1 Subsoil Improvement Works at DVIZ, Haiphong, Vietnam 3 ALICE MONTULET, LUCIEN HALLEUX AND NGUYEN VAN NGOC SUBSOIL IMPROVEMENT WORKS AT DVIZ, HAIPHONG, VIETNAM ABSTRACT This article describes the subsoil improvement works realised in the Dinh Vu Industrial Zone, Haiphong, Vietnam. The Dinh Vu Industrial Zone is located along the Cam and Bach Dang Rivers adjacent to the sea. Before land reclamation, the area was below the water level of a pond. The land was reclaimed by using sand dredged from the sea and pumped into the area to be reclaimed (thickness of the sand 3 m). The subsoil in Dinh Vu consists of soft alluvial and marine clay deposits with a thickness of about 35 m. The soft subsoil has low bearing capacity and excessive settlement characteristics. In order to accelerate the settlement process, subsoil consolidation has been performed in an area of 40 ha in the industrial zone, including installation of prefabricated vertical drains (PVDs) combined with a surcharge preloading. PVDs provide a shorter drainage path in a radial direction which decreases the excess pore pressure and increases the effective stress. In order to realise the design of PVDs (spacing and depth), a pre-soil investigation was performed and theoretical predictions of settlement were calculated. During the project the consolidation process was recorded with settlement marker plates. Settlement recordings have been analysed using the Asaoka method. Theoretical consolidation behaviour predicted before subsoil improvement matched the recorded consolidation. A model was developed and in order to test its accuracy under different loads, a trial embankment was performed (thickness of sand 6 m). A post-soil investigation has also been realised and compared to the pre-soil investigation highlighting the subsoil improvement. INTRODUCTION Vietnam has been a predominantly agricultural civilisation based on wet rice cultivation. A few years ago, governing authorities introduced economic reforms to encourage the growth of industries and commerce which lead to an increase and diversity in economic activities. To serve that target, Vietnam has converted agricultural land into industrial land intensively since the economic reforms. However, the ratio of Above: Waiting for natural settlement to consolidate subsoil is a long and thus costly process. The placement of Prefabricated Vertical Drains (PVDs) expedites the process, but must be prepared by soil investigations and carefully calculated for depth and spacing. agricultural land must be secured while industrialisation is in progress. In fact, the conversion of agricultural land into industrial land has already exceeded the limit. Therefore land reclamation could be a good solution in order to create more economic activities without using land reserved for agricultural purposes. LAND RECLAMATION PROJECT DESCRIPTION In December 2011, Dinh Vu Industrial Zone (DVIZ) was chosen by Bridgestone to establish its new tire plant. The area to be reclaimed is 102 ha of which 40 ha was requested to be consolidated by DVIZ. γ sat Saturated unit weight [kn/m³] σ p Preconsolidation pressure [kpa] C c Compression index [-] C r Recompression index [-] C α Secondary compression index [-] c v Vertical and horizontal coefficient of consolidation [m²/y] d s Diameter of the smear zone [m] d w Diameter of the drain zone [m] k h Horizontal permeability coefficient of the soil in undisturbed zone [m/s] k s Horizontal permeability coefficient of the soil in smear zone [m/s]

2 4 Terra et Aqua Number 133 December 2013 Figure 1. Location map of northern Vietnam and Dinh Vu Industrial Zone. Figure 2. Layout of the industrial zone with the area to be reclaimed and to consolidate. The project area lies in Dinh Vu Peninsula, 15 km east of Haiphong city center, 120 km east of Hanoi. Dinh Vu is located at the mouth of the Cam and Bach Dang Rivers, adjacent to the sea (Figure 1). The original area was below the water level of a pond and water is stored and circulated through channels leading to the Cam River and to the sea (Figures 2 and 3). The land was reclaimed by using sand dredged from the sea and pumped into the land using a hydraulic method (Figure 4). The original soil level at this location was about +2.6 mcd and the land has to be handed over at a final level of +4.8 mcd or +5.8 mcd depending on the location. Reclamation work increases the load on the soft-subsoil causing settlement, but waiting for natural settlement is a time-consuming and thus costly option. Therefore, soil improvement has been realised to accelerate the settlement process. The consolidation process consisted of the installation of Prefabricated Vertical Drains (PVDs) up to a depth of 25 m combined with a surcharge preloading (area reclaimed up to +6.5 mcd) (Figure 5). The contractual specifications between the client and DVIZ required an achievement of a degree of consolidation of 90% (in the area to be handed over at a final level of +4.8 mcd) and 75% (in the area to be handed over at a final level of +5.8 mcd) of the primary consolidation. When consolidation criteria have been reached, the surcharge can be removed to the final level required for the hand-over (Figure 6). Within the framework of the project, soil investigation has been performed before land reclamation in order to realise the design of PVDs (spacing and depth) and theoretical predictions of settlement have been calculated. During this project the consolidation process was recorded with settlement marker plates. Settlement recordings have been back analysed. Furthermore, a post-soil investigation has been performed after completion of the consolidation criteria to compare geotechnical parameters before and after subsoil consolidation. GEOLOGY AND SITE CONDITION The land to be reclaimed is located on the right bank of the Cam River adjacent to the sea. This area is directly affected by the tidal regime. Geological phenomena in the region are mainly storage accumulations of materials originating from rivers and seas; concretely there are silt aggregations brought about by the flow of the Cam River and the tide. The subsoil in Dinh Vu consists of soft alluvial and marine clay deposits with a thickness of about 35 m. The two first layers are softer and have an average thickness of 13 m, underlain by medium stiff to stiff clay layers (Figure 7). SOIL INVESTIGATION In order to determine soil parameters needed to calculate the settlement, a soil investigation was carried out. Six deep boreholes have been drilled with Standard Penetration Tests (SPT) and the lab tests included particle size analysis, unit weight, Atterberg limits, direct shear test and consolidation test. Soil parameters used for settlement calculation are given by the soil investigation.

