1 Reassessment of External Events in View of the Fukushima Accident Michael Knochenhauer Scandpower AB Co-authors: Yvonne Adolfsson and Frida Olofsson, Scandpower AB Tomas Öhlin, Westinghouse Electric (Sweden)
2 Project Background As a consequense of the Fukushima nuclear power plant accident, the EU concluded that the event requires reassessment of the safety in NPPs in Europe. EU and ENSREG agreed upon an initial independent regulatory technical definition of a "stress test" and how it will be applied to the NPPs in Europe, EU Stress Test Specification. The Swedish Radiation Safety Authority (SSM) has required all Swedish nuclear utilities to submit a safety assessment based on the ENSREG specifications. The NOG (Nordic Owners Group) has initiated an analysis of various aspects related to the stress tests with the aim to make sure that no aspects has been disregarded.
3 Project Objectives Initiate assessments within the field of external events in the light of the EU Stress Test Specifications This first phase of the project aims to survey the current status in the field and decide on the necessity for further work. This presentation is made at the conclusion of phase 1-
4 Methodology The reassessment within the present NOG Säk och Miljö project is based on the existing guidance in Westinghouse report NOG Säk och Miljö Metodik för analys av vissa yttre händelser (NOG Safety and Environment Methodology for analysis of certain external events). The review comprises the type of fast evolving initiating events included in the report: Impact on buildings and structures. Electrical environment External flooding Impact on sea water quality For all design basis events the specification of requirements for external events are compiled. Implementation in Nordic reactors is reviewed. Suggestions of areas for further analysis.
5 Reassessment of External Events In the initiating phase of this project, preparatory work is identified for the prospective evaluation of the safety margins, possible cliff-edge effects and the necessity for modifications. Three sub-projects were defined: Extreme water levels in the Baltic Sea and Skagerrak Methodology for the analysis of multiple external events Main heat sink accessibility
6 Extreme water levels in the Baltic Sea and Skagerrak The objective for this work is to evaluate the relevance of the existing analyses which define the external flooding design basis for Swedish and Finnish BWRs. Aspects are presented that should be considered in a flooding analysis of a nuclear facility. The picture shows high sea water levels i Gothenburg Photographer: Tomas Klein, SMHI
7 Extreme water levels in the Baltic Sea and Skagerrak The existing statistical extreme value analysis for recurrence intervals of 100,000 and 1,000,000 years are based on short data series ( years). Such analyses are naturally associated with great uncertainties. Therefore the ambition has been to obtain a more qualitative description of extreme sea level events to use as a benchmark for existing analyses. The work includes the following parts: Description of development in time of observed extreme sea levels Consideration of historical events not included in data series Mechanisms behind extreme sea levels at the Nordic sites Global sea level rise due to climate change
8 Do we have extreme sea levels in the Baltic sea and Skagerrak? Definitely! The picture shows the French ship Caledonia on its way between Copenhagen and Pärnu (Estland) strandad on Bornholm after the devastating storm the night of November 1872.
9 Phenomena affecting water level Air pressure Wind speed Wind direction Wind waves Average sea level Seiche Sjösprång Local effect with short duration caused by a local change in air pressure travelling at the speed of a wave Tide Salinity
10 Historical extreme levels in the Baltic Sea Event (year) Storm Per (2007) Storm Gudrun (2005) January storm (1984) January storm (1983) Christmas Storm (1902) Backafloden (1872) Water level (cm above average) 144, Forsmark 197, Hamina 160, Ringhals 151, Helsinki 150, Göteborg 132, Hanko 177, Kalix 117, Stockholm 206, Lomma 360, Abbekås 280, Pärnu 146, Helsinki Event (year) Water level (cm above average) (1044, 1304, 1320,1449) > 300 (1625) 315, Travemünde (1694) 290, Schleswig (1835) 254, Flensburg Backafloden (1872) Stormfloder (1976, 1986/87, 88, 89) 349, Schleswig Ca 200
11 Methodology for the analysis of multiple external events The work aims to describe a screening analysis in order to identify and prioritize relevant coincident external events applied for deterministic analyses. The methodology is based on existing methodology developed within PSA. Incidence and locations for external event sources.
12 Plant Interfaces Page 12
13 Methodology for the analysis of multiple external events Screening criteria for multiple external events Impact. In order for the multiple event to be relevant to the analysis a situation where the event is challenging any of the safety functions and at the same time degrade at least one safety function is required. Definition. A multiple external event may be included in the definition of a simple external event. Independence. Normally the events included in a multiple event are not independent from each other. Impact on several safety functions. If the events affect the same safety function a further control must be done. The multiple event is relevant only if the combinated strength of the included events are greater than the strength of the separate events.
