1 In Situ Well Development Techniques for Efficient Production and Groundwater Restoration By John Cash Ur-Energy USA Inc.
2 What is Well Development? Any action taken after the well is installed to improve specific capacity. For example: - Removal of drilling muds - Resorting/cleaning the gravel pack - Removal of scale through mechanical or chemical methods - Removal of drilling damage - Injection of chemicals like acid or clay dispersants
3 Why is Good Well Development so Important? Poorly developed wells have low flow rates and uneven vertical distribution of flow which may reduce uranium recovery and lengthen restoration The pumping costs with poorly developed wells can be substantially greater Because poorly developed injection wells must be operated at greater pressure, spills are more likely and larger
4 Well Development Techniques Typically Used in the In Situ Industry Under-Reaming Air Lift Surge Block Swabbing Over-pumping Chemical Treatment Jetting
5 Under-Reaming A retractable cutter is used to increase the diameter of the completion zone before installing the screen For each doubling of the completion interval diameter the flow rate will increase by 10% Cuts away any filtrate (drilling mud or cement) so water can flow into the well bore unimpeded Can be used to redevelop an operating well when other development techniques have failed
6
7
8 Air Lifting Uses a drill rig/air compressor to pump the well at around 600 m/min vertical velocity Simplest technique since rig is already there and is equipped Extremely expensive; $300/hour Generally not effective due to; low pumping rates, agitation in casing not screen, flow in one direction Because the air lift is often in the casing this technique has the same effect as over pumping
9
10 Surge Block Uses a weighted plunger to force water in and out of the screen Relatively cheap method that can be performed without a drill rig Does not remove fines once they are pulled into the well bore. This can actually cause the well to plug Slightly more effective than the pumping method since flow direction is reversed This method can be performed with an air compressor and valve at top of wellhead
11 Swabbing A swab cup is pulled rapidly from the well causing water to flow rapidly through the gravel pack Moderate cost; $90,000 rig and tools plus one person can swab seven 200 m wells per day Moderately aggressive with flow rates of around 1,100 lpm Flow is only in one direction Although unusual, it is possible to collapse a well
12
13
14 Over Pumping Very low cost since only $30,000 of equipment and one person can develop up to three wells per day Generally not effective due to; low pumping rates, minimal agitation, flow in one direction Backwashing is a variation of over pumping that occasionally allows the pumped water column to collapse back into the well so flow direction is reversed
15 Chemical Treatment Effectively removes carbonate scale but severely fouled screens must be physically cleaned first. Acid is also effective at removing bio-fouling and killing the responsible bacteria Clay dispersants may be useful in cases where significant infiltration into the rock occurs and physical development is ineffective
16
17
18 Jetting Jetting uses high pressure water or air to sort the gravel pack. Nozzle discharge pressures of 700 to 1,000 kpa at velocities of 30 to 50 m/s Start jetting at bottom of screen and move upward at 1 foot per 5 to 15 minutes Discrete intervals can be developed individually Jetting is generally not performed with plastic screens since it can erode the soft plastic away Cost effective method with little manpower required
19 Evidence of Poor Well Development Water flow is dominantly from narrow zones instead of from the entire completion Very common for the Geologist to say, That well should be making more water or more pounds Inconsistent discoloration or scaling on screens Down hole videos shows that sand/scale in the screen is not removed effectively
20 Which Method is Best? Dept of Energy study of development techniques resulted in the following specific capacity rates: Over pumping Surging Jetting 96.8 lpm/m lpm/m lpm/m Nebraska study has resulted in similar findings The bottom line is that each operator must asses their own rock type, well design, equipment availability, and cost
21 Design to Improve Development Minimize length of screen Maximize open area of screen Ensure screen material can withstand vigorous development Minimize mud use and focus on the use of polymers that can be easily broken down. Use of mud resulted in a 56% lower specific capacity compared to polymer (DOE 1980 study)
22
23
24 Design to Improve Development Cont d Thick filter packs hinder development. Keep packs under 20 cm. 8 to 10 cms is ideal Design screen so diameter doesn t limit desired development method
25 Recommendations Minimize the need for well development by using appropriate well installation techniques and controlling chemistry and bio-fouling Experiment with various development methods to see what is best for your project All wells should be in a maintenance program where specific capacity is routinely monitored and maximized Wells should be designed so that maintenance is possible
26
STANDARD OPERATING PROCEDURES
PAGE: 1 of 7 CONTENTS 1.0 SCOPE AND APPLICATION* 2.0 METHOD SUMMARY* 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING, AND STORAGE 4.0 INTERFERENCES AND POTENTIAL PROBLEMS* 5.0 EQUIPMENT/APPARATUS* 6.0 REAGENTS
More informationSECTION GRAVEL PACKED WATER WELL
SECTION 02520 GRAVEL PACKED WATER WELL PART 1 GENERAL 1.01 SECTION INCLUDES A. Gravel packed water well includes drilling, installing, cleaning, developing, testing, videoing, abandoning, and site clean
More informationWorksheet #1 Assessing the Risk of Groundwater Contamination from Drinking Water Well Condition
Worksheet #1 Assessing the Risk of Groundwater Contamination from Drinking Water Well Condition Drinking Water Well Condition Why should I be concerned? How will this worksheet help me protect my drinking
More informationSITE INVESTIGATION. Foundation Engineering
SITE INVESTIGATION Assist. Prof. Berrak TEYMUR Foundation Engineering Analysis Design Construction As a foundation engineer, you need to consider geotechnical/structural issues (involves geology, subsurface
More information7. Completing the Well s Structure
7. Completing the Well s Structure 7. Completing the Well s Structure Chapter Table of Contents Chapter Table of Contents Chapter Description... 5 Regulatory Requirements Completing the Well s Structure...
