1 Power to Grow The Story of Sarawak Energy Sarawak Energy And Taiwan SmartGrid Exchange Symposium Lau Kim Swee Chief Executive Office, Syarikat SESCO Berhad
2 Where is Sarawak? Taiwan
3 Sarawak the Natural Home of Power Intensive Industries in ASEAN Sarawak is the largest State in Malaysia ( 12.4million ha) As one of four parties to the formation of Malaysia in 1963 alongside Malaya, Singapore and North Borneo Sarawak has been careful to retain our autonomy in the management of the State s electricity and hydropower resources. Located on the northwest coast of the Island of Borneo, which we share with Indonesian Kalimantan, Brunei and the Malaysian State of Sabah, in the center of the Asia Pacific, bordering the South China Sea. 27 distinct ethnic groups speaking over 40 different languages and dialects English used as the main language in commerce
4 What is Sarawak Energy? A fully integrated power utility and energy development company, wholly owned by the state of Sarawak Almost 4,600 employees serving a population of 2.6 million. Generates power through hydro, coal and gas Supplies almost 640,000 domestic, commercial and industrial (organic, bulk and export) customers through an extensive transmission and distribution network. Lowest tariffs
5 Generation Mix, Installed Capacity & Voltage Range Predominantly renewable hydropower Balance of thermal to maintain diversity and security of supply Alternative energy entering the mix 14% 61% 13% 897MW % 10% 14% 2% 0.04% Coal Diesel 74% 4,696MW % 14% 0.2% 5,383MW 2020 Generation Type Hydro Gas 65% Alternative Energy 15% 25% 0.5% 60% 7,891MW 2025 Voltage classes: Low Voltage: 230 volts, 415 volts Medium Voltage: 11kV, 33kV High Voltage: 132 kv, 275kV Extra-High Voltage (Coming): 500kV 5
6 Generation Mix in year MW
7 Lowest Tariffs in Malaysia & the Region sen/kwh Sarawak PLN Indonesia Sabah Vietnam West Malaysia EGAT Thailand Singapore Meralco Philippines Source: Malaysia Energy Statistic 2016 except - Vietnam based on KPMG Report PLN Indonesia based on PLN Annual Report 2015
8 Hydropower Development in Sarawak Bakun Hydroelectric Plant
9 HYDROPOWER POTENTIAL IDENTIFIED IN 1962 Followed up by various studies in 1980 s and 1990 s 50+ sites totaling 20,000MW Only 3 sites are utilized totaling 3,452MW (17%) Sarawak Landscape Captured by Professional Photographer SC Shekar
10 We subscribe to international standards and best practices in our works We are guided by IHA protocols in our assessment work to ensure the best interest for the local communities Sarawak Energy's hydropower projects are constructed in accordance with the guidelines of the International Commission on Large Dams(ICOLD).
11 Hydroelectric Plants (3,452MW) Batang Ai Murum Bakun 108 MW Installed Capacity Commissioned in MW Installed Capacity Commissioned in ,400MW Installed Capacity Commissioned in 2011
12 Baleh Hydrolectric Project Installed Capacity 1,285 MW Execution Period 8 9 years Date of Commission 2025 State Cabinet approved project commencement on 30 June 2016 Preliminary works have commenced Extension of distribution line from Kapit to Baleh costing RM100 million
13 Sarawak Hydropower Potential Hydropower potential in Sarawak was identified in 1962, followed up by various studies in 1980 s and 1990 s. There are more than 50 potential project sites, totalling 20,000 MW in capacity. To date, only 3 sites, 3,452MW are utilized (17%). Belaga 160 MW Limbang 1 45 MW Limbang MW Kota 2 10 MW Lawas 47 MW Trusan MW Pelagus 465 MW Linau 182 MW Baleh 1285 MW
14 Thermal Power Plants (1233MW) Biawak(Diesel) 114MW Sejingkat(Coal) 210 MW Bintulu(Gas) - 516MW Off grid (Diesel) 44MW Mukah(Coal) 270MW Miri(Gas) -79 MW
15 Balingian Coal Fired Power Plant (600MW in Year 2017) Cooling 130m 2 X 300MW with Circulating Fluidized Bed (CFB) Boiler 1st coal-fired plant with CFB in Malaysia & Largest in ASEAN of this capacity Target first power : End of 2017
16 Tanjung Kidurong CCGT Project Gross Capacity Execution Period 421MW 32 months Tg. Kidurong CCGT Power Plant Date of Commission 2019 Contract Award in October 2016 Commencement of construction: November 2016 Gas Supply Agreement with PETRONAS (20-year)
17 Financial and Operational Transformation
18 Rapid Transformation into a Modern Agile Corporation from Annual Revenue* increased by 2.7 times Number of Power Contracts Signed 14 Profit Before Tax* increased by 3 times Manpower increased by 51% Installed Capacity 4,628 MW increased by 3.5 times
19 Operational Excellence from SAIDI 125 decreased by 46% Carbon Intensity* decreased by 72% Rural Electrification Scheme 101,000 new customers Connected (state electricity coverage -93%) Power Theft 1.03% decreased from 7.73% SAIDI: System Average Interruption Duration Index measuring number of minutes a year the average customer (for distribution) is without power. RES: Rural Electrification Scheme *Figure for Carbon Intensity is based on data from 2010 to tco2/mwh Bakun Power Intake Murum Power Intake
20 Strong Transmission System & Connection to Indonesia
21 A Regional Vision
22 Grid System with the New 500kV Backbone Transmission New 500kV Transmission Line Existing 275kV Transmission Line RM 2.7 Billion State Infrastructure Project (2 nd Backbone) commenced in Oct 2013 Completion date of critical parts : 2017
23 Sarawak-West Kalimantan Interconnection Text Malaysia Sarikin Mambong Bengkayang 120~ km 275kV Interconnector West Kalimantan Slide 23
24 A Regional Vision for 2025: ASEAN s Power House LEGEND Transmission infrastructure connections outside of Sarawak
25 Interconnection Progress West Kalimantan Brunei Interconnection Progress Update Interconnected on 20 Jan 2016 Currently exporting MW to PLN; Increase to 230MW in Earliest 2019 Awaiting High Level agreement on Quantum, Take or Pay and Price. Sabah Sarawak Energy SESB Joint Interconnection Study completed. Moving towards interconnection in 2020/2021.
