1 CHAPTER IX OPERATIONS AND MAINTENANCE PROGRAM 9.1 DISTRICT MANAGEMENT AND PERSONNEL The District is composed of approximately 110 full time positions that are organized into distinct departments including administrative services, operations and maintenance, engineering, and finance. The department heads report to the General Manager who is responsible for the overall management of the utility. The General Manager reports directly to the Board of Commissioners Organization Each department within the District has a specific function that is vital to the inner workings and function of the Utility. The departments work independently, yet cooperatively, in a symbiotic relationship with one another. Each of the departments are responsible for both the water and sewer functions of the District and work on each utility system as needed. The administrative services department provides administrative support to other District departments. The department functions include human resources, information technology and GIS, safety and emergency preparedness, communications, facilities management and support for the Board of Commissioners. The engineering department is led by the District Engineer. This department is responsible for the design, design review and inspection of new utility infrastructure and completion of the District s capital improvement projects. The rate of growth affects engineering staff requirements, as growth typically translates to the installation of new projects requiring engineering review and construction inspection. The finance department is responsible for billing, accounts payable, payroll, customer service and budget formulation. The operations and maintenance department is responsible for operation and maintenance of the treatment facility, the lift stations and force mains, and the gravity sewers and manholes. There are approximately 17 staff members employed as fulltime wastewater field personnel. The District employs seven staff members that work exclusively at the wastewater treatment facility. Additionally, there are three crews responsible for the collections system, consisting of two Vaccon crews (3 persons each) and a two person maintenance crew. The District has a lift station operator and a lift station mechanic that spend between 60% and 100% of their workweek maintaining the lift stations and the mechanical components throughout the collection system. These two positions are supported by a maintenance, field, and shop mechanic who spends 0% to 15% of their work week in this supporting role. The District has a full-time SCADA technician and electrician working on the water and sewer systems as needed. 9-1

2 9.1.2 Certification and Training The District encourages its employees to obtain certification and training for skills relevant to operating and maintaining the sewer system. All staff must, at a minimum, have the following: A high school diploma or GED. A driver s license. And field staff must be certified for confined space entry (CSE). The District requires the lead for the water/sewer works and the wastewater foreman to have a State of Washington Wastewater Collection System Operator (WWCS) 1 certification; however a WWCS 2 is preferred. Certifications are not required for water/sewer worker 1 in the District. In addition, the District provides employees with opportunities for training and certification relative to their position function. Each staff member annually receives approximately 24 hours training. Depending on the employee s function, training may include safety, confined space entry, record keeping, pump station electrical and instrumentation, pump station operation, public relations, vactor truck operations and routine line maintenance, traffic control, and sanitary sewer overflow (SSO)/emergency response. Training is provided in varying mixes of the following categories: Manufacturer training by various equipment suppliers and representatives. On-the-job training in the field, the shop, or in the office. In-house class room training. Industry-wide training at conferences and seminars away from the District. To promote the improvement of its employees, the District pays for annual certification fees, employee time and tuition during certification training courses and provides time off for certification testing. The District also provides staff opportunities to receive the continuing education necessary to maintain certification. Professional growth requirements for certification are met through continuing education units (CEU) that are recorded and maintained by the District. Time sheets are also coded to identify and track employee training hours. Certified District personnel are required to obtain a minimum of three CEUs in three years. 9.2 OPERATIONS AND MAINTENANCE ACTIVITIES AND PROGRAMS This section presents the operations and maintenance activities, including preventive and corrective routines, procedures and wastewater related programs. 9-2

3 9.2.1 Collection System Maintenance Lift Stations The District has a two-person crew that is dedicated to lift station maintenance and incident response. This crew visits every lift station a minimum of once per week. Those stations that are older or that have a tendency to be a source of problems are visited two or three times weekly. The emergency generators are exercised a minimum of once per month. That frequency increases to twice per month during the winter months. Typically the generators are exercised for a 2 to 4 hour period. Approximately half of the wet wells are washed down every month. These wet wells are those that have a high incident of grease accumulation. The remaining wet wells are washed down on a bi-monthly frequency. The District is installing a new SCADA system which will soon be functional. Though the District currently does not have the flexibility to insert a pigging mandrel into the force mains, consideration to adding this feature is being weighed Sanitary Sewers The District s staff has established a plan to conduct an annual internal inspection (closed circuit televising) of 180,000 linear feet of pipeline. The digital record of these inspections are reviewed by the technicians and any segment that is identified as needing repair, sliplining or replacement is noted and reviewed with the Engineering Department. Similarly, those segments that are structurally sound, but in need of routine attention are also tracked and, if warranted, added to the frequent flushing list. The lines that have been previously identified as needing routine flushing are identified on Table 8.1. Depending on the severity of the problem, the staff has categorized the flushing frequency as either monthly, quarterly, annually or bi-annually. The staff is also alert to the potential of odor concerns, though odor complaints in the collection system are extremely rare. The crew also hydraulically jets approximately 600,000 linear feet of pipe each year. The goal is to completely jet the District s entire system every five years Picnic Point WWTP Maintenance The program maintenance protocol currently being used at the WWTP consists of a manual card system that tracks historical maintenance measures for each piece of 9-3