More informationThe Use of Walnut Shell Filtration with Enhanced Synthetic Media for the Reduction and/or Elimination of Upstream Produced Water Treatment Equipment
Siemens Water Solutions The Use of Walnut Shell Filtration with Enhanced Synthetic Media for the Reduction and/or Elimination of Upstream Produced Water Treatment Equipment White Paper January 2016 Researchers
More informationEffective irrigation is not possible without. of Irrigation Wells. Care and Maintenance. AE97 (Revised) Tom Scherer Agricultural Engineer
AE97 (Revised) Care and Maintenance of Irrigation Wells Tom Scherer Agricultural Engineer Effective irrigation is not possible without a reliable water source. In North Dakota, the availability of relatively
More informationscreens TM A Weatherford Company MUNI-PAK DESIGN TECHNOLOGY
screens TM A Weatherford Company MUNI-PAK TM AK A GIANT STEP FORWARD IN WELL DESIGN TECHNOLOGY MUNI-PAK - A BETTER WAY TO GRAVEL PACK Artificial filter pack is one of the most common well designs practiced
More informationSITE INVESTIGATION Validation and Interpretation of data
SITE INVESTIGATION Validation and Interpretation of data Dr. G.Venkatappa Rao The Impact 1 The Need To determine the type of foundation To assess bearing capacity/settlement Location of Ground water table,issues
More informationInjection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection
Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and
More informationPlugs and Profiles. Types Running Pulling Problems
Plugs and Profiles Types Running Pulling Problems Plugs are set for many reasons but mostly for isolation of pressures. Not all plugs are a permanent seal. Sand plugs, cement plugs and inflatables have
More informationSMART RDF Reservoir drill-in fluid family
Advanced completion and formation protection for enhanced well performance miswaco.com/smartrdf SMART RDF Reservoir drill-in fluid family *Mark of Schlumberger or a Schlumberger company Alternate Path
More informationSeptember 1, 2003 CONCRETE MANUAL SPECIAL TYPES OF CONCRETE
September 1, 2003 CONCRETE MANUAL 5-694.800 5-694.810 GENERAL SPECIAL TYPES OF CONCRETE 5-694.800 In the general use of the word concrete, the idea implied is the conventional placement of the material
More informationStormwater Standards. Clackamas County Service District No. 1. Infiltration Testing Guide
Stormwater Standards Clackamas County Service District No. 1 APPENDIX E Infiltration Testing Guide Table of Contents Appendix E - Infiltration Testing Guide... Page E.1 General... 1 E.2 Basic Method -
More informationCase Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California
Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California Executive Summary Aquifer test results demonstrated that the
More informationDiaphragm wall Construction
Diaphragm wall Construction Diaphragm wall is a continuous wall constructed in ground in to facilitate certain construction activities, such as: a) As a retaining wall b) As a cut-off provision to support
More informationEarthquake Reinforcement Using Jet Grouting for a Factory in Operation
6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Earthquake Reinforcement Using Jet Grouting for a Factory in Operation J. Kawamura 1 ABSTRACT
More informationEarth Mechanics, Inc. Geotechnical & Earthquake Engineering
Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo
More informationINVESTIGATION RESULTS
September 13, 2011 Burt Fleischer, R.E.A., R.E.P. Director, Environmental Affairs Hilmar Cheese Company 9001 N. Lander Avenue Hilmar, CA 95324 Subject: Revised Work Plan for Supply Well IN 1 Destruction
More informationSOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS
SOURCES OF WATER SUPPLY GROUND WATER HYDRAULICS, Zerihun Alemayehu GROUNDWATER Groundwater takes 0.6% of the total water in the hydrosphere 0.31% of the total water in the hydrosphere has depth less than
More informationHow to keep water wells healthy and avoid costly repairs
How to keep water wells healthy and avoid costly repairs Water Wells Johnson Screens water well specialists and Nu-Well chemicals improve well production and extend well life. A Weatherford Company 6 CLASSIC
More informationENVIRONMENTAL ENGINEERING-I
ENVIRONMENTAL ENGINEERING-I Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati
More informationThe following sections provide the approved standard infiltration testing specifications.
APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.
More informationPetroleum Production Optimization
Petroleum Production Optimization Petroleum Production Optimization Fundamentals Production Optimization refers to the various activities of measuring, analyzing, modelling, prioritizing and implementing
More informationModel Layout/Components of a Drip Irrigation System
Dept. of Agril. Engg, BAU Lecture Note No. 7 FNRM-121 (Hydrology, Soil and Water Conservation) Instructor- Dr. M. Job First Year Semester II Dated: 15 th July &08 th Aug Drip Irrigation: It can be defined
More informationPaul Ziemkiewicz, PhD, Director WVU Water Research Institute NORM Workshop Columbus OH 12 May 14 SHALE GAS: RADIOACTIVITY IN SOLID AND LIQUID WASTES
Paul Ziemkiewicz, PhD, Director WVU Water Research Institute NORM Workshop Columbus OH 12 May 14 SHALE GAS: RADIOACTIVITY IN SOLID AND LIQUID WASTES THREE STUDIES WERE COMMISSIONED BY THE WV LEGISLATURE
More informationDetermination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities
Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission
More informationApril 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1
PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes
More informationModule 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur
Module 2 The Science of Surface and Ground Water Lesson 7 Well Hydraulics Instructional Objectives At the end of this lesson, the student shall be able to learn the following: 1. The concepts of steady
More informationAir Lift Pumps (Grit Pump) ST-027
Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration
More information7. The diagram below represents cross sections of equal-size beakers A, B, and C filled with beads.
Base your answers to questions 1 and 2 on the diagram below and on your knowledge of Earth science. The diagram represents four tubes, labeled A, B, C, and D, each containing 150 ml of sediments. Tubes
More informationREQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM PROJECT DESCRIPTION
REQUEST FOR BIDS WELL DRILLING & TESTING SERVICES I-77 EXIT 1 WATER SYSTEM The Carroll County Public Service Authority requests bids from properly licensed well drilling firms, hereafter referred to as
More information2015 Global Petroleum Technologies Limited.
CONCEPTUAL DOCUMENT The GPT US - ARTIFICIAL LIFT SYSTEM PERMANENT DEPLOYED ON UMBILICAL OR CONCENTRIC PIPE INSTALLATION AND REMOVAL METHOD (PAT-Pending). The information provided in this document ( Information
More informationFOOD AND BEVERAGE PROCESSING
BILFINGER WATER TECHNOLOGIES FOOD AND BEVERAGE PROCESSING COMPREHENSIVE SOLUTIONS FOR BIO-FUELS, BREWING, CORN WET MILLING, ETHANOL, MALTING, STARCH, SUGAR TREATMENT AND WINE PRODUCTION 2 FOOD AND BEVERAGE
More informationStandard Practice for Thin-Walled Tube Geotechnical Sampling of Soils for Geotechnical Purposes 1
This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Because it may not be technically
More informationGEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION
GEOTHERMAL HEAT PUMPS CONFIGURATIONS/INSTALLATION There are three main categories when dealing with geothermal heat pumps; open-loop, closed-loop, and direct-exchange. The closed-loop and direct-exchange
More informationTechnical Bulletin No. MK3176. PREPARED: July, 2010
Geoprobe DT45 Dual Tube Sampling System Standard Operating Procedure Technical Bulletin No. MK3176 PREPARED: July, 2010 A. B. C. D. E. A. Assembled outer casing with sample sheath and liner driven to collect
More informationSESSION 23 WELL CONSTRUCTION AND COMPLETION
SESSION 23 WELL CONSTRUCTION AND COMPLETION Materials were prepared by House of Water and Environment (HWE) Lecturers Dr. Amjad Aliewi Eng Ayman Jarrar Palestinian Water Authority 1 Introduction Well construction
More informationWellhead Protection General Guidelines for New Private Domestic Wells
Wellhead Protection General Guidelines for New Private Domestic Wells Key principles for wellhead protection for private domestic wells are as follows. Proper Location of Well (Proper sanitary control
More informationChapter 6 Cost Estimation
