1 DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011 FROM: HQ AFCESA/CEO 139 Barnes Drive, Suite 1 Tyndall AFB FL SUBJECT: Engineering Technical Letter (ETL) 11-25: Implementation of Major and Area Source Rules as Applied to Boiler Tune-ups and Energy Assessments for the Boiler MACT Rule 1. Purpose. This ETL provides guidance on meeting the regulatory requirements for boiler tune-ups and energy assessments of Code of Federal Regulations, Title 40, Part 63 (Environmental Protection Agency [EPA] 40 CFR Part 63), March 21, 2011 (see paragraph 3.1). Area Source rules were effective on May 20, Major Source requirements are under judicial review and are not in effect at this time. 2. Application: Requirements in this ETL are mandatory. It is the responsibility of the base civil engineer and the owners/operators of Air Force boilers to become familiar with the provisions of EPA 40 CFR Part 63 as it pertains to their boiler systems Authority: EPA 40 CFR Part 63, March 21, Coordination: The Civil Engineer, Asset Management and Operations Division, Natural Infrastructure (AF/A7CAN) Major command (MAJCOM)/A7Os (Operations) Air Force Center for Engineering and the Environment, Technical Support (AFCEE/TD) 2.3. Effective Date: Immediately Intended Users: MAJCOM engineers Civil engineer squadron commanders Air Force boiler owners/operators Air Force environmental management offices 3. References Federal: EPA 40 CFR Part 63, National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers, March 21, 2011, APPROVED FOR PUBLIC RELEASE: DISTRIBUTION UNLIMITED

2 EPA 40 CFR Part 63, National Emission Standards for Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and Process Heaters, March 21, 2011, /pdf/ pdf 42 USC 7412, Hazardous air pollutants, title42-chap85-subchapi-parta-sec7412.pdf 3.2. Department of Defense (DOD): DOD G, Overseas Environmental Baseline Guidance Document (OEBGD), Sample EPA Forms: Initial Notification of Applicability (Area Sources), Initial Notification of Applicability (Major Sources), Notification of Compliance Status for Boilers Subject to Tune-ups (Area Sources), Tune-up Record and Biennial Compliance Certification (Area Sources), 4. Acronyms. CFR Code of Federal Regulations DOD Department of Defense EPA Environmental Protection Agency ETL Engineering Technical Letter HAP hazardous air pollutant HVAC heating, ventilation, air conditioning MACT Maximum Achievable Control Technology MAJCOM major command MMBtu/hr million British thermal units per hour (where M stands for 1000) NESHAP National Emission Standards for Hazardous Air Pollutants NOC Notification of Compliance Status Report TBtu/yr trillion British thermal units per year TDB to be determined 5. Definitions Boiler: An enclosed device using controlled flame combustion and having the primary purpose of recovering thermal energy in the form of steam or hot water Controlled Flame Combustion: A steady-state, or near steady-state, process wherein fuel and/or oxidizer feed rates are controlled. 2

3 5.3. Process Heater: An enclosed device using controlled flame that transfers heat indirectly to a process material (liquid, gas, or solid) or to a heat transfer material for use in a process unit Energy Use System: Includes, but is not limited to, process heating; compressed air systems; machine drive (motors, pumps, fans); process cooling; facility heating, ventilation, and air-conditioning (HVAC) systems; hot heater systems; building envelopes; and lighting Gas 1: Natural gas, refinery gas, and other high-quality gas that does not exceed the maximum concentration of 40 micrograms per cubic meters of mercury and 4 parts per million by volume of hydrogen sulfide Gas 2: Refers to gas other than Gas Biomass: Any biomass-based solid fuel that is not solid waste. This includes, but is not limited to, wood residue and wood products (e.g., tree stumps, tree limbs, saw dust, chips, and shavings), logging residues, and grain hulls. Biomass boilers burn at least 10 percent (for Major Sources) or 15 percent (for Area Sources) of biomass on an annual basis Hazardous Air Pollutant (HAP). As defined in United States Code Title 42, Chapter 85, Subchapter I, Part A, Section 7412, Hazardous air pollutants (42 USC 7412) (see paragraph 3.1 of this ETL). 6. Background. The EPA published new Boiler MACT rules on February 21, 2011 for both Area Source and Major Source boilers. The regulation sets requirements for emission levels, tune-ups, and energy assessments based on boiler size, HAP and non- HAP emissions, fuel types and source. This ETL provides guidance only on meeting the regulatory requirements for tune-ups and energy assessments. 7. Requirements: EPA 40 CFR Part 63 stipulates operational requirements for boiler tune-ups and energy assessments for Area Source and Major Source boilers. The first step is to determine the source type for the facility: Area Source or Major Source. Check with the base environmental management office to confirm the source type for the boilers Major and Area Source Definitions: Major Source: Any stationary source or group of stationary sources located within a contiguous area and under common control that emits or has the potential to emit, considering controls, in the aggregate, 10 tons per year or more of any single HAP or 25 tons per year or more of any combination of HAPs, unless the EPA administrator establishes a lesser quantity, or, in the case of radionuclides, different criteria from those specified in this paragraph. 3

4 Area Source: Any stationary source of HAPs that is not a Major Source. An Area Source boiler is an existing stationary source or collection of sources located at an Area Source facility or each new boiler located at an Area Source facility Boiler tune-ups are required for Area Source and Major Source boilers according to EPA 40 CFR Part 63, March 21, Area Source Tune-up Requirements: The Area Source tune-up requirements are listed in EPA 40 CFR Part 63, Section Note: Gas-fired boilers are exempt from tune-up requirements under the Area Source rule, including dual-fuel boilers that only burn liquid fuel during periods of gas curtailment Conduct required biennial tune-ups for existing or new coal-fired Area Source boilers having a heat input capacity of less than 10 million British thermal units per hour (MMBtu/hr) Conduct required biennial tune-ups for all existing or new biomassfired and oil-fired sources Annual tune-ups are not required for Area Source boilers Submit an Initial Notification of Applicability form to the EPA Regional office for stationary sources at your facilities subject to the Area Source Boilers National Emission Standards for Hazardous Air Pollutants (NESHAP). Initial notification reports are due September 17, Download a sample Initial Notification of Applicability form at After the initial tune-up, a signed statement must be submitted by the base civil engineer in the Notification of Compliance (NOC) Status Report indicating that a boiler tune-up was conducted (Section (a) and (b) and Section (C)). The signed NOC statement must also include a statement that startups and shutdowns were conducted according to manufacturer s recommended procedures (Table 2 to Subpart JJJJJJ of Part 63). The NOC is submitted to the EPA regional office servicing the plant and copies are maintained in the environmental office and heating plant facility for five years. The initial tune-up must be complete no later than March 21, 2012, and the NOC Status Report must be submitted no later than July 19, For subsequent tune-ups, reports are submitted when requested by the regulatory agency. Download a sample Notification of Compliance Status for Boilers Subject to Tune-ups at 4

