A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131

Size: px
Start display at page:

Download "A.6 Boilers. A.6.1 New and Existing Boilers located within AQCR 131"

Transcription

1 A.6 Boilers The following are Minnesota Standards of Performance for Indirect Heating Equipment (Minn. R ) New boilers: construction, modification, or reconstruction commenced after January 31, 1977 Existing boilers: construction, modification, or reconstruction did not commence after January 31, 1977 Air Quality Control Region (AQCR) 131: Anoka, Carver, Dakota, Hennepin, Ramsey, Scott, and Washington counties A.6.1 New and Existing Boilers located within AQCR 131 What to do Total Particulate Matter: less than or equal to 0.40 pounds per million BTU using a 3-hour rolling average The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Opacity: less than or equal to 20% opacity; except for one-six-minute period per hour of not more than 60% opacity. An exceedance of this opacity standard occurs whenever any one-hour period contains two or more six-minute periods during which the average opacity exceeds 20 percent or whenever any one-hour period contains one or more six-minute periods during which the average opacity exceeds 60 percent. Sulfur Dioxide: less than or equal to 1.6 pounds per million BTU using a 3-hour rolling average when combusting liquid fuels The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Why to do it Minn. R , subp. 1 and ; Minn. R and Minn. R , subp. 2; Minn. R , subp. 2 Minn. R , subp. 1 and ; Minn. R and A.6.2 New and Existing Boilers located within the City of Duluth What to do Total Particulate Matter: less than or equal to 0.40 pounds per million BTU using a 3-hour rolling average The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Why to do it Minn. R , subp. 1 and ; Minn. R and aq-12-01q 4/30/15 Page 234

2 Opacity: less than or equal to 20% opacity; except for one-six-minute period per hour of not more than 60% opacity. An exceedance of this opacity standard occurs whenever any one-hour period contains two or more six-minute periods during which the average opacity exceeds 20 percent or whenever any one-hour period contains one or more six-minute periods during which the average opacity exceeds 60 percent. Sulfur Dioxide: less than or equal to 2.0 pounds per million BTU using a 3-hour rolling average when combusting liquid fuels The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Minn. R , subp. 2; Minn. R , subp. 2 Minn. R , subp. 1 and ; Minn. R and A.6.3 New boilers, located outside AQCR 131 and outside the City of Duluth What to do Total Particulate Matter: less than or equal to 0.40 pounds per million BTU using a 3-hour rolling average The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Opacity: less than or equal to 20% opacity; except for one-six-minute period per hour of not more than 60% opacity. An exceedance of this opacity standard occurs whenever any one-hour period contains two or more six-minute periods during which the average opacity exceeds 20 percent or whenever any one-hour period contains one or more six-minute periods during which the average opacity exceeds 60 percent. Sulfur Dioxide: less than or equal to 2.0 pounds per million BTU using a 3-hour rolling average when combusting liquid fuels The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Why to do it Minn. R , subp. 1 and Minn. R , subp. 2 Minn. R , subp. 1 and A.6.4 Existing boilers, located outside AQCR 131 and outside the City of Duluth What to do Total Particulate Matter: less than or equal to 0.60 pounds per million BTU using a 3-hour rolling average The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Why to do it Minn. R and aq-12-01q 4/30/15 Page 235

3 Opacity: less than or equal to 20% opacity; except for one-six-minute period per hour of not more than 60% opacity. An exceedance of this opacity standard occurs whenever any one-hour period contains two or more six-minute periods during which the average opacity exceeds 20 percent or whenever any one-hour period contains one or more six-minute periods during which the average opacity exceeds 60 percent. Sulfur Dioxide: less than or equal to 2.0 pounds per million BTU using a 3-hour rolling average when combusting liquid fuels The potential to emit from the boilers allowed with this permit is lb/mmbtu due to equipment design and allowable fuels. Minn. R , subp. 2 Minn. R and aq-12-01q 4/30/15 Page 236

4 A.6.5 Boilers Subject to NESHAP subp. DDDDD The following are National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers (40 CFR pt. 63, subp. DDDDD) All boilers subject to 40 CFR pt. 63, subp. DDDDD Affected Source for NESHAP subp. DDDDD: 1. The collection at the facility of all existing industrial, commercial, and institutional boilers within a subcategory. (Subcategories defined in ) a. Eligible affected sources are in the gas 1 and light liquid fuels (distillate oil) subcategories. 2. Each new or reconstructed industrial, commercial, or institutional boiler. New Source: construction or reconstruction commenced after June 4, 2010 at a major source of HAPs Existing sources: construction or reconstruction commenced on or before June 4, 2010 at a major source of HAPs What to do Compliance dates: The Permittee shall comply with 40 CFR pt. 63, subp. DDDDD no later than the following compliance dates, except as provided in 40 CFR 63.6(i): - For any boiler constructed or reconstructed after June 4, 2010, the compliance date is January 31, 2013, or upon startup of the boiler, whichever is later. - For any boiler constructed or reconstructed on or before June 4, 2010, the compliance date is January 31, EMISSION LIMITS AND OPERATIONAL REQUIREMENTS The Permittee shall at all times operate and maintain each boiler at the facility in a manner consistent with safety and good air pollution control practices for minimizing emissions. Determination of whether such operation and maintenance procedures are being used will be based on information available to the EPA Administrator that may include, but is not limited to, monitoring results, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. The Permittee shall comply with the emission limits, work practice standards, and operating limits in 40 CFR pt. 63, subp. DDDDD. These limits apply at all times the affected unit is operating except during periods of startup and shutdown during which time the Permittee shall comply only with the tune-up and energy assessment requirements below. Tune up means adjustments made to a boiler in accordance with the procedures outlined in (a)(10)(i)-(vi): i) As applicable, the Permittee shall inspect the burner, and clean or replace any components of the burner as necessary. The Permittee may delay the Why to do it ; Minn. R. hdr (a)(3); Minn. R. s (a) and (f); Minn. R (a)(10); Minn. R. aq-12-01q 4/30/15 Page 237

5 burner inspection until the next scheduled unit shutdown. Units that produce electricity for sale may delay the burner inspection until the first outage, not to exceed 36 months (72 months for those units requiring a tune up only every 5 years) from the previous inspection. At units where entry into a piece of process equipment or into a storage vessel is required to complete the tune up inspections, inspections are required only during planned entries into the storage vessel or process equipment; ii) The Permittee shall inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer s specifications, if available; iii) The Permittee shall inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. The Permittee may delay the inspection until the next scheduled unit shutdown. Units that produce electricity for sale may delay the inspection until the first outage, not to exceed 36 months (72 months for those units requiring a tune up only every 5 years) from the previous inspection; iv) The Permittee shall optimize total emissions of CO. The optimization should be consistent with manufacturer s specifications, if available, and with any NOx requirement to which the unit is subject; v) The Permittee shall measure the concentrations in the effluent stream of CO in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made Measurements may be either on a dry or wet basis, as long as it is the same basis before and after adjustments are made Measurements may be taken using a portable CO analyzer; and vi) The Permittee shall maintain on-site and submit, if requested by the Administrator, an annual report as described in the Recordkeeping requirements below. General Provisions Appendix: This permit contains an appendix which lists the requirements of the general provisions in s 63.1 through 63.15, and shows which parts of the general provisions apply to sources subject to 40 CFR pt. 63, subp. DDDDD. The Permittee shall comply with all applicable requirements contained in the General Provisions Appendix (Appendix B). RECORDKEEPING Daily Recordkeeping Startup and Shutdown: On each day that a boiler is started up or shut down, the Permittee shall record and maintain: 1) the Emission Unit ID Number of the boiler (as designated on form LE-02); 2) the calendar date, time, occurrence and duration of each startup and shutdown; and 3) the type and amount of fuels used during each startup and shutdown. The Permittee shall maintain on-site and submit, if requested by the , Table 10 to 40 CFR pt. 63, subp. DDDDD; Minn. R. ; Minn. R , subp. 2 Hdr s (i) and (j); Minn. R. ; Minn. R , subp. 2 s aq-12-01q 4/30/15 Page 238

6 Administrator, a biennial (or five-year for those units requiring a tune up only every 5 years) report containing the following information: (A) The concentrations of CO in the effluent stream in parts per million by volume, and oxygen in volume percent, measured at high fire or typical operating load, before and after the tune-up of the boiler; (B) A description of any corrective actions taken as a part of the tune-up; and (C) The type and amount of fuel used over the 24 (or 60 for those units requiring a tune up only every 5 years) months prior to the tune-up, but only if the unit was physically and legally capable of using more than one type of fuel during that period. Units sharing a fuel meter may estimate the fuel used by each unit. The Permittee shall maintain relevant records of: 1) The occurrence and duration of each startup, shutdown, or malfunction of operation (i.e., process equipment); 2) The occurrence and duration of each malfunction of the required air pollution control and monitoring equipment; 3) All required maintenance performed on the air pollution control and monitoring equipment; 4) Actions taken during periods of startup, shutdown, and malfunction (including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation) when such actions are different from the procedures specified in the SSMP; 5) All information necessary to demonstrate conformance with the SSMP when all actions taken during periods of startup, shutdown, and malfunction (including corrective actions to restore malfunctioning process and air pollution control and monitoring equipment to its normal or usual manner of operation) are consistent with the procedures specified in such plan. (The information needed to demonstrate conformance with the SSMP may be recorded using a checklist, or some other effective form of recordkeeping, in order to minimize the recordkeeping burden for conforming events); 6) All required measurements needed to demonstrate compliance with a relevant standard (including, but not limited to and raw performance testing measurements that support data that the source is required to report); 7) All results of performance tests; 8) All measurements as may be necessary to determine the conditions of performance tests; and 9) All documentation supporting initial notifications and notifications of compliance status under The Permittee shall keep the following records: 1) A copy of each notification and report that was submitted to comply with subpart DDDDD, including all documentation supporting any Initial Notification or Notification of Compliance Status or Semi-Annual Compliance Report that was submitted, according to the requirements in (a)(10)(vi) and (a)(11)- (12); Minn. R (b)(2); Minn. R (a); Minn. R. aq-12-01q 4/30/15 Page 239