26 Proposed Borneo Grid LEGEND Pontianak 500kV Transmission Line 275kV Transmission Line 150kV Transmission Line 132kV Transmission Line Future Transmission Line Future Transmission Line Future HVDC Power Exchange Power Export Hydro Electric Power Plant West Malaysia Kuching Telukbatang Sibu Kalimantan Barat Batang Ai Bintulu Bandar Seri Begawan Miri Palangkaraya Bakun HEP Baleh HEP Kalimantan Tengah Murum HEP Kota Kinabalu Kalimantan Utara Kudat Kalimantan Timur Pahlawan Samarinda Balikpapan Tawau Tarakan Sandakan Lahad Datu North Kalimantan s potential hydropower project sites, with total capacity close to 12,000MW Kendawangan Banjarmasin Kalimantan Selantan Java
27 INTERCONNECTION INTERCONNECTION Progress within Borneo unlocks the next steps for the ASEAN Grid INTERCONNECTION Sarawak system Legend Sabah system INTERCONNECTION INTERCONNECTION Brunei system (Existing and planned) Kalimantan system
28 Smelting and Power Intensive Industries in SCORE
29 Sarawak Corridor of Renewable Energy (SCORE) Central Region of Sarawak > 70,000 sq.km Five growth nodes strategically selected to focus investment effort within the corridor Sarawak Energy s role more prominent in Samalaju Node
30 SCORE was developed to propel the economy to a new level of income and development. Principal objective of SCORE is to harness Sarawak s sustainable strategic advantage in the production of bulk electricity at globally competitive prices to attract investment to the State. 6 Objectives of SCORE 1 To create new sources of wealth 2 To move State s economy up to the value chain 3 To achieve higher per capita income 4 To enhance quality of life 5 To achieve balanced regional development 6 To eradicate poverty
31 Sarawak Corridor of Renewable Energy (SCORE) Sarawak Corridor of Renewable Energy Powering the Future of Sarawak SCORE is a comprehensive economic plan to transform Sarawak into a high income State by: harnessing Sarawak s abundant energy resources attracting and developing energy intensive industry Hydropower is the foundation of the SCORE agenda
32 SCORE Contributions Towards Development of Sarawak GDP/capita Ambition to increase GDP/Capita from 9,977 USD (2011) to 15,000 USD by 2020 Year Professionals Semi- Professionals Job Creation in SCORE New jobs created by the SCORE Industries and their value chains Support Staff General Workers Total By , , , , , 413 By , , , , , 895 Source: Utamas Strategic Manpower Study for SCORE
33 Building SCORE: Generation Development % gas 20% coal 60% hydro Installed Capacity (MW) % gas 40% coal 10% hydro 15% gas 10% coal 75% hydro Baleh Hydro Merit Pila Coal Samalaju CCGT Balingian Coal Tg Kiduring CCGT Murum Hydro Bakun Hydro 2000 Existing
34 Building SCORE: Possible Scenario up to 2030 LAWAS HEP (Planned) 38MW LEGEND MIRI POWER STATION - 78MW LIMBANG 1 HEP (Planned) 42MW TRUSAN HEP (Planned) 240MW SAMALAJU GAS POWER STATION (Planned) MW KIDORONG CC GAS POWER STATION (Planned) 400 MW LIMBANG 2 HEP (Planned) 140MW TANJUNG KIDURONG POWER STATION 190MW MAIN POWER STATION COAL POWER STATION SARAWAK POWER GENERATION 310MW MUKAH POWER GENERATION 248MW BARAM 1 HEP (Planned) 1200MW GAS POWER STATION FUTURE HYDRO POWER STATION HYDRO POWER STATION MUKAH WEST1 (Planned) 600MW BALINGIAN POWER STATION (under construction) 600MW BAKUN HEP 2400MW BELAGA HEP (Planned) 220MW BARAM 3 HEP (Planned) 295MW MURUM HEP -944MW SEJINGKAT POWER CORPORATION 210MW MERIT PILA COAL (Planned) 300MW PELAGUS HEP (Planned) 562MW BALEH HEP (Planned) 1295MW TUN ABDUL RAHMAN POWER STATION - 75MW BATANG AI POWER STATION 93MW Slide 34
35 Samalaju Industrial Park Samalaju Port Press Metal Sakura Ferroalloy Power Substation Tokuyama SIG Iwatani & Contech Solar Water Treatment Plant Sewage Treatment Plant Pertama Ferroalloys OM Materials SamalajuResort Hotel Samalaju Industry Park is a green field site launched in 2008 and has attracted RM 41 billion of investment to date since its inception. Main private investors are involved in energy intensive industries such as manganese processing, aluminium smelting and silicone substrate manufacturing. A constant supply of competitive priced power is required for these operators and their energy is sourced from Sarawak's hydroelectric dam. Over 3,000 MW has been committed to mainly SCORE and export customers through 15 PPA agreements. Source: Recoda
36 Major SCORE Customers (Continued) Press Metal Aluminium smelter Total power demand - over 1200MW OM Materials (Sarawak) Ferroalloys smelter Power demand - 300MW 36
37 Major SCORE Customers (Continued) Source: OM Materials Pertama Ferroalloys Ferroalloys smelter Power demand - 170MW Tokuyama Malaysia Polycrystalline silicone manufacturing Power demand - 180MW 37
38 Major SCORE Customers (Continued) Sakura Ferroalloys Silico-Manganese and High Carbon Ferro-Manganese producer Power demand - 75MW Pertama Ferroalloys Silico-Manganese and High Carbon Ferro-Manganese producer Power demand 270MW 38
39 Major SCORE Customers (Continued) Iwatani-SGI Power demand 1MW MPA Integrate Phosphate Complex Power demand 150MW 39
40 Samalaju Port By early 2017 Planned capacity 4 Handymax+ 1 Handysizeberth 18 million tonne per annum (9 Handymaxberths + 3 Handysize berths + 1 Liquid berth) 46 million tonne per annum 40
41 Investment Opportunities for Mineral Processing
42 Priority Industries for SCORE
43 Power Purchase Agreements for New Customers Sarawak offers abundant, reliable, renewable power at an internationally competitive price. It is an ideal destination for new smelters or mineral processing plants. The PPA s offered by Sarawak Energy for new customers are typically: available for loads greater than 5 MW; available for a term of up to 20 years; subject to annual indexation of ~2.5% for the life of the PPA; inclusive of transmission charges to the Samalaju Industrial Park; subject to appropriate take or pay commitments and security package (performance, payment and termination).
