Clermont Modernization Project. National Fuel Gas Supply Corporation Sept. 20, 2016

Size: px
Start display at page:

Download "Clermont Modernization Project. National Fuel Gas Supply Corporation Sept. 20, 2016"

Transcription

1 Clermont Modernization Project National Fuel Gas Supply Corporation Sept. 20, 2016

2 Who is National Fuel Gas Company? A diversified energy company with more than 100 years experience in New York and Pennsylvania. Business segments include: Exploration and production- develops and produces natural gas Gathering- owns and operates natural gas processing and pipeline facilities Pipeline and storage- owns and operates 2,800+ miles of interstate natural gas pipelines Utility- transports natural gas to more than 740,000 customers Energy Marketing- non-utility energy supplier 2

3 Natural Gas in Demand 3

4 Why are we here? Extensive community involvement at an early point in the Clermont Modernization Project. Open dialogue with the public: Answer questions. Listen to comments. Gather input. Question and answer period to follow presentation. 4

5 Regulatory Agencies Federal Agencies Federal Energy Regulatory Commission (FERC) U.S. Army Corps of Engineers (USACE), Pittsburgh District U.S. Fish and Wildlife Service (USFWS), Pennsylvania Field Offices U.S. Department of Transportation (DOT) (PHMSA) Various Native American Tribal Group Contacts Commonwealth of Pennsylvania Agencies Pennsylvania Game Commission Pennsylvania Department of Environmental Protection (PADEP) Pennsylvania Historical and Museum Commission, Bureau for Historic Preservation, State Historic Preservation Office PADEP and McKean County Conservation District Local Municipal Agencies Town Building Permits Road Use/Opening Permits Pennsylvania Department of Conservation and Natural Resources Pennsylvania Fish and Boat Commission 5

6 Project Overview Pipeline YM-2: Replace 7.2 miles of 1940s vintage 8-inch bare steel with 12-inch, coated, high pressure pipeline. Extend12-inch pipeline an additional 7.2 miles generally following existing pipeline corridor to meet transportation requirements. Pipeline FM-120: Replace 5.8 miles of 1950s vintage 12- inch bare steel by inserting 6-inch FlexSteel pipe. Pipeline D6(S): Replace 4,500 feet of 8-inch pipe with 4- inch FlexSteel pipe. Pipeline FM-120: Abandon 12.6 miles of 1950s vintage 12- inch bare steel. New measurement and regulation adjacent to existing interconnect at Route 146 on property owned by Seneca Resources, Inc. 6

7 Project Overview (cont.) Pipeline abandonment areas: Existing gas will be purged from lines. Lines will be cleaned by utilizing "pigging" runs. Ends of abandoned sections will be sealed. 7

8 Project Map 8

9 Proposed Timeline September 2016 September / October 2016 Begin landowner notification and survey permission Survey, environmental, and engineering studies of preferred route December 2016 Submit 7(b) and (c) application to FERC March through December, 2017 December 2017 January 2018 May 2018 June 2018 November 2018 Spring 2019 Right of way acquisition; continue environmental studies as necessary Anticipate FERC approval Begin timber clearing and site activities Construction begins Restoration begins Target in-service date Remaining restoration 9

10 Economic Impact of the Project Investing over $30 million in Pennsylvania. Creating jobs during construction. Supporting local businesses during construction and operation. Ongoing work with area companies. 10

11 Factors in Selection of Route Maximize use of existing pipeline corridors. Minimize impact to landowners. Engineering and technical issues. Constructability issues. Minimize disturbance to land. Natural resource preservation. Cultural and archeological resource preservation. 11

12 Safety Safety is our top priority/outstanding safety record. Pipeline facilities are constructed and maintained to meet or exceed federal safety code: High strength carbon steel with modern fusion bonded epoxy coating Coating protected with Rockshield and/or select screened backfill Minimum 3 foot of cover 100% of welds are X-rayed Hydrostatic test Remote control valves System monitored 24/7 by NFG Gas Control Regulated/inspected by Federal Energy Regulatory Commission and U.S. Department of Transportation. 12