7 63.10(b)(2)(xiv); and 2) Records of performance tests, fuel analyses, or other compliance demonstrations and performance evaluations as required in 63.10(b)(2)(viii). The Permittee shall keep the required records in a form suitable and readily available for expeditious review, according to 63.10(b)(1). The Permittee shall keep each record for 5 years following the date of each occurrence, measurement, maintenance, corrective action, report, or record. The Permittee shall keep each record on site for at least 2 years after the date of each occurrence, measurement, maintenance, corrective action, report, or record. The Permittee may keep the records off site for the remaining 3 years. Such files may be maintained on microfilm, on a computer, on computer floppy disks, on magnetic tape disks, or on microfiche. REPORTING Submittals and notifications under 40 CFR pt. 63, subp. DDDDD shall be sent to both the MPCA and EPA contacts listed on the first page of Table B of this permit, unless otherwise noted. The Permittee shall submit all of the notifications in s 63.7(b) and (c), 63.8 (e), (f)(4) and (6), and 63.9(b) through (h) that apply by the dates specified. See the General Provisions Appendix B to this permit for these requirements. Initial Notification: The Permittee shall submit an Initial Notification not later than 120 days after January 31, 2013, for each industrial boiler unit started up before January 31, Initial Notification: The Permittee shall submit an Initial Notification not later than 15 days after actual the actual date of startup, for each industrial boiler unit started up on or after January 31, Notification of compliance status: due 60 days after Demonstration Completion. The Permittee shall submit a Notification of Compliance Status according to 40 CFR Section 63.9(h)(2)(ii). The Notification of Compliance Status report shall contain the information specified below: - A description of the affected unit(s) including identification of which subcategories the unit is in, the design heat input capacity of the unit, description of the fuel(s) burned; - A signed certification that the affected units have met all applicable emission limits and work practice standards; - If there was a deviation from any emission limit, work practice standard, or operating limit, the Permittee shall also submit a description of the deviation, the duration of the deviation, and the corrective action taken in the Notification of Compliance Status report; ; 40 CFR Section 63.10(b)(1); Minn. R. hdr Minn. R , subp (a); Minn. R (b); 40 CFR Section 63.9(b)(2); Minn. R (c); Minn. R (e); 40 CFR Sections (d)- (f); 63.9(h); Minn. R. aq-12-01q 4/30/15 Page 240

8 - In addition to the information required in 63.9(h)(2), the Notification of Compliance Status shall include the following certification(s) of compliance, as applicable, and signed by a responsible official: o This facility complies with the required initial tune-up according to the procedures in s (a)(10(i) through (vi). o This facility has had an energy assessment performed according to 40 CFR 7530(e). o Except for units that burn only natural gas, refinery gas, or other gas 1 fuel, or units that qualify for a statutory exemption as provided in Section 129(g)(1) of the Clean Air Act, the Permittee shall also include the following: No secondary materials that are solid waste were combusted in any affected unit. Compliance Report: due 31 days after end of each calendar 24 months following Permit Issuance for those units requiring a tune-up every two years. The reporting period shall be [year 1] January 1 to [year 2] December 31. The Compliance Report is due 31 days after the end of the reporting period. The first compliance report shall cover the period beginning on the compliance date that is specified for each boiler in and ending on July 31 or January 31, whichever date is the first date that occurs at least 2 years after the compliance date that is specified for the emission unit in Section Each subsequent compliance report shall cover the 2-year period from January 1 to December 31. Compliance Report: due 31 days after end of each calendar 60 months following Permit Issuance for those units requiring a tune-up every five years. The reporting period shall be [year 1] January 1 to [year 5] December 31. The Compliance Report is due 31 days after the end of the reporting period. The first compliance report shall cover the period beginning on the compliance date that is specified for each boiler in and ending on July 31 or January 31, whichever date is the first date that occurs at least 5 years after the compliance date that is specified for the emission unit in Section Each subsequent compliance report shall cover the 5-year period from January 1 to December 31. Report - Compliance Report - report contents (biennial and 5-year). The report shall contain: a. If the facility is subject to the requirements of a tune up, the Permittee shall include the following information in the compliance report: - Company and Facility name and address, - Process unit information, emissions limitations, and operating parameter limitations, - Date of report and beginning and ending dates of the reporting period, - The total operating time during the reporting period, (b); Minn. R (b); Minn. R. s (b) and (c); 40 CFR pt. 63, subp. DDDDD, Table 9; Minn. R. aq-12-01q 4/30/15 Page 241

9 - If a malfunction occurred during the reporting period, the report shall include the number, duration, and a brief description for each type of malfunction which occurred during the reporting period and which caused or may have caused any applicable emission limitation to be exceeded. The report shall also include a description of actions taken by the Permittee during malfunction of a boiler to minimize emissions in accordance with (a)(3), including actions taken to correct the malfunction, - For each unit subject only to the requirement to conduct a biennial or 5- year tune-up according to (a)(10), (11), or (12) respectively, the Permittee shall include the date of the most recent tune-up. The Permittee shall also include the date of the most recent burner inspection if it was not done biennially or on a 5-year period and was delayed until the next scheduled or unscheduled unit shutdown, - Statement by a responsible official with that official s name, title, and signature, certifying the truth, accuracy, and completeness of the content of the report; b. If there are no deviations from the requirements for work practice standards in Table 3 to subpart DDDDD that apply to the boiler, a statement that there were no deviations from the work practice standards during the reporting period; and c. If there was a deviation from a work practice standard during the reporting period, the report must contain the following information: - A description of the deviation and which emission limit or operating limit from which it deviated, and - Information on the number, duration, and cause of deviations (including unknown cause), as applicable, and the corrective action taken. Notification of fuel switch: If the Permittee switches fuels or makes a physical change to an affected boiler and the fuel switch or physical change results in the applicability of a different subcategory, the Permittee shall provide notice of the date of the switch/change within 30 days of the switch/change. The notification shall identify: - The name of the Permittee, the location of the source, the boiler(s) that have switched fuels or were physically changed, and the date of the notice; - The currently applicable subcategory under 40 CFR pt. 63, subp. DDDDD; and - The date upon which the fuel switch or physical change occurred (h); Minn. R. aq-12-01q 4/30/15 Page 242

10 A Boilers subject to NESHAP subp. DDDDD (Light Liquid Fuel) Boilers subject to 40 CFR pt. 63, subp. DDDDD in the Units Designed to Burn Light Liquid Fuel Subcategory What to do Why to do it EMISSION LIMITS AND OPERATIONAL REQUIREMENTS Fuel Type: natural gas or distillate oil only Performance Tune Up: At least once every two years (24 month period starting with Permit Issuance), the Permittee shall complete a tune-up for each boiler with heat input capacity between 5-10 MMBtu/hr, not to exceed 25 calendar months between tune-ups. This tune-up shall be conducted as specified in the Tune-up requirements in the boilers section of this permit. If the unit is not operating on the required date for a tune-up, the Permittee must conduct the tune-up within 30 calendar days of startup. Performance Tune Up: At least once every five years (60 month period starting with Permit Issuance), the Permittee shall complete a tune-up for each boiler with heat input capacity less than or equal to 5 MMBtu/hr, not to exceed 61 calendar months between tune-ups. This tune-up shall be conducted as specified in the Tune-up requirement in the boiler section of this permit. If the unit is not operating on the required date for a tune-up, the Permittee must conduct the tune-up within 30 calendar days of startup. ADDITIONAL REQUIREMENTS FOR UNITS CONSTRUCTED BEFORE JUNE 4, 2010 The Permittee shall comply with the Maximum Achievable Control Technology (MACT) Standard for Industrial, Commercial, and Institutional Boilers and Process Heaters at Major Sources as of January 31, 2016 (the Compliance Date), except as provided in 63.6(i). Energy Assessment: The Permittee shall have a one-time energy assessment performed by a qualified energy assessor for each existing boiler at the facility. The energy assessment must include the following with extent of the evaluation for items a. to e. appropriate for the on-site technical hours listed in 40 CFR Section : a. A visual inspection of the boiler system; b. An evaluation of operating characteristics of the boiler systems, specifications of energy using systems, operating and maintenance hdr ; Minn. R. ; Minn. R , subp. 2; To qualify for this general permit under Minn. R s ; (d); and (a)(11); Minn. R. s ; (d); and (a)(12); Minn. R. hdr (b); Minn. R ; Minn. R. aq-12-01q 4/30/15 Page 243