4 equipment. This system has been the backbone of scheduling all preventative maintenance. The daily, weekly, monthly and annual measures of oil changes, lubrication and exercising of infrequently used equipment is chronicled on these cards The plant staff does most of the repairs and rebuilds with in house personnel. More complex tasks such as motor rewinding, electrical or instrumentation modifications are out sourced to a third party. Critical equipment that could affect effluent quality has redundant and backup equipment on-the-shelf. This redundancy allows the District to respond to equipment failures without effluent violations. With the backup equipment available the District currently does not routinely replace old equipment until such time as the maintenance efforts become burdensome and replacement is the prudent decision. The new MBR plant improvements will include features that will ease some of the laborintensive maintenance efforts associated with aging equipment. 9.3 PROGRAMS Pretreatment Program The District commissioners, through Resolution No , established pretreatment requirements for all dischargers into the District s system. These standards include a general prohibition that disallows any discharge that would result in a pass through or interference with the Public Owned Treatment Works. This resolution also contains a specific and detailed description of the prohibited substances. The following is a general summary of those specific prohibitions: Any substance that is considered explosive and/or has a flashpoint of less than 140 degrees Fahrenheit. Any substance that may cause an obstruction to the flow in a sewer or at the plant. This includes garbage with particles greater than one-quarter inch (1/4 ), waste from industrial processes including sludges, screenings, and pretreatment residues, animal guts or tissues, paunch manure, bones, hair, hides or fleshings, entrails, whole blood, feathers, ashes, cinders, sand, earth, gravel, coal, rubbish, spent lime stone or marble dust, metal, glass, straw, shavings, grass clippings, rags, spent grains, spent hops, waste paper, wood, plastics, gas, tar, asphalt residues, residues from refining, or processing of fuel or lubrication oil, mud, or glass grinding or polishing wastes. Any wastewater generally having a ph less than 5.5 or greater than 8.5 Any wastewater containing toxic pollutants Any noxious or malodorous substance Any substance that may result in toxic gases, vapors or fumes. Medical wastes Septage Substances that might result in biosolids to be unsuitable for reclamation Substances containing color such as stains, dyes, and paints 9-4

5 Wastewater that is greater than 149 degrees Fahrenheit. Any amount of unpolluted water including non-contact cooling water, stormwater, and other indirect inflow sources. Wastewater containing radioactive wastes. Any substance that would result in a violation of the District s NPDES permit. Metal concentrations must not exceed o Arsenic 0.5 mg/l o Cadmium 0.24 mg/l o Chromium 5.0 mg/l o Copper 3.0 mg/l o Cyanide 0.65 mg/l o Lead 1.89 mg/l o Mercury 0.1 mg/l o Nickel 2.83 mg/l o Silver 0.49 mg/l o Zinc 4.0 mg/l High strength dischargers of BOD, TSS and FOG are obligated to have special provisions that might restrict their rate of discharge or have specific pretreatment requirements. The District s pretreatment resolution also defines the requirements for sizing and maintaining the grease traps and/or interceptors. Failure to comply with the limitations and prohibitions presented above may result in the issuance of a Corrective Order and, if the directive of the corrective order is not followed, fines may be imposed on the violator. The District s FOG policy was passed by the Board of Commissioners under Resolution (see Appendix M) Water Reclamation and Reuse The current plant uses chlorinated and strained effluent for wash down purposes within the plant. No offsite use is currently allowed. The plant does not meter wash down water, so the volume of reuse water is not known. The new MBR plant, as previously stated, has reserved an area and preserved the flexibility for reclaimed water equipment in the future. The future use of reclaimed water will include the District s use for line and manhole flushing and potentially for irrigational use as discussed in Chapter Biosolids Recycling All biosolids generated at the plant are dewatered and hauled to GrowCo in the Kent Valley. There are approximately two to three loads per week delivered to that facility. 9-5

6 Each load is approximately 3 dry tons. Last year a total of approximately 400 dry tons were processed. The biosolids are dewatered using a belt filter press. The 2007 costs associated with hauling was $22.50 per dry ton and the costs for tipping was $64.00 per dry ton. GrowCo uses the biosolids in their composting operations. The new centrifuge and thermal dryer will result in biosolids volumes that are only 12 to 14 percent of that which is currently being hauled to GrowCo. Initially the dried biosolids will be hauled to GrowCo. However, consideration will be given to local distribution to nurseries and parks Sewage Spill Response Plan Emergency response to reported sewage spills and back ups typically come into the District Administrative offices. These calls are forwarded to the maintenance department during normal business hours. During non-business hours, the District has a rotating assignment among the staff to be on-call to respond to incidents 24 hours a day, 7 days per week. The District also requires the user that may have discharged a slug load or accidental discharge of substances prohibited into the POTW to notify the Lead Operator of the Wastewater Treatment Plant immediately. Written report of the event is required within five days of the first notification. The District has a reporting protocol that includes informing the Department of Ecology within the next business day of the spill and within 24 hours to the Snohomish County Health Department CMOM The EPA has issued draft regulations implementing the Capacity, Management, Operations, and Maintenance (CMOM) program. CMOM requires the development of facility maintenance plans, tracking of asset condition, establishing level of service and performance goals. Key requirements are outlined below: 1. Capacity Assurance Plan evaluate existing system; identify capacity deficiencies; establish short and long-term remedies to capacity deficiencies. 2. Management Program specify program goals; establish organizational structure legal authority (e.g. service agreements) to manage flow; establish program measures and ranking of O&M activities based on current capacity and structural deficiencies. 9-6

