Installation instructions
|
|
- Ira Harrison
- 6 years ago
- Views:
Transcription
1 Installation instructions Holetherm Single-walled flue gas discharge system (EW) 2016
2 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints. Holetherm reserves the right to change information, including the text of this disclaimer, at any time, without notice in this regard. This disclaimer is governed by Dutch Law.
3 Index 1 General Introduction 4 2 Quality standards Declaration of Performance Certification Characteristics channel load and resistances 4 3 Instructions Laws and regulations Application Characteristics of the material 6 4 Fire safety and channel installation Fire safety Channel installation Lining existing channel Bending Roof installation Conduits 8 5 Outlet Outlet area of atmospheric flue gas outlet Calculation of the outlet height 10 6 Dilution factor Calculation A detailed example 11 7 Channel maintenance Channel cleaning 13
4 1 General 1.1 Introduction These installation, assembly and maintenance instructions were published to ensure the safety of the product, in a construction environment. They have been drawn up according to the current state of science and technology and serve only as a general guideline. This guideline may be amended regularly based on new insights and regulatory requirements. The current version can be viewed on These instructions have been drawn up with the utmost care. The installer remains responsible for the correct installation of our materials, based on his or her skills. Holetherm shall never accept liability for possible damages resulting from plainly following these instructions in practice. If you have any doubts about the implementation and application, contact one of our experts first. 2 Quality standards 2.1 Declaration of Performance From 1 July 2013, manufacturers, importers and distributors of construction products must provide a Declaration of Performance (DoP) for products to which a harmonised European standard applies. Holetherm SW has classified the DoP statement for its products, per product group. The appropriate DoP number is listed on the product labels and delivery documents. 2.2 Certification The EC Declaration of Conformity, stating that the product, Holetherm SW, meets the CE requirements, as set out in the European Standards EN :2009 for system Characteristics channel load and resistances Kanaalsysteem (Channel system) Holetherm EW T450-N1-D-V2-L50050-G. Load and resistance with a maximum of ten meters of channel sections. Fire safety Chimney fireproof: Yes. Bending load Non vertical installation: maximum distance between 2 supports is 1.5 metres at 45. Horizontal channel In total, apply one section of up to 2 m of horizontal channel, sloped to the unit. Wind load Maximum detached height 1.5 metres from the last support. 4
5 Flow resistance Length=1.0; elbow 15 =0.15; 30 =0.3; elbow 45 =0.4. Freeze/thaw resistant: yes. Declaration of Performance T450 N1 D V2 L50050 G EN Metal system chimney Length T450-NL-D-V 2-L5050-G Load pressure 7 metre chimney parts Flow resistance 0 m2k/w Bend load Non-vertical installation: Maximum distance between two supports 1.5 m at 45 Frost/thaw resistance: Yes Temperature level Pressure level 40Pa vacuum Condensation resistance W: Wet, D: Dry Corrosion resistance determined on material type Material spec mm thick Chimney fire safe: G: Yes, O: No EN Metallsystem Metal system Schornstein-Verbindungsstück chimney Length T450-NL-D-V 2-L5050-G Druckbelastung 7 Meter Load an Schornsteinteilen pressure 7 Strömungswiderstand metre chimney parts Flow Zeta-Wert resistance Kurve Kurve Kurve Elbow 15 Elbow 30 Elbow 45 T-piece 45 T-piece Wärmewiderstand Heat resistance Biegungsbelastung 0 m2 K/W nicht-vertikale Installation: Bend load Maximaler Abstand zwischen zwei Stützteilen Non-vertical installation: Maximum distance between Frost-/Tauwiderstand: two supports ja 1.5 m at 45 Frost/thaw resistance: Yes 5
6 3 Instructions 3.1 Laws and regulations The Holetherm SW flue system conveying flue gas must be installed according to the applicable laws and regulations, and meet the current construction regulations. The installation of the Holetherm SW flue system conveying flue gas must meet the fire safety provisions set out in NEN Application The Holetherm SW can be used inside a building in a shaft, as a lining into an existing or newly constructed architectural chimney flue and as connection pipe between a fireplace or stove to an existing chimney flue. The channel duct is suitable for standardised gaseous and solid fuels with a maximum flue gas temperature of 450 C. The flue gas outlet is called a pressurised system; this means that the pressure in the channel, under normal operating conditions, is lower than the air pressure of the environment. Holetherm SW is applied to a combustion unit with an open combustion system. The flue gas outlet consists of a single wall channel system. 