11 procedures, and unusual operating constraints; c. An inventory of major energy use systems consuming energy from affected boilers and which are under the control of the boiler owner/operator; d. A review of available architectural and engineering plans, facility operation and maintenance procedures and logs, and fuel usage; e. A review of the facility's energy management practices and provide recommendations for improvements consistent with the definition of energy management practices, if identified; f. A list of cost-effective energy conservation measures that are within the facility's control; g. A list of the energy savings potential of the energy conservation measures identified; h. A comprehensive report detailing the ways to improve efficiency, the cost of specific improvements, benefits, and the time frame for recouping those investments. An energy assessment completed on or after January 1, 2008, that meets or is amended to meet the energy assessment requirements in Table 3 to 40 CFR pt. 63, subp. DDDDD, satisfies the energy assessment requirement. A facility that operates under an energy management program compatible with ISO that includes the affected unit also satisfies the energy assessment requirement. A Boilers subject to NESHAP subp. DDDDD (Gas 1 Fuel) Boilers subject to 40 CFR pt. 63, subp. DDDDD in the Units Designed to Burn Gas 1 Fuel Subcategory What to do Why to do it EMISSION LIMITS AND OPERATIONAL REQUIREMENTS Fuel Type: natural gas or distillate oil (as backup) only Fuel Usage: less than or equal to 48 hours as a combined total per calendar year using liquid fuel for periodic testing of liquid fuel, maintenance, or operator training; except during periods of gas curtailment or gas supply interruptions of any duration. Liquid fuel may be used during periods of gas curtailment or gas supply interruptions of any duration. "Combined total" refers to the total hours for which liquid fuel was burned at hdr ; Minn. R. ; Minn. R , subp. 2; To qualify for this general permit under Minn. R ; Minn. R. ; Minn. R , subp. 2 aq-12-01q 4/30/15 Page 244

12 each subject boiler at the facility. Performance Tune Up: At least once every two years (24 month period starting with Permit Issuance), the Permittee shall complete a tune-up for each boiler with heat input capacity between 5-10 MMBtu/hr, not to exceed 25 calendar months between tune-ups. This tune-up shall be conducted as specified in the Tune-up requirement in the boilers section of this permit. If the unit is not operating on the required date for a tune-up, the Permittee must conduct the tune-up within 30 calendar days of startup. Performance Tune Up: At least once every five years (60-month period starting with Permit Issuance), the Permittee shall complete a tune-up for each boiler with heat input capacity less than or equal to 5 MMBtu/hr, not to exceed 61 calendar months between tune-ups. This tune-up shall be conducted as specified in the Tune-up requirement in the boilers section of this permit. If the unit is not operating on the required date for a tune-up, the Permittee must conduct the tune-up within 30 calendar days of startup. Performance Tune Up: At least once every five years (60-month period starting with Permit Issuance), the Permittee shall complete a tune-up for each boiler without a continuous oxygen trim system that maintains an optimum air to fuel ratio, not to exceed 61 calendar months between tune-ups. This tune-up shall be conducted as specified in the Tune-up requirement in the boilers section of this permit. If the unit is not operating on the required date for a tune-up, the Permittee must conduct the tune-up within 30 calendar days of startup. Period of gas curtailment or supply interruption means a period of time during which the supply of gaseous fuel to an affected boiler is restricted or halted for reasons beyond the control of the facility. The act of entering into a contractual agreement with a supplier of natural gas established for curtailment purposes does not constitute a reason that is under the control of the facility for the purposes of this definition. An increase in the cost or unit price of natural gas due to normal market fluctuations not during periods of supplier delivery restriction does not constitute a period of natural gas curtailment or supply interruption. On-site gaseous fuel system emergencies or equipment failures qualify as periods of supply interruption when the emergency or failure is beyond the control of the facility. ADDITIONAL REQUIREMENTS FOR UNITS CONSTRUCTED BEFORE JUNE 4, 2010 The Permittee shall comply with the Maximum Achievable Control Technology (MACT) Standard for Industrial, Commercial, and Institutional Boilers and Process Heaters at Major Sources as of January 31, 2016 (the Compliance Date), except as provided in 60.6(i). Energy Assessment: The Permittee shall have a one-time energy assessment performed by a qualified energy assessor for each existing boiler at the facility. s (e); (d); and (a)(11); Minn. R. s (e); (d); and (a)(12); Minn. R. s (e); (d); and (a)(12); Minn. R ; Minn. R. hdr (b); Minn. R ; Minn. R. aq-12-01q 4/30/15 Page 245

13 The energy assessment must include the following with extent of the evaluation for items a. to e. appropriate for the on-site technical hours listed in 40 CFR Section : a. A visual inspection of the boiler system; b. An evaluation of operating characteristics of the boiler systems, specifications of energy using systems, operating and maintenance procedures, and unusual operating constraints; c. An inventory of major energy use systems consuming energy from affected boilers and which are under the control of the boiler owner/operator; d. A review of available architectural and engineering plans, facility operation and maintenance procedures and logs, and fuel usage; e. A review of the facility's energy management practices and provide recommendations for improvements consistent with the definition of energy management practices, if identified; f. A list of cost-effective energy conservation measures that are within the facility's control; g. A list of the energy savings potential of the energy conservation measures identified; h. A comprehensive report detailing the ways to improve efficiency, the cost of specific improvements, benefits, and the time frame for recouping those investments. An energy assessment completed on or after January 1, 2008, that meets or is amended to meet the energy assessment requirements in Table 3 to 40 CFR pt. 63, subp. DDDDD, satisfies the energy assessment requirement. A facility that operates under an energy management program compatible with ISO that includes the affected unit also satisfies the energy assessment requirement. RECORDKEEPING Daily Recordkeeping - Alternative fuel usage: On each day that a boiler in the Unit designed to burn gas 1 subcategory burns a fuel other than natural gas, the Permittee shall record and maintain: 1) The Emission Unit ID Number of the boiler (as designated on form LE-02); 2) The number of hours that the boiler burned the alternative fuel; 3) The reason for burning the alternative fuel (e.g. periodic testing of liquid fuel, maintenance, or operator training; period of gas curtailment or gas supply interruptions); and 4) The type of fuel burned. Monthly Recordkeeping Alternative fuel usage: By the 15th of each month following a calendar month during which a boiler in the Unit designed to burn gas 1 subcategory burned a fuel other than natural gas, the Permittee shall record and maintain: hdr (h); Minn. R. ; Minn. R , subp (h); Minn. R. ; Minn. R , subp. 2 1) The Emission Unit ID Number of the boiler (as designated on form LE-02) and total number of hours for the previous calendar month that an alternative fuel aq-12-01q 4/30/15 Page 246

14 was burned for periodic testing of liquid fuel, maintenance, or operator training for each boiler in the Unit designed to burn gas 1 subcategory that burned an alternative fuel; 2) The combined total number of hours for the current calendar year (from January 1 through the end of the previous calendar month) that alternative fuels were burned for periodic testing of liquid fuel, maintenance, or operator training for all boilers in Unit designed to burn gas 1 subcategory that burned alternative fuels; 3) The Emission Unit ID Number of the boiler (as designated on form LE-02) and total number of hours for the previous calendar month that an alternative fuel was burned for any reason for each boiler in the Unit designed to burn gas 1 subcategory that burned an alternative fuel; and 4) The combined total number of hours for the current calendar year (from January 1 through the end of the previous calendar month) that alternative fuels were burned for any reason for all boilers in Unit designed to burn gas 1 subcategory that burned alternative fuels. REPORTING Notification of Alternative Fuel Use: The Permittee shall submit a notification of alternative fuel use within 48 hours of the declaration of each period of natural gas curtailment or supply interruption, as defined in The notification shall include the information specified in (f) paragraphs (1) through (5) below, and shall be sent to both MPCA and EPA. (1) Company name and address. (2) Identification of the affected unit. (3) Reason the Permittee is unable to use natural gas or equivalent fuel, including the date when the natural gas curtailment was declared or the natural gas supply interruption began. (4) Type of alternative fuel that the Permittee intends to use. (5) Dates when the alternative fuel use is expected to begin and end. hdr (f); Minn. R. aq-12-01q 4/30/15 Page 247

15 A.6.6 Boilers Subject to NESHAP subp. JJJJJJ The following are National Emission Standards for Hazardous Air Pollutants for Industrial, Commercial, and Institutional Boilers (40 CFR pt. 63, subp. JJJJJJ) All boilers subject to 40 CFR pt. 63, subp. JJJJJJ Eligibility Requirements: The Permittee must use only distillate oil (diesel, fuel oil #1 or #2), natural gas, biodiesel, liquid petroleum gas, and/or gasoline fuels in stationary combustion sources. Affected Source for NESHAP subp. JJJJJJ: 1. The collection at an area source of HAPs of all existing industrial, commercial, and institutional boilers within a subcategory. (Subcategories defined in ) except as specified in a. Eligible affected sources are in the light liquid fuels (distillate oil) subcategories. b. Facilities which burn only natural gas (gas 1 fuels) are not subject to this standard. 2. Each new or reconstructed industrial, commercial, or institutional boiler. New Source: construction or reconstruction commenced after June 4, 2010 at an area source of HAPs Existing sources: construction or reconstruction commenced on or before June 4, 2010 at an area source of HAPs Definitions: Gaseous fuels includes, but is not limited to, natural gas, process gas, landfill gas, coal derived gas, refinery gas, hydrogen, and biogas. Gas-fired boiler includes any boiler that burns gaseous fuels not combined with any solid fuels and burns liquid fuel only during periods of gas curtailment, gas supply interruption, startups, or periodic testing on liquid fuel. Periodic testing of liquid fuel shall not exceed a combined total of 48 hours during any calendar year. Liquid fuel includes, but is not limited to, distillate oil, residual oil, any form of liquid fuel derived from petroleum, used oil meeting the specification in 40 CFR , liquid biofuels, biodiesel, and vegetable oil, and comparable fuels as defined under 40 CFR Seasonal boiler means a boiler that undergoes a shutdown for a period of at least 7 consecutive months (or 210 consecutive days) each 12-month period due to seasonal conditions, except for periodic testing. Periodic testing shall not exceed a combined total of 15 days during the 7-month shutdown. This definition only applies to boilers that would otherwise be included in the biomass subcategory or the oil subcategory. Temporary boiler means any gaseous or liquid fuel boiler that is designed to, and is capable of, being carried or moved from one location to another by means of, for example, wheels, skids, carrying handles, dollies, trailers, or platforms. A boiler is not a temporary boiler if any one of the following conditions exists: aq-12-01q 4/30/15 Page 248

