How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.

Size: px
Start display at page:

Download "How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc."

Transcription

1 How LEED & The Retro-Commissioning Credits Produce Energy Savings James Vallort Vice President Environmental Systems Design, Inc.

2 Retro-Commissioning Today s session will focus on the following items: 1.What is Retro-Cx? 2.Retro-Cx and LEED 3.The Retro-Commissioning Process 4.Pricing challenges for Retro-Commissioning 5.A case study of a Retro-Cx project 6.Open discussion on commissioning

3 Retro Commissioning (Cx) The many meanings of Retro Cx What is the difference between Retro-Cx & Re-Cx Retro Cx LEED EB LEED Stipulates Systems Time Frame to complete testing Depth of Testing Minimal steps & procedures requirements

4 Retro Commissioning (Cx) Retro Cx Ala Cart Can be focused on a single system Can be performed as part of a renovation Can be very detailed Rebalance entire facility Can be high level Dangerous May just verify problems and not identify the source Can involve re-engineering the systems Can be added scope to a LEED EB Retro Cx

5 LEED EB 2.0 vs. LEED Operations & Maintenance LEED EB 2.0 EA Pre-requisite 1 Verify that fundamental building systems and assemblies are performing as intended to meet current needs and sustainability requirements. Pre-requisite NO POINTS! No credits for continuous commissioning

6 LEED EB 2.0/V3 vs. LEED Operations & Maintenance Changes in LEED O&M Prereq 1 Energy Efficiency Best Management Practices - Planning, Documentation, and Opportunity Assessment Credit 2.1 Existing Building Commissioning - Investigation and Analysis Credit 2.2 Existing Building Commissioning - Implementation Credit 2.3 Existing Building Commissioning - Ongoing Commissioning

7 Prereq 1 Energy Efficiency Best Mgmt Practices - Planning, Documentation, and Opportunity Assessment Document the current sequence of operations Develop a building operations plan Develop System Narratives Create a preliminary preventative maintenance plan Conduct an energy audit (walk-through assessment)

8 Credit 2.1 Existing Building Commissioning Investigation and Analysis (Two options) (2 Points) Option A Develop a Retro-Cx Plan Conduct the investigation and analysis phases Breakdown energy consumption in the facility Develop a list of operational problems Develop of list of improvements and the associated cost benefit analysis

9 Credit 2.2 Existing Building Commissioning Implementation (2 Points) Implement no or low cost operational improvements Create a capital plan for future improvements Provide training on energy efficiency, system operations and other sustainable bldg operations topics Demonstrate the observed or anticipated financial costs & benefits of implemented improvements Update the building operations plan

10 Credit 2.3 Existing Building Commissioning - Ongoing Commissioning Implement an ongoing commissioning program Create a written plan for a 24 month cycle Complete 50% of the current Retro-Cx cycle Update the building operations plan

11 The Retro-Commissioning Process Commissioning is a process driven activity. Focus on resolutions and opportunities Realize that good buildings need tune ups over time Building goals and objectives change over time Building goals some time conflict Comfort vs. energy efficiency

12 What Is Commissioning? Commissioning is a quality-assurance process that can be incorporated into building design and construction to meet the following objectives: Verify that design intent is accomplished Assure that systems operate as intended Validate system performance Calibrate baseline measurement of system performance Train operations staff

13 Why Should We Consider Commissioning For Our Project?" Commissioning enhances building performance by: Minimizing energy consumption by ensuring that all systems function in accordance with the design intent Minimizing environmental impacts associated with faulty construction Maximizing occupant healthy and comfort by optimizing system performance Optimizing life-cycle costs by maximizing system performance

14 Where Opportunities Are Found Based on data from LBNL PECI and Texas A&M 2004 study the following summary was provided. Significant opportunities in Air Handling & Distribution Next major category is the Cooling Plant

15 Savings Beyond Energy from Retro-Cx Based on data from LBNL, PECI and Texas A&M 2004 study the following summary was provided. Significant savings in extended equipment life Next major category is Thermal Comfort When combined with IAQ becomes largest

16 Sample Bldg Cx Timeline Retro/Re-Cx ` Site Inventory Collate Findings Observe and Test Performance Implement Improvements Ongoing Monitoring Collect Data Develop Cx Plan List Deficiencies & Improvements Re-test Improvements Final Report PLANNING INVESTIGATION IMPLEMENTATION EVALUATION Project Timeline

17 Planning Phase Initial Meeting with Facility and Commissioning Teams. Inventory Equipment / Collect Nameplate Data. Review Maintenance Practices and Equipment History. Collect Energy Consumption Data. Collect Building Occupant Data. Collate Findings and Review.

18 Investigation Phase Develop Retro-commissioning Plan. Develop diagnostic monitoring plans. Develop Design Intent and optimum operating plans. Develop functional performance test plans. Conduct site assessment to perform diagnostic monitoring, testing and data collection.

