1 The Benefits of Building Commissioning Jay Cederberg, P.E. Energy Solutions Specialist
2 All of these jobs would work nicely and probably give satisfaction if the man who knew the most or paid the most attention to detail had the low bid. Edward Richmond Pierce October, 1911
3 What is Commissioning? Commissioning is a process to verify that the owner has received what they contracted for during the programming and design phases and during the construction phase. It also gives them a comfortable feeling of knowing someone is looking out for them throughout the project and the 1 st year of occupancy It also verifies that the architects and engineers have received what was designed and approved
4 What Commissioning is NOT Test and Balance Start-up Plan Review Design Contract Administration Inspection
5 The Principal Goal of Commissioning The Principal Goal of the Commissioning Process is: The identification and correction of deficiencies and problems as early in the process as possible.
6 Scope The Commissioning Scope must be defined prior to entering into a commissioning contract: Whole Building Commissioning Pre-design through 1 yr warranty System Commissioning HVAC Plumbing Electrical Fire Alarm Etc.
7 Systems Commissioning Systems commissioning is just one piece of the Total Building Commissioning Process Verifies operation of components under various conditions Verifies interaction between systems and subsystems Documents performance of systems to design criteria Instructs building personnel on proper operation of systems Ongoing after building occupancy as requirements change
8 Benefits of Commissioning Project gets completed on time Establish & maintain energy and maintenance budgets Change orders are greatly reduced Claims are greatly reduced Punch list is non-existent Operators have correct training Enforce Start-Up Requirements Reduce Post-Occupancy Corrective Work
9 Benefits of Commissioning (Cont.) Reduce Operating Costs Develop lasting professional relationships Buildings and systems are operating as owner predicted Minimize Effects of Design Defects Improve Indoor Environment and Employee Production Increase Value through Better Quality construction Improve Energy Efficiency
10 So how can the commissioning process help improve energy efficiency?
11 Top 10 Deficiencies Discovered during Commissioning (Carl Lawson) Incorrect scheduling of HVAC and Lighting equipment Incorrect heating and cooling Sequence of Operation Incorrect Calibration of Sensors and Instrumentation Lack of control strategies for optimum comfort and efficient operation Malfunctioning air and water side economizers
12 Top 10 Deficiencies Discovered during Commissioning (cont.) Under-utilized computer-based control systems Short cycling of HVAC equipment leading to premature failure Lack of design intent and building documentation Lack of training for building operators or service contractors on complex systems
13 Energy Savings Examples Schedules Outside Air Reset Infiltration
14 Energy Savings Examples E-Quest Model 25,000 square foot two story office building Billings, MT Typical VAV system
15 Energy Savings Example #1 Schedules No schedules specified in construction documents Owner occupancy is 7:00 to 6:00 4 days per week Programmer assumed 8 to 5 occupancy 5 days per week Annual Energy Savings: Electricity - $739 Nat. Gas - $486 Total - $1225
16 Energy Savings Example #2 Outside Air Reset Specifications - HW Reset schedule: O.A.: 65 deg F - ->HW supply Temp.: 140 deg. F O.A.: 0 deg F - ->HW Supply Temp: 180 deg. F Cold Deck Reset schedule: O.A.: 80 deg F - ->Supply Air Temp.: 55 deg. F O.A.: 60 deg F - ->Supply Air Temp: 65 deg. Programmer did not include any reset schedules Annual Energy Savings: Electricity: $423 Nat. Gas: $4045 Total: $4468
17 Energy Savings Example #3 Infiltration Architecural Plans provided for a relatively tight building having a infiltration rate of cfm per sq ft Poor Construction and incorrect pressure relationships resulted in an actual building infiltration rate of cfm per sq ft Annual Energy Savings: Electrical - $86 Nat. Gas - $755 Total - $841
18 What about existing buildings? An estimated 85% of buildings that will exist in urban areas in 2030 have already been built. Retro Commissioning Re-Commissioning
19 Retro Commissioning Commissioning an existing building that has never been commissioned Only 5% to 10% of existing buildings have been commissioned 15% to 50% Energy Savings
20 Re-Commissioning Commissioning an existing building that has previously been commissioned Of the 5% to 10% of buildings that have been commissioned, few are ever re-commissioned 5% to 30% Energy Savings
21 Continuous Commissioning On-going Commissioning of an existing building Annual Energy Savings of 5% to 30%
22 Training a necessity Control Systems Maintenance Schedules Occupied/Unoccupied Schedules Set point adjustments Alarms Training should be in a classroom setting and also at the respective piece of equipment Use factory trainers not the local sales rep
23 Commissioning Where it is going It is mandatory to commission all LEED projects to a specified level Some states have mandated that state owned or leased buildings be commissioned US FEDERAL GSA has mandated that GSA buildings be commissioned More and more hospitals are now requiring commissioning Commissioning is a standard in Canada
