1 Shelburne Basin Venture Exploration Drilling Project Environment Report for Cheshire L-97A Project Shelburne Basin Venture Exploration Drilling Project Document Title Environmental Report for Cheshire L-97A Document Number EP Document Revision 04A Document Status Owner / Author Issued for Authority Approval (IFAA) L. Smandych/L. Dalton Issue Date January 6, 2017 Expiry Date Security Classification Disclosure None Restricted CNSOPB

2 Revision History REVISION STATUS APPROVAL Rev. Date Description Originator Reviewer Approver 01R Draft for Review 02R Lara Smandych/ Lexy Dalton Scott Jardine/Tara Barnett/Greg Krauss/Lindsay Grice Draft for Review Lexy Dalton Tara Barnett/Greg Krauss 03A Final Lexy Dalton Ben Martell Greg Krauss 04A Revised Appendix B Lexy Dalton N/A Greg Krauss All signed originals will be retained by the P&T Document Control Center and an electronic copy will be stored in Livelink N/A N/A Signatures for this revision Date Role Name Signature or electronic reference ( ) January 6, 2017 December 20, 2016 January 6, 2017 Originator Reviewer Approver Lexy Dalton Ben Martell Greg Krauss

3 TABLE OF CONTENTS ACRONYMS SCOPE AND PURPOSE PROJECT OVERVIEW GENERAL ENVIRONMENT CONDITIONS ENVIRONMENTAL PROTECTION AND PERFORMANCE Spills and Discharges Summary of Spills Summary of Authorized Discharges Summary of Unauthorized Discharges Waste Material Summary of Waste Material Produced Waste Reduction Measures ENVIRONMENTAL CONTINGENCY PLAN EXERCISES REFERENCES APPENDIX A SUMMARY OF OPERATIONAL DISCHARGES APPENDIX B SUMMARY OF MONTHLY COMPLIANCE MONITORING REPORTS APPENDIX C SUMMARY OF WASTE DISPOSED DURING THE CHESHIRE WELL LIST OF FIGURES Figure 2-1: Cheshire L-97A Location... 7 Figure 4-1: Rig Discharges Quick Reference Card... 21

4 ACRONYMS AFFF... Aqueous Film Forming Foam BOP... blowout preventer CCG... Canadian Coast Guard CNSOPB... Canada-Nova Scotia Offshore Petroleum Board CO... Carbon Monoxide CO 2...Carbon Dioxide CO 2 e... Carbon Dioxide Equivalent E&CCC... Environment and Climate Change Canada ECRC... Eastern Canada Response Corporation EL... Exploration Licenses EPP... Environmental Protection Plan GHG... Greenhouse Gas HSSE & SP CF... Health, Safety, Security, Environment and Social Performance Control Framework JSA... Job Safety Analysis MARPOL... International Convention for the Prevention of Pollution from Ships NO x... Nitrogen Oxides OA-D... Operations Authorisation Drilling OCSG... Offshore Chemical Selection Guidelines for Drilling and Production Activities on Frontier Lands OEM... original equipment manufacturer OSPAR... Oslo and Paris Commissions OSR... Oil Spill Response OSRP... Oil Spill Response Plan OSV... Offshore Support Vessel OWS... oil water separator OWTG... Offshore Waste Treatment Guidelines PLONOR... Poses Little Or No Risk to the environment PM... Planned Maintenance PMR... Performance Monitoring and Reporting ROP... rate of penetration Document # EP December 20, 2016 Revision 03A Restricted

5 ROV... remotely operated vehicle SBM... synthetic based mud SCCP... Source Control Contingency Plan SOC... synthetic-on-cuttings SO x... Sulphur Oxides TMS... Tether Management System WMP... Waste Management Plan Document # EP December 20, 2016 Revision 03A Restricted

6 1. SCOPE AND PURPOSE Shell Canada Limited (Shell) has developed this Environmental Report for the Cheshire L-97A exploration well (the Cheshire well) in accordance with the requirements of Section 87(2) of the Nova Scotia Offshore Drilling and Production Regulations (SOR / ). This report describes the environmental protection measures implemented and environmental performance observed during the drilling of the Cheshire well. 2. PROJECT OVERVIEW Shell is conducting an exploration drilling project within the area of its offshore Exploration Licences (EL) 2423, 2424, 2425, 22426, 2429 and 2430 in the Nova Scotia Offshore Area, under the jurisdiction of the Canada-Nova Scotia Offshore Petroleum Board (CNSOPB). The Shelburne Basin Venture Exploration Drilling Project (the Project) is divided into two separate drilling campaigns; Campaign one consists of drilling two wells and Campaign two, up to five additional wells. As part of the Project, Shell has completed the drilling of the first exploration well of the first campaign, the Cheshire well. The well is located 250 km offshore Nova Scotia in a water depth of approximately 2,143m (Figure 2-1). Drilling activity was completed by Shell s contractor, Stena Drilling (Stena), using the Stena IceMAX drill ship (IceMAX). Drilling commenced on October 23, 2015 and the well was abandoned in accordance with applicable regulations on September 21, Document # EP December 20, 2016 Revision 03A Restricted

7 Figure 2-1: Cheshire L-97A Location Document # EP Revision 03A -7- December 20, 2016 Restricted

8 3. GENERAL ENVIRONMENT CONDITIONS In accordance with Section 87.1 of the CNSOPB Drilling and Production Guidelines (D&P Guidelines), the Physical Environmental Report required under Section 7 of the Offshore Physical Environmental Guidelines complies with the reporting requirements for describing the General Environment Conditions as outlined in section 87(2)(a) of the Nova Scotia Offshore Drilling and Production Regulations (D&P Regulations). As part of the Cheshire end of well reporting requirements, Shell commissioned Amec Foster Wheeler (AMEC) to develop a Physical Environment Report. The report contains meteorological data; weather forecasts; oceanographic data, including current and wave data; and descriptions of the instrumentation installed, including calibration reports on each sensor. Please reference the Physical Environmental Report submitted for the Cheshire well for the General Environment Conditions required in accordance with Section 87.1 of the D&P Guidelines. 4. ENVIRONMENTAL PROTECTION AND PERFORMANCE Shell developed an Environmental Protection Plan (EPP) at the onset of the Project as part of the CNSOPB Operations Authorisation Drilling (OA-D) approval process, in accordance with Section 9 of the D&P Regulations and the Environmental Protection Plan Guidelines. The EPP is managed as an evergreen document throughout Project operations and continuously updated to improve environmental compliance and accountability for operational activities. The EPP describes the expected operational discharges and outlines the environmental management and protection procedures to be executed to comply with relevant environmental management commitments and requirements for Project operations. These procedures are developed from the Offshore Waste Treatment Guidelines (OWTG) as well as Shell s Commitment and Policy on Health, Security, Safety, the Environment and Social Performance and Health, Safety, Security, Environment and Social Performance Control Framework (HSSE & SP CF). Shell s HSSE & SP CF includes 11 individual manuals written to guide Shell employees and contractors in appropriate health and safety management. These manuals cover key areas of HSSE & SP risk including environment (with subsections on biodiversity, emissions and waste among others), social performance and chemical management. The control framework also includes guidance for overall implementation of these manuals including a chapter on Performance Monitoring and Reporting (PMR) of HSSE & SP data. The purpose of this chapter is to report HSSE & SP performance data that are relevant, consistent, transparent, Document # EP December 20, 2016 Revision 03A Restricted

9 accurate and complete. Shell measures, monitors and reports performance of the following Project environmental parameters under PMR: Energy Use Greenhouse Gas (GHG) Emissions Venting Water Use Oil Discharged to Surface Water Waste Volume of synthetic-on-cuttings (SOC) disposed at sea Mass of water based mud and cuttings disposed Mass of synthetic based mud and cuttings disposed Biodiversity Data is collected quarterly from each Operating Company within Shell (the Project is considered an Operating Company) and compared between Assets, Business Units etc. across all of Shell. The data collected is used to quantify Shell s HSSE & SP performance with the goal of continuous improvement, each year s data improving on the year before. The following sections summarize the environmental protection matters during the drilling of the Cheshire well and the measures implemented to reduce environmental impact. As part of Shell s commitment to continuous improvement, Shell initiated an EPP Audit Program to confirm compliance with the Project EPP. The objectives of the audits are to assess the adequacy of the Project environmental protection controls and whether they are effectively implemented towards achieving site, business and regulatory environmental objectives. Where weaknesses or deficiencies are identified, recommendation and guidance on what is expected and needed to demonstrate adherence to the EPP is provided and documented. Each section of the EPP is audited independently; the following sections were audited during the drilling of the Cheshire well: Section 12 Environmental Protection and Compliance Monitoring of Waste Streams Section 14 Chemical Selection and Management Section 15 Waste Management For Section 12 all discharges outlined in the EPP were reviewed onboard the IceMAX to ensure they are managed as described and there have not been any changes to the waste management systems onboard. For Section 14 a selection of proposed chemicals were reviewed to confirm if they are still in use or not and to ensure the Material Safety Data Document # EP December 20, 2016 Revision 03A Restricted