19 Investigation Phase (cont.) Analyze Results of the data collection and testing. Develop Master List of deficiencies and improvements. Analyze Return on Investment. Review Findings with Cx Team

20 Implementation Phase Implement repairs and improvements. Retest and re-monitor for results. Fine Tune improvements if needed. Revise estimated energy savings calculations. This phase can be phased over a multi-year plan

21 Project Wrap-Up Prepare final report Often there are multiple final reports as a result of phased implementation Develop Re-Commissioning Manual. Monitoring Energy Consumption Basis for next phase of Retro-Cx

22 Pricing Methods The pricing for Retro Cx is extremely complex There are multiple phases of Retro Cx Each phase may change the predicted scope of work for future phases The ability to adapt to discoveries contractually is key to solving problems

23 Pricing Methods (cont.) Some common methods are: Square Footage Ranges between 15 a sq ft to 50 per sq ft Most risky pricing method. Cx Agent has limited or excess time. May limit amount of re-engineering to permanently fix and improve system performance Recommended to be utilized for budgetary purposes Commissioning is a component and system based task A 1,200,000 sq. ft. bldg constructed in 2001 has one massive built up fan system consisting of 8 fans that serves 90% of the building A 1,200,000 sq. ft. bldg constructed in 1934 has over 50 fan systems that serve the building

24 Pricing Methods (cont.) Level of effort per system Itemize the systems to be commissioned Project level of effort to: Document the current systems, investigate reengineering potential, verify installation, verify performance and back check corrections made during testing Allows for a phased approach on critical systems first

25 Pricing Methods (cont.) What to include in the budget for a Retro Cx project: Internal Time Outside contractors Retro Cx Agent O&M / repair costs Immediate and long term Capital Improvements Immediate and long term

26 Internal Resources Required The internal staff can have a big or small effort on the project. This is a critical decision, be honest about the time commitments and capabilities of staff. Some common staff activities that take away from current activities Gathering design, renovations and maintenance data for the facility Serving as tour guides for outside contractors to facilitate bidding and performance of work

27 Internal Staff Required (cont.) Assisting in Retro-Cx activities can provide benefits: Minimize costs Train staff - New staff members become familiar with systems - Retro Cx should become a continuous process. Interface with occupants of the facility during testing Evaluating proposed facility changes

28 Outside Resources Some common outside contractors are: Test & Balance (TAB) Design / Engineering Building Automation contractors To manipulate systems To verify BAS is accurate To propose / price system enhancements

29 Outside Resources (cont.) Trade related contractors Mechanical Electrical Glazing Cleaning Etc.

30 Outside Resources: Why Engineering Design / Engineering The fact that your building was designed and is operational does not limit the need for reengineering. Retro-Cx vs. Retro-Cx/Re-engineering Retro-Cx with Re-engineering opens the opportunity to fix problems Address facility changes with the best technology Update the design top integrate latest trends and energy savings

31 The Savings Are Real The University of Illinois has begun a Retro-Commissioning Program and has seen real results in five buildings.

32 Case Study 135 S LaSalle Street, Chicago Illinois Formerly the Field Building (Retailer Marshall Field) Constructed in 1934 as an Art Deco skyscraper 44 stories tall totaling 1.25 million sq. ft.

33 LEED EB and Custom Retro-Cx The 135 S LaSalle Street Retro-Cx project was LEED project that went one step further Long range plan established to performed detailed Retro-Cx and re-engineering of all major systems. The systems to be commissioned include HVAC Lighting Building automation system

34 Initial Focused Retro-Cx Efforts Systems selected for detailed retro Cx Primary AHUs serving the tower 60% of the building sq ft Increased focus on: System objectives System performance Long term system planning

35 Retro-Cx Team Commissioning Firm Controls Contractor Test & Balance Contractor Facilities Staff

36 Retro-Cx Team Concept Not a time to point fingers or assign blame. No hidden agenda or blind shots

37 Retro-Cx Team Concept Open professional communication is the key to success. TEAMWORK

38 Energy Savings Opportunities Identified Eliminating the hot deck damper leakage in the dual duct terminal units. Hot deck leakage is taking away from the cooling effect of the cold deck supply air. Projected Energy Savings:$450,000 Required Implementation Steps: Terminal Unit Test & Balance / Repair Program - Eliminate Hot deck bypass - No longer paying to push return air back to the space

39 Energy Savings Opportunities Identified Programming OA dampers to be closed during morning warm-up and cool down periods, when the building is unoccupied and doesn t require any OA. Projected Energy Savings: $35,000 Required Implementation Steps: Programming change (No capital changes)

40 Energy Savings Opportunities Identified Minimizing OA CFM to the greatest extent possible by bringing the air systems into compliance with ASHRAE s Standard , Ventilation for Acceptable Indoor Air Quality. Focus on leaking OA dampers. Projected Energy Savings: $40,000 Required Implementation Steps: Replace aged and leaking dampers - The staff had been repairing these dampers for years and there useful life had expired.