24 Commissioning Where is it going? Your Thoughts....
25 Coil Damaged
26 It Gets Cold When I Make Coffee
27 No Outside Air
28 Who Got There First?
29 Labeling?
30 Questions Thank You Jay Cederberg Mechanical Technology Inc Billings, Montana Phone
How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.
How LEED & The Retro-Commissioning Credits Produce Energy Savings James Vallort Vice President Environmental Systems Design, Inc. Retro-Commissioning Today s session will focus on the following items:
More informationCommissioning for the 2015 IECC Code. Lunch & Learn Presentation O Connell Robertson - TEMA March 10, 2016
Commissioning for the 2015 IECC Code Lunch & Learn Presentation O Connell Robertson - TEMA March 10, 2016 Learning Objectives Impact of Statewide Change from IECC 2009 to IECC 2015 At the end of this program,
More informationCommissioning & Retro-Commissioning Meet Energy Code
Commissioning & Retro-Commissioning Meet Energy Code Agenda Introductions What is Commissioning Value of Commissioning Code Required Cx Process Customize your Cx Process What documentation should be expected
More informationRetro-Commissioning for Existing Facilities
Retro-Commissioning for Existing Facilities Tom Meyer Director, Technical Programs National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, Maryland 20877 (301) 977-3698 www.nebb.org
More informationAn Introduction to The Retro-Commissioning Process For Existing Buildings
An Introduction to The Retro-Commissioning Process For Existing Buildings By: Robert L. (Bob) Towell, P.E., LEED AP, QCxP and Robert Haskell, EIT Retrocommissioning (RCx) is the application of the commissioning
More informationAbsolute Energy Raters Commissioning Plan Outline Template
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. Absolute Energy Raters is not rendering advice concerning any commission project or practices. This document is neither
More informationBuilding Control Strategies That Work to Improve Your Energy Bottom Line
Building Control Strategies That Work to Improve Your Energy Bottom Line William D. (Skip) Milton MBA, CEM, CEA Assistant Director of Facilities Operations Texas Children s Hospital Objective: Learn how
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction September 24, 2014 Re: Request for Proposals- Commissioning Services Hardin Library for Health Sciences Upgrade Building Systems # University of Iowa
More informationBuilding Retro-Commissioning
Building Retro-Commissioning Greg Swiss SEDAC Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign WHAT IS RETRO-COMMISSIONING? Commissioning
More informationBuild it Right the First Time: Building Envelope Commissioning/ Retro-Commissioning
Build it Right the First Time: Building Envelope Commissioning/ Retro-Commissioning NFMT 2016 T. Stephen Kisielnicki, RWC, LEED AP, BECxP March 24, 2016 About Gale Building Envelope Technology Roof, walls,
More informationA Building Commissioning Overview. Presented by: Goetting & Associates Commissioning
A Building Commissioning Overview Presented by: Goetting & Associates Commissioning www.goettingcx.com What is the Definition of Commissioning? Building Commissioning is a Quality Assurance Process of
More informationDESIGN AND CONSTRUCTION STANDARDS OUTLINE SPECIFICATIONS
SECTION 01 91 13 GENERAL COMMISSIONING REQUIREMENTS GENERAL The University of South Alabama is officially and formally committed to the concept of Commissioning all new buildings and major renovations.
More informationRETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE
RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT Adam Renzi, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute
More informationExisting Building Commissioning (or Retro-Commissioning)
SOUTHEAST REGION Existing Building Commissioning (or Retro-Commissioning) SERBCA Annual Meeting Covington, KY December 6, 2013 Session Learning Objectives o Definition of Existing Building Cx / RetroCx
More informationBanyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL
SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationCommissioning Toolkit for In-House Commissioning of Small Buildings
1 Commissioning Toolkit for In-House Commissioning of Small Buildings Dan Burgoyne Sustainability Manager California Department of General Services California Commissioning Collaborative April 12, 2007
More informationINFRASTRUCTURE ONTARIO
INFRASTRUCTURE ONTARIO 2015 BUILDING SYSTEMS DESIGN GUIDELINE INSTRUMENT NO. 2.1.2.T3V1 DECEMBER 12 TH, 2014 INFRASTRUCTURE ONTARIO 2015 Building Systems Design Guideline 1 This document is intended for
More informationWireless Pneumatic Thermostats:
Wireless Pneumatic Thermostats: Quality Commissioning is Essential Peter Pollard, P.E. Principal kw Engineering AIA Quality Assurance The Building Commissioning Association is a Registered Provider with
More informationCommissioning In Energy Savings Performance Contracts
Commissioning In Energy Savings Performance Contracts Karl Stum, P.E., Portland Energy Conservation Inc. (PECI) ABSTRACT Energy savings performance contracts (PCs) using the international measurement and
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014
1 Commissioning at NYP Joseph Lorino, PE, LEED Corporate Director April 1, 2014 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program NYP Commissioning Process
More informationFact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY?
Commissioning Fact Sheet Funding for this publication is provided by the Northwest Energy Efficiency Alliance. OCTOBER 2017 VOLUME 1, ISSUE 2 WHAT IS THE PURPOSE OF THIS REQUIREMENT? There is a saying
More informationAttachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #
UCF Design, Construction, and Renovation Standards Attachment 04 Substantial and Final Completion Approval Form Project Description Project # Date of Completion Permit # Phone # Intent: This Substantial
More informationExecutive Summary. Sample Company. BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA PHONE: FAX:
Executive Summary Sample Company BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA 17070 PHONE: 717-697-6300 FAX: 717-697-1699 Executive Summary Sample Company has constructed a 80,000 sf. addition
More informationRE-COMMISSIONING BY: BERNARD (BERNIE) W. NELSON P. ENG., PE., LEED AP, CEM C.E.S. GROUP. <insert your logo here> Twitter hashtag: #psforum
RE-COMMISSIONING BUILDINGS BY: BERNARD (BERNIE) W. NELSON P. ENG., PE., LEED AP, CEM THE COMMISSIONING PROCESS (Cx) The commissioning process: ASHRAE guideline 0-2005 definition: A quality-focused process
More informationNEBBinar: Retro-Commissioning for Comfort and Energy Efficiency. August 21, 2013
NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency August 21, 2013 0 Moderator Jim Huber, NEBB Vice President and President of Complete Commissioning Jim Huber is the President of Complete
More informationOwner Project Requirements
Owner Project Requirements How to get what you need From an Owner s Perspective Learning Objectives What is an OPR Case Study (CHC) Looking to the Future Closing Arguments Crafton Hills College 1 What
More informationDIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING
DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING Purpose: The purpose of this Directive is to describe, in outline, the requirements of Commissioning on SUCF Projects. 1. Applicability a. New York
More informationGeorge Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING
George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING AIA Quality Assurance Learning Objectives Demonstrate global results of the analysis of energy
More informationCOMMISSIONING for LEED New and Existing Buildings
Better Buildings By Design Conference Burlington, Vermont February 11-12. COMMISSIONING for LEED New and Existing Buildings Ron Wilkinson, P.E., LEED AP rwilkinson@akf-eng.com AKF Group, LLC What is Commissioning?
