1 SOLAR HEAT INJECTION INTO BOREHOLES Parham Eslami-nejad 1, Antoine Langlois 1, Simon Chapuis 1, Michel Bernier 1, Wassim Faraj 2 1 Département de génie mécanique, École Polytechnique de Montréal Case Postale 6079, succursale «centre-ville», Montréal, Québec, Canada 2 Morrison Hershfield Limited, Mechanical Department 235 Yorkland Blvd., Ste 600, Toronto, ON M2J 1T1 ABSTRACT This paper focuses on solar heat injection into geothermal boreholes that are linked to ground-source heat pumps (GSHP) used for space conditioning of buildings. Single and multiple borehole configurations are examined. In the first case, the borehole is equipped with two independent circuits, one linked to a GSHP and the other to thermal solar collectors. With this arrangement simultaneous solar injection and heat retrieval is possible. The second example is a case study performed on an actual installation where a combined solar/gshp system is considered to heat a 2,400 sq. meter building and three greenhouses. It consists of a square 5 5 bore field where heat from thermal solar collectors is injected throughout the year in the 9 center boreholes. The other 16 boreholes at the periphery are not linked to solar collectors as they are used to cool the building. Simulation results using TRNSYS indicate that solar injection into single boreholes has a negligible effect on heat pump energy consumption. As for the multiple borehole case, it is shown that solar recharging of the core is essential to limit the ground temperature decrease and to keep the return fluid temperature above the lower operating limit of the heat pumps. INTRODUCTION As shown in the literature reviews provided by Chapuis and Bernier (2008, 2009), several solar/geothermal borehole configurations have been built worldwide. One of the most prominent example is the Drake Landing project in Canada. As was shown by Sibbit et al. (2007) and McDowell and Thornton (2008), this project will achieve almost a 100% solar fraction for space heating of 52 homes after several years of charging. The bore field is composed of 144 closely-packed boreholes arranged to promote radial stratification. The predicted end-of-summer storage temperature is approximately 80 C. Such a high storage temperature has two drawbacks. First, the return temperature to the solar collectors is relatively high which leads to relatively low solar collector efficiencies. Second, heat losses from the borehole storage are relatively high as they represent approximately 60% of the injected heat (Sibbitt et al., 2007). It has been suggested to lower the average borehole storage temperature to a level approximately equal to the annual ambient temperature and to use heat pumps for space heating (Chapuis and Bernier 2008, 2009). Had this approach been used in the Drake Landing project, the solar collector area would have been reduced by a factor of 4. However, heat pump energy consumption would limit the solar fraction to approximately 75%. This concept of lower borehole storage temperature combined with heat pumps is further examined in this paper. Furthermore, a novel concept is proposed whereby solar injection is performed in core boreholes while periphery boreholes act as a thermal guard to limit unwanted heat diffusion from the warm core to the cool undisturbed ground temperature. For single borehole configurations, Bernier and Salim Shirazi (2007) have looked at the effect of solar injection on the required borehole length. They concluded that solar injection has a minimum impact on the required borehole length because peak heating is done at night when solar heat is unavailable. However, they did not look at the reduction in heat pump energy consumption resulting from solar injection. This paper is divided into two main parts. In the first part, single boreholes are analyzed. The objective is to quantify, using multi-year hourly simulations, the impact of solar heat injection on the annual heat pump energy consumption. The second part is a case study performed on an actual installation where a combined solar/gshp system is considered to heat and cool a 2,400 sq. meter building and three greenhouses. It consists of a square 5 5 bore field where heat from thermal solar collectors is injected throughout the year in the 9 center boreholes. The other 16 boreholes at the periphery are not linked to solar collectors as they are used to cool the building. Design and simulations studies are presented for this second part. 237
2 SINGLE BOREHOLE Configuration The single borehole configuration considered here is presented schematically in Figure 1. It consists of a single borehole GSHP system coupled to a solar domestic hot water (SDHW) system. The borehole is equipped with two independent circuits thus forming a four-pipe borehole (2 U-tubes). One of the circuits is linked to a GSHP which provides year-round space conditioning to the house. The other U-tube is connected to thermal solar collectors. The useful gain from the solar collectors, Q useful, can either be used directly by the solar domestic hot water system (Q in,dhw ) or injected into the borehole (Q injected ) where it is either transferred to the other U-tube if the heat pump is running or to the adjoining ground when the heat pump is off. In this study, solar injection is either done only during the winter (from October 1 st to January 31 st ) or over the whole year. Finally, auxiliary electric heat, Q aux, is used in the hot water tank in case solar energy is insufficient to meet the DHW needs. The objective of this part of the study is to quantify Q aux and the heat pump energy consumption (HPEC) for various scenarios. Figure 1: Schematic representation of the single borehole configuration Building heating/cooling load (kw) Hour of the year Figure 2: Hourly load for the example building COP Heating Cooling Inlet temperature to the heat pump ( o C) Figure 3: Performance of the heat pump used in this study Methodology The system shown in Figure 1 is simulated using TRNSYS (Klein et al, 2004) for the Toronto climate. Standard components from TRNSYS and from the TESS library (TESS, 2004) are used. The ground heat exchanger is modeled using the well-known DST model (i.e. TYPE 557a in TRNSYS). The borehole thermal resistance portion of the DST model was modified according to the recent work of Zeng et al. (2003). However, as pointed out by Bernier and Salim Shirazi (2007), even with this last modification the complex interaction between the solar and GSHP legs in the borehole cannot be accounted for. Therefore, the following assumptions had to be used: i) only the GSHP leg is considered. Thus, the borehole is approximated as one U-tube; ii) the heat transferred into the ground, Q ground, is the sum of the heat collected/rejected by the heat pump in the ground, Q hp, and the injected solar energy in the ground, Q injected (the value of Q ground can either be positive or negative); iii) both return fluid temperatures from the borehole, T in,hp and T in,solar are equal. Solar collector efficiency, η coll, is given by: ( T T )/ G (1) Coll in, solar ext where T in,solar ( C) is the inlet temperature to the collectors, T ext is the ambient temperature ( C), and G (W/m 2 ) is the solar radiation striking the collector array. Collectors are assumed to be facing south with a 45 slope. Simulation results are based on the hourly cooling/heating loads of a typical residence (Figure 2). Peak loads are around 6 and 4 kw in heating and cooling, respectively. The yearly space heating and cooling needs are 14,550 and 1535 kwh, in heating and cooling, respectively. This house is equipped with a commercially available 3-ton (10.5 kw) heat pump unit (Anon. A) whose performance is given in Figure 3 as a function of the entering fluid temperature (i.e. return fluid temperature from the ground). It should be noted that heat pump operation when the 238