16 (1) The equipment is attached to a foundation. (2) The boiler or a replacement remains at a location within the facility and performs the same or similar function for more than 12 consecutive months, unless the regulatory agency approves an extension. An extension may be granted by the regulating agency upon petition by the owner or operator of a unit specifying the basis for such a request. Any temporary boiler that replaces a temporary boiler at a location within the facility and performs the same or similar function will be included in calculating the consecutive time period unless there is a gap in operation of 12 months or more. (3) The equipment is located at a seasonal facility and operates during the full annual operating period of the seasonal facility, remains at the facility for at least 2 years, and operates at that facility for at least 3 months each year. (4) The equipment is moved from one location to another within the facility but continues to perform the same or similar function and serve the same electricity, steam, and/or hot water system in an attempt to circumvent the residence time requirements of this definition. What to do Compliance dates: The Permittee shall comply with 40 CFR pt. 63, subp. JJJJJJ no later than the following compliance dates: - For any existing boiler subject to a management practice standard of a tuneup, you must conduct the tune-up no later than March 21, For any boiler constructed or reconstructed after May 20, 2011, the compliance date is upon startup of the boiler. - For any boiler constructed or reconstructed on or before May 20, 2011, the compliance date is no later than May 20, EMISSION LIMITS AND OPERATIONAL REQUIREMENTS The Permittee shall at all times operate and maintain each boiler at the facility in a manner consistent with safety and good air pollution control practices for minimizing emissions. The general duty to minimize emissions does not require you to make any further efforts to reduce emissions if required levels have been achieved. Determination of whether such operation and maintenance procedures are being used will be based on information available to the EPA Administrator that may include, but is not limited to, review of operation and maintenance procedures, review of operation and maintenance records, and inspection of the source. The Permittee shall conduct an initial tune-up for the following existing boilers in accordance with Table 2 to 40 CFR pt. 63, subp. JJJJJJ: - Existing oil-fired boiler with heat input capacity greater than 5 MMBtu/hr that does not meet the definition of seasonal boiler or limited-use boiler, or uses an oxygen trim system that maintains an optimum air to fuel ratio. - Existing seasonal boiler Why to do it hdr (b); 40 CFR Section (b) aq-12-01q 4/30/15 Page 249

17 - Existing limited-use boiler - Existing oil-fired boiler with heat input capacity less than or equal to 5 MMBtu/hr - Existing oil-fired boiler with an oxygen trim system that maintains an optimum air to fuel ratio that would otherwise be subject to a biennial tune-up. Performance Tune Up: At least once every two years (24-month period starting with permit issuance), the Permittee shall conduct a biennial tune-up for the following boilers in accordance with Table 2 to 40 CFR pt. 63, subp. JJJJJJ: - Existing oil-fired boilers with heat input capacity greater than 5 MMBtu/hr that do not meet the definition of a seasonal boiler or a limited-use boiler, or use an oxygen trim system that maintains an optimum air to fuel ratio. - New oil-fired boilers with heat input capacity greater than 5 MMBtu/hr that do not meet the definition of a seasonal boiler or a limited-use boiler, or use an oxygen trim system that maintains an optimum air to fuel ratio (b); 40 CFR Section (b) Each 2-year tune-up for must be conducted no more than 25 months after the previous tune-up. The Permittee may delay the burner inspection and inspection of the system controlling the air-to-fuel ratio until the next scheduled unit shutdown, but must inspect each burner and system controlling the air-to-fuel ratio at least once every 30 months. Performance Tune Up: At least once every five years (60-month period starting with permit issuance), the Permittee shall conduct a tune-up for the following boilers in accordance with Table 2 to 40 CFR pt. 63, subp. JJJJJJ: - Existing seasonal boiler - New seasonal boiler - Existing limited-use boiler - New limited-use boiler - Existing oil-fired boiler with heat input capacity less than or equal to 5 MMBtu/hr - New oil-fired boiler with heat input capacity less than or equal to 5 MMBtu/hr - Existing oil-fired boiler with an oxygen trim system that maintains an optimum air to fuel ratio that would otherwise be subject to a biennial tune-up. - New oil-fired boiler with an oxygen trim system that maintains an optimum air to fuel ratio that would otherwise be subject to a biennial tune-up (b); 40 CFR Sections (c)- (f), (b) Continued below Each 5-year tune-up for must be conducted no more than 61 months after the previous tune-up. The Permittee may delay the burner inspection and inspection of the system controlling the air-to-fuel ratio until the next scheduled unit shutdown, but must inspect each burner and system controlling the air-to-fuel ratio at least once every 72 months. aq-12-01q 4/30/15 Page 250

18 Conduct the performance tune-up while burning the type of fuel (or fuels) that provided the majority of the heat input to the boiler over the 12 months prior to the tune-up. Tune up means adjustments made to a boiler in accordance with the procedures outlined in (i)-(v): i) As applicable, the Permittee shall inspect the burner, and clean or replace any components of the burner as necessary. The Permittee may delay the burner inspection until the next scheduled unit shutdown. Units that produce electricity for sale may delay the burner inspection until the first outage, not to exceed 36 months (72 months for those units requiring a tune up only every 5 years) from the previous inspection; ii) The Permittee shall inspect the flame pattern, as applicable, and adjust the burner as necessary to optimize the flame pattern. The adjustment should be consistent with the manufacturer s specifications, if available; iii) The Permittee shall inspect the system controlling the air-to-fuel ratio, as applicable, and ensure that it is correctly calibrated and functioning properly. The Permittee may delay the inspection until the next scheduled unit shutdown. Units that produce electricity for sale may delay the inspection until the first outage, not to exceed 36 months (72 months for those units requiring a tune up only every 5 years) from the previous inspection; iv) The Permittee shall optimize total emissions of CO. The optimization should be consistent with manufacturer s specifications, if available, and with any NOx requirement to which the unit is subject; and v) The Permittee shall measure the concentrations in the effluent stream of CO in parts per million, by volume, and oxygen in volume percent, before and after the adjustments are made Measurements may be either on a dry or wet basis, as long as it is the same basis before and after adjustments are made Measurements may be taken using a portable CO analyzer. If the boiler is not operating on the required date for a tune-up, the tune-up must be conducted within 30 days of startup. General Provisions Appendix: This permit contains an appendix which lists the requirements of the general provisions in s 63.1 through 63.15, and shows which parts of the general provisions apply to sources subject to 40 CFR pt. 63, subp. JJJJJJ. The Permittee shall comply with all applicable requirements contained in the General Provisions Appendix (Appendix B) (a) (b)(1)-(5) (b)(7) , Table 10 to 40 CFR pt. 63, subp. JJJJJJ; Minn. R , subp. 2 RECORDKEEPING The Permittee must keep a copy of each notification and report submitted and all documentation supporting any Initial Notification or Notification of Compliance Status that you submitted (c)(1) aq-12-01q 4/30/15 Page 251

19 The Permittee shall keep records to document conformance with the work practices, emission reduction measures and management practices required by s and as follow: 1) Records must identify each boiler, the date of tune-up, the procedures followed for tune-up, and the manufacturer s specifications to which the boiler was tuned. 2) For each boiler that meets the definition of seasonal boiler, the Permittee must keep records of days of operation per year. The Permittee shall: 1) keep the required records in a form suitable and readily available for expeditious review; 2) keep each record for 5 years following the date of each recorded action and 3) keep each record on site or be accessible from a central location by computer or other means that instantly provide access at the site for at least 2 years after the date of each recorded action. The Permittee may keep the records off site for the remaining 3 years. REPORTING Submittals and notifications under 40 CFR pt. 63, subp. JJJJJJ shall be sent to both the MPCA and EPA contacts listed on the first page of Table B of this permit, unless otherwise noted. The Permittee shall submit all of the notifications in s 63.7(b), 63.8 (e) and (f), and 63.9(b) through (e), (g) and (h) that apply by the dates specified. See the General Provisions Appendix B to this permit for these requirements. Initial Notification: The Permittee shall submit an Initial Notification not later than January 20, 2014, or within 120 days after the source becomes subject to the standard. Notification of Compliance Status for new oil-fired boilers: due 120 days after startup. The notification must be submitted electronically using the Compliance and Emissions Data Reporting Interface (CEDRI) that is accessed through EPA's Central Data Exchange (CDX) ( However, if the reporting form specific to this subpart is not available in CEDRI at the time that the report is due, the written Notification of Compliance Status must be submitted to the Administrator at the address provided in this permit. Compliance Report: due 31 days after end of each calendar 24 months following Permit Issuance for those units requiring a tune-up every two years. The reporting period shall be [year 1] January 1 to [year 2] December 31. The Compliance Report is due 31 days after the end of the reporting period. The first compliance report shall cover the period beginning on the compliance date that is specified for each boiler and ending on July 31 or January 31, (c)(2) (d) hdr Minn. R , subp (a)(1) (a)(2); CFR Section 63.9(b)(2) (b); 40 CFR Section (b); 63.9(h) (4)(vi) (b) aq-12-01q 4/30/15 Page 252