More information5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations
Ensuring a Successful Transition to Sustainable, High-Performance Operations Ed Tinsley, PE, LEED AP, HFDP, CHFM, CHC Managing Principal, TME, Inc. Agenda What is High Performance Operations? High Performance
More informationTHE COTTAGE at THORNAPPLE Hastings, Michigan
THE COTTAGE at THORNAPPLE ADDENDUM NO. 2 March 07, 2012 The Cottage at Thornapple 2580 Nashville Road Hastings, MI 49058 Owner: Barry County / Thornapple Manor 2700 Nashville Road Hastings, MI 49058 Architect:
More informationCUSTOMER FACILITY INFORMATION
This Project Information Form provides a template to collect project systems and equipment information and specifications. In addition, this form serves as a general overview of eligibility criteria for
More informationCan You Afford Not To Retro-Commission Your Facility In These Lean Times? Wednesday, October 3, :00pm 2:15pm
Can You Afford Not To Retro-Commission Your Facility In These Lean Times? Wednesday, October 3, 2012 1:00pm 2:15pm Presenters Bruce Pitts bpitts@woodharbinger.com Len Rozek lrozek@ecube.com Mark Howe cmarkhowe@yahoo.com
More informationLEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering
LEED Commissioning and Actual Energy Use John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering AIA Quality Assurance Learning Objectives 1. Why Best Practice and Fundamental Commissioning are
More informationMay 17 th New Youth Services Center Architect s Contract Amendment Building Commissioning Services. Dear Mr. Carrizal:
May 17 th 2011 Ernie Carrizal, P.E. County of El Paso, Texas Road & Bridges Public Works Administration 500 E. San Antonio, 4 th Floor El Paso, Texas 79901 Re: New Youth Services Center Architect s Contract
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction November 26, 2014 Re: Request for Qualifications - Commissioning Services Bowen Science Building Modernize Building Systems University of Iowa The
More informationCommissioning & Retro-Commissioning Helping You Get the Most of Your Facilities
Commissioning & Retro-Commissioning Helping You Get the Most of Your Facilities John Rimer, CFM Introduction John Rimer, CFM 16+ Years Facility Management Numerous Industries & Various Roles Owner, FM360
More informationStrategies for Persistence: Measurement and Verification. Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions
Strategies for Persistence: Measurement and Verification Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The
More informationCase Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency
Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency Summary Major Fortune 500 Telecom Company Estimated 40% the corporate building portfolio still use pneumatic thermostats
More informationB. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section.
SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division
More informationPersistence Tracking in a Retro-commissioning Program
Persistence Tracking in a Retro-commissioning Program Mike Eardley Architectural Energy Corporation Synopsis The persistence of energy savings and electrical demand reductions created by retrocommissioning
More informationCommissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015
1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program
More informationCommissioning: What Architects Need to Know
Commissioning: What Architects Need to Know Rino Zan P.Eng., Morrison Hershfield Ltd. rzan@morrisonhershfield.com Ontario Association of Architects May 12 & 13, 2016 Commissioning: What Architects need
More informationBuilding Commissioning
Building Commissioning Roles, Responsibilities, and Benefits 2010 ASHRAE Annual Meeting CxA WORKSHOP Saturday, June 26, 2010 Jim Magee, CxA, LEED-AP Facility Commissioning Group Overview Cx Advocacy, Economics,
More informationComparison of Air Distribution Systems
of Air Distribution s vs. s & s Presentation Outline & s Distribution Conclusion & s & s Project Team Owner - Capital One Financial Corporation Owner s Rep - Jones Lang LaSalle Architect - Ai Architecture
More informationHigher Value Commissioning
Higher Value Commissioning Presented by: Erik Jeannette, PE May 2011 Commissioning What is it? Commissioning (Cx) is a comprehensive and systematic process to verify and document the systems of a facility
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 018 TITLE: SYSTEM TESTING AND START-UP APPROVED:
More informationExisting Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne
Existing Building Cx: Processes & Results A Cultural Journey Barry Abramson Senior Vice President Servidyne AIA Quality Assurance Learning Objectives 1. Define the key steps in the process of retrocommissioning