3 ALICE MONTULET is working as a geologist for Dinh Vu Industrial Zone (DVIZ) in Vietnam which is under management of a consortium of Haiphong city and Rent-a-Port (Belgium). She is responsible for subsoil consolidation and design of PVD for new projects as well as the follow up of currently ongoing projects. She holds a MSc in Geological Engineering from the University of Liège (2008). Before coming to Vietnam, she was working as a Project Engineer in several countries in Europe. LUCIEN HALLEUX is Director of G-Tec and visiting Professor of Geophysics at the University of Leuven. He is a qualified geo-engineer from the University of Liège (Belgium) and holds a PhD in geophysical engineering. He has 30 years of experience in Engineering Geology and Geophysics. In 1993 he founded G-Tec, a company that designs, carries out and interprets site investigation campaigns. Recent assignments include numerous marine projects involving dredging and land reclamation such as the deepening of the Panama Canal, harbour infrastructures and renewable offshore energy projects all over the world. NGUYEN VAN NGOC is Professor and Dean of the Hydraulic Engineering Faculty, Vietnam Maritime University. He was director of the Maritime Construction Development and Consultant Center and has more than 30 years of experience in dealing with soft soil conditions around the northern coastal area of Vietnam. He focuses on geotechnical and foundation engineering for port development and has been working as project manager for many big port development projects in Vietnam such as Haiphong Port, Dinh Vu Port, Nam Dinh Vu sea dike. Figure 3. Aerial view of the reclamation area. An average profile has been used for the model coming from data of the 6 boreholes (see Table I). The secondary compression index was not tested in the laboratory; therefore values have been adapted from literature resources. The horizontal coefficient of consolidation has not been defined, but a ratio of 2 is assumed for the clayey materials as it is often the case in natural sediments that the horizontal permeability is larger than the vertical permeability (a ratio of 1 is assumed for the mud). For all layers a preconsolidation pressure of about 60kPa has been found from the lab testing results. Such a preconsolidation stress, however, seems to be too high. Because of this uncertainty and the important effect of this, the preconsolidation stress will (conservatively) be neglected in the calculations. SUBSOIL IMPROVEMENT WORKS The low bearing capacity and high compressibility of soft subsoil affects the longterm stability of buildings. Therefore, the stabilisation of soft subsoil before commencing construction was recommended. Surcharge (preloading) is one of the most successful techniques for improving the shear strength of soft subsoil because it loads the ground surface to introduce a greater part of the ultimate settlement that is expected to bear after hand-over. When PVDs combined with surcharge preloading are applied, vertical drains provide a much shorter drainage path in a radial direction which decreases the excess pore pressure and increases the effective stress; this reduces the required preload period significantly (see Figure 8). In order to determine the PVD design depth of the PVDs and spacing between PVDs settlement calculations have been performed based on the formula of Terzaghi assuming one dimensional deformation. Installation of the PVDs disturbs the soil surrounding the PVD which has an impact on the rate of consolidation. For this reason the smear effect was taken into account in the model. The ratio d s /d w was chosen as 2 (size of PVD and mandrel) and the ratio k h /k s of 3 is assumed. The target was to reach 90% of consolidation under a load which is a final level +4.8 mcd or 75% of consolidation under a load which is a final level +5.8 mcd. Calculation coming from the model indicated that without any PVD installation the time required to reach 90% of consolidation is more than 10 years. With PVDs, the time required to reach 90% of consolidation is reduced to 3 months. Thanks to settlement calculation, the design of PVD has been chosen as follows: Spacing between 2 PVDs is 1 m (square grid) and depth of the PVD is 25 m which means that PVD also penetrate layers 3 and 4.

4 6 Terra et Aqua Number 133 December 2013 Figure 4. Land reclamation using hydraulic method. Figure 5. PVD installation to a depth of 25 m. MONITORING AND ANALYSIS The consolidation process was recorded with settlement marker plates (Figure 9). Settlement and sand elevation data recorded on site are shown in Figure 10. As can be seen, the area has been filled up to +6.7 mcd. During the surcharge installation, the settlement velocity is significant; then the settlement velocity decreases, until the installation of PVDs. After PVD installation, the settlement velocity increases again. Variations in the settlement velocity after PVD installation are mainly a result of the variations of the ground water level (hydraulic land filling in an area close to the settlement marker plate). Settlement develops mainly during the surcharge installation and during the two months after PVDs installation. Settlement recordings (from 39 rod settlement gauges) were analysed by the Asaoka method in order to obtain the final settlement. From these analyses final settlements vary between 0.7 m and 0.85 m. The contractual specifications indicate that the land has to reach 90% or 75% of consolidation under a load which is a fill to a final level +4.8 mcd or +5.8 mcd. As the land was reclaimed to +6.5 mcd, the final settlement obtained by the Asaoka method corresponds to the final settlement under a load which is a fill (originally) to level +6.5 mcd. Therefore a correction based on the effective stress increase has been applied to the final settlement obtained by the Asaoka method to define the final settlement under a load which is a fill to final level +4.8 mcd or +5.8 mcd. Results indicate that 2 months after the PVD installation, the consolidation reached the contractual specifications everywhere. The theoretical time-settlement behaviour calculated before soil consolidation has been compared to the evolution of the timesettlement behaviour recorded on site. Results show a theoretical settlement behaviour that Figure 6. Removing the surcharge to the final level required for the hand-over.

5 Subsoil Improvement Works at DVIZ, Haiphong, Vietnam 7 Table I. Geotechnical parameters used in the model. Soil type γ sat σ p C c C r C α c v c h [kn/m³] [kpa] [-] [-] [-] [m²/y] [m²/y] Layer 1 very soft Layer 2 very soft to soft Layer 3 stiff to very stiff Layer 4 medium stiff Layer 5 dense to very dense >> >> matched quite well with the recorded settlement; however the magnitude of calculated settlements was slightly higher than the recorded settlements. This is because the preconsolidation pressure was chosen to be neglected (0kPA). Therefore, the preconsolidation pressure was modified in the input of the model in order to obtain similar calculated and recorded settlements. The preconsolidation pressure was adjusted to 10kPa in all layers. With this small modification in the input values, both the settlement behaviour and the magnitude of the calculated settlements show a good fit with recordings (see Figure 10), and the final settlement obtained using the Asaoka method matches the final settlement calculated with the model. TRIAL EMBANKMENT In order to test the accuracy of the model under different loads, a trial embankment was built. On the top of the reclaimed area to average +6.5 mcd, 2 m of dry sand was added. The trial embankment is 2 m in height, 20 m wide and 20 m long. The settlement beacon was located in the middle of the embankment. This trial embankment has been built after installation of the PVDs as seen in Figure 11a. During all this time, settlements were recorded. In Figure 11b, the recorded settlements are compared to the calculated settlements (1: calculated settlement under a fill to +7 mcd but without PVD; 2: calculated settlement under a fill to +7mCD with PVD; 3: calculated settlement when 2 m of dry sand are added with PVD). The geotechnical parameters used in the model for the calculations of the settlement are the same as presented in Table I, except for the preconsolidation pressure which is 10kPa, coming from the back-analysis results explained above. As can be seen in Figure 11b, the settlements recorded on site and settlements calculated with this model are Settlement Figure 7. Geological cross-section from pre-soil investigation. Time Without PVD PVD without surcharge Required settlement PVD with surcharge Figure 8. Time settlement curve of soft clay showing a significant time reduction to reach the required settlement by using PVD with surcharge preloading. Figure 9. Measuring the settlement at the settlement marker plates.