10 Sheets are up to date onboard the IceMAX. The Section 15 audit is discussed in more detail in Section For all three audits there were no significant findings Spills and Discharges Summary of Spills During the drilling of the Cheshire well there were no reportable spills (as defined in the CNSOPB Incident Reporting and Investigation Guidelines) from the IceMAX or the Project s offshore support vessels Summary of Authorized Discharges Shell s environmental protection measures are based on best management practices to reduce and prevent the generation and/or discharge of waste into the marine environment. All offshore discharges associated with the Project are managed as described in the Project EPP and Waste Management Plan (WMP), in compliance with the Fisheries Act, the Migratory Birds Convention Act, the International Convention for the Prevention of Pollution from Ships (MARPOL) and the OWTG as applicable, prior to discharge. Within the EPP, Shell has identified normal operational discharges from the IceMAX and the associated compliance measurements, monitoring and/or reporting requirements in as outlined in the OWTG. These discharges are listed in Appendix A. In accordance with the OWTG and the EPP, Shell reports the discharges of bilge water, deck drainage, 48-hr mass average SOC, blowout preventer (BOP) control fluid and Monoethylene Glycol to the CNSOPB in a monthly EPP Compliance Monitoring Report (EPP Monthly Report). This report was submitted to the CNSOPB on the 15th day of each month from September 15, 2015 through to October 15, A summarized list of reported discharges and volumes from the drilling of the Cheshire well is provided in Appendix B except for SOC discharges. These are described in more detail in Section and summarized in Table Bilge Water The IceMAX employs a MARPOL compliant oil-water separator (OWS) to treat bilge water from machinery spaces prior to discharge. The oil concentration limit for the separated water Document # EP December 20, 2016 Revision 03A Restricted

11 is set to 15 mg/l (15 ppm) and the unit is equipped with a high oil-in-water alarm that will sound if this limit is exceeded in the separated bilge water. There were no exceedances of the bilge water oil concentration limit during the drilling of the Cheshire well Deck Drainage Drainage from exposed decks of the Stena IceMAX is collected in a drain line that flows through a monitoring system overboard. The oil-in-water detectors installed on the port and starboard side of the exposed decks use remotely operated valves to control the flow of deck drainage on the rig. If the detected oil concentration in the drains exceeds 15mg/L the deck drainage is directed into a drain tank for collection and processing through an OWS prior to discharge. If the oil concentration is below 15 mg/l, then the deck drainage is routed overboard. Drainage from the drill floor is collected in drain/holding tanks. From these tanks the collected drain water is transferred through a dedicated MARPOL compliant OWS which removes the oil from the drain water. Clean drainage water (oil concentration <15 mg/l) is discharged overboard and oily drainage (oil concentration >15 mg/l) drain water is returned to the recovered oil tank. There were no exceedances of the deck drainage oil concentration limit during the drilling of the Cheshire well Synthetic Retained on Cuttings The riser system installed after top hole drilling creates a conduit to capture the associated drilling fluids and cuttings from the well, and transport them back to the IceMAX for further processing. During this phase of drilling, Shell utilized a synthetic-based mud (SBM). Drill cuttings are separated from the drilling fluid utilizing the IceMAX s solid control system. The separated cuttings are processed through the cuttings dryer prior to being discharged approximately 2 m below the sea surface. Only synthetic-based fluid adhering to cuttings Document # EP December 20, 2016 Revision 03A Restricted

12 (SOC) at a concentration of 6.9% (6.9g/100g) after processing is discharged at sea in accordance with the OWTG. As per the OWTG, the concentration of SBM retained on discharged drill cuttings is measured every 12 hours in accordance with the Procedure for Field Testing Oil Based Drilling Muds (API 1991). A mass-weighted rolling 48-hour average is calculated in grams of synthetic fluid per 100 grams wet solids. The average 48-hr mass-averaged SOC concentration for the well as a whole was 3.53g/100g. As described in the EPP Monthly Reports, Shell experienced a number of reportable SOC exceedances during the drilling of the Cheshire well. In these instances, the 48-hour mass average of retained SOC discharged to sea that was calculated in accordance with the guidelines exceeded 6.9g oil/100g cuttings discharged. These exceedances were initially due to misinterpretation of the OWTG, this was corrected following consultation with the CNSOPB. Later exceedances were caused by the method of calculating the %SOC, which gives a distorted result when centrifuge waste is discharged when not drilling ahead. These occurrences were reported to the CNSOPB within 24 hours of occurrence as well as in the EPP Monthly Reports and were investigated and corrected on the rig. Procedures were updated so that when not drilling ahead and the calculated SOC concentration is likely to exceed the discharge limit, processed cuttings are contained and shipped onshore for disposal. A summary of the exceedances is provided in Table 1 below. Document # EP December 20, 2016 Revision 03A Restricted

13 Table 1: Cheshire SOC Exceedances and Corrective Actions Date 48 hr Mass Averaged SOC wet (g/100g) Reason for Exceedance Corrective Action Taken 22-Nov Nov Nov Nov Nov Centrifuges were run without other discharges such as drilled cuttings from the dryer (which have a lower SOC concentration and typically bring down the overall concentration discharged) The rig was instructed to not centrifuge unless the cuttings dryer is in use. 27-Nov Dec Dec Dec Dec The centrifuge was being run while the cuttings dryer was in use, but as there was no drilling in the time period therefore there was no drilled volume to enable recording the % SOC from the dryer which would have reduced the reported % SOC. Due to the way the % SOC is calculated, the exceedance carried over into December Dec The rig was reaming to bottom and using the dryer and centrifuge; however, reamed cuttings are not measured as drilled cuttings and therefore were not included in the discharge calculations resulting in a higher discharge concentration. Going forward cuttings are only discharged during drilling. Going forward cuttings are only discharged during drilling. Additional discussion and clarification was provided regarding cuttings management during reaming versus drilling ahead. Document # EP December 20, 2016 Revision 03A Restricted

14 Date 48 hr Mass Averaged SOC wet (g/100g) Reason for Exceedance Corrective Action Taken 25-Dec Dec When cleaning the mud traps, the solids from the effluent tank were centrifuged. The crew on the rig treated mud conditioning the same as drilling and discharged the cuttings. As there were no drilled cuttings to reduce the overall discharge concentration, this caused another exceedance which carried over into December Sep The rig was drilling ahead and, as is the usual practice, the effluent mud recovered from the dryer was being centrifuged to reduce the finer solids. Due to the lower rate of penetration (ROP) combined with finer screens on the shakers, the % SOC was higher for this period than the limit. The lower ROP generates a smaller amount of cuttings and means that the %S OC of the dryer solids is a higher proportion of the overall % SOC value. Additional clarification was provided to the rig that only when drilled cuttings are included can cuttings be discharged. Outside of this, all centrifuge waste is to be skipped and transported to shore for disposal. This was an unusual event magnified by the low ROP and the method used to calculate the % SOC. Typically all solids recovered from centrifuging when not drilling ahead are being collected in skips and shipped ashore. This exceedance was caused by the low ROP during drilling, this will be closely monitored in the future to prevent future exceedances Blowout Preventer Fluids In accordance with the OWTG, the Project EPP includes a description of the BOP fluid discharges associated with the Project. The original EPP described BOP control fluid discharges to sea related to low volume function testing of the choke and kill lines. The IceMAX is equipped with a unique return line system, whereby high volume function testing of the Ram/Annular preventers does not discharge BOP control fluid to the sea. The current accepted version of the EPP describes all potential BOP control fluid discharges, including non-routine and emergency events. The inclusion of all BOP control fluid discharges, as well as estimates of the volumes to be discharged and the frequency of reporting, ensures full compliance with the OWTG. This additional detail regarding BOP control fluid discharges in Document # EP December 20, 2016 Revision 03A Restricted

15 the Project EPP is considered a positive improvement to environmental oversight of potential discharges to the marine environment offshore Nova Scotia. Further, the full inclusion ensures that these BOP control fluid discharges would be considered authorized discharges in accordance with the CNSOPB Incident and Investigation Reporting Guidelines. A summary of BOP fluid discharged is included in Appendix B. The total volume of BOP fluid discharged over the course of the Cheshire well includes one unauthorized discharge which is described in Section Monoethylene Glycol Hydrate build up around the wellhead connector has the potential to prevent the BOP from being disconnected from the wellhead. To prevent the buildup of hydrates, approximately L of monoethylene glycol was pumped into this seal by the remotely operated vehicle (ROV) every 1-2 days. At times excessive hydrate buildup was observed by the ROV and the volume and frequency of glycol discharged was increased.as reported in the EPP Monthly Reports. The glycol is typically discharged to sea through the connector, removing any hydrates that may be present; hydrates from around the BOP are also jetted directly using either sea water or glycol. Glycol has been assessed under the Offshore Chemical Selection Guidelines for Drilling and Production Activities on Frontier Lands (OCSG) and is accepted for use and discharge offshore as it is appears on the OSPAR PLONOR List as a substance that Poses Little or No Risk to the Environment and is readily biodegradable. The total volume of glycol injected by ROV during the drilling of the Cheshire well is included in Appendix B Fire Suppression Chemicals The IceMAX uses Aqueous Film Forming Foam (AFFF) in her fire suppression system. The fire monitors are tested monthly with seawater and the foam is sampled annually. During the drilling of the Cheshire well no foam was discharged to the marine environment Air Emissions There are two sources of air emissions onboard the IceMAX, the ship engines and the onboard oil incinerator. Document # EP December 20, 2016 Revision 03A Restricted

