Submission by Prospect to the Department for Business Energy and Industrial Strategy

Size: px
Start display at page:

Download "Submission by Prospect to the Department for Business Energy and Industrial Strategy"

Transcription

1 Coal Generation in Great Britain Submission by Prospect to the Department for Business Energy and Industrial Strategy 8 th February Latest revision of this document: This revision:

2 Introduction Prospect represents professionals, managers and specialists in a number of sectors including energy. Our 140,000 members include around 25,000 professionals working as energy specialists. We represent members with a diverse range of professional, managerial and specialist roles including engineering, research, trading, asset management, and business development. Prospect is dedicated to supporting and championing the work our members do in the energy sector to provide safe, secure and affordable energy for domestic consumers and industry. Prospect is not affiliated to any political party and believes its political independence provides it with the stability and credibility needed to effectively represent its membership. Prospect believes that energy policy should be reviewed as a whole and should consider the broader impact of energy on wider industrial and skills policy. Our frustration is that the UK s energy policy has not supported innovation in thermal generation and that the UK faces the challenge of replacing most of its existing generation capacity over the next fifteen years with the closure of the first round of gas-fired CCGT stations, the closure of coal stations and the retirement of Britain s AGR fleet. Unlike other developed economies, the UK s energy policy has not encouraged the development of new cleaner coal plant such as the Advanced Supercritical Power stations being constructed in Germany, China, Denmark and Japan with emissions reduced by over 33% compared to the aged UK fleet. Similarly the Government has withdrawn support for two Carbon Capture and Storage (CCS) demonstration plants, one using new coal technology and the other developing gas CCGT technology, despite the importance of CCS if the UK is to meet its carbon emission targets for During their design life, the fate of CCS is as important for gas plant built around 2020 as for new abated coal. Therefore we face the closure of the remaining 14 GW of coal capacity, at a time when all coal capacity is required to meet winter peaks and to provide ancillary services such as reactive voltage and black-start. We do not believe that the replacement of peaking coal plant with small-scale diesel, reciprocating gas and Open Cycle Gas turbines (OCGTs) makes a significant difference to carbon emissions. At the same time, the retirement of coal plant by small-scale peaking plant reduces the ancillary services available to National Grid to secure grid stability and obtain the customer benefits of better management of the transmission system that improves security of supply and reduces emissions. Britain requires the replacement of its aging power generation plants but uncertainty about future prices and regulation is the barrier to new build, not doubts about when in the 2020s coal plant closes This response sets out our view on the Government s proposals Prospect submission on Coal generation in Great Britain Page 2

3 Energy Policy Given the current technical constraints on renewable and nuclear generation, there remains a need for thermal generation. Prospect believes in a balanced energy policy that meets the five following objectives for thermal power generation: Timing the replacement of existing plant so we avoid a capacity gap; Ensuring that the market rewards capacity and other services rather than just price; Maintaining long-term stability for thermal power including biomass to reduce financial risk and prices to consumers; Building on existing skills partnerships so the process of transition retains core skills and develops the complex technical skills for active networks; Retaining Government support for the commercial development of new technologies such as Carbon Capture and Storage Given the timescales for building new plant, we believe that a decision to force the retirement of all coal plant before 2025 is not in the public interest. In the rest of this paper we respond to the specific questions raised by the consultation document. Thermal Power The consultation paper recognises the importance of thermal power for load-following and broadly aims to encourage new CCGT gas build by setting a final closure date for coal that provides 15% of the UK s electricity capacity. Our experience of the sector and involvement in employment decisions gives us the perspective that any significant new power project is based on a 25/30 year design life when assessing decision to build any new plant to run between 2020 and 2050, the following factors are as important as the closure date for Britain s aged coal fleet: Income streams, in the absence of contracts for differences for gas, this is a major risk forcing up the cost of capital; Gas Supply contracts; Government skills policy; Transmission charges and their evolution as renewable capacity is built offshore; The emissions control measures required to meet the UK s target and their development over the next 30 years. The decision to change the policy on coal generation making investment in IED compliance redundant has increased regulatory risk; and The future support for CCS. The development of new modern generation capacity requires a more focussed policy approach than setting a final date for coal plant closure. In practice, current policy will restrict coal use to peak-covering by 2020 with closures driven by the cost of maintenance and the discovery of the need for major remedial work on aged coal plant. Prospect submission on Coal generation in Great Britain 3