5 Download a sample Tune-up Record and Biennial Compliance Certification form for Area Sources at Guidance for overseas bases is found in country-specific Final Governing Standards or DOD G, Overseas Environmental Baseline Guidance Document (OEBGD) Major Source Tune-up Requirements. The Major Source tune-up requirements are listed in EPA 40 CFR Part 63, Sections (a)(10) and (a)(11). Note: Major Source requirements are under judicial review and are not in effect at this time. Compliance may be required in the future. Check with the base environmental office for updates Conduct required biennial tune-ups for existing or new coal/oil/biomass/gas 1 or Gas 2 Major Source boilers having a heat input capacity less than 10 MMBtu/hr Conduct required annual tune-ups for existing or new gas 1 Major Source boilers having a heat input capacity of 10 MMBtu/hr or greater Submit an Initial Notification of Applicability form to the EPA regional office for stationary sources at your facilities subject to the Major Source Boilers NESHAP. However, since the Major Source rules are under judicial review, the initial notification reports will not be required until the final rule is issued. Download a sample Initial Notification of Applicability form at After the initial tune-up, a signed statement must be submitted by the base civil engineer in the NOC Status Report indicating that a boiler tune-up was conducted (Section (e)). The signed NOC statement must also include a statement that startups, shutdowns, and adjustments were conducted according to the manufacturer s recommended procedures (Section ). The NOC is submitted to the EPA regional office servicing the plant and copies are maintained in the environmental office and heating plant facility for five years. Further details on Major Source tune-up requirements will be issued after the final rule is issued Major Source Tune-up Records and Certification Forms. The EPA has not issued example forms for Major Sources, but tune-up records and certifications must include the same information as required in EPA 40 CFR Part 63. 5

6 An overview of tune-up requirements is summarized in Attachment 1 for Area Source and Major Source tune-ups. See referenced sections of EPA 40 CFR Part 63 for complete requirements and details Energy Assessments. Energy assessments are a one-time requirement for Area Source and Major Source boilers according to EPA 40 CFR Part 63, March 21, Energy Assessment Defined. An energy assessment refers to a process which involves a thorough examination of potential savings from energy efficiency improvements, pollution prevention, and productivity improvement. It leads to the reduction of pollutants through process changes and other efficiency modifications. Improving energy efficiency reduces negative impacts on the environment and reduces operating and maintenance costs. Improvements in energy efficiency result in decreased fuel use, which results in a corresponding decrease in emissions (both HAP and non-hap) from the boiler Scope of Energy Assessments. The energy assessment applies to existing regulated boilers, energy use systems, facilities, or percentage of facilities served as identified in the Energy Assessment Guide (Attachment 2) under the section Important! Clarifications About Scope. An energy assessment should identify all energy conservation measures Purpose of Energy Assessment. The energy assessment s purpose is to identify energy conservation measures (e.g., process changes or other modifications to the facility) that can be implemented to reduce system and facility energy demand which would reduce fuel use and emissions Energy Assessment Applicability. Energy assessments are required for Area Sources. (Note: Major Source requirements for energy assessments [paragraphs , , and ) are under judicial review and are not in effect at this time.) The energy assessment requirements of EPA 40 CFR Part 63 are listed below: Area Sources: Required for existing boilers only 10 MMBtu/hr coal/oil/biomass (not gas) existing only. This is a one-time requirement Major Sources: Required for boilers and process heaters, any size any fuel: coal/oil/biogas/gas 1 or Gas 2 existing only. This is a one-time requirement Compliance Dates for Energy Assessments Area Sources: March 21, 2014 (Table 2 to Subpart JJJJJJ of Part 63). 6

7 Major Sources: March 21, 2014 (Table 3 to Subpart DDDDD of Part 63) Prior Assessments. Energy assessments completed on or after January 1, 2008, that includes the criteria of Table 2 to Subpart JJJJJJ in Section and Table 3 to Subpart DDDDD in Section of 40 CFR Part 63 can be used to satisfy this requirement. The base civil engineer will determine if the prior assessment meets the criteria before submitting to the EPA. If part of the requirements are lacking, the remaining tasks may be completed and submitted with the previous assessment. Send energy assessments to the EPA regional office Records and Documentation. Records must be kept for five years. The Notification of Compliance Status form is used for submittal to the EPA (see paragraph ) Existing Area Source facilities having a boiler (or combination of boilers) with a heat input capacity of 10 MMBtu/hr or greater and subject to this rule must submit documentation to the EPA that the energy assessment was performed and cost-effective energy conservation measures were identified Existing Major Source facilities (including boilers and process heaters) must submit documentation to the EPA (when Major Source requirements are approved) certifying this facility has had an energy assessment performed according to Section (e) and the requirements listed in Table 3 to Subpart DDDDD of Part An overview of Area Source and Major Source energy assessment requirements is summarized in Attachment 2. See referenced sections of EPA 40 CFR Part 63 for complete requirements and details. 8. Point of Contact. Recommendations for improvements to this ETL are encouraged and should be furnished to the HVAC Subject Matter Expert, HQ AFCESA/CEOA, 139 Barnes Drive Suite 1, Tyndall AFB FL , DSN , Commercial (850) , afcesar@tyndall.af.mil. ANDREW A. LAMBERT, Colonel, USAF Chief, Operations and Programs Support Div. 3 Atchs 1. Tune-up Guide 2. Energy Assessment Guide 3. Distribution List 7