16 There are six 7.4MW main diesel engines onboard the IceMAX. Through combustion of diesel the engines produce primarily CO 2, NO X and CO along with other combustion products. The incinerator is used to burn waste oil from the rig, including oil that has been separated from the bilge water and deck drainage streams prior to discharge overboard. Combustion of waste oil produces primarily CO 2, SO X and CO along with other combustion products. In accordance with the OWTG, GHG are reportable to Environment and Climate Change Canada (E&CCC) rather than the CNSOPB. GHG reporting to E&CCC occurs annually and is only mandatory for facilities (including offshore installations) that produce more than tonnes of GHG in a calendar year. The Project did not exceed this tonne threshold in 2015 and therefore did not report GHG emissions for The Project will exceed the tonnes for 2016, primarily from drilling of the Cheshire well (January September) with some additional emissions associated with the drilling of the second well in the campaign, Monterey Jack E-43. A summary of CO 2 equivalent emissions produced during the drilling of the Cheshire well is included in Table 2 below. Document # EP December 20, 2016 Revision 03A Restricted

17 Table 2: Summary of CO2e Emissions Produced 2015 Engines (tonnes CO 2 e) Incinerator (tonnes CO 2 e) Oct Nov Dec TOTAL Engines (tonnes CO 2 e) Incinerator (tonnes CO 2 e) Jan Feb Mar Apr May Jun Jul Aug Sep TOTAL Summary of Unauthorized Discharges As per the Project EPP, Shell lists and describes all known discharges expected as part of the drilling of the Cheshire well. Any product, event or volume exceedance not included within the EPP is considered unauthorized and was reported to the CNSOPB and the Canadian Coast Guard (CCG). Table 3 includes the unauthorized discharges reported during the drilling of Cheshire and the corrective actions taken by Shell and its contractors. Document # EP December 20, 2016 Revision 03A Restricted

18 Table 3: Summary of Cheshire Unauthorized Discharges Date November 3, 2015 November 13, 2015 Fluid Discharged Hydraulic Fluid Leak Hydraulic Fluid Leak Volume Source Root Cause Corrective Actions 300ml IceMAX: Starboard ROV Atlas Hybrid Manipulator Arm 7.5L IceMAX: Port ROV Hydraulic Hose 1. Damage to Atlas Hybrid manipulator arm due to contact with ROV crash frame 1. Procedures need improving - hose failure due to inadequate installation 1. Adjust the Atlas hybrid manipulator restrictors and relief valves per original equipment manufacturer (OEM) guidance. 2. Communicate to the ROV Supervisors and Technicians: ROV pilot to position the ROV in such a manner to provide the best execution of work utilizing the manipulator, field of camera view, and away from close proximity of obstacles such as the ROV top bumper frame. 1. Inspect all other multipurpose skid hoses immediately, replace and report any damaged hoses found 2. Inspection needs improvement hoses located in cramped area 3. Planned maintenance program did not include specific direction to inspect this skid 2. Review routing of the multipurpose skid hoses and options to improve access for inspection 3. Remove excessive hose length 4. Review Preventative Maintenance (PM) program for MIL126 and incorporate PM task for the Document # EP November 5, 2016 Revision 01R Unrestricted

19 Date Fluid Discharged Volume Source Root Cause Corrective Actions multipurpose skid hose March 5, 2016 BOP Fluid Release 1,742 L Erifon 4,354 L Glycol IceMAX: Marine riser hydraulic fluid lines 1. Hydraulic lines were drained when riser dropped from the drill ship to the seafloor. Unavoidable release as lines fully charged at the time of incident however incident is unprecedented in industry with low risk of repetition. 1. Incident prompted review of the EPP and revision to include additional BOP fluid discharges possible during an emergency or accidental event. May 26, 2016 Hydraulic Fluid Leak 1.9 L IceMAX: Starboard ROV Plug (during recovery) 1. Inadequate preventative maintenance inspection frequency of the Tether Management System (TMS) o-rings 1. Increase frequency of inspection of TMS o-rings by adding this to the monthly preventative maintenance inspection June 22, 2016 Synthetic Based Mud (SBM) 5 L IceMAX: Slip joint packer leaked into moonpool 1. The upper packer air pressure was insufficient to provide an adequate seal to compensate for any possible wear of the packer element 1. The air pressure and sealing of the telescopic joint is monitored and documented daily as per standard procedures. The pressure will be maintained at the higher end of the recommended range 2. As per normal routine between wells, the packer elements will be Document # EP November 5, 2016 Revision 01R Unrestricted

20 Date Fluid Discharged Volume Source Root Cause Corrective Actions inspected and assessed for any wear and tear upon recovery of the telescopic joint The majority of unauthorized discharges that occurred during the drilling of the Cheshire well involved the release of ROV hydraulic fluid. Shell utilises an environmentally-friendly, readily biodegradable biobased hydraulic fluid in lieu of a standard petroleum based fluid. All substances released in the above unauthorized discharges have been assessed under the OCSG and accepted for use and discharge as they are deemed to have relatively low toxicity. To improve compliance and reporting performance of unauthorized discharges, Shell created Quick Reference Cards highlighting the approved rig discharges, including BOP fluid (Figure 4-1). These cards were made available to all personnel onboard the IceMAX. Document # EP November 5, 2016 Revision 01R Unrestricted

21 Figure 4-1: Rig Discharges Quick Reference Card 4.2. Waste Material Summary of Waste Material Produced Wastes destined for onshore treatment, recycling and/or disposal are managed in accordance with the Nova Scotia Solid Waste-Resource Management Regulations and comply with applicable federal and provincial waste requirements as well as municipal bylaws. Terrapure is the third-party waste management contractor for the Project. They manage all hazardous and non-hazardous wastes transported onshore from the IceMAX and ensure the waste is treated/disposed at Shell audited and approved facilities. As per the Shelburne WMP, all waste materials are properly classified, labeled and segregated to ensure all personnel in the waste management chain can follow appropriate safety, handling and disposal practices. Terrapure provides monthly summaries to Shell detailing the type and weight of waste received and the associated disposal/treatment method used. A full listing of all wastes sent onshore during the drilling of the Cheshire well is provided in Appendix C. A summary of hazardous and non-hazardous waste masses that were recycled and disposed over the course of the Cheshire well is provided in Table 4 below.

22 Table 4: Summary of Wastes Disposed and Recycled Waste Category Disposed (kg) Recycled (kg) Total (kg) Hazardous 7,537, ,434 7,973,543 Non-hazardous 70, , ,395 Totals 7,607, ,699 8,188,938 The largest waste stream disposed was interface fluids from riser displacements, which makes up 52.5% of all hazardous waste generated. This waste stream originates when displacing the riser from SBM to seawater in preparation for a well disconnect. The second largest waste stream produced was cuttings/drill muds (9.9% of all hazardous waste) which are sent to shore for disposal when the SOC concentration exceeds the allowable offshore discharge limit, as per OWTG. The third highest waste stream (9.8% of all hazardous waste generated) was a mix of SBM and water, this waste stream represents slops produced during tank cleaning. The largest waste stream that was recycled is oily water/wash water (31% of all recycled waste) which is generated from the drain tanks onboard the rig. The second largest recycled stream (26.9% of recycled waste) is a mix of lube oil/water/glycol, waste lube oil is generated from the IceMAX engine oil changes and is recycled with waste water and waste glycol from the rig (glycol is used in MUX lines, radiators etc.). The third largest recycled waste stream is scrap metal (8.9% of recycled waste) which originates from various maintenance, repair and fabrication activities that occur daily on the rig Waste Reduction Measures Project Waste Management onboard the Stena IceMAX Shell s waste management philosophy, as outlined in the HSSE & SP CF, aims to prevent or reduce waste generation and requires project teams to incorporate controls into the design, procedures and working practices of all new activities in order to achieve this. Other Shell waste management strategies include reusing waste for the same or alternative applications, including in other industries, returning unused materials to suppliers and identifying recycling and recovery opportunities for waste. Shell has reviewed the waste management policies of Stena and has confirmed that they align with Shell s philosophy. Stena is committed to reducing, reusing and recycling of waste generated by its activities (e.g. drilling). In order to achieve this, a number of initiatives are being implemented including: Utilisation of environmentally friendly substances and products wherever possible