20 whichever date is the first date that occurs at least 2 years after the compliance date that is specified for the emission unit in Each subsequent compliance report shall cover the 2-year period from January 1 to December 31. Compliance Report: due 31 days after end of each calendar 60 months following Permit Issuance for those units requiring a tune-up every five years. The reporting period shall be [year 1] January 1 to [year 5] December 31. The Compliance Report is due 31 days after the end of the reporting period. The first compliance report shall cover the period beginning on the compliance date that is specified for each boiler and ending on July 31 or January 31, whichever date is the first date that occurs at least 5 years after the compliance date that is specified for the emission unit Each subsequent compliance report shall cover the 5-year period from January 1 to December 31. Report - Compliance Report Contents (biennial and 5-year). The report shall contain: a. Company and Facility name and address, b. Statement by a responsible official, with the official s name, title, phone number, address, and signature, certifying the truth, accuracy, and completeness of the content of the report, and a statement that the facility has complied with all the relevant standards and other requirements; c. The following certifications of compliance, as applicable signed by a responsible official: i. This facility complies with the requirements of to conduct a biennial or 5-year tune-up, as applicable, of each boiler. ii. No secondary materials that are solid waste were combusted in any affected unit. iii. This facility complies with the requirements in s (d) and (g) to minimize the boiler s time spent during startup and shutdown and to conduct startups and shutdowns according to the manufacturer s recommended procedures or procedures specified for a boiler of similar design if manufacturer s recommended procedures are not available. Notification of fuel switch: If the Permittee switches fuels or makes a physical change to an affected boiler and the fuel switch or change results in the applicability of a different subcategory, the Permittee shall provide notice of the date of the switch/change within 30 days. The notification shall identify: - The name of the Permittee, the location of the source, the boiler(s) that have switched fuels or were physically changed, and the date of the notice; - The currently applicable subcategory; and - The date upon which the fuel switch or physical change occurred (b) (4)(b) (4)(g) aq-12-01q 4/30/15 Page 253

502(b)(10) Permit for Part 70 Source

502(b)(10) Permit for Part 70 Source 502(b)(10) Permit for Part 70 Source Permit Attachment No.: 2075-139-0002-V-03-1 Effective Date: November 9, 2015 Facility Name: Mailing Address: Parent/Holding Company: 862 West Ridge Road Gainesville,

More information

Draft Air Individual Permit Major Amendment

Draft Air Individual Permit Major Amendment Draft Air Individual Permit Major Amendment 08500016-102 Permittee: Facility name: Plasti Fab Plasti Fab 116 Pine St S Lester Prairie, MN 55354-1010 McLeod County Operating permit issuance date: July 18,

More information

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4

Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers. General (Q1 Q9)...2. Applicability (Q10 Q22)...4 Boiler MACT, 40 CFR Part 63, Subpart DDDDD (5D) Question and Answers Table of Contents General (Q1 Q9)....2 Applicability (Q10 Q22)...4 Compliance Testing (Q23-Q30).....7 Implementation: Tune-ups (Q31

More information

Air Individual Permit Part 70 Reissuance Pine St S Lester Prairie, MN McLeod County

Air Individual Permit Part 70 Reissuance Pine St S Lester Prairie, MN McLeod County Air Individual Permit Part 7 Reissuance 8516-11 Permittee: Facility name: PFB Manufacturing LLC Plasti Fab 116 Pine St S Lester Prairie, MN 55354-11 McLeod County Expiration date: July 18, 222 * All Title

More information

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji

DRAFT/PROPOSED AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Land & Lumber LLC, Bemidji DRAFT/PROPOSED AIR EMISSION PERMIT NO. 05700002-006 IS ISSUED TO Potlatch Land & Lumber LLC, Bemidji POTLATCH LAND & LUMBER LLC, BEMIDJI 50518 County Road 45 Bemidji, Hubbard County, Minnesota 56601 The

More information

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY

DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY DEPARTMENT OF THE AIR FORCE HEADQUARTERS AIR FORCE CIVIL ENGINEER SUPPORT AGENCY 8 AUG 2011 FROM: HQ AFCESA/CEO 139 Barnes Drive, Suite 1 Tyndall AFB FL 32403-5319 SUBJECT: Engineering Technical Letter

More information

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013

Boiler MACT & Related Rules. Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Boiler MACT & Related Rules Western Regional Boiler Association 45 th Annual Meeting Portland, Oregon March 14, 2013 Clean Air Act Rules Recently Finalized National Emissions Standard for Hazardous Air

More information

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry.

BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ. Industrial Boilers used in manufacturing processing, mining, refining or other industry. BOILER AREA MACT 40 CFR PART 63 SUBPART JJJJJJ Applicability: Industrial Boilers used in manufacturing processing, mining, refining or other industry. Commercial Boilers used in stores/malls, laundries,

More information

NSPS for Dc Boilers Burning Residual Oil

NSPS for Dc Boilers Burning Residual Oil Minnesota Pollution Control Agency AQ Doc. # 8.07 February 1998 Facts about NSPS for Dc Boilers Burning Residual Oil In an effort to regulate new sources of air pollution and ensure that those sources

More information

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC DRAFT AIR EMISSION PERMIT NO. 07900006 004 Major Amendment IS ISSUED TO Miller Milling Co LLC Miller Milling Co LLC 100 2nd Avenue Southwest New Prague, Le Sueur County, MN 56071 The emission units, control

More information

BOILER MACT 40 CFR 63 DDDDD

BOILER MACT 40 CFR 63 DDDDD BOILER MACT 40 CFR 63 DDDDD I. Applicability (63.7485): Industrial, commercial, or institutional boiler or process heater (63.7575) located at a HAP major, except for (63.7491) exempted listed below. Note:

More information

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No

STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No STATEMENT OF BASIS Mannington Mills, Inc. dba Mannington Wood Floors Epes, Sumter County, Alabama Facility/Permit No. 412-0011 This draft initial Title V Major Source Operating Permit (MSOP) is issued

More information

Draft Air Individual Permit Part 70 Permit

Draft Air Individual Permit Part 70 Permit Draft Air Individual Permit Part 70 Permit 14500185-101 Permittee: Facility name: Carlson Engineered Composites USA Inc Carlson Saint Cloud Plant 4751 Heatherwood Rd Saint Cloud, MN 56301 Stearns County

More information

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. AmeriPride Services Inc

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. AmeriPride Services Inc DRAFT AIR EMISSION PERMIT NO. 05300209 001 Total Facility Operating Permit IS ISSUED TO AmeriPride Services Inc AMERIPRIDE SERVICES INC MINNEAPOLIS 700 Industrial Boulevard Northeast Minneapolis, Hennepin

More information

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers

World Water & Environmetal Resources Congress 2004 Salt Lake City June New Air Quality Requirements for Facilities with Boilers World Water & Environmetal Resources Congress 2004 Salt Lake City June 24-27 New Air Quality Requirements for Facilities with Boilers F. Jason Martin, PE, ASCE Member 1 1 Short Elliott Hendrickson, 809

More information

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr

COMAR Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr Department of the Environment COMAR 26.11.09 Amendments and Regulation.12 Standards for Biomass Fuel-Burning Equipment Equal to or Greater Than 350,000 Btu/hr October 30, 2013 Topics Covered Standards,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Waldorf Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. Waldorf Corporation AIR EMISSION PERMIT NO. 12300410-001 IS ISSUED TO Waldorf Corporation Waldorf Corporation - A Rock-Tenn Company 2250 Wabash Avenue St. Paul, Ramsey County, MN 55114 The emission units, control equipment

More information

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources

Overview. SBEAP Affected sources Compliance requirements Notification, reporting, record keeping Resources 40 CFR Part 63, Subpart JJJJJJ National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers March 28, 2013 Barb Goode, Kansas Small Business

More information

AIR EMISSION PERMIT NO IS ISSUED TO. LSP - Cottage Grove LP

AIR EMISSION PERMIT NO IS ISSUED TO. LSP - Cottage Grove LP AIR EMISSION PERMIT NO. 16300087-003 IS ISSUED TO LSP - Cottage Grove LP LSP COTTAGE GROVE COGENERATION FACILITY 9525 105th Street Court South Cottage Grove, Washington County, MN 55016 The emission units,

More information

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC

AIR QUALITY PERMIT. Anthony Forest Products Company, LLC AIR QUALITY PERMIT Permit No. Effective Date January 22, 2016 In accordance with the provisions of the Georgia Air Quality Act, O.C.G.A. Section 12-9-1, et seq and the Rules, Chapter 391-3-1, adopted pursuant