8 TUNE-UP GUIDE AREA SOURCE MAJOR SOURCE APPLICABILITY Boilers only Boilers and Process Heaters Biennial Existing, 10 MMBtu/hr, Oil / Biomass Existing or New, < 10 MMBtu/hr, Coal / Oil / Biomass Existing or New, < 10 MMBtu/hr, Coal / Oil / Biomass / Gas 1 or Gas 2 Annual None Existing or New, 10 MMBtu/hr, Gas 1 COMPLIANCE DATE Rule Reference (a)(1), (b) or (c) (a) or (b) Existing Sources 3/21/2012 3/21/2014 New Sources 5/20/2011 or upon startup (whichever later) 5/20/2011 or upon startup (whichever later) INITIAL NOTICE OF COMPLIANCE (NOC) STATUS Rule Reference (a)(4) (e) NOC Due Date Example NOC To be submitted within 120 days after compliance date (7/19/2012) or within 60 days of stack test if required Initial Notification of Compliance Status for Boilers Subject to Tune-ups - Area Sources To be submitted within 60 days after completion of all initial compliance demonstrations and all performance tests and fuel analyses for the affected source TBD Rule Reference (b) TUNE-UP REQUIREMENTS Annual: (a)(10), Biennial: (a)(11) General Conduct biennial tune-ups no more than 25 months after previous tune-up Conduct biennial tune-ups no more than 25 months after previous tune-up Conduct annual tune-ups no more than 13 months after previous tune-up Tune-up Requirements 1. As applicable, inspect the burner and clean or replace any components of the burner as necessary (you may delay the burner inspection until the next scheduled unit shutdown, but you must inspect each burner at least once every 36 months). 2. Inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer s specifications, if available. Atch 1 (1 of 2)

9 3. Inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. 4. Optimize total emissions of carbon monoxide. This optimization should be consistent with the manufacturer s specifications, if available. 5. Measure the concentrations in the effluent stream of carbon monoxide in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made. (Measurements may be either on a dry or wet basis, as long as it is the same basis before and after the adjustments are made.) Tune-up Requirements (Cont.) 6. Maintain records onsite and submit, if requested by the EPA administrator, a biennial report containing the information in paragraphs (i) through (iii) of this section. (i) The concentrations of carbon monoxide (CO) in the effluent stream in parts per million, by volume, and oxygen in volume percent, measured before and after the tune-up of the boiler. (ii) A description of any corrective actions taken as a part of the tune-up of the boiler. (iii) The type and amount of fuel used over the 12 months prior to the biennial tune-up of the boiler. 6. Maintain records on-site and submit, if requested by the EPA administrator, an annual report containing the information in paragraphs (A) through (C) of this section. (A) The concentrations of carbon monoxide (CO) in the effluent stream in parts per million by volume, and oxygen in volume percent, measured before and after the adjustments of the boiler; (B) A description of any corrective actions taken as a part of the combustion adjustment; and (C) The type and amount of fuel used over the 12 months prior to the annual adjustment, but only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel use by each unit. 7. If the unit is not operating on the required date for a tune-up, the tune-up must be conducted within one week of startup. Atch 1 (2 of 2)

10 ENERGY ASSESSMENT GUIDE AREA SOURCE APPLICABILITY MAJOR SOURCE Unit Boilers only Boilers and Process Heaters Size 10 MMBtu/hr Any Size Fuel Category Coal / Oil / Biomass (not Gas) Any Fuel: Coal / Oil / Biomass / Gas 1 or 2 Compliance Date Existing Only 3/21/2014 DOES NOT APPLY TO NEW UNITS COMPLIANCE DATE Existing Only Major Source requirements for energy assessments are under judicial review and are not in effect at this time 3/21/2014 Rule Reference (a)(3) (b) NOC Due Date INITIAL NOTICE OF COMPLIANCE (NOC) STATUS To be submitted within 120 days after compliance date (7/19/2014) or within 60 days of stack test, if required To be submitted within 60 days after completion of all initial compliance demonstrations and all performance tests and fuel analyses for the affected source Rule Reference (a)(4) (e) Example NOC Initial Notification of Compliance Status for Boilers Subject to Tune-ups - Area Sources TBD ENERGY ASSESSMENT REQUIREMENTS Rule Reference Table 2 to Subpart JJJJJJ (40 CFR 63) Table 3 to Subpart DDDDD (40 CFR 63) General A one-time energy assessment must be performed by a qualified energy assessor. An energy assessment completed on or after January 1, 2008, that meets or is amended to meet the energy assessment requirements below satisfies the energy assessment requirement. 1. A visual inspection of the boiler system. 2. An evaluation of operating characteristics of the facility, specifications of energy-using systems, operating and maintenance procedures, and unusual operating constraints. Energy Assessment Requirements 3. Inventory of major systems consuming energy from affected boiler(s). 4. A review of available architectural and engineering plans, facility operation and maintenance procedures and logs, and fuel usage. 5. A list of major energy conservation measures. Atch 2 (1 of 3)

11 Energy Assessment Requirements (Cont.) Requirement 6 not included for Area Sources 6. A review of the facility s energy management practices and provide recommendations for improvements consistent with the definition of energy management practices. 7. A list of the energy savings potential of the identified energy conservation measures. 8. A comprehensive report detailing the ways to improve efficiency, the cost of specific improvements, benefits, date of assessment, and the time frame for recouping those investments. SCOPE OF ENERGY ASSESSMENT < 0.3 TBtu/yr 1. Energy assessment for facilities with affected boilers using less than 0.3 trillion Btu (TBtu) per year heat input will be one day in length maximum. The boiler system and energy use system accounting for at least 50 percent of the affected boiler(s) energy output will be evaluated to identify energy savings opportunities, within the limit of performing a one-day energy assessment. 0.3 to 1 TBtu/yr 2. Energy assessment for facilities with affected boilers and process heaters using 0.3 to 1 TBtu/year will be three days in length maximum. The boiler system(s) and any energy use system(s) accounting for at least 33 percent of the affected boiler(s) energy output will be evaluated to identify energy savings opportunities, within the limit of performing a three-day energy assessment. > 1 TBtu/yr 3. Energy assessment for facilities with affected boilers and process heaters using greater than 1.0 TBtu/year, the boiler system(s) and any energy use system(s) accounting for at least 20 percent of the affected boiler(s) energy output will be evaluated to identify energy savings opportunities. IMPORTANT! - CLARIFICATIONS ABOUT SCOPE The heat input cut-off values apply to the combined heat input of all the affected boilers (and process heaters, if a major source facility). For example, if there are 10 boilers at your facility and they are individually less than 0.3 TBtu/yr but their combined heat input is greater than 1 TBtu/yr, then your facility would be considered to be in the > 1 TBtu/yr category to determine the scope of the energy assessment. The energy assessment must include all of the affected boiler systems. For example, if you have 10 affected boilers in your facility then you will likely have to assess ten boiler systems. The requirement is that the energy assessment must include, in addition to the affected boiler system, some percent of the systems using the energy from the affected boilers. That percent will be 50, 33, or 20 percent, depending on the heat input category identified for the facility. For example, if the facility is in the > 1 TBtu/yr heat input category, and there is one boiler that serves ten buildings, then the energy assessment should include the boiler system and any of the ten buildings that would be using at least 33% of the energy from that boiler system. If none of the buildings are using at least 33% of the energy then only the boiler system would be included in the energy assessment. Atch 2 (2 of 3)