7 audit documentation of changes in system condition and performance establish standards and requirements for new construction as well as rehabilitation and repair. 3. Overflow Response Plan (ORP) steps to respond to SSO s and to implement response plan 4. Audit Operations and Maintenance performance initial assessment of O&M activities; establish performance goals, measures and priorities perform periodic audits to identify progress and required revisions to the program. Between 2002 and 2004, District staff prepared a draft CMOM plan that responded to the draft regulations. However, since the rules were not promulgated, implementation of that plan has not moved forward Puget Sound Water Quality Management Plan The Federal Water Pollution Control Act established the requirement for a Water Quality Management Plan. Resultantly, RCW established the need of a Puget Sound Water Quality Management Plan. The stated objectives of this governance are to recover of the Puget Sound waters by the year This Comprehensive Sewer Plan is consistent with the intended goals of the Water Quality Management Plan. 9.4 MANAGEMENT SYSTEM / RECORD KEEPING Collection System The District maintains an ongoing record of existing and as-built sewer extensions. Previously these records were retained as AutoCAD files, though more recently, the District has developed GIS based drawings in an effort to have a more comprehensive and consolidated record of pipe age, size and material, invert and rim elevations, slopes and manhole identifiers. As the GIS mapping expands, the O&M activities should be incorporated into this data base. These activities should include the last time the pipe segments were internally televised, flushed and jetted. It could also include incident reports, backup events and surcharging manholes National Pollution Discharge Elimination System (NPDES) Permit The District s NPDES permit requires that record keeping be maintained and that regular reporting be made to DOE. Any spills in the District s collection system are reported as part of the NPDES Permit requirements. A copy of the District s current NPDES Permit is included in Appendix K. 9-7

8 9.5 PERFORMANCE INDICATORS Wastewater Treatment Plant The Picnic Point WWTP operates under the current NPDES Permit No. WA This permit requires regular reporting of influent loading and effluent mass and concentrations discharged through the existing marine outfall. From the period beginning in September 2000 through July 2006, the plant noted only two excursions beyond the limits defined in the permit. These are summarized below: Minimum ph threshold of 6.00 was exceeded in September 2000 with a reading of 5.86 Maximum chlorine residual of 0.50 mg/l was exceeded in November 2003 with a measurement of 0.55 mg/l The NPDES permit also defines the maximum allowable influent loadings and concentrations. Several excursions beyond the prescribed mass loading limits for the influent BOD and Total Suspended Solids were noted. Despite greater influent loadings, the plant was able to meet the BOD and TSS effluent threshold values in the NPDES permit. 9.6 CONDITION ASSESSMENT Collection System The District staff has an ongoing routine of performing internal inspection of the District s lines. As described in section the staff TVs approximately 180,000 linear feet of pipe each year. These records are retained and reviewed to judge the progression of the deterioration of those pipe segments. The staff also maintains a frequent flush list. The frequency and any particular observances are tracked in a separate notebook specifically for these chronic problem areas Lift Stations A conditions assessment report was prepared in 2007 that identified and prioritized the recommended improvements for the District s lift stations. The recommendations were grouped into three categories: Asset improvements that were common to all stations Specific upgrades or replacements needed now. Future or anticipated improvements (Asset Upgrade Program). 9-8

9 The recommendations contained in that report have been incorporated into the CIP in Chapter STAFFING NEEDS The District employs a total of 17 field people in the wastewater division. Of these 17, seven are assigned to the WWTP, six are Vaccon crews, two are line maintenance and two are lift station maintenance. In addition, the District has various other staff that work between the water and wastewater divisions, including a SCADA technician, electrician and other staff. The WWTP is staffed 10 hours/day, 5 days/week. On weekends and holidays personnel are assigned to visit the plant and take samples and laboratory work as necessary. These weekend visits are typically 2 to 3 hours. To compare the pipeline and lift station staffing with other special service districts, the report has looked at the Woodinville Water District and Southwest Suburban Sewer District. The summary below also presents the estimates as used by EPA in the Estimating Costs and Manpower Requirements for Conventional Wastewater Treatment Facilities and Innovative and Alternative Technology Assessment Manual. Agency Service Lift Current Length Person/ Person/ Area, Ac Stations Staff Pipe, LF 100,000 LF 10,000 Ac. Woodinville WD 1, , SWSSD 7, ,419, AWWD 24, ,942, EPA Estimate for AWWD 11 As expected, the personnel per acre values decrease as the size of the service area increases. However, using a very conservative application of the EPA guidelines, it would suggest that the District might be slightly under staffed by one employee. Prior to adding staff, it is recommended that the District revisit their previous staffing studies to determine if adding staff is warranted. 9.8 RECOMMENDED OPERATION AND MAINTENANCE IMPROVEMENTS The District has been proactive in taking steps to solve the most critical maintenance issues. The Lift Station assessment identified the improvements needed. The District has been responsive to these improvements and has incorporated them into the CIP. One feature that the District may want to consider is the addition of a pigging mandrel station for those force mains that are prone to solids deposition. 9-9

10 The construction of the new MBR plant will replace many of the labor intensive efforts needed to keep the existing plant functional. The District should consider incorporating an automated maintenance management system for the new MBR plant and all of the District s facilities. This would provide automatic reminders of routine maintenance tasks as well as less frequent and non-routine tasks. 9-10

2.0 PROHIBITIONS AND LIMITATIONS ON WASTEWATER DISCHARGES

2.0 PROHIBITIONS AND LIMITATIONS ON WASTEWATER DISCHARGES 2.0 PROHIBITIONS AND LIMITATIONS ON WASTEWATER DISCHARGES 2.1 PROHIBITIONS ON WASTEWATER DISCHARGES No person may discharge, or allow to be discharged, into the treatment works of the Authority or any

More information

No user shall introduce or cause to be introduced into the POTW the following pollutants, substances, or wastewater:

No user shall introduce or cause to be introduced into the POTW the following pollutants, substances, or wastewater: SECTION 30.03 - PRETREATMENT OF WASTEWATER 1. Prohibited Discharge Standards General Prohibitions (i) (ii) No user shall introduce or cause to be introduced into the POTW any pollutant or wastewater, which

More information

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges.