3.3 Characteristics of the material Holetherm SW Stainless Steel flue gas channel: (316L) has a wall thickness of 0.5 mm. Holetherm EW is a comprehensive concept. The product is not interchangeable with or connectable to products from other manufacturers. If you make changes and/or adjustments to the Holetherm SW concept, this may adversely affect the proper functioning thereof. Any guarantee and liability expires when such adjustments are made. For an overview of the components, refer to the product catalogue on our website 4 Fire safety and channel installation 4.1 Fire safety According to the building regulations, measures need to be taken to prevent fire penetration inside of buildings and with conduits in a wall or floor, and in places where the fire resistance of the structure is adversely affected. Applicable standards can be found in the Building regulations, and the provision for fire safety can be found in NEN6062. The NEN6068 standards define the resistance against fire penetration and transfer between spaces mutually. Depending on the situation on site, this may vary between 30 or 60 minutes. 6
7 Before an installation can be fitted, the conduit route should be inspected in the intended route. The conduit route must meet the regulations set out in the Building Regulations. The application of the flue gas outlet in existing partitions and casings, should also meet the fire safety requirements in NEN6062. Rain cap 4.2 Channel installation The flue gas outlet must be built from the connection to the combustion unit to the outlet on the roof. The channel must be installed as vertically as possible. Holetherm SW channels or channel sections may only be installed to a maximum length of 2 m¹ horizontal. The maximum angle for an elbow in the vertical channel is 135. The various sections are inserted into each other as a socket connection. Slide the channel with the plug connection in the socket, from the section beneath it. This is necessary because the Holetherm SW is an inward draining system. A reverse installation could potentially lead to leakage problems, possibly resulting in penetrating rainwater or condensation forming within the channel. Therefore, during installation, take note of the arrow printed on every section; this indicates the direction to the gas flue outlet. Channel elements Use a connecting piece for connection to a stove or fireplace. If your stove or fireplace has a rear connection, two elbows of 45 may be installed after the connection piece instead of a T-piece, to prevent horizontal channel sections. Elbows should be mounted stress free. 4.3 Lining existing channel If the single-walled Holetherm system is used as a liner in an existing chimney, the channel system should be introduced to the existing chimney from above. The channel sections are mutually secured with a stainless steel clamping strip. With this method, the lower end of the channel should be supported with a seat structure in order to ensure the stability of the channel. Construction channel The channel sections may not be shortened! Fittings are available for different channel lengths. Combustion unit Seat construction 7
8 4.4 Bending If an elbow is required in the route, only one bend is allowed per channel. The maximum bending into the flue gas outlet may not exceed 2 metres. If you pass through a wall opening in stone-like material, you should consider a 20 mm distance around the channel on the back of your stove or fireplace. Never fix the channel in concrete or cement, since there will be no relief for the thermal effect. Secure the first vertical channel section after the connecting piece, with a wall bracket. After this a wall bracket must be applied after every 1.5 metres. 4.5 Roof installation We recommend using an extractor enhancing hood as an end cap on an atmospheric flue gas outlet. This reduces the risk of over pressure in the channel as a result of a downward wind. 4.6 Conduits Ensure that the passage openings in a non-combustible (stone-like) floor remain free for at least 2 mm around the installed Holetherm SW channel. With a combustible floor, the opening around should be at least 50 mm. Always finish such openings with fire-resistant material. The fire-resistant materials should always be applied in accordance with the instructions of the manufacturer and the Building Regulations. 8
9 5 Outlet 5.1 Outlet area of atmospheric flue gas outlet The location of the outlet of the flue channel must be chosen with care, the best position is the ridge of the roof, or as close as possible to this area. With a roof slope of less than 23, the outlet should be 0.5 metre above the roof. For roofs with a slope greater than 23, the following formula applies H (α 23) a H = height of the outlet A = Roof slope in degrees a = The horizontal distance from the ridge to the centre line of the outlet. Adjacent buildings Outlet area 1 and 2 permitted with a sloping roof cap. Forbidden outlet area Adjacent buildings 9
10 5.2 Calculation of the outlet height Calculate the outlet height if the flue gas outlet does not pass through the roof surface, measured 0.8 m from the ridge of the roof. Forbidden outlet area Flat roof Slanted roof sloop Slanted roof sloop 6 Dilution factor 6.1 Calculation The dilution factor is a measure of the quality of the supplied air. The dilution factor is calculated from the distance between the outlet of a ventilation or flue gas outlet, and the inlet of the ventilation supply provisions. The following requirements apply to the dilution factor: Table 1 Dilution factors with various types of outlets. Type of outlet Ventilation air outlet 0.01 Flue gas fuelled device 0.01 Flue gas device for other fuels Dilution factor 10