6 8 Terra et Aqua Number 133 December 2013 close. For example, 2 months after the installation of the embankment, the settlement recorded was m and the settlement calculated was m. The settlements recorded on site under a constant load (after installation of the embankment) were also analysed by the Asaoka method to define the final settlement. The result is a final settlement of 1.16 m. The final settlement coming from the model is 1.20 m. This trial embankment can prove that this model is quite accurate under different loads. POST SOIL INVESTIGATION Once the consolidation criteria have been reached, a post-soil investigation was realised in order to compare the evolution of geotechnical parameters before and after the consolidation process (Figure 12). Two deep boreholes were drilled close to the location of pre-soil investigation boreholes. Similar laboratory tests were performed. The results show a decrease in the moisture content and a significant increase in the shear strength especially in the 2 first layers which are softer. SPT values also slightly increase in the soft layers. It seems that most of the consolidation takes place in the two first layers (0-14m). At higher depths the difference of moisture content and shear strength values tends to diminish. CONCLUSIONS At Dinh Vu an area of 40 ha has been consolidated using PVDs (Prefabricated Vertical Drains) and surcharge preloading. Before land reclamation, a model was realised using data coming from the geotechnical survey in order to determine the design of the PVDs (spacing and depth). Settlements recorded on site have been analysed using the Asaoka method and compared to the settlement model. Settlement behaviour and magnitude of settlement calculated matched the recorded settlement rather well and the trial embankment proves that the model is accurate. The post soil investigation realised after consolidation highlights the improvement of geotechnical parameters and that it especially takes place in the two first layers. The subsoil consolidation performed at Dinh Vu Industrial Zone has reached the contractual specifications and the project was successfully completed on schedule. Fill height (mcd) Settlement (m) Fill heigth (mcd) Settlement (m) PVD installation Time (days) Recorded settlement Calculated settlement Figure 10. (a) Top, Elevation of the sand level; (b) Below, Calculated vs recorded settlement Sand filling PVD installation Add 2m of sand Time (days) Calculated settlement 2 Recorded settlement 3 Figure 11. (a) Top, Elevation of the sand level at the location of the trial embankment; (b) Below, calculated vs recorded settlement at the location of the trial embankment.

7 Subsoil Improvement Works at DVIZ, Haiphong, Vietnam 9 Figure 12. Soil parameters before and after subsoil consolidation. REFERENCES Bo, M.W., Chu, J., Low, B.K. and Choa, V. (2003). Soil Improvement Prefabricated Vertical Drain Techniques, Thomson, Singapore. Indraratna B., Rujikiatkamjorn C. and Xueyu G. (2011). Performance and prediction of surcharge and vacuum consolidation via prefabricated vertical drains with special reference to highways, railways and ports. ISSMGE TC2011 International Symposium on Ground Improvement. Long P.V., Bergado D.T., Balasubramaniam A.S. and Quang N.C. (2006). Back analyses of compressibility and flow parameters of PVD improved soft ground in Southern Vietnam. Geosynthetics. Van de Molen, M. and Berg, R.J. (2006). Soil improvement works at Changi East, Singapore. Geosynthetics.

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE Prof. J. N. Mandal Department of civil engineering, IIT Bombay, Powai, Mumbai 400076, India. Tel.022-25767328 email: cejnm@civil.iitb.ac.in Module - 9

More information

American International Journal of Research in Science, Technology, Engineering & Mathematics

American International Journal of Research in Science, Technology, Engineering & Mathematics American International Journal of Research in Science, Technology, Engineering & Mathematics Available online at http://www.iasir.net ISSN (Print): 2328-3491, ISSN (Online): 2328-3580, ISSN (CD-ROM): 2328-3629

More information

Earthwork and Ground Technology. Site Improvement

Earthwork and Ground Technology. Site Improvement Earthwork and Ground Technology Site Improvement Slides adapted and upgraded from original presentation slide by College of Engineering, University of Washington. Methods of site improvement Removal and

More information

Study of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment

Study of Various Techniques for Improving Weak and Compressible Clay Soil under a High Earth Embankment MATEC Web of Conferences 11, 03006 ( 2014) DOI: 10.1051/ matecconf/ 20141103006 C Owned by the authors, published by EDP Sciences, 2014 Study of Various Techniques for Improving Weak and Compressible Clay

More information

PVD Ground Improvement System

PVD Ground Improvement System eau eau CeTeau stands for innovative ground improvement technologies with Prefabricated Vertical Drains. Prefabricated Vertical Drains (PVD), also called Wick Drains, are prefabricated drain strips consisting

More information

Improving Engineering Properties of Soft Soil Using Preloading and Prefabricated Vertical Drains

Improving Engineering Properties of Soft Soil Using Preloading and Prefabricated Vertical Drains Volume 1, Issue 2, October-December, 2013, pp. 08-12, IASTER 2013 www.iaster.com, Online: 2347-2855, Print: 2347-8284 ABSTRACT Improving Engineering Properties of Soft Soil Using Preloading and Prefabricated

More information

WORKING OF PREFABRICATED VERTICAL DRAIN- Α CASE STUDY

WORKING OF PREFABRICATED VERTICAL DRAIN- Α CASE STUDY WORKING OF PREFABRICATED VERTICAL DRAIN- Α CASE STUDY Aniket S. Shukla 1, A. R. Kambekar 2 P.G. Student, Construction Management, Department of Civil Engineering, Sardar Patel College of Engineering, Andheri

More information

Downloaded from Downloaded from /1

Downloaded from  Downloaded from  /1 PURWANCHAL UNIVERSITY VI SEMESTER FINAL EXAMINATION-2003 LEVEL : B. E. (Civil) SUBJECT: BEG359CI, Foundation Engineering. Full Marks: 80 TIME: 03:00 hrs Pass marks: 32 Candidates are required to give their