More information

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit

State of New Hampshire Department of Environmental Services Air Resources Division. Temporary Permit State of New Hampshire Department of Environmental Services Air Resources Division Temporary Permit Permit No: TP-0120 Date Issued: December 26, 2012 This certifies that: Northeast Utilities Public Service

More information

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 05300015-002 ADMINISTRATIVE AMENDMENT IS ISSUED TO Northern States Power Company NSP - RIVERSIDE 3100 Marshall Street Northeast Minneapolis, Hennepin County, MN 554181826 The emission

More information

AIR EMISSION PERMIT NO Minor Amendment IS ISSUED TO. Order of St Benedict/St John's Abbey

AIR EMISSION PERMIT NO Minor Amendment IS ISSUED TO. Order of St Benedict/St John's Abbey AIR EMISSION PERMIT NO. 14500008-004 Minor Amendment IS ISSUED TO Order of St Benedict/St John's Abbey ORDER OF ST BENEDICT/ST JOHN'S ABBEY Power Plant Collegeville, Stearns County, MN 56321 The emission

More information

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland

AIR QUALITY PERMIT Issued under 401 KAR 52: Wolohan Drive, Suite 1 Ashland Commonwealth of Kentucky Environmental and Public Protection Cabinet Department for Environmental Protection Division for Air Quality 803 Schenkel Lane Frankfort, Kentucky 40601 (502) 573-3382 AIR QUALITY

More information

AIR EMISSION PERMIT NO IS ISSUED TO. CUMMINS POWER GENERATION, INC rd Avenue Northeast Fridley, Anoka County, MN 55432

AIR EMISSION PERMIT NO IS ISSUED TO. CUMMINS POWER GENERATION, INC rd Avenue Northeast Fridley, Anoka County, MN 55432 AIR EMISSION PERMIT NO. 00300019-002 IS ISSUED TO CUMMINS POWER GENERATION, INC. 1400 73 rd Avenue Northeast Fridley, Anoka County, MN 55432 The emission units, control equipment and emission stacks at

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr

AIR EMISSION PERMIT NO IS ISSUED TO. Brown Printing Company - Division of Gruner & Jahr AIR EMISSION PERMIT NO. 16100013-001 IS ISSUED TO Brown Printing Company - Division of Gruner & Jahr Brown Printing Company - Waseca Division 2300 Brown Avenue Waseca, Waseca County, MN 56093 The emission

More information

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. Wausau Paper Mills LLC

DRAFT/PROPOSED. AIR EMISSION PERMIT NO Total Facility Oper. Permit - Reissuance IS ISSUED TO. Wausau Paper Mills LLC DRAFT/PROPOSED AIR EMISSION PERMIT NO. 03500002-005 Total Facility Oper. Permit - Reissuance IS ISSUED TO Wausau Paper Mills LLC WAUSAU PAPER MILLS LLC 1801 Mill Avenue Northeast Brainerd, Crow Wing County,

More information

STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003

STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003 STATEMENT OF BASIS Dudley Lumber Company, Inc. Salem, Lee County, Alabama Facility Permit No. 206-S003 This draft renewal Title V Major Source Operating Permit (MSOP) is proposed under the provisions of

More information

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870

Technical Contact. Mike Knudson Environmental Manager (252) Gaston Road Roanoke Rapids, NC 27870 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date:?? Facility Data Applicant (Facility s Name): KapStone Kraft Paper Corporation Facility Address: KapStone Kraft Paper Corporation

More information

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015.

SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015. SUNY Westchester Community College Air Emissions Permit Program Latest Revision Date January 2, 2016 Previous Revision Date June 12, 2015 Air Emissions Permit Program Contents I. Air Permitting Introduction

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. ConAgra Food Ingredients Co AIR EMISSION PERMIT NO. 03700020-003 Administrative Amendment IS ISSUED TO ConAgra Food Ingredients Co CONAGRA FLOUR MILL - HASTINGS 2005 South Vermillion Street Hastings, Dakota County, MN 55033 The emission

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Order of St. Benedict/St. John's Abbey

AIR EMISSION PERMIT NO IS ISSUED TO. Order of St. Benedict/St. John's Abbey AIR EMISSION PERMIT NO. 14500008-002 IS ISSUED TO Order of St. Benedict/St. John's Abbey Order of St. Benedict/St. John's Abbey Power Plant Collegeville, Stearns County, MN 56321 The emission units, control

More information

Draft Air Individual Permit Part 70 Reissuance S Robert Trail Inver Grove Heights, MN Dakota County

Draft Air Individual Permit Part 70 Reissuance S Robert Trail Inver Grove Heights, MN Dakota County Draft Air Individual Permit Part 70 Reissuance 03700064 005 Permittee: Facility name: Xcel Energy Wescott LNG Plant Xcel Energy Wescott LNG Plant 10326 S Robert Trail Inver Grove Heights, MN 55075 Dakota

More information

Draft Air Individual Permit State Permit

Draft Air Individual Permit State Permit Draft Air Individual Permit State Permit 13500023-101 Permittee: Facility name: Central Boiler Inc Central Boiler Inc 20502 160th St Greenbush, MN 56726-9251 Roseau County Expiration date: Non-Expiring

More information

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Nico Products Inc.

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit Reissuance IS ISSUED TO. Nico Products Inc. DRAFT AIR EMISSION PERMIT NO. 05300113 003 Total Facility Operating Permit Reissuance IS ISSUED TO Nico Products Inc. NICO PRODUCTS, INC. 2929 1st Avenue South Minneapolis, Hennepin County, MN 55408 The

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Northern States Power Company dba Xcel Energy

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Northern States Power Company dba Xcel Energy AIR EMISSION PERMIT NO. 05300015-005 Major Amendment IS ISSUED TO Northern States Power Company dba Xcel Energy Xcel Energy - Riverside Generating Plant 3100 Marshall Street Northeast Minneapolis, Hennepin

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For AIR EMISSION PERMIT NO. 03700020-002 IS ISSUED TO ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE 68103-0500 For CONAGRA FLOUR MILLING COMPANY HASTINGS 2005 South Vermilion Street Hastings, Dakota

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 14100004-001 IS ISSUED TO Northern States Power Company NSP - Sherburne County 13999 Industrial Boulevard Becker, Sherburne County, Minnesota 55308 The emission units, control equipment

More information

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For

AIR EMISSION PERMIT NO IS ISSUED TO. ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE For AIR EMISSION PERMIT NO. 03700020-001 IS ISSUED TO ConAgra Flour Milling Company P.O. Box 3500 Omaha, NE 68103-0500 For CONAGRA FLOUR MILLING COMPANY - HASTINGS 2005 South Vermillion Street Hastings, Dakota

More information

Air Individual Permit Part 70 Reissuance Gateway Blvd Arden Hills, Minnesota Ramsey County

Air Individual Permit Part 70 Reissuance Gateway Blvd Arden Hills, Minnesota Ramsey County Air Individual Permit Part 70 Reissuance 12300718-101 Permittee: Facility name: Hood Packaging Corp - Arden Hills Hood Packaging Corp - Arden Hills 1887 Gateway Blvd Arden Hills, Minnesota 55112-2770 Ramsey

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc. AIR EMISSION PERMIT NO. 03700070-001 IS ISSUED TO Van Hoven Company, Inc. VAN HOVEN COMPANY, INC. 505 Hardman Avenue South South Saint Paul, Dakota County, Minnesota 55075-2413 The emission units, control

More information

Air Individual Permit Part 70 Reissuance Ever-Green Energy, Inc. Environmental Wood Supply, LLC

Air Individual Permit Part 70 Reissuance Ever-Green Energy, Inc. Environmental Wood Supply, LLC Air Individual Permit Part 70 Reissuance 12300063-004 Permittee: Co-permittee name: District Energy St Paul Inc-Hans O Nyman St Paul Cogeneration Ever-Green Energy, Inc. Environmental Wood Supply, LLC

More information

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL

RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL RULES OF TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF AIR POLLUTION CONTROL CHAPTER 1200-03-10 REQUIRED SAMPLING, RECORDING, AND REPORTING TABLE OF CONTENTS 1200-03-10-.01 Sampling

More information

Boiler Tune-up Guide

Boiler Tune-up Guide Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ

More information

PERMIT APPLICATION REVIEW SUMMARY

PERMIT APPLICATION REVIEW SUMMARY PERMIT APPLICATION REVIEW SUMMARY New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 Phone: 603-271-1370 Fax: 603-271-7053 AFS

More information

Minnesota Pollution Control Agency

Minnesota Pollution Control Agency Minnesota Pollution Control Agency April 24, 2006 Mr. Tom Feiro EH&S Specialist University of Minnesota/Board of Regents 5_1_1_W_ a_sh_i_n,gton Ave Ste 310 TSB Minneapolis, MN 55104 RE: Air Emission Permit

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Order of St. Benedict/St. John's Abbey

AIR EMISSION PERMIT NO IS ISSUED TO. Order of St. Benedict/St. John's Abbey AIR EMISSION PERMIT NO. 14500008-003 IS ISSUED TO Order of St. Benedict/St. John's Abbey ORDER OF ST. BENEDICT/ST. JOHN'S ABBEY Power Plant Collegeville, Stearns County, MN 56321 The emission units, control

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 13100005-004 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC. SHELDAHL ROAD East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield, Dakota County, Minnesota 55057-0170