11 A dilution factor of 0.01, for example, means that no more than 0.1% contaminated indoor air or smoke ends up in the fresh air. To calculate the dilution factor, the following information has to be available: The required air volume flow qv for the outlet of the indoor air or the load B for the outlet of smoke from a combustion device. The shortest distance L between the outlet of the ventilation/flue gas outlet and the inlet opening(s) for ventilation air. The mutual difference in height Δh of the outlet and the supply opening. The placements, corresponding to the situations 1 through 17 according to table 4 from NEN The following formulas can be applied: 6.2 A detailed example Step 1 This involves a supply and outlet provision for ventilation. The required air volume flow rate qv for the outlet of the indoor air is 42 l/s. Step 2 The shortest distance L between the ventilation outlet and supply system is 1 m horizontal to the roof edge. Step 3 The difference in height Δh = 0.5 m between the ventilation supply system and the roof edge. Step 4 This concerns situation 1, outlet in the roof surface and supply through the wall. (refer to the following diagram) 11
12 1 m 0,5 m Drain 42l/s Supply Residence Dilution factor Fig. 1 Cross-Section of a residence to calculate the dilution factor If we fill in the date, this results in a dilution factor of This meets the requirement of Take note! The calculation method for the dilution factor is not intended to counteract odour pollution, but only to prevent situations that may be harmful for the health. There are no public requirements for the distance between a ventilation air supply and a sewer vent. Additional requirements with respect to the dilution are contained in the method in NEN 3215/NTR More information can be found on our website 12
13 7 Channel maintenance 7.1 Channel cleaning Ensure that the maintenance to your chimney flue is synchronised with the maintenance of your combustion device. The channel should be cleaned by the installer or an accredited chimney sweeper. If you experienced a chimney fire, your channel should always be assessed on reusability of the channel components, by a competent authority. 13
14
Installation instructions
Installation instructions Holetherm Double-walled flue gas discharge system (DW) 2016 All information in this release is subject to misprints. No liability is accepted for the consequences of misprints.
More informationDeclaration of Performance (DOP)
Declaration of (DOP) No. 9174 073 DOP 2015-07-27 1. Unique identification code of the product-type: Multi-wall chimney system type FURADO-F according to 2. Type, batch or serial number or any other element
More informationDeclaration of Performance (DOP)
Declaration of Performance (DOP) No. 9174 009 DOP 2014-01-27 1. Unique identification code of the product-type: Multi-wall chimney system type DW-VISION according to 2. Type, batch or serial number or
More informationEEC-DECLARATION OF CONFORMITY
0432 EEC-DECLARATION OF CONFORMITY Herewith, the : interactive B.V. Lichtenhorststraat 2 Postbus 200 6940 HA Didam (NL) declares that, in accordance with EEC-Construction Products Directive 89/106/EEC,
More informationProduct catalogue. Socket cast iron pipe system
Product catalogue Socket cast iron pipe system GALLERY ADVANTAGES OF SOCKET PIPE SYSTEM Classic form: Fits well the architecture of renovated buildings. Wide range of products: Pipes, siphons, stormwater
More informationAir flue duct for use with ecotec boilers
For the installer Flue installation instructions Air flue duct for use with ecotec boilers Concentric System Ø 80/5 (Galvanized steel air duct/plastic flue duct) GB Contents Notes on the documentation
More informationInoxSabiana 25 Flues. Stainless Steel Double Wall
Cert. n 0545/5 Flues Stainless Steel Double Wall Introduction and main constructional characteristics Double Wall, Stainless Steel Flues The is the result of innovative development based on over 0 years
More informationProduct catalogue. Socket cast iron pipe system
Product catalogue Socket cast iron pipe system KZO S.A. Dear Customers, For decades, KZO S.A. has been the leading manufacturer of socket cast iron pipes and fittings. Long tradition and experience allowed
More informationProduct catalogue. Socket cast iron pipe system
Product catalogue Socket cast iron pipe system ADVANTAGES OF SOCKET PIPE SYSTEM Classic form: Fits well the architecture of renovated buildings. Wide range of products: Pipes, siphons, stormwater dampers,
More informationAPPENDIX "B" November 5, 2002 Page 1 of 6 BOILERSMITH LTD. STACKS AND BREECHING
APPENDIX "B" November 5, 2002 Page 1 of 6 BOILERSMITH LTD. STACKS AND BREECHING NOTE The Stack and Breeching shall be installed in conformance with national, regional and local codes and standards and/or
More informationCHIMNEYS AND FIREPLACES
SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3 and 4. R1001.2 Footings and foundations.