More information

CIV E Geotechnical Engineering I Consolidation

CIV E Geotechnical Engineering I Consolidation Purpose Determine the magnitude and time rate of settlement for a compressible cohesive soil. Required reading Das 2006 Sections 10.4 to 10.16 (pages 312 to 358). Theory Bringing soil samples into the

More information

A POORLY GRADED SAND COMPACTION CASE STUDY

A POORLY GRADED SAND COMPACTION CASE STUDY Proceedings of Softsoils 2014, October, 21-23 rd 2014 A POORLY GRADED SAND COMPACTION CASE STUDY Liu Yu 1, Marcello Djunaidy 2 ABSTRACT: One 350 hectare artificial island using hydraulic dredging sand

More information

Module 4:Preloading and vertical drains Lecture 10:Introduction to preloading and vertical drains. The Lecture Contains:

Module 4:Preloading and vertical drains Lecture 10:Introduction to preloading and vertical drains. The Lecture Contains: The Lecture Contains: Preloading and vertical drains file:///d /Dr.patra/ground_improvement_techniques/lecture10/10_1.htm [10/11/2011 4:24:16 PM] Pre, loading and vertical drains Preloading Increases the

More information

GROUND IMPROVEMENT SITE INVESTIGATON

GROUND IMPROVEMENT SITE INVESTIGATON GROUND IMPROVEMENT SITE INVESTIGTON November 2009 Lankelma ltd old Harbour arn old Harbour Lane Iden, East Sussex TN31 7UT U.K. T: +44 (0)1797 280050 E: info@lankelma.com www.lankelma.com Gardline Lankelma

More information

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils

Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Experience of a Large Scale Unintentionally Long Surcharge on Organic Soils Ying Liu, Ph.D., P.E., Senior Engineer, Group Delta Consultants, Inc., 37 Amapola Ave., Suite 212, Torrance, CA. Email: yingl@groupdelta.com

More information

Colbonddrain. Colbonddrain. Next Generation. Installation SOIL CONSOLIDATION. Colbond. Proven Performance. Unique Core Design

Colbonddrain. Colbonddrain. Next Generation. Installation SOIL CONSOLIDATION. Colbond. Proven Performance.  Unique Core Design is a leading producer of high-quality synthetic nonwovens for flooring, automotive and construction applications and three-dimensional polymeric mats and composites for civil engineering, building and

More information

SITE INVESTIGATION Validation and Interpretation of data

SITE INVESTIGATION Validation and Interpretation of data SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues

More information

Performance of Mechanically Stabilized Earth walls over compressible soils

Performance of Mechanically Stabilized Earth walls over compressible soils Performance of Mechanically Stabilized Earth walls over compressible soils R.A. Bloomfield, A.F. Soliman and A. Abraham The Reinforced Earth Company, Vienna, Virginia, USA ABSTRACT: Two projects have recently

More information

Experiences on embankment fill in land expressway over soft ground

Experiences on embankment fill in land expressway over soft ground Second International Seminar on the Design & Construction of the Second Penang Bridge Experiences on embankment fill in land expressway over soft ground Prepared by ; AZMI MADMARJUKI Project Location JAMBATAN

More information

PE Exam Review - Geotechnical

PE Exam Review - Geotechnical PE Exam Review - Geotechnical Resources and Visual Aids Item Page I. Glossary... 11 II. Parameters... 9 III. Equations....11 IV. Tables, Charts & Diagrams... 14 1. Module 1 - Soil Classification... 14

More information

Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles

Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles Behavior of Reinforced Embankment on Soft Ground with and without Jet Grouted Soil-Cement Piles by 1 Dennes T. Bergado and 2 Glen A. Lorenzo 1 Professor and 2 Doctoral Candidate, respectively Geotechnical

More information

Application of Vibro Techniques for Infrastructure Projects in India

Application of Vibro Techniques for Infrastructure Projects in India Application of Vibro Techniques for Infrastructure Projects in India Rainer Wegner Contract Manager, Keller Grundbau GmbH, Germany Dr. V.R. Raju Director, Keller Ground Engineering India Pvt Ltd, India

More information

Prefabricated Vertical Drains

Prefabricated Vertical Drains Prefabricated Vertical Drains Technical Design Manual CeTeau stands for innovative ground improvement technologies with Prefabricated Vertical Drains. Prefabricated Vertical Drains (PVD), also called Wick

More information

Ground improvement support using Confined aggregate piers in soft soil. Brian Metcalfe, P.E. Director of Engineering Geopier Foundation Company

Ground improvement support using Confined aggregate piers in soft soil. Brian Metcalfe, P.E. Director of Engineering Geopier Foundation Company Ground improvement support using Confined aggregate piers in soft soil Brian Metcalfe, P.E. Director of Engineering Geopier Foundation Company OUTLINE Ground improvement historical perspective Confined

More information

Chapter 11 Compressibility of Soil

Chapter 11 Compressibility of Soil Page 11 1 Chapter 11 Compressibility of Soil 1. The compression of soil layers as a result of foundation or other loadings is caused by (a) deformation of soil particles. (b) relocation of soil particles.

More information

COMPRESSIBILITY OF PEAT

COMPRESSIBILITY OF PEAT COMPRESSIBILITY OF PEAT Brendan C. O Kelly Department of Civil Engineering Trinity College Dublin 15 th Irish Environmental Researchers Colloquium 28 30 January 2005, Sligo 1 OVERVIEW Construction of embankments

More information

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Converting slurry tailings facilities to filtered dry stacks a case history John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant Objectives General discussion on the geotechnical issues. Case

More information

Soil distrubance associated with mandrel-driven prefabricated vertical drains: field experience

Soil distrubance associated with mandrel-driven prefabricated vertical drains: field experience University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part A Faculty of Engineering and Information Sciences 2014 Soil distrubance associated with mandrel-driven

More information

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN

STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN STATIC ALTERNATING CYCLIC HORIZONTAL LOAD TESTS ON DRIVEN STEEL PIPE PILES OF FOUNDATIONS FOR HIGHWAY BRIDGES Kouichi TOMISAWA, Civil Engineering Research Institute of Hokkaido, Japan Satoshi NISHIMOTO,