14 Main heat sink accessibility The objective is to sketch on proposals for measures to prevent different sources of unavailable main heat sink events. Proposals implying minor effort as complementary analyses, minor modifications and improved procedures. More comprehensive solution for diversification is implementation of a backup main heat sink as a cooling tower. The focus of the assessment is on oil spills from ships.
15 Main heat sink accessibility Alternatives for handling the risks from unannounced oil spills Prove that the risk is acceptable using statistical methods. Implement a measurement system of water quality that could detect oil spills. Implement a diversified heat sink. The basic idea is to construct a cooling tower that connects to the secondary cooling circuit. Unannounced oil spills in the Baltic Sea an the Skagerakk
16 Result/Conclusions The existing methodology for external events (NOG Safety and Environment Methodology for analysis of some external events) can be used as a base. Some questions regarding the methodology may need to be further analysed. The final results of the survey may indicate a need for additional safety provisions; either technical or organizational (such as procedures, human resources, emergency response organization and use of external resources).
17 For more information, please contact: Michael Knochenhauer President Scandpower AB T +46 (0) E mkn@scandpower.com W w
Safety Goals for Nuclear Installations a Status Overview
Safety Goals for Nuclear Installations a Status Overview Michael Knochenhauer Vice President, R&D Director Lloyd s Register Scandpower POWER-GEN Vienna Austria, 4-6 June 2013 Overview Safety Goals what
More informationStress tests specifications Proposal by the WENRA Task Force 21 April 2011
Stress tests specifications Proposal by the WENRA Task Force 21 April 2011 Introduction Considering the accident at the Fukushima nuclear power plant in Japan, the Council of the European Union declared
More informationFOSH Forsmark Safety Enhancement Project Post-Fukushima actions at Forsmark NPP
FOSH Forsmark Safety Enhancement Project Post-Fukushima actions at Forsmark NPP NKS January 12-13, 2016 Ove Nilsson Sekretessklass: Open (S1) 1 2015-12-23 FOSH Forsmark Safety Enhancement Project F-0003165
More informationSwedish action plan. for nuclear power plants
Swedish action plan for nuclear power plants Response to ENSREG s request December 2012 Page 2 (48) Abstract Following the severe accidents which started in the Fukushima Dai-ichi nuclear power plant,
More informationEuropean level recommendations Sect. in NAcP 2 Generic recommendation for WENRA, Finland participates and follows the work.
Cross reference table of ENSREG and Extraordinary CNS recommendations and national actions 1(16) 2.1 European guidance on assessment of natural hazards and margins The peer review Board recommends that
More informationNordic PSA Conference Castle Meeting 2013
Nordic PSA Conference Castle Meeting 2013 10 th -12 th April 2013 (version 2013-04-05) Ladies and Gentlemen, First of all. On behalf of the Swedish Radiation Safety Authority (SSM) and the Nordic PSA Group
More informationVincent Rebour, Frédéric Ménage IRSN: PRP-DGE/SCAN, PSN-EXP. Assessing flooding hazards: new guidelines
Vincent Rebour, Frédéric Ménage IRSN: PRP-DGE/SCAN, PSN-EXP Assessing flooding hazards: new guidelines 1 Content 1. Experience feedback from Le Blayais 2. New guidelines for NPPs and other NIs 3. Conclusion
More informationStrategic Vision and Implementation of Human and Organizational Factors in the Nuclear Industry. Kerstin Dahlgren Persson CNSO, Vattenfall, Sweden
Strategic Vision and Implementation of Human and Organizational Factors in the Nuclear Industry Kerstin Dahlgren Persson CNSO, Vattenfall, Sweden Content Fukushima and Systemic Failures Integrated approach
More informationEDF s Nuclear Fleet Objectives and Challenges of an Industry. Eric MAUCORT Deputy Director Nuclear Operations
EDF s Nuclear Fleet Objectives and Challenges of an Industry Eric MAUCORT Deputy Director Nuclear Operations TWh Nuclear energy: A French Choice France based its choice of nuclear energy after the two
More informationBelgian Stress Test Nuclear Power Plants (BEST)
Belgian Stress Test Nuclear Power Plants (BEST) 2013-08-26 TM IAEA: Belgian Stress Tests Stress Test Specifications Technical scope Initiating events Earthquake Flooding Other extreme natural events (extreme
More informationMeetings for Sharing International Knowledge and Experience on Stress Tests
Meetings for Sharing International Knowledge and Experience on Stress Tests Presented by: Peter Hughes, Ovidiu Coman, Javier Yllera Department of Nuclear Safety and Security Division of Nuclear Installation
More informationAttachment VIII-1. July 21, 2011 Nuclear and Industrial Safety Agency
Assessment Procedures and Implementation Plan Regarding the Comprehensive Assessments for the Safety of Existing Power Reactor Facilities Taking into Account the Accident at Fukushima Dai-ichi Nuclear
More informationThe Stress Test Process in France (CSA*) Its impact on Research Facilities
BgNS International Conference NUCLEAR POWER FOR THE PEOPLE 10 13 October 2012, AUGUSTA SPA Hotel, Hissar, Bulgaria The Stress Test Process in France (CSA*) ---- Its impact on Research Facilities G. Cognet
More informationThe EU-Stresstest Dr. Christoph Pistner
The EU-Stresstest Dr. Christoph Pistner 23.10.2015 Nuclear power plants in Europe as of 25.05.2014 Reactors in operation: Europe (West): 117 KKW 113,5 GW el. Europe (Middle and east): 68 KKW 48,6 GW el.