13 Safety (cont.) FlexSteel Steel reinforced flexible plastic pipe, that is proof tested to withstand twice of the rated pressure. Connected by stainless steel swaged fittings designed to be stronger than the pipe. Pipe design allows for continuous monitoring to ensure safety. 30 years of experience designing and manufacturing pipe. Flexsteel has not had a failure due to the design of the pipe. Currently used in regulated pipelines with a special permit. Special permit requires operator to design, install, and operate the line with an equivalent or greater level of safety then what is required of traditional steel lines. 13

14 Safety (cont.) FlexSteel Steel reinforced flexible plastic pipe, tested to withstand twice the rated pressure. Stainless steel swaged fittings. 30 years of use in offshore / marine environments. Zero in-service failures due to FlexSteel pipe design. Special DOT permit allows use of FlexSteel which provides an equivalent or greater level of safety than traditional steel lines. 14

15 Surveying in Your Area Surveying property mostly by walking land and installing colored flagging and stakes. Minimal disturbance by shovel testing, if necessary. Test holes repaired upon completion of testing. Surveying does not harm the land. Company representatives carry photo ID at all times. Will not ask to enter your home for any reason. Allows for communication with landowners. 15

16 Landowner Compensation Landowners will be appropriately compensated for economic loss/use (crop and timber damage) caused by construction. Proposed pipeline and facility easements will be acquired through negotiation based on comparable property sales and/or current market value. Land will be restored to original or better condition. 16

17 Proven Results Before During After 17

18 INGAA Landowner Commitments The Interstate Natural Gas Association of America (INGAA) is committed to leading an industry that builds and maintains strong positive relationships with Landowners. Each INGAA member company embraces the following commitments: 1. Respect and Trust 2. Accurate and Timely Information 3. Negotiate in Good Faith 4. Respect the Regulatory Compact 5. Responding to Issues 6. Outreach 7. Industry Ambassadors 8. Ongoing Commitment to Training 18

19 Contact Information Carly Manino Assistant Director, Corporate Communications , Ext Feedback c/o Corporate Communications 1100 State St. Erie, Pa

The PennEast Pipeline Project

The PennEast Pipeline Project The Project About the Project AGL Resources; NJR Pipeline Company; PSEG Power; South Jersey Industries; Spectra Energy and UGI Energy Services (UGIES) comprise Company, LLC. Over $1 billion investment

More information

The PennEast Pipeline Project

The PennEast Pipeline Project The Project About the Project AGL Resources; NJR Pipeline Company; PSEG Power; South Jersey Industries; Spectra Energy and UGI Energy Services (UGIES) comprise Company, LLC. Nearly $1 billion investment

More information

MOUNTAINEER XPRESS. Columbia Pipeline Group

MOUNTAINEER XPRESS. Columbia Pipeline Group MOUNTAINEER XPRESS Columbia Pipeline Group C169566.indd 1 TABLE OF CONTENTS CPG AT A GLANCE THE PLAN/PROJECT COMPONENTS COMMITMENT TO KEEPING YOU INFORMED PROJECT BENEFITS SAFETY FREQUENTLY ASKED QUESTIONS

More information

ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting. February 27, 2013 Middlebury VFW Post 7823

ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting. February 27, 2013 Middlebury VFW Post 7823 ADDISON NATURAL GAS PROJECT Phase 2 Middlebury Community Meeting February 27, 2013 Middlebury VFW Post 7823 0 Agenda Vermont Gas Natural Gas Economics Review of the Addison Natural Gas Project Discuss

More information

Long-term Management Plan For The Mitigation Bank

Long-term Management Plan For The Mitigation Bank Note: The California multi-agency Project Delivery Team developed this general outline to assist in the development of the Long-term Management Plan for mitigation banks. Objectives and tasks are provided

More information

Mariner East 2 Project Sunoco Pipeline L.P.