3 inlet fluid temperature is below 20 F (-6.7 C) is not recommended by the manufacturer. As for domestic hot water consumption, a typical daily water draw of 200 liters is used. The entering water mains temperature is assumed constant and equal to 10 C while the domestic hot water set point temperature is set at 60 C. This leads to an annual DHW consumption of approximately 4230 kwh if an all-electric hot water tank is used. Finally, the ground and borehole properties, which are summarized in Table 1, are the same as the ones used by Bernier and Salim Shirazi (2007). Table 1 Characteristics of the geothermal fields used in this study Parameter Single borehole Multiple boreholes Ground Thermal conductivity (Wm -1 K -1 ) Thermal diffusivity (m 2 /day) Undisturbed temperature ( C) Borehole Total number (-) Spacing (m) Depth (m) Diameter (cm) Header depth (m) Thermal resistance (mkw -1 ) * From a thermal response test (GeoEnergy, 2009) ** average for the year N/A ** Results Twenty year simulations with a one hour time step have been performed. The main results are presented in Table 2. Four cases are examined and the results are presented for the first and 20 th year of operation as well as for the 20 year average. Table 2 Simulation results for the single borehole configuration collector area Solar ** injection Heating HPEC H Heat pump Cooling HPEC C Solar DHW * * * * Total energy consumption Total Q aux + HPEC Q hp Q useful η coll Q injected Q aux Total HPEC Cases * m 2 kwh kwh kwh kwh kwh kwh kwh kwh HP+SDHW 5 winter only st year HP+SDHW 10 winter only HP/ no SDHW 10 whole year SDHW/HP 5 N/A HP+SDHW 5 winter only th year HP+SDHW 10 winter only HP/ no SDHW 10 whole year SDHW/HP 5 N/A HP+SDHW 5 winter only HP+SDHW 10 winter only average HP/ no SDHW 10 whole year over years SDHW/HP 5 N/A *HP+SDHW: Set-up presented in Figure 1 HP/ no SDHW : All solar energy injected into the ground; DHW provided by resistance heating SDHW/HP : Two separate systems: HP for space conditioning and SDHW for DHW heating ** Winter is defined here as the period from October 1 st to January 31 st. The first thing to note in Table 2 is that there are slight differences between the energy consumption for the first and twentieth year. For example, the combined system (HP+SDHW with 5m 2 of collector area) has a total energy consumption (HPEC + Q aux ) of 5653 kwh in the first year and 5731 kwh in the 20 th year. This represents a 1.4% difference. This increase is due to the fact that the outlet temperature from the borehole decreases with time. As indicated in Figure 4, the average outlet temperature during the heating season in the first year is approximately 4 C, while it is down to around 3 C for the 20 th year. This decrease in outlet temperature increases the heat pump energy consumption in heating (HPEC H ) from 3385 to 3463 kwh. The decrease in outlet temperature is due to the fact that the injected solar energy, Q injected, does not compensate for the annual amount of energy collected from the ground by 239
4 the heat pump, Q hp. For example, for the first year, Q hp = kwh (the minus sign indicates that more energy is collected than rejected by the heat pump) and Q injected = 942 kwh. On the cooling side, as indicated in Figure 5, the average outlet temperature during the cooling season decreases also by about 1 C. This outlet temperature decrease has a modest beneficial effect on the energy consumption of the heat pump in cooling with a drop from 197 to 193 kwh as indicated in Table 2. Given that there are only minor differences between the first and last year of operation, the analysis will now focus on the average values over the 20 year operation of the system, i.e. the last four lines of Table 2. Temperature ( o C) HP+SDHW 5m 2 HP+SDHW 10m 2 HP/no SDHW 10m 2 SDHW/HP Year Temperature ( o C) HP+SDHW 5m 2 HP+SDHW 10m 2 HP/no SDHW 10m 2 SDHW/HP Year Figure 5: Outlet temperature of the borehole in the cooling mode Figure 4: Outlet temperature of the borehole in the heating mode The operation of the system with an increased collector area from 5 to 10 m 2 decreases the total energy consumption from 5715 to 5281 kwh. Most of this reduction comes from an increase in the amount of hot water heated with solar energy in the summer as Q aux decreases from 2075 to 1686 kwh. The total heat pump energy consumption goes down by only 45 kwh from 3640 kwh to 3595 kwh. Thus, doubling Q injected (from 976 to 1876 kwh) has a small impact on the heat pump energy consumption as the outlet temperature for the 10 m 2 case is only about 1 C higher than for the 5 m 2 case (Figure 4). If solar injection is performed year-round and DHW is provided with electric heating (HP/no SDHW 10 m 2 case), the total heat pump energy consumption decreases by 3.1% from 3595 to 3484 kwh. The heat pump energy consumption in heating decreases from 3401to 3263 kwh while it increases from 194 to 221 kwh in cooling. These behaviours can be explained by the increased outlet temperature which reaches a value close to 6 C in heating (Figure 4) and a value slightly above 16 C in cooling (Figure 5). Finally, if there is no solar injection in the borehole and solar energy is used only for DHW (SDHW/HP case), then the heat pump energy consumption increases to 3692 kwh. However, Q aux is now reduced to 1485 kwh. Overall, this arrangement gives the lowest total energy consumption at 5177 kwh. These results show that solar injection in a single borehole configuration does not reduce significantly the heat pump energy consumption in heating. From an energy point of view, it is preferable to use solar collectors for DHW than to inject solar heat in a borehole. MULTIPLE BOREHOLES Configuration This section presents the results of calculations performed to design and simulate a solar/geothermal bore field that is planned to heat and cool a 2,400 sq. meter existing building and three new greenhouses located in Toronto, Canada. As shown in Figures 6 and 7, the bore field consists of 25 equally spaced boreholes arranged in a square pattern (5 5 with a 8 m borehole-to-borehole spacing) divided into two independent circuits. Base heating is provided by three 100 kw water-to-water heat pumps (Anon. B), denoted by HP-1, HP-2, and HP-3 in Figure 7, while peak heating is performed using two equally-sized high efficiency boilers with a total capacity of 328 kw. Cooling of the building is performed using HP-2 and HP
5 Figure 6 Geothermal field - 9/16 boreholes configuration - Overview Figure 7 Schematic representation of the solar/geothermal field As shown in Figure 6, the first circuit includes 9 boreholes centrally located in the bore field. They are connected in series to HP-1 and to a flat-plate collector array. The second circuit includes the 16 remaining boreholes located at the periphery. They are connected to HP-2 and HP-3. These boreholes are not linked to the solar collectors but they benefit indirectly from solar injection in the center boreholes through ground heat conduction from the warm core to the cool periphery. All 25 boreholes have single U-tubes. The characteristics of the bore field are given in Table 1. Building and ground loads without solar injection The peak and average monthly heating and cooling loads for HP were estimated for the building and the three greenhouses. These loads are summarized in Table 3. The last three columns represent the peak and monthly ground loads which are calculated assuming a COP of 4 in both heating and cooling. As shown in Table 3, the annual ground thermal imbalance is kw. This implies that the annual balance between the amount of energy collected from the ground and the amount of energy rejected into the ground is MWh (24.93 kw 8760 hours). Table 3 : Monthly summary of building and ground loads(excluding boiler peak heating) Building Loads Ground Loads hours per month monthly building cooling load peak building cooling load monthly building + greenhouse heating load peak building + greenhouse heating load peak hourly ground cooling load peak hourly ground heating load (with greenhouses) monthly ground load (with greenhouses) kwh kw kwh kw kw kw kw january february march april may june july august september october november december Totals annual ground imbalance (kw) Notes: 1- A COP of 4 is assumed in both heating and cooling Peak loads are assumed to prevail for 6 hours 3- Building loads are negative in heating; ground loads are positive in heating 241