More information

Area Ratio A % % = 16.88%

Area Ratio A % % = 16.88% Tutorial: Site Investigation Semester I Session 2013/2014 BFC 43103 Foundation Engineering Dept. of Infrastructure and Geomatic Engineering Faculty of Civil and Environmental Engineering 2013 drknmy Examples

More information

BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM

BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM BEHAVIOR IMPROVEMENT OF FOOTINGS ON SOFT CLAY UTILIZING GEOFOAM G. E. ABDELRAHMAN AND A. F. ELRAGI Department of Civil Engineering, Fayoum University Fayoum, Egypt ABSTRACT: EPS, expanded poly-styrene

More information

Northport Berth 3 design and construction monitoring

Northport Berth 3 design and construction monitoring Proc. 18 th NZGS Geotechnical Symposium on Soil-Structure Interaction. Ed. CY Chin, Auckland Lucy Coe, Nicola Ridgley, Do Van Toan Beca Infrastructure Limited, Auckland, NZ Keywords: retaining wall, deflections,

More information

Ground Improvement Techniques in Land Reclamation. M. Kitazume Tokyo Institute of Technology

Ground Improvement Techniques in Land Reclamation. M. Kitazume Tokyo Institute of Technology Ground Improvement Techniques in Land Reclamation M. Kitazume Tokyo Institute of Technology Contents Introduction Ground Improvement Techniques Sand drain method Kansai International Airport PVD method

More information

Road Embankment Test Sections over Soft Peat Layer, Võõbu, Estonia

Road Embankment Test Sections over Soft Peat Layer, Võõbu, Estonia Historical Experience and Challenges of Proceedings of 13th Baltic Sea Geotechnical Conference Geotechnical Problems in Baltic Sea Region ISSN 2424-5968 / ISBN 978-609-457-957-8 Lithuanian Geotechnical

More information

SITE INVESTIGATION. Foundation Engineering

SITE INVESTIGATION. Foundation Engineering SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface

More information

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015

Subsurface Investigations PDCA Professor s Driven Pile Institute. Loren R. Anderson Utah State University June 25, 2015 Subsurface Investigations PDCA Professor s Driven Pile Institute Loren R. Anderson Utah State University June 25, 2015 Ralph B. Peck (1962) Subsurface engineering is an art; soil mechanics is an engineering

More information

Breakwater on Soft Subsoil Problems of Design and Execution

Breakwater on Soft Subsoil Problems of Design and Execution Third Chinese-German Joint Symposium on Coastal and Ocean Engineering National Cheng Kung University, Tainan November 8-16, 2006 Breakwater on Soft Subsoil Problems of Design and Execution Siegmund Schlie

More information

Reclamation of a Conventional Tailings Facility for Long Term Dry Stacking Operations in Western Australia

Reclamation of a Conventional Tailings Facility for Long Term Dry Stacking Operations in Western Australia Reclamation of a Conventional Tailings Facility for Long Term Dry Stacking Operations in Western Australia Andrew Bodley, Hatch Associates Pty Ltd, Canada, Mississauga, Canada Sha Chen, Hatch Associates

More information

Finite Element Analysis of Ground Modification Techniques for Improved Stability of Geotubes Reinforced Reclamation Embankments Subjected to Scouring

Finite Element Analysis of Ground Modification Techniques for Improved Stability of Geotubes Reinforced Reclamation Embankments Subjected to Scouring Finite Element Analysis of Ground Modification Techniques for Improved Stability of Geotubes Reinforced Reclamation Embankments Subjected to Scouring Hyeong-Joo Kim 1), *Jay Jamin 2) and Jose Leo Mission

More information

Ground Improvement Techniques: Dynamic Compaction Martin Larisch & Tim Pervan

Ground Improvement Techniques: Dynamic Compaction Martin Larisch & Tim Pervan Ground Improvement Techniques: Dynamic Compaction Martin Larisch & Tim Pervan INSERT DATE HERE Ground Improvement - What is it? Ground Improvement = Black Box? Ground Improvement - Introduction Ground

More information

A STUDY ON GROUND IMPROVEMENT USING STONE COLUMN TECHNIQUE

A STUDY ON GROUND IMPROVEMENT USING STONE COLUMN TECHNIQUE A STUDY ON GROUND IMPROVEMENT USING STONE COLUMN TECHNIQUE Karun Mani 1, Nigee.K 2 U.G Student, Dept, of Civil Engineering, M.A.College of Engineering, Ernakulam, Kerala, India 1 P.G Student, Applied Mechanics

More information

A Case Study: Foundation Design in Liquefiable Site

A Case Study: Foundation Design in Liquefiable Site RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,

More information

Use of Polymer Geogrid Composite to support rail track over weak saturated clay subgrade a case study

Use of Polymer Geogrid Composite to support rail track over weak saturated clay subgrade a case study Geo-Environmental Engineering 2015 Concordia University Montreal, Canada May 21-22, 2015 Use of Polymer Geogrid Composite to support rail track over weak saturated clay subgrade a case study Sam Bhat *,

More information

Ground Improvement Specialists

Ground Improvement Specialists is a design-build specialty geotechnical contractor offering expertise on ground improvement for sites with poor soil. We combine value engineering and innovative techniques to deliver practical, sustainable

More information

EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO SOIL

EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO SOIL International Symposium on Sustainable Geosynthetics and Green Technology for Climate Change (SGCC) 2 to 21 June 212 Bangkok, Thailand EFFECT OF CEMENT CONTENT ON UNCONFINED COMPRESSIVE STRENGTH OF JAMSHORO

More information

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two.