More informationOverview of IAEA's Projects on Safety Goals and Integrated Risk Informed Decision Making
Overview of IAEA's Projects on Safety Goals and Integrated Risk Informed Decision Making Presented by: Irina Kuzmina, PhD, Safety Officer Safety Assessment Section/ Division of Nuclear Installation Safety/
More informationSENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective
SENIOR REGULATORS MEETING Strengthening the Implementation of Defence in Depth IAEA Perspective 58th IAEA General Conference 25 September 2014 James Lyons Director of the Division of Nuclear Installation
More informationWorking together for a safer world. Nuclear Academy. Courses in Nuclear Probabilistic Safety Assessment
Working together for a safer world Nuclear Academy Courses in Nuclear Probabilistic Safety Assessment Lloyd s Register Nuclear Academy offers a comprehensive training programme in Probabilistic Safety
More informationRegulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident
Regulation of existing and new nuclear power stations in South Africa in the light of the Fukushima Accident O Phillips: Senior Executive Manager - National Nuclear Regulator The Fukushima Ministerial
More informationSafety enhancement of NPPs in China after Fukushima Accident
Safety enhancement of NPPs in China after Fukushima Accident CHAI Guohan 29 June 2015, Brussels National Nuclear Safety Administration, P. R. China Current Development of Nuclear Power Mid of year 2015
More informationSAFETY REQUIREMENTS IN FRANCE FOR THE PROTECTION AGAINST EXTREME EARTHQUAKES
SAFETY REQUIREMENTS IN FRANCE FOR THE PROTECTION AGAINST EXTREME EARTHQUAKES French Safety Authority Nuclear Power Plants Department Radioprotection and Nuclear Safety Institute IRSN/PRP-DGE/SCAN/BERSSIN
More informationInternational Atomic Energy Agency. Impact of Extreme Events on Nuclear Facilities following Fukushima. Dr C H Shepherd Nuclear Safety Consultant, UK
Impact of Extreme Events on Nuclear Facilities following Fukushima by Dr C H Shepherd Nuclear Safety Consultant, UK CRA PSA/HFA Forum 8-9 September 2011, Warrington Contents of the Presentation IAEA views
More informationPROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS
PROBABILISTIC SAFETY ANALYSIS IN SAFETY MANAGEMENT OF NUCLEAR POWER PLANTS 1 GENERAL 3 2 PSA DURING THE DESIGN AND CONSTRUCTION OF A NPP 3 2.1 Probabilistic design objectives 3 2.2 Design phase 4 2.3 Construction
More informationin China Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August , Vienna
Post-Fukushima Safety Improvement Measures for NPPs in China ZHENG Lixin Nuclear and Radiation Safety Center, Ministry i of Environmental Protection, ti P. R. China August 26-2929 2013, Vienna 1 Background
More informationGUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs
GUIDELINES FOR REGULATORY REVIEW OF EOPs AND SAMGs CNCAN, ROMANIA 2016 1 TABLE OF CONTENTS 1. INTRODUCTION 1.1. Background 1.2. Purpose and scope of the guidelines 1.3. Structure of the guidelines 1.4.