6 Preliminary design calculations (bore field sizing) As a point of reference it is useful to establish what would be the total required borehole length if they were no solar injection. This is accomplished here using the ASHRAE borehole sizing procedure (Bernier, 2006) where the length is determined according to equation 2: qr qr a a qmrm qr L T T ( Tg Tp) 2 h b h h out, ground in, ground (2) where, q a is the yearly average ground load, q m is the monthly ground load, q h is the peak hourly load, R a, R m, and R h represent effective ground thermal resistances for 5 years, 1 month, and 6 hours thermal pulses, R b is the effective borehole thermal resistance ( = 0.10 mkw -1 see Table 1), T g is the far-field ground temperature (= 10.8 C see Table 1), T p is the temperature penalty (caused by borehole interference), and T out,ground and T in,ground are the outlet and inlet ground temperatures at design conditions. The value of T out,ground, which is also the entering fluid temperature to the heat pump is assumed to be 0 C. This value is purposely selected higher than the safe operating limit of heat pumps (usually around 6 C) to allow for a margin of safety. The value of T in,ground (-3.7 C) is calculated based on the peak heating load and the peak fluid flow rate. A life span of 5 years was assumed as the greenhouses were to be dismantled after that period. Without solar injection In this first design length calculation all 25 boreholes are used for heating and cooling both the building and the greenhouses. There is no solar injection and all 25 boreholes are connected in parallel. Solving equation 2 for the loads given in Table 3 leads to a total required length of 5917 m (236.7 m per borehole): (3) Thus, in the worst conditions, i.e. a five year thermal pulse of q a followed by a monthly pulse of q m and a 6 hour pulse of q h, a length of 5917 m is required to have a T out,ground = 0 C. This length is greater than the total planned borehole depth (146m x 25 = 3650 m). It is also worth noting that the temperature penalty is -3.5 C after 5 years. Thus, the kw ground imbalance has the effect of decreasing the undisturbed ground temperature by -3.5 C after 5 years which decreases the effective temperature difference from the fluid in the borehole to the undisturbed ground temperature and, consequently, increases the heat exchanger area, i.e. the borehole length. With solar injection As was just shown, the ground thermal imbalance increases the borehole length. In this second set of design length calculations, the ground thermal imbalance, q a, is set to 0. This is accomplished by injecting an amount of solar energy equivalent to an annual average power injection of kw. This injection is equally distributed in each of the 25 boreholes using the double U-tube set-up proposed by Chapuis and Bernier (2008, 2009) and presented in Figure 1. The required monthly injection rates are shown in the 5 th column of Table 4. These rates were determined based on 245 m 2 of solar collector area operating at an average efficiency of 60% in Toronto climate. The modified monthly ground loads are presented in the last column. The end result is that the annual ground thermal imbalance is 0 kw. Furthermore, a comparison between Tables 3 and 4 indicates that the monthly ground loads, q m, are reduced in winter. However, the peak ground loads are unchanged as these peaks occur at night when there is no available solar energy. With these new loads, the total required length is 3783 m (151.3 m per borehole). Calculation details are shown in equation 4. (4) 242
7 Table 4: Monthly summary of ground loads resulting from q a = 0 peak hourly ground cooling load peak hourly ground heating load (with greenhouses) Total radiation on tilted surface (Toronto) slope=45 azimuth=0 monthly mean solar injection monthly ground load (with injection) kw kw W/m 2 kw kw january february march april may june july august september october november december annual ground imbalance (kw) 0 As expected T p =0 C which increases the value of the denominator and, consequently, decreases the required length. The final length is close to the planned borehole length of 3650 m. Although this solution was considered, the construction of the double U-tube boreholes was estimated at a cost equivalent to about 2.5 times the cost of regular single U-tube boreholes. As an alternate less costly solution the system presented in Figures 6 and 7 has been proposed. However, with this system, the ASHRAE borehole sizing procedure cannot be used as boreholes do not experience the same loads. Instead, hourly system simulations have to be performed. System simulation Control sequence The proposed system presented earlier in Figures 6 and 7 is simulated using TRNSYS. The system operation flow chart is presented in Figure 8. During the heating season, there are two main controlling factors. First, if the entering fluid temperature in HP-1 (T ewt,hp ) is less than 1 C, then this heat pump is deactivated. Heating is provided by HP-2 and HP-3 and solar charging is activated if solar energy is available. If the entering fluid temperature in HP-1 is greater than 1 C than HP-1 is activated. The activation of HP-2 and HP-3 (and eventually of the backup boilers) will depend on whether HP-1 can handle the building load; solar charging takes place when solar energy is available. In the cooling season, HP-1 is always deactivated, HP-2 and HP-3 provide cooling to the building and solar charging is performed whenever solar energy is available. This flow chart was implemented in TRNSYS in the form of a control sequence. Ground loads The heating and cooling ground loads are the same as the ones presented earlier in Table 3. Hourly loads would have been preferable for system simulation. However, they were not calculated due to time constraints. Instead, the average monthly ground load was assumed to prevail each hour of the month except for a six hour peak period. These peak periods were set such that they would occur at night in the winter and during the day in the summer. Borehole model The 9/16 configuration cannot be simulated with the DST model used for the single borehole analysis. Instead, another borehole model has to be used. Space does not permit to describe this model. Therefore, only a brief description is provided here. The heat transfer process in the ground is modeled using the analytical solution for transient average temperature over the borehole length developed by Lamarche and Beauchamp (2007) based on the finite line source model of Zeng et al. (2002). The multiple load aggregation algorithm (MLAA) of Bernier et al. (2004) is used to account for the load variation effects with time. For more details concerning the finite line source model and the borehole thermal interactions, the reader is referred to the work of Sheriff and Bernier (2008). 243
8 Figure 8: Operation flowchart for the system presented in Figures 6 and 7 Solar collectors Simulations are performed with a 200 m 2 solar collector area. This area was determined based on preliminary simulations which indicated that such an area was required to maintain the inlet temperature to HP-2 and HP-3 above 0 C. The collectors used for the single borehole analysis are used (Equation 1). They are facing south with a 45 slope. As indicated in Figure 7, the solar collector array has been placed downstream of HP-1. Therefore, as it exits the bore field, the fluid is first used by HP-1 before being sent to the solar collectors. Preliminary simulations indicated that a reverse order (i.e. borehole, followed by the solar collectors then by HP-1) gives similar results. A series of valves are used to either send flow only to the solar collectors or only to HP-1. Results Figures 9 to 12 present the results of the TRNSYS simulations. These figures show the hourly outlet temperatures for both the 9 solar and the 16 regular borehole circuits over a 5 year period starting on May 1 st. It should be noted that even though the results for both circuits are presented separately, the model accounts for the thermal interactions between the core and the periphery. Figures 9 and 10 show what would happen without solar injection for the 16 and the 9 boreholes, respectively. As expected, the outlet temperature from the 16 boreholes rises in the first summer with peaks corresponding to the peak building cooling loads. Then, the outlet temperature drops to a value close to -1 C at the end of the first winter. This cycle is repeated each year but with a downward trend caused by the thermal imbalance. At the peak of the 5 th winter, the outlet temperature is around -6.5 C. Most heat pumps would cease to operate at such low temperatures. The 9 borehole circuit (Figure 10) experiences a similar pattern. In the summer, HP-1 is not operating and the outlet temperature is somewhat stable as no energy is rejected in these 9 center boreholes. Figures 11 and 12 show results obtained with solar injection. A comparison between Figures 9 and 11 shows the beneficial effect of solar injection as the minimum outlet temperature is raised from -6.5 C to about of 0 C. Thus, solar heat injected in the core boreholes has diffused to the periphery boreholes helping raised the ground temperature and, consequently, the outlet temperature. However, this heating up of the ground in the periphery could be detrimental in summer when the heat pumps are in cooling mode. 244