More information

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. The City of Chaska AND

AIR EMISSION PERMIT NO Total Facility Operating Permit - Reissuance IS ISSUED TO. The City of Chaska AND AIR EMISSION PERMIT NO. 01900059-003 Total Facility Operating Permit - Reissuance IS ISSUED TO The City of Chaska AND Minnesota Municipal Power Agency MMPA - Minnesota River Station 1040 Dahlen Lane Chaska,

More information

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. NuStar Pipeline Operating Partnership LP

DRAFT. AIR EMISSION PERMIT NO Total Facility Operating Permit IS ISSUED TO. NuStar Pipeline Operating Partnership LP DRAFT AIR EMISSION PERMIT NO. 14500016 006 Total Facility Operating Permit IS ISSUED TO NuStar Pipeline Operating Partnership LP NuStar Sauk Centre Terminal 1833 Beltline Road Sauk Centre, Stearns County,

More information

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered

Technology Advancement and Standards for Biomass Fuel to Energy Conversion. Topics Covered Department of the Environment Technology Advancement and Standards for Biomass Fuel to Energy Conversion Husain Waheed Ph.D., Ad.Tech February 18, 2015 For discussion only Topics Covered Standards, Technology,

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Pan O Gold Baking Co

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Pan O Gold Baking Co DRAFT AIR EMISSION PERMIT NO. 14500176 002 Major Amendment IS ISSUED TO Pan O Gold Baking Co Pan O Gold Baking Co 444 St. Germain Street East St. Cloud, Sherburne County, MN 56304 The emission units, control

More information

EPA EMISSION RULES - BOILERS

EPA EMISSION RULES - BOILERS EPA EMISSION RULES - BOILERS WHAT S NEXT FOR OWNER AND OPERATORS? On March 21, 2011 the U.S. Environmental Protection Agency published three rules regarding air emission standards in the Federal Register.

More information

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. American Crystal Sugar Company

AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. American Crystal Sugar Company AIR EMISSION PERMIT NO. 02700001-011 Major Amendment IS ISSUED TO American Crystal Sugar Company AMERICAN CRYSTAL SUGAR - MOORHEAD 2500 11th Street North Moorhead, Clay County, MN 56560 The emission units,

More information

Draft Permit Air Individual Permit Part 70 Reissuance

Draft Permit Air Individual Permit Part 70 Reissuance Permittee: Alumacraft Boat Co Facility name: Alumacraft Boat Co 315 Saint Julien St W St. Peter, MN56082 Nicollet County Expiration date: TBD * All Title I Conditions do not expire Part 70 Reissuance:

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354

AIR EMISSION PERMIT NO IS ISSUED TO. Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354 AIR EMISSION PERMIT NO. 08500016-001 IS ISSUED TO Poly Foam, Inc. 116 Pine Street South Lester Prairie, McLeod County, Minnesota 55354 The emission units, control equipment and emission stacks at the stationary

More information

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P.

STATEMENT OF BASIS for NEWARK BAY COGENERATION PARTNERSHIP L.P. I. FACILITY INFORMATION Newark Bay Cogeneration Partnership L.P. is located at 414-514 Avenue P, Newark, New Jersey, Essex County and consists of a 120-megawatt cogeneration plant. The facility is owned

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin FOR

AIR EMISSION PERMIT NO IS ISSUED TO. Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin FOR AIR EMISSION PERMIT NO. 14100038-001 IS ISSUED TO Plymouth Foam Products 1800 Sunset Drive Plymouth, Wisconsin 53073 FOR Plymouth Foam Products - Becker 13900 Industry Ave Becker, Sherburne County, Minnesota

More information

AIR EMISSION PERMIT NO IS ISSUED TO. HARD CHROME INC Second Street Northeast Minneapolis, Hennepin County, MN 55418

AIR EMISSION PERMIT NO IS ISSUED TO. HARD CHROME INC Second Street Northeast Minneapolis, Hennepin County, MN 55418 AIR EMISSION PERMIT NO. 05300247-001 IS ISSUED TO HARD CHROME INC. 2631 Second Street Northeast Minneapolis, Hennepin County, MN 55418 The emission units, control equipment and emission stacks at the stationary

More information

Boiler MACT: Energy Assessments

Boiler MACT: Energy Assessments Boiler MACT: Energy Assessments Conference on the Environment November 12, 2013 Alex Mentzer, EIT Consultant Overview Boiler Rules Brief Recap Energy Assessments Requirements Qualified Energy Assessor

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. November 15, 2013 PERMIT TO INSTALL MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION November 15, 2013 PERMIT TO INSTALL 143-13 ISSUED TO Newberry Correctional Facility LOCATED AT 13747 East County Road 428 Newberry, Michigan

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION ADMINISTRATIVE CODE CHAPTER 335-3-5 CONTROL OF SULFUR COMPOUND EMISSIONS TABLE OF CONTENTS 335-3-5-.01 Fuel Combustion 335-3-5-.02 Sulfuric Acid

More information

SECTION 2.0 PERMIT BY RULE: Asphalt Plants

SECTION 2.0 PERMIT BY RULE: Asphalt Plants FACILITY NAME: DATE NDEQ Facility ID# TE: YOU MUST ALSO FILL OUT SECTION 1.0 IN ITS ENTIRETY TE: If you are already covered by the Asphalt Plant Permit-by-Rule and are applying for a relocation, you need

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Tennant Co

AIR EMISSION PERMIT NO IS ISSUED TO. Tennant Co AIR EMISSION PERMIT NO. 05300143-003 IS ISSUED TO Tennant Co TENNANT CO - GOLDEN VALLEY 701 Lilac Drive North Golden Valley, Hennepin County, MN 55422 The emission units, control equipment and emission

More information

B. Use welding process variations (e.g., pulsed current GMAW), which can reduce fume generation rates; or

B. Use welding process variations (e.g., pulsed current GMAW), which can reduce fume generation rates; or GENERALLY AVAILABLE CONTROL TECHNOLOGY For the welding operations (ID No.(s). xxx), the Permittee shall comply with all applicable provisions, including the notification, testing, and monitoring requirements

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 06100001-011 IS ISSUED TO Blandin Paper Company/Minnesota Power Rapids Energy Center/Minnesota Power 115 1st Street Southwest Grand Rapids, Itasca County, MN 55744 The emission

More information

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review

NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Permit Issue Date: NORTH CAROLINA DIVISION OF AIR QUALITY Application Review Facility Data Applicant (Facility s Name): CPI USA North Carolina - Roxboro Plant Facility Address: CPI USA North Carolina -

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Corporation. Potlatch Corporation - Cloquet PO Box 503 Cloquet, Carlton County, MN 55720

AIR EMISSION PERMIT NO IS ISSUED TO. Potlatch Corporation. Potlatch Corporation - Cloquet PO Box 503 Cloquet, Carlton County, MN 55720 AIR EMISSION PERMIT NO. 01700002-003 IS ISSUED TO Potlatch Corporation PO Box 503 Cloquet, Carlton County, MN 55720 The emission units, control equipment and emission stacks at the stationary source authorized

More information

AIR EMISSION PERMIT NO IS ISSUED TO Minnesota Power & Light

AIR EMISSION PERMIT NO IS ISSUED TO Minnesota Power & Light AIR EMISSION PERMIT NO. 13700013-001 IS ISSUED TO Minnesota Power & Light MINNESOTA POWER AND LIGHT - LASKIN ENERGY County Road 110 and 633 Aurora, St. Louis County, Minnesota 55705 The emission units,

More information

AIR EMISSION PERMIT NO IS ISSUED TO. PowerMinn 9090, LLC 2295 Corporate Boulevard, Suite 222 Boca Raton, FL

AIR EMISSION PERMIT NO IS ISSUED TO. PowerMinn 9090, LLC 2295 Corporate Boulevard, Suite 222 Boca Raton, FL AIR EMISSION PERMIT NO. 15100038-004 IS ISSUED TO PowerMinn 9090, LLC 2295 Corporate Boulevard, Suite 222 Boca Raton, FL 33431 And Fibrominn LLC 301 Oxford Valley Road, Suite 704A Makefield Executive Quarters

More information

Draft Technical Support Document For Air Emission Permit No

Draft Technical Support Document For Air Emission Permit No Draft Technical Support Document For Air Emission Permit No. 13700028-101 This technical support document (TSD) is intended for all parties interested in the draft permit and to meet the requirements that

More information

AIR EMISSION PERMIT NO IS ISSUED TO. GAF Building Materials Manufacturing Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. GAF Building Materials Manufacturing Corporation AIR EMISSION PERMIT NO. IS ISSUED TO GAF Building Materials Manufacturing Corporation oration 50 Lowry Avenue North Minneapolis, Hennepin County, MN 55411 The emission units, control equipment and emission

More information

Dollars and Sense: Boiler Tuning as a Best Management Practice

Dollars and Sense: Boiler Tuning as a Best Management Practice WHITE PAPER Dollars and Sense: Boiler Tuning as a Best Management Practice John A. Bacon, MBA, PG, CEM TRC Environmental Corporation August 1, 2018 Dollars and Sense: Boiler Tuning as a Best Management

More information

AIR EMISSION PERMIT NO IS ISSUED TO. BLANDIN PAPER COMPANY & Minnesota Power

AIR EMISSION PERMIT NO IS ISSUED TO. BLANDIN PAPER COMPANY & Minnesota Power AIR EMISSION PERMIT NO. 06100001-003 IS ISSUED TO BLANDIN PAPER COMPANY & Minnesota Power Blandin Paper Company 115 Southwest First Street, Grand Rapids, MN 55744-3662 Minnesota Power Blandin Energy Center

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY Adoption of Rules Governing Air Quality Minnesota Rules, Chapters 7002 Emission Permit Fees, 7005 Definitions and Abbreviations, 7007 Air Emissions

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light The Wisconsin Public Power Inc. System

AIR EMISSION PERMIT NO IS ISSUED TO. Minnesota Power & Light The Wisconsin Public Power Inc. System AIR EMISSION PERMIT NO. 06100004-001 IS ISSUED TO Minnesota Power & Light The Wisconsin Public Power Inc. System MINNESOTA POWER AND LIGHT - BOSWELL ENERGY P.O. Box 128 Cohasset, Itasca County, Minnesota

More information

Enclosed is a minor source permit issued pursuant to our review of your application (Approval Nos & 1990).