More informationCHIMNEYS AND FIREPLACES
CHAPTER 10 CHIMNEYS AND FIREPLACES SECTION R1001 MASONRY FIREPLACES R1001.1 General. Masonry fireplaces shall be constructed in accordance with this section and the applicable provisions of Chapters 3
More informationDINAK Camiño do Laranxo, , VIGO (SPAIN) DIFLUX POLYPOPRYLENE. TÜV Industrie Service GmbH TÜV SÜD Gruppe 0036 CPD
Rev.2 DECLARATION OF CONFORMITY AND PRODUCT DESCRIPTION 14471 Chimneys - System chimneys with plastic flue liners - Requirements and test methods Manufacturer: Product commercial name: Product description:
More informationIssued in accordance with the Construction Products Directive 89/106/EEC. Oude Veerseweg 23 Middelburg - The Netherlands
EC-DECLARATION OF CONFORMITY Page 1 / 6 0432 Issued in accordance with the Construction Products Directive 89/106/EEC Product: Twin walled stainless steel system chimney products with insulation System
More informationfemale pipe. A Wall Support must be installed just above the tee and at least every 8 feet thereafter. If the pipe is to be run through a roof overhang then a Flashing, Storm Collar and Vertical Rain Cap
More information2. Type, batch or serial number or any other element allowing identification of the construction product as required under Article 11(4):
1. Unique identification code of the product-type: Rigid and flexible flue liner type TEC-FLEX 2. Type, batch or serial number or any other element allowing identification of the construction product as
More informationFlue gas systems for oil and gas condensing boilers. Flue gas kit DN60 rigid in the duct. Accessories DN60 (additionally available to gas flue kit)
Flue gas kit DN60 rigid in the duct 100193 Flue gas kit No Outlet set plastic 1 x Set 100193 39.10 (Quantities in the image differ from the set) 1003253 1001938 Spacer set * ( pieces) Top inspection opening
More informationSection Old G4 February 2014 Amendments to G4
Dear Customer Please find enclosed Amendment 3, effective 14 February 2014, to the Acceptable Solution and Verification Method for Clause G4 Ventilation of the New Zealand Building Code. The previous amendment
More informationInstallation instruction
Installation instruction Ci51 www.contura.eu 114 CERTIFICATE Declaration of performance according to Regulation (EU) 305/2011 No. Ci51-CPR-150821-SE-2 PRODUCT Product type Type designation Manufacturing
More informationDunbrik A1 Concrete Flue Liners
Dunbrik A1 Concrete Flue Liners System Guide Firebelly stove FB2 woodburner in pewter domestic flue & chimney systems Certificate No.FM24104 Benefits of a Chimney A chimney adds appeal to a house A real
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationMANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev
MANUAL METAL ROOF MOUNTING SYSTEM EN landscape orientation portrait orientation metal roof mounting system for solar panels ESDEC BV 2018 CONTENTS 1. Introduction 1 2. General installation conditions 1
More informationFIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS
FIREPLACE INSERT ENCLOSURE INSTALLATION INSTRUCTIONS ENCLOSURE MODEL 90566400 FOR INSERT MODEL 5660NA And ENCLOSURE MODEL 90566000 FOR INSERT MODEL 5660 STANDARD KEEP THESE INSTRUCTIONS FOR FUTURE USE
More informationRECOMMENDED STANDARDS for the INSTALLATION of WOODBURNING STOVES
RECOMMENDED STANDARDS for the INSTALLATION of WOODBURNING STOVES Prepared By Office of State Fire Marshal Maine Office of Energy Resources 52 State House Station 55 Capital Street Augusta, ME 04333 Augusta,
More informationINSTRUCTION MANUAL OF INSTALLATION, SELECTION AND OpERATION OF METAL CHIMNEYS AND THEIR SYSTEM ELEMENTS
INSTRUCTION MANUAL OF INSTALLATION, SELECTION AND OpERATION OF METAL CHIMNEYS AND THEIR SYSTEM ELEMENTS Edition No. 6 Approved: 2017-02-05 2017 Manufacturer: SAURESTA UAB Rasų street 39, LT-11351 Vilnius,
More informationOuter Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual
Outer Skin Kit & Flue: IB600, IB850, IB1100 Installation Manual Please see IB series product installation guide for details of installing the gas fire into this preformed metal cavity. Important: The appliance
More informationCI/SfB Oct 12 (52.5) Uniclass L7314
CI/SfB Oct 12 (52.5) Uniclass L7314 Bailey Flow-therm Product Selector A RANGE OF QUALITY AND ROBUST RAINWATER OUTLET AND VENTILATION SYSTEMS FOR FLAT ROOFS, MANUFACTURED FROM RIGID POLYURETHANE. Bailey
More informationDear Customer. Section Old G4 January 2017 Amendment 4. Replace with new title page and document history pages 1 2B
Dear Customer Please find enclosed Amendment 4, effective 1 January 2017, to the Acceptable Solution and Verification Method for Clause G4 Ventilation of the New Zealand Building Code. The previous amendment