44 Sustainability Agenda
45 Our 4 Pillars of CSR Creating employment and economic opportunities for Sarawakians Supporting partners in Community Investment. Implementing projects in a sustainable way Engaging communities and promoting transparency
46 Supporting Partners in Community Investment Education & Young People Education & Young People Special Education Fund for communities in Murum Skills Training for Youth Culture & Heritage Supporting indigenous music Telang Usan Warisan Sape Workshop Sape Classic from Belaga Limbang & Sarawak Museum Restoration Murum Penan Batu Tungun Ritual Ceremony
47 Supporting Partners in Community Investment Community Development and Entrepreneurship Contemporary rattan products by Murum artisans Murum artisans participating in national level handicrafts exhibition, KL Documentary to showcase the progress of communities affected by HEPs - The Mat Weavers Tale HRH Princess Royal being briefed on Murum Penan handicrafts
48 Title Text Housing Condition Before Resettlement 48 Slide 48 Slide 48
49 Title Text Murum Resettlement Longhouse 49 Slide 49 Slide 49
50 Title Text HAS GIVEN WRITTEN CONSENT TO RESETTLEMENT Slide 50 Slide 50
51 Title Text Long Wat Longhouse External View Slide 51 Front & Back View of Ruai
52 Title Text Provision of Instrastructures Provision of Street Lightings Genset Room Slide 52 One Duty & One Standby Genset for each Village
53 Title Text Water Supply Works Water Filtration System Water Catchment Weir Slide 53 Water Storage Tank
54 Home Gardens
55 Title Text Integrated Multipurpose Hall, Chapel & Kindergarten Slide 55
56 Title Text School for Tegulang& Metalun Resettlements School in Session 56 Slide 56 Slide 56
57 Thank You
Sarawak the Smelting and Minerals Processing Hub for Asia Pacific
Sarawak the Smelting and Minerals Processing Hub for Asia Pacific Nick Wright Vice President, Business Development 5 April 2017 Mines and Money Asia 2017, Hong Kong Where is Sarawak? What is Sarawak Energy?
More informationGroup Managing Director Sarawak Energy Berhad
China ASEAN Power Coorporation & Development Forum Nanning, Guangxi,, China 28 th 29th October 2007 Chinese Power Plants in Malaysia Present & Future Development by Tan Sri Datuk Amar Abdul Aziz Husain
More informationMalaysia the next production center of manganese in Asia? Dmitriy Nadtochiy, General Manager Commerce Asia Minerals Limited
Malaysia the next production center of manganese in Asia? Dmitriy Nadtochiy, General Manager Commerce Asia Minerals Limited Target: To review Mn-alloys investment background. To go through the opportunities
More informationDelivering Sustainable Energy Empowering Growth SUSTAINABILITY REPORT 2015 CATALY ST FOR CHANGE
Delivering Sustainable Energy Empowering Growth SUSTAINABILITY REPORT 2015 CATALY ST FOR CHANGE Menara Sarawak Energy is the first office building in East Malaysia to be certified as a green building and
More informationInternational Workshop: Future Perspective of Bioenergy Development in Asia
International Workshop: Future Perspective of Bioenergy Development in Asia Session 1: Setting the Scene - An overview of Asian Bioenergy Policy and Market TABLE OF CONTENT 1. Introduction to Biomass Strategy
More informationFor personal use only
OM HOLDINGS LIMITED (ARBN 081 028 337) No. of Pages Lodged: 25 21 November 2014 ASX Market Announcements ASX Limited 4 th Floor 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam OM HOLDINGS LIMITED PRESENTATION
More informationWEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation
WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation Construction of the Bengkayang Substation Sohail Hasnie Oil fuels all power generation
More informationSolar PV in ASEAN Challenges and Opportunities. Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia
Solar PV in ASEAN Challenges and Opportunities Peerapat Vithayasrichareon Centre for Energy and Environmental Markets (CEEM), UNSW Australia ESI Workshop on the value of PV in Singapore 18 February 2016
More informationDeveloping a Regional Roadmap on Energy Connectivity. China Electric Power Planning & Engineering Institute Bangkok
Developing a Regional Roadmap on Energy Connectivity China Electric Power Planning & Engineering Institute 2017.12 Bangkok Outline 1. Current Status of Energy Connectivity 2. Potential Analysis in the
More informationTHE ELECTRIC POWER INDUSTRY: Power Capacity Mix
THE ELECTRIC POWER INDUSTRY: Power Capacity Mix Energy & Power Committee American Chamber of Commerce AmCham Hall, Makati City 20 March 2017 Undersecretary Jesus P. Posadas DOE s Mandate To ensure the
More informationEnergy Policy in Lao PDR
Energy Policy in Lao PDR Phonepasong SITHIDETH. Technical staff Ministry of Energy and Mines. (MEM) Department of Electricity. (DOE) IEEJ, May 2011 Tokyo Japan Content Background Current energy policy
More informationChapter 1. Integrated, Trans-boundary Energy and Electricity Markets in the BIMP Region A Quantitative Assessment. Yuhji Matsuo and Miyuki Tsunoda
Chapter 1 Integrated, Trans-boundary Energy and Electricity Markets in the BIMP Region A Quantitative Assessment Yuhji Matsuo and Miyuki Tsunoda December 216 This chapter should be cited as Matsuo, Y.