Mariner East 2 Project Sunoco Pipeline L.P. Mariner East 2 Project Sunoco Pipeline L.P. ABOUT SUNOCO LOGISTICS AND THE MARINER EAST PROJECT Q: Who is Sunoco Logistics and Sunoco Pipeline? A: Sunoco Logistics Partners L.P. (SXL) is a publicly traded

More information

192GasCatalog.

192GasCatalog. 192GasCatalog www.energyu.org www.midwestenergy.org 192-Abnormal Operating Conditions... 4 192-0101 Characteristics and Hazards of Natural Gas... 4 192-0201 Gas Detection and Alarm System Maintenance...

More information

Addison Natural Gas Project

Addison Natural Gas Project 0 Addison Natural Gas Project Addison County Regional Planning Commission November 14, 2012 Outline Vermont Gas The Addison Natural Gas Project Overview Route Design Town Benefits Route Sections ACRPC

More information

Natural Resource Management of Pipeline Infrastructure

Natural Resource Management of Pipeline Infrastructure Natural Resource Management of Pipeline Infrastructure Dan Devlin Director, Bureau of Forestry www.dcnr.state.pa.us Connection between Pipelines & DCNR Commonwealth s forests Fragmentation or reduction

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

Pipeline Status Document. API Document AUGUST 2017

Pipeline Status Document. API Document AUGUST 2017 Pipeline Status Document API Document AUGUST 2017 Special Notes Classified areas may vary depending on the location, conditions, equipment, and substances involved in any given situation. Users of this

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21; and by Saskatchewan Regulations

More information

NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT

NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT NORTH TEXAS MUNICIPAL WATER DISTRICT EAST FORK RAW WATER SUPPLY PROJECT Denise Hickey Agenda NTMWD Background Water Planning East Fork Raw Water Supply Project Overview Benefits Nature Center NTMWD BACKGROUND

More information

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP

VALLEY LATERAL PROJECT. RESOURCE REPORT 11 Reliability and Safety. FERC Docket No. CP VALLEY LATERAL PROJECT RESOURCE REPORT 11 Reliability and Safety FERC Docket No. CP16- -000 November 2015 Section TABLE OF CONTENTS Page 11.0 RELIABILITY AND SAFETY... 11-1 11.1 NATURAL GAS PIPELINE INDUSTRY

More information

PHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services

PHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services PHILADELPHIA GAS WORKS SPECIFICATION BOOK For Common Trenching For Natural Gas Mains and Services Introduction This manual is designed as a guide and reference source for developers, builders, contractors,

More information

Notice No Closing Date: May 12, 2017

Notice No Closing Date: May 12, 2017 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

A Community Wildfire Protection Plan. Insert signature Block

A Community Wildfire Protection Plan. Insert signature Block A Community Wildfire Protection Plan Insert signature Block A Community Wildfire Protection Plan A Simplified Template Objectives of a Community Wildfire Protection Plan: Comprehensive Forest planning

More information

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling

C900/RJ. CertainTeed. PVC Pipe. with CertainTeed s proven Certa-Lok restrained joint system. Directional Drilling 1 1 CertainTeed C900/RJ PVC Pipe with CertainTeed s proven Certa-Lok restrained joint system Directional Drilling Underground Water Mains and Restrained, Non-Metallic Change-of-Direction Fittings (No Thrust

More information

Dead Horse Creek Project. Community Open House Minnewasta Golf & Country Club Morden, Manitoba June 15, 2017

Dead Horse Creek Project. Community Open House Minnewasta Golf & Country Club Morden, Manitoba June 15, 2017 Dead Horse Creek Project Community Open House Minnewasta Golf & Country Club Morden, Manitoba June 15, 2017 Dead Horse Creek Project Overview Enbridge operates seven pipelines that cross Dead Horse Creek

More information

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION 820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing

More information

Appendix A. Project Description

Appendix A. Project Description Appendix A Project Description I. Project Summary 1. The proposed Jordan Cove LNG export terminal ( Jordan Cove ) is a facility designed to produce and export liquefied natural gas ( LNG ). Jordan Cove