4 Chapter3:1 Closure of unabated coal: response to questions The analysis is unduly optimistic about the prospects for coal plant running up to 2025 and beyond in the current commercial environment. We believe that some assessment of the low coal option is required especially as regulatory risk is a major inhibitor to further investment. The analysis also needs to consider ancillary services such as black-start and reactive voltage to understand the full impact of the loss of coal plant. Given the important role of the National Grid in managing energy demand and transmission constraints, these services are important for Grid stability. Further analysis is required to assess the system impact of the loss of these services with coal closures and its impact on system efficiency. In our experience, the construction of new large scale gas plant takes three-tofour years once planning permission and finance has been secured. The speed of new build and the willingness of investors to develop new gas capacity is not borne out by experience: for example, the latest capacity market process did not deliver significant new capacity. Indeed the capacity market is good at encouraging the retention of existing plant but is an ineffective instrument for encouraging the development of new thermal plant that would run from 2022 to We do not believe that the analysis fully assess the other factors driving investment in efficient large-scale gas plant. We believe that a managed transition from unabated coal to gas and abated coal requires some positive policy measures rather than simply accelerating the closure of existing coal plant. Given the age of existing coal plant and the lack of an effective contract for differences regime for CCS, the discussion over CCS demonstration is academic as it asks an unrealistic question. For CCS to be an effective commercial option, it requires a 25 year project life to recover capital like nay thermal or renewable power proposal. Clearly this requires new plant rather than the retrofitting of 50 year old power stations.if the UK is to secure the environmental and commercial opportunities of CCS, then a more effective regulatory regime is needed. The closure of existing coal plant provides a skilled and experienced workforce for CCS demonstration plants but in the absence of Government support for a new CCS initiative using existing grid connections, this opportunity is likely to be lost. Whilst biomass co-firing would reduce emissions and retain capacity as new plant is built, the current arrangements do not provide any new incentive to increase the proportion of biomass. The biggest threat from these proposals is that they penalise companies that have invested in IED compliance. Apart from Uniper other operators have invested in feasibility studies and design proposals. The current proposals increase the perception of regulatory risk, especially for new gas plant that may face similar changes in policy as the UK shifts to further restrictions on carbon emissions in the 2020s and 2030s. Moreover the discussion of retro-fitting CCS to aged coal plant without the commercial support provided to other low-carbon forms of generation fuels a perception that the Government is not minded to support CCS which is likely to become essential for new-build gas power stations during their operating life. Prospect submission on Coal generation in Great Britain 4

5 We believe that any changes should be introduced at the end of the 2025/6 financial years: given current trends in energy use, coal plant is only commercially viable during the Winter and a closure date before March 2026 is likely to make the effective date 31 st March Chapter3:2 Constraints before 2025 We believe that existing policy, particularly the IED emissions requirements constrain coal significantly from 2020 to Further restrictions run the risk of forcing up prices as coal plant closes before new gas plant can be both constructed and commissioned. Regulatory uncertainty remains unhelpful to investment and is a major reason behind the slow pick-up of new technology in the UK. We are particularly concerned that the premature closure of coal could result in the introduction of environmentally unfriendly plant such as small-scale diesel. Whilst we are not convinced by the case for further constraints in coal prior to 2025, if such constraints are deemed necessary to reduce overall emissions by encouraging the replacement of coal by lower carbon then they should apply to the coal fleet as a whole. Given the different investment strategies and technical profiles of remaining coal plant, then assessing the impact on the whole fleet rather than applying change uniformly to all coal plant is more likely to be effective. All coal-plant operators have practical experience of trading electricity, fuel and ROCS so a simple trading mechanism that encourages economic efficiency is practicable in this case. The capacity market is an effective short to medium mechanism for retaining sufficient energy capacity to meet demand. We believe that suitable reform of the capacity market would be more effective than introducing another set of regulatory arrangements that add to complexity and perceptions of regulatory risk Given that the age of coal plant and the IED emissions limits further investment in coal plant, there remains a clear signal that new capacity is needed. A more effective mechanism than constraining coal would address the other barriers to new gas and abated coal investment rather than forcing coal plant to run at less than the limits already imposed by the IED legislation. Whilst we believe that the Capacity mechanism should include some commitment to provide training as the shortage of skilled staff is an impediment to further innovation, we do not believe that placing further constraints on coal will improve the efficiency of the capacity market auction process. The introduction of new constraints is likely to push up prices to retain the same short term security of supply by deterring bids from coal plants and will add to the perceptions of regulatory risk that inhibit investment in new gas an abated coal plant. Chapter3:3 Security of Supply The experience of the Capacity Market auction does not give us confidence that the process is robust enough to secure security of supply if the closure of coal plant is accelerated by further environmental constraints. Prospect submission on Coal generation in Great Britain 5

6 Given that the electricity generation market is based on market forces and investment from multinational private investors, Government no longer has the ability to operate on the basis of command and control. In addition the use of interconnectors should not assume that there will be a return to a permanent electricity surplus in mainland Europe and this adds further complexity to the market, largely beyond the influence of the UK government. In these circumstances, there is sufficient doubt about the impact of policy that it is in the public interest for the Secretary of State to retain powers to suspend the closure date and constraints if security of supply is threatened. Any use of the Secretary of State s powers to suspend the closure should be accompanied by other policy steps to encourage flexible generation, A suspension that is clearly part of a coherent policy to improve investment in plant and skills is more likely to be successful than an isolated response to an emergency. We believe that the future build rates are over-optimistic: our view is that a combination of uncertainty about the commercial environment over the 25 year life of the CCGT plant and a shortage of skilled staff to operate and maintain new plant is a further constraint on the introduction of new plant. The skills required to successfully operate a new CCGT or OCGT gas plant are very different to the skills needed for construction. Uncertainty about the future of generation has led to a reduction in recruitment and has resulted in an aging workforce; continued uncertainty is likely to result in displaced staff from coal stations leaving the industry rather than being redeployed into new types of generation. Similarly the impact assessment uses a lower investment hurdle than most commercial organisations for the 25/30 life of anew CCGT/OCGT power station. Whilst the premature closure of coal plant may improve profitability in the first 2/3 years of operation, the capital investment per permanent employee for these plants is over 5 million and project planning assumes 25 years of operation. Therefore it would be prudent to use a higher rate of return of at least 12% to reflect: o commercial risk for plant operating in the most commercially-risky part of the electricity market, o past experience of significant losses by CCGT plant operators; and o investor concern that these proposals set a precedent for further restrictions on gas plant mid-way through their design life as the UK seeks further reductions in carbon emissions. Chapter 4: the wider impact of closures The impact assessment does not take into account the impact on local economies of coal station closures and the need for a more focussed approach to staff relocation than that used by Job Centre Plus in previous closures of coal-fired power stations and coal mines. In our experience, Job Centre Plus s ability to fund training is limited and that there was insufficient co-ordination between Job Centre Plus and employers with a need for engineering skills to determine what type of training and funding is required to convert skills. Prospect submission on Coal generation in Great Britain 6

