Strabane District Council Planning Committee Report Derry City and Strabane District Council Planning Committee Report COMMITTEE DATE: 4 th July 2018 APPLICATION No: APPLICATION TYPE: PROPOSAL: LOCATION: APPLICANT: AGENT: A/2014/0558/F Full Application

More information

Introduction. The Need for Wind Energy. Consultation. The Applicant

Introduction. The Need for Wind Energy. Consultation. The Applicant Introduction Peel Wind Farms (UKC) Ltd (Peel) propose to construct a wind farm on an area of land that forms part of the former Asfordby mine and tip site and part of the existing Asfordby Business Park

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

Proposed Blackhillock Substation Expansion. Public Exhibition

Proposed Blackhillock Substation Expansion. Public Exhibition Proposed Blackhillock Substation Expansion Public Exhibition 9 February 2012 Blackhillock Substation Expansion: Pre Application Consultation The proposals are for the redevelopment of the existing substation

More information

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017

OPEN HOUSE PROJECT OVERVIEW OPEN HOUSE NOVEMBER 16, :00-8:00 PM FALL 2017 FALL 2017 PROJECT OVERVIEW EDF EN Canada is proposing to develop, construct, and operate the Cypress Wind Power Project with 243.6 megawatts (MW) of generating capacity. The Project is south of Dunmore,

More information

Hopsrig Wind Farm Environmental Statement Volume 1: Non Technical Summary February 2017

Hopsrig Wind Farm Environmental Statement Volume 1: Non Technical Summary February 2017 Hopsrig Wind Farm Environmental Statement Volume 1: Non Technical Summary February 2017 Introduction Hopsrig Wind Farm Limited (the Applicant 1 ) has applied to Dumfries and Galloway Council for planning

More information

Ewe Hill Windfarm. Non-Technical Summary

Ewe Hill Windfarm. Non-Technical Summary Ewe Hill Windfarm Non-Technical Summary October 2009 Contents 1. Introduction... 1 2. Environmental Impact Assessment... 1 3. Windfarm Proposal... 4 4. Legal and Policy Framework... 4 5. Landscape and

More information

South Kyle Wind Energy Project

South Kyle Wind Energy Project South Kyle Wind Energy Project Newsletter September 2013 Keeping you informed The South Kyle Wind Energy proposal has now been submitted to the Energy Consents Unit of the Scottish Government for consideration.

More information

GROUSEMOUNT WIND FARM County Kerry

GROUSEMOUNT WIND FARM County Kerry GROUSEMOUNT WIND FARM County Kerry ENVIRONMENTAL IMPACT STATEMENT VOLUME 1 - NON-TECHNICAL SUMMARY & EIS TEXT ESB WIND DEVELOPMENT Report No. QR-320171-11-GK0715-R01 ESB WIND DEVELOPMENT LIMITED GROUSEMOUNT

More information

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary

Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Scira Offshore Energy Limited 9 April 2009 9R8482 SHERINGHAM SHOAL OFFSHORE WIND

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

Limestone Quarry Wind Farm Non-technical summary

Limestone Quarry Wind Farm Non-technical summary Limestone Quarry Wind Farm Non-technical summary Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate an eight turbine wind farm at one of its quarry sites in West

More information

Rumster Wind Energy Project

Rumster Wind Energy Project Rumster Wind Energy Project Report OSE3525 Appendix D Noise and Shadow Flicker Assessment Orkney Sustainable Energy Limited 6 North End Road Stromness Orkney KW16 3AG Telephone 01856850054 Facsimile 01856851199

More information

DESIGN & ACCESS STATEMENT

DESIGN & ACCESS STATEMENT DESIGN & ACCESS STATEMENT IN SUPPORT OF THE PROPOSED ERECTION OF A SINGLE WIND TURBINE WITH MAXIMUM BLADE TIP HEIGHT OF 67M, FORMATION OF NEW VEHICULAR ACCESS, ACCESS TRACK AND ASSOCIATED INFRASTRUCTURE

More information

5. ENVIRONMENTAL IMPACT ASSESSMENT

5. ENVIRONMENTAL IMPACT ASSESSMENT 5. ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION Environmental Impact Assessment (EIA) is a process that considers how a proposed development will change existing environmental conditions, and what

More information

WHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY?

WHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY? WHO ARE GAELECTRIC? Founded in 2004 with a vision to empower the next generation of energy users with power from nature, we provide energy from renewable sources to reduce dependence on fossil fuels and

More information

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT

NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Welcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm.

Welcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm. Welcome Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm. Update: In 2011 Cornwall Council s Planning Committee granted permission

More information

CPRW Position statement Single and small groups of wind turbines

CPRW Position statement Single and small groups of wind turbines CPRW Position statement Single and small groups of wind turbines April 2014 The purpose of this Position Statement is to guide CPRW Branches in the approach they adopt when considering the acceptability

More information

DEUCHRIES WIND FARM Environmental Statement

DEUCHRIES WIND FARM Environmental Statement DEUCHRIES WIND FARM Environmental Statement Volume 4: ES Non-Technical Summary September 2012 NON TECHNICAL SUMMARY Introduction (Force 9 Energy) and EDF Energy Renewables (EDF) are jointly seeking planning

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company

More information

Project siting. Lanfine. Wind resource assessment. Wind Power Project

Project siting. Lanfine. Wind resource assessment. Wind Power Project Project siting Wind resource assessment This assessment determines how much electrical energy can be extracted from the wind Meteorological towers are installed on site to measure wind speed and direction

More information

Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland

Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland Overcoming Ecological Challenges and Exploring Biodiversity Opportunities Associated with Energy Infrastructure Projects in Scotland Kathy Dale EnviroCentre Limited Summary Scotland s renewables targets

More information

Coire Glas Pumped Storage Scheme

Coire Glas Pumped Storage Scheme About SSE SSE is one of the UK s largest energy companies and is headquartered in Perth. Our purpose is to provide the energy people need in a reliable and sustainable way. We're involved in producing,

More information

Glenmuckloch Pumped Storage Hydro Scheme

Glenmuckloch Pumped Storage Hydro Scheme Glenmuckloch Pumped Storage Hydro Scheme Contents Introduction 1 The Applicant 2 Purpose of the NTS 2 Further Information 2 Project Benefits 3 Objectives & Need for Development 3 Economic Benefits 4 How

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent

Heckington Fen Onshore Wind Farm Application to Vary Existing Consent FAO Mr Keith Welford Department of Energy & Climate Change 3 Whitehall Place London SW1A 2AW 18th October 2016 By Email Only : keith.welford@decc.gsi.gov.uk Dear Mr Welford, Heckington Fen Onshore Wind

More information

Welcome to the Lyrenacarriga Wind Farm public information event

Welcome to the Lyrenacarriga Wind Farm public information event Welcome to the Lyrenacarriga Wind Farm public information event Innogy Renewables Ireland Ltd (innogy) is investigating the potential for developing Lyrenacarriga Wind Farm in the vicinity of Lyrencarriga

More information

SP Transmission Ltd SOUTH WEST SCOTLAND RENEWABLES CONNECTION PROJECT: ENVIRONMENTAL STATEMENT

SP Transmission Ltd SOUTH WEST SCOTLAND RENEWABLES CONNECTION PROJECT: ENVIRONMENTAL STATEMENT SP Transmission Ltd SOUTH WEST SCOTLAND RENEWABLES CONNECTION PROJECT: ENVIRONMENTAL STATEMENT Volume 3: Figures December 2008 VOLUME THREE: FIGURES INTRODUCTION 1.1 Location of Wind Farms Requiring Connection

More information

Prepared by:... Checked by:...

Prepared by:... Checked by:... Hameldon Hill Wind Farm Extension Volume 4 - Non Technical Summary Submitted on behalf of RWE NPower Renewables Limited to Burnley Borough Council December 2009 Prepared by:... Checked by:... Mark Herod

More information

Wether Hill Windfarm Extension

Wether Hill Windfarm Extension Wether Hill Windfarm Extension May 2013 May 2013 Wether Hill Windfarm Extension page i 1. Introduction 6 1.1 Background 6 1.2 The Applicant 6 1.3 Purpose of the Document 7 1.4 Structure 8 1.5 Terminology

More information

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton Clean Power owns a 4.5ha site at Whistleberry Road, Hamilton - the site of the former Craighead School. This site, which neighbours the East

More information

Merkins Windfarm Environmental Statement

Merkins Windfarm Environmental Statement Merkins Windfarm Environmental Statement Non Technical Summary October 2011 www.landuse.co.uk PREFACE Copies of the Environmental Statement can be obtained from: Lomond Energy East Cambusmoon Farm Gartocharn