12 APPLICABLE DEFINITIONS (1) Someone who has demonstrated capabilities to evaluate a set of the typical energy savings opportunities available in opportunity areas for steam generation and major energy using systems, including, but not limited to: (i) Boiler combustion management. (ii) Boiler thermal energy recovery, including (A) conventional feed water economizer, (B) conventional combustion air preheater, and (C) condensing economizer. (iii) Boiler blowdown thermal energy recovery. (iv) Primary energy resource selection, including (A) fuel (primary energy source) switching, and (B) applied steam energy versus direct-fired energy versus electricity. (v) Insulation issues. (vi) Steam trap and steam leak management. Energy Assessor (vii) Condensate recovery. (viii) Steam end-use management. (2) Capabilities and knowledge includes, but is not limited to: (i) Background, experience, and recognized abilities to perform the assessment activities, data analysis, and report preparation. (ii) Familiarity with operating and maintenance practices for steam or process heating systems. (iii) Additional potential steam system improvement opportunities, including improving steam turbine operations and reducing steam demand. (iv) Additional process heating system opportunities, including effective utilization of waste heat and use of proper process heating methods. (v) Boiler-steam turbine cogeneration systems. (vi) Industry-specific steam end-use systems. Boiler System The boiler and associated components, such as the feed water system, the combustion air system, the fuel system (including burners), blowdown systems, combustion control system, and energy consuming systems. Energy Use system Includes, but is not limited to, process heating; compressed air systems; machine drive (motors, pumps, fans); process cooling; facility HVAC systems; hot heater systems; building envelope; and lighting. Atch 2 (3 of 3)

13 DISTRIBUTION LIST SPECIAL INTEREST ORGANIZATIONS Information Handling Services (1) Construction Criteria Database (1) 15 Inverness Way East National Institute of Bldg. Sciences Englewood CO L Street NW, Suite 400 Washington, DC Atch 3 (1 of 1)

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry. BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ Applicability: Industrial Boilers used in manufacturing processing, mining, refining or other industry. Commercial Boilers used in stores/malls, laundries,

More information

Boiler MACT: Energy Assessments

Boiler MACT: Energy Assessments Boiler MACT: Energy Assessments Conference on the Environment November 12, 2013 Alex Mentzer, EIT Consultant Overview Boiler Rules Brief Recap Energy Assessments Requirements Qualified Energy Assessor

More information

EPA EMISSION RULES - BOILERS

EPA EMISSION RULES - BOILERS EPA EMISSION RULES - BOILERS WHAT S NEXT FOR OWNER AND OPERATORS? On March 21, 2011 the U.S. Environmental Protection Agency published three rules regarding air emission standards in the Federal Register.

More information

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131 A.6 Boilers The following are Minnesota Standards of Performance for Indirect Heating Equipment (Minn. R. 7011.0500-7011.0553) New boilers: construction, modification, or reconstruction commenced after

More information

Texas Industries of the Future November 20, 2013

Texas Industries of the Future November 20, 2013 For Texas Industries of the Future November 20, 2013 Bob Bessette, President Council of Industrial Boiler Owners CIBO is dedicated to ensuring that non-utility industrial, commercial and institutional

More information

502(b)(10) Permit for Part 70 Source

502(b)(10) Permit for Part 70 Source 502(b)(10) Permit for Part 70 Source Permit Attachment No.: 2075-139-0002-V-03-1 Effective Date: November 9, 2015 Facility Name: Mailing Address: Parent/Holding Company: 862 West Ridge Road Gainesville,

More information

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4 Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers Table of Contents General (Q1 Q9)....2 Applicability (Q10 Q22)...4 Compliance Testing (Q23-Q30).....7 Implementation: Tune-ups (Q31

More information

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Boiler MACT & Related Rules Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Clean Air Act Rules Recently Finalized National Emissions Standard for Hazardous Air

More information

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr Department of the Environment COMAR 26.11.09 Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr October 30, 2013 Topics Covered Standards,

More information

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015. SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015 Air Emissions Permit Program Contents I. Air Permitting Introduction

More information

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered Department of the Environment Technology Advancement and Standards for Biomass Fuel to Energy Conversion Husain Waheed Ph.D., Ad.Tech February 18, 2015 For discussion only Topics Covered Standards, Technology,

More information

BOILER MACT 40 CFR 63 DDDDD

BOILER MACT 40 CFR 63 DDDDD BOILER MACT 40 CFR 63 DDDDD I. Applicability (63.7485): Industrial, commercial, or institutional boiler or process heater (63.7575) located at a HAP major, except for (63.7491) exempted listed below. Note:

More information

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers World Water & Environmetal Resources Congress 2004 Salt Lake City June 24-27 New Air Quality Requirements for Facilities with Boilers F. Jason Martin, PE, ASCE Member 1 1 Short Elliott Hendrickson, 809

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05700002-006 IS ISSUED TO Potlatch Land & Lumber LLC, Bemidji POTLATCH LAND & LUMBER LLC, BEMIDJI 50518 County Road 45 Bemidji, Hubbard County, Minnesota 56601 The