7 This proposal remains silent about the skills challenges posed by a significant change in generation technology. We believe that Government should work closely with industry training bodies such as the National Skills Academy for Power to ensure that sufficient staff can be recruited and trained. We estimate the average cost of training a graduate or school-leaver to the professional standard required by generation companies is in the region of 90,000 to 175,000. Prospect submission on Coal generation in Great Britain 7

Investing under regulatory uncertainty

Investing under regulatory uncertainty August 2016 Investing under regulatory uncertainty Finding the new equilibrium The investment challenge In the past, assessing the prospects for generation investment was relatively straightforward. Given

More information

Are the 2020 renewables targets (for electricity and heat) achievable? If not, why not?

Are the 2020 renewables targets (for electricity and heat) achievable? If not, why not? SUBMISSION BY NATIONAL GRID PLC Introduction to National Grid National Grid owns and operates the high voltage electricity transmission system in England and Wales and, as National Electricity Transmission

More information

About Energy UK. Introduction

About Energy UK. Introduction REC 34-15 Energy UK response to DG Comp investigation of Investment Contract (early Contract for Difference) for Lynemouth power station biomass conversion 10 May 2015 About Energy UK Energy UK is the

More information

Global Gas and Steam Turbine Markets Conventional Thermal Power Expansion Driven by Emerging Markets and Rising Natural Gas Availability

Global Gas and Steam Turbine Markets Conventional Thermal Power Expansion Driven by Emerging Markets and Rising Natural Gas Availability Global Gas and Steam Turbine Markets Conventional Thermal Power Expansion Driven by Emerging Markets and Rising Natural Gas Availability June 2014 Executive Summary Return to contents 4 Key Findings Global

More information

Black Start Strategy

Black Start Strategy Issue 1 Revision Black Start Strategy Produced in accordance with Standard Condition C16 of the NGET Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT HISTORY Version 1.0

More information

CBI Response to BEIS Call for Evidence

CBI Response to BEIS Call for Evidence CBI Response to BEIS Call for Evidence Smart, Flexible Power System The CBI welcomes the opportunity to respond to the BEIS Call for Evidence on A Smart, Flexible Energy System. Across the UK, the CBI

More information

UK Electricity Market Reform: Lessons from a policy and regulatory journey

UK Electricity Market Reform: Lessons from a policy and regulatory journey UK Electricity Market Reform: Lessons from a policy and regulatory journey Michael Grubb Professor of Energy and Climate Change, University College London (UCL) Chair, UK Panel of Technical Experts on

More information

Ofgem s embedded benefits reform minded to decision

Ofgem s embedded benefits reform minded to decision Ofgem s embedded benefits reform minded to decision Summary and Aurora s commentary Background The first two Capacity Market auctions held in December 2014 and December 2015 delivered results that largely

More information

UK Electricity Market Reform: Lessons from a policy and regulatory journey

UK Electricity Market Reform: Lessons from a policy and regulatory journey UK Electricity Market Reform: Lessons from a policy and regulatory journey Michael Grubb Professor of Energy and Climate Change, University College London (UCL) Institute of Sustainable Resources & Energy

More information

Electricity trading and transmission arrangements. Towards better electricity trading and transmission arrangements

Electricity trading and transmission arrangements. Towards better electricity trading and transmission arrangements Agenda Advancing economics in business Electricity trading and transmission arrangements Towards better electricity trading and transmission arrangements The UK is facing the significant challenge of integrating

More information

Highlights and Key Results

Highlights and Key Results Highlights and Key Results June 15, 2015 Eric Lantz National Renewable Energy Laboratory 1 Program Name or Ancillary Text eere.energy.gov Wind Vision: Goals Understand the potential role of wind power

More information

npower who we are Tilbury Power Station

npower who we are Tilbury Power Station npower who we are npower who we are RWE npower, part of the RWE Group, is the leading UK energy company committed to conducting its business with a sense of responsibility for the environment, its customers

More information

Some Doubts about Oxford s Argument on Stranding Thermal Coal in Japan

Some Doubts about Oxford s Argument on Stranding Thermal Coal in Japan Some Doubts about Oxford s Argument on Stranding Thermal Coal in Japan Jun ARIMA Professor, Graduate School of Public Policies The University of Tokyo On May 12, the electronic version of the Nikkei carried

More information

Efficient regime for the expansion of renewable energies, further development of the energy-only market and preservation of EU-ETS

Efficient regime for the expansion of renewable energies, further development of the energy-only market and preservation of EU-ETS Efficient regime for the expansion of renewable energies, further development of the energy-only market and preservation of EU-ETS ABASTRACT OF A STUDY FOR RWE AG June 2013 Frontier Economics Ltd/r2b.