2. Pavement Materials: Consist of flexible or rigid pavements, typically HMA or PCC, respectively, or a composite of the two. Design Manual Chapter 6 - Geotechnical 6C - Pavement Systems 6C-1 Pavement Systems A. General Information This section addresses the importance of pavement foundations and the potential for pavement problems

More information

Geotechnical Performance of ATA -Treated Fluid Fine Tailings

Geotechnical Performance of ATA -Treated Fluid Fine Tailings Geotechnical Performance of ATA -Treated Fluid Fine Tailings T. Moore, Thurber Engineering Ltd., Canada C. Zhang, Thurber Engineering Ltd., Canada M. Pinheiro, Thurber Engineering Ltd., Canada Outline

More information

GEOGRID REINFORCED RAILWAYS EMBANKMENTS: DESIGN CONCEPTS AND EXPERIMENTAL TEST RESULTS

GEOGRID REINFORCED RAILWAYS EMBANKMENTS: DESIGN CONCEPTS AND EXPERIMENTAL TEST RESULTS GEOGRID REINFORCED RAILWAYS EMBANKMENTS: DESIGN CONCEPTS AND EXPERIMENTAL TEST RESULTS Filippo Montanelli Engineer Sales Director - Geosynthetics Division TENAX Spa, Viganò (Lecco) - Italy Filippo Montanelli,

More information

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD

CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD 24 Terra et Aqua Number 133 December 2013 TAKU SAITOH CONSTRUCTION OF A PERIMETER BUND USING THE PRE-MIXED (PM)-CLAY METHOD ABSTRACT Securing disposal fields to receive soft dredged material has become

More information

5.3 Flood Protection Plan

5.3 Flood Protection Plan 5.3 Flood Protection Plan 5.3.1 Existing Conditions (1) Land Elevation The majority of land in the study area is characterized as undeveloped land such as agricultural, unused land and forests which have

More information

Steel screw settlement reduction piles for a raft foundation on soft soil

Steel screw settlement reduction piles for a raft foundation on soft soil Proc. 18 th NZGS Geotechnical Symposium on Soil-Structure Interaction. Ed. CY Chin, Auckland Alexei Murashev Opus International Consultants Limited, Wellington, New Zealand. Keywords: piled raft, settlement

More information

Effectiveness of Gel-Push Sampling Technique to Retrieve Undisturbed Sandy Specimens for Liquefaction Test

Effectiveness of Gel-Push Sampling Technique to Retrieve Undisturbed Sandy Specimens for Liquefaction Test 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Effectiveness of Gel-Push Sampling Technique to Retrieve Undisturbed Sandy Specimens for

More information

Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone

Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone Challenges in Design and Construction of Deep Excavation With Case Studies - KVMRT in KL Limestone Gue See Sew G&P Professionals Sdn Bhd www.gnpgroup.com.my 20 July 2016 CONTENTS INTRODUCTION SOIL PARAMETERS

More information

New Approach for Determination of Bearing Capacity of Soil using Direct Shear Test (Lab test)

New Approach for Determination of Bearing Capacity of Soil using Direct Shear Test (Lab test) New Approach for Determination of Bearing Capacity of Soil using Direct Shear Test (Lab test) Pravin Shrinivas Dussa Assistant Professor, Department of Civil Engineering, N. B. Navale Sinhgad College of

More information

Numerical Modeling of Slab-On-Grade Foundations

Numerical Modeling of Slab-On-Grade Foundations Numerical Modeling of Slab-On-Grade Foundations M. D. Fredlund 1, J. R. Stianson 2, D. G. Fredlund 3, H. Vu 4, and R. C. Thode 5 1 SoilVision Systems Ltd., 2109 McKinnon Ave S., Saskatoon, SK S7J 1N3;

More information

Long-term stress measurements in the clay cores of storage reservoir embankments

Long-term stress measurements in the clay cores of storage reservoir embankments Long-term stress measurements in the clay cores of storage reservoir embankments K S WATTS, Building Research Establishment Ltd, Watford, UK. A KILBY, Thames Water plc, London, UK J A CHARLES, Building

More information

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil.

RIGID INCLUSIONS. Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. H A Y W A R D B A K E R I N C. RIGID INCLUSIONS Rigid Inclusions offer an economical approach for building on sites underlain by soft soil. Above: HBI installed Rigid Inclusions on a congested downtown

More information

GROUND IMPROVEMENT USING DYNAMIC REPLACEMENT FOR NCIG CET3 COAL STOCKYARD

GROUND IMPROVEMENT USING DYNAMIC REPLACEMENT FOR NCIG CET3 COAL STOCKYARD FOR NCIG CET3 COAL STOCKYARD Charles CH Chua 1, Ming Lai 2, Graeme Hoffmann 2 and Brett Hawkins 1 1 Connell Hatch, Australia, 2 Keller Ground Engineering Pty Ltd ABSTRACT This paper presents an overview

More information

Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique

Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique Evaluation the Effectiveness of Rapid Impact Compaction (RIC) as a Ground Improvement Technique Bashar Tarawneh, Ph.D, P.E Assistant Professor Civil Engineering Department The University of Jordan Amman,

More information

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES

A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES North American Society for Trenchless Technology (NASTT) No-Dig Show 2011 Washington, D.C. March 27-31, 2011 Paper F-1-04 A THREE DIMENSIONAL STUDY OF THE EFFECT OF SOIL EROSION ON RIGID PIPES Sherif Kamel

More information

SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION

SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION Geotech., Const. Mat. and Env., ISSN:2186-2982(P), 2186-2990(O), Japan SEEPAGE FLOW-STABILITY ANALYSIS OF THE RIVERBANK OF SAIGON RIVER DUE TO RIVER WATER LEVEL FLUCTUATION A. Oya 1, H.H. Bui 2, N. Hiraoka

More information

Study on earth pressure acting upon shield tunnel lining in clayey and sandy grounds based on field monitoring

Study on earth pressure acting upon shield tunnel lining in clayey and sandy grounds based on field monitoring Geotechnical Aspects of Underground Construction in Soft Ground Ng, Huang & Liu (eds) 2009 Taylor & Francis Group, London, ISBN 978-0-415-48475-6 Study on earth pressure acting upon shield tunnel lining

More information

Innovative Soft Soil Improvement Method through Intelligent Use of Vacuum De-Watering and Dynamic Compaction Techniques

Innovative Soft Soil Improvement Method through Intelligent Use of Vacuum De-Watering and Dynamic Compaction Techniques Innovative Soft Soil Improvement Method through Intelligent Use of Vacuum De-Watering and Dynamic Compaction Techniques Robert Y. Liang Distinguished Professor, Department of Civil Engineering, University

More information

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Created by Simpo PDF Creator Pro (unregistered version)  Asst.Prof.Dr. Jaafar S. Maatooq Lect.No.9 2 nd Semester Barrages, Regulators, Dams 1 of 15 In order to harness the water potential of a river optimally, it is necessary to construct two types of hydraulic structures, as shown in Figure

More information

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL

SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL SCG INTERNATIONAL TRINIDAD AND TOBAGO LIMITED COUVA CHILDREN S HOSPITAL GEOTECHNICAL CONSULTANT Prepared by Checked by Approved by Mr. C Allen Dr. Derek Gay Dr. Derek Gay Signature Date Signature Date