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England

The West East Link Main is a 125 million pipeline project that will carry water across the North West of England West East Link Main 55km pipeline, carrying 100 million litres, is one of the largest ever undertaken by a water company by Jon Higham The West East Link Main is a 125 million pipeline project that will

More information

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017 SPONSOR: Gary Pestorious Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017 REFER TO: 2012-01634-DAS SECTION:404 - Clean Water Act 1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL: Pickerel Lake

More information

National Academy of Sciences

National Academy of Sciences National Academy of Sciences Transportation Research Board Study of Pipeline Transportation of Diluted Bitumen PHMSA Regulatory Authority and Keystone XL Pipeline October 23, 2012-1 - Topics for Briefing

More information

An Employee-Owned Company

An Employee-Owned Company An Employee-Owned Company October 26, 2016 Clinton Township Floodplain Administrator P.O. Box 256, Creek Road Factoryville, PA 18419 Re: Atlantic Sunrise Project Central Penn Line North Clinton Township,

More information

PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES

PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES January 30-31, 2018 Royal Sonesta Houston Houston, TX COURSE PIPELINES 101 BASIC PRINCIPLES OF ONSHORE PIPELINES RELATED EVENT: PIPELINES 102: PART 192 REGULATORY REQUIREMENTS FOR NATURAL GAS PIPELINES

More information

About TransCanada. At TransCanada, our mission is to safely, responsibly and reliably transport energy used by millions of North Americans every day.

About TransCanada. At TransCanada, our mission is to safely, responsibly and reliably transport energy used by millions of North Americans every day. About TransCanada Wholly Owned Natural Gas Pipeline Partially Owned Natural Gas Pipeline Natural Gas Pipeline Under Construction Natural Gas Pipeline In Development Liquids Pipeline Liquids Pipeline Under

More information

GOOD NEIGHBOR POLICY

GOOD NEIGHBOR POLICY Regional Open Space MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GOOD NEIGHBOR POLICY Adopted by the Board of Directors October 26, 1988 Amended August 14, 1996 Amended September 26, 2007 Introduction The

More information

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference

Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference Gas Transmission MAOP Verification Integrity Verification Process Oklahoma CC Pipeline Safety Conference U.S. DOT / PHMSA Steve Nanney November 19, 2014 1 Integrity Verification Process Drivers Overview

More information

Spring Forecast Based Operations, Folsom Dam, California

Spring Forecast Based Operations, Folsom Dam, California Spring Forecast Based Operations, Folsom Dam, California Paul E. Pugner, P.E. Chief, Water Management Section Sacramento District U.S. Army 1325 J Street, Room 1126 Sacramento, CA 95814-2922 Tel: (916)

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

Urban Pipeline. Replacement Program A NATURAL GAS PIPELINE INITIATIVE. Southwest Calgary Connector & South Glenmore Lateral. Safety First. Always.

Urban Pipeline. Replacement Program A NATURAL GAS PIPELINE INITIATIVE. Southwest Calgary Connector & South Glenmore Lateral. Safety First. Always. Urban Pipeline Replacement Program A NATURAL GAS PIPELINE INITIATIVE Southwest Calgary Connector & South Glenmore Lateral Safety First. Always. ATCO s Urban Pipeline Replacement Program In January 2014,

More information

Emerging Trends in Ecological Offsets

Emerging Trends in Ecological Offsets Emerging Trends in Ecological Offsets Citizens Advisory Council Meeting November 14, 2017 Agenda Overview of Ecological Offsets Market-based, generating offset products, at large scale Wetland/Stream Mitigation

More information

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.