More informationSUSTAINABLE ENERGY DEVELOPMENT
SUSTAINABLE ENERGY DEVELOPMENT 19 I. INTRODUCTION 19.01 During the Eighth Plan period, the development of the energy sector was focused on ensuring a secure, reliable and cost-effective supply of energy,
More informationAn Outlook of Renewable Energy Development in Malaysia
An Outlook of Renewable Energy Development in Malaysia Biomass Asia Conference, 21 st May 2013 Amer Aqel Amer Nordin Consultant, Energy & Environment Amer Aqel Amer Nordin Functional Expertise Consulting
More informationBrunei Freight Forwarders Association (BRUFA) BRUNEI
Brunei Freight Forwarders Association (BRUFA) BRUNEI Country Report Year 2018 for The 45 th Executive Council Meeting THE FEDERATION OF ASIA PACIFIC AIR CARGO ASSOCIATIONS (FAPAA) FROM 29 30 August, 2018
More informationPresentation of. Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report Card. Mini hydro power plants
Presentation of Mini hydro power plants Answering Indonesia s power crisis with renewable energy solutions Micro hydro power systems Clean Energy Asia 2013: Renewable Energy Policies in Indonesia A Report
More informationBy Bot Sosani HAPUA Secretarat. Sustainable Energy Training, Bangkok 25 th November 2013
ASEAN Power Grids Interconnection Projects for Energy Efficiency and Security Supply HAPUA s perspective and analysis on Regional electricity systems and sustainability By Bot Sosani HAPUA Secretarat Sustainable
More informationEnergy in Kenya. Energy Scenarios Workshop July 24, 2013 Stanley Hotel
Energy in Kenya Energy Scenarios Workshop July 24, 2013 Stanley Hotel Energy Vital input to the socio economic development -fuels industry, commerce, transportation and agriculture Key enabler to achieving
More informationSUSTAINABLE ENERGY TOWARDS. To achieve sustainable growth and prosperity. for Sarawak We Are Connected
To achieve sustainable growth Life s and prosperity Better When for Sarawak We Are Connected It became clear that the most compelling At CIMB, caring for customers and strategy for the State economic survival
More informationENERGY POLICY SHIFT AND KEY ENERGY PROJECTS TOWARDS SUSTAINABLE ENERGY FUTURE FOR MALAYSIA
ENERGY POLICY SHIFT AND KEY ENERGY PROJECTS TOWARDS SUSTAINABLE ENERGY FUTURE FOR MALAYSIA 3 RD ENERGY FORUM 12 TH JULY 2011 DR. KAMARIAH NORUDDIN DIRECTOR, ENERGY SECTION ECONOMIC PLANNING UNIT, PM s
More informationCAMBODIA ENERGY SECTOR
CAMBODIA ENERGY SECTOR Overview of potential electricity sector opportunities June 2018 Background This summary paper has been prepared by Investing In Infrastructure Cambodia (3i) a development program
More informationI. Objectives. 2.To recommend a suitable approach and set of actions for responding to their sectoral needs.
WATER AND ENERGY I. Objectives 1. To introduce Southeast Asia for expanded economic relations through an overview of the region s needs and opportunities in the energy and water sectors; and 2.To recommend
More informationDECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1
DECADES Tool to Make Comparative Assessment of Electricity Generation in Indonesia 1 Abubakar Lubis Agus Sugiyono Agency for the Assessment and Application of Technology (BPPT) Indonesia 1. Introduction
More informationADB and Renewable Energy
ADB and Renewable Energy A Presentation at the Workshop on Participated in a workshop organized by GIZ on Solar Energy in the Philippines Solar Energy in the Philippines - Opportunities for German Companies
More informationBRIEF OUTLOOK ON MALAYSIAN ELECTRICITY SUPPLY INDUSTRY, TNB & MALAYSIA NATIONAL COMMITTEE OF CIGRE (MNC-CIGRE)
PLENARY SESSION FOR POWER INDUSTRY, AORC-CIGRE TECHNICAL MEETING, 3 SEPTEMBER 2013 GUANGZHOU, CHINA MNC BRIEF OUTLOOK ON N ELECTRICITY SUPPLY INDUSTRY, TNB & NATIONAL COMMITTEE OF CIGRE (MNC-CIGRE) DATUK
More informationRenewable Energy Policies in Southeast Asia. Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018
Renewable Energy Policies in Southeast Asia Renewable Energy Auctions: A New Paradigm for Asia ACEF, 8 June 2018 Rising energy demand to sustain development in Southeast Asia GDP reached USD 2.5 trillion
More informationBRIGHTER SOLUTIONS FOR GREEN ENERGY KEYNOTE SPEECH BY:
BRIGHTER SOLUTIONS FOR GREEN ENERGY KEYNOTE SPEECH BY: IR. MOHD AZHAR ABDUL RAHMAN MANAGING DIRECTOR TNB ENERGY SERVICES SDN. BHD. TENAGA NASIONAL BERHAD SEPTEMBER 2014 CONTENT BACKGROUND MALAYSIA S PERSPECTIVE
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.:45460 Project Name Rural Electrification and Transmission Interconnection Project (RETP) Region EAST ASIA AND PACIFIC Sector Energy Project ID
More informationCURRENT STATUS ON CARBON CAPTURE AND STORAGE INITIATIVES IN MALAYSIA
4 th IEA INTERNATIONAL CCS REGULATORY NETWORK MEETING 9 10 MAY 2012, PARIS, FRANCE CURRENT STATUS ON CARBON CAPTURE AND STORAGE INITIATIVES IN MALAYSIA by Loo Took Gee Secretary General, Ministry of Energy,
More informationOpportunities and challenges of the Indonesian electrification drive. March 2015
Opportunities and challenges of the Indonesian electrification drive March 2015 Indonesia s new cabinet has announced a new 35GW power plan to meet rising energy needs Opportunity to participate in one
More informationFor personal use only
OM HOLDINGS LIMITED (ARBN 081 028 337) No. of Pages Lodged: 9 8 November 2011 Company Announcements Office ASX Limited 4 th Floor 20 Bridge Street SYDNEY NSW 2000 Dear Sir/Madam OM SARAWAK FERRO ALLOY
More informationTHE BIOECONOMY TRANSFORMATION PROGRAMME AGENDA FOR BORNEO KOTA KINABALU, SABAH 19 FEBRUARY 2013
THE BIOECONOMY TRANSFORMATION PROGRAMME AGENDA FOR BORNEO KOTA KINABALU, SABAH 19 FEBRUARY 2013 The outcome of the future depends on the choices made today. The good news is, WE HAVE A CHOICE. Our world
More informationOff-Grid Case Study: Bandung Polytechnic. Hendrik Bohne 4 November 2010
Off-Grid Case Study: Bandung Polytechnic Hendrik Bohne 4 November 2010 AGENDA Trends on solar energy Key Success Factors and Risks in developing PV Power Plants Off-grid Case study Overview Conergy Group
More informationSECTOR ASSESSMENT (SUMMARY): ENERGY
Power Sector Rehabilitation Project (RRP KGZ 44198) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunity a. Introduction 1. The Kyrgyz Republic is a landlocked
More informationPotential of ASEAN Power Market Integration and Its Progress
Potential of ASEAN Power Market Integration and Its Progress Prof. Suthiphand Chirathivat Executive Director ASEAN Studies Center, Chulalongkorn University Nepal Power Investment Summit Nepal 2018 Power
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Rural Electrification and Transmission Interconnection Project (RETP) Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:47622 Project Name Rural
More informationTHE PROGRESS OF NUCLEAR POWER PROGRAMME IN MALAYSIA
THE PROGRESS OF NUCLEAR POWER PROGRAMME IN MALAYSIA INPRO Dialogue Forum on Nuclear Energy Innovations: Common User Consideration for Small and Medium-sized Nuclear PR, Vienna, 10-14 October 2011 Ir Dr
More informationENERGY FORUM Consumers Perspective on Energy Issues By Philip Tan Representing FMM August 9, 2010 Sheraton Imperial Hotel, KL
ENERGY FORUM Consumers Perspective on Energy Issues By Philip Tan Representing FMM August 9, 2010 Sheraton Imperial Hotel, KL Industry s Concerns Benchmark for energy pricing Efficiencies in power sector
More informationPerspective on Accelerating RE to reach ASEAN s 23% aspirational target. Asia Clean Energy Forum 2017, ADB, Manila Deep-dive session - 6 June 2017
Perspective on Accelerating RE to reach ASEAN s 23% aspirational target Asia Clean Forum 2017, ADB, Manila Deep-dive session - 6 June 2017 DICLAIMER The views, opinions, and information expressed in this
More informationINDONESIA POWER MARKET OUTLOOK TO 2030, UPDATE 2014 MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE
REFERENCE CODE GDPE0723ICR PUBLICATION DATE JULY 2014 INDONESIA POWER MARKET OUTLOOK TO 2030, UPDATE 2014 MARKET TRENDS, REGULATIONS AND COMPETITIVE LANDSCAPE Executive Summary Coal- and Gas-Based Thermal
More informationabundance around us and are part of everyday life that are used so evident. Another
CHAPTER 1.0 INTRODUCTION Renewable energy in general can be defined as a source of energy which rapidly replaced by natural processes such as solar, wind, geothermal and biomass. It is filling and naturally
More informationPOLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT.