Developing a budget for a rainwater harvesting system may be as simple as adding up the prices for each of the components and deciding what one can afford. For households without access to reliable groundwater
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL
DEPARTMENT OF ENVIRONMENTAL QUALITY WATER QUALITY DIVISION PERMIT APPLICATION FORM UNDERGROUND INJECTION CONTROL (UIC) CLASS V WELL Mail To: WDEQ/WQD ATTN: UIC Program 122 W. 25 th St. 4W Cheyenne, WY
More informationStudent Name. School Name and City,
Pre Event Assignment (Credit for 1 workshop will be given for completing this assignment) Advisors: 1. Confirm completion of each section. 2. Sign your initials in the PRE- EVENT column of the student
More informationWater Well Decommissioning Guidelines
Water Well Decommissioning Guidelines Approval Date: June 1, 2007 Effective Date: September 10, 2007 Approved By: Gerard MacLellan Version Control: This is a new guideline I. Introduction The Water Well
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 2 CONTRACT 2018.03 EXIT 44 SOUTHBOUND ON RAMP IMPROVEMENTS MILE 44.3 The following changes are made to the Proposal, Specifications, and Plans. PROPOSAL Proposal Sheets
More informationMembrane Systems. Featuring Aqua MultiBore Membranes
Membrane Systems Featuring Aqua MultiBore Membranes Aqua-Aerobic Membrane Systems Featuring Aqua MultiBore Membranes For nearly 50 years, Aqua-Aerobic Systems has provided thousands of customers with adaptive
More informationMr. Paul Dunlap, California Department of Water Resources
Memorandum To: From: Mr. Paul Dunlap, California Department of Water Resources Oroville Dam Spillway Incident Independent Forensic Team Date: September 5, 2017 Re: Interim Status Memorandum Introduction
More informationDomestic Waste Water (Sewage): Collection, Treatment & Disposal
Domestic Waste Water (Sewage): Collection, Treatment & Disposal Sanitary sewers Storm water sewers Combined sewers Types of sewers: Types of collection system Building sewer/building connections:connected
More informationScreenless Sand Control Completions. New dimensions in sand management
Screenless Sand Control Completions New dimensions in sand management Applications Primary sand control completion for new wells expected to produce formation sand Remedial sand control completion for
More information(this page left intentionally blank)
12. Flowing Wells (this page left intentionally blank) 12. Flowing Wells Chapter Table of Contents Chapter Table of Contents Chapter Description...6 Regulatory Requirements Flowing Wells...6 Relevant Sections
More informationSlant Well Desalination Feedwater Supply
Slant Well Desalination Feedwater Supply Comparison Between Dana Point Test Slant Well and CEMEX Test Slant Well CalAm 9 Oct 14 Doheny Ocean Desalination Project Dana Pt. Project Location & Layout 30 mgd
More informationINIZIATIVE INDUSTRIALI
INIZIATIVE INDUSTRIALI S.p.A. Sarplast is a company located in Santa Luce (Pisa, Italy) which has over 35 years experience in the design, manufacturing and supply of Glass-Fiber Reinforced Plastic (GRP)
More informationAwesome Aquifers A DEMONSTRATION. THE GROUNDWATER FOUNDATION
Awesome Aquifers A DEMONSTRATION THE GROUNDWATER FOUNDATION www.groundwater.org Groundwater is water found underground in the spaces and cracks between rocks, sand, soil and clay. Groundwater is stored
More informationMARS SYNERGY GEO TECH Pvt Ltd An ISO 9001: 2015 Certificate Company # 30/25 Drowpathy Amman Koil 1 st Street Velachery, Chennai
PROPOSED CONSTRUCTION OF G+2 RESIDENTIAL BUILDING AT NO:26, BAJANAI KOIL STREET, BHARATHI NAGAR, SELAIYUR, CHENNAI. Report on Geotechnical Investigation Client: M/s. Alankar Construction, Chennai. MARS
More informationCleanReam Premium Casing-Reaming Bit Efficiently drills out casing and liner using a robust cutting structure
CleanReam Premium Casing-Reaming Bit Efficiently drills out casing and liner using a robust cutting structure Applications Liner reaming Casing reaming Features and Benefits The bladed concentric nose
More informationAPPENDIX F NON-ROUTINE SERVICES
APPENDIX F NON-ROUTINE SERVICES Non-Routine Services means Services and maintenance that cannot be performed by the staffing assigned to carry out Routine Services and the other duties of the operator.