More informationUse of PSA to Support the Safety Management of Nuclear Power Plants
S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Use of PSA to Support the Safety Management of Nuclear Power Plants РР - 6/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS
More informationEuropean programs supporting harmonisation in PSA methodologies and in risk assessment
European programs supporting harmonisation in PSA methodologies and in risk assessment Jan Erik Holmberg, VTT Göran Hultqvist, FKA Michael Knochenhauer, Scandpower European networks compared to USnetworks
More informationThe Nuclear Safety Authority (ASN - Autorité de Sûreté Nucléaire),
REPUBLIQUE FRANÇAISE ASN Resolution 2014-DC-0406 of 21 th January 2014 instructing Electricité de France - Société Anonyme (EDF-SA) to comply with additional prescriptions applicable to the Gravelines
More informationNuclear power: OECD/NEA perspective
R&D activities underway and priority gaps and opportunities for climate resilience and preparedness Nuclear power: OECD/NEA perspective Dr. Henri PAILLERE, OECD Nuclear Energy Agency henri.paillere@oecd.org
More informationSUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD
МИНИСТЕРСТВО ЭНЕРГЕТИКИ И УГОЛЬНОЙ ПРОМЫШЛЕННОСТИ УКРАИНЫ НАЦИОНАЛЬНАЯ АТОМНАЯ ЭНЕРГОГЕНЕРИРУЮЩАЯ КОМПАНИЯ SUMMARY OF SE NNEGC ENERGOATOM PERFORMANCE IN POST-FUKUSHIMA PERIOD D.V. Biley Inspector General
More informationfor ELFORSK (the Electrical Utilities R & D Company, Sweden)
Economic aspects on Flexible Production and the Nordic Market IAEA-TM 46216 on Flexible Operation Approaches for Nuclear Power Plants 4-6 Sept 2013 Hans Henriksson, Jonas Persson Vattenfall R&D, Sweden
More informationBrazilian Operator s Response to Fukushima Daiichi Accident Luiz Soares Technical Director
Simposyum Siting of New Nuclear Power Plants and Irradiated Fuel Facilities Buenos Aires Argentina 24-28 June 2013 Panel Fukushima Daiichi s Impact in Nuclear Power Programs Worldwide Brazilian Operator
More informationRadiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted in Helsinki on 22 December 2015
UNOFFICIAL TRANSLATION FROM FINNISH. LEGALLY BINDING ONLY IN FINNISH AND SWEDISH. REGULATION STUK Y/4/2016 Radiation and Nuclear Safety Authority Regulation on the Safety of Disposal of Nuclear Waste Adopted
More informationHarmonized EUR revision E requirements corresponding to currently available technical solutions
Harmonized EUR revision E requirements corresponding to currently available technical solutions Csilla TOTH - EUR Steering Committee MVM Paks II Ltd., Hungary, Technical Director IAEA International Conference
More informationANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW
ANTICIPATED ANALYSIS OF FLAMANVILLE 3 EPR OPERATING LICENSE - STATUS AND INSIGHTS FROM LEVEL 1 PSA REVIEW Gabriel Georgescu, Patricia Dupuy and Francois Corenwinder Institute for Radiological Protection
More informationGuidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities
DRAFT Regulatory Document RD-152 Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities Issued for Public Consultation May 2009 CNSC REGULATORY
More informationOSART Good Practices OPERATIONAL EXPERIENCE FEEDBACK Utilization and dissemination of operating experience
OSART Good Practices OPERATIONAL EXPERIENCE FEEDBACK Utilization and dissemination of operating experience St. Laurent, France Mission Date; 27 Nov.-14 Dec., 2006 Operational experience during outages
More informationSweden s nuclear fuel cycle policy
Sweden s nuclear fuel cycle policy Björn Skala Ministry for Foreign Affairs Enheten för nedrustning och icke-spridning (NIS), Sweden Abstract. Sweden is a long established utilizer of nuclear power for
More informationSAFETY GUIDES. Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY
S ON IMPLEMENTATION OF THE LEGAL REQUIREMENTS Deterministic Safety Assessment РР - 5/2010 ÀÃÅÍÖÈß ÇÀ ßÄÐÅÍÎ ÐÅÃÓËÈÐÀÍÅ BULGARIAN NUCLEAR REGULATORY AGENCY TABLE OF CONTENTS 1. GENERAL PROVISIONS...2 LEGAL
More informationImplementation of Lessons Learned from Fukushima Accident in CANDU Technology
e-doc 4395709 Implementation of Lessons Learned from Fukushima Accident in CANDU Technology Greg Rzentkowski Director General, Power Reactor Regulation Canadian Nuclear Safety Commission on behalf of CANDU
More informationREGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES
REGULATORY CONTROL OF SAFETY AT NUCLEAR FACILITIES 1 GENERAL 5 2 GOVERNMENT RESOLUTION 5 2.1 Application and its processing 5 2.2 Documents to be submitted to STUK 6 3 CONSTRUCTION LICENCE 6 3.1 Licence