41 Energy Savings Opportunities Identified Minimizing OA CFM to the greatest extent possible by bringing the air systems into compliance with ASHRAE s Standard , Ventilation for Acceptable Indoor Air Quality. Focus OA CO 2 volume control Projected Energy Savings: $210,000 Required Implementation Steps: Implement programming changes to track and control OA Install CO2 sensors to provide input to control system

42 Energy Savings Opportunities Identified Installing Isolation dampers on the 7 of 19 floors where they do not exist so that an overtime HVAC request will not feed at least 7 floors with conditioned air. Projected Energy Savings: $190,000 Required Implementation Steps: Isolation dampers were already installed on 12 of 19 floors Install isolation dampers on the remaining 7 floors Provide operator interface to open and close isolation dampers via the building automation system

43 Energy Savings Opportunities Identified Supply air static pressure control, where the air systems are made capable of operating as true variable air volume systems (VAV) as opposed to their current constant air volume (CAV) state of operation. Projected Energy Savings:$300,000 Required Implementation Steps: Replace static pressure sensors Relocate static pressure sensors Repair return fan inlet vane control

44 Energy Savings Opportunities Identified Supply air discharge temperature reset, where the air systems supply air temperature is allowed to adjust according to whether or not the greatest zone demand load is satisfied or not. Projected Energy Savings:$35,000 Required Implementation Steps: Controls programming to canvas available points For improved operation additional space temperature and humidity points

45 Energy Savings Opportunities Identified Revising the chilled water pump sequence of operation to take advantage of the pump VFDs and use the fourth pump as a back-up since it adds very little to the CHW flow and pressure head of the system. Projected Energy Savings: $35,000 Required Implementation Steps: Programming changes only

46

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning

A Building Commissioning Overview. Presented by: Goetting & Associates Commissioning A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of

More information

Underf loor For Schools

Underf loor For Schools The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

City of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training

City of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training City of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training November 18, 2015 Agenda Commissioning Monitoring Based Commissioning Building Tune up Case

More information

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING AIA Quality Assurance Learning Objectives Demonstrate global results of the analysis of energy

More information

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel  Mechanical Option EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

The Benefits of Building Commissioning. Jay Cederberg, P.E. Energy Solutions Specialist

The Benefits of Building Commissioning. Jay Cederberg, P.E. Energy Solutions Specialist The Benefits of Building Commissioning Jay Cederberg, P.E. Energy Solutions Specialist All of these jobs would work nicely and probably give satisfaction if the man who knew the most or paid the most attention

More information

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN FORM 010.901 REV 1211 THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS SUSTAINABLE DESIGN GUIDE StopWaste.Org LEED-NC Platinum Energy Foundation LEED-CI Platinum Adobe East Tower LEED-EB

More information

Persistence Tracking in a Retro-commissioning Program

Persistence Tracking in a Retro-commissioning Program Persistence Tracking in a Retro-commissioning Program Mike Eardley Architectural Energy Corporation Synopsis The persistence of energy savings and electrical demand reductions created by retrocommissioning

More information

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne Existing Building Cx: Processes & Results A Cultural Journey Barry Abramson Senior Vice President Servidyne AIA Quality Assurance Learning Objectives 1. Define the key steps in the process of retrocommissioning

More information

Commissioning. National Training for Commissioning, Presented By Paul Sra and Mike Cavan

Commissioning. National Training for Commissioning, Presented By Paul Sra and Mike Cavan Commissioning National Training for Commissioning, 2006 Presented By Paul Sra and Mike Cavan 1 Scope of Presentation Commissioning overview Commissioning requirements for LEED Standard Roles and responsibilities

More information

RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE

RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT Adam Renzi, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute

More information

Technical Retro-Commissioning of Existing Buildings

Technical Retro-Commissioning of Existing Buildings Standard S0 0 0 Technical Retro-Commissioning of Existing Buildings Review Draft (--) This draft has been recommended for public review by the responsible project committee. To submit a comment on this

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

Building Controls Strategies Conference. Retro-Commissioning with BAS Overview. 10 March Steve Brown, CAP ESD Controls Team Leader

Building Controls Strategies Conference. Retro-Commissioning with BAS Overview. 10 March Steve Brown, CAP ESD Controls Team Leader Building Controls Strategies Conference Retro-Commissioning with BAS Overview 10 March 2015 Steve Brown, CAP ESD Controls Team Leader Kevin Caho PE, LEED AP ESD Energy Engineer Agenda BAS Overview RCx

More information

Retro-Commissioning for Existing Facilities

Retro-Commissioning for Existing Facilities Retro-Commissioning for Existing Facilities Tom Meyer Director, Technical Programs National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, Maryland 20877 (301) 977-3698 www.nebb.org

More information

THE KEMPER BUILDING 1 EAST WACKER DRIVE PHIL KEUHN SIEBEN ENERGY ASSOCIATES

THE KEMPER BUILDING 1 EAST WACKER DRIVE PHIL KEUHN SIEBEN ENERGY ASSOCIATES THE KEMPER BUILDING 1 EAST WACKER DRIVE BY PHIL KEUHN OF SIEBEN ENERGY ASSOCIATES CHAPTERfREGIONAL TECHNOLOGY A WARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable).,..(!)~8(}~lnerc[~i~~ii9in:~~).,...;;().