Enclosed is a minor source permit issued pursuant to our review of your application (Approval Nos & 1990). 6 June 2007 Mr. Gregory J. Laramie Chair, Foster-Glocester Regional Building Committee Foster-Glocester Regional School District 1145 Putnam Pike Chepachet, RI 02814 Dear Mr. Laramie: The Department of

More information

Final Boiler MACT Rule Requirements Summary

Final Boiler MACT Rule Requirements Summary Federal Regulation: Final Boiler MACT Rule Requirements Summary NESHAP 40 CFR 63 Subpart DDDDD Proposed rule published 6/4/2010 Final rule signed 2/21/2011 Info at http://epa.gov/airquality/combustion/actions.html

More information

Representing the Interests of America s Industrial Energy Users since 1978

Representing the Interests of America s Industrial Energy Users since 1978 Representing the Interests of America s Industrial Energy Users since 1978 COMMENTS OF THE COUNCIL OF INDUSTRIAL BOILER OWNERS on EPA Proposed Reconsidered Rule National Emission Standards for Hazardous

More information

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION. June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION June 16, 2016 PERMIT TO INSTALL 71-03C ISSUED TO JBS USA LOCATED AT 11 11 th Street Plainwell, Michigan IN THE COUNTY OF Allegan STATE

More information

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO

DRAFT. AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO DRAFT AIR EMISSION PERMIT NO. 09900002 012 Major Amendment IS ISSUED TO Hormel Foods Corp Quality Pork Processors HORMEL FOODS CORP/QPP AUSTIN 500 14th Avenue Northeast Austin, Mower County, Minnesota

More information

AIR EMISSION PERMIT NO IS ISSUED TO. 3M Company

AIR EMISSION PERMIT NO IS ISSUED TO. 3M Company AIR EMISSION PERMIT NO. 16300015-002 IS ISSUED TO 3M Company 3M - Cottage Grove Center Utilities 10746 Innovation Drive Cottage Grove, Washington County, MN 55016 The emission units, control equipment

More information

AIR EMISSION PERMIT NO [AMENDMENT TO AIR EMISSION PERMIT NO ] IS ISSUED TO

AIR EMISSION PERMIT NO [AMENDMENT TO AIR EMISSION PERMIT NO ] IS ISSUED TO AIR EMISSION PERMIT NO. 05301050-021 [AMENDMENT TO AIR EMISSION PERMIT NO. 05301050-011] IS ISSUED TO THE UNIVERSITY OF MINNESOTA AND FOSTER WHEELER TWIN CITIES, INC. FOR THE UNIVERSITY OF MINNESOTA TWIN

More information

AIR EMISSION PERMIT NO IS ISSUED TO. American Color Graphics, Inc.

AIR EMISSION PERMIT NO IS ISSUED TO. American Color Graphics, Inc. AIR EMISSION PERMIT NO. 13900051-001 IS ISSUED TO American Color Graphics, Inc. Shakopee Valley Printing 5101 South Valley Industrial Boulevard Shakopee, Scott County, MN 55379-1821 The emission units,

More information

Draft Air Individual Permit Part 70 Reissuance County Road 25 Saint Louis Park, MN55416 Hennepin County

Draft Air Individual Permit Part 70 Reissuance County Road 25 Saint Louis Park, MN55416 Hennepin County Draft Air Individual Permit Part 70 Reissuance 05300138-101 Permittee: Facility name: Northland Aluminum Products Inc Northland Aluminum Products Inc 5005 County Road 25 Saint Louis Park, MN55416 Hennepin

More information

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company

AIR EMISSION PERMIT NO ADMINISTRATIVE AMENDMENT IS ISSUED TO. Northern States Power Company AIR EMISSION PERMIT NO. 16300005-003 ADMINISTRATIVE AMENDMENT IS ISSUED TO Northern States Power Company NSP - ALLEN S KING GENERATING PLANT 1103 King Plant Road Bayport, Washington County, MN 55003 The

More information

Combustion MACT Standards Implementation Topics and Q&A

Combustion MACT Standards Implementation Topics and Q&A Combustion MACT Standards Implementation Topics and Q&A Diane Brockshus Iowa DNR Air Quality Bureau Air and Waste Management Association (AWMA) Iowa Chapter Meeting, February 7, 2012 Current Delegation

More information

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Magellan Midstream Partners, LP

AIR EMISSION PERMIT NO Administrative Amendment IS ISSUED TO. Magellan Midstream Partners, LP AIR EMISSION PERMIT NO. 01300017-006 Administrative Amendment IS ISSUED TO Magellan Midstream Partners, LP MAGELLAN PIPELINE CO LP - MANKATO 55199 State Highway 68 Mankato, Blue Earth County, MN 56001

More information

Technical Contact. William Horton Lead Environmental Specialist (980) South Church Street (EC13K) Charlotte, NC 28202

Technical Contact. William Horton Lead Environmental Specialist (980) South Church Street (EC13K) Charlotte, NC 28202 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date: Facility Data Applicant (Facility s Name): Duke Energy Carolinas, LLC - Marshall Steam Station Facility Address: Duke Energy

More information

Technical Contact. Mike Gurley Environmental Manager (704) Morehead Road Concord, NC 28027

Technical Contact. Mike Gurley Environmental Manager (704) Morehead Road Concord, NC 28027 NORTH CAROLINA DIVISION OF AIR QUALITY Air Permit Review Permit Issue Date: Facility Data Region: Mooresville Regional Office County: Cabarrus NC Facility ID: 1300110 Inspector s Name: Melinda Wolanin

More information

AIR EMISSION PERMIT NO IS ISSUED TO

AIR EMISSION PERMIT NO IS ISSUED TO AIR EMISSION PERMIT NO. 16300005-004 IS ISSUED TO Northern States Power Company For the NSP - ALLEN S KING GENERATING PLANT 1103 King Plant Road Oak Park Heights, Washington County, MN 55003 The emission

More information

AIR EMISSION PERMIT NO IS ISSUED TO. Hood Packaging Corporation

AIR EMISSION PERMIT NO IS ISSUED TO. Hood Packaging Corporation AIR EMISSION PERMIT NO. 12300718-002 IS ISSUED TO Hood Packaging Corporation HOOD PACKAGING CORP - ARDEN HILLS 1887 Gateway Boulevard Arden Hills, Ramsey County, MN 55112 The emission units, control equipment

More information

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1

Tennessee Gas Pipeline Company, LLC Compressor Station Whites Creek Pike Page 1 Tennessee Gas Pipeline Company, LLC Compressor Station 563 7650 Whites Creek Pike Page 1 Joelton, Tennessee Reviewed by: Blake McClain RE: Installation of two Solar Titan 250-30000S natural gas-fired turbines

More information

Minnesota s State Implementation Plan

Minnesota s State Implementation Plan Minnesota s State Implementation Plan What is in Minnesota s SIP? SIPs that were submitted by states to the EPA and acted upon by the EPA are listed in 40 CFR pt. 52. Minnesota s SIP is identified in 40

More information

State of the Art (SOTA) Manual for Stationary Gas Turbines

State of the Art (SOTA) Manual for Stationary Gas Turbines State of the Art (SOTA) Manual for Stationary Gas Turbines Original Date: July 1997 Revision Date: November 1999 State of New Jersey Department of Environmental Protection Air Quality Permitting Program

More information

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman

Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments. September 20, 2012 H. Carl Horneman Boiler MACT, NAAQS Revisions and Other Clean Air Act Developments September 20, 2012 H. Carl Horneman Industrial, Commercial & Institutional Boilers, Process Heaters and Waste Incinerator Rules Final rules

More information

A.4.2 Minn. R. for Fiberglass Operations placed in operation on or after July 9, 1969

A.4.2 Minn. R. for Fiberglass Operations placed in operation on or after July 9, 1969 A.4 Fiberglass Operations The following are Minnesota Standards of Performance for Industrial Process Equipment A.4.1 Minn. R. for Fiberglass Operations placed in operation before July 9, 1969 Total Particulate

More information

University of Minnesota Board of Regents. 202 Morrill Hall Minneapolis, Hennepin County, Minnesota 55455

University of Minnesota Board of Regents. 202 Morrill Hall Minneapolis, Hennepin County, Minnesota 55455 AIR EMISSION PERMIT NO. 05301050-007 Major Amendment IS ISSUED TO University of Minnesota Board of Regents UNIVERSITY OF MN - TWIN CITIES 202 Morrill Hall Minneapolis, Hennepin County, Minnesota 55455

More information