More informationNuclear waste management in Sweden compared to nuclear waste management in Denmark
Nuclear waste management in Sweden compared to nuclear waste management in Denmark Dr. Johan Swahn, Director The Swedish NGO Office for Nuclear Waste Review, MKG e-mail: johan.swahn@mkg.se, mobile: +46
More informationTHE ROLE OF SWEDISH UNIVERSITIES IN SUPPORTING SSM ACTIVITIES IN THE FIELD OF DETERMINISTIC SAFETY ANALYSIS
THE ROLE OF SWEDISH UNIVERSITIES IN SUPPORTING SSM ACTIVITIES IN THE FIELD OF DETERMINISTIC SAFETY ANALYSIS Alexander Agung 1), József Bánáti 1), Christophe Demazière 1), Mathias Stålek 1), Ninos Garis
More informationPost-Fukushima Assessment of the AP1000 Plant
ABSTRACT Post-Fukushima Assessment of the AP1000 Plant Ernesto Boronat de Ferrater Westinghouse Electric Company, LLC Padilla 17-3 Planta 28006, Madrid, Spain boronae@westinghouse.com Bryan N. Friedman,
More informationBAMBI - Baltic Sea marine biodiversity addressing the potential of adaptation to climate change implications Grant Agreement number: call
BAMBI - Baltic Sea marine biodiversity addressing the potential of adaptation to climate change implications Grant Agreement number: call2012-76 PROJECT SUMMARY The overall goal of BAMBI is to assess and
More informationXII. Lessons Learned From the Accident Thus Far
XII. Lessons Learned From the Accident Thus Far The Fukushima NPS accident has the following aspects: it was triggered by a natural disaster; it led to a severe accident with damage to nuclear fuel, Reactor
More informationAn assessment by the Radiation and Nuclear Safety Authority on the periodic safety review of Loviisa NPP
Safety assessment 1 (107) An assessment by the Radiation and Nuclear Safety Authority on the periodic safety review of Loviisa NPP Table of Contents Table of Contents... 1 1 Introduction... 4 1.1 Documents
More informationJoint Convention on the safety of spent fuel management and on the safety of radioactive waste management
Ds 2014:32 Sweden s fifth national report under the Joint Convention on the safety of spent fuel management and on the safety of radioactive waste management Sweden s implementation of the obligations
More informationClimate Change Adaptation in the Baltic Sea Region showcasing multilevel governance in practice
Climate Change Adaptation in the Baltic Sea Region showcasing multilevel governance in practice HELCOM Workshop on Baltic Sea Region Climate Change and its implications Warnemuende 5-6 February 2013 C.A.
More informationClass I Guidances. Guideline on the evaluation of the external flooding hazard for new class I nuclear installations.
Class I Guidances Guideline on the evaluation of the external flooding hazard for new class I nuclear installations -- February 2015 Table of contents 1. Introduction... 2 1.1. Background... 2 1.2. Scope...
More informationRisk-informed classification of systems, structures and components
Rakenteiden Mekaniikka (Journal of Structural Mechanics) Vol. 41, No 2, 2008, pp. 90-98 Risk-informed classification of systems, structures and components Jan-Erik Holmberg and Ilkka Männistö Summary.
More informationEnhancement of Nuclear Safety
Enhancement of Nuclear Safety Soon Heung Chang Handong Global University May 6, 2015 Contents 1 2 3 4 Importance of Energy Fundamentals of Nuclear Safety How to Enhance Nuclear Safety Closing Remarks 2
More informationConvention on Nuclear Safety
Implementation of the obligations of the Convention on Nuclear Safety CNS National Report of Switzerland for the Second Extraordinary Meeting in Accordance with Article 5 of the Convention May 2012 Implementation
More informationAssessing and Managing Severe Accidents in Nuclear Power Plant
Assessing and Managing Severe Accidents in Nuclear Power Plant Harri Tuomisto Fortum, Finland IAEA Technical Meeting on Managing the Unexpected - From the Perspective of the Interaction between Individuals,
More informationDevelopment and use of SAMGs in the Krško NPP
REPUBLIC OF SLOVENIA Development and use of SAMGs in the Krško NPP Tomaž Nemec Slovenian Nuclear Safety Administration tomaz.nemec@gov.si IAEA TM on the Verification and Validation of SAMGs, Vienna, 12
More informationTECHNICAL MEETING ON TECHNICAL SUPPORT ORGANIZATION (TSO) ROLE AND RESPONSIBILITIES May 2013
TECHNICAL MEETING ON TECHNICAL SUPPORT ORGANIZATION (TSO) ROLE AND RESPONSIBILITIES May 2013 1 MARCH 13 What is TSO? What do we understand as a Technical Support Organization (TSO) in the nuclear business?