More information

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources 40 CFR Part 63, Subpart JJJJJJ National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers March 28, 2013 Barb Goode, Kansas Small Business

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500016-102 Permittee: Facility name: Plasti Fab Plasti Fab 116 Pine St S Lester Prairie, MN 55354-1010 McLeod County Operating permit issuance date: July 18,

More information

Dollars and Sense: Boiler Tuning as a Best Management Practice

Dollars and Sense: Boiler Tuning as a Best Management Practice WHITE PAPER Dollars and Sense: Boiler Tuning as a Best Management Practice John A. Bacon, MBA, PG, CEM TRC Environmental Corporation August 1, 2018 Dollars and Sense: Boiler Tuning as a Best Management

More information

Boiler Tune-up Guide

Boiler Tune-up Guide Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ

More information

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AND PROCESS HEATERS AT MAJOR SOURCE FACILITIES ACTION On February 21, 2011, the Environmental Protection Agency

More information

Update on ICI Boiler MACT

Update on ICI Boiler MACT Update on ICI Boiler MACT Bruce Hedman March 5, 2013 Clean Air Acts Standards for Boilers and Incinerators On December 20, 2012, EPA finalized a specific set of adjustments to March 2011 Clean Air Act

More information

Final Boiler MACT Rule Requirements Summary

Final Boiler MACT Rule Requirements Summary Federal Regulation: Final Boiler MACT Rule Requirements Summary NESHAP 40 CFR 63 Subpart DDDDD Proposed rule published 6/4/2010 Final rule signed 2/21/2011 Info at http://epa.gov/airquality/combustion/actions.html

More information

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments September 20, 2012 H. Carl Horneman Industrial, Commercial & Institutional Boilers, Process Heaters and Waste Incinerator Rules Final rules

More information

Gas-Fired Boilers under EPA s Boiler MACT

Gas-Fired Boilers under EPA s Boiler MACT Gas-Fired Boilers under EPA s Boiler MACT What Do I Need to Know About the Rules for Gas-Fired Units Now that Reconsideration Is Complete? Prepared by: Shannon Broome Darrin Gambelin Katten Muchin Rosenman

More information

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No. 412-0011 This draft initial Title V Major Source Operating Permit (MSOP) is issued

More information

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC AIR QUALITY PERMIT Permit No. Effective Date January 22, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

State of the Art (SOTA) Manual for Stationary Gas Turbines

State of the Art (SOTA) Manual for Stationary Gas Turbines State of the Art (SOTA) Manual for Stationary Gas Turbines Original Date: July 1997 Revision Date: November 1999 State of New Jersey Department of Environmental Protection Air Quality Permitting Program

More information

Elements of a completeness review

Elements of a completeness review WHAT IS IT? Elements of a completeness review Checking for missing forms Checking for missing information Checking for the appropriateness of the forms submitted Construction Permitting Review Process

More information

GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD

GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD GOVERNMENT of PUERTO RICO OFFICE OF THE GOVERNOR ENVIRONMENTAL QUALITY BOARD Air Quality Area STATEMENT OF BASIS Title V Initial Permit The Puerto Rico Environmental Quality Board (EQB) is issuing a draft

More information

Air Individual Permit Part 70 Reissuance Pine St S Lester Prairie, MN McLeod County

Air Individual Permit Part 70 Reissuance Pine St S Lester Prairie, MN McLeod County Air Individual Permit Part 7 Reissuance 8516-11 Permittee: Facility name: PFB Manufacturing LLC Plasti Fab 116 Pine St S Lester Prairie, MN 55354-11 McLeod County Expiration date: July 18, 222 * All Title

More information

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date:?? Facility Data Applicant (Facility s Name): KapStone Kraft Paper Corporation Facility Address: KapStone Kraft Paper Corporation

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION. PROPOSED REVISION TO FLORIDA S SECTION 111(d) STATE PLAN SUBMITTAL

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION. PROPOSED REVISION TO FLORIDA S SECTION 111(d) STATE PLAN SUBMITTAL STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION PROPOSED REVISION TO FLORIDA S SECTION 111(d) STATE PLAN SUBMITTAL COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS PRE-HEARING SUBMITTAL

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service

More information

EPA Emissions Rules for Boilers

EPA Emissions Rules for Boilers EPA Emissions Rules for Boilers The EPA has published two new rules for boilers in an effort to reduce emissions of air pollutants. The two rules are the Major Source Rule (also known as the Boiler MACT

More information

RULE 36 - NEW SOURCE REVIEW - HAZARDOUS AIR POLLUTANTS (Adopted 10/6/98)

RULE 36 - NEW SOURCE REVIEW - HAZARDOUS AIR POLLUTANTS (Adopted 10/6/98) VENTURA COUNTY AIR POLLUTION CONTROL DISTRICT RULE 36 - NEW SOURCE REVIEW - HAZARDOUS AIR POLLUTANTS (Adopted 10/6/98) A. Applicability The requirements of this Rule apply to any owner or operator who

More information

CHP, Waste Heat & District Energy

CHP, Waste Heat & District Energy 600 500 400 300 200 100 0 Electric Cooling T/E Ratio Electricity Consumption & Cooling T/E Ratio 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 CHP, Waste Heat & District Energy Module 5: Biomass

More information

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES ACTION On February 21, 2011, the Environmental Protection Agency (EPA) finalized a

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE CHAPTER 335-3-5 CONTROL OF SULFUR COMPOUND EMISSIONS TABLE OF CONTENTS 335-3-5-.01 Fuel Combustion 335-3-5-.02 Sulfuric Acid

More information

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011 DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY FROM: HQ AFCESA/CEO 139 Barnes Drive, Suite 1 Tyndall AFB FL 32403-5319 8 AUG 2011 SUBJECT: Engineering Technical Letter

More information

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS

Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS Michigan Department of Environmental Quality - Air Quality Division ADDITIONAL TECHNICAL INFORMATION FOR BOILERS The following information will be used for the technical review of a permit to install application