POLICY BRIEF #25 BUILDING GLOBAL ENERGY INTERCONNECTION (GEI) TO PROMOTE 2030 AGENDA FOR SUSTAINABLE ENERGY DEVELOPMENT Developed by: Global Energy Interconnection Development and Cooperation Organization,
More informationENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations)
ENERGY AND POWER SUMMARY (Avoidance, mitigation and enhancement considerations) 1 What issues are addressed in each SEA stage? From an energy and power perspective Baseline Assessment Impact Assessment
More informationCOGENERATION IN MALAYSIA. by Datuk Ir. Ahmad Fauzi Hasan Energy Commission Malaysia 27 February 2013
COGENERATION IN MALAYSIA by Datuk Ir. Ahmad Fauzi Hasan Energy Commission Malaysia 27 February 2013 The Asia Pacific Energy Research Centre (APERC) Annual Conference 2013 Malaysia s Major Energy Resources
More informationHAPUA Heads of ASEAN Power Utilities/Authorities
HAPUA Heads of ASEAN Power Utilities/Authorities Somchai Kokkamhaeng Director of Alternative Energy Development Division Electricity Generating Authority of Thailand ( EGAT ) HAPUA Under the Organization
More informationSolar PV: Policy, Market & Industry in Malaysia
Solar PV: Policy, Market & Industry in Malaysia Dr Wei-nee Chen Chief Corporate Officer, Sustainable Energy Development Authority (SEDA) Malaysia October 2017 Malaysia: Electricity Generation Mix Source:
More informationInternationalisation of Malaysian Construction Industry
1 Internationalisation of Malaysian Construction Industry 5 TH BUSINESS FORUM ROAD ENGINEERING ASSOCIATION OF ASIA AND AUSTRALASIA Manila, Philippines MEGAT KAMIL AZMI MEGAT RUS KAMARANI Senior General
More informationREGIONAL DEVELOPMENT OF SPECIFICATION AND EMPLOYMENT DEVELOPMENT IN SABAH AND SARAWAK: AN ANALYSIS WITH SHIFT SHARE TECHNIQUES
J1711 REGIONAL DEVELOPMENT OF SPECIFICATION AND EMPLOYMENT DEVELOPMENT IN SABAH AND SARAWAK: AN ANALYSIS WITH SHIFT SHARE TECHNIQUES BY CHEW PEI SHAN CHEW YI TAU MOK JIA YING SIM SHI YING WONG SHIN CHET
More informationContent Introduction Institutional Arrangement Energy Policy Documents Energy Statistics Legal and Policy Efforts for Hydropower Development Problems
A COUNTRY REPORT OF NEPAL Presented by: Pralhad Prasad Sapkota Under Scretary Government of Nepal,Ministry of Energy, Kathmandu, Nepal Content Introduction Institutional Arrangement Energy Policy Documents
More informationPolicies and Systems toward Sustainable Management of Production Forests in Indonesia and Malaysia
Policies and Systems toward Sustainable Management of Production Forests in Indonesia and Malaysia Workshop on SDG 13 Climate Action and 15 Life on Land Sanjo Conference Hall, University of Tokyo, 18 Jan
More informationepermit For THE Highlight
Highlight epermit For THE The Right Honourable Pehin Sri Haji Abdul Taib Mahmud (centre) witnessing the signing of agreement between STIDC and Dagang Net Sendirian Berhad. 15th August 2007 marked the signing
More informationPhotovoltaics in Indonesia. Frank Südbeck (853303)
Photovoltaics in Indonesia Frank Südbeck (853303) 12.04.2012 1 Facts about Indonesia - Geography - Largest Archipelago in the world - Consist of more than 17000 islands - More than 6000 are inhabited -
More informationASEAN TRANSPORT COOPERATION. 15 March 2018
ASEAN TRANSPORT COOPERATION 15 March 2018 1977 1992 COTAC 1996 1998 Transport Action Agenda 2005 2010 ASEAN Transport Action Plan 2016 2025 Kuala Lumpur Transport Strategic Plan 1996 Ministerial Understanding
More informationEnergy, Economic and Environmental Impact of Hydropower in Malaysia
Energy, Economic and Environmental Impact of Hydropower in Malaysia M. Faizal 1,2, L. J. Fong 1, J. Chiam 1 and A. Amirah 3 1 ADP, SLAS, Taylor's University Lakeside Campus, 47500 Selangor, Malaysia 2
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982 Project Name Electric
More informationFrequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular
Frequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular 1. What is Vehicle Shipping Service? The Vehicle Shipping Service is
More informationExpert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017
Expert Working Group Meeting on Universal Access to Energy Services, Renewable Energy, Energy Efficiency and Clean Use of Fossil Fuels 14 Dec 2017 United Nations Conference Center Bangkok, 14 December
More information12 A Leader of Clean Energy Technology. Operations. Generation System. Power Generation and Purchase. Fuel Utilization
Operations Generation System In 2013, EGAT s power plants had a total installed generating capacity of 15,010.13 MW accounting for 44.57 percent of the country s gross energy generation. The purchased
More informationPHILIPPE LIENHART EDF 1
NEA SYMPOSIUM MARCH 8TH, 2018 IN LINO HALL TOKYO STRATEGY FOR NORTHEAST ASIA POWER SYSTEM INTERCONNECTION EDF TECHNICAL ASSISTANCE TO MONGOLIA ADB PROJECT MID-TERM INFORMATION ON THE PROJECT PHILIPPE LIENHART
More informationCurrent Status & Prospects of PV Power Generation in Malaysia
Current Status & Prospects of PV Power Generation in Malaysia Ir. Ahmad Hadri Haris hadri@ptm.org.my Malaysia Energy Centre (PTM) PVPS @ PVSEC-19 10 th November 2009, Jeju Korea Malaysia Population: 27
More informationRegional Value Chain, AEC and Challenges for Archipelagic Countries
Regional Value Chain, AEC and Challenges for Archipelagic Countries Yose Rizal Damuri Centre for Strategic and International Studies Jakarta ESRI Workshop on the Potentials of the Asian Economic Zone,
More informationIndonesia's Energy Transit: Struggle to Realize Renewable Potential
Indonesia's Energy Transit: Struggle to Realize Renewable Potential By Jeremy Wilcox, Contributor September 14, 2012 LONDON -- Indonesia's electricity market is moving from a monopoly fossil-fuel generation
More informationThe Southeast Asian Coal Market the Next Success Story?