More information

WHITE PAPER August Natural Gas Pipeline System: Reliability and Resiliency

WHITE PAPER August Natural Gas Pipeline System: Reliability and Resiliency WHITE PAPER August 2013 Natural Gas Pipeline System: Reliability and Resiliency 1 Introduction The United States electric grid system is riddled with well documented power outages. In the past five years,

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

PIPELINE SITING IN WEST VIRGINIA: An Uphill Battle Even in an Energy Friendly State. Bob Orndorff Dominion October 27, 2015

PIPELINE SITING IN WEST VIRGINIA: An Uphill Battle Even in an Energy Friendly State. Bob Orndorff Dominion October 27, 2015 PIPELINE SITING IN WEST VIRGINIA: An Uphill Battle Even in an Energy Friendly State Bob Orndorff Dominion October 27, 2015 West Virginia: A Major Contributor to the Gas Revolution Reshaping American Energy

More information

Introduction to Gas Pipeline Design and Construction. Marco D. Boscardin, Ph.D., P.E., LSP Boscardin Consulting Engineers, Inc.

Introduction to Gas Pipeline Design and Construction. Marco D. Boscardin, Ph.D., P.E., LSP Boscardin Consulting Engineers, Inc. Introduction to Gas Pipeline Design and Construction Marco D. Boscardin, Ph.D., P.E., LSP Boscardin Consulting Engineers, Inc. Outline of Presentation I. Introduction II. Typical Gas Pipeline Design Considerations

More information

Reducing Lost and Unaccounted for Natural Gas in Distribution Systems

Reducing Lost and Unaccounted for Natural Gas in Distribution Systems Reducing Lost and Unaccounted for Natural Gas in Distribution Systems Summary: Reduce lost and unaccounted (L&U) for natural gas from natural gas distribution operations by 15% by the year 2020. The period

More information

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES

POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES POLYGUARD RD-6 A FAIL SAFE PIPELINE COATING SYSTEM FOR REHABILITATION OR GIRTH WELDS ON CATHODICALLY PROTECTED PIPELINES A large percent of corrosion failures on cathodically protected structures are associated

More information

nalcofabtech.com A Nalco Champion Company

nalcofabtech.com A Nalco Champion Company nalcofabtech.com A Nalco Champion Company 2 CONTENTS Goal Zero - Safety Culture...4 About Us...6 Capabilities...8 Services...24 Equipment and Facilities... 36 3 4 At Nalco FabTech, our programs ensure

More information

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN

REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN REQUEST FOR STATEMENT OF QUALIFICIATIONS FOR WATER SOURCE RAW WATER TRANSMISSION MAIN FOR CITY OF SIDNEY SIDNEY, OHIO PROPOSALS TO BE RECEIVED AT THE OFFICE OF THE PUBLIC WORKS DIRECTOR 201 WEST POPLAR

More information

Pipelines Transmission of Natural Gas from Marcellus Shale

Pipelines Transmission of Natural Gas from Marcellus Shale Marcellus Shale Natural Gas Extraction Study 2011 Addendum Pipelines Transmission of Natural Gas from Marcellus Shale Leagues of Women Voters of Southeastern Pennsylvania and Indiana County Study Committee

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain

More information

I. Project Overview and Limits. Project Goal

I. Project Overview and Limits. Project Goal Scope of Work and Deliverables for Subsurface Utility Engineering (SUE) for both Underground and Overhead Utilities on T.H. 10, and its Connecting Roads under S.P. 8001-40 I. Project Overview and Limits

More information

Roadrunner Gas Transmission Pipeline. Frequently Asked Questions Summer 2015

Roadrunner Gas Transmission Pipeline. Frequently Asked Questions Summer 2015 Roadrunner Gas Transmission Pipeline Frequently Asked Questions Summer 2015 Will the pipeline provide gas service to communities along the route? No. The Roadrunner pipeline is a natural gas transmission

More information

Atlantic Link: An Update. June 6, 2017

Atlantic Link: An Update. June 6, 2017 Atlantic Link: An Update June 6, 2017 About Emera Publicly traded (TSX: EMA); approximately CDN$29 billion in assets Constructing the 500 MW Maritime Link a 170-kilometre subsea HVdc cable between Newfoundland

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

SECTION 6: MITIGATION STRATEGY

SECTION 6: MITIGATION STRATEGY SECTION 6: MITIGATION STRATEGY This section describes the process by which the Lehigh Valley Steering Committee and municipal planning partnership performed the update to the county and local mitigation

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance

Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance Revised 2/15 Pennsylvania Department of Transportation District 8-0 Rest Area Site G Specifications for Landscaping and Lawn Maintenance 1. DESCRIPTION The contractor shall furnish all equipment, personnel

More information

Joint venture ownership stakes in the pipeline are: Dominion, 45%; Duke Energy, 40%; Piedmont, 10%; and AGL Resources, 5%.

