1 29 World of Coal Ash (WOCA) Conference - May 4-7, 29 in Lexington, KY, USA Use of a CCB Grout Barrier to Reduce the Formation of Acid Mine Drainage: The Siege of Acre Project, Kempton, Maryland Robin L. Guynn 1, Jason Litten 2, Raymond T. Hemmings 3, and Paul Petzrick 4 1 ERM, Inc., 2 Harry S Truman Parkway, Annapolis, MD 2141; 2 Frostburg State University, Western Maryland Regional GIS Center, 11 Braddock Rd. Frostburg, MD 21532; 3 Hemmings and Associates, LLC, 41 Lock Ridge Ct. Kennesaw, GA 3152; 4 Maryland Department of Natural Resources, Power Plant Research Program, Tawes Office Building, B-3, Annapolis, MD 2141 KEYWORDS: beneficial use, grout, acid mine drainage, Kempton Mine Complex, Siege of Acre ABSTRACT The Maryland Department of Natural Resources Power Plant Research Program (PPRP) has proposed the Siege of Acre Project to demonstrate the feasibility of reducing acid mine drainage (AMD) formation by coating pyritic mine pavement with a CCB-based grout. Use of grout as a surface coating rather than bulk fill will preserve the existing and complex flow system in the mine, decreasing the risk of unintended consequences that can be associated with bulk fills (e.g. blow-outs). The Kempton Mine Complex covers 12 square miles (31 square kilometers) in Maryland and West Virginia and discharges approximately 3.5 million gallons (13.2 million liters) of AMD per day into Laurel Run, a tributary to the Potomac River in Western Maryland. The Siege of Acre segment forms the northern extremity of the Complex in Maryland. Siege of Acre includes an isolated straight run of three parallel tunnels, each 75 feet (229 meters) long by 16 feet (5 meters) wide, running up-dip from the edge of the Kempton mine pool. These tunnels are representative of several hundred acres of mine pavement within the Kempton Mine and in other Upper Freeport mines in Maryland and neighboring states. PPRP has determined the tunnel locations, orientations, and dimensions through desktop and field investigations. Water quality of the mine pool and flowing across the mine pavement has also been characterized. PPRP has also initiated long-term accelerated weathering experiments that expose cured CCB grout blocks to continuous flows of acidic water to simulate a deep mine environment. The results of these accelerated weathering experiments will be used to determine the durability of a CCB-grout coating of the pavement within mine tunnels, such as those at Siege of Acre. 1

2 INTRODUCTION The Maryland Department of Natural Resources Power Plant Research Program (PPRP) has partnered with private industry to undertake a series of projects to demonstrate the beneficial application of coal combustion by-products (CCBs) to create flowable grouts for placement in underground coal mines to reduce acid formation. These demonstration projects are a key component of Maryland s overall ash utilization program to promote and expand the beneficial use of CCBs on a large scale. The ultimate goals of these projects are to utilize CCB-based grouts to effect significant acid reduction at large acid mine drainage (AMD) sources in Maryland and to mitigate subsidence problems associated with lands disturbed by coal mining and natural karst topography. The Siege of Acre Project is a proposed injection project designed to demonstrate the use of a CCB grout to reduce the formation of acid along pyritic mine pavement that is not fully submerged, but is part of a flow path for water running into an acidic mine pool. Previous PPRP demonstration projects have demonstrated the use of CCB grouts to reduce the formation of AMD in other ways. The Winding Ridge Project showed how a CCB grout can be successfully used to reduce acid formation within a small mine by bulk filling of the mine tunnels 1. The Kempton Manshaft Project used a CCB grout to attempt to create an impermeable grout curtain around a mine shaft that was acting as a conduit allowing good quality shallow ground water to drain into the acidic Kempton Mine Pool 2. Bulk mine filling poses certain challenges for large mines containing large mine pools. Massive quantities of material are needed, which present associated cost, transportation, and storage challenges. In addition, bulk filling of a large mine presents the possibility of blow-outs when mine water becomes impounded behind grout dams. Thus, for the Siege of Acre Site, which is part of the large Kempton Mine Complex, a CCB-grout coating of the mine pavement is proposed as an alternative. Coating the mine floor with CCB grout requires smaller amounts of material to prevent reactions between oxygen, mine water and pyrite (mine pavement and debris) without disrupting the existing water flow patterns within the mine. Figure 1 shows, conceptually, how the grout coating of the mine pavement would be created. As with any underground mine-related project, a significant amount of preparatory work is required before injection can occur. The selected mine, or mine segment must be verified as an acceptable injection site; mine tunnel locations must be accurately determined so that injection boreholes can be placed within the tunnels; pre-injection conditions within the tunnels must be assessed so that any post-injection changes in water quality can be discerned; a suitable grout formula must be developed; and the likely fate of the cured grout in the mine tunnel environment must be considered. This paper presents the methods and findings of investigative activities that have been 2

3 undertaken in preparation for grout injection to create a CCB grout barrier coating the mine pavements of the tunnels within the Siege of Acre mine segment. CCB Grout Feed Downhole Camera to Monitor Grout Progress Ground Surface Grouting Borehole Mine Void Injected CCB Grout Coating Figure 1: Creation of a grout coating of mine pavement SELECTION OF SITE The Siege of Acre Site (the Site) is a part of the Kempton Mine Complex (the Complex), which covers approximately 12 square miles (31 square kilometers) and straddles Maryland and West Virginia (Figure 2). The Complex discharges approximately 3.5 million gallons (13.2 million liters) of AMD per day into Laurel Run, which is a major tributary to the North Branch of the Potomac River in Western Maryland. 3

4 Figure 2: Regional Context of the Kempton Mine Complex. The Siege of Acre Site forms the northern extremity of the Complex in Maryland. It consists of three mine tunnels that are 16 feet (5 meters) wide. The three tunnels are also interconnected by several crosscuts developed in the conventional method of up dip and pillar mining. The three tunnels extend 75 feet (229 meters) up-dip from the mine pool, with overburden thicknesses ranging from 175 feet (53 meters) near the edge of the mine pool to 14 feet (43 meters) near the high wall, where a surface mine cut into and exposed the underground mine works (Figure 3). Pre-injection characterization of the mine tunnels (which will be further discussed in the next section) has indicated that the three mine tunnels are not permanently submerged in the mine pool. Rather, water flows across the pavement in at least the southernmost tunnel. Figure 4 shows the layout of the three Siege of Acre mine tunnels. The tunnels intercept the mine pool at their eastern end, prior to intersecting the more numerous northeast-southwest running mine tunnels. 4

5 Figure 3: The Kempton Mine Complex, showing both the Kempton and the Coketon mine pools. 5

6 Figure 4: Layout of the Siege of Acre segment of the Kempton Mine Complex. 6

7 Several factors make the Siege of Acre site an attractive location for this type of demonstration project. The Siege of Acre mine tunnels are representative of several hundred acres of sub-aerial exposed mine pavement within the Kempton Complex and thousands of acres of sub-aerial mine pavement within Appalachia. Water flowing along the mine pavement becomes acidic as it contacts pyrite and oxygen, and recharges the mine pool. Although the Siege of Acre tunnels are part of the large Kempton Complex and drain directly to the Kempton Mine pool, they are also suitably isolated at the northern extremity of the Complex. Thus the Siege of Acre mine segment can be easily isolated from the pool if leaching of constituents from the grout or any other aspect of the grouting operation required such consideration; and Siege of Acre is located in close proximity to sources both of selfcementing fluidized bed combustion (FBC) products and fly ash. In addition, access to the site is readily available via pre-existing coal haul roads constructed by the Buffalo Coal Mining Corporation. Empirical data required before completing the engineering design for injection are as follows The tunnels must be accurately located in the field. The Siege of Acre site is situated in an isolated location. Although a property corner was located within 3 feet (91 meters) of the site, the nearest georeferenced location (which could be used to correlate surface geography with the tunnel maps) is 4, feet (1,219 meters) away. High resolution of the location of the mine tunnels is needed to maximize drilling efficiency (and minimize costs) so that the boreholes can be drilled into the tunnels and not solid coal. The quality and quantity of mine water produced in this portion of the mine must be determined; A grout formula must be developed that of adequate viscosity to flow along 75-foot (229 meter) long, debris-littered tunnels, but with sufficient durability to cure into a competent and impermeable barrier along the mine pavement. The remainder of this paper presents the investigative activities performed to address these challenges in preparation for grout injection activities at the Site. 7