More information

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES

FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES FACT SHEET FINAL AIR TOXICS STANDARDS FOR INDUSTRIAL, COMMERCIAL, AND INSTITUTIONAL BOILERS AT AREA SOURCE FACILITIES ACTION On February 21, 2011, the Environmental Protection Agency (EPA) finalized a

More information

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P. I. FACILITY INFORMATION Newark Bay Cogeneration Partnership L.P. is located at 414-514 Avenue P, Newark, New Jersey, Essex County and consists of a 120-megawatt cogeneration plant. The facility is owned

More information

Industrial and Institutional Boilers after Boiler MACT

Industrial and Institutional Boilers after Boiler MACT Representing the Interests of America s Industrial Energy Users since 1978 Industrial and Institutional Boilers after Boiler MACT for The National Board 2011 General Meeting May 9, 2011 What do I Want

More information

Representing the Interests of America s Industrial Energy Users since 1978

Representing the Interests of America s Industrial Energy Users since 1978 Representing the Interests of America s Industrial Energy Users since 1978 COMMENTS OF THE COUNCIL OF INDUSTRIAL BOILER OWNERS on EPA Proposed Reconsidered Rule National Emission Standards for Hazardous

More information

STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003

STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003 STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003 This draft renewal Title V Major Source Operating Permit (MSOP) is proposed under the provisions of

More information

SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS

SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS SUBCHAPTER 17. INCINERATORS PART 9. COMMERCIAL AND INDUSTRIAL SOLID WASTE INCINERATION UNITS 252:100-17-60. Effective date; applicability (a) This Part applies to each individual commercial and industrial

More information

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland Commonwealth of Kentucky Environmental and Public Protection Cabinet Department for Environmental Protection Division for Air Quality 803 Schenkel Lane Frankfort, Kentucky 40601 (502) 573-3382 AIR QUALITY

More information

15A NCAC 02Q.0102 is amended with changes as published in 30:07 NCR as follows:

15A NCAC 02Q.0102 is amended with changes as published in 30:07 NCR as follows: 0 0 0 A NCAC 0Q.00 is amended with changes as published in 0:0 NCR - as follows: A NCAC 0Q.00 ACTIVITIES EXEMPTED FROM PERMIT REQUIREMENTS (a) This Rule does not apply to facilities required to have a

More information

International Certification Scheme 1.0

International Certification Scheme 1.0 CEM International Certification Scheme Page 1 of 9 International Certification Scheme 1.0 Scope The Certified Energy Manager (CEM ) is an individual who optimizes the energy performance of a facility,

More information

Challenges in Industrial Waste Heat Recovery. Texas Technology 2006 Showcase Tony Dafft December 6 & 7, 2006

Challenges in Industrial Waste Heat Recovery. Texas Technology 2006 Showcase Tony Dafft December 6 & 7, 2006 Challenges in Industrial Waste Heat Recovery Texas Technology 2006 Showcase Tony Dafft December 6 & 7, 2006 Outline Plant Statistics and Energy History Tools Used to Identify Projects Sample of Projects

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 15, 2013 PERMIT TO INSTALL 143-13 ISSUED TO Newberry Correctional Facility LOCATED AT 13747 East County Road 428 Newberry, Michigan

More information

Proposed Boiler MACT Sets Aggressive Emission Limits

Proposed Boiler MACT Sets Aggressive Emission Limits regulatory update Proposed Boiler MACT Sets Aggressive Emission Limits Tom Muscenti, PE Managing Consultant Charlotte On June 4, 2010, U.S. EPA proposed National Emission Standards for Hazardous Air Pollutants

More information

Hydraulic Fracture Pollution Capture: Oil & Gas Production Air Regulations

Hydraulic Fracture Pollution Capture: Oil & Gas Production Air Regulations Applying our technical expertise to a more sustainable world Hydraulic Fracture Pollution Capture: Oil & Gas Production Air Regulations Andrew D. Shroads, QEP Regional Director P.O. Box 1276 Westerville,

More information

P.O. Box 1276 Westerville, OH (614)

P.O. Box 1276 Westerville, OH (614) Applying our technical expertise to a more sustainable world Greenhouse Gas Reporting: More Tips & Tricks Andrew D. Shroads, QEP Regional Director, inc. P.O. Box 1276 Westerville, OH 43086 (614) 887-7227

More information

Title 40: Protection of Environment PART 63 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES

Title 40: Protection of Environment PART 63 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES Title 40: Protection of Environment PART 63 NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES Subpart ZZZZ National Emissions Standards for Hazardous Air Pollutants for Stationary

More information

Centralize vs Decentralize The Business Case Analysis

Centralize vs Decentralize The Business Case Analysis Session: District Heating & Cooling: Centralize vs Decentralize Centralize vs Decentralize The Business Case Analysis Teresa S. Isenhour NAVFAC Mid Atlantic August 9, 2016 Rhode Island Convention Center

More information

A. Federally-Enforceable: All limitations and conditions which are directly enforceable by U.S. EPA, including:

A. Federally-Enforceable: All limitations and conditions which are directly enforceable by U.S. EPA, including: RULE 201.2 Synthetic Minor Source - Adopted 1/25/96 I. Purpose The purpose of this Rule is to allow owners or operators of specified stationary sources that would otherwise be major stationary sources

More information

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary

Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Final Reconsidered Rules Requirements Summary Commercial and Industrial Solid Waste Incinerator (CISWI) Rules Reconsidered Rules Requirements Summary Federal Regulations: 40 C 60 Subpart CCCC NSPS for new/reconstructed/modified CISWI 40 C 60 Subpart

More information

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER 1200-03-10 REQUIRED SAMPLING, RECORDING, AND REPORTING TABLE OF CONTENTS 1200-03-10-.01 Sampling

More information

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama

Statement of Basis. Daikin America, Inc. Morgan County Decatur, Alabama Statement of Basis Daikin America, Inc. Morgan County Decatur, Alabama 712-0061 Daikin America, Inc. ( Daikin ) has applied for renewal of Major Source Operating Permit No. 712-0061. This proposed Title

More information

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY

ECO2 LINCS LTD SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY SLEAFORD RENEWABLE ENERGY PLANT IPPC APPLICATION - NON TECHNICAL SUMMARY ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page ISSUE NUMBER 1 DATE 16/11/07 AUTHOR CHECKED SMO TME Title Page TABLE