9 Figure 9 Outlet temperatures from the 16 boreholes circuit over a 5 year period - 0 m 2 collector area Figure 10 Outlet temperatures from the 9 boreholes circuit over a 5 year period - 0 m 2 collector area As shown in Figure 11, this is not the case here as the summer outlet temperature reaches a maximum of approximately 25 o C, a temperature well below the high temperature limit of heat pumps in cooling (40-45 C). As for the 9 solar boreholes, Figure 12 shows that the outlet temperature fluctuates from about 28 C down to 0 C. These relatively low temperatures are favorable for solar collector operation as the annual average solar collector efficiency is 64 %. Finally, the total annual amount of solar energy injected in the core boreholes is 190 MWh. This value is close to the value of MWh indicated earlier for the case of solar injection in all 25 boreholes to offset the ground thermal imbalance. Figure 11 Outlet temperatures from the 16 boreholes circuit over a 5 year period m 2 coll. area Figure 12 Outlet temperatures from the 9 boreholes circuit over a 5 year period m 2 coll. area CONCLUSION This paper focuses on solar heat injection into geothermal boreholes that are linked to ground-source heat pumps (GSHP) used for space conditioning of buildings. Single and multiple borehole configurations are examined. In the first case, the borehole is equipped with two independent circuits, one linked to a ground-source heat pump and the other to thermal solar collectors. With this arrangement simultaneous solar injection and heat retrieval is possible. The second example is a case study performed on an actual installation where solar heat injection is considered to heat a 2,400 sq. meter building and three greenhouses. It consists of a square 5 5 bore field where heat from thermal solar collectors is injected throughout the year in the 9 center boreholes. The other 16 boreholes at the periphery are not linked to solar collectors as they are used to cool the building. Simulation results using TRNSYS show that solar injection in a single borehole configuration does not reduce significantly the heat pump energy consumption in heating. From an energy point of view, it is preferable to use solar collectors for DHW than to inject solar heat in a borehole. As for the multiple borehole case, it is shown, for a particular case, that solar recharging of the core is essential to limit the ground temperature decrease over time and to keep the return fluid temperature above the lower operating limit of the heat pumps. ACKNOWLEDGMENTS The authors would like to express their gratitude to Howard Lee, Executive director of Parc Downsview Park inc. This work was funded in part by the Solar Buildings Research Network under the Strategic Network Grants Program of the Natural Sciences and Engineering Research Council of Canada. 245
10 REFERENCES Anonymity A (site consulted on April 6 th 2009), Model TS036 with ECM motor, index/comm_ts_page. Anonymity B (site consulted on March 20 th 2009) Model TMW size comm_tmw_page. Bernier, M., Langlois, A., Chapuis, S Sizing and hourly simulations of the solar/geothermal borefield at 70 Canuck avenue Downsview park. Confidential report. 10 pages. Bernier, M., Salim Shirazi, A Solar heat injection into boreholes: A preliminary analysis, Canadian Solar Buildings Conference, Calgary, June 10-13, 2007, paper T1-1-1, 8 pages. Bernier, M Closed-loop Ground-Coupled Heat Pumps Systems, ASHRAE Journal, Vol. 48, no.9, pp.12-19, Bernier, M.A., Labib, R., Pinel, P., Paillot, R A Multiple Load Aggregation Algorithm for Annual Hourly Simulations of GCHP Systems. HVAC and R Research, 10(4), p Chapuis, S., Bernier, M Seasonal storage of solar energy in boreholes. Approved for presentation at the 11 th IBPSA conference, University of Stratchlyde, Glasgow, Scotland. Chapuis, S., Bernier, M Étude préliminaire sur le stockage solaire saisonnier par puits géothermiques, 3 rd Canadian Solar Buildings Conference, Frédéricton, Nouveau-Brunswick, pages GeoEnergy Solutions inc Report on a geothermal energy test borehole and in-situ thermla conductivity test, Report prepared for Parc Downsview Park. 14 pages. Klein, S. A., et al., TRNSYS 16 A TRaNsient SYstem Simulation program, User manual. University of Wisconsin-Madison, Solar Energy Laboratory, Madison, WI, United States. Lamarche, L., Beauchamp, B A new contribution to the finite line-source model for geothermal boreholes. Energy and Buildings 39(2): McDowell, T.P., Thornton J.W Simulation and model calibration of a large-scale solar seasonal storage system, 3 rd National conference of IBPSA-USA, Berkeley (California), USA. Sheriff, F., Bernier, M Simulations de champs de puits géothermiques verticaux de charges thermiques différentes. 5 th IBPSA Canada Conference. Quebec (Quebec), Canada. Sibbitt, B., Onno, T., McClenahan, D., Thornton, J., Brunger, A., Kokko J., Wong. B The Drake Landing Solar Community Project Early Results, 2 nd Canadian Solar Buildings Conference, Calgary (Alberta), Canada. TESS, TESS Libraries Version 2, User manual. Madison, WI: Thermal Energy Systems Specialists. Zeng, H., Diao, N. and Fang, Z., Heat transfer analysis of boreholes in vertical ground heat exchangers. International Journal of Heat and Mass Transfer, 46(23): Zeng, H. Y., Diao, N. R., Fang, Z. H A finite line-source model for boreholes in geothermal heat exchangers. Heat Transfer - Asian Research 31(7):
Bore field sizing : Theory and applications
Bore field sizing : Theory and applications Michel Bernier Département de genie mécanique Polytechnique Montréal Seminar - KTH Stockholm May 28 th 2015 OUTLINE Introduction Sizing of bore fields ASHRAE
More informationSimulations of a New Double U-tube Borehole Configuration with Solar Heat Injection and Ground Freezing
Simulations of a New Double U-tube Borehole Configuration with Solar Heat Injection and Ground Freezing Parham Eslami Nejad 1 and Michel Bernier 2 1 Canmet Energy Technology Center, Varennes, Québec 2
More informationTEMPERATURE STRATIFICATION OF CIRCULAR BOREHOLE THERMAL ENERGY STORAGES
- 1 - TEMPERATURE STRATIFICATION OF CIRCULAR BOREHOLE THERMAL ENERGY STORAGES Jens Penttilä, Engineer; José Acuña, Researcher; Patricia Monzó, PhD student KTH Royal Institute of Technology, Dept. of Energy
More informationResearch on Ground Source Heat Pump Design
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Research on Ground Source Heat Pump Design Amanda Jo Pertzborn University
More informationLimitations of Using Uniform Heat Flux Assumptions in Sizing Vertical Borehole Heat Exchanger Fields
Limitations of Using Uniform Heat Flux Assumptions in Sizing Vertical Borehole Heat Exchanger Fields Veera Malayappan 1, Jeffrey D. Spitler 2 1,2 Mechanical and Aerospace Engineering, Oklahoma State University
More informationPREPROCESSOR FOR THE GENERATION OF G-FUNCTIONS USED IN THE SIMULATION OF GEOTHERMAL SYSTEMS
PREPROCESSOR FOR THE GENERATION OF G-FUNCTIONS USED IN THE SIMULATION OF GEOTHERMAL SYSTEMS Massimo Cimmino 1, and Michel Bernier 1 1 Département de génie mécanique Polytechnique Montreal Case postale
More informationSIMULATION MODEL IN TRNSYS OF A SOLAR HOUSE FROM BRAŞOV, ROMANIA
SIMULATION MODEL IN TRNSYS OF A SOLAR HOUSE FROM BRAŞOV, ROMANIA C. Şerban 1, E. Eftimie 1 and L. Coste 1 1 Department of Renewable Energy Systems and Recycling Transilvania University of Braşov B-dul
More informationCLOSED-LOOP HEAT EXCHANGER FOR GROUND COUPLED HEAT PUMPS
Bulletin of the Transilvania University of Braşov Vol. () - 0 Series : Special Issue No. CLOSED-LOOP HEAT EXCHANGER FOR GROUND COUPLED HEAT PUMPS G. DRAGOMIR I. BOIAN V. CIOFOAIA Abstract: Hydraulic imbalances
More informationEVALUATION OF THE DESIGN LENGTH OF VERTICAL GEOTHERMAL BOREHOLES USING ANNUAL SIMULATIONS COMBINED WITH GENOPT
EVALUATION OF THE DESIGN LENGTH OF VERTICAL GEOTHERMAL BOREHOLES USING ANNUAL SIMULATIONS COMBINED WITH GENOPT Mohammadamin Ahmadfard, Michel Bernier, Michaël Kummert Département de génie mécanique Polytechnique
More informationChapter Six{ TC "Chapter Six" \l 1 } System Simulation
Chapter Six{ TC "Chapter Six" \l 1 } System Simulation In the previous chapters models of the components of the cooling cycle and of the power plant were introduced. The TRNSYS model of the power plant
More informationThe performance of a high solar fraction seasonal storage district heating system five years of operation
Available online at www.sciencedirect.com Energy Procedia 30 (2012 ) 856 865 SHC 2012 The performance of a high solar fraction seasonal storage district heating system five years of operation Bruce Sibbitt
More informationSorTech package solution description
SorTech package solution description Version 2.0 Edited by: Jörg Rupp Lotta Koch, Edo Wiemken, Björn Nienborg Freiburg, 06.10.2009 Table of Contents 1 Introduction... 3 2 The Chiller... 4 3 System s Components...