23 Preventing stock passing expiry dates and having to be discarded Reduce organic domestic waste All crew on the IceMAX are responsible for minimising generation of waste. Both Stena and Shell recognise that improper disposal of waste (and the associated transport) is potentially harmful to the environment. The potential impacts of unnecessary transportation and improper disposal of waste can be reduced by minimising the quantity of waste generated and ensuring that all waste is correctly categorised, stored and disposed. As outlined in Stena s waste management procedure, waste products on the rig are separated at the source to encourage recycling. Shell has developed a WMP for the project to detail the management processes and procedures for waste that is generated in association with the Project. The WMP is based on Shell s waste management philosophy of reduce, reuse and recycle wherever possible. In addition to the principles outlined in the HSSE & SP CF, the following working practices were also implemented to reduce the amount of waste generated: Complete use of materials and contents of containers Adequate storage to avoid spoilage Use of oldest supplies to avoid disposal due to expiry Reduction of paper waste through use of electronic media Reuse of waste material and products where possible in additional operational activities Using non-hazardous alternatives, where possible Return of unused materials to suppliers, where possible Waste Management Assurance As outlined in Section 4, EPP Section 15 Waste Management was audited during the drilling of the Cheshire well. The purpose of the EPP Section 15 audit was to review waste management practices and confirm that wastes are being managed in accordance with the Project EPP and WMP. There were no major findings from the audit. To further demonstrate Shell s commitment to implementing above average environmental performance in waste handling and treatment, all facilities used to treat, store, dispose or recycle Project waste streams are reviewed and approved through the Shell Offsite Residuals Management audit process. Approved waste management facilities are reviewed every 5 years to ensure continued compliance.

24 Only those waste management facilities on the approved list are used in support of Project waste management, the following Shell approved facilities are currently in use: Terrapure Sussex Terrapure Chatueaugay Stericycle BD Rae Environmental Aces Recycling Miller Waste John Ross & Sons Halifax C&D Recycling Otter Lake Waste Processing and Disposal Facility Terrapure Beechill Clean Earth Technologies Lafarge Canada Conrads/SRT Soil Remediation Technologies 5. ENVIRONMENTAL CONTINGENCY PLAN EXERCISES Shell takes all reasonable measures to prevent accidents and malfunctions that may result in adverse environmental effects and will implement emergency response procedures and contingency plans developed in relation to the Project. Examples of these Project contingency plans include the Oil Spill Response Plan (OSRP) and associated Wildlife Response Plan and Dispersant Preparedness and Operations Plan; as well as the Source Control Contingency Plan (SCCP) and associated Subsea Dispersant Plan and Contingency Plan for Cap and Contain. Project response procedures and contingency plans were implemented prior to the commencement of operations, and assurance activities are undertaken to verify that plans are up-to-date, correct and appropriately implemented. Stena performs weekly safety drills onboard the IceMAX including environmental drills (local spill response). Prior to the commencement of drilling operations, Shell conducted emergency response exercises to assure that the response capabilities outlined in the procedures and contingency plans were understood and could be mobilized and deployed, as required. These include an April 23, 2015 Shell Americas Response Team Tier III Oil Spill Response Exercise and an October 2015 table top emergency response communications exercises. Shell has a comprehensive oil spill response (OSR) training program to assure that the necessary competency and response capabilities outlined in Shell s response procedures and contingency plans are ready to be implemented, as required. From September 2015 to September 2016, all crews on all four OSVs completed multiple live on water Offshore Oil

25 Spill Preparedness training sessions delivered by Eastern Canada Response Corporation (ECRC). The goal of each oil spill response training session is to safely develop OSV crew competency and expertise to understand and operate Tier I or Tier II Response Equipment, as per their vessel emergency response role and technical capability. The principal objective is to have each vessel crew able to safely and independently: set-up, deploy, operate and recover each piece of equipment assigned to their vessel in realistic offshore conditions, and to validate and operationalize the OSRP. Operational and procedural challenges and recommendations were also captured and incorporated into training materials, after action reviews, training summaries and Job Safety Analyses (JSAs) for wider distribution and sharing of best practices/lessons learned. In 2016, Aerial Observation of Marine Oil Spills training for flight crews was also added to the training program. This course included discussion on oil properties, fate and effects of oil, and oil spill assessment.

26 6. REFERENCES Stantec Consulting Limited Shelburne Basin Venture Exploration Drilling Project Environmental Impact Statement. Volume 1: EIS Document. Prepared for Shell Canada Limited. Stena Drilling Limited Stena IceMAX HSE Case Part 3 Vessel Description. Stena Drilling Limited Stena IceMAX HSE Case Part 5 Emergency Response. Stena Drilling Limited Management of Waste Offshore.

27 APPENDIX A SUMMARY OF OPERATIONAL DISCHARGES Discharge Stream OWTG Limit Management (per OWTG) Regulatory Requirement Air Emissions (sources: engines and onboard oil incinerator) N/A Greenhouse gas (GHG) emissions are reported to Environment and Climate Change Canada (E&CCC) as required. Air emissions are reported annually. In 2015 the Project did not reach the threshold for GHG reporting emissions will be submitted June 2017 per E&CCC requirements. OWTG Bilge Water 15 mg/l oil in water The IceMAX employs a MARPOL compliant oilwater separator to treat bilge water from machinery spaces. This equipment is set to 15 mg/l and is equipped with a high oil-in-water alarm that will sound if this limit is exceeded. MARPOL OWTG Ballast Water N/A The IceMAX ballast water is contained in segregated tanks and therefore not contaminated with oil or chemicals. The IceMAX conducts all ballast water exchanges or saltwater tank flushing >200nm from shore. OWTG Deck Drainage 15 mg/l oil in water Drainage from exposed decks: - If the oil concentration of the deck drainage exceeds 15 mg/l, the drainage flows into a deck drain tank through remotely operated valves. - If the oil concentration of the deck drainage is below 15 mg/l, then the deck drainage is discharged overboard. Drainage from the drill floor: - Collected drainage is transferred through a dedicated MARPOL compliant oil water separator (OWS) which removes the oil from the drain water. - Clean drainage(oil concentration< 15 mg/l) is discharged overboard and oily drainage (>15 mg/l) is returned to the recovered oil tank. MARPOL OWTG Sewage and Grey Water Macerated to a particle size of <6mm All sewage and food wastes are reduced through maceration to an average particle size of 4 mm prior to discharge at sea. The majority of the sewage and grey water produced on the IceMAX is passed through a nonchlorinated system. Sewage that is chlorinated is injected with a 15% solution on demand when the MARPOL OWTG

28 Discharge Stream OWTG Limit Management (per OWTG) Regulatory Requirement discharge pump is activated. The chlorine is substantially consumed during the disinfection process. Cooling Water N/A There is no biocide added to the cooling water on board the IceMAX therefore it is considered an authorized discharge and not subject to discharge limit. OWTG Drilling Discharges (includes: Drilling Muds and Drilling Cuttings) 6.9g/100g synthetic-oncuttings (SOC) All substances that make up the drilling muds (water based mud, WBM, and synthetic based mud, SBM) are screened through Shell s Chemical Selection and Review Process developed in consideration of the OCSG, for more information on this process (see Condition 3.2). No whole SBM was discharged during the drilling of the Cheshire well. Drill cuttings are treated on board the IceMAX in order produce a 48 hour mass weighted average of retained synthetic-on-cutting (SOC) not exceeding 6.9g/100g (see Condition 3.12.). The 48-hr mass average SOC discharge SOC is reported monthly to the CNSOPB OCSG OWTG Blowout Preventer (BOP) Fluids (including hydrate seal glycol) N/A The BOP fluids used on the IceMAX are assessed under the OCSG as having low aquatic toxicity and are accepted for use and discharge in accordance with those guidelines. All operational and batch discharges of BOP fluid and hydrate seal glycol are described in the EPP and are accepted for use and discharge as per the OCSG. The volumes of BOP fluid and glycol discharged are reported monthly to the CNSOPB. OCSG OWTG Fire Suppression Chemicals N/A Fire monitors are tested monthly with seawater which is discharged without treatment. The active fire extinguishing agent, Aqueous Film Forming Foam (AFFF) is sampled annually and contained on board. If AFFF is anticipated to be released to the marine environment during testing or sampling, prior notification will be provided to CNSOPB. OWTG

29 APPENDIX B SUMMARY OF REPORTED DISCHARGES

30 Date Parameter EPP Section Unit Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 May-16 Jun-16 Jul-16 Aug-16 Sep-16 Volume of bilge water discharged m Volume of deck drainage discharged m Monoethylene Glycol L BOP control fluid L *values are the total volumes for each month October 2015 Well spudded towards the end of the month (23rd) therefore no discharges this month Summary of Discharges for Cheshire L-97A October 23, Sept 20, 2016 March-June 2016 Marine Riser Incident - few discharges as drilling was suspended July 2016 BOP fluid discharges: - Increased use of the fail safe valves - Additional BOP acoustic testing (as per CNSOPB condition) August 2016 BOP fluid discharges: - Increased use of the fail safe valves - Additional non-routine closure of the failsafe valves - Increased acoustic testing (as per CSNOPB condition) - Rig disconnected from the well and moved off well center while pulling the LMRP up to surface, the conduit lines were drained. September After a weather disconnect, the BOP was landed again which requires the conduit lines to be flushed. - BOP pressure and function tests were performed with the acoustic system due to auto-shear trigger damage. - The BOP was retrieved as part of planned abandonment operations, as described in the EPP the full volume of the conduit lines is drained during retrieval.