More informationInstallation Instructions
Installation Instructions Flue Gas System Basic Kit GA-K - Chimney Flue Gas System for GB125 Oil Condensing Boiler For trained and certified installers Please read carefully prior to installation. 6 720
More informationCI/SfB Oct 12 (52.5) Uniclass L7314
CI/SfB Oct 12 (52.5) Uniclass L7314 Bailey Flow-therm Product Selector A RANGE OF QUALITY AND ROBUST RAINWATER OUTLET AND VENTILATION SYSTEMS FOR FLAT ROOFS, MANUFACTURED FROM RIGID POLYURETHANE. Bailey
More informationRediflow Concrete Gas Flue System
Rediflow Concrete Gas Flue System Rediflow Concrete Gas Flue System Rediflow the complete gas flue block system Red Bank s range of Rediflow pre-cast concrete gas flue block system manufactured to BS EN
More information40CDi conventional. RD 537i. Installation Instructions for Flue Duct Kit AZB 873/1 Vertical Flue Terminal Assembly Ø 60/100 mm Ø135
Installation Instructions for Flue Duct Kit AZB 873/1 Vertical Flue Terminal Assembly Ø 60/100 mm 7 719 002 430 Ø100 Ø62 1140 116 3x Ø135 2x Ø100 4x 6 720 611 739-00.1O for Gas Condensing Boilers: R 29
More informationIndoor Air Quality and Mechanical Ventilation (Page 1 of 5)
Indoor Air Quality and Mechanical Ventilation (Page 1 of 5) Title 24, Part 6, Section 150.0(o) Ventilation for Indoor Air Quality. All dwelling units shall meet the requirements of ANSI/ASHRAE Standard62.2.
More informationThese installation instructions cover the installation and operation of Jetmaster Inset and Freestanding Barbecues
These installation instructions cover the installation and operation of Jetmaster Inset and Freestanding Barbecues ADDRESS Jetmaster Fires Ltd Unit 2, Peacock Trading Estate Goodwood Road Eastleigh Hampshire`
More informationARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )
8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article
More informationDaytona Beach Pier Building Renovation Jun 2010
SECTION 15150 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationEXCELPrime 18 Clearance Stove Pipe INSTALLATION AND MAINTENANCE INSTRUCTIONS
EXCELPrime 18 Clearance Stove Pipe INSTALLATION AND MAINTENANCE INSTRUCTIONS A MAJOR CAUSE OF CHIMNEY RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACE) TO COMBUSTIBLE MATERIALS. IT IS
More informationBuildingName The Description of the Project P DOCUMENTS
ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION
More informationInstallation instructions
Installation instructions for contractors Flue gas system for Vitocrossal (type CU3), Vitodens and Vitoladens Safety instructions Please follow these safety instructions closely to prevent accidents and
More informationTC54. for architects & designers. Dimensions Clearances Venting
for architects & designers TC54 Series D Dimensions Clearances enting IMPORTANT This booklet is intended as a basic specification guide for architects, designers and builders. Please refer to the Instruction
More information150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS
ULEB 150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS WARNING: THIS FLUE KIT HAS BEEN MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND TESTED TO APPENDIX F. TO ENSURE SAFETY THIS
More informationEPV Pellet Vent Pellet Stove Venting System Installation Instructions
EPV Pellet Vent Pellet Stove Venting System Installation Instructions A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES (AIR SPACES) TO COMBUSTIBLE MATERIALS. IT IS OF THE
More informationInstallation Instructions. PolyPro Double-Wall Flex Gas Vent System for Category II & IV Gas-Burning Appliances. PolyPro Flex
Installation Instructions PolyPro Double-Wall Flex Gas Vent System for Category II & IV Gas-Burning Appliances PolyPro Flex A MAJOR CAUSE OF VENT RELATED FIRES IS FAILURE TO MAINTAIN REQUIRED CLEARANCES
More information150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS
150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS WARNING: THIS FLUE KIT HAS BEEN MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND TESTED TO APPENDIX F. TO ENSURE SAFETY THIS FLUE
More information150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS
150MM FREE STANDING WOOD FIRE FLUE KIT MKIII INSTALLATION INSTRUCTIONS WARNING: THIS FLUE KIT HAS BEEN MANUFACTURED IN ACCORDANCE WITH AS/NZS 2918:2001 AND TESTED TO APPENDIX F. TO ENSURE SAFETY THIS FLUE
More informationTested to BS EN and BS EN 1443
Tested to BS EN 1856-2 and BS EN 1443 Introduction Page 2 Midtherm Flue Systems Limited is an independent British manufacturing company producing a wide range of flue and chimney products, along with associated
More informationLecture (6) on. Schematic of a Thermal Power Plant. By Dr. Emad M. Saad. Mechanical Engineering Dept. Faculty of Engineering.