More information

Competitive energy landscape in Europe

Competitive energy landscape in Europe President of Energy Sector, South West Europe, Siemens Competitive energy landscape in Europe Brussels, siemens.com/answers Agenda Europe s competitiveness depends on an affordable and reliable energy

More information

Renewable energy: Investing in Africa

Renewable energy: Investing in Africa 1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission

More information

Power Perspectives 2030

Power Perspectives 2030 Executive Summary A contributing study to Roadmap 2050: a practical guide to a prosperous, low-carbon europe EXECUTIVE SUMMARY A. CONTEXT In October 2009, the European Council set an economy-wide greenhouse

More information

Renewables for Africa and for the World

Renewables for Africa and for the World RENEWABLE ENERGY Renewables for Africa and for the World Paul Simons Deputy Executive Director International Energy Agency SAIREC, Cape Town, 5 October 2015 Profound changes underway in energy markets

More information

Changing energy infrastructure and the potential role of new forms of energy storage

Changing energy infrastructure and the potential role of new forms of energy storage Changing energy infrastructure and the potential role of new forms of energy storage Mike Colechin 2013 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies

More information

Industrial Energy Efficiency - Key Messages

Industrial Energy Efficiency - Key Messages Energy Research Partnership Industrial Energy Efficiency - Key Messages Introduction The world s energy systems are fundamentally inefficient recent work suggests that only 11% of primary energy ends up

More information

Emissions Performance Standard

Emissions Performance Standard Emissions Performance Standard Briefing for House of Lords Report Stage consideration of Energy Bill Recommendations 1. Existing coal plants upgrading to meet the IED should be included under the EPS.

More information

Electricity liberalisation in the UK the end is nigh

Electricity liberalisation in the UK the end is nigh Electricity liberalisation in the UK the end is nigh Malcolm Keay Preamble: The Dynamics of Power Generation investment in liberalised power markets will be problematic for governments It will be lumpy,

More information

Flexible energy for efficient and cost effective integration of renewables in power systems

Flexible energy for efficient and cost effective integration of renewables in power systems A Wärtsilä White Paper supported by modelling conducted by Redpoint Energy, a business of Baringa Partners Flexible energy for efficient and cost effective integration of renewables in power systems 2

More information

Ian Curry Managing Director BR Energy South Africa

Ian Curry Managing Director BR Energy South Africa Ian Curry Managing Director BR Energy South Africa GRID INTEGRATED ENERGY STORAGE THE MISSING LINK IN SOUTH AFRICA S INTEGRATED RESOURCE PLAN INTRODUCTION South Africa is currently experiencing one of

More information

Royal Society response to Defra review of the UK Climate Change Programme

Royal Society response to Defra review of the UK Climate Change Programme Policy document 02/05 April 2005 Royal Society response to Defra review of the UK Climate Change Programme This response has been approved on behalf of the Council of the Royal Society by the Treasurer

More information

Tomorrow s Energy Scenarios 2017 Summary Booklet

Tomorrow s Energy Scenarios 2017 Summary Booklet Tomorrow s Energy Scenarios 2017 Summary Booklet Planning our Energy Future EirGrid Tomorrow s Energy Scenarios Summary Booklet Planning our Energy Future Page 1 Introducing scenario planning At EirGrid,

More information

Future Energy Scenarios in five minutes. July 2017

Future Energy Scenarios in five minutes. July 2017 Future Energy Scenarios in five minutes July 2017 Executive summary About FES National Grid has an important role to play in leading the debate on the energy revolution across the industry and working

More information

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS 1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS EXECUTIVE SUMMARY Since industrialisation, the United Kingdom has relied heavily on fossil fuels for the bulk of its energy supply. This is by and large still

More information

An Examination of National Grid s Future Energy Scenarios

An Examination of National Grid s Future Energy Scenarios An Examination of National Grid s Future Energy Scenarios Do the scenarios deliver security of supply? Dr Capell Aris and Colin Gibson Dr Capell Aris worked in the Electricity Supply Industry first as

More information

Optimization and Flexibility First: The Clear Case for Energy Storage

Optimization and Flexibility First: The Clear Case for Energy Storage Optimization and Flexibility First: The Clear Case for Energy Storage Ontario s Long-Term Energy Plan (2017) Submission of Energy Storage Canada (ESC) December 16, 2016 1 Executive Summary In the last

More information

Black Start Procurement Methodology

Black Start Procurement Methodology Issue 1 Revision Black Start Procurement Methodology Produced in accordance with Standard Condition C16 of the National Grid Transmission Licence Effective from 1 st April 2017 to 31 st March 2018 DOCUMENT

More information

DECC CONSULTATION RESPONSE: RO Grace periods consultation

DECC CONSULTATION RESPONSE: RO Grace periods consultation DECC CONSULTATION RESPONSE: RO Grace periods consultation Introduction RenewableUK represents 610 organisations in the field of wind, wave and tidal stream energy. Scottish Renewables represents the renewable

More information

ENABLING EMBEDDED GENERATION

ENABLING EMBEDDED GENERATION APRIL 2014 ENABLING EMBEDDED GENERATION Turning Australian electricity on its head WHAT IS EMBEDDED GENERATION? Energy supply systems around the world are being transformed by embedded (or distributed)

More information

Defence Watch ICT Development Division

Defence Watch ICT Development Division Chief Information Officer Group Defence Watch ICT Development Division Mrs Anne Brown Defence Chief Information Security Officer (CISO) First Assistant Secretary ICT Development IA 2.0 Current Areas of

More information

Renewables London 04 October 2017

Renewables London 04 October 2017 Renewables 2017 London 04 October 2017 Context Policy support & technology progress continue to drive robust growth in renewables Solar PV broke new records in 2016, led by China Solar PV grew faster than