Joint venture ownership stakes in the pipeline are: Dominion, 45%; Duke Energy, 40%; Piedmont, 10%; and AGL Resources, 5%. Pipeline Project #1298 Pipeline project Name and Ownership Project Name: Atlantic Coast Pipeline C Three ID#: 1298 Holding Company or Parent Organization: Dominion Resources View Project Map See All of

More information

SPECIFICATION : BORING AND JACKING

SPECIFICATION : BORING AND JACKING SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in

More information

Pipeline Projects: Preparing for FERC Certification, Addressing Environmental Impacts

Pipeline Projects: Preparing for FERC Certification, Addressing Environmental Impacts Presenting a live 90-minute webinar with interactive Q&A Pipeline Projects: Preparing for FERC Certification, Addressing Environmental Impacts Navigating the Certification and Environmental Review Processes

More information

US Army Corp of Engineers

US Army Corp of Engineers US Army Corp of Engineers Each year thousands of construction projects are undertaken in the United States that could potentially impact the nation s rivers, streams, wetlands and other aquatic resources.

More information

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION US Army Corps of Engineers Organization The Wilmington District Regulatory Division consists of 4 field offices in Wilmington, Washington,

More information

The Santa Rosa Plain Conservation Strategy

The Santa Rosa Plain Conservation Strategy 10 The Santa Rosa Plain Conservation Strategy CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES Santa Rosa Plain Conservation Strategy (California) I. OVERVIEW & BACKGROUND Location: Sonoma County,

More information

Environmental Restoration and Conservation Program - Williams. John Satterfield, Sr. Director Government and Environmental Affairs October 15, 2015

Environmental Restoration and Conservation Program - Williams. John Satterfield, Sr. Director Government and Environmental Affairs October 15, 2015 Environmental Restoration and Conservation Program - Williams John Satterfield, Sr. Director Government and Environmental Affairs October 15, 2015 Who We Are > Williams operates approximately 33,000 miles

More information

LOCATING NEW POWER LINES

LOCATING NEW POWER LINES Members of utilities, agencies, environmental groups and other civic groups jointly Please visit us today at / Macro corridors are used to focus data collection. A grid of 100-square foot cells Using higher

More information

Sudbury to Hudson Transmission Reliability Project

Sudbury to Hudson Transmission Reliability Project Hudson, Massachusetts Board of Selectmen Presentation February 22, 2016 Revised 3-24-16 Page 4 revised last bullet on Route Analysis Process. Page 9 revised preferred route (overhead) visual simulation

More information

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction. General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting

More information

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications

Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications Penn State Forestland Management Office Multi-Strand High-Tensile Wire Fence Specifications 1. FENCE REQUIREMENTS Hazard Trees All hazard trees, which are within tree length of the fence, must be felled

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following:

SEGMENTAL BLOCK RETAINING WALLS. Comply with Division 1 - General Provisions and Covenants, as well as the following: SEGMENTAL BLOCK RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES Segmental Block Retaining Walls 1.02 DESCRIPTION OF WORK Constructing segmental block retaining walls. 1.03 SUBMITTALS Comply with

More information

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County

Special Research Study. Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Special Research Study Comparison of Stormwater Pipe Installation Lengths and Costs in Texas: Frisco, Arlington, Austin, Victoria and Hidalgo County Client: American Chemistry Council BCC Research 49 Walnut

More information

TABLE OF CONTENTS LIST OF TABLES. Table 1-1: PEA Checklist Key Table 1-2: Less-Than-Significant Impacts with Implementation of APMs...