1 2 Lecture (6) on Schematic of a Thermal Power Plant By Dr. Emad M. Saad Mechanical Engineering Dept. Faculty of Engineering Fayoum University Faculty of Engineering Mechanical Engineering Dept. 2015-2016
More informationCertificate No: EW597H
Certificate No: EW597H K Rend Brick Rend & Mineral TC Description of Product This is an assessment of K Rend Brick Rend and K Rend Mineral TC. K Rend Brick Rend is a cement based polymer modified two-coat
More informationInstallation Instructions
Installation Instructions Flue Gas System Basic Kit HT-K - Horizontal Flue Gas System For GB125 Oil Condensing Boiler For trained and certified Installers Please read carefully prior to installation. 6
More informationSkoberne Flue systems
Skoberne Flue systems Product Catalogue 2018 2 The Skoberne flue system The components of the Skoberne flue system are made of high quality, flame-retardant polypropylene. They are characterised by their
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationInstallation Instructions
Installation Instructions SAVE THESE INSTRUCTIONS Please read this entire manual before you install and use your room heater. Failure to follow instructions may result in property damage, bodily injury,
More informationCounty of Yolo Development Services Building Inspection Division
County of Yolo Development Services Building Inspection Division 292 W. Beamer Street Woodland, CA. 95695 www.yolocounty.org (530) 666-8775 Mechanical Plan Review Comments Plan Review No. Owners Name Job
More informationDrain DESIGN & INSTALLATION GUIDE 316L STAINLESS STEEL INDUSTRIAL FLOOR DRAINS & LINEAR DRAINAGE CHANNELS
DESIGN & INSTALLATION GUIDE 316L STAINLESS STEEL INDUSTRIAL FLOOR DRAINS & LINEAR DRAINAGE CHANNELS KEMDRAIN TM STAINLESS INDUSTRIAL FLOOR DRAINS AND LINEAR CHANNELS, OFFERING ALL THE BENEFITS OF 316L
More informationATTENTION INSTALLING PERSONNEL
DCVK-20 & DCVK-30 CONCENTRIC VENT TERMINATION KIT INSTALLATION INSTRUCTIONS Goodman Manufacturing Company, L.P. 2003-2007 5151 San Felipe, Suite 500, Houston, TX 77056 www.goodmanmfg.com -or- www.amana-hac.com
More informationBUILDING CODES & DESIGN CRITERIA
BUILDING CODES & DESIGN CRITERIA Adopted Building Codes: 2006 International Building Code (IBC) 2006 International Residential Code (IRC) 2006 International Mechanical Code (IMC) 2006 International Plumbing
More informationXtratherm Thin-R Thermal Liner (XT/TL Grade)
CERTIFICATE NO. 03/0183 DETAIL SHEET 4 Xtratherm Thin-R Thermal Liner (XT/TL Grade) PRODUCT DESCRIPTION: This Detail Sheet relates to Xtratherm Thin-R Thermal Liner, as defined in NSAI Agrément Certificate
More informationLeaving Certificate Revision Notes. Airtightness. Potential air leakage paths (the numbered points in section 2.1 give a description for
Leaving Certificate Revision Notes Airtightness 6 7 8 8 9 10 5 11 5 12 4 3 1 2 13 12 14 Potential air leakage paths (the numbered points in section 2.1 give a description for Airtightness Introduction
More informationAdvanced Ventilation for Residential applications FBC Res 2010.
Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean
More informationimperband standard kit
Data sheet imperband standard kit The standard imperband kit is an indoor waterproofing system consisting of a ABS outlet thermowelded to a 150 x 225 cm waterproof sheet. Specially recommended for waterproofing
More informationTechnical and Dimensional Data. Saf-T Vent SC
Technical and Dimensional Data Saf-T Vent SC 3"/5" & 4"/7" Concentric Reduced Clearance Double Wall for Special Gas Vent and/or Sealed Combustion Systems Copyright 2003 Saf-T Vent is a registered trademark
More informationINSTRUCTION MANUAL OF INSTALLATION, SELECTION AND OPERATION OF METAL CHIMNEYS AND THEIR SYSTEM ELEMENTS
INSTRUCTION MANUAL OF INSTALLATION, SELECTION AND OPERATION OF METAL CHIMNEYS AND THEIR SYSTEM ELEMENTS Edition No. 4 Approved: 03 07 2016 2016 Manufacturer: SAURESTA UAB Rasų street 39, LT-11351 Vilnius,
More informationSECTION FIRESTOPPING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 84 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationREAD ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter X X X Adopt Entire Chapter as amended (amended sections listed below) X X X X X X
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE CHAPTER 9 - VENTS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and building application.)
More informationFollowing contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.
Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform
More informationPRODUCTS AND SYSTEMS FOR ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES
04 05 PRODUCTS AND SYSTEMS FOR ELECTRICAL AND DIGITAL BUILDING INFRASTRUCTURES Over floor trunking 0 300 9 0 300 93 0 38 00 Conform to standard EN 50085-- For creating a link between trunking, column,
More informationReinforced edge channels KE-200
Drainage with system Reinforced edge channels KE-00 SERVICE ANRIN provides custom solutions and possibilities for the contract business. Here you benefit from reliable cooperation with our technical office
More information1. Description Damper Design Dimensions, weights Placement and Assembly Statement of installations...
These technical specifications state a row of manufactured sizes and models of fire dampers (further only dampers) CFDM. It is valid for production, designing, ordering, delivery, assembly and operation.
More informationBlast Resistant Enhanced Curtain Wall. Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION PERFORMANCE
Blast Resistant Enhanced Curtain Wall Blast Resistant Enhanced Curtain Wall Reference Brand: Sapa Building System Elegance 85PF GENERAL DESCRIPTION Grid based thermally insulated curtain wall system with
More informationBuilding Envelope
9.36.2. Building Envelope Module 2 BCBC 9.36. 2014 1 Richard Kadulski Architect 9.36.2. Building Envelope Focus is on total building performance, not just thermal insulation Heat transfer and air leakage
More informationInstallation GUIde Please read these instructions before proceeding
Installation GUIde Please read these instructions before proceeding Installing your Earthfire is a relatively straight forward job, but there are several key aspects that may seem arbitrary to the general
More informationClearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal On-roof mounting SRH 2.3
Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Horizontal On-roof mounting 15-75 SRH 2.3 www.glow-worm.co.uk 1 Guarantee Registration These Clearly Solar Flat Plate collectors
More informationXtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)
CERTIFICATE NO. 03/0183 DETAIL SHEET 1 Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade) PRODUCT DESCRIPTION This Detail Sheet relates to Xtratherm Thin-R Partial Fill Cavity Wall Board, as
More informationGUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )
Milk and Dairy Food Safety Branch 1220 N Street, Sacramento, CA 95814 GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev. 10-20-2011) The outline below lists sanitary requirements
More informationMETALLIC CHIMNEY LINER SYSTEM Single Wall Construction Rigid Chimney Liner
METALLIC CHIMNEY LINER SYSTEM Single Wall Construction Rigid Chimney Liner Models CBI Cat. I: Part 1 CBH Cat I, II, III, IV: Part 2 3STS This symbol shows that venting systems Models CBI and CBH are Listed
More informationDe Montfort Mark 7 Incinerator (Flatpack)
De Montfort Mark 7 Incinerator (Flatpack) Introduction This design is specially for those occasions when a large number of incinerators are to be built at one location and transported to the places where
More informationDuraFlex. Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635.
DuraFlex Flexible stainless steel relining for masonry chimney. UL 1777 and ULC S635. Specifications DuraFlex Pro Applications DuraFlex Pro ultra flexible relining for masonry chimney. Use with gas, wood
More informationClearly Solar. Installation Instructions. Solar Thermal Flat Plate Collector. Vertical On-roof mounting SHV
Clearly Solar Solar Thermal Flat Plate Collector Installation Instructions Vertical On-roof mounting 15-75 SHV 2.3 www.glow-worm.co.uk 1 Guarantee Registration These Clearly Solar Flat Plate collectors
More information1. Description Damper Design Dimensions, weights Placement and Assembly Statement of installations...
These technical specifications state a row of manufactured sizes and models of fire dampers (further only dampers) CFDM. It is valid for production, designing, ordering, delivery, assembly and operation.