More information

Hydrogen: Bridging Electrical & Natural Gas Systems

Hydrogen: Bridging Electrical & Natural Gas Systems Hydrogen: Bridging Electrical & Natural Gas Systems Daryl Wilson President & CEO Hydrogenics October 13 th, 2011 NY-BEST Advanced Energy Conference Buffalo Dispatchability vs. Sustainability DISPATCHABILITY

More information

Global Challenges in Energy: Comparison between UK and India

Global Challenges in Energy: Comparison between UK and India Global Challenges in Energy: Comparison between UK and India G R O U P 2 A D A M S A M U E L A R C H I S A R R O Z A M A D H U R I D A S N A V E E N S H R I V A S T A V A S H A L I N I G R A H A M Overview

More information

SUSTAINABLE USE OF OCEANS IN THE CONTEXT OF THE GREEN ECONOMY AND THE ERADICATION OF POVERTY, PRINCIPALITY OF MONACO, NOVEMBER, 2011

SUSTAINABLE USE OF OCEANS IN THE CONTEXT OF THE GREEN ECONOMY AND THE ERADICATION OF POVERTY, PRINCIPALITY OF MONACO, NOVEMBER, 2011 SUSTAINABLE USE OF OCEANS IN THE CONTEXT OF THE GREEN ECONOMY AND THE ERADICATION OF POVERTY, PRINCIPALITY OF MONACO, 28 30 NOVEMBER, 2011 Implementation of Offshore Wind Power & Potential of Tidal, Wave

More information

WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010

WIND POWER TARGETS FOR EUROPE: 75,000 MW by 2010 About EWEA EWEA is the voice of the wind industry actively promoting the utilisation of wind power in Europe and worldwide. EWEA members from over 4 countries include 2 companies, organisations, and research

More information

Response to the geothermal aspects of the BEIS Call for Evidence Contracts for Difference

Response to the geothermal aspects of the BEIS Call for Evidence Contracts for Difference Response to the geothermal aspects of the BEIS Call for Evidence Contracts for Difference Cornwall Council and the C&IoS Local Enterprise Partnership Date 19/12/2016 Question 2: What are the expected heat

More information

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response

Renewable Heat Incentive: proposals for a domestic scheme. Community Housing Cymru Group response Renewable Heat Incentive: proposals for a domestic scheme Community Housing Cymru Group response 1. About Us The Community Housing Cymru Group (CHC Group) is the representative body for housing associations

More information

Electricity System Operator Forward Plan 2018/19

Electricity System Operator Forward Plan 2018/19 Electricity System Operator Forward Plan 2018/19 Contents 1. Our vision 2. An ambitious plan 3. A changing landscape 4. Value for consumers 5. A plan built with our customers and stakeholders 6. Our roles,

More information

RENEWABLE POWER GENERATION COSTS IN 2014

RENEWABLE POWER GENERATION COSTS IN 2014 RENEWABLE POWER GENERATION COSTS IN Executive Summary The competiveness of renewable power generation technologies continued improving in 2013 and. The cost-competitiveness of renewable power generation

More information

Input to public consultation on ENERGY MARKET DESIGN

Input to public consultation on ENERGY MARKET DESIGN Brussels, Oktober 2015 Input to public consultation on ENERGY MARKET DESIGN by Eurometaux, EU Transparency Register n 61650796093-48 Eurometaux supports the Commission's goal to establish a European wide

More information

BALANCING CODE NO. 1 (BC1)

BALANCING CODE NO. 1 (BC1) Paragraph No/Title BALANCING CODE NO. 1 (BC1) PRE GATE CLOSURE PROCESS CONTENTS (This contents page does not form part of the Grid Code) Page Number BC1.1 INTRODUCTION... 1 BC1.2 OBJECTIVE... 1 BC1.3 SCOPE...

More information

Review of the National Vocational Education and Training Regulator Act 2011

Review of the National Vocational Education and Training Regulator Act 2011 Review of the National Vocational Education and Training Regulator Act 2011 ACPET Submission August 2017 Introduction Established in 1992, ACPET is the national industry association for private providers

More information

Australian climate change policy where to from here?

Australian climate change policy where to from here? Australian climate change policy where to from here? 1 Tim Nelson February 2016 AGL s Nyngan Solar Plant Agenda 2 1 Energy-only (EO) markets and renewable energy investment 2 3 Barriers to exit Where to

More information

By Leaps. and Bounds. Lessons Learned from Renewable Energy Growth in China. By Ming Ni and Zhixin Yang

By Leaps. and Bounds. Lessons Learned from Renewable Energy Growth in China. By Ming Ni and Zhixin Yang By Leaps By Ming Ni and Zhixin Yang and Bounds Lessons Learned from Renewable Energy Growth in China NEW WIND POWER INSTALLATIONS in China have doubled every year since 4. By 2010, China s wind generation

More information

Some highlights of the Victoria study include: A large untapped resource: The modelling results show strong growth in

Some highlights of the Victoria study include: A large untapped resource: The modelling results show strong growth in Victoria has enough clean energy potential to power homes remove pollution equivalent to cars create 1,500,000 1,600,000 6,500 new jobs Australia is in the early stages of a clean energy boom, with tens

More information

100% Renewables for Australia?

100% Renewables for Australia? 100% Renewables for Australia? Challenges and Opportunities Dr Jenny Riesz Engineers Australia 20 th Nov 2014 Who am I? Overview 100% renewables worth thinking about? 100% renewables technically feasible?