More information

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014

BARRASFORD QUARRY PERIODIC REVIEW. Environmental Statement - Non Technical Summary. October 2014 BARRASFORD QUARRY PERIODIC REVIEW Environmental Statement - Non Technical Summary October 2014 Environmental Statement - Non Technical Summary. October 2014 1 LAFARGETARMAC.COM Introduction This is a Non

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 20 May 2014 by J M Trask BSc(Hons) CEng MICE an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 24 July 2014 Appeal

More information

State code 23: Wind farm development

State code 23: Wind farm development 23.1 Purpose statement The purpose of the code is to protect individuals, communities and the environment from adverse impacts as a result of the construction, operation and decommissioning of wind farm

More information

We are here to:

We are here to: Welcome! We are here to: Provide an overview and update of the proposed wind energy project Introduce the Project team Review the wind project development process Answer your questions NextEra Energy Resources

More information

WELCOME BRAINT WIND FARM

WELCOME BRAINT WIND FARM 252000 253000 254000 255000 376000 W Legend App - 73 1 Tur Lan Acc Cra 2 Co Sub 375000 3 Site Infra Applicatio Reproduced by permission of Ordnance Survey on behalf of HMSO. Crown copyright and database

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT

BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT BROGBOROUGH WIND ENERGY DEVELOPMENT DESIGN AND ACCESS STATEMENT FCC Environment Ltd [3512084A] [Final] Brogborough Wind Energy Development Prepared for FCC Environment Ltd Ground Floor West 900 Pavilion

More information

POLICY CONTEXT Introduction National Energy Policy Documents National Planning Policy Documents

POLICY CONTEXT Introduction National Energy Policy Documents National Planning Policy Documents 5. POLICY CONTEXT Introduction... 5-2 National Energy Policy Documents... 5-2 National Planning Policy Documents... 5-5 Local Planning Policy Documents... 5-14 Conclusions... 5-23 5-1 5. Policy Context

More information

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.

Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

LINE ONE LINE TWO LINE THREE

LINE ONE LINE TWO LINE THREE LINE ONE LINE TWO LINE THREE Hill of Braco Wind Farm Environmental Statement Volume 1: Non Technical Summary January 2013 Preface This Environmental Statement (ES) re ports the results of an Environmental

More information

Douglas West & Dalquhandy DP Renewable Energy Project

Douglas West & Dalquhandy DP Renewable Energy Project Douglas West & Dalquhandy DP Renewable Energy Project NON-TECHNICAL SUMMARY July 2015 Non-Technical Summary Contents 1. Background 1 2. Purpose of the Proposed Development Environmental Statement (ES)

More information

Berry Fen Wind Farm: Non-Technical Summary

Berry Fen Wind Farm: Non-Technical Summary Berry Fen Wind Farm: June 2014 Berry Fen Wind Farm Prepared on behalf of REG Windpower by LUC June 2014 Project Title: Berry Fen Wind Farm Environmental Statement: Client: REG Windpower Version Date Version

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

30A RULES FOR RENEWABLE ENERGY GENERATION

30A RULES FOR RENEWABLE ENERGY GENERATION 30A RULES FOR RENEWABLE ENERGY GENERATION Policies 16A.4.1 Activities Tables 30A.1 Subdivision Activities Activity Status The operation and maintenance of existing renewable energy generation facilities

More information

Barcloy Hill Wind Farm Environmental Statement Volume I - Non-technical Summary

Barcloy Hill Wind Farm Environmental Statement Volume I - Non-technical Summary Barcloy Hill Wind Farm Environmental Statement 2012 Volume I - Non-technical Summary Contents 1 Introduction 1 2 RES 3 3 Site Setting 3 Site Location 3 Environmental Sensitivity 3 4 The Need for the Development

More information

PLANNING & DESIGN & ACCESS STATEMENT To aid the planning application for the installation of 2 Endurance X-35 wind turbines, Located at:

PLANNING & DESIGN & ACCESS STATEMENT To aid the planning application for the installation of 2 Endurance X-35 wind turbines, Located at: PLANNING & DESIGN & ACCESS STATEMENT To aid the planning application for the installation of 2 Endurance X-35 wind turbines, Located at: Land Belonging to High Moor Farm, Land on the South side of Briscoe

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information