More informationimperband refurbishing kit
Data sheet The imperband rehabilitación kit is an interior water-proofing system consisting of a superfine ABS outlet connected via a ring to an impermeable laminate measuring 150 x 225 cm. Recommended
More informationPrecast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS
Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS GENERAL INSTALLATION INSTRUCTIONS 1 Ensure that the trench where the channels are going to be installed has enough room for the appropriate
More information20 YEARS WARRANTY Against Corrosion
20 YEARS WARRANTY Against Corrosion Relating to the quality of Magnelis ZM310-type coated flat carbon steel. Subject to the conditions of this document, this warranty covers the non-perforation nonrupture
More informationGas Fireplaces. P33-10/P33E-10 Gas Fireplace P33 DIMENSIONS WITH VIGNETTE FACEPLATE CLEARANCES WITH VIGNETTE FACEPLATE
Model P33-NG10 P33-LP10 P33E-NG10 P33E-LP10 Fuel Type Natural Gas Propane Natural Gas Propane Minimum Supply Pressure 5 W.C. (1.25 kpa) 11 W.C. (2.74 kpa) 5 W.C. (1.25 kpa) 11 W.C. (2.74 kpa) Manifold
More informationA. This Section includes sanitary waste and vent piping inside the building and to locations indicated.
SECTION 221316 SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationXtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)
CERTIFICATE NO. 03/0183 DETAIL SHEET 1 Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade) PRODUCT DESCRIPTION This Detail Sheet relates to Xtratherm Thin-R Partial Fill Cavity Wall Board, as
More informationSECTION THROUGH-PENETRATION FIRESTOP SYSTEMS
SECTION 07841 - THROUGH-PENETRATION FIRESTOP SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationBuilding Permit Fee Schedule For Calendar Years
A. BUILDING PERMITS Building Fee Schedule Construction value of $1.00 to $500.00 $ 26.00 Construction value of $501.00 to $600.00 $ 30.00 Construction value of $601.00 to $700.00 $ 32.00 Construction value
More informationBuilding Permit Fee Schedule For Calendar Years
A. BUILDING PERMITS Building Fee Schedule Construction value of $1.00 to $500.00 $ 26.00 Construction value of $501.00 to $600.00 $ 30.00 Construction value of $601.00 to $700.00 $ 32.00 Construction value
More informationSECTION WELDED STEEL WATER STORAGE TANKS
SECTION 33 16 20 WELDED STEEL WATER STORAGE TANKS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Elevated tanks. 2. Appurtenances and accessories. B. Related Sections: 1. Section 03 31 20 - Concrete
More informationInstallation & User Manual
Desktop UHF Radio Paging System Installation & User Manual Scope Communications UK Ltd, Quantum House, Steamer Quay, Totnes, Devon TQ9 5AL Tel: +44 1803 860700 Fax: +44 1803 863716 Email: sales@scope-uk.com
More informationCardok Carlift with Rigid Chains Data Sheet
Credit: SERAPID/LinkLift system CARDOK CARLIFT with Rigid chains technology Very fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp Dimensions:
More informationPIP PCEPA003 Process Analyzer System Field Installation Guidelines
January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationDrainage with system SELF structural elements
Drainage with system SELF structural elements Drainage channels, boot scrapers, yard sumps for the house, yard and garden Contents 04 ANRIN SELF structural elements Material / Application / Properties
More information1. Description Damper Design Dimensions, weights Placement and Assembly Statement of installations...
These technical specifications state a row of manufactured sizes and models of fire dampers (further only dampers) CFDM. It is valid for production, designing, ordering, delivery, assembly and operation.
More informationSECTION FUEL-FIRED UNIT HEATERS
SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable
More informationMidtherm Vitrelux flue pipe is available from stock, in the following standard colours and diameters, unless otherwise stated:
Introduction Midtherm Flue Systems Limited is an independent ritish manufacturing company producing a wide range of flue and chimney products, along with associated components and services. Established
More informationLOGIC FLUE & ACCESSORIES GUIDE.
& ACCESSORIES GUIDE. COMBI C COMBI ESP1 + COMBI C SYSTEM S + SYSTEM S HEAT H + HEAT H CODE COMBI ESP1 WWW.IDEALBOILERS.COM This manual is for guidance only and must be read in conjunction with the Installation
More informationSupplementary Standard SB-12. Energy Efficiency For Housing
OBC Excerpt: SB 12 Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing November
More informationExterior Wall Solutions Building Shell
A strong, water tight and thermally insulated building shell will ensure the buildings sustainability of usage over time. The Exterior Shell is the most important factor of protection to ensure that the
More information