More informationThe Nuts and Bolts of the Commissioning Process
The Nuts and Bolts of the Process May 2, 2007 10:30 Noon 15 th National Conference on Building Where the Industry Meets Agenda Introduction Getting started When is commissioning required? Choosing a commissioning
More informationFACILITIES MANAGEMENT
FACILITIES MANAGEMENT Planning, Design & Construction February 26, 2015 Re: Request for Proposals- Commissioning Services College of Public Health Building - Fit Out Fifth Floor University of Iowa The
More informationCommissioning of Homes
Commissioning of Homes for 2018 Energy Design Conference By Mike D. Wilson Dakota Supply Group In accordance with the Department of Labor and Industry s statute 326.0981, Subd. 11, This educational offering
More informationNext Connecticut Energy Code
Connecticut Chapter Association of Energy Engineers Next Connecticut Energy Code 1 Next Connecticut State Building Code n 2012 International Building Code n 2012 International Existing Building Code n
More informationRetro-commissioning and on-going commissioning 23 November 2016
Retro-commissioning and on-going commissioning 23 November 2016 1 CONTENTS 1. Needs for Retro-Commissioning (RCx) 2. Retro-Commissioning (RCx) Definition and Scope 3. Briefing of RCx Process 4. Alternative
More informationDanville Utilities Home$ave Program Manual
2017-2019 Danville Utilities Home$ave Program Manual Version 063017 This Program Manual is intended to serve as a reference manual for the residential customers of Danville Utilities that are interested
More informationRetro-Commissioning for Energy Efficiency
High Performance Buildings 2006 AABC Commissioning Group (ACG) April 6, 2006 Retro-Commissioning for Energy Efficiency Making buildings work. Better. Tom Poeling, P.E., CEM, LEED AP E M C Engineers, Inc.
More informationImplementing Smart Hospital Systems. Adam R. Bare, PE, LEED APBD+C Stanton Stafford, PE, LEED APBD+C Donald L. Walker, PE, RCDD
Implementing Smart Hospital Systems Adam R. Bare, PE, LEED APBD+C Stanton Stafford, PE, LEED APBD+C Donald L. Walker, PE, RCDD Topics I. Planning & Strategy Presented by: Donny Walker II. Implementation
More informationCodes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS
Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute
More informationOpening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction
Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP AIA Quality Assurance
More informationA. The purpose of this section is to specify Division 23 responsibilities in the commissioning process.
SECTION 23 99 50 - (ADD#4) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationCxA Gap Session. April 25, :00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP
CxA Gap Session April 25, 2017 2:00 p.m. 4:30 p.m. Instructors: Derek De Jesús, CxA, LEED AP Darren Draper, PE, CxA, LEED AP AIA Provider Number 50111116 Course Description This session and short quiz,
More informationCapital Projects Group Mechanical Work Commissioning Specification
Capital Projects Group Mechanical Work Commissioning Specification Specification 20 05 40 Revision 0 Date: August 2018 Mechanical Work Commissioning Specification Specification 20 05 40 Publication Date:
More informationJim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC
Jim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC LEED is an voluntary Rating System with Design Guidance The intent of ASHRAE 189.1 is to: Codify the minimum requirements of a high
More informationNavigating Vermont s New Core Performance Guide. Session Overview 2/18/2008
Navigating Vermont s New Core Performance Guide Jonathan Kleinman, Efficiency Vermont Mark Frankel, New Buildings Institute Better Buildings by Design Conference Burlington, VT February 13, 2008 1 Session
More informationXavier Energy Initiative
Xavier Energy Initiative By Ron Perkins Report of August Site Visit To paraphrase Blaise Pascal, if I had more time I would have written a shorter report. In deference to those who do not share my enthusiasm
More informationSteve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University
Post Occupancy Building Commissioning Successes through Continuous Commissioning Steve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University AIA Quality Assurance
More informationRetrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System
Retrocommissioning Within the U.S. Green Building Council s LEED for Existing Buildings (LEED-EB) Certification System Eric Baxter, Hannah Friedman, Larry Luskay, and Tudi Haasl, Portland Energy Conservation,
More informationIntroduction. Agenda. New and Existing Facilities. Cx Programs & Terminology. Building Commissioning. Commissioning. D.