More informationEVALUATION OF A HIGH TEMPERATURE SOLAR THERMAL SEASONAL BOREHOLE STORAGE
EVALUATION OF A HIGH TEMPERATURE SOLAR THERMAL SEASONAL BOREHOLE STORAGE Johan Heier 1, Chris Bales 1, Artem Sotnikov 2 and Ganna Ponomarova 2 1 Solar Energy Research Center (SERC), Dalarna University,
More informationGround-Coupled Heat Pump And Energy Storage
Ground-Coupled Heat Pump And Energy Storage By Ed Lohrenz, Member ASHRAE; and Sergio Almeida, P.Eng., Member ASHRAE Ground-coupled heat pump (GCHP) systems consume less purchased energy than an HVAC system
More informationThe Effects of Set-Points and Dead-Bands of the HVAC System on the Energy Consumption and Occupant Thermal Comfort
The Effects of Set-Points and Dead-Bands of the HVAC System on the Energy Consumption and Occupant Thermal Comfort Ongun Berk Kazanci, Bjarne W. Olesen 1 1 International Center for Indoor Environment and
More informationThe Potential and Challenges of Solar Boosted Heat Pumps for Domestic Hot Water Heating
The Potential and Challenges of Solar Boosted Heat Pumps for Domestic Hot Water Heating Stephen Harrison Ph.D., P. Eng., Solar Calorimetry, Dept. of Mechanical and Materials Engineering, Queen s University,
More informationAPPLICATIONS OF A DYNAMIC THREE-DIMENSIONAL NUMERICAL MODEL FOR BOREHOLE HEAT EXCHANGERS. M. He, S.J. Rees, L. Shao
APPLICATIONS OF A DYNAMIC THREE-DIMENSIONAL NUMERICAL MODEL FOR BOREHOLE HEAT EXCHANGERS ABSTRACT M. He, S.J. Rees, L. Shao Institute of Energy and Sustainable Development De Montfort University Leicester,
More informationAssessment of a solar assisted air source and a solar assisted water source heat pump system in a Canadian household
Available online at www.sciencedirect.com Energy Procedia 30 (2012 ) 654 663 SHC 2012 Assessment of a solar assisted air source and a solar assisted water source heat pump system in a Canadian household
More informationComparative Heating Performances of Ground Source and Air Source Heat. Pump Systems for Residential Buildings in Shanghai
Comparative Heating Performances of Ground Source and Air Source Heat Pump Systems for Residential Buildings in Shanghai Zhaohui Liu 1,2, Hongwei Tan 1,2,3* 1 School of Mechanical Engineering, Tongji University,
More informationANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA
Bulletin of the Transilvania University of Braşov Series I: Engineering Sciences Vol. 5 (54) No. 2-212 ANNUAL ENERGY PERFORMANCE OF SOLAR THERMAL SYSTEMS IN BRAŞOV, ROMANIA C. ŞERBAN 1 E. EFTIMIE 1 Abstract:
More informationModeling and analyzing solar cooling systems in Polysun
Modeling and analyzing solar cooling systems in Polysun Seyed H. Rezaei (seyed.rezaei@velasolaris.com) 1 Andreas Witzig (andreas.witzig@velasolaris.com) 1 Michael Pfeiffer (michael.pfeiffer@velasolaris.com)
More informationSolar Energy Technologies
1 Solar Energy Technologies ME 430 Queen s University The Solar Energy Resource Varies over day and year, (i.e., intermittent) Generally non-dispatchable Ottawa average for year ~4 kwh/m 2 per day e.g.,
More informationSeptember Hybrid Air, Solar, and Ground Source Heat Pump Designs. Gaylord Olson, Yao Yu
Abstract September 2017 Hybrid Air, Solar, and Ground Source Heat Pump Designs Air-Source Heat Pumps (ASHP) are often considered as an alternative to conventional air conditioners and gas-fired furnaces/boilers
More informationLife cycle analysis of thermosyphon solar water heaters
Life cycle analysis of thermosyphon solar water heaters Soteris A. KALOGIROU Department of Mechanical Engineering and Materials Sciences and Engineering Cyprus University of Technology, P. O. Box 50329,
More informationDESIGN AND MODELING THE Φ-F
powered by DESIGN AND MODELING THE Φ-F CHART METHOD FOR ACTIVE SOLAR ENERGY SYSTEMS Authors: S. Poles, M. Venturin Keywords: Scilab; Solar energy systems; φ-f chart method Abstract: The aim of this paper
More informationResidential Swimming Pool Heating with Geothermal Heat Pump Systems
Residential Swimming Pool Heating with Geothermal Heat Pump Systems by Andrew Chiasson, P.E. ABSTRACT The objective of this study is to examine the feasibility of swimming pool heating with geothermal
More informationSOLAR ENGINEERING OF THERMAL PROCESSES
SOLAR ENGINEERING OF THERMAL PROCESSES Second Edition JOHN A. DUFFIE Emeritus Professor of Chemical Engineering WILLIAM A. BECKMAN Professor of Mechanical Engineering Solar Energy Laboratory University
More informationReference System, Germany Solar domestic hot water system, single-family house
Description: Definition of the reference system for solar domestic hot water (SDHW) preparation in a single-family house, Germany Date: 14.09.207, last revision 12.11.2017 Authors: Download possible at:
More informationAvailable online at ScienceDirect. Procedia Engineering 121 (2015 )
Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 121 (2015 ) 1413 1419 9th International Symposium on Heating, Ventilation and Air Conditioning (ISHVAC) and the 3rd International
More informationBaltimore County Detention Center Expansion Towson, Maryland
V. Active Solar System Introduction After the energy crises of the 1970s and the subsequent increases in the cost of petroleumbased fuels, interest in active solar energy systems surged. Thousands of active
More informationNUMERICAL STUDY ON THERMAL DEPLETION OF THE GROUND AROUND A GEOTHERMAL HEAT PUMP S PROBE
U.P.B. Sci. Bull., Series C, Vol. 75, Iss. 3, 2013 ISSN 2286-3540 NUMERICAL STUDY ON THERMAL DEPLETION OF THE GROUND AROUND A GEOTHERMAL HEAT PUMP S PROBE Constantin IONESCU 1, Clément MONTANGE 2 Long
More informationGround Source Heat Pump System Performance: Measuring the COP
Ground Source Heat Pump System Performance: Measuring the COP Ground Energy Support, LLC June 2013 1 Introduction This article is the second in a three-part series prepared by Ground Energy Support LLC
More informationAR No. # - Solar Thermal
AR No. # - Solar Thermal Recommendation We recommend installing a solar thermal array on the building roof. This will provide an alternative source for 10% of the facilities energy consumption and reduce
More informationA Case Study in Energy Modeling of an Energy Efficient Building with Gas Driven Absorption Heat Pump System in equest