OPINION By Dr. Lars Schernikau President of HMS Bergbau Group, Singapore and Germany The Southeast Asian Coal Market the Next Success Story? CA Lucky Ebenhaezer Southeast Asia The five biggest coal importers
More informationFrequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular
Frequently Asked Questions for Vehicle Shipping Service from Peninsular to Sabah and Sarawak or from Sabah and Sarawak to Peninsular 1. What is Vehicle Shipping Service? The Vehicle Shipping Service is
More informationCHAPTER 11 - ENERGY LIST OF TABLES
CHAPTER 11 - ENERGY I. Introduction II. Progress, 1996-2000 III. Prospects, 2001-2005 IV. Allocation V. Conclusion LIST OF TABLES Table 11-1 Final Commercial Energy Demand1 By Source, 1995-2005 Table 11-2
More informationFunded by: European Union
1 Enhancing Institutional Capacity for the Market Development of Decentralised Energy Systems in Thailand WADE DE Model Development for Thailand and Key Results Sridhar Samudrala Director ASIA World Alliance
More information2-2. PRLCE in Papua New Guinea
APERC Workshop at EWG54 Wellington, New Zealand, 20 November, 2017 2-2. PRLCE in Papua New Guinea Elvira Torres Gelindon Senior Researcher, APERC Outline of Presentation Background of APEC PRLCE Objectives
More informationSOLAR PV PROMOTION PROGRAM IN INDONESIA
SOLAR PV PROMOTION PROGRAM IN INDONESIA Presented by: M. Sjachdirin Head of Sub Directorat of Technical and Environment al Various New Energi and Renewable Energy DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY
More informationMohit Pawnday Head Commercial
www.seml.co.in Mohit Pawnday Head Commercial Synergy in Energy M I N I N G P O W E R F E R R O-A L L O Y S S T E E L 2016 Asian Pacific Ferro-Alloys & Steel International Conference Venue:- Hanoi Sofitel
More informationA Regional Approach to a Global Biobased Economy
A Regional Approach to a Global Biobased Economy Malaysia s Experience 10th Annual World Congress on Industrial Biotechnology 17 June 2013 Montreal, Canada OUR WORLD FACES A CONFLUENCE OF VERY PRESSING
More informationChapter 10. Lao PDR Country Report. September 2016
Chapter 10 Lao PDR Country Report September 2016 This chapter should be cited as Kouphokham, K. (2016), Lao PDR Country Report in Kimura, S. and P. Han (eds.) in Energy Outlook and Energy Saving Potential
More information5 th Energy Forum. Round Table Discussion Taking on Tomorrow s Energy Challenges Today. Tenaga Nasional Berhad. 3 September 2013
5 th Energy Forum Round Table Discussion Taking on Tomorrow s Energy Challenges Today Tenaga Nasional Berhad 3 September 2013 Three Major Electricity Utilities in Malaysia PENINSULAR MALAYSIA Tenaga Nasional
More informationUniversal Access to Modern Energy Services and Clean Energy Development
Universal Access to Modern Energy Services and Clean Energy Development USEA Global Workshop on Clean Energy Development December 5, 2012 Junhui Wu, Senior Policy Advisor Retired World Bank Director of
More informationAFGHANISTAN EXECUTIVES EXAMINE STRATEGIES FOR CLEAN ENERGY INTEGRATION
AFGHANISTAN EXECUTIVES EXAMINE STRATEGIES FOR CLEAN ENERGY INTEGRATION EXECUTIVE EXCHANGE FOR DA AFGHANISTAN BRESHNA SHERKAT (DABS) & THE MINISTRY OF ENERGY & WATER (MEW) TO INDONESIA APRIL 2015 JAKARTA,
More informationplanning and implementation of the HoB initiative. The Declaration/document on the HoB Initiative is attached as Appendix 1.
JOINT STATEMENT THIRD BRUNEI DARUSSALAM-INDONESIA-MALAYSIA-PHILIPPINES EAST ASEAN GROWTH AREA SUMMIT (3 rd BIMP-EAGA SUMMIT) 12 January 2007, Cebu City, Philippines 1. We, the Leaders of the Brunei Darussalam-Indonesia-Malaysia-Philippines
More informationOutlook for Energy Market in Asia (India and ASEAN)
9 June, 2017 Smart Community Summit 2017 Outlook for Energy Market in Asia (India and ASEAN) Shigeru SUEHIRO Energy Data and Modelling Center (EDMC) The Institute of Energy Economics, Japan (IEEJ) 1 Energy
More informationEmbedded Generation: A Private Sector Perspective
Embedded Generation: A Private Sector Perspective LAGOS, NIGERIA 14 NOVEMBER 2012 CLARA MUSAMA SENIOR MANAGER, INVESTOR RELATIONS Outline ozambian Energy Sector ocase Study of CEC 16 November 2012 2 Zambian
More informationLESAM nd Leading Edge Conference on Strategic Asset Management
LESAM 2007 2 nd Leading Edge Conference on Strategic Asset Developing Sustainable Plans for Water Supply within Sarawak Malaysia by Kerry Jones & David Cox Developing Sustainable Plans for Water Supply
More informationIndonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 2015
Indonesia s Generation Fuel Mix in an Era of Price Uncertainty Tom Parkinson 14 April 215 Who we are Helping Our Clients Create Value Market analysis and insights Asset valuation / M&A Policy / regulation
More informationTHE VESSEL TURNAROUND TIME: THE CASE OF SEPANGAR BAY CONTAINER PORT (SBCP) Heather Valarie Benilus
THE VESSEL TURNAROUND TIME: THE CASE OF SEPANGAR BAY CONTAINER PORT (SBCP) Heather Valarie Benilus Politeknik Kota Kinabalu No.4, Jalan Politeknik KKIP Barat, Kota Kinabalu Industrial Park, 88460 Kota
More informationvre Grid Integration in ASEAN
vre Grid Integration in ASEAN Sanjayan Velautham Executive Director ASEAN Centre for Energy Asia Clean Energy Forum Manila, 16 June 2015 1 OUTLINE ASEAN & ASEAN Centre for Energy ( ACE) Background RE Development
More informationKey Statistical Data
Key Statistical Data System Installed Generating Capacity Type of Power Plant 2012 2011 Increase MW Percentage MW Percentage Percentage EGAT s Power Plants Thermal 4,699.00 14.41 4,699.00 14.94 - Combined