More information

Jordan Assessment Report

Jordan Assessment Report Ms Nicola Ehlermann-Cache Head of the MENA Investment Programme OECD Global Relations Secretariat nicola.ehlermann-cache@oecd.org MENA-OECD INVESTMENT PROGRAMME www.oecd.org/mena/investment MENA.Investment@oecd.org

More information

Procurement Guidelines

Procurement Guidelines Procurement Guidelines Effective Date: 01 April 20172018 Version Number: 1516.0 Published in accordance with Standard Condition C16 of National Grid Electricity Transmission Licence Procurement Guidelines

More information

Whole-system cost of variable renewables in future GB electricity system

Whole-system cost of variable renewables in future GB electricity system Whole-system cost of variable renewables in future GB electricity system Joint industry project with RWE Innogy, Renewable Energy Systems and ScottishPower Renewables October 2016 Imperial College Project

More information

Executive summary OECD/IEA Executive Summary

Executive summary OECD/IEA Executive Summary Executive summary Great efforts are being made to boost the share of renewable energy sources in the global energy mix, driven by the need for enhanced energy security and environmental protection and

More information

All Party Parliamentary Group for Excellence in the Built Environment - Call for evidence

All Party Parliamentary Group for Excellence in the Built Environment - Call for evidence 20 January 2017 All Party Parliamentary Group for Excellence in the Built Environment - Call for evidence Inquiry into the impact of Brexit on future skills needs in the construction industry and the built

More information

Low-Carbon Jobs in an Inter-Connected World

Low-Carbon Jobs in an Inter-Connected World Low-Carbon Jobs in an Inter-Connected World Global Climate Network discussion paper no. 3 December 2009 Global Climate Network 2009 SUMMARY www.globalclimatenetwork.info 2 Global Climate Network Low-Carbon

More information

Emission Cuts Realities Electricity Generation Cost and CO 2 emissions projections for different electricity generation options for Australia to 2050

Emission Cuts Realities Electricity Generation Cost and CO 2 emissions projections for different electricity generation options for Australia to 2050 Emission Cuts Realities Electricity Generation Cost and CO 2 emissions projections for different electricity generation options for Australia to 2050 By Peter Lang January 2010 Abstract Five options for

More information

Office of Gas and Electricity Markets, 9 Millbank, London SW1P 3GE

Office of Gas and Electricity Markets, 9 Millbank, London SW1P 3GE Target audience: Consumers and their representatives, transmission and distribution companies, generators and offshore gas producers/importers, suppliers, shippers, debt and equity investors, environmental

More information

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE

LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE Q U É B E C S H Y D R O P O W E R R E S O U R C E S P O W E R I N G T H E E M P I R E S TAT E LONG-TERM SOLUTIONS FOR NEW YORK S CLEAN ENERGY FUTURE Hydro-Québec, New York s energy partner for decades,

More information

IoD response to BIS consultation on Zero hours employment contracts

IoD response to BIS consultation on Zero hours employment contracts IoD response to BIS consultation on Zero hours employment contracts The Institute of Directors (IoD) welcomes the opportunity to respond to the consultation document on Zero hours employment contracts

More information

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies).

Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). Response to the consultation on the Draft review of the BEREC Common Position on geographical aspects of market analysis (definition and remedies). 7 February 2014 FTTH Council Europe ASBL Rue des Colonies

More information

The Flexibility Challenge in Global Power Sector Transformation: Monopoly vs. Liberalized Markets

The Flexibility Challenge in Global Power Sector Transformation: Monopoly vs. Liberalized Markets The Flexibility Challenge in Global Power Sector Transformation: Monopoly vs. Liberalized Markets Berlin 22 March 2017 Michael Hogan Senior Advisor The Regulatory Assistance Project (RAP) Summary Question:

More information

European gas markets and LNG, 2017

European gas markets and LNG, 2017 European gas markets and LNG, 2017 Simon Pirani Senior visiting research fellow, Oxford Institute for Energy Studies ENERGETIKA CONFERENCE, ST PETERSBURG NOVEMBER 2017 European gas markets and LNG European

More information

Adding flexibility to India s electricity system

Adding flexibility to India s electricity system [ ENERGY / IN DETAIL ] [ ENERGY / IN DETAIL ] Adding flexibility to India s electricity system AUTHOR: Rajagopalan, M (Raj), Market Development Director - MEA, Wärtsilä Power Plants 10 in detail WÄRTSILÄ

More information

Decarbonising heat in buildings: Summary report. for. The Committee on Climate Change. April Project Name Document Name

Decarbonising heat in buildings: Summary report. for. The Committee on Climate Change. April Project Name Document Name Project Name Document Name Decarbonising heat in buildings: 2030 2050 for The Committee on Climate Change April 2012 Element Energy Limited 20 Station Road Cambridge CB1 2JD Tel: 01223 852499 1 Contents

More information

1. Executive Summary Ameren Missouri

1. Executive Summary Ameren Missouri Ameren Missouri Ameren's Energy Vision for the Future Ameren's vision is "Leading the Way to a Secure Energy Future," and its mission is "To Power the Quality of Life." At the center of that vision and

More information

2 November Project Manager Queensland Renewable Energy Expert Panel PO Box 15456, City East Queensland Online:

2 November Project Manager Queensland Renewable Energy Expert Panel PO Box 15456, City East Queensland Online: 2 November 2016 Project Manager Queensland Renewable Energy Expert Panel PO Box 15456, City East Queensland 4002 Level 22 530 Collins Street Melbourne VIC 3000 Postal Address: GPO Box 2008 Melbourne VIC