A Case Study in Energy Modeling of an Energy Efficient Building with Gas Driven Absorption Heat Pump System in equest Altamash A. Baig Alan S. Fung Mechanical and Industrial Engineering, Ryerson University
More informationOptimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System
Optimisation and Cost Analysis of a Lithium Bromide Absorption Solar Cooling System Georgios A. Florides and Soteris A. Kalogirou Mechanical Engineering Department, Higher Technical Institute, Nicosia,
More informationPERFORMANCE OF SOLAR COLLECTORS UNDER LOW TEMPERATURE CONDITIONS: Measurements and simulations results
PERFORMANCE OF SOLAR COLLECTORS UNDER LOW TEMPERATURE CONDITIONS: Measurements and simulations results Mircea Bunea *, Sara Eicher, Catherine Hildbrand, Jacques Bony, Bengt Perers 2 and Stéphane Citherlet
More informationTHE MODELLING OF PHOTOVOLTAIC, SOLAR THERMAL, AND PHOTOVOLTAIC/THERMAL DOMESTIC HOT WATER SYSTEMS
THE MODELLING OF PHOTOVOLTAIC, SOLAR THERMAL, AND PHOTOVOLTAIC/THERMAL DOMESTIC HOT WATER SYSTEMS By Jonathan Berger A thesis submitted to the Department of Mechanical and Materials Engineering in conformity
More informationStudy on Heat Exchange Characteristics for PHC Energy Piles
The 2012 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM 12) Seoul, Korea, August 26-30, 2012 Study on Heat Exchange Characteristics for PHC Energy Piles *Sangwoo Park
More informationReference System, Austria Solar domestic hot water system for single- family house
Description: Date: 30.11.2016 Authors: Download possible at: Definition of the reference solar domestic hot water (SDHW) system for single- family house (SFH), Austria Thomas Ramschak, François Veynandt
More informationINFO Sheet A06. Reference System, Austria Solar Domestic Hot Water system, multi-family house. Introduction. Hydraulic Scheme of the System
Description: Definition of the reference solar domestic hot water (SDHW) system for multifamily house (MFH), Austria Date: 30.11.2016, last revision: 12.11.2017 Authors: Download possible at: Thomas Ramschak,
More informationReference System, Austria Solar domestic hot water preparation for multi- family house
Description: Date: 30.11.2016 Authors: Download possible at: Definition of the reference solar domestic hot water (SDHW) system for multifamily house (MFH), Austria Thomas Ramschak, François Veynandt http://task54.iea-
More informationNEW GENERATION OF A HIGHLY COMPACT SOLAR HEAT PUMP SYSTEM WITH BOOSTED ENERGETIC EFFICIENCY
NEW GENERATION OF A HIGHLY COMPACT SOLAR HEAT PUMP SYSTEM WITH BOOSTED ENERGETIC EFFICIENCY I. Mojic 1 ; M.Y. Haller 1 ; B. Thissen 2 ; F. Hengel 3, A. Heinz 3 1: Institute for Solar Technology SPF, HSR
More informationThe correct citation for this paper is:
This paper has been downloaded from the Building and Environmental Thermal Systems Research Group at Oklahoma State University (http://www.hvac.okstate.edu) The correct citation for this paper is: Cullin,
More informationAR No. # Solar Thermal. Assessment Recommendation Savings Summary Source. Cost Savings Natural Gas. $984 * 1 MMBtu = 1,000,000 Btu
AR No. # Solar Thermal Recommendation We recommend installing a solar thermal array on the building roof. This will provide an alternative source for 9.8% of the facilities energy consumption and reduce
More informationRESIDENTIAL SWIMMING POOL HEATING WITH GEOTHERMAL HEAT PUMP SYSTEMS
RESIDENTIAL HEATING WITH GEOTHERMAL SYSTEMS Andrew hiasson, P.E. Geo-Heat enter ABSTRAT The objective of this study is to examine the feasibility of swimming pool heating with geothermal heat pump (GHP)
More informationSimulation and Optimization of Vacuum Tube Solar Collector Water Heating System in Iran
Online available since February 2016 at www.oricpub.com (2016) Copyright ORIC Publications Journal of Science and Engineering; Vol. 07 (01), 2016, 001-019 ISSN: 2331-5172 Simulation and Optimization of
More informationEVALUATION OF GROUND COUPLED HEAT PUMPS FOR THE STATE OF WISCONSIN
EVALUATION OF GROUND COUPLED HEAT PUMPS FOR THE STATE OF WISCONSIN by Jonathan J. Giardina A thesis submitted in partial fulfillment of the requirements for the degree of MASTERS OF SCIENCE (MECHANICAL
More informationDesign guidelines for direct ground cooling systems in different climates
Design guidelines for direct ground cooling systems in different climates Adriana Angelotti and Giulio Solaini Dipartimento BEST, Politecnico di Milano, Milano, Italy ABSTRACT: Direct ground cooling systems
More informationStatus of Canadian Energy Storage. Edward Morofsky Richard Stockton College May 2006
Status of Canadian Energy Storage Edward Morofsky Richard Stockton College May 2006 Ottawa Average Temps and RH Monthly Ottawa Temperatures Ottawa Humidity 30 90 25 80 Degrees C 20 15 10 5 0-5 -10-15 Jan
More informationNikolaos Taousanidis 1* and Elisavet Amanatidou 2
Nikolaos Taousanidis 1* and Elisavet Amanatidou 2 1 Department of Mechanical Engineering and Industrial Design, Technological Education Institution of Western Macedonia, Kozani 50100, Greece, E-mail address:
More informationStudy of Adsorbent Energy Density and Regeneration for Long Term Thermal Energy Storage Of Solar and Waste Heat
Study of Adsorbent Energy Density and Regeneration for Long Term Thermal Energy Storage Of Solar and Waste Heat Dan Dicaire (dandicaire@hotmail.com) and F. Handan Tezel (*) Department of Chemical and Biological
More informationThermal Energy Storage in Office Buildings Foundations
Thermal Energy Storage in Office Buildings Foundations H. Schnürer, C. Sasse, M. N. Fisch Technical University of Braunschweig Institute for Building Services and Energy Design D-38106 Braunschweig, Germany
More informationPitfalls of Rules of Thumb in Geothermal Heat Pump Design
Pitfalls of Rules of Thumb in Geothermal Heat Pump Design Thumbs Up or Thumbs Down? Andrew Chiasson, Ph.D., P.E. Department of Mechanical and Aerospace Engineering University of Dayton ASHRAE Dayton Chapter
More informationSide by side tests of two SDHW systems with solar collectors with and without antireflection treatment
Downloaded from orbit.dtu.dk on: Mar 31, 2018 Side by side tests of two SDHW systems with solar collectors with and without antireflection treatment Kong, Weiqiang; Han, Jiangong; Perers, Bengt; Furbo,