8 INVESTIGATION TO-DATE Location of Tunnels To assess water quality and quantity within the mine tunnels and ultimately to perform injection, it is necessary to drill boreholes into the mine tunnels. To accurately drill boreholes into the 16-foot (5-meter) wide mine tunnels situated 14 to 175 feet (43-53 meters) below ground surface, the locations of the tunnels were first determined as accurately as practical. Specifically, preparation for borehole drilling began with a detailed desktop study, as well as non-intrusive field reconnaissance of the Siege of Acre segment of the mine. Four important pieces of information were used in the assessment of the location of the tunnels: The landowner, Western Pocahontas Properties (WPP), provided a digitized version of the original large scale Davis Coal & Coke (DC&C) mine map to the Geospatial Research Group (GRG) at Frostburg State University (FSU). (This group has since been renamed the Western Maryland Regional GIS Center). In 1999, GRG contracted with 3DI of Easton, Maryland to obtain very high quality aerial photographs of the surface over the Kempton Mine Complex. The resulting digitized aerial photographs were available for use in the project. GRG personnel discovered that many of DC&C s local records were stored in their former headquarters building, now known as the Railroad Building, in Thomas, West Virginia. These assets were controlled by the Thomas Historical Society. The Society Director agreed to share access to these records, as well as the rock cores remaining in the building. This diverse material included detailed maps, engineering memos, and survey notes; information that has proven to be invaluable in the characterization of the Kempton Mine Complex. These records are referred to collectively as the DC&C Records. During field reconnaissance conducted along a logging trail, which was known to cross the three mine tunnels near their eastern ends, three large depressions were observed at uniform intervals corresponding to the dimensions and spacing of the mine tunnels, ascertained from the other available materials. These depressions were successfully used to site the boring locations. Based on the principles of mine subsidence, the depressions noted on the logging trail were believed to be the result of sag subsidence over the mine tunnels and thus, surface expressions of the mine tunnels. To check this hypothesis, the location of the 8

9 depressions was surveyed and compared with the tunnel locations as shown on the mine maps, georeferenced to the aerial photographs. The mine maps and aerial photographs showed the tunnels to be approximately 3 feet (9 meters) northwest of the depression locations. However, distances between other geospatial reference points, as measured on mine maps are frequently longer than the same displacements measured in aerial photography, or as determined from differences in latitude and longitude. Thus, it was reasoned that there may be a systematic error in the mine maps. Using the empirical data, drilling proceeded on the assumption that the depressions marked the true tunnel locations, and this assumption was found to be correct when boreholes installed in the depressions encountered the mine tunnels. The mine tunnel maps and georeferencing to the aerial photographs were adjusted using additional survey data as well as borehole information, once it had been obtained. Exploratory drilling was conducted in November 22, with additional drilling and retrofitting of boreholes for sampling purposes conducted in June 23. A total of nine boreholes were installed, as described below and in Figure 5. Figure 5: Location of all nine exploratory boreholes installed at the Siege of Acre Site and final mapped (and corrected) location of mine tunnels The first borehole (LTBE-3) encountered the mine pool; The second, third, and fourth boreholes (LTB-3, LTB-2, and LTB-1, respectively) encountered the mine tunnels just up-dip of the mine pool; The fifth and sixth boreholes (UTB-4 and UTB-5) were targeted at locating the mine tunnels further up-dip of the LTB boreholes, but these boreholes encountered only coal at the expected tunnel elevation (these boreholes were subsequently abandoned). Re- 9

10 assessment of the original mine maps, borehole camera observations, and georeferenced mine workings indicated that a one-degree rotation of the maps provided the best fit to all of the data collected. This rotation showed that UTB-4 and UTB-5 had actually been drilled into pillars located southwest of Tunnels 3 and 2. This information was used to determine the locations of the remaining boreholes; The seventh and eighth boreholes (UTB-6 and UTB-7) encountered the mine tunnels up-dip of the LTB boreholes. The ninth borehole (LTBE-1) was drilled during the second mobilization in 23 and encountered the mine pool. Figure 6 shows the adjustment that was made (based on the results of the desktop study, GIS mapping, and initial borehole drilling) to the georeferenced mine tunnel maps to show the true locations of the tunnels. Figure 6: Location of first six boreholes installed at Siege of Acre and adjustment of mine tunnel locations on the map. 1

11 Determination of Water Quality To assess the potential benefits of grouting the mine pavement for the Siege of Acre mine tunnels, and to assess the likely longevity of any grout injected into the tunnels, the water quality within the mine tunnels and in the adjacent mine pool was evaluated. The collection of water samples from the mine pool was relatively simple, as boreholes LTBE-3 and LTBE-1 allowed access to the mine pool, which is deep enough to be sampled with conventional methods (i.e. bailers). Sampling of water within the mine tunnels was more complicated because water is not pooled within the tunnels, but rather flows along the pavement toward the mine pool at a depth insufficient for conventional sampling techniques. Initially, at borehole LTB-1 a hydrophilic pad was used to collect a sample of the water flowing along the mine pavement. The pad was covered by a shroud as it was lowered into and removed from the borehole to protect the sample from condensate on the well casing walls (Figure 7) 4-inch PVC well riser Eye Bolt for rope Not to Scale 1-Inch PVC Pipe 1 feet long 2-Inch PVC Shroud 1 foot long Hydrophylic Pad Mine Void Mine Pavement Figure 7: Hydrophilic pad sampling device used temporarily to sample location LTB-1. During the second round of drilling and borehole retrofitting in 23, a sump was installed at LTB-1 to allow mine pavement water to collect to a depth that could be sampled with a conventional bailer. Monitoring wells LTBE-3, LTBE-1, and LTB-1 comprise the mine pool and mine tunnel water quality monitoring network for the Site. Monitoring has been performed regularly (first on a monthly basis and later reduced to a quarterly basis) from June 22 through August 28. The available data is summarized in Table 1 and key parameters are shown graphically in Figure 8. In general, the mine pavement water has lower ph, 11

12 higher acidity, and higher concentrations of iron, sulfate, and other metals than the mine pool water. This is consistent with the concept that AMD forms readily as water flows along the mine pavement where water, pyritic debris, and air are readily in contact. AMD then flows into the Kempton mine pool, where there is less contact between these three components, and is diluted. Pre-Injection Pre-Injection Pre-Injection Parameter Units LTB-3E (Mine Pool) LTB-1E (Mine Pool) LTB-1(Mine Tunnel) Min Max Average Min Max Average Min Max Average Metals Aluminum mg/l Antimony mg/l Arsenic mg/l Barium mg/l Beryllium mg/l Boron mg/l Cadmium mg/l Calcium mg/l Chromium mg/l Cobalt mg/l Copper mg/l Lead mg/l Magnesium mg/l Manganese mg/l Mercury mg/l Nickel mg/l Potassium mg/l Selenium mg/l Silver mg/l Sodium mg/l Thallium mg/l Zinc mg/l Other Acidity mg/l Alkalinity mg/l Chloride mg/l Conductivity umho Iron (mg/l) mg/l Nitrate-Nitrogen mg/l Nitrite- Nitrogen mg/l ph su Sulfates mg/l Dissolved Solids mg/l Suspended Solids mg/l Table 1: Summary of water quality analysis for the Kempton mine pool and water flowing along tunnels at the Siege of Acre site. 12