31 APPENDIX C SUMMARY OF WASTE DISPOSED DURING THE CHESHIRE WELL

32 Shelburne: October 2015/ September 2016 ONSHORE WASTE DISPOSAL QUANTITIES FOR CHESHIRE L97-A (well #1) Harzardous/ Non Hazardous Recycle or Disposal Waste Description UOM Well #1 Well #1 Well #1 Well #1 Well #1 Well #1 Rig Repairs Rig Repairs Rig Repairs/ Well #1 Well #1 Well #1 Well #1 October November December January Febuary March April May June July August September Total Hazardous Disposal Barite/ Drill Mud KG 189, ,450 Hazardous Disposal WDF (well displacement fluid) KG 113,400 1,604,000 1,094, , ,620 4,187,140 Hazardous Disposal WDF/ wash water KG 31, , , ,700 Hazardous Disposal SBM KG 121, , ,140 22, ,650 Hazardous Disposal SBM/ Water KG 277, , , , ,700 Hazardous Disposal Cuttings/ Drill mud KG 1, ,550 33,710 44,000 54,600 42, , ,060 Hazardous Disposal Water base cutting KG 12,000 12,000 Hazardous Disposal Cement powder KG 3,660 6, , ,260 23,960 Hazardous Disposal Barite KG 800 1,984 2,784 Hazardous Disposal Barite/ Cement powder KG ,600 Hazardous Disposal Barite/ Mud KG 403, ,960 Hazardous Disposal Empty pails KG ,900 Hazardous Disposal Lime bags KG 1,200 5,700 3,800 1, ,250 1,800 1,600 18,500 Hazardous Disposal Oily Rags KG 6,355 2,000 8,800 15,000 3,200 9,200 9,400 6,400 5,800 4,800 70,955 Hazardous Disposal Hydraulic Hoses KG , ,200 Hazardous Recycled Hydraulic oil (Houghto Safe 273) KG 205 7,400 20,950 13,700 42,255 Hazardous Disposal Dye Containmented Garbage KG Hazardous Disposal Creysilic Acid KG Hazardous Recycled Empty Totes KG 2, ,400 3,000 3,500 13,100 Hazardous Disposal Shaker Screens KG , ,700 Hazardous Recycled Oily filters KG ,800 Hazardous Disposal Oily Debris KG , ,800 Hazardous Disposal Dieseal KG Hazardous Disposal mineral spirits KG Hazardous Disposal Benzoic Acid KG Hazardous Disposal cooking oil KG 205 1,000 1,205 Hazardous Disposal Grease pails KG ,005 Hazardous Recycled Lube Oil/ Water/ Glycol KG 5,600 5,600 11,060 14,000 15,800 27,850 30,450 16,180 7,770 18,100 4, ,710 Hazardous Recycled Waste Oil KG 8, ,140 Hazardous Recycled Oily Water/ wash water KG 10,450 87,300 5,100 36,500 11,500 13,980 5,310 5,340 5, ,780 Hazardous Recycled Glycol KG 4,000 4,000 Hazardous Recycled Empty Drums KG ,350 Hazardous Recycled Cal/ Aerosol Cans KG ,300 Hazardous Disposal Floor Resin KG Hazardous Recycled Aviation Fuel KG 5, ,000 3,550 1,630 1,500 14,995 Hazardous Disposal Van-sol KG ,295 Hazardous Recycled Batteries KG Hazardous Disposal Paint Cans KG 1,400 1,025 1, ,200 6,725 Hazardous Recycled Diesel/ Water KG 6,800 6,800 Hazardous Disposal Medical Waste KG Hazardous Disposal Paint KG ,230 Hazardous Recycled Electronic Waste KG Hazardous Recycled Flourscent Tubes KG ,344 Non Hazardous Disposal Domestic / Garbage KG 620 9,000 5,585 6,690 8,555 5,205 5,255 3,725 4,675 4,335 4,295 3,790 61,730 Non Hazardous Recycled Wood (construction debris) KG 1,271 2,260 1,330 1,490 5,280 9,220 11,060 3,530 2,820 3,880 2,290 44,431 Non Hazardous Recycled Cardboard/ Paper KG 750 1,750 1,500 1,250 1,250 1, ,000 1, ,750 Non Hazardous Recycled Recyclables/ Plastic KG 500 1, ,800 1, , ,250 Non Hazardous Recycled Glass KG Non Hazardous Recycled Scrap Metal KG 1,860 4, ,574 12,620 4,590 3,990 6,340 5,090 2,450 3,620 59,234 Non Hazardous Recycled Pipe End Caps KG 6,000 11,200 1,600 18,800 Non Hazardous Disposal Food Waste KG ,000 1,200 1,600 5,200 Non Hazardous Disposal Grinding Disc KG 200 3,000 3,200 TOTALS (KGS) 23, , ,705 1,740,850 1,238,838 1,529,025 85, , , , ,840 1,350,040 8,188,968

Abate on Site This involves adding something to the design to abate the impact eg pollution controls.

Abate on Site This involves adding something to the design to abate the impact eg pollution controls. 6 MITIGATION AND MANAGEMENT MEASURES 6.1 INTRODUCTION A key objective of the EIA is to develop and describe practical, commensurate and cost effective mitigation measures that avoid, reduce, control, remedy

More information

Shelburne Basin Venture Exploration Drilling Project Environmental Protection Plan

Shelburne Basin Venture Exploration Drilling Project Environmental Protection Plan Shelburne Basin Venture Exploration Drilling Project Environmental Protection Plan Project Document Title Document Number Document Revision Document Status Document Type Owner / Author Shelburne Basin

More information

8.0 ACCIDENTAL EVENTS

8.0 ACCIDENTAL EVENTS 8.0 ACCIDENTAL EVENTS BP uses a systematic process to identify and manage potential accidental events that could occur during its project activities. This chapter presents potential accidental events that

More information

DRAFT FOR CONSULTATION

DRAFT FOR CONSULTATION DRAFT FOR CONSULTATION Exclusive Economic Zone and Continental Shelf (Environmental Effects Discharge and Dumping) Regulations 2014 Governor-General Order in Council At Wellington this day of 2014 Present:

More information

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction 9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE 9.1.1 Introduction This chapter is the provisional Environmental Management Plan (EMP) for the Jubilee Phase 1 Development project. The elements of

More information

Shelburne Basin Venture Exploration Drilling Project Oil Spill Response Plan

Shelburne Basin Venture Exploration Drilling Project Oil Spill Response Plan Project Document Title Document Number Shelburne Basin Venture Exploration EP201506213093 Document Revision 04.5A Document Status Owner / Author Scott Jardine/KC Sullivan Issue Date 2016-12-13 Expiry Date

More information

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry

Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Mitigating Environmental Impacts in the Offshore Oil and Gas Industry Paul Barnes, Manager - Atlantic Canada & Arctic NOTES 2015 St. John s, NL April 27, 2015 Overview Who is CAPP? Oil and Gas Lifecycle

More information

DECLARATION OF INSPECTION

DECLARATION OF INSPECTION DOI DECLARATION OF INSPECTION CHECKLIST: (EXAMPLE: The Following Document is an example of a Declaration of Inspection. Other forms such as ISGOTT (International Oil Tanker and Terminal Safety Guide)-Type

More information

OIL RECORD BOOK INSTRUCTIONS

OIL RECORD BOOK INSTRUCTIONS OIL RECORD BOOK INSTRUCTIONS Oil Record Book, Part I - Machinery space operations (All Ships) The following pages of this section show a comprehensive list of items of machinery space operations which

More information

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment

Azeri, Chirag & Gunashli Full Field Development Phase 3 Environmental & Socio-economic Impact Assessment 5.7 Export Pipelines 5.7.1 Overview Phase 3 offshore facilities will use the existing Azeri Project marine export pipeline infrastructure to export its oil and gas to the onshore terminal at Sangachal.