More information

AHU Models Using Whole Building Cooling and Heating Energy Consumption Data

AHU Models Using Whole Building Cooling and Heating Energy Consumption Data Calibrating AHU Models Using Whole Building Cooling and Heating Energy Consumption Data Mingsheng Liu, Ph.D., P. E. ; Guanghua Wei; and D. E. Claridge, Ph.D., P. E. Energy Systems Laboratory Texas A&k?

More information

DLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S.

DLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S. DLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S. firms. This ranking is based on design excellence (reflected

More information

Mission Critical Commissioning for Healthcare Facilities

Mission Critical Commissioning for Healthcare Facilities Mission Critical Commissioning for Healthcare Facilities Steven R. Rusty Ross SSRCx, LLC Synopsis Healthcare Facilities serve a critical and unique mission. Few facilities delivered by the construction

More information

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering LEED Commissioning and Actual Energy Use John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering AIA Quality Assurance Learning Objectives 1. Why Best Practice and Fundamental Commissioning are

More information

Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency

Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency Summary Major Fortune 500 Telecom Company Estimated 40% the corporate building portfolio still use pneumatic thermostats

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa

More information

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION

ROUND LAKE AREA SCHOOLS DISTRICT 116: LIMITED COMMISSIONING GUIDELINES INTRODUCTION INTRODUCTION Commissioning (Cx) is a quality assurance process that works to ensure the design intent of a building is fully realized. It requires a systematic approach to review, verify, and document

More information

Energy Reduction Strategy Through 2020

Energy Reduction Strategy Through 2020 Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and

More information

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,

More information

USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit

USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit Jeffrey Salay, PE, CEM, LEED AP Senior Principal 13 December 2017 GHT Limited is a

More information

Use of Building Automation Systems for (Retro)Commissioning

Use of Building Automation Systems for (Retro)Commissioning Center for Energy and Environment Use of Building Automation Systems for (Retro)Commissioning Neal Ray, Center for Energy and Environment Gustav Brändström, Center for Energy and Environment January 17,

More information

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents

More information

5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations

5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations Ensuring a Successful Transition to Sustainable, High-Performance Operations Ed Tinsley, PE, LEED AP, HFDP, CHFM, CHC Managing Principal, TME, Inc. Agenda What is High Performance Operations? High Performance

More information

Sustainable Building Operations & Upgrades

Sustainable Building Operations & Upgrades Sustainable Building Operations & Upgrades LEED for Existing Buildings 2010 Energy / Facilities Connections Conference Brightworks & Glumac Eric Baxter and Todd McGuire 12 May, 2010 The Value Proposition

More information

Optimizing BAS Information for Operator Effectiveness and Optimal Control

Optimizing BAS Information for Operator Effectiveness and Optimal Control Optimizing BAS Information for Operator Effectiveness and Optimal Control Len Beyea, CBCxP, EBCxP, HBDP, CEM, LEED AP Principal RetroCom Energy Strategies, Inc. AIA Quality Assurance The Building Commissioning

More information

How We Retro-Cx 4M sf in Four Months. St. Louis Green Business Challenge

How We Retro-Cx 4M sf in Four Months. St. Louis Green Business Challenge How We Retro-Cx 4M sf in Four Months St. Louis Green Business Challenge Presenters David Meyers, AIA, CxA, PMP, LEED AP Manager of Commissioning Mr. Meyers is a Certified Commissioning Authority and Program

More information

Re: College of Lake County: AB Wing HVAC Remodeling Programming Mtg #3 Architect s Project Number: Meeting Minutes

Re: College of Lake County: AB Wing HVAC Remodeling Programming Mtg #3 Architect s Project Number: Meeting Minutes March 6, 204 VIA Email College of Lake County 935 West Washington Street Grayslake, Illinois 60030 Re: College of Lake County: AB Wing HVAC Remodeling Programming Mtg #3 Architect s Project Number: 2406.00

More information

Implementing Smart Hospital Systems. Adam R. Bare, PE, LEED APBD+C Stanton Stafford, PE, LEED APBD+C Donald L. Walker, PE, RCDD

Implementing Smart Hospital Systems. Adam R. Bare, PE, LEED APBD+C Stanton Stafford, PE, LEED APBD+C Donald L. Walker, PE, RCDD Implementing Smart Hospital Systems Adam R. Bare, PE, LEED APBD+C Stanton Stafford, PE, LEED APBD+C Donald L. Walker, PE, RCDD Topics I. Planning & Strategy Presented by: Donny Walker II. Implementation