More information

CISWI and solid-waste-identification rules

CISWI and solid-waste-identification rules CISWI and solid-waste-identification rules This regulatory summary is for informational purposes and serves only as a general reference. Refer to the regulation when evaluating its applicability to specific

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE Environmental Management Chapter 335-1-7 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT GENERAL ADMINISTRATION ADMINISTRATIVE CODE CHAPTER 335-1-7 AIR DIVISION OPERATING PERMIT FEES TABLE OF CONTENTS 335-1-7-.01

More information

PERMIT TO INSTALL. Table of Contents

PERMIT TO INSTALL. Table of Contents Permit No. 77-17 Page 1 of 7 PERMIT TO INSTALL Table of Contents Section Page Alphabetical Listing of Common Abbreviations / Acronyms... 2 General Conditions... 3 Special Conditions... 5 Emission Unit

More information

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM

ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM ALLEGHENY COUNTY HEALTH DEPARTMENT AIR QUALITY PROGRAM October 5, 2011 SUBJECT: Renewal Title V Operating Permit Application Chambers Development Company, Inc. - Monroeville Landfill 600 Thomas Street

More information

Technical Contact. Conrad Carter, Jr. President (704) PO Box 1760 Albemarle, NC

Technical Contact. Conrad Carter, Jr. President (704) PO Box 1760 Albemarle, NC NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date: January 5, 2016 Facility Data Region: Fayetteville Regional Office County: Montgomery NC Facility ID: 6200015 Inspector s Name:

More information

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY JUL 24 2001 FROM: SUBJECT: HQ AFCESA/CESC 139 Barnes Drive, Suite 1 Tyndall AFB FL 32403-5319 Engineering Technical Letter

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr AIR EMISSION PERMIT NO. 16100013-001 IS ISSUED TO Brown Printing Company - Division of Gruner & Jahr Brown Printing Company - Waseca Division 2300 Brown Avenue Waseca, Waseca County, MN 56093 The emission

More information

ENVIRONMENTAL FOOTPRINT COMPARISON TOOL A tool for understanding environmental decisions related to the pulp and paper industry

ENVIRONMENTAL FOOTPRINT COMPARISON TOOL A tool for understanding environmental decisions related to the pulp and paper industry EFFECTS OF DECREASED ENERGY CONSUMPTION Table of Contents General Overview Water Use Greenhouse Gases Emissions to Air Thermal efficiency of steam generation Energy savings by reducing steam demand Energy

More information

TITLE V OPERATING PERMIT STATEMENT OF BASIS

TITLE V OPERATING PERMIT STATEMENT OF BASIS Facility Name: Title V Permit No.: Permit Application Nos.: Site ID: Equipment Address: Goal Line, L.P. APCD2016-TVP-00043 APCD2016-APP-004597 APCD1992-SITE-08447 555 North Tulip Street Escondido, CA 92025

More information

DRAFT AUTHORITY TO CONSTRUCT

DRAFT AUTHORITY TO CONSTRUCT A/C NO.: 25596 ISSUED BY: DATE ISSUED: DRAFT JORGE DEGUZMAN DATE EXPIRES: ISSUED TO: DRAFT 28 TH STREET LANDFILL, SOLID WASTE DIVISION, CITY OF SACRAMENTO LOCATION: 20 28 TH STREET, SACRAMENTO, CA 95816

More information

STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No

STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No STATEMENT OF BASIS MASTERBRAND CABINETS INC. Auburn, Alabama Facility No. 206-0032 On August 2, 2016, the Department received a renewal Major Source Operating Permit (MSOP) application from MasterBrand

More information

THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM

THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM EKV THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM Master of Science Thesis Division of Heat and Power Technology 2003 Department of Energy

More information

An Introduction to Central Heating Plant Planning

An Introduction to Central Heating Plant Planning An Introduction to Central Heating Plant Planning Course No: D02-002 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony

More information

General Permit (GP-016A) for Manufacturing and Materials Handling Equipment

General Permit (GP-016A) for Manufacturing and Materials Handling Equipment State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit (GP-016A) for Manufacturing and Materials Handling Equipment This General Permit allows for the construction,

More information

Draft Technical Support Document For Air Emission Permit No

Draft Technical Support Document For Air Emission Permit No Draft Technical Support Document For Air Emission Permit No. 13700028-101 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011

EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011 EPA's Final Rules to Reduce Air Toxics from Industrial Boilers MARAMA/ICAC CONTROL TECHNOLOGY WORKSHOP MAY 18-19, 2011 Topics Overview of actions Who is covered Why we issued the rules Benefits, costs,

More information

Boiler and. steadily increases while the supply decreases energy

Boiler and. steadily increases while the supply decreases energy FEATURE ARTICLE by William G. Acker ENERGY SURVEYS FOR Stewart Cohen/Stone The efficient use of energy is fast becoming a top concern for industry. As business managers become more conscientious about

More information

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward

RELEASE POINT TYPE Enter or select one of the following stack/emission point release orientation: downward EMISSION SOURCE (Internal Combustion Engines) Instructions for Form B2-G Form B2-G should be completed for all generators. Make as many copies of the form as necessary. Attach all calculations and assumptions

More information

4.0 Emissions Inventory

4.0 Emissions Inventory 4.0 Emissions Inventory Potential emissions during normal, startup, and shutdown operations were estimated for the proposed project. Emission estimates are based on AP-42 emission factors, vendor data,

More information

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by

Naughton Power Plant. Chapter 6, Section 2 Construction Permit Application. Submitted to the Wyoming Air Quality Division And Prepared by Naughton Power Plant Chapter 6, Section 2 Construction Permit Application Submitted to the Wyoming Air Quality Division And Prepared by 1407 West North Temple Salt Lake City, Utah 84116 March 2008 1.0

More information

[Including Revisions to Affected Portions of the Interstate Transport SIP for the hour Ozone and 1997 PM 2.5 NAAQS]

[Including Revisions to Affected Portions of the Interstate Transport SIP for the hour Ozone and 1997 PM 2.5 NAAQS] [Including Revisions to Affected Portions of the Interstate Transport SIP for the 1997 8-hour Ozone and 1997 PM 2.5 NAAQS] Department of Environmental Quality March 20, 2013 Table of Contents List of Tables...