TOWN OF HASTINGS, FLORIDA TOWN CODE. Chapter 18. Previous Page. Water and Sewer. Article II. Sewers -- Prohibited Discharges. TOWN OF HASTINGS, FLORIDA TOWN CODE Chapter 18 Previous Page Water and Sewer Article II Sewers -- Prohibited Discharges. Sec. 18-20. General Prohibition No Person shall discharge or cause to be discharged

More information

The Board of Supervisors of the County of Riverside, State of California, do ordain as follows:

The Board of Supervisors of the County of Riverside, State of California, do ordain as follows: ORDINANCE NO. 592 (AS AMENDED THROUGH 592.1) AN ORDINANCE OF THE COUNTY OF RIVERSIDE AMENDING ORDINANCE NO. 592 REGULATING SEWER USE, SEWER CONSTRUCTION AND INDUSTRIAL WASTEWATER DISCHARGES IN COUNTY SERVICE

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

SANITARY SEWER SERVICE POLICIES

SANITARY SEWER SERVICE POLICIES CHAPTER 95 SANITARY SEWER SERVICE POLICIES 95.01 Service Characteristics 95.04 Costs of Installation; Permit Required 95.02 Engineering Practice 95.05 Construction Materials and Methods 95.03 Sewer Line

More information

Mark Kelly, PE Industrial Waste Engineer July 25, 2013

Mark Kelly, PE Industrial Waste Engineer July 25, 2013 Mark Kelly, PE Industrial Waste Engineer July 25, 2013 What is The Sewer Use and Wastewater Control Ordinance? Sets requirements for sanitary sewer users Regulates the discharge of pollutants into the

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

Essential Pretreatment program knowledge and requirements in accordance with 40 CFR 403

Essential Pretreatment program knowledge and requirements in accordance with 40 CFR 403 Essential Pretreatment program knowledge and requirements in accordance with 40 CFR 403 Purpose It establishes responsibilities of Federal, State, and local government, industry and the public to implement

More information

Industrial Pretreatment Program Industrial User Guide

Industrial Pretreatment Program Industrial User Guide Industrial Pretreatment Program Industrial User Guide Industrial Pretreatment Program Industrial User Guide Contents Introduction... 1 Federal and Local Regulations... 1 Industrial Waste Discharge Permitting...

More information

UC DAVIS LOCAL LIMITS - SEWER DISPOSAL POLICY

UC DAVIS LOCAL LIMITS - SEWER DISPOSAL POLICY UC Davis has developed the following policy governing sewer disposal. 1. General Discharge Prohibitions Unless specifically approved by the Manager (currently O&M Utilities Manager David Phillips), no

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

Sanitary Sewer Collection System Annual Performance Report 2018 WDR R

Sanitary Sewer Collection System Annual Performance Report 2018 WDR R Sanitary Sewer Collection System Annual Performance Report 218 WDR R3-22-78 January 31, 219 Sanitary Sewer Collection System Performance Report State of California Water Quality Control Board. WDR R3-22-78

More information

Lucas County Sanitary Engineer 2015 Strategic Plan

Lucas County Sanitary Engineer 2015 Strategic Plan Lucas County Sanitary Engineer 2015 Strategic Plan MISSION Defines scope of responsibilities and expectations of the desired level of service TO PROVIDE CUSTOMERS WITH HIGH QUALITY, SAFE, COST EFFECTIVE

More information

Frequently Asked Questions for Permitting

Frequently Asked Questions for Permitting Frequently Asked Questions for Permitting What is a National Pretreatment Program? The National Pretreatment Program is a cooperative effort of federal, state, and local regulatory environmental agencies

More information

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Western Region-Salem Office PERMITTEE: City of Aumsville P.O. Box 227 Aumsville, OR 97325 File Number: 4475

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

BOROUGH OF ALBURTIS SEWER DEPARTMENT

BOROUGH OF ALBURTIS SEWER DEPARTMENT BOROUGH OF ALBURTIS SEWER DEPARTMENT Capacity, Management, Operations, and Maintenance Program for Sewers Borough of Alburtis Lehigh Co., Pennsylvania February 2018 Prepared for: BOROUGH OF ALBURTIS 260

More information

2.3.3 Defining Metrics Refining Survey Questions Arranging Data in a Matrix Reviewing Performance Indicators 18

2.3.3 Defining Metrics Refining Survey Questions Arranging Data in a Matrix Reviewing Performance Indicators 18 Table of Contents Chapter 1 Understanding Wastewater Collection System Problems and Needs 1.1 Purpose of a Wastewater Collection System 2 1.2 Problems 2 1.3 O&M Programs 4 1.3.1 Types of Maintenance 5

More information

A Class I Permit is issued to any user who meets any one of the following conditions:

A Class I Permit is issued to any user who meets any one of the following conditions: chapter 3 PERMITS 3.1 INTRODUCTION The Orange County Sanitation District s (District) Industrial Wastewater Discharge Permit System was implemented to establish control mechanisms which contain effluent

More information

Beckley Sand/Oil/Water Separator Survey Form

Beckley Sand/Oil/Water Separator Survey Form Beckley Sanitary Board Sand/Oil/Water Separator Survey Form General: The purpose of this document is to provide the reader with general information about how sand traps and oil/water separators work and

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE

DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE I. INSPECTION FEES A. For Laterals - $100 DERRY TOWNSHIP MUNICIPAL AUTHORITY RATE SCHEDULE B. For Building Sewers 150 feet or less in length - $100. Fees for longer Building Sewers may be charged based

More information

RULE NO. 19 PRETREATMENT PROGRAM WASTEWATER DISCHARGE PERMIT

RULE NO. 19 PRETREATMENT PROGRAM WASTEWATER DISCHARGE PERMIT RULE NO. 19 PRETREATMENT PROGRAM WASTEWATER DISCHARGE PERMIT In compliance with regulations of the Environmental Protection Agency, the commercial and industrial Customers located within the certificated

More information

PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES

PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES Click to edit Master title style PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES SPEAKERS Scott Smith Shri Vani Sripada February 20, 2014 Click to edit Master title style WHAT ARE LOCAL LIMITS &

More information

WASTEWATER DISCHARGE PERMIT APPLICATION AUTOMOTIVE OPERATIONS

WASTEWATER DISCHARGE PERMIT APPLICATION AUTOMOTIVE OPERATIONS WASTEWATER DISCHARGE PERMIT APPLICATION AUTOMOTIVE OPERATIONS * * * * * * * * * * * RETURN TO: NARRAGANSETT BAY COMMISSION PRETREATMENT SECTION 2 ERNEST STREET PROVIDENCE, RHODE ISLAND 02905 (401) 461-8848

More information

MT. VIEW SANITARY DISTRICT POLICY & PROCEDURE MANUAL

MT. VIEW SANITARY DISTRICT POLICY & PROCEDURE MANUAL POLICY TITLE: JOB DESCRIPTION WASTEWATER OPERATOR SERIES Wastewater Operator-in-Training I POLICY NUMBER: 2435 Definition This job series description includes the entry level through journey level wastewater

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

Upper Blackstone Water Pollution Abatement District

Upper Blackstone Water Pollution Abatement District Upper Blackstone Water Pollution Abatement District Pretreatment Annual Report 2017 2 Table of Contents Section Title Page 1.0 Introduction 5 2.0 Program Effectiveness 6 Compliance and Enforcement Public

More information

4.1 Sewer System Mapping

4.1 Sewer System Mapping A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains,

More information

Section 9 Monitoring, Measurement, and Program Modifications

Section 9 Monitoring, Measurement, and Program Modifications Monitoring, Measurement, and Program Modifications One of the critical components of a comprehensive SSMP program is the development and tracking of performance indicators. Performance indicators describe

More information

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility 2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:

More information

The City of Grand Forks Industrial Pretreatment Program

The City of Grand Forks Industrial Pretreatment Program The City of Grand Forks Industrial Pretreatment Program Background Environmental Protection Agency (EPA) was created in December 1970 through a Presidential Executive Order. The Clean Water Act passed

More information

City of Visalia Sewer System Management Plan (SSMP) August 2012

City of Visalia Sewer System Management Plan (SSMP) August 2012 City of Visalia Sewer System Management Plan (SSMP) August 2012 Table of Contents Chapter 1: Introduction... 2 Chapter 2: Goals... 7 Chapter 3: Organization... 9 Chapter 4: Legal Authority... 12 Chapter

More information

COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 PERMIT AGENDA

COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 PERMIT AGENDA COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 Erik D. White, PE Michael Golando, Esq COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT AGENDA

More information

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge For the Service Area of the Littleton/Englewood Wastewater

More information

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 250-RICR-150-10-4 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 150 WATER RESOURCES SUBCHAPTER 10 - WASTEWATER & STORMWATER PART 4 Rules and Regulations for the Operation and Maintenance of

More information

ATTACHMENT B. FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9)

ATTACHMENT B. FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9) ATTACHMENT B FEES AND CHARGES OF RENEWABLE WATER RESOURCES (ReWa) (Effective January 1, 2019) RESIDENTIAL CHARGES (1)(7)(9) Volume Charge Base Charge $5.86 per 1,000 gallons of metered water $12.00 per

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

APPLICATION FOR SPECIAL DISCHARGE APPROVAL

APPLICATION FOR SPECIAL DISCHARGE APPROVAL APPLICATION FOR SPECIAL DISCHARGE APPROVAL I. WASTEWATER SOURCE IDENTIFICATION: II. APPLICANT (mailing information): Site Name: Applicant Name: Premise Address: Title: City: State: Zip: Company Name: Owner:

More information

Capacity Assurance, Management, Operation, and Maintenance Program

Capacity Assurance, Management, Operation, and Maintenance Program CITY OF INDIANAPOLIS Capacity Assurance, Management, Operation, and Maintenance Program Table of Contents EXECUTIVE SUMMARY...ES-1 SECTION 1 PURPOSE AND GOALS... 1-1 1.1 Purpose... 1-1 1.2 Goals... 1-2

More information

City of Needles Waste Water

City of Needles Waste Water City of Needles Waste Water Sewer System Management Plan (SSMP) 817 Third Street Needles, CA 92363 March 2011 Table of Contents LIST OF ABBREVIATIONS... 3 Section I GOALS... 5 Section II ORGANIZATION...