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Three: Mechanical Systems Existing Conditions Evaluation Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date:

More information

What Contractors Need to Know about LEED Commissioning & IAQ Management

What Contractors Need to Know about LEED Commissioning & IAQ Management What Contractors Need to Know about LEED Commissioning & IAQ Management Presented by Energy Ace, Inc. Wayne Robertson, PE, CxA What is Commissioning? Commissioning is a systematic process of assuring that

More information

MBCx: The Next Wave of Energy Savings in Utility Incentive Programs

MBCx: The Next Wave of Energy Savings in Utility Incentive Programs AABC Commissioning Group AIA Provider Number 50111116 MBCx: The Next Wave of Energy Savings in Utility Incentive Programs Course Number: CXENERGY1716 Walid Guerfali, ComEd Ben Talbot, DLR Group Ruairi

More information

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing.

B. ASHRAE 1991 HVAC Applications Handbook: Chapter 34--Testing, Adjusting and Balancing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 230593 TESTING, ADJUSTING, AND BALANCING A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

Energy Saving Calculations for Recommissioning and Design

Energy Saving Calculations for Recommissioning and Design ASHRAE December Chapter Meeting Energy Saving Calculations for Recommissioning and Design Gustav Brändström Angela Vreeland December 13, 2011 Agenda Agenda Introduction Trending and Trend Data TMY and

More information

Mount Sinai Main Hospital Energy Conservation and Demand Management Plan

Mount Sinai Main Hospital Energy Conservation and Demand Management Plan Mount Sinai Main Hospital Energy Conservation and Demand Management Plan Leadership in Energy Efficiency Already at the top quartile of energy performance, Mount Sinai is working towards becoming one of

More information

Commissioning for Energy Savings

Commissioning for Energy Savings Commissioning for Energy Savings Presented To: AEE / ASHRAE / USGBC 2013 Energy Expo St. Paul RiverCentre, St. Paul, Minnesota October 2, 2013 Presented By: Rebecca T. Ellis, PE LEED AP BD+C, CCP, CPMP

More information

Ventilation. Demand-controlled ventilation (DCV) Demand-Controlled. With ASHRAE Standard Based

Ventilation. Demand-controlled ventilation (DCV) Demand-Controlled. With ASHRAE Standard Based CO Demand-Controlled 2 -Based Ventilation With ASHRAE Standard 62.1 Though not as straightforward as it once was, remains a practical way to reduce costs Editor s note: Following is an update of the November

More information

South Carolina Society for Hospital Engineers

South Carolina Society for Hospital Engineers South Carolina Society for Hospital Engineers Selecting Energy Partners: Criteria & Pitfalls and the Top 10 Ways to Reduce Energy in a Hospital Presented by Jon Dierking, PE, CEM, LEED AP Director of Energy

More information

Pepco Holdings, Inc. (PHI) C&I Energy Savings Program Commissioning and O&M Incentives

Pepco Holdings, Inc. (PHI) C&I Energy Savings Program Commissioning and O&M Incentives Pepco Holdings, Inc. (PHI) C&I Energy Savings Program Commissioning and O&M Incentives Brooke Smallwood- Lockheed Martin Brooke is a Program Specialist for Lockheed Martin. Lockheed Martin is the implementation

More information

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa #

REQUEST FOR PROPOSAL. Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # REQUEST FOR PROPOSAL Commissioning Services College of Pharmacy Building Construct New Facility University of Iowa # Addendum #1 Issued Wednesday, February 10, 2016 Changes: Item #01: Item #02: Section

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Italcementi Center for Research and Innovation

Italcementi Center for Research and Innovation Italcementi Center for Research and Innovation Bergamo, Italy LEED-NC v2.1 EAc1 A. Project Narrative (Viridian) analyzed the energy use of the proposed Italcementi Center for Research and Innovation located

More information

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction

Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance

More information

Building Commissioning

Building Commissioning Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,

More information

LEED And Your Indoor Environment

LEED And Your Indoor Environment LEED And Your Indoor Environment An overview of LEED v3 and Indoor Air Quality David McCauley, CIE Council Certified Indoor Environmentalist ACAC CIE #1008005 USGBC's Mission To transform the way buildings

More information

DCAS Energy Management. August 15, 2014 Ellen Ryan & Mike Dipple

DCAS Energy Management. August 15, 2014 Ellen Ryan & Mike Dipple DCAS Energy Management August 15, 2014 Ellen Ryan & Mike Dipple DCAS Energy Management Mission DCAS Energy Management (DEM) serves as the hub for City government s energy management. DEM provides energy

More information

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program

More information

Commissioning Guide. Transportation and Works Building Design and Construction Division

Commissioning Guide. Transportation and Works Building Design and Construction Division Commissioning Guide Transportation and Works December 13, 2013 TABLE OF CONTENTS 1. COMMISSIONING 12 STEP PROCESS... 1 2. PURPOSE OF THE GUIDE... 2 3. INTENT OF COMMISSIONING... 2 4. DEFINITION OF COMMISSIONING...