More informationRegulatory Actions and Follow up Measures against Fukushima Accident in Korea
Int Conference on Effective Nuclear Regulatory Systems, April 9, 2013, Canada Regulatory Actions and Follow up Measures against Fukushima Accident in Korea Seon Ho SONG* Korea Institute of Nuclear Safety
More informationIAEA Study on Design Safety Requirements to SMR Technologies
IAEA Study on Design Safety Requirements to SMR Technologies Kristine Madden Associate Nuclear Safety Officer Safety Assessment Section Division of Nuclear Installation Safety Department of Nuclear Safety
More informationProbabilistic Safety Assessment Safety & Regulatory Framework
Probabilistic Safety Assessment Safety & Regulatory Framework Presentation to the CNSC August 2017 Dr. V.G. Snell 1 Purpose To summarize work done under CNSC contract 87055-16-0251: Role of the Probabilistic
More informationPower Generation. Ronaldo Jenkins Electrical Engineering Branch Chief Office of New Reactors (NRO)
Power Generation Ronaldo Jenkins Electrical Engineering Branch Chief Office of New Reactors (NRO) Agenda Overview Design Considerations 10 Code of Federal Regulations (CFR) 50 10 CFR 50, General Design
More informationSYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC
SYSTEMATIC AND DESIGN SAFETY IMPROVEMENTS OF NPPS IN CZECH REPUBLIC 3.10.2016 ČEZ, a. s. Meeting at IAEA Vienna Overview of topics ČEZ nuclear fleet (basic features) Systematic measures targeted to improve
More informationSafety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident. Ryodai NAKAI Japan Atomic Energy Agency
Safety Implication for Gen-IV SFR based on the Lesson Learned from the Fukushima Dai-ichi NPPs Accident Ryodai NAKAI Japan Atomic Energy Agency Contents Introduction Japanese Government Report to the IAEA
More informationP Forsmark site investigation. Control of microorganism content in flushing water used for drilling of KFM05A
P-04-285 Forsmark site investigation Control of microorganism content in flushing water used for drilling of KFM05A Lotta Hallbeck, Karsten Pedersen, Annika Kalmus Göteborgs Universitet October 2004 Svensk
More informationFrequency of Frazil Ice and Algae Threats to Ultimate Heat Sink for Hanhikivi-1 NPP. Ilkka Männistö 1
Frequency of Frazil Ice and Algae Threats to Ultimate Heat Sink for Hanhikivi-1 NPP Ilkka Männistö 1 1 Fennovoima Oyj, Salmisaarenaukio 1, 00180 Helsinki, Finland, Ilkka.mannisto@fennovoima.fi Hanhikivi-1
More informationTHE NATIONAL REPORT OF SOUTH AFRICA FOR THE SECOND EXTRAORDINARY MEETING OF THE CONVENTION FOR NUCLEAR SAFETY
THE NATIONAL REPORT OF SOUTH AFRICA FOR THE SECOND EXTRAORDINARY MEETING OF THE CONVENTION FOR NUCLEAR SAFETY South African National Report August 2012 1 Table of Contents Executive Summary... 5 1 Purpose...
More informationPRESENTATION FROM VIETNAM
Technical Meeting on Tools and Techniques for Effective Nuclear Communications PRESENTATION FROM VIETNAM NGUYEN THI VAN LY General Manager International Relation Department Ninh Thuan Nuclear Power Projects
More informationThe Nuclear Safety Authority (ASN),
FRENCH REPUBLIC ASN resolution 2012-DC-0276 of 26 June 2012 instructing Électricité de France Société Anonyme (EDF-SA) to comply with additional requirements applicable to the Bugey NPP (Ain département)
More informationVattenfall Capital Markets Day
Vattenfall Capital Markets Day Magnus Hall President and CEO Solna, 27 May 2015 Contents Vattenfall at a glance Market dynamics Political & regulatory issues Market trends Strategy & Structure Lignite
More informationBackground. Introduction. Overview of vendor design review process
Executive Summary A pre-licensing review of a new nuclear power plant (NPP), also referred to as a vendor design review (VDR), provides an opportunity for CNSC staff to assess a design prior to any licensing
More informationTransport policy and international goods shipments in the Nordic countries. Summary Memorandum Report 2014:4
Transport policy and international goods shipments in the Nordic countries Summary Memorandum Report 2014:4 Transport policy and international goods shipments in the Nordic countries Summary Memorandum
More informationIdentifying and Addressing the Support Needs in Member States Intending to Expand Existing Nuclear Power Programmes and Lessons Learned
International Conference on the Challenges Faced by TSOs in Enhancing Nuclear Safety and Security, 25-29 October 2010, Tokyo, Japan Identifying and Addressing the Support Needs in Member States Intending