More information

Engineering solutions to eliminate waste. Offshore Services

Engineering solutions to eliminate waste. Offshore Services Engineering solutions to eliminate waste Offshore Services Engineering solutions to eliminate waste Due to a combination of new legislative imperatives, enhanced ethical awareness and a growing trend towards

More information

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 October to 30 December 2015

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 October to 30 December 2015 Environment, Safety&Health Quarterly Performance Report Reporting period: 1 October to 30 December 2015 Welcome to AWE s fourth quarterly performance report for 2015. This document is designed to inform

More information

GENERAL WASTE MANAGEMENT

GENERAL WASTE MANAGEMENT Preparation: Safety Mgr Authority: CEO Issuing Dept: Safety Page: Page 1 of 7 Purpose The purpose of this waste management strategy was developed to provide guidance and requirements necessary for efficient,

More information

Commonwealth of Dominica. Office of the Maritime Administrator

Commonwealth of Dominica. Office of the Maritime Administrator Marine Safety Circular CD-MSC 08-03 Rev01 Commonwealth of Dominica Office of the Maritime Administrator TO: SUBJECT: PURPOSE: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

Loy Yang B Environment Improvement Plan

Loy Yang B Environment Improvement Plan Loy Yang B Environment Improvement Plan 2017 Table of Contents 1 Endorsement 1 2 Environment Policy 2 3 Operating Arrangements 3 4 Site Management and Business Systems 4 5 Environmental Impacts and Risks

More information

9.0 Environmental Protection Program

9.0 Environmental Protection Program 9.0 Environmental Protection Program 9.1.1 Overview Manitoba Hydro s Environmental Protection Program (EPP) provides the framework for the delivery, management and monitoring of environmental and socio-economic

More information

THE REPUBLIC OF LIBERIA Bureau Of Maritime Affairs

THE REPUBLIC OF LIBERIA Bureau Of Maritime Affairs THE REPUBLIC OF LIBERIA Bureau Of Maritime Affairs 8619 Westwood Center Dr Suite 300 Vienna, VA USA 22182 Telephone: (703) 790-3434 Fax: (703) 790-5655 December 13, 2006 MARINE OPERATIONS NOTE 9/2006 -

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice POL-012 Rev. 10/17 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

SHELL ONSHORE OPERATING PRINCIPLES

SHELL ONSHORE OPERATING PRINCIPLES SHELL ONSHORE OPERATING PRINCIPLES FOR TIGHT SAND OR SHALE OIL AND GAS In 2011, Shell publicly shared five aspirational operating principles that govern the activities where we operate and where hydraulic

More information

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 April to 30 June 2015

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 April to 30 June 2015 Environment, Safety&Health Quarterly Performance Report Reporting period: 1 April to 30 June 2015 Welcome to AWE s second quarterly performance report for 2015. This document is designed to inform you

More information

/ 1 2 ANNUAL REPORT BALANCE RECRUITMENT E N V I R O N M E N T A L

/ 1 2 ANNUAL REPORT BALANCE RECRUITMENT E N V I R O N M E N T A L BALANCE RECRUITMENT E N V I R O N M E N T A L ANNUAL REPORT 2 0 1 1 / 1 2 Balance Recruitment provides recruitment consultancy services for the placement of professionals in office environments, on both

More information

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage

Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage Marine Protection Rules Part 100 Port Reception Facilities Oil, Noxious Liquid Substances and Garbage MNZ Consolidation Marine Protection Rules ISBN 978-0-947527-29-7 Published by Maritime New Zealand,

More information

Protecting our clients. Safeguarding our environment.

Protecting our clients. Safeguarding our environment. PRODUCTION MANAGEMENT INDUSTRIES Protecting our clients. Safeguarding our environment. ENVIRONMENTAL SERVICES PRODUCTION MANAGEMENT I N D U S T R I E S PMI Environmental Services has grown to become a

More information

Environmental Requirement Review Checklist and Certification

Environmental Requirement Review Checklist and Certification Environmental Requirement Review Checklist and Certification All contractors are required to review the applicable requirements and submit this checklist to envreports@nassco.com A. Contractor Information

More information

9.6 Interfield Pipeline Installation and Commissioning and Operation

9.6 Interfield Pipeline Installation and Commissioning and Operation 9.6 Interfield Pipeline Installation and Commissioning and Operation As described in the Project Description (Chapter 5.7), Phase 3 will tie-in to the existing Azeri Project marine export pipeline infrastructure

More information

6.1 Introduction to Wastewater Issues

6.1 Introduction to Wastewater Issues Section 6: Water Pollution This Section will help you: Understand if you generate industrial wastewater; Understand where your wastewater goes; Make sure you meet requirements for floor drains; Properly

More information

The VGP: From the Old to the New

The VGP: From the Old to the New The VGP: From the Old to the New Sean Ramach NPDES Programs Branch, Region 5 U.S. Environmental Protection Agency 09/06/2013 This presentation is informational only and does not provide official EPA regulatory

More information

Shell Canada Limited Material Safety Data Sheet Effective Date: Supersedes:

Shell Canada Limited Material Safety Data Sheet Effective Date: Supersedes: Shell Canada Limited Material Safety Data Sheet Effective Date: 2003-06-05 Supersedes: 2001-01-08 1. PRODUCT AND COMPANY IDENTIFICATION PRODUCT: TELLUS* 22 SYNONYMS: HYDRAULIC OIL PRODUCT USE: Hydraulic

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

Pollution Prevention Technical Information note

Pollution Prevention Technical Information note Pollution Prevention Technical Information note Airfield management April 2011 This note gives you pollution prevention advice for the activities and processes that occur at airfields in England and Wales.

More information

Executive Summary. Consistent with Schedule 3 of the Environmental Assessment Act, IWM is submitting for evaluation this registration document.

Executive Summary. Consistent with Schedule 3 of the Environmental Assessment Act, IWM is submitting for evaluation this registration document. Executive Summary Island Waste Management Inc. (IWM) has been successfully operating a biomedical waste collection and disposal system for the Newfoundland and Labrador Health Boards Association (NLHBA)

More information

Environmental Authorization Application to the EPA for Offshore 2D Seismic, Multibeam and Coring Acquisition Survey

Environmental Authorization Application to the EPA for Offshore 2D Seismic, Multibeam and Coring Acquisition Survey TGS GEOPHYSICAL COMPANY (UK), LTD. PROJECT SUMMARY for Environmental Authorization Application to the EPA for Offshore 2D Seismic, Multibeam and Coring Acquisition Survey Project Title TGS Guyana Offshore

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

Oil Spill Preparedness and Response

Oil Spill Preparedness and Response Oil Spill Preparedness and Response Purpose To plan and prepare for effective Oil Spill Response 1 that mitigates potential consequences of an Incident, including identification and fulfilment of requirements

More information

Guidance on the Standards for Storage and Treatment of End-of-life vehicles

Guidance on the Standards for Storage and Treatment of End-of-life vehicles Guidance on the Standards for Storage and Treatment of End-of-life vehicles Introduction This guidance has been prepared by the Environment Agency and the Scottish Environment Protection Agency (SEPA),

More information

Hazardous Waste Management

Hazardous Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

Best Management Practices. Automotive Repair Operations that Discharge to a Sanitary Sewer System

Best Management Practices. Automotive Repair Operations that Discharge to a Sanitary Sewer System Best Management Practices Automotive Repair Operations that Discharge to a Sanitary Sewer System Prepared by the Canadian Petroleum Products Institute (CPPI) March 2004 STATEMENT OF DISCLAIMER No responsibility

More information

Environmental Improvement Plan. Sohar Refinery

Environmental Improvement Plan. Sohar Refinery Environmental Improvement Plan Sohar Refinery Feb 2014 Page 1 of 18 Waste Water Treatment Plant Improvements Background The treatment of the waste water of the Refinery was malfunctioning for a long period.