More information

Chilled Beams. The new system of choice?

Chilled Beams. The new system of choice? Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams

More information

Steps to Making Existing Commercial Buildings Become High Performance. Jim Bochat

Steps to Making Existing Commercial Buildings Become High Performance. Jim Bochat Steps to Making Existing Commercial Buildings Become High Performance Jim Bochat Steps to Advanced Existing Building Energy Performance Presentation s Reference Documents ASHRAE s Energy Efficiency Guides

More information

Optimizing Buildings Using Analytics and Engineering Expertise

Optimizing Buildings Using Analytics and Engineering Expertise Optimizing Buildings Using Analytics and Engineering Expertise Course Code: CEU244 CEU Value:.1 CEU April 2014 Learning Objectives Upon completion of this seminar you will be able to: Define the concept

More information

EnOcean Technology and LEED Enabling Sustainability

EnOcean Technology and LEED Enabling Sustainability Rev A 2010-01-22 Prepared by Building Intelligence Group LLC: Paul Ehrlich, PE Jeffrey Seewald, PE (651) 204-0105 info@buildingintelligencegroup.com www.buildingintelligencegroup.com Building Intelligence

More information

Baffled Openings at Chain Link Fencing: Design shall consist of two end-posts set 4 feet apart, and a 10 foot wide chain-link fence panel equal in height as the adjacent fence. Chain link fence panel shall

More information

SMART COMMISSIONING. Matt Berbée, Caltech Glenn Friedman, Taylor Engineering Jim Meacham, Altura Associates

SMART COMMISSIONING. Matt Berbée, Caltech Glenn Friedman, Taylor Engineering Jim Meacham, Altura Associates SMART COMMISSIONING Matt Berbée, Caltech Glenn Friedman, Taylor Engineering Jim Meacham, Altura Associates Complexity of Smart Buildings Image Source: USGBC m TRADITIONAL COMMISSIONING DESIGN & CONSTRUCTION

More information

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE

DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE DESIGN & CONSTRUCTION PHASE COMMISSIONING PLAN TEMPLATE Based upon B3 Minnesota Sustainable Building Guidelines VERSION 2.1 Notes to the reader have been added to this document within numerous text boxes

More information

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017

CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 CODE REQUIREMENTS FOR BUILDING COMMISSIONING SCOTT WEAVER, PE, QCXP, LEED AP BD+C DIRECTOR, COMMISSIONING DECEMBER 1, 2017 OVERVIEW The recent adoption by the Centers for Medicaid and Medicare Services

More information

Fresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION

Fresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION Fresh Air Ideas SUPPORTING GREEN INITIATIVES WITH INNOVATION SUPPORTING GREEN INITIATIVES WITH INNOVATION As one of the first manufacturers of air movement and control equipment to join the U.S. Green

More information

YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM

YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATORS Regardless of building type or rating system, today s building must be as energy

More information

Introduction. Agenda. New and Existing Facilities. Cx Programs & Terminology. Building Commissioning. Commissioning. D.

Introduction. Agenda. New and Existing Facilities. Cx Programs & Terminology. Building Commissioning. Commissioning. D. New and xisting Facilities D. ric Gregory, CCP Commissioning Manager Sustainable Performance Program Manager mory University eric.gregory@emory.edu (404) 727-1388 Introduction Cx Manager at mory University

More information

Draft Policy for Commissioning/ Retro-Commissioning

Draft Policy for Commissioning/ Retro-Commissioning Draft Policy for Commissioning/ Retro-Commissioning Strategic Plan Task 3.2.4: Deliverable 2.E.3 Funded by: Southern California Edison Company Local Government Strategic Plan Strategies Program 2010 2012

More information

Integration of Controls

Integration of Controls Integration of Controls Rick Aeder Glumac Patty Anderson McKinstry AIA Quality Assurance Learning Objectives 1. Provide an understanding of how expanding the utilization and function of the Building Automation

More information

Centre for Addiction and Mental Health Queen Street Campus Energy Conservation and Demand Management Plan

Centre for Addiction and Mental Health Queen Street Campus Energy Conservation and Demand Management Plan Centre for Addiction and Mental Health Queen Street Campus Energy Conservation and Demand Management Plan In Transition to Sustainable Infrastructure The Centre for Addiction and Mental Health is in the

More information

Energy modeling in IDA ICE according to ASHRAE , app. G

Energy modeling in IDA ICE according to ASHRAE , app. G Energy modeling in IDA ICE according to ASHRAE 90.1-2007, app. G About this document This document is a user s guide for a relatively experienced IDA ICE operator for using the 90.1 add-in and for performing