More information

Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers

Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers OPERATIONAL EXCELLENCE A WORLD LEADER STEWARDSHIP Boiler MACT Compliance Plan and Strategies Financial Impacts & Capital Expenditures Required to Meet U.S. EPA s NESHAP Rule for Industrial Boilers Daniel

More information

Wood Products Energy Savings Guide

Wood Products Energy Savings Guide Wood Products Energy Savings Guide The Oregon wood products industry faces challenges of rising operating costs, rigorous product and safety standards, evolving environmental regulations and increasing

More information

Meet Ja, H2S, and BTU flare regulations while reducing your total cost of ownership

Meet Ja, H2S, and BTU flare regulations while reducing your total cost of ownership Process Analytics Meet Ja, H2S, and BTU flare regulations while reducing your total cost of ownership As environmental regulations for flare emissions become more stringent, companies are facing immense

More information

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN:

STATEMENT OF BASIS. For the issuance of Draft Air Permit # 1987-AOP-R4 AFIN: STATEMENT OF BASIS For the issuance of Draft Air Permit # 1987-AOP-R4 1. PERMITTING AUTHORITY: Arkansas Department of Environmental Quality 5301 Northshore Drive North Little Rock, Arkansas 72118-5317

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA LOCATED AT 11 11 th Street Plainwell, Michigan IN THE COUNTY OF Allegan STATE

More information

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1 Tennessee Gas Pipeline Company, LLC Compressor Station 563 7650 Whites Creek Pike Page 1 Joelton, Tennessee Reviewed by: Blake McClain RE: Installation of two Solar Titan 250-30000S natural gas-fired turbines

More information

PRIMARY OR ALTERNATIVE OPERATING SCENARIO

PRIMARY OR ALTERNATIVE OPERATING SCENARIO EMISSION SOURCE (Fuel Combustion Source) Instructions for Form B2 Form B2 should be completed for all fuel combustion emission sources (e.g., generators, boilers, burn-off ovens, bakeon ovens, bakery ovens,

More information

Energy Efficiency in the Industrial Sector

Energy Efficiency in the Industrial Sector Energy Efficiency in the Industrial Sector Case Studies from Lebanon Nader Hajj Shehadeh Senior Energy & Sustainability Consultant WHY? WHY? Energy dominates an average of 30% 30% of industrial facilities

More information

PART 11. OTHER SOLID WASTE INCINERATION UNITS [NEW]

PART 11. OTHER SOLID WASTE INCINERATION UNITS [NEW] SUBCHAPTER 17. INCINERATORS PART 11. OTHER SOLID WASTE INCINERATION UNITS [NEW] 252:100-17-90. Effective date; applicability 252:100-17-91. Definitions 252:100-17-92. Terminology related to 40 CFR 252:100-17-93.

More information

NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2

NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2 NOTIFICATION OF COMPLIANCE (NOC) WITH THE REQUIREMENTS OF 40 CFR 63 SUBPART EEE FOR THE FIXED BOX INCINERATOR #2 Prepared for: 260 Hudson River Road Waterford, New York 12188 Prepared by: Franklin Engineering

More information

"LIST AND CRITERIA" INDEX INTRODUCTION Section 1 - General Application Information... 5

LIST AND CRITERIA INDEX INTRODUCTION Section 1 - General Application Information... 5 "LIST AND CRITERIA" INFORMATION REQUIRED OF APPLICANTS SEEKING A PERMIT FROM THE SACRAMENTO AIR QUALITY MANAGEMENT DISTRICT Adopted March, 1985 (Amended 6-7-94, 01-11-96, 08-01-96) INDEX INTRODUCTION...

More information

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Permit Issue Date: NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Facility Data Applicant (Facility s Name): CPI USA North Carolina - Roxboro Plant Facility Address: CPI USA North Carolina -

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER ARNOLD ENGINEERING DEVELOPMENT COMPLEX ARNOLD AIR FORCE BASE INSTRUCTION 32-1061 26 JULY 2018 Civil Engineering PROVIDING UTILITIES TO ARNOLD AIR FORCE BASE COMPLIANCE WITH THIS

More information

NSPS Subpart OOOO Overview

NSPS Subpart OOOO Overview NSPS Subpart OOOO Overview June 4, 2013 Ron Truelove, Director, Oil and Gas Sector Services Trinity Consultants Overview Founded 1974 in Dallas ~400 employees in 35 U.S. offices, including China and Bahrain

More information

WOOD PELLETS- A GROWING MARKETPLACE

WOOD PELLETS- A GROWING MARKETPLACE WOOD PELLETS- A GROWING MARKETPLACE The present drive for carbon neutral energy sources has given rise to increasing focus on biomass for energy. A big component of the world s biomass energy resource

More information

FINAL DETERMINATION. To Grant a. Temporary Permit/Non-Attainment New Source Review Permit. For. Concord Steam Corporation.

FINAL DETERMINATION. To Grant a. Temporary Permit/Non-Attainment New Source Review Permit. For. Concord Steam Corporation. FINAL DETERMINATION To Grant a Temporary Permit/Non-Attainment New Source Review Permit For Concord Steam Corporation To Construct a 305 MMBtu/hr Biomass Boiler (Wood & Natural Gas), 2 Auxiliary Boilers

More information

Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution (40 CFR 60, Subpart OOOO) Air Quality Compliance

Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution (40 CFR 60, Subpart OOOO) Air Quality Compliance Standards of Performance for Crude Oil and Natural Gas Production, Transmission and Distribution (40 CFR 60, Subpart OOOO) Air Quality Compliance By: Emily Ohde Division of Compliance Assistance KOGA Annual

More information

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. March 31, PERMIT TO INSTALL No A

MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION. March 31, PERMIT TO INSTALL No A MICHIGAN DEPARTMENT OF NATURAL RESOURCES AND ENVIRONMENT AIR QUALITY DIVISION March 31, 2010 PERMIT TO INSTALL No. 74-02A ISSUED TO Arted Chrome, Inc. LOCATED AT 38 Piquette Street Detroit, Michigan 48202

More information