13 ph ph /19/1 9/1/2 1/14/4 5/28/5 1/1/6 2/22/8 7/6/9 Sample Collection Date Acidity (mg/l) Acidity /19/1 9/1/2 1/14/4 5/28/5 1/1/6 2/22/8 7/6/9 Sample Collection Date Cond. (umho's) Conductivity 4/19/1 9/1/2 1/14/4 5/28/5 1/1/6 2/22/8 7/6/9 Sample Collection Date Iron (mg/l) Iron 4/19/1 9/1/2 1/14/4 5/28/5 1/1/6 2/22/8 7/6/9 Sample Collection Date Sulfate (mg/l) Sulfate /19/1 9/1/2 1/14/4 5/28/5 1/1/6 2/22/8 7/6/9 Sample Collection Date LTBE-3 (Mine Pool) LTBE-1 (Mine Pool) LTB-1 (Mine Pavement) Figure 8: Selected water quality data for the mine pool and water flowing along the mine pavement at the Siege of Acre site. Grout Development In general, the design of grout (whether made from Portland cement or CCBs) for injection into abandoned mine workings for the purpose of reducing AMD formation or preventing subsidence due to mine tunnel collapse must balance the fluidity of the grout during injection with its strength after curing 3. Fluidity is important because the grout must be pumped, often through long lengths of hose or piping. In addition, because drilling into abandoned mine workings is expensive and boreholes may not always penetrate the mine workings, it is most practical to be able to use as few injection locations as possible. Thus, the grout must be of low viscosity to be able to flow long distances and around and over debris and other obstacles, while retaining its cohesiveness. In the case of Siege of Acre, the goal is to inject grout at the upper end 13

14 of the mine tunnels and allow the grout to flow via gravity down the 15-3% slope of the 75-foot (229-meter) long tunnels. Grout strength is of obvious importance in cases where grout is intended to prevent mine tunnel collapse and associated surface subsidence. In the case of Siege of Acre, the strength of the grout is primarily important because a strong grout tends to be more cohesive and less permeable. Low permeability is of high importance to the success of the grout in preventing water in the mine tunnels from contacting the acid-producing pavement covered by the grout. Successful grout mixes for injection were developed for the Winding Ridge and the Kempton Manshaft Projects 1,2. The Winding Ridge grout mix contained: 6% fluidized bed combustion ash (FBC) from the Morgantown Energy Associates power plant; 2% flue gas desulfurization product, from the Virginia Power Company s Mt. Storm; power plant; 2% Class F fly ash, also from Mt. Storm 47% water (primarily pumped from the mine being grouted) 1. The Kempton Manshaft grout mix contained: 5% FBC ash from the Dominion Power Company s North Branch power plant and from the AES Warrior Run power plant; 5% Class F fly ash, also from the North Branch power plant; and Water sufficient to create a solids to water ratio of 6% to 7% (ratios had to be field-adjusted to maintain grout fluidity 2. Based on the results of these previous injection projects, and the results of the CCB block weathering study (discussed below), it is anticipated that the grout mixture to be used for injection at Siege of Acre will contain: Approximately 5% FBC from the Warrior Run power plant (baghouse material); Approximately 5% Pulverized Fly Ash (PFA) from the R. Paul Smith power plant; and Water sufficient to create a solids to water ratio of approximately 6%. The final grout mix will depend upon the availability of materials, field conditions, and the field equipment to be used. 14

15 CCB Block Weathering Study Experimental Design As part of the grout development process for the Siege of Acre project, a bench study has been conducted to study the weathering of CCB grouts under conditions anticipated in the mine tunnels at the site 4. The study is currently on-going, but only the first year of data is presented here. Many studies have performed the standard Toxicity Characteristic Leaching Procedure (TCLP) and Synthetic Precipitation Leaching Procedure tests on CCBs (both stabilized and unstabilized). These leaching procedures simulate the potential of the tested substance to leach under non-hazardous landfill conditions or under exposure to atmospheric precipitation, respectively; however, few studies have been conducted that have attempted to simulate the exposure of CCBbased grouts to conditions anticipated in underground mines. The CCB Block Weathering Study is a bench-scale CCB-grout weathering experiment designed to subject the CCB grout blocks to flowing water that simulates subsurface mine conditions. The Block Weathering Study was initiated in 25. Four blocks were formed from 1 percent CCBs. The blocks were formed with a.79 inch (2 centimeter) deep groove in which ph-adjusted running water is allowed to flow continually. Table 2 details the composition of each block and the ph condition of the water it is exposed to. Block Number Dry Wt% Warrior Run Baghouse FBC Dry Wt% Warrior Run Bed Drain FBC Dry Wt% R. Paul Smith PFA % Water Content Notes: Dry Wt% - Dry weight percent. Grout mixes were formulated by Hemmings & Associates. Table 2: Weathering Block composition and ph exposures. The four blocks were allowed to cure in their molds at ambient temperature and 1% relative humidity in a sealed plastic container for 28 days before initiating exposure testing. During the study, the blocks have been inclined at a 3 angle to simulate the pavement slope in the Siege of Acre mine tunnels. The water is recycled through the system using fish pond pumps. Water is occasionally added to the system to compensate for evaporative losses. The ph of the water is adjusted daily with sulfuric acid. Samples of the circulating water are collected periodically and analyzed for the parameters listed in Table 3. In addition, one sample of the tap water supply used for the experiment has been analyzed for the same suite of parameters to provide a baseline for comparison. ph 15

16 Major Ions Trace Elements Other Parameters Aluminum Arsenic Mercury Alkalinity Calcium Barium Manganese Silica Sodium Boron Molybdenum Total Dissolved Solids Magnesium Cadmium Nickel Potassium Cobalt Lead Iron Chromium Zinc Chloride Copper Nitrate/Nitrite Sulfate Table 3: Parameters of concern analyzed in Weathering Block Study. Results Figure 9 presents the analytical results for potassium, sodium, calcium, aluminum, iron, sulfate, chloride, and TDS in the water that has been allowed to run over the blocks. The experimental CCB blocks have been found to have significant buffering capacity, as indicated by the fact that the recycled water for the low ph experiments (ph 3 and 4) requires the daily addition of acid to maintain the desired ph. The concentrations of all analytical parameters increased sharply above the tap water concentration at the initiation of the experiment. For all four blocks, calcium, potassium, sodium, sulfate, and total dissolved solids concentrations decreased over time to levels lower than the initially observed levels, but higher than the initial tap water levels. This same pattern of concentration was also observed for aluminum and iron in Blocks 2 and 3. Aluminum and iron in Blocks 1 and 4 also increased initially, but eventually decreased to levels similar to the original tap water concentration. The pattern of chloride concentrations is slightly different from the other parameters in that an initial release of chloride was observed, followed by a decrease and finally a steady increase above the original tap water concentration and the initially observed concentrations. The data appear to indicate that upon first exposure of the CCB-grout to water, there is an initial release of certain parameters, possibly due to surface-held ions or easily soluble surface minerals. Over time, the observed concentrations appear to stabilize (with the exception of chloride, for which the continued increase in concentration may be due to external factors, such as evaporation). This observation is consistent with field data observed at the Winding Ridge injection site where, after an initial concentration spike for certain parameters related to the grout rather than to AMD (calcium, potassium, sodium, and chloride), the concentrations of these parameters gradually decreased, but in many cases remained elevated relative to pre-injection conditions for several years 1. 16

17 12 Calcium 4 Potassium mg/l mg/l /28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date 5/28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date 25 Sodium 12 Aluminum mg/l /28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date mg/l /28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date 1 Iron 5 Sulfate.8 4 mg/l.6.4 mg/l /28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date 5/ 28/ 5 9/ 5/ 5 12/ 14/ 5 3/ 24/ 6 7/ 2/ 6 Date 1 Chloride 4 Total Dissolved Solids 8 3 mg/l /28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date Block 1 Block 2 Block 3 5/28/5 9/5/5 12/14/5 3/24/6 7/2/6 Date X Block 4 Tap Water Figure 9: Analytical results for water allowed to cycle over CCB grout blocks. 17