More information

Advantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure

Advantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure Advantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure Guanghua Wei, P.E. Malcolm Verdict, C.E.M Joseph T. Martinez Energy Systems Laboratory, 3581 TAMU Texas A&M University

More information

Sustainable Maintenance Best Practice: Energy Efficiency in the Carbon Free World. Michel Abi Saab. Team Leader, Energy Efficiency LEED AP, CEM, CMVP

Sustainable Maintenance Best Practice: Energy Efficiency in the Carbon Free World. Michel Abi Saab. Team Leader, Energy Efficiency LEED AP, CEM, CMVP Sustainable Maintenance Best Practice: Energy Efficiency in the Carbon Free World Michel Abi Saab Team Leader, Energy Efficiency LEED AP, CEM, CMVP Masdar Insert Date3rd Here September 2015 ABSTRACT A

More information

LEEDv4: What s New? February 18, 2016

LEEDv4: What s New? February 18, 2016 LEEDv4: What s New? February 18, 2016 CLAYTON BARTCZAK, LEED-AP BD+C Sustainable Design Team Leader TRACEY WHALEY, PE, FPE, CxAP Commissioning Team Leader 2016 Ambient Energy all rights reserved. 2015

More information

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods LEED An Introduction to LEED V3 2009 LEED Leadership in Energy and Environmental Design A voluntary, consensus-based national standard for developing high-performance, sustainable buildings and neighborhoods

More information

Introduction. ED02 White Paper Paul Meyer, PE, LEED AP BD+C, CEM, CBCP Senior Vice President, Commissioning WSP Parsons Brinckerhoff 1

Introduction. ED02 White Paper Paul Meyer, PE, LEED AP BD+C, CEM, CBCP Senior Vice President, Commissioning WSP Parsons Brinckerhoff 1 Building Enclosure Commissioning as Part of LEED V4 Total Commissioning Package Paul Meyer, PE, LEED AP BD+C, CEM, CBCP Senior Vice President, Commissioning WSP Parsons Brinckerhoff Learning Objectives:

More information

LEED 2009 for New Construction and Major Renovations

LEED 2009 for New Construction and Major Renovations LEED 2009 for New Construction and Major Renovations Bayshore District Operations Building Project Checklist 4.28.6 20 4 0 Sustainable Sites Possible Points: 26 Y? N d/c Notes: Y C Prereq Construction

More information

CARRIER PRODUCTS AND LEED CERTIFICATION

CARRIER PRODUCTS AND LEED CERTIFICATION CARRIER PRODUCTS AND LEED CERTIFICATION Carrier Cpation Syracuse, New Yk August 2007 TABLE OF CONTENTS INTRODUCTION... 3 LEED RATING SYSTEM OVERVIEW... 4 LEED FOR NEW CONSTRUCTION... 4,5 ENERGY & ATMOSPHERE

More information

IECC Commercial Significant Changes Summary Tier I

IECC Commercial Significant Changes Summary Tier I 2009-2015 IECC Commercial Significant Changes Summary Tier I The first change is in the layout of the book. Instead of having Chapters 1-3 that applied to all projects and then having Chapter 4 Residential

More information

NAVFAC SOUTHWEST / OICC MCIWEST. World Class Construction Forum Commissioning

NAVFAC SOUTHWEST / OICC MCIWEST. World Class Construction Forum Commissioning NAVFAC SOUTHWEST / OICC MCIWEST World Class Construction Forum Commissioning 17 August 2011 Agenda 0830-0845: Welcome Aboard & Forum Introduction 0845-0900: Commissioning 0900-1015: Commissioning Lessons

More information

The ENERGY DETECTIVE. Where Is Your Home Losing Money? Find out with The Energy Detective Call Home Energy Analysis Program

The ENERGY DETECTIVE. Where Is Your Home Losing Money? Find out with The Energy Detective Call Home Energy Analysis Program The ENERGY DETECTIVE Where Is Your Home Losing Money? Find out with The Energy Detective Call 800-858-5522 Home Energy Analysis Program What Is a Home Energy Analysis? You probably know that upgrading

More information

WELCOME. Page 1. WELCOME to the Building Environmental Comfort Verification Survey.

WELCOME. Page 1. WELCOME to the Building Environmental Comfort Verification Survey. WELCOME WELCOME to the Building Environmental Comfort Verification Survey. By answering a few brief questions, you can provide valuable information to assist in maintaining or improving temperature and

More information

Voyager kw rooftop units Plug and Play comfort in commercial applications

Voyager kw rooftop units Plug and Play comfort in commercial applications Voyager 17-165 kw rooftop units Plug and Play comfort in commercial applications Top efficiency, flexibility, reliability Eurovent certification for the Voyager range guarantees accurate performance data

More information

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program

Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Environmental Stewardship Conference October 05, 2013 Energy Water and Sustainability (EWaS) Program Agenda EWaS Overview History Who is EWaS? Mission EWaS Standards & Tools Energy Efficiency HVAC equipment