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

BEVERLY HILLS STAFF REPORT. Meeting Date: December 5, 2017 To: From:

BEVERLY HILLS STAFF REPORT. Meeting Date: December 5, 2017 To: From: BEVERLY HILLS 9 STAFF REPORT Meeting Date: December 5, 2017 To: From: Honorable Mayor & City Council Trish Rhay, Assistant Director of Public Works Josette Descalzo, Environmental Compliance and Sustainability

More information

Learning Wastewater Treatment

Learning Wastewater Treatment Learning Wastewater Treatment The Northeast Ohio Regional Sewer District encourages all employees to learn about its core service, the collection, treatment and disposal of wastewater. Employees can increase

More information

CHAPTER 2 WASTEWATER REGULATORY ISSUES

CHAPTER 2 WASTEWATER REGULATORY ISSUES CHAPTER 2 WASTEWATER REGULATORY ISSUES 2.1 Introduction The principal regulations affecting GWA s wastewater utility are included in the federal Clean Water Act. This important body of regulations includes

More information

SANITARY SEWER SYSTEM C.M.O.M. PROGRAM

SANITARY SEWER SYSTEM C.M.O.M. PROGRAM SANITARY SEWER SYSTEM C.M.O.M. PROGRAM Prepared by Bradley Bennett, P.E. Certified Collection System Operator March 2010 Table of Contents I. INTRODUCTION... 3 A. SANITARY SEWER SYSTEM DESCRIPTION... 3

More information

GENERAL FATS, OILS, & GREASE (FOG) PERMIT

GENERAL FATS, OILS, & GREASE (FOG) PERMIT GENERAL FATS, OILS, & GREASE (FOG) PERMIT FOR AUTHORIZATION TO DISCHARGE COMMERCIAL WASTEWATER FROM THE FOOD SERVICE ESTABLISHMENT FOOD PREPARATION AND KITCHEN SERVICE AREA TO THE CITY OF DOTHAN, ALABAMA

More information

City of Clinton: Wastewater Systems Annual Performance Report

City of Clinton: Wastewater Systems Annual Performance Report City of Clinton: Wastewater Systems Annual Performance Report January 2016 through December 2016 I. General Information Facility/System Name: City of Clinton Collection System and Norman H. Larkins Wastewater

More information

Waste Discharge Permit Application

Waste Discharge Permit Application Greater Vancouver Sewerage & Drainage District Sewer Use Bylaw No. 299 (as amended), 2007 Apr 2018-26992661 GVS&DD This is an application for a Waste Discharge Permit under the Greater Vancouver Sewerage

More information

CITY OF SIOUX FALLS ADMINISTRATIVE RULES. Chapter 77 Public Works / Water Reclamation. Article 77:01 INDUSTRIAL PRETREATMENT PROGRAM

CITY OF SIOUX FALLS ADMINISTRATIVE RULES. Chapter 77 Public Works / Water Reclamation. Article 77:01 INDUSTRIAL PRETREATMENT PROGRAM CITY OF SIOUX FALLS ADMINISTRATIVE RULES Chapter 77 Public Works / Water Reclamation Article 77:01 INDUSTRIAL PRETREATMENT PROGRAM Division 77:01:01 LIQUID WASTE CONTROL PROGRAM ADOPTED: MARCH 3, 1998

More information

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF WATER RESOURCES RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

More information

Monthly Operating Report

Monthly Operating Report Executive Summary Wastewater Treatment Plant Operations staff is working with partners to evaluate 1) a system to automate control of the solids balance aspect of the treatment plant s activated sludge

More information

WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane

WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane AND MOST IMPORTANTLY. ARE YOU MEETING YOUR CURRENT PRETREATMENT PERMIT LIMITS? IF NOT, CAN YOUR COMPANY PARTICIPATE IN

More information

SERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING

SERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING Operation and Maintenance This section summarizes key operation and maintenance aspects of the City's sewer system. Included in this section is a description of the wastewater system personnel, instrumentation

More information

PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT

PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT PORT SEVERN WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: #3-0429-96-006 INTRODUCTION The Lone Pine Road Water Pollution Control Plant in Port Severn was a design / build

More information

HARNETT COUNTY NC OIL & GREASE CONTROL ORDINANCE

HARNETT COUNTY NC OIL & GREASE CONTROL ORDINANCE HARNETT COUNTY NC OIL & GREASE CONTROL ORDINANCE In an effort to curb sanitary sewer overflows (SSO s) from grease accumulation in its sanitary sewer mains, the Harnett County Board of Commissioners adopted,

More information

City of Pocatello Water Pollution Control. Collections Systems, Operations, Maintenance, Laboratory and Pretreatment

City of Pocatello Water Pollution Control. Collections Systems, Operations, Maintenance, Laboratory and Pretreatment City of Pocatello Water Pollution Control Collections Systems, Operations, Maintenance, Laboratory and Pretreatment WPC Mission statement To collect and treat wastewater at the lowest practical cost while