More information

CBR of Soaked Clay Drained by Sandy Layer

CBR of Soaked Clay Drained by Sandy Layer Proceedings of the World Congress on Civil, Structural, and Environmental Engineering (CSEE 16) Prague, Czech Republic March 3 31, 216 Paper No. ICGRE 116 DOI: 1.11159/icgre16.116 CBR of Soaked Clay Drained

More information

REPORT STATUS: DATE: Report n :

REPORT STATUS: DATE: Report n : REPORT: Expanded clay LWA in CEA Lightweight fill and thermal insulation products for civil engineering applications. Installation and structural quality control on site. STATUS: Technical report DATE:

More information

Effectiveness of vertical drains in soft clay with special reference to smear effect

Effectiveness of vertical drains in soft clay with special reference to smear effect University of Wollongong Research Online University of Wollongong Thesis Collection University of Wollongong Thesis Collections 1999 Effectiveness of vertical drains in soft clay with special reference

More information

339. Massarsch, K.R and Fellenius, B.H., Ground vibrations from pile and sheet pile driving. Part 1 Building Damage. Proceedings of the DFI-

339. Massarsch, K.R and Fellenius, B.H., Ground vibrations from pile and sheet pile driving. Part 1 Building Damage. Proceedings of the DFI- 339. Massarsch, K.R and Fellenius, B.H., 2014. Ground vibrations from pile and sheet pile driving. Part 1 Building Damage. Proceedings of the DFI- EFFC International Conference on Piling and Deep Foundations,

More information

IMPROVEMENT OF LOAD CARRYING CAPACITY OF BC SOIL USING REINFORCED STONE COLUMN

IMPROVEMENT OF LOAD CARRYING CAPACITY OF BC SOIL USING REINFORCED STONE COLUMN IMPROVEMENT OF LOAD CARRYING CAPACITY OF BC SOIL USING REINFORCED STONE COLUMN Prof.HARISH C 1, VINOD B.R 2 MOHD SHAHID HUSSAIN 3 1 Assistant, professor, Department of Civil Engineering, EWIT, Bengaluru,

More information

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil

Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil Introduction Example of the Unified Design procedure for use in the September 8, 2014, short course on in Brazil The Unified Design procedure involves two main steps. The first is verifying that the loads

More information

Modelling of a pile row in a 2D plane strain FE-analysis

Modelling of a pile row in a 2D plane strain FE-analysis Numerical Methods in Geotechnical Engineering Hicks, Brinkgreve & Rohe (Eds) 2014 Taylor & Francis Group, London, 978-1-138-00146-6 Modelling of a pile row in a 2D plane strain FE-analysis J.J.M. Sluis,

More information

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome

Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Module - CE 3132 Geotechnical Engineering Assignment Triaxial Test Marks 10% Learning Outcome Ability to conduct a Unconsolidated Undrained (UU) triaxial test Ability to evaluate the undrained shear strength

More information

Application of Geotechnical Engineering in Construction Industry and Beyond

Application of Geotechnical Engineering in Construction Industry and Beyond Application of Geotechnical Engineering in Construction Industry and Beyond By Dr Myint Win BO, Ph.D, P.Eng, P.Geo, IntPE Senior Principal/Director (Geo-Services) DST Consulting Engineers Inc. Adjunct

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Comparison of Eurocode 8 and Turkish Earthquake Code 2007 for Residential RC Buildings in Cyprus

Comparison of Eurocode 8 and Turkish Earthquake Code 2007 for Residential RC Buildings in Cyprus Comparison of Eurocode 8 and Turkish Earthquake Code 2007 for Residential RC Buildings in Cyprus I. SAFKAN University College London, UK SUMMARY The Cyprus Island is located at seismic zone and many destructive

More information

Swinburne Research Bank

Swinburne Research Bank Powered by TCPDF (www.tcpdf.org) Swinburne Research Bank http://researchbank.swinburne.edu.au Author: Bo, Myint Win; Arulrajah, Arul; Horpibulsuk, Suksun; Leong, Melvyn; Disfani, Mahdi Miri Title: Densification

More information

techie-touch.blogspot.com www.vidyarthiplus.com CE2305 FOUNDATION ENGINEERING 2 MARKS QUESTIONS & ANSWERS 16 MARKS QUESTIONS UNIT -1 1. What are components of total foundation settlement? elastic settlement,

More information

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS

SOIL PRESSURE IN EMBANKMENT STABILIZATIONS SOIL PRESSURE IN EMBANKMENT STABILIZATIONS Analysis of the 3D shadowing effect of piles Dipl.-Ing. M. Filus Fides DV-Partner GmbH ABSTRACT: Pile checks required by the codes alone are usually not sufficient

More information

SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN

SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN 1.0 GENERAL This work comprises of supply and installation of prefabricated vertical drains in accordance to the Specifications and Drawings. 2.0 MATERIALS

More information

GEOSYNTHETIC-REINFORCED PAVEMENT SYSTEM : TESTING & DESIGN

GEOSYNTHETIC-REINFORCED PAVEMENT SYSTEM : TESTING & DESIGN GEOSYNTHETIC-REINFORCED PAVEMENT SYSTEM : TESTING & DESIGN FILIPPO MONTANELLI TENAX SPA, ITALY AIGEN ZHAO TENAX CORPORATION, USA PIETRO RIMOLDI TENAX SPA, ITALY ABSTRACT A large scale experimental program

More information

CPTU/DMT Control of Heavy Tamping Compaction of Sands

CPTU/DMT Control of Heavy Tamping Compaction of Sands CPTU/DMT Control of Heavy Tamping Compaction of Sands Norbert Kurek Menard Polska sp. z o.o.,warsaw, Poland. E-mail:nkurek@menard.pl Lech Bałachowski Gdańsk University of Technology, Gdańsk, Poland. E-mail:

More information

Mass Stabilization Virgin & Contaminated Soil / Sediment

Mass Stabilization Virgin & Contaminated Soil / Sediment Mass Stabilization Virgin & Contaminated Soil / Sediment Presented at: Remediation Technologies Symposium 2013 Charles Wilk, Manager Stabilization and Remediation Applications ALLU Group Inc. What is Mass

More information

AMERDRAIN. Prefabricated Vertical Soil Drainage Systems ICK. Soil drainage method for accelerating settlement through vertical drainage

AMERDRAIN. Prefabricated Vertical Soil Drainage Systems ICK. Soil drainage method for accelerating settlement through vertical drainage AMERDRAIN Prefabricated Vertical Soil Drainage Systems Soil drainage method for accelerating settlement through vertical drainage MERICAN ICK RAIN CORPORATION INTRODUCTION The problem Historically, the

More information

Preloaded Road Embankments: monitoring and analysis of results

Preloaded Road Embankments: monitoring and analysis of results NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Preloaded Road Embankments: monitoring and analysis of results T. Damtew, M. S.