More information

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program

COMMERCIAL LOAD ESTIMATING. Load Estimating Level 3: Block and Zone Loads. Technical Development Program COMMERCIAL LOAD ESTIMATING Load Estimating Level 3: Block and Zone Loads Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design,

More information

Beyond Advanced Lighting Controls: Reaching Net Zero with Integrated Building Controls

Beyond Advanced Lighting Controls: Reaching Net Zero with Integrated Building Controls Beyond Advanced Lighting Controls: Reaching Net Zero with Integrated Building Controls James Donson, Jon Schoenfeld and Bruce Chamberlain, kw Engineering ABSTRACT Many manufacturers offer proven ALC systems

More information

Building Automation Systems

Building Automation Systems Published on Business Energy Advisor (https://alliantenergy.bizenergyadvisor.com) Home > Building Automation Systems Building Automation Systems The building automation system (BAS) has become the accepted

More information

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

LEED Application Guide for Multiple Buildings and On-Campus Building Projects LEED Application Guide for Multiple Buildings and On-Campus Building Projects For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Released October 31, 2011

More information

Creating Environmentally Sustainable Buildings TM

Creating Environmentally Sustainable Buildings TM Case Studies of Performance Contracting in Higher Education Presented by Wayne Robertson, PE Energy Ace, Inc. Energy Ace, Inc. Energy Issues Energy Costs Rising At the same time, budgets are being cut

More information

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

How to Reduce Energy Use in Your Labs by Up to 50%

How to Reduce Energy Use in Your Labs by Up to 50% How to Reduce Energy Use in Your Labs by Up to 50% Illinois Chapter of ASHRAE April 11, 2017 Dan Doyle, Chairman Grumman/Butkus Associates 1 Course Description Labs have high exhaust requirements and large

More information

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA

Commissioning: The Most Important Component of LEED. Rick Miller, PE, LEED AP. RNM Engineering, Inc. San Luis Obispo, CA Commissioning: The Most Important Component of LEED by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA LEED and Commissioning EA Prerequisite Fundamental Commissioning of Building Energy

More information

Promoting Building Energy Efficiency through Performancebased Standards: Is it a Challenge? By Priyantha Bandara

Promoting Building Energy Efficiency through Performancebased Standards: Is it a Challenge? By Priyantha Bandara Promoting Building Energy Efficiency through Performancebased Standards: Is it a Challenge? By Priyantha Bandara Senior Lecturer General Sir John Kotelawala Defence University, Sri Lanka & Rahula Attalage

More information

ENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN

ENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN ENERGY AND WATER CONSERVATION AND DEMAND MANAGEMENT PLAN 2014 2019 CONTENTS EXECUTIVE SUMMARY... 3 1. CENTENNIAL COLLEGE - DISTRIBUTION OF ENERGY CONSUMPTION IN 2012... 4 1.1. Overview of Centennial College

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction March 7, 2013 Re: Request for Proposals- Commissioning Services Mayflower Hall Permanent Flood Recovery & Mitigation (UI# 0200201) University of Iowa

More information

Bryant University s Energy Guidelines for Sustainability

Bryant University s Energy Guidelines for Sustainability Bryant University s Energy Guidelines for Sustainability Rising carbon emissions have a disruptive impact on global climate patterns and pose a risk to the security of communities around the world. The

More information

Construction Specifications Canada Conference May 23, BOMA BESt

Construction Specifications Canada Conference May 23, BOMA BESt Construction Specifications Canada Conference May 23, 2013 BOMA BESt Creating a sustainable environment one building at a time. BOMA Calgary BOMA Canada BOMA Calgary BOMA BESt local administrator BOMA

More information

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard

Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Evaluation of Energy Savings of the New Chinese Commercial Building Energy Standard Wei Feng, Ke Huang, Mark Levine and Nan Zhou, Lawrence Berkeley National Laboratory Shicong Zhang, Lawrence Berkeley

More information

Energy Efficiency, Clean Energy, Sustainability:

Energy Efficiency, Clean Energy, Sustainability: Energy Efficiency, Clean Energy, Sustainability: Industry Perspectives and ERS Services Main Headquarters: 120 Water Street Suite 350 North Andover, MA 01845 With offices in: NY, ME, TX, CA, OR November

More information

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES

Texas Hospital. Central Plant Redesign. Central Utility Plant SECOND PLACE HEALTH CARE FACILITIES, EXISTING 2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES This article was published in ASHRAE Journal, January 2014. Copyright 2014 ASHRAE. Posted at www. ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission

More information

ASHRAE 62.2: What s New in 2016

ASHRAE 62.2: What s New in 2016 ASHRAE 62.2: What s New in 2016 Rick Karg 2016 Residential Energy Dynamics, LLC What We Will Talk About Overview of mechanics of 62.2-2016. Logic behind the Standard. Sizing local ventilation (exhaust-only).

More information