18 Among the trace elements analyzed in the water, cadmium, cobalt, mercury, nickel, and lead have never been detected. Copper has been detected in the water samples, but at levels below those detected in the tap water sample. Among the remaining trace metals that have been detected in one or more water samples from the weathering block experiment at levels above the tap water level, only arsenic has been detected at a level above its maximum contaminant level (MCL). The concentrations of arsenic in the Weathering Block Study samples ranged from non-detect to.31 mg/l. These levels are lower than the levels of arsenic detected in samples from the Kempton mine pool (non-detect to.76 mg/l) and in the water flowing along the mine pavement at Siege of Acre (non-detect to 1.9 mg/l). This data suggests that although some release of trace metals from the CCB grout could occur in the presence of acidic mine water, the levels are expected to be low compared to the levels already present in the AMD. Overall, the Weathering Block study data indicate that limited dissolution of the grout has occurred. The grout dissolution that occurs produces elevated ph levels (if acid is not added continuously, as was done in the study), and elevated levels of total dissolved solids and major ions. While limited leaching of trace metals has been observed in the analytical results, the levels appear to be very low, especially when compared to the levels of trace metals generally observed in typical AMD environments 4. STEPS FORWARD The initial proposal for the Siege of Acre injection project divided the project into 5 phases: Phase 1 Characterization of Siege of Acre Phase 2 Materials Research Phase 3 Engineering Design Assimilate the results of Phase 1 and Phase 2 to prepare a final engineering design and bid package for the project. Phase 4 CCB Grout Injection; and Phase 5 Post-Injection Monitoring The activities detailed in this paper represent the completion of Phases 1 and 2, and work is slated to begin on Phase 3 Engineering Design in the near future. The Final Engineering Design will include identification and procurement of necessary federal, state, and local permits as well as the preparation of a conceptual engineering design for bid by qualified contractors. REFERENCES [1] Guynn, R.L., R.L. Rafalko, and P. Petzrick (27). Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 1-Year Update on the Winding Ridge Project. Presented at the 3 rd World of Coal Ash Conference, Covington, Kentucky. 18

19 [2] Warner, N.R., L. Rafalko, B. Williams, P. Petzrick, and R.T. Hemmings (25). The Kempton Man Shaft Project: Application of CCP Grout as a Seepage Barrier. Presented at the 2 nd World of Coal Ash Conference, Lexington, Kentucky. [3] Hemmings, R.T., P. Petzrick, J. Sherwill, and B.J. Cornelius (22). Beneficial Use of CCPs in Maryland in Large-Scale Engineering Applications: Design and Development of CCP Grouts. Presented at the 19 th Annual International Pittsburgh Coal Conference, Pittsburgh, Pennsylvania. [4] Warner, N. J. Giacinto, G. Reeves, A. Albirght, and P. Petzrick (27). Effects of Acid Mine Drainage on CCP Grout: A Bench-Scale Weathering Experiment. Presented at the 3 rd World of Coal Ash Conference, Covington, Kentucky. 19

Effects of Acid Mine Drainage on CCP Grout: A Bench-Scale Weathering Experiment

Effects of Acid Mine Drainage on CCP Grout: A Bench-Scale Weathering Experiment 27 World of Coal Ash (WOCA), May 7-1, 27, Covington, Kentucky, USA Home Effects of Acid Mine Drainage on CCP Grout: A Bench-Scale Weathering Experiment Nathaniel Warner 1, Joseph Giacinto 1 ; Gary Reeves

More information

Maryland Power Plant Research Program Promotes the Beneficial Use of CCPs as a Means to Protect Maryland s Natural Resources

Maryland Power Plant Research Program Promotes the Beneficial Use of CCPs as a Means to Protect Maryland s Natural Resources Maryland Power Plant Research Program Promotes the Beneficial Use of CCPs as a Means to Protect Maryland s Natural Resources William K. Hodges, Ph.D. 1 and Robert W. Keating 2 1 Maryland Department of

More information

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project 2007 World of Coal Ash (WOCA), May 7-10, 2007, Covington, Kentucky, USA Home Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project Robin L. Guynn

More information

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project 2007 World of Coal Ash (WOCA), May 7-10, 2007, Northern Kentucky, USA http://www.flyash.info Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: 10-Year Update on the Winding Ridge Project

More information

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: An Update on the Winding Ridge Project

Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: An Update on the Winding Ridge Project 2005 World of Coal Ash (WOCA), April 11-15, 2005, Lexington, Kentucky, USA http://www.flyash.info Use of a CCP Grout to Reduce the Formation of Acid Mine Drainage: An Update on the Winding Ridge Project

More information

The Use of Power Plant Combustion Products in Maryland Paul A. Petzrick

The Use of Power Plant Combustion Products in Maryland Paul A. Petzrick The Use of Power Plant Combustion Products in Maryland Paul A. Petzrick Maryland Power Plant Research Program, 580 Taylor Avenue, B-3, Annapolis, MD 21401 KEYWORDS: power plants, combustion products, cementitious

More information

The Release of Base Metals During Acidic Leaching of Fly Ash

The Release of Base Metals During Acidic Leaching of Fly Ash The Release of Base Metals During Acidic Leaching of Fly Ash George Kazonich and Ann G. Kim U.S. Department of Energy Federal Energy Technology Center P.O. Box 19 Pittsburgh, PA 153 ABSTRACT Since 199,

More information

An Evaluation of Free-Lime Containing By-products to Produce CCB Grouts for Use in AMD Abatement

An Evaluation of Free-Lime Containing By-products to Produce CCB Grouts for Use in AMD Abatement An Evaluation of Free-Lime Containing By-products to Produce CCB Grouts for Use in AMD Abatement Heather L. Wattenbach 1, Leonard G. Rafalko 1, and Paul Petzrick 2 1 Environmental Resources Management,

More information

Combustion Ash Research Activities (Year 2003) at Temple University

Combustion Ash Research Activities (Year 2003) at Temple University Combustion Ash Research Activities (Year 2003) at Temple University by David M. Kargbo, Ph.D., Associate Professor Civil & Environmental Engineering Temple University WTE Research and Technology Council

More information

The Maryland Coal Combustion By-Product/Acid Mine Drainage Partnership

The Maryland Coal Combustion By-Product/Acid Mine Drainage Partnership The Maryland Coal Combustion By-Product/Acid Mine Drainage Partnership Paul A. Petzrick Maryland Department of Natural Resources, Power Plant Research Program, Tawes State Office Building, B-3, Annapolis,

More information

PLAN FOR INJECTION OF COAL COMBUSTION BYPRODUCTS INTO THE OMEGA MINE FOR THE REDUCTION OF ACID MINE DRAINAGE 1

PLAN FOR INJECTION OF COAL COMBUSTION BYPRODUCTS INTO THE OMEGA MINE FOR THE REDUCTION OF ACID MINE DRAINAGE 1 PLAN FOR INJECTION OF COAL COMBUSTION BYPRODUCTS INTO THE OMEGA MINE FOR THE REDUCTION OF ACID MINE DRAINAGE 1 Thomas A. Gray Terence C. Moran David W. Broschart Gregory A. Smith 2 Abstract: The Omega

More information

Influent preheating (note that the heat will be recovered before discharge);

Influent preheating (note that the heat will be recovered before discharge); TO Rick Schryer - Fortune Minerals Limited DATE 23 February 2012 CC Jen Gibson FROM Bridgette Hendricks, Kevin Conroy PROJECT No. 09-1373-1004.9600 UNDERTAKING #1 EFFLUENT TREATMENT SYSTEM INFORMATION

More information

Coal Ash Beneficial Use in Mine Reclamation and Mine Drainage Remediation in Pennsylvania

Coal Ash Beneficial Use in Mine Reclamation and Mine Drainage Remediation in Pennsylvania Coal Ash Beneficial Use in Mine Reclamation and Mine Drainage Remediation in Pennsylvania FORWARD... i PREFACE... ii Letters of endorsement from IMCC, ACAA and environmental groups Table of Contents...

More information

Pilot Study Report. Z-92 Uranium Treatment Process

Pilot Study Report. Z-92 Uranium Treatment Process Pilot Study Report for Z-92 Uranium Treatment Process conducted at the Mountain Water & Sanitation District, Conifer, Colorado Revised November 11, 4 Page 2 Executive Summary Mountain Water & Sanitation

More information

Groundwater Monitoring Requirements of the CCR Rule What s Next?