More information

The Economics of Capacity Payment Mechanisms in Restructured Electricity Markets

The Economics of Capacity Payment Mechanisms in Restructured Electricity Markets The Economics of Capacity Payment Mechanisms in Restructured Electricity Markets David P. Brown University of Alberta, Department of Economics Institute for Public Economics Capacity Market Design 1 /

More information

QUALIFICATION AND COURSE CATALOGUE CIPD

QUALIFICATION AND COURSE CATALOGUE CIPD QUALIFICATION AND COURSE CATALOGUE CIPD CIPD CATEGORIES Click on a category to view course titles CIPD Advanced Awards in HR CIPD Intermediate Awards in HR CIPD Intermediate Awards in L&D CIPD Foundation

More information

What s New in Energy Finance? Frank Napolitano May 6, 2014

What s New in Energy Finance? Frank Napolitano May 6, 2014 What s New in Energy Finance? Frank Napolitano May 6, 2014 OVERVIEW: TWO EMERGING TRENDS I.Renewable Energy has Increasing Access to Capital Markets II.The Utility Business Model faces Major Changes 1

More information

The geopolitics of new energy realities

The geopolitics of new energy realities The changing dynamics of global energy markets: The geopolitics of new energy realities Tom Howes DG European Commission Target: a low carbon-economy by 2050 100% 100% 80% Power Sector Current policy 80%

More information

Green industrial policy: The political economy of managing the transition to a sustainable economy

Green industrial policy: The political economy of managing the transition to a sustainable economy Green industrial policy: The political economy of managing the transition to a sustainable economy CEPAL, Santiago de Chile 19 November 2013 Tilman Altenburg, DIE 2008 Deutsches Institut für Entwicklungspolitik

More information

Summary HEFCE operating plan for

Summary HEFCE operating plan for Summary HEFCE operating plan for 2006-09 Updated April 2008 Contents Introduction 2 Summary operating plan Enhancing excellence in learning and teaching 4 Widening participation and fair access 9 Enhancing

More information

Distributed Generation in Electricity Markets, its impact on Distribution System Operators, and the role of Regulatory and Commercial Arrangements

Distributed Generation in Electricity Markets, its impact on Distribution System Operators, and the role of Regulatory and Commercial Arrangements Distributed Generation in Electricity Markets, its impact on Distribution System Operators, and the role of Regulatory and Commercial Arrangements M. Scheepers and M. van Werven Energy research Centre

More information

MTEP18 Futures. Planning Advisory Committee June 14, 2017

MTEP18 Futures. Planning Advisory Committee June 14, 2017 MTEP18 Futures Planning Advisory Committee June 14, 2017 Overview Objective: Present final MTEP18 Futures and an overview of stakeholder feedback Key Takeaways: Four Futures to be used in MTEP18 to consider

More information

Overview of National Grid s Balancing Services

Overview of National Grid s Balancing Services Overview of National Grid s Balancing Services Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

More information

Creating New Electricity Markets in Europe to Meet Energy Policy Challenges

Creating New Electricity Markets in Europe to Meet Energy Policy Challenges Creating New Electricity Markets in Europe to Meet Energy Policy Challenges Explaining the Electricity Market Reform Landscape Third Generation Environmentalism (E3G) Table of Contents 1. Executive Summary

More information

CHAPTER 1 EXECUTIVE SUMMARY

CHAPTER 1 EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY The 2016 SD Electricity Supply Resource Procurement Plan The 2016 South Dakota Electricity Supply Resource Procurement Plan ( Plan ) evaluates NorthWestern Energy s ( NorthWestern

More information

U.S. Energy Market Deregulation

U.S. Energy Market Deregulation 2015 U.S.-Japan Renewable Energy and Energy Efficiency Policy Business Roundtable U.S. Energy Market Deregulation Challenges Solutions & Market Impacts Peter Weigand Chairman & CEO www.skippingstone.com

More information

Making the Journey A Manifesto for Transport

Making the Journey A Manifesto for Transport Making the Journey A Manifesto for Transport 1 What is the UK s Transport Network? The local and national infrastructure that delivers transport by rail, road, air and water. This includes the operation

More information

Providing a secure natural gas supply for Europe

Providing a secure natural gas supply for Europe International Association of Oil and Gas Producers Providing a secure natural gas supply for Europe 3rd South East Europe Energy Dialogue on 18-19 June Who are OGP? International Association of Oil & Gas

More information

DSR follow on final presentation

DSR follow on final presentation DSR follow on final presentation A presentation to DECC Andrew Nind, Oliver Pearce, Kostas Theodoropoulos 4 April 2011 Agenda 1. Objectives 2. Scenario assumptions 3. Scenario results 4. Next steps 2 Objectives

More information

Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid

Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid Grid Code Review Panel Intermittent Generation Strategy Paper Date Raised: 18 July 2012 GCRP Ref: pp12/34 A Panel Paper by Steven Lam National Grid Summary The purpose of this paper is to describe the

More information

Governing for Demand Management Innovations in Germany. Dr Caroline Kuzemko Senior Research Fellow, IGov University of Exeter Ofgem, 17 th March 2016

Governing for Demand Management Innovations in Germany. Dr Caroline Kuzemko Senior Research Fellow, IGov University of Exeter Ofgem, 17 th March 2016 Governing for Demand Management Innovations in Germany Dr Caroline Kuzemko Senior Research Fellow, IGov University of Exeter Ofgem, 17 th March 2016 Presentation in Sum This work part of the IGov project:

More information

Indonesia s Energy Requirements Part One: Current Energy Dynamics

Indonesia s Energy Requirements Part One: Current Energy Dynamics 10 February 2015 Indonesia s Energy Requirements Part One: Current Energy Dynamics Stewart Patterson FDI Associate Key Points Domestic consumption has been a key driver of Indonesian economic growth and,

More information

Dispatching Variable Generation Resources

Dispatching Variable Generation Resources Dispatching Variable Generation Resources A Discussion Paper for Stakeholder Engagement 91 (Renewable Integration) Table of Contents Introduction... 3 IESO Dispatch Processes... 5 Registration... 5 Dispatch

More information

CLOSING THE CARBON GAP WWF S RECOMMENDATIONS FOR THE UK S EMISSIONS REDUCTION PLAN

CLOSING THE CARBON GAP WWF S RECOMMENDATIONS FOR THE UK S EMISSIONS REDUCTION PLAN CLOSING THE CARBON GAP: WWF S RECOMMENDATIONS FOR THE UK S EMISSIONS REDUCTION PLAN 13 CLOSING THE CARBON GAP WWF S RECOMMENDATIONS FOR THE UK S EMISSIONS REDUCTION PLAN CLOSING THE CARBON GAP: WWF S RECOMMENDATIONS

More information

Aberdeen and Grampian Chamber of Commerce Russell Borthwick, Chief Executive

Aberdeen and Grampian Chamber of Commerce Russell Borthwick, Chief Executive Russell Borthwick, Chief Executive Thank you for your letter dated 30 November 2017 regarding the draft budget 2017/18. We welcome the opportunity to respond to the questions following the evidence received

More information

PHILIPPE LIENHART EDF 1

PHILIPPE LIENHART EDF 1 NEA SYMPOSIUM MARCH 8TH, 2018 IN LINO HALL TOKYO STRATEGY FOR NORTHEAST ASIA POWER SYSTEM INTERCONNECTION EDF TECHNICAL ASSISTANCE TO MONGOLIA ADB PROJECT MID-TERM INFORMATION ON THE PROJECT PHILIPPE LIENHART

More information

Indonesia's Energy Transit: Struggle to Realize Renewable Potential

Indonesia's Energy Transit: Struggle to Realize Renewable Potential Indonesia's Energy Transit: Struggle to Realize Renewable Potential By Jeremy Wilcox, Contributor September 14, 2012 LONDON -- Indonesia's electricity market is moving from a monopoly fossil-fuel generation

More information

Renewable Energy Auctions: An Overview of Design Options

Renewable Energy Auctions: An Overview of Design Options Renewable Energy Auctions: An Overview of Design Options Workshop of the Renewable Energy Working Party (REWP) Paris, 14 March 2016 Henning Wuester, Director, Knowledge, Policy and Finance Centre, IRENA

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council ECE/ENERGY/2014/5/Rev.1 Distr.: General 28 November 2014 Original: English only Economic Commission for Europe Committee on Sustainable Energy Twenty-third session

More information

Medium Term Renewable Energy Market Report 2016

Medium Term Renewable Energy Market Report 2016 Medium Term Renewable Energy Market Report 2016 Clean Energy Investment and Trends IETA Pavilion COP22, Marrakech November 10, 2016 Liwayway Adkins Environment and Climate Change Unit International Energy

More information

German Energy Policy: Reactions after the Fukushima Accident ( Energiewende )

German Energy Policy: Reactions after the Fukushima Accident ( Energiewende ) German Energy Policy: Reactions after the Fukushima Accident ( Energiewende ) - Energiewende & Nuclear Phase-out (NPo) - Energy consume & Energy mix - Consequences of the NPo - Self-imposed goals & EC-goals

More information

Analyses market and policy trends for electricity, heat and transport Investigates the strategic drivers for RE deployment Benchmarks the impact and c

Analyses market and policy trends for electricity, heat and transport Investigates the strategic drivers for RE deployment Benchmarks the impact and c Paolo Frankl Head Renewable Energy Division International Energy Agency Institute of Energy Economics, Japan (IEEJ) Energy Seminar Tokyo, 7 March 2012 OECD/IEA 2011 Analyses market and policy trends for

More information

Enterprise in the Energy Sector

Enterprise in the Energy Sector Enterprise in the Energy Sector Mike Colechin 2016 Energy Technologies Institute LLP The information in this document is the property of Energy Technologies Institute LLP and may not be copied or communicated

More information

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008

Transmission Planning at the Midwest ISO. Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Transmission Planning at the Midwest ISO Mr. Eric Laverty Senior Manager of Transmission Access Planning Midwest ISO June 26 th, 2008 Midwest ISO: What We Do Monitor flow of power over the high voltage

More information

The Economic Impacts of the Energiewende (Energy Transition)

The Economic Impacts of the Energiewende (Energy Transition) The Economic Impacts of the Energiewende (Energy Transition) Graham Weale, Chief Economist RWE AG, Bocconi University Energy Seminar Milan 6th May 214 RWE AG 3/5/214 PAGE 1 Contents 1. Key features of

More information

Internal Revenue Service

Internal Revenue Service Internal Revenue Service Number: 201208035 Release Date: 2/24/2012 Index Number: 48.00-00 --------------------- ---------------------- ---------------------------------- ----------------------------------------

More information