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

Clark County Water Reclamation District January 1, 2017

Clark County Water Reclamation District January 1, 2017 Clark County Water Reclamation District January 1, 2017 DEFINITIONS Unless specifically indicated otherwise, the meaning of terms in these Service Rules shall be as follows. 1. Accidental Discharge Accidental

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018 NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, 2017 - SEPTEMBER 30, 2018 Introduction This document serves as the Pennsylvania Department of Environmental Protection

More information

WATER RESOURCES COORDINATOR

WATER RESOURCES COORDINATOR File: Water Resources Coordinator Job Code: 456 FLSA: Non-exempt Unit: Public Services Operating Engineers Local 3 Revised: 2/2001 WATER RESOURCES COORDINATOR DEFINITION Under general supervision, plans,

More information

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM Page 1 of 10 INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM S A N F R A N C I S C O P U B L I C U T I L I T I E S C O M M I S S I O N Wastewater Enterprise/Collection System Division 3801

More information

SEWER SYSTEM MANAGEMENT PLAN (SSMP) for the. Summerland Sanitary District

SEWER SYSTEM MANAGEMENT PLAN (SSMP) for the. Summerland Sanitary District SEWER SYSTEM MANAGEMENT PLAN (SSMP) for the Summerland Sanitary District Table of Contents Introduction... 1 Goals... 1 Organization... 2 Legal Authority... 4 Operations and Maintenance Program... 5 Design

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

City of Tehachapi Sewer System Management Plan (SSMP)

City of Tehachapi Sewer System Management Plan (SSMP) City of Tehachapi Sewer System Management Plan (SSMP) 10/10/2012 Table of Contents Page(s) Section I SSMP Goals.2 Section II - Organization...3-5 Section III Legal Authority..6 Section IV Operations and

More information

SEWER SYSTEM MANAGEMENT PLAN (SSMP)

SEWER SYSTEM MANAGEMENT PLAN (SSMP) SEWER SYSTEM MANAGEMENT PLAN (SSMP) August 2010 TABLE OF CONTENTS SYSTEM OVERVIEW... 1 1.0 GOALS... 2 2.0 ORGANIZATION... 3 3.0 OVERFLOW AND EMERGENCY RESPONSE PLAN... 4 4.0 FATS, OILS AND GREASE (FOG)

More information

NPDES Permit No. IL Notice No. BDF: bah. Public Notice Beginning Date: February 17, Public Notice Ending Date: March 19, 2012

NPDES Permit No. IL Notice No. BDF: bah. Public Notice Beginning Date: February 17, Public Notice Ending Date: March 19, 2012 Notice No. BDF:11041503.bah Public Notice/Fact Sheet Issued By: Public Notice Beginning Date: February 17, 2012 Public Notice Ending Date: March 19, 2012 National Pollutant Discharge Elimination System

More information

SUMMARY OF FEDERAL PRETREATMENT STANDARDS CENTRALIZED WASTE TREATMENT CATEGORY. Within U.S.: 165

SUMMARY OF FEDERAL PRETREATMENT STANDARDS CENTRALIZED WASTE TREATMENT CATEGORY. Within U.S.: 165 SUMMARY OF FEDERAL PRETREATMENT STANDARDS CENTRALIZED WASTE TREATMENT CATEGORY Applicable CFR: 40 CFR Part 437 Estimated Number of Companies Affected: Within U.S.: 165 Proposal in Federal Register: January

More information

Bracebridge Wastewater Treatment 2017 Summary Report

Bracebridge Wastewater Treatment 2017 Summary Report Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District

More information

University of California Santa Cruz

University of California Santa Cruz University of California Santa Cruz Sewer System Management Plan May 2009 Rev July 2013 Rev May 2014 Rev June 2016 UCSC SSMP 062016.doc 2 Table of Contents 1.0 Goals of the SSMP Page 4 2.0 Organization

More information

City of Fairview Park

City of Fairview Park Cuyahoga County Together We Thrive 2016 ANNUAL REPORT Prepared For The: City of Fairview Park By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Department of Public Works Established in 1919, the office of the

More information

Cuyahoga County Together We Thrive 2016 ANNUAL REPORT. City of Lyndhurst. Prepared For The: By the DEPARTMENT OF PUBLIC WORKS

Cuyahoga County Together We Thrive 2016 ANNUAL REPORT. City of Lyndhurst. Prepared For The: By the DEPARTMENT OF PUBLIC WORKS Cuyahoga County Together We Thrive 2016 ANNUAL REPORT Prepared For The: City of Lyndhurst By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Department of Public Works Established in 1919, the office of the Cuyahoga

More information

Need-to-Know Criteria Wastewater Treatment Operator Class IV

Need-to-Know Criteria Wastewater Treatment Operator Class IV 2017 Need-to-Know Criteria Wastewater Treatment Operator Class IV A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class IV Certification Exam Before You Dive In What is ABC

More information

OIL/WATER SEPARATORS & GREASE INTERCEPTORS. Requirements for Oil/Water Separators and Grease Interceptors discharging into Kitsap County Sewer mains

OIL/WATER SEPARATORS & GREASE INTERCEPTORS. Requirements for Oil/Water Separators and Grease Interceptors discharging into Kitsap County Sewer mains OIL/WATER SEPARATORS & GREASE INTERCEPTORS Requirements for Oil/Water Separators and Grease Interceptors discharging into Kitsap County Sewer mains ************************************************************************

More information

City of Clovis Sewer System Management Plan

City of Clovis Sewer System Management Plan City of Clovis Sewer System Management Plan July 2014 City of Clovis Sewer System Management Plan 1 Element 1 - Goals This Sewer System Management Plan (SSMP) element identifies the goals of the City of