New and xisting Facilities D. ric Gregory, CCP Commissioning Manager Sustainable Performance Program Manager mory University eric.gregory@emory.edu (404) 727-1388 Introduction Cx Manager at mory University
More informationFundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619
AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,
More informationEnergy Strategies That Work
Energy Strategies That Work Emmy Presenter s Riley, Building name Professional Energy Specialist Title (eg. architect/energy Illini Center specialist..) 10-10-12 Smart Energy Design Assistance Center (SEDAC),
More informationAir-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels
Air-Water Systems and Beams Early 1980 s 1980 1990 2005 Buildings well insulated for heating Advent of personal computers Need to remove heat from space Limited space available TROX USA 1 2 Principle of
More informationRetrocommissioning Investigation Report
Continuous Optimization for Commercial Buildings Program Retrocommissioning Investigation Report March 22, 2013 Prepared for: Thompson Rivers University International Building BC Hydro #:COP10-353 Prism
More informationCommissioning In Schools
Commissioning In Schools Why are schools doing commissioning? What challenges do K-12 schools face? How has a School District Approached Cx? Examples LEED Small/Private Chicago Public Schools School Commissioning
More informationBuilding Optimization: Recommissioning Your Building to Deliver Peak Performance
Building Optimization: Recommissioning Your Building to Deliver Peak Performance Recommissioning uses simple solutions to improve building performance, value, and employee productivity. March 2009 / White
More informationB. OPR and BoD documentation may be included by reference for information only.
SECTION 01 91 13 - GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other
More informationCommissioning for Energy Savings
Commissioning for Energy Savings Presented To: AEE / ASHRAE / USGBC 2013 Energy Expo St. Paul RiverCentre, St. Paul, Minnesota October 2, 2013 Presented By: Rebecca T. Ellis, PE LEED AP BD+C, CCP, CPMP
More informationENHANCED BUILDING OPERATIONS PROGRAM
ENHANCED BUILDING OPERATIONS PROGRAM TABLE OF CONTENTS Introduction 1 Building eligibility 2 How to take part 3 Financial incentives 4 Technical assistance and guide 5 System investigation templates 5
More informationEnergy Efficiency Opportunities in the OR
Energy Efficiency Opportunities in the OR John D. Villani, P.E. Vice President, Grumman/Butkus Associates Laurence Steiner, P.E. Associate Vice President, Grumman/Butkus Associates BUILD. CONNECT. ACHIEVE.
More informationDUKE UNIVERSITY CONSTRUCTION STANDARDS
1 23 08 00 Commissioning of HVAC Systems 1. GENERAL A. GENERAL PROVISIONS 1. Drawings and general provisions of the Contract, including General Conditions and Division - 1 Specifications Sections, apply
More information9/13/2011. Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center. Terry Malloy P.E., Cxa, Project Manager, Teng & Associates
Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center September 21 st, 2011 4:15pm 5:15pm Terry Malloy P.E., Cxa, Project Manager, Teng & Associates Energy consumption (BTU/SF) in
More informationFacility Department Integration
Facility Department Integration FACILITIES DEPARTMENT INTEGRATION - CUSTODIAL, MAINTENANCE, AND CAPITAL IMPROVEMENTS The primary role of the District s Facilities Department is to support the students
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationCustom Application 2018 Retrofit Program
The Retrofit Program is designed for Commercial and Industrial (C&I) customers to help replace aging and inefficient equipment and systems with more energy efficient technologies. Tailored to a customer's
More informationNEBBinar: Managing Building Performance through Commissioning. March 28, 2013
NEBBinar: Managing Building Performance through Commissioning March 28, 2013 0 Moderator Jim Huber, NEBB Vice President and President of Complete Commissioning Jim Huber is the President of Complete Commissioning.