Groundwater Monitoring Requirements of the CCR Rule What s Next? 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Groundwater Monitoring Requirements of the CCR Rule What s Next? Thomas A. Mann, PE SynTerra Corporation,

More information

GROUNDWATER ASSESSMENT MONITORING REPORT APRIL 2014

GROUNDWATER ASSESSMENT MONITORING REPORT APRIL 2014 Tennessee Valley Authority John Sevier Fossil Plant GROUNDWATER ASSESSMENT MONITORING REPORT APRIL 2014 Prepared by Amos L. Smith, PG Chattanooga, Tennessee June 4, 2014 DOCUMENT CERTIFICATION I certify

More information

CASE STUDY: USE OF CIRCULATING FLUIDIZED BED BOILER BYPRODUCT TO SOLIDIFY OILY SLUDGE

CASE STUDY: USE OF CIRCULATING FLUIDIZED BED BOILER BYPRODUCT TO SOLIDIFY OILY SLUDGE 2009 World of Coal Ash (WOCA) Conference - May 4-7, 2009 in Lexington, KY, USA http://www.flyash.info/ CASE STUDY: USE OF CIRCULATING FLUIDIZED BED BOILER BYPRODUCT TO SOLIDIFY OILY SLUDGE J.F. Beech,

More information

FIRST ANNUAL COAL COMBUSTION RESIDUALS (CCR) GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT LANDFILL AND SURFACE IMPOUNDMENTS

FIRST ANNUAL COAL COMBUSTION RESIDUALS (CCR) GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT LANDFILL AND SURFACE IMPOUNDMENTS FIRST ANNUAL COAL COMBUSTION RESIDUALS (CCR) GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT LANDFILL AND SURFACE IMPOUNDMENTS R.D. MORROW, SR. GENERATING STATION 304 OLD OKAHOLA SCHOOL ROAD PURVIS,

More information

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan SPECIFICATION NO.1197S Addendum No.4 Attachment D Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan Page 1 of 2 Specification No. 1197S Addendum No. 4 ATTACHMENT

More information

Jacqueline Ho, Mackenzie Valley Land and Water Board

Jacqueline Ho, Mackenzie Valley Land and Water Board To: From: cc: Subject: Jacqueline Ho, Mackenzie Valley Land and Water Board Judy Dudley John Key, Julian Morse, Tim Smith, Jeff Hussey MVLWB May 15, 2018 Information Request for MV2018L2-003 Pine Point

More information

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe

PHASE I ERNEST MINE COMPLEX. The objective of the project was to develop an economically feasible, safe PHASE I ERNEST MINE COMPLEX Project Objectives The objective of the project was to develop an economically feasible, safe method of diverting all flows from the Ernest Mine Complex to a central discharge

More information

Appendix U. Mapping of Water Quality Concentration Contours across the Province

Appendix U. Mapping of Water Quality Concentration Contours across the Province ALDERON IRON ORE CORP. ENVIRONMENTAL IMPACT STATEMENT KAMI IRON ORE MINE AND RAIL INFRASTRUCTURE, LABRADOR Appendix U Mapping of Water Quality Concentration Contours across the Province Figure 17I.1 Alkalinity

More information

Statistics valid as of January 2004.

Statistics valid as of January 2004. After completion each well typically requires initial fracturing (fracing) operation to realize maximum gas production with additional fracing every few years. Statistics valid as of January 2004. Basic

More information

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road October 27 2010 Inorganics Fluoride 1.5 MAC 0.17 0.13

More information

FORTUNE MINERALS LIMITED 140 Fullarton Street, Suite 1902, London, Ontario, Canada N6A 5P2 Tel ~ Fax

FORTUNE MINERALS LIMITED 140 Fullarton Street, Suite 1902, London, Ontario, Canada N6A 5P2 Tel ~ Fax FORTUNE MINERALS LIMITED 140 Fullarton Street, Suite 1902, London, Ontario, Canada N6A 5P2 Tel. 519-858-8188 ~ Fax. 519-858-8155 September 30, 2011 Chuck Hubert Environmental Assessment Officer Mackenzie

More information

ALKALINE FOUNDATION DRAINS AND ALKALINE AMENDMENTS FOR AMD CONTROL IN COAL REFUSE PILES 1

ALKALINE FOUNDATION DRAINS AND ALKALINE AMENDMENTS FOR AMD CONTROL IN COAL REFUSE PILES 1 ALKALINE FOUNDATION DRAINS AND ALKALINE AMENDMENTS FOR AMD CONTROL IN COAL REFUSE PILES 1 David L. Brant and Paul F. Ziemkiewicz 2 Abstract: Coal refuse, a by product of cleaning coal is normally disposed

More information

Western Maryland Resource Conservation and Development Council

Western Maryland Resource Conservation and Development Council Western Maryland Resource Conservation and Development Council Kempton Acid Mine Drainage Complex Prepared for the 2005 Mid-Atlantic Association of RC&D Council s s Annual Conference Tim Hann Coordinator

More information

DEEP MINE ABANDONMENT SEALING AND UNDERGROUND TREATMENT TO PRECLUDE ACID MINE DRAINAGE

DEEP MINE ABANDONMENT SEALING AND UNDERGROUND TREATMENT TO PRECLUDE ACID MINE DRAINAGE DEEP MINE ABANDONMENT SEALING AND UNDERGROUND TREATMENT TO PRECLUDE ACID MINE DRAINAGE Danny R. Hause Larry R. Willison BethEnergy's Mine 105W is located in Barbour County, West Virginia, near Buckhannon.

More information

Appendix C1: Batch Kinetics Tests

Appendix C1: Batch Kinetics Tests Appendix C1: Batch Kinetics Tests This appendix contains the entire data set for the batch kinetics tests for the potential biofilter components. These tests were performed to provide estimates of optimal

More information

Since the Game Lands are publicly owned, reclamation can be done with Project 500 bond issue funds. E. D'Appolonia Consulting Engineers, Inc.

Since the Game Lands are publicly owned, reclamation can be done with Project 500 bond issue funds. E. D'Appolonia Consulting Engineers, Inc. FINAL REPORT ENGINEERING SURVEY AND FEASIBILITY STUDY MINE DRAINAGE POLLUTION ABATEMENT STATE GAME LANDS NO. 117 WASHINGTON COUNTY, PENNSYLVANIA PROJECT NO. SL-130-1 1.0 INTRODUCTION Raccoon Creek is one

More information

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation Matrix: CWA (Non Potable Water) Discipline EPA 120.1 Chemistry Conductivity 8/1/2015 Aluminum 8/1/2015 Antimony 8/1/2015 Arsenic 8/1/2015 Barium 8/1/2015 Beryllium 8/1/2015 Boron 8/1/2015 Cadmium 8/1/2015

More information

COOPERATIVE EXTENSION Bringing the University to You

COOPERATIVE EXTENSION Bringing the University to You COOPERATIVE EXTENSION Bringing the University to You Fact Sheet-02-91 SAMPLING AND INTERPRETATION OF LANDSCAPE IRRIGATION WATER Robert Morris and Dr. Dale Devitt TAKING A WATER SAMPLE FOR ANALYSIS Contact

More information

ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT FOR 2018 JAMES RIVER POWER STATION (JRPS) Prepared for:

ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT FOR 2018 JAMES RIVER POWER STATION (JRPS) Prepared for: ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT FOR 2018 JAMES RIVER POWER STATION (JRPS) Prepared for: City Utilities of Springfield 301 E. Central Street Springfield, Missouri Prepared by:

More information

Newmont Mining Corporation Water Management Standard

Newmont Mining Corporation Water Management Standard Page No: Page 1 of 5 1 PURPOSE AND OBJECTIVES This Global Standard sets the minimum Newmont requirements to proactively plan and manage water from exploration to post-closure in accordance with Newmont

More information

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3) NORTH TEXAS MUNICIPAL WATER DISTRICT - Wylie Water Analysis Jan-2018 Mineral Analysis Raw Treated Standards Residue on Evaporation 412 456 500 1000 Silica (SiO2) 3.63 3.41 Iron (Fe) 0.378 0.259 0.3 0.3