TABLE OF CONTENTS LIST OF TABLES. Table 1-1: PEA Checklist Key Table 1-2: Less-Than-Significant Impacts with Implementation of APMs... TABLE OF CONTENTS 1.0 PROJECT BACKGROUND... 1-1 1.1 PROJECT COMPONENTS... 1-2 1.2 PROJECT LOCATION... 1-3 1.3 PROJECT NEED AND ALTERNATIVES... 1-3 1.4 AGENCY COORDINATION... 1-4 1.4.0 California Department

More information

ASBESTOS CEMENT WATER MAIN REPLACEMENT

ASBESTOS CEMENT WATER MAIN REPLACEMENT ASBESTOS CEMENT WATER MAIN REPLACEMENT Presenter: Bryon Killian, PE bkillian@entecheng.com References Drinking Water Operator Certification Training Modules. Pennsylvania Department of Environmental Protection

More information

URS- EIA- REP Date of Issue 19th November 2012

URS- EIA- REP Date of Issue 19th November 2012 DocID: External DocID: URS-EIA-REP-201040 46369085_Doc020_REP_Rev03 Date of Issue 19th November 2012 This report has been prepared by URS Infrastructure & Environment UK Limited on behalf of South Stream

More information

CEA Energy 101: The Association of Oil Pipe Lines (AOPL) An Overview of the liquids pipeline industry, policy, and how it impacts consumers

CEA Energy 101: The Association of Oil Pipe Lines (AOPL) An Overview of the liquids pipeline industry, policy, and how it impacts consumers CEA Energy 101: The Association of Oil Pipe Lines (AOPL) An Overview of the liquids pipeline industry, policy, and how it impacts consumers Crude oil Liquid Pipeline Products Refined petroleum products

More information

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe

PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe Design and Installation Guide PVC Fittings & Laterals for Solid-Wall PVC Sewer Pipe TABLE OF CONTENTS Introduction 2 Products 3 Main-Line Fittings & Service-Line Fittings 3-4 Connections to Dissimilar

More information

Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013

Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013 COMMUNITY DEVELOPMENT DEPARTMENT Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013 FACTS Property Rights and Interests Property rights: each tract of land contains a set of rights

More information

Holly Swartz and Jason Shirey

Holly Swartz and Jason Shirey Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes

More information

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved.

Federal Regulation. Copyright 2011 Gary A. Robbins. All rights reserved. Federal Regulation Copyright 2011 Gary A. Robbins. All rights reserved. Roles Different Federal agencies have different jurisdictions over water resources Main agencies Army Corp of Engineers (USACE) Bureau

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN

SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type

More information

MDOT SHA s NEPA/MEPA, Agency and Public Involvement Processes. Presentation to BRTB s Technical Committee August 1, 2017

MDOT SHA s NEPA/MEPA, Agency and Public Involvement Processes. Presentation to BRTB s Technical Committee August 1, 2017 MDOT SHA s NEPA/MEPA, Agency and Public Involvement Processes Presentation to BRTB s Technical Committee August 1, 2017 Agenda Introductions MDOT SHA Overview and NEPA Evaluation Process Section 4(f) TERP

More information

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Plastic Pipe

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Plastic Pipe Plastic Pipe Materials, Joining, Installation, & Other Considerations Some of the pipe that you may see? Around the late 1950 s to early 2000 s Thermoplastics Plastic Materials Must Meet: ASTM D-2513 (Thermoplastic)

More information

Dam Failure Hazard Profile

Dam Failure Hazard Profile Appendix F Dam Failure Hazard Profile F-1 THIS PAGE INTENTIONALLY LEFT BLANK F-2 4.3.12. Dam Failure 4.3.12.1. Location and Extent Dam failures most often occur during or after a massive rainfall, flooding,

More information

Marcellus Shale Advisory Commission Infrastructure Work Group Meeting El Paso Corporation Tennessee Gas Pipeline Company April 11, 2011