More informationReference System, Austria Solar combisystem system, single-family house
Description: Definition of the reference solar system for domestic hot water preparation and space heating (combi) for single family house (SFH), Austria Date: 30.11.2016, revised 07.11.2017 Authors: Download
More informationDIRECTIONAL-BORE GROUND SOURCE HEAT PUMP FIELD REPORT
PROJECT REPORT DIRECTIONAL-BORE GROUND SOURCE HEAT PUMP FIELD REPORT Rio Mondego, California August 214 WESTERN COOLING EFFICIENCY CENTER PREPARED FOR: Bruce Baccei Project Manager Sacramento Municipal
More informationRETScreen ICE AND CURLING RINKS Model
- 1 - RETScreen ICE AND CURLING RINKS Model Daniel Giguère, Technology expert, CETC-Varennes, Natural Resources Canada 1615 Blvd. Lionel-Boulet, Varennes, Québec, Canada Nathalie Meloche, Project manager,cetc-varennes,
More informationA Software for Performance Simulation of Solar Water Heating Systems
A Software for Performance Simulation of Solar Water Heating Systems PABLO LISBOA University of the State of Rio de Janeiro Rua São Francisco Xavier, 524 sala 5020-A Rio de Janeiro, RJ BRAZIL pablisboa@gmail.com
More informationLow-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine Cycle
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine
More informationPINCH ANALYSIS: For the Efficient Use of Energy, Water & Hydrogen. PULP AND PAPER INDUSTRY Energy Recovery and Effluent Cooling at a TMP Plant
PINCH ANALYSIS: For the Efficient Use of Energy, Water & Hydrogen PULP AND PAPER INDUSTRY Energy Recovery and Effluent Cooling at a TMP Plant PINCH ANALYSIS: For the Efficient Use of Energy, Water & Hydrogen
More informationEnergy efficiency of a solar domestic hot water system
Energy efficiency of a solar domestic hot water system Miroslaw Zukowski 1,* 1 Bialystok University of Technology, Department of HVAC Engineering, ul. Wiejska 45E, 15-351 Bialystok, Poland Abstract. The
More informationSystem sizing of a new central solar heating plant with a seasonal duct storage in Geneva
System sizing of a new central solar heating plant with a seasonal duct storage in Geneva D. Pahud 1), J.-C. Hadorn 2), C. Cornu 3) and S. Commend 4) 1) University of Applied Sciences of Southern Switzerland,
More informationThermal Accumulation in Solar Systems for Hot Water Abstract 1. Introduction
Thermal Accumulation in Solar Systems for Hot Water Stanko Vl. Shtrakov, Anton Stoilov South - West University Neofit Rilski, Dept of Physics, 66 Ivan Mihailov Str., 2700 - Blagoevgrad, BULGARIA, E-mail:
More informationRETScreen Software Online User Manual
RETScreen International Clean Energy Decision Support Centre www.retscreen.net RETScreen Software Online User Manual Ground-Source Heat Pump Project Model Background This document allows for a printed
More informationSOLAR COOLING: STATE OF THE ART, TECHNICAL ANALYSIS AND FIRSTS APPLICATIONS
SOLAR COOLING: STATE OF THE ART, TECHNICAL ANALYSIS AND FIRSTS APPLICATIONS F. Asdrubali, G. Baldinelli, A. Presciutti, M. Caporali University of Perugia - Industrial Engineering Department, Via G. Duranti
More informationModeling of Standing Column Wells in Ground Source Heat Pump Systems
Modeling of Standing Column Wells in Ground Source Heat Pump Systems Zheng D. O Neill Ph.D., P.E. Cimetrics, Inc. Boston, Mass Jeffrey D. Spitler Ph.D., P.E. Oklahoma State University, Stillwater, OK Simon
More informationSteve Kavanaugh Professor Emeritus The University of Alabama
Ground Source Heat Pump System Designer GshpCalc Version 5.0 An Instruction Guide for Using a Design Tool for Vertical Ground-Coupled, Groundwater and Surface Water Heat Pumps Systems Steve Kavanaugh Professor
More informationAdvanced Building Systems Dirk Müller, Azadeh Badakhshani, Alexander Hoh
Advanced Building Systems Dirk Müller, Azadeh Badakhshani, Alexander Hoh ANNEX 49, 2.1.21, Prof. Dr.-Ing. Dirk Müller EBC Institute for Energy Efficient Buildings and Indoor Climate Exergy balance of a
More informationImplications of Measured Commercial Building Loads on Geothermal System Sizing
Implications of Measured Commercial Building Loads on Geothermal System Sizing ASHRAE Annual Meeting June 23, 1999 Hugh I Henderson, Jr.. P.E. CDH Energy Corp. Cazenovia,, NY www.cdhenergy.com Overview
More informationSolar Absorption Aqua-Ammonia Absorption system simulation base on Climate of Malaysia
Solar Absorption Aqua-Ammonia Absorption system simulation base on Climate of Malaysia POORYA OOSHAKSARAEI 1, SOHIF MAT 1, M. YAHYA 1, AHMAD MAHIR RAZALI 1, AZAMI ZAHARIM 2, K. SOPIAN 3 1 Solar Energy
More informationAustralian Solar Cooling 2013 Conference April 12th, 2013 North Ryde, Australia. All-in-oneSolar Thermal CoolingandHeatingSystem
BAVARIAN CENTER FOR APPLIED ENERGY RESEARCH Australian Solar Cooling 2013 Conference April 12th, 2013 North Ryde, Australia All-in-oneSolar Thermal CoolingandHeatingSystem Manuel Riepl & Martin Helm ZAE
More informationA simulation of the performance of PVthermal (PVT)systems for residential application in Tokyo
研究論文 A simulation of the performance of PVthermal (PVT)systems for residential application in Tokyo Thipjak NUALBOONRUENG *1 Yuki UEDA * Kaoru HIRAYAMA * Atsushi AKISAWA * Abstract Although PV-thermal
More informationAvailable online at ScienceDirect. Energy Procedia 78 (2015 )
Available online at www.sciencedirect.com ScienceDirect Energy Procedia 78 (215 ) 1859 1864 6th International Building Physics Conference, IBPC 215 An evaluation of distributed solar thermal "net metering"
More informationGEO-HEAT CENTER EXECUTIVE SUMMARY
GEO-HEAT CENTER Oregon Institute of Technology, Klamath Falls, Oregon 97601 541/885-1750 FAX 541/885-1754 John W. Lund, Director Andrew Chiasson Tonya Toni Boyd Debi Carr EXECUTIVE SUMMARY The Geo-Heat
More information7. Electrical Facility Ratings
7. Electrical Facility Ratings 7.1 Accredited Net Generating Capacity This Section shall be used to determine the annual and seasonal accredited net generating capacity of generators in calculating the
More informationCase study : RIO VENA (Seasonal Storage Solar DH Study)
Case study : RIO VENA (Seasonal Storage Solar DH Study) Name of the project: Adress of the project: Name and type of the owner: RIO VENA (Seasonal) Burgos, E-09006 Burgos (Spain) VEOLIA, utility company