More information

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI

Report. Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI Report Inflow Design Flood Control System Plan St. Clair Power Plant St. Clair, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,

More information

2015 Annual Report. Prepared For The: City of Lyndhurst. By the DEPARTMENT OF PUBLIC WORKS

2015 Annual Report. Prepared For The: City of Lyndhurst. By the DEPARTMENT OF PUBLIC WORKS 2015 Annual Report Prepared For The: City of Lyndhurst By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Established in 1919, the office of the Cuyahoga County Sanitary Engineer was created to provide administrative

More information

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned

More information

OPERATOR SERIES OPERATOR-IN-TRAINING (Operator-in-Training)/I/II/III Salary Grades 128/149/170/189

OPERATOR SERIES OPERATOR-IN-TRAINING (Operator-in-Training)/I/II/III Salary Grades 128/149/170/189 December, 2017 OPERATOR SERIES OPERATOR-IN-TRAINING (Operator-in-Training)/I/II/III Salary Grades 128/149/170/189 DEFINITION Under immediate (Operator-in-Training and Operator I) to general (Operator II)

More information

Section 303 General Sewer Regulations Page 1 of 8

Section 303 General Sewer Regulations Page 1 of 8 303. Minnetonka Beach City Code Sec. 303 (1) Unauthorized Connections. No unauthorized person shall uncover, make any connection with or opening into, use, alter, or disturb any public sewer or appurtenance

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

2016 Industrial Waste Pretreatment Seminar A "How To" Guide for Pretreatment. November 2, 2016

2016 Industrial Waste Pretreatment Seminar A How To Guide for Pretreatment. November 2, 2016 2016 Industrial Waste Pretreatment Seminar A "How To" Guide for Pretreatment November 2, 2016 How to Guide: Classification, Permitting & Enforcement Lisa Lucht, P.E. Nichole Schaeffer, P.E. Jennifer Sorensen,

More information

OVERVIEW OF POTW PRETREATMENT PROGRAM REQUIREMENTS

OVERVIEW OF POTW PRETREATMENT PROGRAM REQUIREMENTS OVERVIEW OF POTW PRETREATMENT PROGRAM REQUIREMENTS STATE WATER BOARDS Julio Lara Compliance, Regulatory and Permitting Section Regional Water Quality Control Board, Santa Ana Region (951) 782-4901, Julio.Lara@waterboards.ca.gov

More information

City of Cleveland Heights

City of Cleveland Heights 2015 Annual Report Prepared For The: City of Cleveland Heights By the DEPARTMENT OF PUBLIC WORKS OVERVIEW Established in 1919, the office of the Cuyahoga County Sanitary Engineer was created to provide

More information

WASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION)

WASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION) ENVIRONMENTAL STANDARD OPERATING PROCEDURE 17 WASTEWATER EFFLUENT DISPOSAL PUBLICLY OWNED TREATMENT WORKS (CAMP BARRETT WASTEWATER PUMP STATION) 1. Version, Date. 1, 12 Feb 08 (EMS) 2. Purpose. This document

More information

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017

Georgia Power Plant Bowen NPDES Permit No. GA Ash Pond Dewatering Plan. Revised December 2017 Georgia Power Plant Bowen NPDES Permit No. GA0001449 Revised December 2017 Purpose This (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures that Georgia Power

More information

A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater

A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater A Happy Marriage? How Your Friends in Sewer will Save Your Stormwater Zach Henderson Woodard & Curran Tim Haskell and Phillip Tucker York Sewer District AMERICAS WASTEWATER AND STORMWATER INFRASTRUCTURE

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

City of Mebane. Wastewater Collection and Treatment Facility

City of Mebane. Wastewater Collection and Treatment Facility --...-.-.--~~---------------- City of Mebane. Wastewater Collection and Treatment Facility For the Fiscal Year July 1, 2015 - June 30, 2016 City of Mebane Wastewater Collection and Treatment Facility For

More information

MEADOW LAKE COUNTY WATER & SEWER DISTRICT POLICIES AND PROCEDURES

MEADOW LAKE COUNTY WATER & SEWER DISTRICT POLICIES AND PROCEDURES MEADOW LAKE COUNTY WATER & SEWER DISTRICT POLICIES AND PROCEDURES Who Are We? The Meadow Lake County Water & Sewer District was formed February 6, 1984 as a duly authorized non-profit corporation to provide

More information

Core Elements: Fats, Oils, and Grease (FOG) Ordinance No. OCSD-25

Core Elements: Fats, Oils, and Grease (FOG) Ordinance No. OCSD-25 ORANGE COUNTY SANITATION DISTRICT F A C T S H E E T Core Elements: Fats, Oils, and Grease (FOG) Ordinance No. OCSD-25 The Orange County Sanitation District s (OCSD) Board of Directors adopted a Fats, Oils,

More information

SEWER USER RATE CHARGE STUDY

SEWER USER RATE CHARGE STUDY SEWER USER RATE CHARGE STUDY CITY OF PRESCOTT SEWER DEPARTMENT JULY 2018 604 WILSON AVENUE MENOMONIE, WI 54751 CONTENTS CONTENTS...i 1 INTRODUCTION...3 1.1 PURPOSE...3 1.2 EXISTING SEWER USER CHARGE BASIS...3

More information