More information

Clyde Mine Discharge/Tenmile Creek Water Quality Final Report

Clyde Mine Discharge/Tenmile Creek Water Quality Final Report Clyde Mine Discharge/Tenmile Creek Water Quality Final Report November 01, 2016 Background In follow-up to the Pennsylvania Department of Environmental Protection s (DEP) December 15, 2015, Tenmile Creek

More information

Borough of Hopewell, New Jersey

Borough of Hopewell, New Jersey Pilot Study Report for Z-92 Uranium and Z-88 Radium Treatment Processes conducted for Borough of Hopewell, New Jersey February 22, 2010 9500 West 49 th Ave., Suite D100, Wheat Ridge, Colorado 80033 TEL:

More information

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation

State of Nevada Department of Conservation and Natural Resources Division of Environmental Protection Laboratory Scope of Accreditation Matrix: CWA (Non Potable Water) Discipline: Chemistry ASTM D516-07 ASTM D6888-09 ASTM D7511-09e2 EPA 160.4 EPA 1631E EPA 1664A EPA 1664A (SGT-HEM) EPA 180.1 Sulfate 8/1/2018 Cyanide, Amenable 8/1/2018

More information

Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility

Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility 1 Trans- Ash Landfill Benton County, Tennessee Class II Disposal Facility We have reviewed the Environmental Integrity report concerning the Trans Ash Landfill and believe there are several errors and/or

More information

FGD as a Soil Amendment for Mine Reclamation Warren A. Dick

FGD as a Soil Amendment for Mine Reclamation Warren A. Dick FGD as a Soil Amendment for Mine Reclamation Warren A. Dick School of Environment and Natural Resources Ohio State University, Wooster, OH 220-263-3877; dick.5@osu.edu FGD Properties of Value for Mineland

More information

Beneficial Re-use of CCR for Site Closures using Mining Reclamation Technologies

Beneficial Re-use of CCR for Site Closures using Mining Reclamation Technologies 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ Beneficial Re-use of CCR for Site Closures using Mining Reclamation Technologies Dale W. Evans, P.E. 1,

More information

Statewide Characterization of Oklahoma s Major Aquifers

Statewide Characterization of Oklahoma s Major Aquifers Statewide Characterization of Oklahoma s Major Aquifers Mark Belden, Brittany McCall, Sarah Yepez Water Quality Programs Division, OWRB Oklahoma Clean Lakes & Watersheds Conference April 5-6, 2017 Groundwater

More information

Water Quality at the Roberts-Dawson Coal Mine Three Years After Placement of Flue Gas Desulfurization By-Product

Water Quality at the Roberts-Dawson Coal Mine Three Years After Placement of Flue Gas Desulfurization By-Product Water Quality at the Roberts-Dawson Coal Mine Three Years After Placement of Flue Gas Desulfurization By-Product P. Taerakul, M. Lamminen, H.W. Walker, and E. Whitlatch Department of Civil and Environmental

More information

Understanding Your Test Results

Understanding Your Test Results Understanding Your Test Results The following interpretation is based on public drinking water system standards. These standards only apply to public water systems but the health implications are the same

More information

In the fall of 2008, Barr and PolyMet identified four sources of historical Colby Lake water quality data. Those sources are listed below:

In the fall of 2008, Barr and PolyMet identified four sources of historical Colby Lake water quality data. Those sources are listed below: External Memorandum To: Dave Blaha, ERM From: Miguel Wong and Katie Wenigmann Project: 23/69 0862.00 006 001 c: Jim Scott, PolyMet; Stuart Arkley, MDNR; John Borovsky, Barr PolyMet has not been requested

More information

Drilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics

Drilling for Natural Gas in the Marcellus and Utica Shales: Environmental Regulatory Basics January 2014 Introduction This fact sheet provides a basic overview of natural gas drilling in the Marcellus and Utica Shale regions of Ohio and the potential environmental issues associated with these

More information

The Role of Dense Slurry in Achieving Zero Liquid Discharge

The Role of Dense Slurry in Achieving Zero Liquid Discharge 2017 World of Coal Ash (WOCA) Conference in Lexington, KY - May 9-11, 2017 http://www.flyash.info/ The Role of Dense Slurry in Achieving Zero Liquid Discharge Timmons, D.M. 1, Kovacsics, Istvan 2 1 NAES

More information

MAYO STEAM ELECTRIC PLANT RISK CLASSIFICATION

MAYO STEAM ELECTRIC PLANT RISK CLASSIFICATION MAYO STEAM ELECTRIC PLANT RISK CLASSIFICATION Mayo Steam Electric Plant Overall Risk Classification DEQ has proposed the risk classification for the Ash Pond as LOW. Groundwater Key Factor. Based on the

More information

Summary of Basin Characteristics and Facilities. General Land-use Characteristics: Withdrawal and Discharge Sites: Sampling Site Statistics:

Summary of Basin Characteristics and Facilities. General Land-use Characteristics: Withdrawal and Discharge Sites: Sampling Site Statistics: -Digit Watershed Identity Number: 28 This report was prepared by the Kentucky Water Research Institute as a product of the statewide Kentucky Watershed Management process. Information presented in this

More information

Use of Lime Activated Class F Fly Ash for Full Depth Reclamation (FDR) of Asphalt Pavements

Use of Lime Activated Class F Fly Ash for Full Depth Reclamation (FDR) of Asphalt Pavements Use of Lime Activated Class F Fly Ash for Full Depth Reclamation (FDR) of Asphalt Pavements William Wolfe, Tarunjit Butalia, Harold Walker Ryan Mackos, Gursimran Singh, James Howdyshell The Ohio State

More information

Abu Dhabi Trade Effluent Standards & Regulations Summary

Abu Dhabi Trade Effluent Standards & Regulations Summary Abu Dhabi Trade Effluent Standards & Regulations Summary August 2010 Disclaimer: The standards & regulations provided here are attributable to the named source and are assumed to be accurate at the time

More information

Base Metal and Iron Ore Mining

Base Metal and Iron Ore Mining Multilateral Investment Guarantee Agency Environmental Guidelines for Base Metal and Iron Ore Mining Industry Description and Practices This document addresses the mining of base metal ores (copper, lead

More information

um"ts: m1 1grams per rt1er (mg./l)

umts: m1 1grams per rt1er (mg./l) 28 Clark Avenue St. Louis, MO 633-257 4 (314) 531-8080 FAX (31 4) 531-8085 P.O. Box 897 Page 1of8 REPORT OF ALYSIS ID: WATER NO. 1-1 5 T FLOOR BREAKROOM, 05/09/16 um"ts: m1 1grams per rt1er (mg./l) ANION

More information

ACID MINE DRAINAGE TREATMENT VIA ALKALINE INJECTION TECHNOLOGY 1

ACID MINE DRAINAGE TREATMENT VIA ALKALINE INJECTION TECHNOLOGY 1 ACID MINE DRAINAGE TREATMENT VIA ALKALINE INJECTION TECHNOLOGY 1 G.A. Canty and J.W. Everett 2 Abstract. The Oklahoma Conservation Commission conducted a demonstration project to investigate the feasibility

More information

Water Quality Protection Issues for New Water Supply Wells

Water Quality Protection Issues for New Water Supply Wells Water Quality Protection Issues for New Water Supply Wells Water Quality Protection Issues for New Water Supply Wells Project siting Facility water balance Supply well water quality analysis Supply well

More information

Technical Memorandum Groundwater Quality Sampling, November 2010 Event

Technical Memorandum Groundwater Quality Sampling, November 2010 Event Kennedy/Jenks Consultants Technical Memorandum Groundwater Quality Sampling, November 2010 Event Date: 10 March 2011 To: From: Subject: Amy Blain City of Longview Steve Misner Kennedy/Jenks Consultants

More information

Pebble Project Surface Water Quality Program Streams, Seeps, and Ponds

Pebble Project Surface Water Quality Program Streams, Seeps, and Ponds Day1_1445_Surface Water Quality_PLP_McCay.mp3 Pebble Project Surface Water Quality Program Streams, Seeps, and Ponds Mark Stelljes SLR International February 1, 2012 Outline Stream Program Overview Results