More informationPotential Reduction in Energy and Environmental Pollutants by Solar Assisted Ground Coupled Heat Pump Systems
Proceedings World Geothermal Congress 2015 Melbourne, Australia, 19-25 April 2015 Potential Reduction in Energy and Environmental Pollutants by Solar Assisted Ground Coupled Heat Pump Systems Soheil Porkhial
More informationThermally operated mobile air-conditioning system
Thermally operated mobile air-conditioning system Development and test of a laboratory prototype R. de Boer S.F. Smeding Paper to be presented on the International Sorption Heat Pump Conference 2008, Seoul,
More informationAvailable online at ScienceDirect. Procedia Environmental Sciences 38 (2017 ) 44 51
Available online at www.sciencedirect.com ScienceDirect Procedia Environmental Sciences 38 (2017 ) 44 51 International Conference on Sustainable Synergies from Buildings to the Urban Scale, SBE16 Development
More informationRenewable Energy Based Active Cooling System
1th Eco-Energy and Materials Science and Engineering Symposium, Ubon ratchathani, Thailand, December -8. 212 Renewable Energy Based Active Cooling System Boonrit Prasartkaew Department of Mechanical Engineering,
More informationUnit 7 Overview of Solar Thermal Applications
ELTR 1223 Survey of Renewable Energy Technology Unit 7 Overview of Solar Thermal Applications REEC 120 Sustainability and Renewable Energy Source: Use Policy This material was developed by Timothy J. Wilhelm,
More informationDISTRIBUTED TEMPERATURE MEASUREMENTS ON A MULTI-PIPE COAXIAL BOREHOLE HEAT EXCHANGER
00079-1 - DISTRIBUTED TEMPERATURE MEASUREMENTS ON A MULTI-PIPE COAXIAL BOREHOLE HEAT EXCHANGER José Acuña, PhD Student Björn Palm, Professor Royal Institute of Technology KTH, Brinellvägen 68, 100 44 Stockholm,
More informationANALYSIS OF VARIOUS DESIGNING PARAMETERS FOR EARTH AIR TUNNEL HEAT EXCHANGER SYSTEM
INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) ISSN 0976 6340 (Print) ISSN 0976 6359 (Online) Volume 5, Issue 12, December (2014), pp. 118-125 IAEME: www.iaeme.com/ijmet.asp Journal
More informationProject Report: SunMaxx Commercial Case Studies
Project Report: 14 x ThermoPower-VHP30 Total Gross Surface Area: 738.50 sq.ft Azimuth: 10 Incl.: 37 2100 gal/day 130 F Gas Boiler - 9 150 kbtu/hr StorMaxx NP Vol:2500 gal Existing Hot Water Heater Vol:1000
More informationLocal Conduction Heat Transfer in U-pipe Borehole Heat Exchangers
Excerpt from the Proceedings of the COMSOL Conference 2009 Milan Local Conduction Heat Transfer in U-pipe Borehole Heat Exchangers J. Acuña, B. Palm The Royal Institute of Technology KTH Brinellvägen 68,
More informationIntegration of the hidden refrigeration capacity as a heat pump in smart energy systems
Integration of the hidden refrigeration capacity as a heat pump in smart energy systems Torben Funder-Kristensen This presentation outlines the concepts behind the Danish EUDP-project (64016-0106) Super
More informationEFFICIENCY OF HEAT PUMP SYSTEMS UNDER REAL OPERATING CONDITIONS
- 1 - EFFICIENCY OF HEAT PUMP SYSTEMS UNDER REAL OPERATING CONDITIONS M. Miara, Dipl.-Ing., Head of Team Heat Pumps, Fraunhofer-Institute for Solar Energy Systems ISE, Heidenhofstrasse 2, 79110 Freiburg,
More informationMaking a difference to your environment. Suncool conference LIFE11 ENV/SE/ SUNCOOL
Making a difference to your environment Suncool conference LIFE11 ENV/SE/000838 SUNCOOL October 9 th, 2014 Agenda 1. Presentation of the research and development work, leading up to the Suncool collectors
More informationRenewable Energy for Indoor Agriculture
Renewable Energy for Indoor Agriculture Lucas Semple 1, Rupp Carriveau 2,3,4, David S.K. Ting 2,3,4 1 Engineering Manager, UnderSun Acres 2 Environmental Energy Institute 3 Turbulence and Energy Lab 4
More informationEVALUATION OF STANDARD SOLAR COMBI PLUS SYSTEMS FOR SMALL SCALE APPLICATIONS
EVALUATION OF STANDARD SOLAR COMBI PLUS SYSTEMS FOR SMALL SCALE APPLICATIONS R. Fedrizzi 1, G. Franchini 2, D. Mugnier 3, P. N. Melograno 1, M. Theofilidi 4, A. Thuer 5, B. Nienborg 6, L. Koch 6, R. Fernandez
More informationReference System, Switzerland Solar Domestic Hot Water system, multi-family house
Description: Definition of a reference solar thermal domestic hot water system with gas auxiliary for multi-family houses, Switzerland Date: 03.01.2017, last revision 12.11.2017 Authors: Download possible
More informationAn Integrated Solution for Commercial AC Chillers Using Variable Speed Scroll Compressors
Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 An Integrated Solution for Commercial AC Chillers Using Variable Speed
More informationParametric Study for Evaluation of Design Parameters of Standing Column Well
Proceedings World Geothermal Congress Bali, Indonesia, 5-9 April Parametric Study for Evaluation of Design Parameters of Standing Column Well Dong-Yeop Kwak 1, Duhee Park 1, Jae-Hoon Chang 1, Sang-Min
More informationAvailable online at ScienceDirect. Energy Procedia 101 (2016 )
Available online at www.sciencedirect.com ScienceDirect Energy Procedia 101 (2016 ) 288 296 71 st Conference of the Italian Thermal Machines Engineering Association, ATI2016, 14-16 September 2016, Turin,
More informationElectrical/thermal performance of hybrid PV/T system in Sharjah, UAE
International Journal of Smart Grid and Clean Energy Electrical/thermal performance of hybrid PV/T system in Sharjah, UAE Amna A. Alzaabi a, Nadine K. Badawiyeh a, Hind O. Hantoush a, A. K. Hamid b* a
More information2 kw. ak.com. www. Energy report
2 kw Thermal System Example of SolarPeak residential installation Energy report Find your closest agent www w.solarpea ak.com SolarPeak Head Office ops@ @SolarPeak.com (3) 547 58 19 Nelson 1 What is this
More informationHow heat pumps can help your project to pass Planning and Building Regulations Learning Outcomes Understand current planning and building regulations Understand the software used to meet these regulations
More informationExperimental investigation of single-phase and twophase closed thermosyphon solar water heater systems
Scientific Research and Essays Vol. 6(4), pp. 688-693, 18 February, 2011 Available online at http://www.academicjournals.org/sre DOI: 10.5897/SRE09.072 ISSN 1992-2248 2011 Academic Journals Full Length
More information