More informationRisk Management. What do I want on my SATs? Wayne A. Dunn PE
Risk Management What do I want on my SATs? Why are there SAT s? College Board 1901-purpose eliminate bias 1926: Became Scholastic Aptitude Test 1930: arithmetic added then subtracted in 1936 1942: math
More informationand LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist
ASHRAE University of Illinois Student Chapter April 20, 2011 Building Energy Efficiency and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist Building Research Council,
More informationTechnical Retro-Commissioning of Existing Buildings
Standard S0 0 0 Technical Retro-Commissioning of Existing Buildings Review Draft (--) This draft has been recommended for public review by the responsible project committee. To submit a comment on this
More informationWhy Did I Commission
Why Did I Commission Gretchen & Mark Biedron Owners - Co-Founders General Contractor Parents The Willow School Develop Future Leaders PREMISE Man is part of the natural cycle, we are not here to control
More informationIII. Economics. A. General Page III-2 B. Initial Capital Costs Page III-3 C. Life Cycle Costs Page III-4
III. Economics Use of AERCON resulted in 3-month schedule reduction on this $23 million, 245,000-sq. ft. Residence Hall Complex. A. General Page III-2 B. Initial Capital Costs Page III-3 C. Life Cycle
More informationThe Building Systems Detective
Building Re-Commissioning Presented By Greg Bradshaw, CEM The Building Systems Detective Bradshaw Building Solutions, Inc. 303-475-77147714 greg@bradshawbuildingsolutions.com Introduction Re-Commissioning
More informationMATERIAL ALLOWANCES AND UNIT PRICES
PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to
More informationSMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses
SMART HVAC & LIGHTING SYSTEMS Savings From Two Major C&I End Uses September 21, 2016 PRESENTATION OVERVIEW Why this focus? Significant savings potential Smart controls coupled with more efficient technologies
More informationOUR EXPERIENCE WITH RCX SOFTWARE: TRIUMPHS AND CHALLENGES
OUR EXPERIENCE WITH RCX SOFTWARE: TRIUMPHS AND CHALLENGES By Celeste L. Cizik, PE, CEM, PMP, LEED-AP Group14 Engineering, PBC. ABSTRACT With the ever increasing complexity in commercial building HVAC and
More informationHPBS [ HIGH PERFORMANCE BUILDING STANDARD]
HPBS [ HIGH PERFORMANCE BUILDING STANDARD] STATE OF MONTANA HIGH PERFORMANCE BUILDING STANDARDS MINIMUM REQUIREMENTS FOR ALL PROJECTS UNDER 17-7-201, MCA PART 2 1.1 DESIGN AND DOCUMENTATION A. Incorporate
More informationRequest for Proposal. for. Building Commissioning Services
Page 1 of 11 Request for Proposal for Building Commissioning Services State College Area School District High School Project December 15, 2014 Page 2 of 11 Request for Proposal for Building Commissioning
More informationAdvantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure
Advantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure Guanghua Wei, P.E. Malcolm Verdict, C.E.M Joseph T. Martinez Energy Systems Laboratory, 3581 TAMU Texas A&M University
More informationReducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE
Reducing Hospital Energy Use and Maintaining Savings Glen Anderson, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing
More informationRCi. roof consultants, inc. Thank you for your interest in Roof Consultants, Inc.
Thank you for your interest in Roof Consultants, Inc. We have been providing quality services for building owners and managers for over 30 years and have over 100 years of combined experience in the roofing
More informationRefrigerant Charge Verification
(Page 1 of 5) A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 System Identification or Name 02 System Location or Area Served
More informationAE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems Option
Senior Thesis Program The Department of Architectural Engineering The Pennsylvania State University University Park, PA 2016-2017 AE 481-COMPREHENSIVE SENIOR PROJECT I Building Mechanical & Energy Systems
More informationEnergy Efficiency Improvement of an Institutional Facility through Retro-Commissioning (RCx) A Case Study
Energy Efficiency Improvement of an Institutional Facility through Retro-Commissioning (RCx) A Case Study Lonny Simonian, P.E. and Thomas Korman, Ph.D., P.E. California Polytechnic State University San
More information