More information

9. SOIL PERMEABILITY. 9.0 Why is it important to determine soil permeability?

9. SOIL PERMEABILITY. 9.0 Why is it important to determine soil permeability? 9. SOIL PERMEABILITY 9.0 Why is it important to determine soil permeability? Soil permeability is the property of the soil to transmit water and air and is one of the most important qualities to consider

More information

Suitability of Different Materials for Stone Column Construction

Suitability of Different Materials for Stone Column Construction Suitability of Different Materials for Stone Column Construction Dipty Sarin Isaac and Girish M. S. Department of Civil Engineering College of Engineering, Trivandrum, Kerala diptyisaac@yahoo.com, girishmadhavan@yahoo.com

More information

Improvement of clayey soil by electro

Improvement of clayey soil by electro International Conference on GEOTECHNIQUES FOR INFRASTRUCTURE PROJECTS 7 th & 8 th bruary 17, Thiruvananthapuram Improvement of clayey soil by electro osmosis Reshma R J Department of Civil Engineering

More information

Effect of Ground Subsidence on Load Sharing and Settlement of Raft and Piled Raft Foundations

Effect of Ground Subsidence on Load Sharing and Settlement of Raft and Piled Raft Foundations Effect of Ground Subsidence on Load Sharing and Settlement of Raft and Piled Raft Foundations T.V. Tran, S. Teramoto, M. Kimura, T. Boonyatee and Le Ba Vinh Abstract In this paper, two centrifugal model

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

LACHEL FELICE & Associates. Advances in Finite Element Modeling Using PLAXIS SILVER REEF HOTEL/CASINO EXPANSION

LACHEL FELICE & Associates. Advances in Finite Element Modeling Using PLAXIS SILVER REEF HOTEL/CASINO EXPANSION LACHEL FELICE & Associates Advances in Finite Element Modeling Using PLAXIS SILVER REEF HOTEL/CASINO EXPANSION The Design/Construction Team OWNER: Silver Reef Casino; Harlan Oppenheim Architect: Morris

More information

NPTEL Course GROUND IMPROVEMENT USING MICROPILES

NPTEL Course GROUND IMPROVEMENT USING MICROPILES Lecture 22 NPTEL Course GROUND IMPROVEMENT USING MICROPILES Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Email: gls@civil.iisc.ernet.in Contents

More information

A Study of Loading Time Effect in Oedometer Test

A Study of Loading Time Effect in Oedometer Test A Study of Loading Time Effect in Oedometer Test *Sanchari Halder 1, Ji-Seung Park 2 and Myoung-Soo Won 3 1), 2), 3) Department of Civil Engineering, Kunsan National University, Gunsan, South Korea 1)

More information

LOAD CAPACITY OF AUGER DISPLACEMENT PILES

LOAD CAPACITY OF AUGER DISPLACEMENT PILES International Conference on Ground Improvement and Ground Control (ICGI 2012), 30 Oct. 2 Nov. 2012, University of Wollongong, Australia B. Indraratna, C. Rujikiatkamjorn and J S Vinod (editors) LOAD CAPACITY

More information

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS

SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS, Zerihun Alemayehu GROUNDWATER Groundwater takes 0.6% of the total water in the hydrosphere 0.31% of the total water in the hydrosphere has depth less than

More information

Long-Term Instrumentation Program to Monitor Various Geo-Technologies Used on the I-15 Reconstruction Project, Salt Lake City, Utah

Long-Term Instrumentation Program to Monitor Various Geo-Technologies Used on the I-15 Reconstruction Project, Salt Lake City, Utah Farnsworth and Bartlett Long-Term Instrumentation Program to Monitor Various Geo-Technologies Used on the I-15 Reconstruction Project, Salt Lake City, Utah By Clifton Farnsworth Geotechnical Division Utah

More information

DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE ABSTRACT

DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE ABSTRACT DREDGING TECHNIQUES USED TO DEVELOP A MAN-MADE IJXE ON A DEEP ORGANIC PROFILE by Thomas D. Swantko, Geotechnical Consultant, Los Angeles, California, and Stephen W. Berry, Vice President, Michael D. Sims

More information

the ground improvement specialist Design Construct Perform

the ground improvement specialist Design Construct Perform the ground improvement specialist Design Construct Perform ABOUT US Menard is a worldwide leader in ground improvement works, providing complete range of ground improvement techniques to meet specific

More information

EPS 2011 Lillestrøm, Norway 6 8 June 2011 COST COMPARISON OF CONSTRUCTION METHODS FOR HIGHWAY WIDENING ON COMPRESSIBLE SUBGRADE

EPS 2011 Lillestrøm, Norway 6 8 June 2011 COST COMPARISON OF CONSTRUCTION METHODS FOR HIGHWAY WIDENING ON COMPRESSIBLE SUBGRADE EPS 2011 Lillestrøm, Norway 6 8 June 2011 COST COMPARISON OF CONSTRUCTION METHODS FOR HIGHWAY WIDENING ON COMPRESSIBLE SUBGRADE Milan Duškov InfraDelft BV, the Netherlands (milan.duskov@infradelft.nl)

More information

CPT Guide 5 th Edition. Cone Penetration Test (CPT) Quality control (QC) Gregg Drilling & Testing, Inc. Dr. Peter K. Robertson Webinar #

CPT Guide 5 th Edition. Cone Penetration Test (CPT) Quality control (QC) Gregg Drilling & Testing, Inc. Dr. Peter K. Robertson Webinar # Gregg Drilling & Testing, Inc. Site Investigation Experts Cone Penetration Test (CPT) Quality control (QC) Dr. Peter K. Robertson Webinar #10 2013 CPT Guide 5 th Edition Download FREE copy from: Robertson

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5. Turbine Foundation Construction Method Statement Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5 Turbine Foundation Construction Method Statement Copyright ESB International Limited, all rights reserved. Farm Contents 1 Introduction

More information