More informationAtoms for the Future 2014 Paris September National Debate and Public Confidence in Sweden
Atoms for the Future 2014 Paris 12-13 September National Debate and Public Confidence in Sweden Ted Lindquist Coordinator Association of Swedish Municipalities with Nuclear Facilities KSO Association of
More informationFOLLOW-UP TO THE FRENCH NUCLEAR POWER PLANT STRESS TESTS UPDATE OF THE ACTION PLAN OF THE FRENCH NUCLEAR SAFETY AUTHORITY (ASN) DECEMBER 2017
43 FOLLOW-UP TO THE FRENCH NUCLEAR POWER PLANT STRESS TESTS UPDATE OF THE ACTION PLAN OF THE FRENCH NUCLEAR SAFETY AUTHORITY (ASN) DECEMBER 2017 UPDATED NATIONAL ACTION PLAN OF THE FRENCH NUCLEAR SAFETY
More informationPreliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development
Preliminary Lessons Learned from the Fukushima Daiichi Accident for Advanced Nuclear Power Plant Technology Development A. Introduction The IAEA Report on Reactor and Spent Fuel Safety in the Light of
More informationEU Stresstest National Report of Germany. Implementation of the EU Stress Tests in Germany
EU Stresstest National Report of Germany Implementation of the EU Stress Tests in Germany Implementation of the EU Stress Tests in Germany The European Council concluded in March 2011 that the safety of
More informationPower and Heat Tapio Kuula President, Power and Heat Sector Capital Markets Day
Power and Heat Tapio Kuula President, Power and Heat Sector Capital Markets Day June 17, 2004 Create the leading power and heat company Fortum focuses on the Nordic energy market as a platform for long-term
More informationGovernment Decision-in-Principle of 6 May 2010 on the Application of Teollisuuden Voima Oyj Regarding Construction of a Nuclear Power Plant Unit
M 2/2010 vp Government Decision-in-Principle of 6 May 2010 on the Application of Teollisuuden Voima Oyj Regarding Construction of a Nuclear Power Plant Unit Helsinki 2010 ISBN 978-952-227-375-8 Content
More informationIntroduction to the 2015 Darlington NGS Probabilistic Safety Assessment. Carlos Lorencez and Robin Manley Ontario Power Generation August 2015
Introduction to the 2015 Darlington NGS Probabilistic Safety Assessment Carlos Lorencez and Robin Manley Ontario Power Generation August 2015 Introduction to the 2015 Darlington NGS Probabilistic Safety
More informationTechnical notice Earthquake resistance of the Donzère-Mondragon canal embankment
Technical notice Earthquake resistance of the Donzère-Mondragon canal embankment 1. Geographical situation of the Tricastin NPP Le Tricastin nuclear site is located on the right bank of the Donzère-Mondragon
More informationThe 2014/2015 European Peer Reviews facilitating for statistical cooperation in the Nordic countries
The 2014/2015 European Peer Reviews facilitating for statistical cooperation in the Nordic countries Naja Andersen 1, Ari Tyrkkö 2 and Live Margrethe Rognerud 3 1 Statistics Denmark, Copenhagen, Denmark,
More informationSummary of the report on removing the costs for connecting to the national grid for offshore wind power
1 (5) Summary of the report on removing the costs for connecting to the national grid for offshore wind power This is a summary of the Swedish Energy Agency s report Slopade anslutningskostnader för havsbaserad
More informationNuclear Power and Nuclear Safety Post Fukushima
Nuclear Power and Nuclear Safety Post Fukushima C. Pistner, M. Englert, Öko-Institut e.v. DPG AKE AGA: Nuclear Energy and Security Münster, 29.03.2017 Agenda 1 2 3 4 5 Status of Nuclear Power Today Review
More informationClimate change vulnerability and adaptation in the energy sector, focus on the nuclear power sector
Climate change vulnerability and adaptation in the energy sector, focus on the nuclear power sector Loreta Stankeviciute (IAEA) and Henri Paillère (NEA) OECD Nuclear Energy Agency (NEA) and the International
More informationWorkshop Information IAEA Workshop
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Deterministic Safety Analysis: Input Data, Verification & Validation, Conservative/BE Approaches (Part. 2) Lecturer
More informationSAFETY, SITTING, EMERGENCY PLANNING ISUES FOR SMR DEPLOYMENT IN INDONESIA
SAFETY, SITTING, EMERGENCY PLANNING ISUES FOR SMR DEPLOYMENT IN INDONESIA PANDE Made Udiyani National Nuclear Energy Agency (BATAN) Republic of Indonesia INPRO Dialogue Forum on Legal and Institutional