More information

OIL POLLUTION EMERGENCY PLAN

OIL POLLUTION EMERGENCY PLAN International Association of Drilling Contractors North Sea Chapter OIL POLLUTION EMERGENCY PLAN Template for Non-Production Mobile Offshore Drilling Units Revision Amendment Date 1. Final revision to

More information

BIOMEDICAL WASTE FACILITY INSPECTION REPORT* Facility name: Permit #: Date of Inspection:

BIOMEDICAL WASTE FACILITY INSPECTION REPORT* Facility name: Permit #: Date of Inspection: BIOMEDICAL WASTE FACILITY INSPECTION REPORT* *Note: Biomedical waste facilities and commercial biomedical waste incinerators are subject to the Solid Waste processing facility requirements of OAC 252:520

More information

Guidance on disposal of cargo residues in line with MARPOL Annex V

Guidance on disposal of cargo residues in line with MARPOL Annex V Guidance on disposal of cargo residues in line with MARPOL Annex V Introduction As has been covered in our previous guidance, preparation of cargo holds for the carriage of their next intended cargo is

More information

ANNEX 1 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006

ANNEX 1 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006 DRAFT RESOLUTION MEPC.140(54) Adopted on 24 March 2006 GUIDELINES FOR APPROVAL AND OVERSIGHT OF PROTOTYPE BALLAST WATER TREATMENT TECHNOLOGY PROGRAMMES (G10) THE MARINE ENVIRONMENT PROTECTION COMMITTEE,

More information

Focus on Hydraulic Fracturing

Focus on Hydraulic Fracturing INTRODUCTION Focus on Hydraulic Fracturing We have been hydraulically fracturing, or fracking, wells to produce natural gas and crude oil for decades. Our Health, Safety and Environment (HSE) Policy and

More information

Are you in control of process safety? Basis of safety assurance can provide the answer

Are you in control of process safety? Basis of safety assurance can provide the answer Loss Prevention Bulletin 231 June 2013 23 Safety practice Are you in control of process safety? Basis of safety assurance can provide the answer Phil Eames Eur Ing BSc CEng FIChemE Eames Risk Consulting

More information

From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC

From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC From: D. McDonald, Project Manager, Canadian Environmental Assessment Agency To: A. Perry, Regional Manager, Nova Scotia, BP Canada Energy Group ULC Dear Ms. Perry, The Canadian Environmental Assessment

More information

OWNER S, OPERATIONAL, AND MAINTENANCE MANUAL

OWNER S, OPERATIONAL, AND MAINTENANCE MANUAL OWNER S, OPERATIONAL, AND MAINTENANCE MANUAL H-TWO-O SERIES 2 WASTEWATER TREATMENT PLANTS CLASS 1 SYSTEMS 500/600/750/1,000 GALLONS PER DAY DESOTO CONCRETE PRODUCTS, INC. P.O. BOX 336 CERTIFIED OLIVE BRANCH,

More information

Trends in Technology Development for Marine Spill Response. Chantal Guénette CANADIAN COAST GUARD - ENVIRONMENTAL RESPONSE

Trends in Technology Development for Marine Spill Response. Chantal Guénette CANADIAN COAST GUARD - ENVIRONMENTAL RESPONSE Trends in Technology Development for Marine Spill Response Chantal Guénette CANADIAN COAST GUARD - ENVIRONMENTAL RESPONSE Spill Response for the Future Conference Stjørdal, Norway, April 8, 2011 Presentation

More information

Railroad Commission of Texas. Chairman Elizabeth Ames Jones Commissioner David Porter Barry T. Smitherman

Railroad Commission of Texas. Chairman Elizabeth Ames Jones Commissioner David Porter Barry T. Smitherman Railroad Commission of Texas Chairman Elizabeth Ames Jones Commissioner David Porter Barry T. Smitherman 1 Crossing the Pecos River The Railroad Commission of Texas acquired jurisdiction over oil and gas

More information

recycle water reuse it save up to from showers & baths for flushing toilets 30% of water use

recycle water reuse it save up to from showers & baths for flushing toilets 30% of water use Residential recycle - Water reuse Recovery - save recycle water from showers & baths reuse it for flushing toilets save up to 30% of water use www.recoverwater.com How it works Greywater is lightly soiled

More information

Scott Hockly. Environmental Management of an Inner City Roading Project

Scott Hockly. Environmental Management of an Inner City Roading Project Scott Hockly Environmental Management of an Inner City Roading Project Overview National War Memorial Park (Pukeahu) The big picture The Alliance Constraints Memorial Park Empowering Act Approach Reality

More information

Inland Technologies Inc

Inland Technologies Inc Inc Evaluation of the Mono-ethylene Glycol [MEG] Concentrator to Recycle MEG used in Hydrate Prevention March 2007 Document Nr 0035_INL-OPT-REP-001 Client : Inland Technologies Inc Project : Evaluation

More information

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action

ISO Monitoring and Measurement Nonconformance and Corrective and Preventative Action ISO 14001 4.5.1 Monitoring and Measurement 4.5.2 Nonconformance and Corrective and Preventative Action 4.5.1 Monitoring and Measurement The organization shall establish and maintain documented procedures

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

Irish Country Meats Camolin

Irish Country Meats Camolin Irish Country Meats Camolin Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Water 4.2 Surface Water 4.3 Boiler Emissions

More information

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II

Appendix 4. Standard format for the Procedures and Arrangements Manual. Annex II Appendix 4 : Regulations for the Control of Pollution by NLS Standard format for the Procedures and Arrangements Manual Note 1: The format consists of a standardized introduction and index of the leading

More information

F2. Vehicle and Heavy Equipment Repair and Maintenance

F2. Vehicle and Heavy Equipment Repair and Maintenance F2. Vehicle and Heavy Equipment Repair and Maintenance Commercial / Industrial / Institutional & Municipal Pollution Prevention Goal: Prevent or reduce the risk of discharge of pollutants to stormwater

More information

Ballast water treatment market. Opportunities for technologies in the light of regulation changes

Ballast water treatment market. Opportunities for technologies in the light of regulation changes Analysts report Ballast water treatment market Opportunities for technologies in the light of regulation changes Executive summary Current status: surging market are the primary driver behind the ballast

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission

2012 Pipeline Performance and Activity Report. BC Oil and Gas Commission 2012 Pipeline Performance and Activity Report BC Oil and Gas Commission Table of Contents BC Oil and Gas Commission 2 Pipeline Performance and Activity 3 Integrity Management Programs 5 Pipeline Requirements

More information

MANUFACTURING MECHANICAL. Twist Drills, Reamers, and Rotary Cutting Devices. Bearing Identification. Fasteners and Screw Threads

MANUFACTURING MECHANICAL. Twist Drills, Reamers, and Rotary Cutting Devices. Bearing Identification. Fasteners and Screw Threads Twist Drills, Reamers, and Rotary Cutting Devices Bearing Identification MANUFACTURING The objective of this course is to provide the student with an expanded understanding of the use, design, construction,

More information

Toxic Substance Reduction Plan Summaries Phase 2 Substances

Toxic Substance Reduction Plan Summaries Phase 2 Substances 2012 TOXICS REDUCTION ACT Toxic Substance Reduction Plan Summaries Phase 2 Substances VERSION 1.0 Petro-Canada Lubricants Inc. 385 Southdown Road Mississauga, Ontario L5J 2Y3 December 1, 2013 Version Control

More information

OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER. M. K. SICHONE Anglo Platinum, ACP, Kroondal, South Africa

OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER. M. K. SICHONE Anglo Platinum, ACP, Kroondal, South Africa OPTIMISATION OF ANGLO PLATINUM S ACP ACID PLANT CATALYTIC CONVERTER Anglo Platinum, ACP, Kroondal, South Africa ABSTRACT Anglo Platinum s Waterval smelting complex based in South Africa operates the Anglo

More information

Environmental Awareness Training

Environmental Awareness Training Environmental Awareness Training Issued by: Environmental Branch Code 1023 July 2017 Administrative or Operational Use as determined 08 July2015. Other requests shall be referred to Public Affairs Officer

More information

Water 2. Compliance 5

Water 2. Compliance 5 UPS 2016 Corporate Sustainability Report Supplemental Data About This Document In 2016, UPS reported its annual Corporate Sustainability Report in accordance with the GRI Standards: Comprehensive option.

More information

A LOOK INTO TRASH & RECYCLING SYSTEMS

A LOOK INTO TRASH & RECYCLING SYSTEMS A LOOK INTO TRASH & RECYCLING SYSTEMS Presentation created by Jamie Garuti, Sustainability Intern, Tulane Office of Sustainability and Environmental Studies, 2015. The Problem The combination of a growing

More information

PART 3 TERMINAL INFORMATION

PART 3 TERMINAL INFORMATION International Safety Guide Part 3 Terminal information PART 3 TERMINAL INFORMATION Edition 1-2010 CCNR/OCIMF 2010 Page 235 International Safety Guide Part 3 Terminal information Edition 1-2010 CCNR/OCIMF

More information

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM Page 1 of 10 INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM S A N F R A N C I S C O P U B L I C U T I L I T I E S C O M M I S S I O N Wastewater Enterprise/Collection System Division 3801

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

MECHANICAL INTEGRITY

MECHANICAL INTEGRITY MECHANICAL INTEGRITY 1.0 Purpose This element identifies Petsec s Mechanical Integrity (MI) program as required by its Safety and Environmental Management System (SEMS) Program and applies to all Petsec

More information

2013 UPS Corporate Sustainability Report: Supplemental Data

2013 UPS Corporate Sustainability Report: Supplemental Data 2013 UPS Corporate Sustainability Report: Supplemental Data Table of Contents Water.... 2 Effluents and Waste.... 3 Compliance... 5 Key Performance.... 7 Indicators About this document In 2013, UPS migrated

More information

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock

Rail Safety Management Procedure General Engineering and Operational Systems - Asset Management of Rolling Stock 1/16 Management of Rolling Stock Revision Date Comments 1 January 2011 Procedure developed to support SMS and legislative requirements. 2 February 2012 Reviewed with RISSB Standards and change of titles

More information

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations.