More information

Technical Memorandum Groundwater Quality Sampling, First 2010 Semiannual Event

Technical Memorandum Groundwater Quality Sampling, First 2010 Semiannual Event Kennedy/Jenks Consultants Technical Memorandum Groundwater Quality Sampling, First 2010 Semiannual Event Date: 30 July 2010 To: From: Subject: Amy Blain City of Longview Steve Misner Kennedy/Jenks Consultants

More information

Guidance for Remediation Program Landfills and Open Dumps. MSECA s Quarterly Meeting February 19, 2019

Guidance for Remediation Program Landfills and Open Dumps. MSECA s Quarterly Meeting February 19, 2019 Guidance for Remediation Program Landfills and Open Dumps MSECA s Quarterly Meeting February 19, 2019 Remediation Program Landfills and Open Dumps Guidance Resource www.idem.in.gov/cleanups/ files/tech_guidance_landfill

More information

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters

THE ABATEMENT PLAN. beneficial abatement plan. For the purpose of defining the pollution potential of surface waters THE ABATEMENT PLAN GENERAL PLAN Preventing surface waters from entering deep mine workings apparently offers the most beneficial abatement plan. For the purpose of defining the pollution potential of surface

More information

2017 Annual Groundwater Monitoring and Correction Action Report

2017 Annual Groundwater Monitoring and Correction Action Report 2017 Annual Groundwater Monitoring and Correction Action Report Milton R. Young Station Coal Combustion Residuals (CCR) Disposal Facility Center, ND Prepared for Minnkota Power Cooperative, Inc. December

More information

CHAPTER I. PURPOSE The purpose of the acid mine drainage study of the Redstone Creek Watershed and portions of the Uniontown Syncline was to:

CHAPTER I. PURPOSE The purpose of the acid mine drainage study of the Redstone Creek Watershed and portions of the Uniontown Syncline was to: CHAPTER I INTRODUCTION AUTHORITY The Pennsylvania Department of Environmental Resources, in response to the Commonwealth of Pennsylvania Legislative Act 443, "Land and Water Conservation and Reclamation

More information

RIMINI ROAD IMPROVEMENT PROJECT RESTORATION OF ABANDONED MINE SITES PROJECT DRAFT REPORT

RIMINI ROAD IMPROVEMENT PROJECT RESTORATION OF ABANDONED MINE SITES PROJECT DRAFT REPORT RIMINI ROAD IMPROVEMENT PROJECT RESTORATION OF ABANDONED MINE SITES PROJECT DRAFT REPORT Prepared by U.S. Army Corps of Engineers Omaha District Omaha, Nebraska August 2004 Table of Contents 1 Introduction...

More information

Coal Combustion By-Products (CCBs): An Overview

Coal Combustion By-Products (CCBs): An Overview Toxic Contaminants Workgroup Coal Combustion By-Products (CCBs): An Overview David Tancabel Director Power Plant Research Program Department of Natural Resources Why We Care What Happens to CCBs All CCBs

More information

MONTEREY COUNTY HEALTH DEPARTMENT ENVIRONMENTAL HEALTH BUREAU DRINKING WATER PROTECTION SERVICES APPLICATION FOR A NEW OR AMENDED WATER SYSTEM PERMIT

MONTEREY COUNTY HEALTH DEPARTMENT ENVIRONMENTAL HEALTH BUREAU DRINKING WATER PROTECTION SERVICES APPLICATION FOR A NEW OR AMENDED WATER SYSTEM PERMIT MONTEREY COUNTY HEALTH DEPARTMENT ENVIRONMENTAL HEALTH BUREAU DRINKING WATER PROTECTION SERVICES APPLICATION FOR A NEW OR AMENDED WATER SYSTEM PERMIT Return Application to: Monterey County Health Department

More information

Sugar Creek Watershed Watershed Number:

Sugar Creek Watershed Watershed Number: Watershed Watershed Number: 512511 Location Map Mercer Jessam ine %g 27 %g15 41 Harrodsburg Burgin %g 152 %g 39 %g1268 Sugar C reek W atershed Richm ond %g1355 %g 876 Madison %g 34 %g 595 Boyle Danville

More information

January 31, Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana

January 31, Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana January 31, 2018 Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana 46204-2901 ATC Group Services LLC 7988 Centerpoint Dr. Suite 100 Indianapolis,

More information

Livingston County Department of Public Health Environmental Health Division. Hydrogeologic Investigation Requirements for Land Division Developments

Livingston County Department of Public Health Environmental Health Division. Hydrogeologic Investigation Requirements for Land Division Developments Livingston County Department of Public Health Environmental Health Division Hydrogeologic Investigation Requirements for Land Division Developments Reviewed March 1, 2013 Table of Contents Scope/Authority..1

More information

The Role of Dense Slurry in Achieving Zero Liquid Discharge

The Role of Dense Slurry in Achieving Zero Liquid Discharge ISSN 1946-0198 journal homepage: www.coalcgp-journal.org The Role of Dense Slurry in Achieving Zero Liquid Discharge D.M. Timmons 1, Istvan Kovacsics 2 1 NAES Corporation, 1180 NW Maple, Issaquah, WA 98029,

More information

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA

DROGHEDA LANDFILL SITE COLLON ROAD, MELL, DROGHEDA GROUNDWATER MONITORING INFORMATION QUARTERLY REPORT FOR PERIOD APRIL TO JUNE 216 BY LOUTH COUNTY COUNCIL TO ENVIRONMENTAL PROTECTION AGENCY FOR WASTE LICENCE REFERENCE: W33-1 DROGHEDA LANDFILL SITE COLLON

More information

APPENDIX 8E SITE DISCHARGE WATER QUALITY MODELLING REPORT

APPENDIX 8E SITE DISCHARGE WATER QUALITY MODELLING REPORT APPENDIX 8E SITE DISCHARGE WATER QUALITY MODELLING REPORT Table of Contents 8E1 INTRODUCTION... 1 8E2 MODEL APPROACH... 3 8E2.1 Mine Water Management Plan... 3 8E2.1.1 Phase 1: Dewatering and Operations...

More information

Annual Groundwater Monitoring and Corrective Action Report Year Ending December 31, 2017

Annual Groundwater Monitoring and Corrective Action Report Year Ending December 31, 2017 City Water, Light & Power Coal Combustion Residuals Surface Impoundments Annual Groundwater Monitoring and Corrective Action Report Year Ending December 31, 2017 January 2018 Prepared for: City Water,

More information

Modelling of Mine Flooding in the Pittsburgh Coal Basin, USA

Modelling of Mine Flooding in the Pittsburgh Coal Basin, USA Modelling of Mine Flooding in the Pittsburgh Coal Basin, USA B R Leavitt 1, J J Donovan 2, A J Morris 2 and E Werner 2 ABSTRACT Coal mining in the Pittsburgh coal seam, in the eastern United States, began

More information

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program

W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program W12A Landfill Groundwater, Leachate, Water Well, Landfill Gas and Surface Water Quality Monitoring Program The groundwater, leachate, water well, landfill gas and surface water monitoring programs are

More information

January 31, Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana

January 31, Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana January 31, 2018 Mr. David M. Heger Senior Counsel AES US Services, LLC One Monument Circle, Suite 701A Indianapolis, Indiana 46204-2901 ATC Group Services LLC 7988 Centerpoint Dr. Suite 100 Indianapolis,

More information

ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN

ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN Introduction Troy Titchenell and Jeff Skousen Anker Energy and West Virginia University From its headwaters in Pocahontas, Randolph

More information

INITIAL ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT

INITIAL ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT Prepared For: Fort Armistead Road Lot 15 Landfill, LLC 1005 Brandon Shores Road, Suite 100 Baltimore, Maryland 21226 INITIAL ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT FEDERAL CCR RULE

More information

NEILSON RESEARCH CORPORATION

NEILSON RESEARCH CORPORATION NEILSON RESEARCH CORPORATION Environmental Testing Laboratory 5/23/2016 Russell Deen Southern Oregon University TEL: (541) 552-6798 FAX (541) 552-6415 RE: Dear Russell Deen: Order No.: 1605610 received