Marcellus Shale Advisory Commission Infrastructure Work Group Meeting El Paso Corporation Tennessee Gas Pipeline Company April 11, 2011 Interstate Pipelines Exploration & Production Marcellus Shale Advisory Commission Infrastructure Work Group Meeting El Paso Corporation Tennessee Gas Pipeline Company April 11, 2011 El Paso Corporation

More information

Bonner Bridge: Ensuring Connectivity and Resilience on North Carolina's Coastal Barrier Islands

Bonner Bridge: Ensuring Connectivity and Resilience on North Carolina's Coastal Barrier Islands Bonner Bridge: Ensuring Connectivity and Resilience on North Carolina's Coastal Barrier Islands This article discusses how the North Carolina Department of Transportation is incorporating a unique coastal

More information

Statement of Qualifications Page 1

Statement of Qualifications Page 1 Statement of Qualifications Page 1 ALPINE ARCHAEOLOGY OVERVIEW Alpine Archaeological Consultants, Inc. is a respected, fullservice archaeological consulting firm established to help clients implement their

More information

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL APRIL 2014 Southeast Florida Rail Network & Proposed All Aboard Florida Route To Jacksonville Tampa Orlando Everglades

More information

Frequently Asked Questions (FAQ) about Epoxy-Coated Reinforcing Bars

Frequently Asked Questions (FAQ) about Epoxy-Coated Reinforcing Bars 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Engineering Technical Note ETN???? Frequently Asked Questions (FAQ) about Epoxy-Coated Reinforcing Bars Introduction CRSI routinely receives

More information

Special Research Study. Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia

Special Research Study. Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia Special Research Study Comparison of Water Pipe Installation Lengths and Costs in Michigan: Port Huron, Grand Rapids, Monroe, and Livonia Client: American Chemistry Council BCC Research 49 Walnut Park

More information

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/

DuPage County Division of Transportation 421 N. County Farm Road Wheaton, IL / (Fax) 630/ Within DuPage County Highway Rights-of-Way NOTE: All construction shall be performed and materials specified/installed according to IDOT S Standard Specifications for Road and Bridge Construction (latest

More information

Solano Multi-Species Habitat Conservation Plan

Solano Multi-Species Habitat Conservation Plan Solano Multi-Species Habitat Conservation Plan 580,000 Acres 37 Covered Species 4 Natural Communities 12,000 acres of Proposed Development Approximately 23,000 acres will be Preserved Plan Participants

More information

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...

More information

195LiquidsCatalog.

195LiquidsCatalog. 195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403

More information

STANDARD SPECIFICATIONS SECTION JACKED CASING

STANDARD SPECIFICATIONS SECTION JACKED CASING STANDARD SPECIFICATIONS SECTION 02315 JACKED CASING PART 1 - GENERAL A. Description Tunneling method by jacked casing, directional drilling, or a tunnel boring machine, for highway, railroad, creek, and

More information

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT LAKE BRITTON PLANNING UNIT Pit-McCloud River Watershed Lake Britton Planning Unit Fish, Plant, and Wildlife Habitat Conduct surveys of lands outside the FERC boundary to identify biological resources and

More information

THE CORPS REGULATORY AUTHORITY

THE CORPS REGULATORY AUTHORITY Regulatory Branch THE CORPS REGULATORY AUTHORITY THE U.S. ARMY CORPS OF ENGINEERS REGULATORY AUTHORITY IS BASED UPON 1. SECTION 10 OF THE RIVERS AND HARBORS ACT OF 1899 (RHA) AND 2. SECTION 404 OF THE

More information

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce Lake County Success Generating Environmental Gains With Geothermal Power By Mark Dellinger, Administrator, Lake County (CA) Sanitation District, and Eliot Allen, Principal, Criterion/Planners Engineers

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

PHMSA Update: Aging Infrastructure and Integrity Verification Process

PHMSA Update: Aging Infrastructure and Integrity Verification Process PHMSA Update: Aging Infrastructure and Integrity Verification Process NAPCA Workshop August 15, 2013 Houston, Texas Safety Administration (PHMSA) Steve Nanney 1 PHMSA Safety Update - Topics Performance

More information