PLEASE NOTE. For more information concerning the history of these regulations, please see the Table of Regulations. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 7, 2004. It is intended for information and reference purposes only.

More information

Across the industry, ways are being sought to

Across the industry, ways are being sought to F O C U S Questioning the Way We Drill Across the industry, ways are being sought to find and extract oil and gas more cost-effectively, while improving safety and environmental performance. Drilling is

More information

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22 HYDRO DECK CONTENTS OVERVIEW 3 DESIGN 4 OVERVIEW OF KEY FEATURES 6 DESIGN BENEFITS 8 Versatile 8 High capacity ballast system 9 High deck strength and space 10 Integrated mooring system 11 Adaptable 12

More information

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval

APPENDIX 2. Nova Scotia Department of Environment and Labour Environmental Assessment Terms and Conditions for Environmental Assessment Approval APPENDIX 2 Nova Scotia Department of Environment and Labour Terms and Conditions for Approval Approval Approval Date: March 14, 2007 Keltic Petrochemicals Inc. LNG and Petrochemical Plant Facilities Keltic

More information

Solan Production Chemical Permit SAT Chemical Risk Assessment for Platform and SOST Installation, Commissioning and Operation

Solan Production Chemical Permit SAT Chemical Risk Assessment for Platform and SOST Installation, Commissioning and Operation Solan Production Chemical Permit SAT for Platform and SOST Installation, Commissioning and Operation REV ISSUE DATE STATUS AMENDMENT DETAILS ORIGINATE D BY APPROVED B1 30/05/14 1 st Draft Submitted for

More information

ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS

ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS c t ENVIRONMENTAL PROTECTION ACT AIR QUALITY REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to August 7, 2004.

More information

Good afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc.

Good afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc. Good afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc., a software development company based locally in Mount Pearl, Newfoundland.

More information

RESTAURANTS AND FOOD OUTLETS

RESTAURANTS AND FOOD OUTLETS Best Practice Guidelines for Stormwater Pollution Prevention RESTAURANTS AND FOOD OUTLETS MANAGING WASH WATER I Contents SECTION PAGE Introduction 2 What you need to know 3 Stormwater and wastewater -

More information

COLD SOLVENT CLEANING AND STRIPPING OPERATIONS (Adopted & Effective 5/23/07) (2) Any cleaning of application equipment is not subject to this rule.

COLD SOLVENT CLEANING AND STRIPPING OPERATIONS (Adopted & Effective 5/23/07) (2) Any cleaning of application equipment is not subject to this rule. RULE 67.6.1 COLD SOLVENT CLEANING AND STRIPPING OPERATIONS (Adopted & Effective 5/23/07) (a) APPLICABILITY (1) Except as provided in Section (b), this rule is applicable to all cold solvent cleaning and

More information

Imperial Gear Compound EP ISO 68, 100, 150, 220, 320, 460, 680 Page 1 of 6

Imperial Gear Compound EP ISO 68, 100, 150, 220, 320, 460, 680 Page 1 of 6 Imperial Gear Compound EP ISO 68, 100, 150, 220, 320, 460, 680 Page 1 of 6 1. CHEMICAL PRODUCT AND COMPANY IDENTIFICATION PRODUCT NUMBER(S): Imperial Gear Compound EP ISO 68, 100, 150, 220, 320, 460, 680

More information

SAFETY DATA SHEET. Identification of the material and the supplier. Non-silicone exterior and interior dressing, non flammable.

SAFETY DATA SHEET. Identification of the material and the supplier. Non-silicone exterior and interior dressing, non flammable. Page 1 of 6 Car Clean Products NZ Limited Ph + 64 9 250 0091 - Fax + 64 9 250 0092 - www.pacer.co.nz 33 Ha Crescent, Wiri - P O Box 97 948 - Manukau - Auckland 2241 - New Zealand SAFETY DATA SHEET Section

More information

THE COMPLETE GUIDE TO ISO14001

THE COMPLETE GUIDE TO ISO14001 THE COMPLETE GUIDE TO ISO14001 1. Introduction... 3 Plan Do Check Act... 5 2. Requirements... 7 Environmental Policy... 7 Environmental Aspects... 7 Legal and Other Requirements... 8 Objectives & Targets...

More information

ANNEX 3 ASSESSMENT OF ENVIRONMENTALLY CRITICAL EQUIPMENT

ANNEX 3 ASSESSMENT OF ENVIRONMENTALLY CRITICAL EQUIPMENT QHSE Manual Section-10 Environmental Management ANNEX 3 ASSESSMENT OF ENVIRONMENTALLY CRITICAL EQUIPMENT Waste Stream Machinery space bilge water Monitoring and Reduction 1. Monitor generation in monthly

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information

MATERIAL SAFETY DATA SHEET

MATERIAL SAFETY DATA SHEET MATERIAL SAFETY DATA SHEET MSDS# 1500 SECTION 1 QUADRANT EPP 2120 FAIRMONT AVENUE TELEPHONE NUMBERS: P.O. BOX 14235 PRODUCT INFORMATION(Quadrant EPP ) - READING, PA. 19612-4235 610-320-6600 TRANSPORTATION

More information

Challenges in the Installation and Operation of Ballast Water Treatment Systems. Dr. John Kokarakis

Challenges in the Installation and Operation of Ballast Water Treatment Systems. Dr. John Kokarakis Challenges in the Installation and Operation of Ballast Water Treatment Systems Dr. John Kokarakis The process 2 Questions to reply Enough capacity? Limitations Enough power? Safety? Gas Dangerous Zones

More information

Incident Reporting Requirements

Incident Reporting Requirements Incident Reporting Requirements Directive PNG014 December 2016 Version 2.0 Governing Legislation: Acts: The Oil and Gas Conservation Act The Pipelines Act, 1998 Regulations: The Oil and Gas Conservation

More information

2011 ANNUAL WATER REPORT

2011 ANNUAL WATER REPORT 2011 ANNUAL WATER REPORT June 2012 Engineering and Operations Department TABLE OF CONTENTS Page 2 1.0 INTRODUCTION... 3 2.0 PARKSVILLE WATER SYSTEM... 3 3.0 DISTRIBUTION SYSTEM... 6 4.0 SCADA... 9 5.0

More information

MATERIAL SAFETY DATA SHEET (in accordance with Directive 1907/2006 EC) Revised Date:

MATERIAL SAFETY DATA SHEET (in accordance with Directive 1907/2006 EC) Revised Date: 1. COMPANY AND PRODUCT IDENTIFICATION Trade Name: Company Name & Address: POLIKAP (PVDC, PVOH, Acrylic coated), POLISTRIP POLİNAS PLASTİK San. ve Tic. A.Ş. Organize Sanayi Bölgesi Cumhuriyet Cad. No: 2-26

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

#287 FOOD GRADE FLUSHING AGENT

#287 FOOD GRADE FLUSHING AGENT #287 FOOD GRADE FLUSHING AGENT Food Grade Flushing Agent is a non-toxic, non-drying, anti-wear flushing and cleaning lubricant that can be used to clean and flush all types of processing and packaging

More information

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Closed loop unloading systems are designed to minimize solvent vapor emissions during transfer by exchanging the liquid solvent in the

More information

Construction Waste Measurement Guide

Construction Waste Measurement Guide Draft V6 Last updated: February 2013 Construction Waste Measurement Guide A guide to measuring and reporting waste from construction activities 1 Introduction This document provides guidance on how to

More information

OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT

OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT OUR EXPERIENCE: BALLAST WATER MANAGEMENT SYSTEM (BWMS) RETROFIT Presented By: Chandru Sirumal Rajwani (CEO of N-KOM) PREFERRED SHIPYARD DELIVERING SOLUTIONS ERHAMA BIN JABER AL JALAHMA SHIPYARD CONTENTS

More information

Chapter 2. Editor. Ted W. van der Gulik, P.Eng. Senior Engineer. Authors. Stephanie Tam, P.Eng. Water Management Engineer

Chapter 2. Editor. Ted W. van der Gulik, P.Eng. Senior Engineer. Authors. Stephanie Tam, P.Eng. Water Management Engineer B.C. SPRINKLER IRRIGATION MANUAL Chapter 2 Editor Ted W. van der Gulik, P.Eng. Senior Engineer Authors Stephanie Tam, P.Eng. Water Management Engineer Andrew Petersen, P.Ag. Regional Resource Specialist

More information

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well

Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well Ambient Air Quality Monitoring Baseline Report, Kirby Misperton A Wellsite, KM8 Production Well. Prepared for: Third Energy UK Gas Ltd. Document Control Page Client Third Energy UK Gas Ltd. Document Title

More information

Construction Site Waste Management Process.

Construction Site Waste Management Process. Construction Site Waste Management Process. EMS DOCUMENT TYPE: ENVIRONMENTAL ASPECT: PURPOSE: Operational Control Document Waste Management To ensure we manage our waste in compliance with legislation

More information