More informationMINORITY SHAREHOLDER WATCHDOG GROUP (MSWG) 27 TH ANNUAL GENERAL MEETING. 18th December Prepared by: CoE Investor Relations
MINORITY SHAREHOLDER WATCHDOG GROUP (MSWG) 27 TH ANNUAL GENERAL MEETING 18th December 2017 Prepared by: CoE Investor Relations Q1 The Planning and Implementation Committee for Electricity Supply and Tariff
More informationBusiness as Usual (BAU) Preliminary Scenario Results
6 th APEC Energy Demand and Supply Outlook Business as Usual (BAU) Preliminary Scenario Results Cecilia Tam Deputy Vice President, APERC Asia Pacific Energy Research Centre This presentation is for review
More informationMONGOLIA ENERGY SECTOR: DEVELOPING FRAMEWORK FOR ENERGY COOPERATION
Expert Workshop for Towards Multilateral Energy Cooperation in North East Asia, Seoul, Korea, September 5-6, 2003 Panelist: Mr.Tumentsogt Tsevegmid (MSc, MPA) Ministry of Infrastructure, Mongolia Overview
More informationEthiopia: Policies for productivity growth and structural transformation. G-24 Technical Group Meeting, Addis Ababa, February 27, 2017
Ethiopia: Policies for productivity growth and structural transformation G-24 Technical Group Meeting, Addis Ababa, February 27, 2017 Outline of presentation Country context Reorientation in political
More informationPRESS RELEASE. Tuesday, 26 June 2018 SURIA CAPITAL RECORDS 29% REVENUE GROWTH IN 2017
PRESS RELEASE Tuesday, 26 June 2018 SURIA CAPITAL RECORDS 29% REVENUE GROWTH IN 2017 Suria Capital Holdings Berhad is pleased to announce that the Company and its Group of subsidiaries (SuriaGroup) recorded
More informationAGENDA. 1. Facts of Indonesia. 2. Strategic Sectors Focus. 3. Trade Statistic with Italy
AGENDA 1. Facts of Indonesia 2. Strategic Sectors Focus 3. Trade Statistic with Italy 2 Facts of Indonesia 3 Indonesia at a Glance Country name: Republic of Indonesia Capital city: Jakarta - 24 Million
More informationMinisterial Perspectives on Energy Transition and Regional Cooperation Country/ Organization Statement and Discussion
The statement delivered at the Second Asian and Pacific Energy Forum on 4 April 2018 Ministerial Perspectives on Energy Transition and Regional Cooperation Country/ Organization Statement and Discussion
More informationBrunei Darussalam Country Report
Chapter 3 Brunei Darussalam Country Report September 2016 This chapter should be cited as Energy and Industry Department of Prime Minister s office (2016), Brunei Darussalam Country Report, in Kimura,
More informationPRIVATE SECTOR PLAYERS: LOGISTICS SOLUTIONS FOR EFFICIENT SUPPLY CHAIN MANAGEMENT IN INDONESIA
PRIVATE SECTOR PLAYERS: LOGISTICS SOLUTIONS FOR EFFICIENT SUPPLY CHAIN MANAGEMENT IN INDONESIA By Jeffrey Bahar Deputy Chief Executive Officer Spire Research and Consulting Topic 1 Market and Performance
More informationSECTOR OVERVIEW. Government of Indonesia, State Electricity Corporation (PLN). Electricity Power Supply Business Plan (RUPTL ). Jakarta.
Eastern Indonesia Renewable Energy Project (Phase 1) (RRP INO 51209) SECTOR OVERVIEW A. Sector Performance 1. Indonesia is the largest economy in Southeast Asia, with an estimated gross domestic product
More informationAre Sustainable Urban Energy Systems Essential for a New Deal on Energy Access for Africa? By Dave Turk, Head of IEA Energy Environment Division
Are Sustainable Urban Energy Systems Essential for a New Deal on Energy Access for Africa? By Dave Turk, Head of IEA Energy Environment Division OECD/IEA, 2016 The IEA works around the world to support
More informationThe Role of Clean Energy and Renewables in the Lower Mekong Energy Scenario
ADB Clean Energy Week Workshop on Renewables in the Lower Mekong Region The Role of Clean Energy and Renewables in the Lower Mekong Energy Scenario Venkatachalam Anbumozhi Economic Research Institute for
More informationSyarikat Samling Timber Sdn Bhd A member of Samling Global Limited PUBLIC SUMMARY. Forest Management Plan. for. Forest Management Unit
Syarikat Samling Timber Sdn Bhd A member of Samling Global Limited PUBLIC SUMMARY Forest Management Plan for Forest Management Unit Ravenscourt Sdn Bhd T/ 0294 for the period 2016 to 2026 Page 1 of 6 This
More informationRehabilitation of The Tenom Pangi Hydropower Project
Malaysia Rehabilitation of The Tenom Pangi Hydropower Project Field Survey: August 2003 1. Project Profile and Japan s ODA Loan Tenon Pangi Site location map Entrance to Tenom Pangi Hydroelectric Power
More informationSri Lanka s Power Generation Past, Present and Future
CEYLON ELECTRICITY BOARD Sri Lanka s Power Generation Past, Present and Future Eng. Noel Priyantha- Chief Engineer (Renewable Energy) Eng. Buddhika Samarasekara- Chief Engineer (Generation Planning) Transmission
More informationGlobal Energy Interconnection: An Innovative Global Solution for Implementing. Paris Agreement
Global Energy Interconnection: An Innovative Global Solution for Implementing Paris Agreement Global Energy Interconnection Development and Cooperation Organization (GEIDCO) Research Center for Sustainable
More informationElectricity is crucial to
Anniversary In line with this aspect, the vision of the government is to enrich Bangladesh as a middle-income country by 2021. The government is planning to speed up power demand growth by setting up economic
More informationPowering the future: Promoting energy for inclusive growth
Powering the future: Promoting energy for inclusive growth EPDP Conference 2016 13 January 2016 New World Makati Hotel ARSENIO M. BALISACAN, PhD Secretary of Economic Planning National Economic and Development
More information