More informationBelgian stress tests. National report on nuclear power plants. Man-made events
Belgian stress tests National report on nuclear power plants Man-made events This national report is issued by the Belgian regulatory body as part of the the programme of stress tests carried out on Belgian
More informationSNRIU Nuclear installation modifications
State Nuclear Regulatory Inspectorate of Ukraine SNRIU Nuclear installation modifications Andrii Goroshanskyi Law of Ukraine «On Use of Nuclear Energy and Radiation Safety» of 08-Feb-1995 Article 22. The
More informationComplementary Safety Assessments. of French nuclear installations
Complementary Safety Assessments of French nuclear installations 15 September 2011 Summary France considers that the accident on March, 11 2011 at the Fukushima Daiichi nuclear power plant in Japan, is
More informationEDF GROUP PRESENTATION
EDF GROUP PRESENTATION Decommissioning & Waste Treatment Lokala säkerhetsnämnden 9/12/2016 AGENDA 1. EDF GROUP, THE WORLD S LEADING ELECTRICITY COMPANY 2. OUR AMBITION IN THE NUCLEAR DECOMMISSIONING &
More informationChallenges for a TSO supporting both the regulator and industry. Eija Karita Puska VTT Technical Research Centre of Finland
Challenges for a TSO supporting both the regulator and industry Eija Karita Puska VTT Technical Research Centre of Finland 10/28/2014 2 Introduction Contents Background and Current Operational Environment
More informationEuropean Clearinghouse: Report on External Hazard related events at NPPs Summary Report of an European Clearinghouse Topical Study
European Clearinghouse: Report on External Hazard related events at NPPs Summary Report of an European Clearinghouse Topical Study Benoit Zerger Manuel Martín Ramos Miguel Peinador Veira 2013 Report EUR
More informationRisks of Nuclear Ageing
Risks of Nuclear Ageing Technical characteristics of ageing processes and their possible impacts on nuclear safety in Spain S. Mohr, S. Kurth Greenpeace, Valencia, November 2014 Age of European NPPs (grid
More informationExpected roles of nuclear energy in France s energy policy
Expected roles of nuclear energy in France s energy policy Pierre-Yves CORDIER Nuclear Counselor Ambassade de France, Tokyo Pierre-Yves CORDIER AESJ meeting July 2011, Tokyo 1 Outline Nuclear energy in
More informationReactor Technology: Materials, Fuel and Safety. Dr. Tony Williams
Reactor Technology: Materials, Fuel and Safety Dr. Tony Williams Course Structure Unit 1: Reactor materials Unit 2. Reactor types Unit 3: Health physics, Dosimetry Unit 4: Reactor safety Unit 5: Nuclear
More informationRegulatory Guide An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping
Regulatory Guide 1.178An Approach For Plant-S... Page 1 of 32 July 1998 Regulatory Guide 1.178 An Approach For Plant-Specific Risk-informed Decisionmaking Inservice Inspection of Piping Publication Information
More informationRecent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C
Int. Conf. on Topical Issues in Nuclear Installation Safety, Vienna Austria, 6~9 Jun. 2017 Recent Approaches related to Safety Enhancement of Operating NPPs in Korea Tae Eun JIN KEPCO E&C Contents 1. Introduction
More informationLITHUANIA. Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA, Vienna
LITHUANIA Technical Meeting on the Country Nuclear Power Profiles (CNPP) IAEA, Vienna 2016 05 11 Lithuania: Facts & Figures 2 Nuclear installations: Ignalina NPP Light-water, graphite-moderated type reactors,
More informationMeasuring Conceptual Knowledge Among NPP Maintenance Personnel A Tool For Knowledge Management
Measuring Conceptual Knowledge Among NPP Maintenance Personnel A Tool For Knowledge Management Pia Oedewald and Teemu Reiman Organization Research VTT, Technical Research Centre of Finland pia.oedewald@vtt.fi,
More informationSEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND
SEVERE ACCIDENT FEATURES OF THE ALTERNATIVE PLANT DESIGNS FOR NEW NUCLEAR POWER PLANTS IN FINLAND Risto Sairanen Radiation and Nuclear Safety Authority (STUK) Nuclear Reactor Regulation P.O.Box 14, FI-00881
More informationOil transportation in the Baltic Sea and MIMIC project
Oil transportation in the Baltic Sea and MIMIC project 14 th International Conference Maritime Transport and Infrastructure 2012 Olli-Pekka Brunila UTU/ CMS Riga, Latvia 26 April 2012 www.merikotka.fi/mimic
More information