More information

REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT A.B. BROWN GENERATING STATION WEST FRANKLIN, INDIANA

REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT A.B. BROWN GENERATING STATION WEST FRANKLIN, INDIANA www.haleyaldrich.com REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT WEST FRANKLIN, INDIANA by Haley & Aldrich, Inc. Greenville, South Carolina for Southern Indiana Gas and Electric

More information

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018

Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA Ash Pond Dewatering Plan. Revised May 2018 Georgia Power Plant McDonough-Atkinson NPDES Permit No. GA0001431 Revised May 2018 Purpose This updated (Plan) describes the additional procedures, safeguards and enhanced wastewater treatment measures

More information

Environmental Remediation Cement Solidification/Stabilization

Environmental Remediation Cement Solidification/Stabilization Environmental Remediation Cement Solidification/Stabilization After decades of improper waste management, an industrial location in Sydney Harbor became severely contaminated Throughout the 20 th century,

More information

Water Monitoring - Teralba Quarry EPA Point No.4 - Adit Overflow

Water Monitoring - Teralba Quarry EPA Point No.4 - Adit Overflow No. Dates Water Monitoring - Teralba Quarry - 2018 - EPA Point No.4 - Adit Overflow EPA No 4-148 ABCDE EPA No 4-149 ABCDE EPA No 4-150 ABCDE January 2018. Febrary 2018. March 2018. EPA No 4-151 AB April

More information

SOUTH BRANCH SUBWATERSHED

SOUTH BRANCH SUBWATERSHED SOUTH BRANCH SOUTH BRANCH SUBWATERSHED The South Branch Subwatershed includes the South Branch drainage area plus all the drainage area along the main stream to the south from the mouth of Surrena Run

More information

WEF Collection Systems Conference Evaluation of High ph Infiltration Water and Recycled Bedding Material

WEF Collection Systems Conference Evaluation of High ph Infiltration Water and Recycled Bedding Material Evaluation of High ph Infiltration Water and Recycled Bedding Material Keith Hobson, PE, BCEE, FOX Engineering Associates, Inc. ABSTRACT The purpose of this evaluation was to determine the cause and source

More information

Sequatchie Valley Coal Mine Sequatchie County, Tennessee

Sequatchie Valley Coal Mine Sequatchie County, Tennessee CASE STUDY Sequatchie Valley Coal Mine Sequatchie County, Tennessee 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from this

More information

Succeed at Removing Metals and Other Contaminants from Water

Succeed at Removing Metals and Other Contaminants from Water Succeed at Removing Metals and Other Contaminants from Water The MAR Systems Vision Cleaner Water to Benefit the World s Present and Future Generations What We Do Manufacturer of comprehensive adsorbent

More information

Kawishiwi Watershed Metals Data Summary 2012

Kawishiwi Watershed Metals Data Summary 2012 Kawishiwi Watershed Metals Data Summary 212 Prepared for the Kawishiwi Watershed Protection Project Nolan Baratono, Watershed Ecologist Jesse Anderson, Research Scientist Background The Kawishiwi Watershed

More information

Goldfields Environmental Management Group Workshop on Environmental Management Kalgoorlie-Boulder, May 2010

Goldfields Environmental Management Group Workshop on Environmental Management Kalgoorlie-Boulder, May 2010 Goldfields Environmental Management Group Workshop on Environmental Management Kalgoorlie-Boulder, May 2010 MBS Environmental Geochemical Capabilities Waste characterisations for projects in WA, NT & Qld:

More information

REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT A.B. BROWN GENERATING STATION WEST FRANKLIN, INDIANA

REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT A.B. BROWN GENERATING STATION WEST FRANKLIN, INDIANA www.haleyaldrich.com REPORT ON 2017 ANNUAL GROUNDWATER MONITORING AND CORRECTIVE ACTION REPORT A.B. BROWN GENERATING STATION WEST FRANKLIN, INDIANA by Haley & Aldrich, Inc. Greenville, South Carolina for

More information

State of Utah. Department of Health Environmental Laboratory Certification Program. Certification is hereby granted to

State of Utah. Department of Health Environmental Laboratory Certification Program. Certification is hereby granted to State of Utah Department of Health Environmental Laboratory Certification Program Certification is hereby granted to 1673 Terra Avenue Sheridan, WY 82801 Has conformed with the 2009 TN/ Standard Scope

More information

IMPACT OF SALT ON METAL LEACHING FROM COAL FLY ASH

IMPACT OF SALT ON METAL LEACHING FROM COAL FLY ASH 2015 World of Coal Ash (WOCA) Conference in Nasvhille, TN - May 5-7, 2015 http://www.flyash.info/ IMPACT OF SALT ON METAL LEACHING FROM COAL FLY ASH Jay E. Renew, P.E. 1, Kirk M. Ellison 2, Keith Hendershot

More information

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA)

#47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) #47 CASE STUDY INSTALLATION OF A SOIL-BENTONITE CUTOFF WALL THROUGH AN ABANDONED COAL MINE (GROVE CITY, PA) by Michael J. Carey Michael J. Fisher Steven R. Day Presented at: International Containment Technology

More information

FORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION

FORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WASTE MANAGEMENT FORM 26R CHEMICAL ANALYSIS OF RESIDUAL WASTE ANNUAL REPORT BY THE GENERATOR INSTRUCTIONS GENERAL INFORMATION

More information

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2

Holcim (Australia) Pty Limited. Lynwood Quarry Groundwater Monitoring Program Revision 2 Holcim (Australia) Pty Limited Lynwood Quarry Groundwater Monitoring Program Revision 2 June 2011 Lynwood Quarry Groundwater Monitoring Program Revision 2 Prepared by on behalf of Holcim (Australia) Pty

More information

Groundwater Investigations for CCR Landfills in Karst Terrain

Groundwater Investigations for CCR Landfills in Karst Terrain Groundwater Investigations for CCR Landfills in Karst Terrain Justin Brown, RG, GeoEngineers, Inc. Chris Hickman, PG, Jacobs Engineering Coal Ash Regulatory History 1978: Fossil fuel combustion waste was

More information

Written Testimony. before the SUBCOMMITTEE ON ENERGY AND ENVIRONMENT UNITED STATES HOUSE OF REPRESENTATIVES WASHINGTON, D.C.

Written Testimony. before the SUBCOMMITTEE ON ENERGY AND ENVIRONMENT UNITED STATES HOUSE OF REPRESENTATIVES WASHINGTON, D.C. Written Testimony before the SUBCOMMITTEE ON ENERGY AND ENVIRONMENT UNITED STATES HOUSE OF REPRESENTATIVES WASHINGTON, D.C. Ken Ladwig Senior Research Manager Electric Power Research Institute Palo Alto,

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Keith Thompson Company: Rosemont Copper Company Date: August

More information

S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT S TATEMENT. Appendix A. Mine Site Water Balance and Water Quality

S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT S TATEMENT. Appendix A. Mine Site Water Balance and Water Quality S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I MPACT S TATEMENT Appendix 6.2.7-A Mine Site Water Balance and Water Quality TABLE OF CONTENTS S TAR-ORION S OUTH D IAMOND P ROJECT E NVIRONMENTAL I

More information

ANNUAL GROUNDWATER MONITORING REPORT

ANNUAL GROUNDWATER MONITORING REPORT ANNUAL GROUNDWATER MONITORING REPORT ACTIVE COAL COMBUSTION RESIDUALS LANDFILL ANNUAL GROUNDWATER MONITORING REPORT 2017 Escalante Generating Station Prewitt, New Mexico Submitted To: Tri-State Generation

More information

Grouting for Freezing

Grouting for Freezing Grouting for Freezing Joseph A. Sopko, Ph.D., P.E. M.ASCE 1, Adam T. Curry, P.E. M.ASCE, 2 and Gregory T. Ziegler, P.E., M.ASCE 3 1 Moretrench American Corporation, 100 Stickle Ave., Rockaway, NJ 07866;

More information