More informationwater-powered drilling in ground engineering
1 water-powered drilling in ground engineering STRAIGHT FORWARD DRILLING The Wassara technology uses water to power the hammer. This makes it the ideal choice for most drilling applications in ground engineering
More informationNGWA s Water Well Construction Standard: ANSI/NGWA 01-14
NGWA s Water Well Construction Standard: ANSI/NGWA 01-14 NGWA Standard Development Process as Approved by ANSI What is ANSI? The American National Standards Institute (ANSI), founded in 1918, promotes
More informationCost of Municipal and Industrial Wells in Illinois,
Circular 98 STATE OF ILLINOIS DEPARTMENT OF REGISTRATION AND EDUCATION Cost of Municipal and Industrial Wells in Illinois, 1964-1966 by J. P. GIBB and E. W. SANDERSON ILLINOIS STATE WATER SURVEY URBANA
More informationPROCEEDINGS, INDONESIA PETROLEUM ASSOCIATION Thirty-Fourth Annual Convention & Exhibition, May 2010
IPA10-SE-026 PROCEEDINGS, INDONESIA PETROLEUM ASSOCIATION Thirty-Fourth Annual Convention & Exhibition, May 2010 A LABORATORY TEST CHEMICAL CONSOLIDATION TO FIELD INJECTION Imam Fathoni* Gema Wahyudi Purnama*
More informationAP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd
AP5K-C Precision AC Double-Pulse Spot Welding Machine User s Manual Shenzhen Will-Best Electronics Co., Ltd 1 Content 1. Introduction...3 1.1 Functions...3 1.2 Units of AP5K-C...4 2. The Initial Installation
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More informationSolid-Expandable Systems. The Key to Economical Recovery in Mature Fields
Solid-Expandable Systems The Key to Economical Recovery in Mature Fields A White Paper November 2013 Solid-expandable technology provides a low-cost, permanent alternative to cement squeezes. 2013 Weatherford.
More informationElectrical Conductivity & Hydraulic Profiling. The Combining of Two Subsurface Investigation Methods (With More to Come)
Electrical Conductivity & Hydraulic Profiling The Combining of Two Subsurface Investigation Methods (With More to Come) How has field work been progressing? Split Spoon and Standard Penetration Testing
More informationTotal Clean System. Taking the lead with your Solids Control Needs!
Total Clean System Taking the lead with your Solids Control Needs! Del Tank & Filtration Systems patented TOTAL CLEAN SYSTEM is used for the removal of solids from slurries that are common in the Dredging,
More informationJet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay
GROUND MODIFICATION, PROBLEM SOILS, AND GEO-SUPPORT 265 Jet Grouting to Increase Lateral Resistance of Pile Group in Soft Clay Kyle M. Rollins 1, Matthew E. Adsero 2, and Dan A. Brown 3 1 Prof. Civil &
More informationGeotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples
Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com
More informationTennessee Underground Injection Control Program Overview
Tennessee Underground Injection Control Program Overview Mission of the UIC Program The UIC program s mission is to protect underground sources of drinking water from contamination by regulating the construction
More informationModule 6 Shock Chlorination. For more information refer to the Water Wells That Last video (Part III Shock Chlorination).
For more information refer to the Water Wells That Last video (Part III Shock Chlorination). Well maintenance is essential to ensure that a well will last. Water wells provide ideal conditions for IRBs.
More informationDivision Mandates. Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources.
Division Mandates Supervise the drilling, operation, and maintenance of wells to prevent damage to life, health, property, and natural resources. Supervise and permit the owners/operators to utilize all
More informationExtending value through field redevelopment
Extending value through field redevelopment Solutions that maximize the value of mature assets Compression & Solutions www.siemens.com/oilgas The real alternative: Field redevelopment solutions As well
More information7/17/2017 Page 1 of 5
HORIZONTAL DIRECTIONAL DRILLING AND BORING PART 1.0 GENERAL 1.1 DESCRIPTION This section covers the work necessary for the installation of conduit duct banks by directionally controlled horizontal drilling
More informationaeration: to expose to circulating air; adds oxygen to the water and allows gases trapped in the water to escape; the first step in water treatment.
WATER WORKS OBJECTIVES The student will do the following: 1. Demonstrate the process that water treatment plants use to purify water for drinking by conducting a water purification experiment. 2. Describe
More informationLecture 7 BALLAST & SUBGRADE. Dr. Charisma Choudhury. April 2011
Transportation Engineering II: Highway Design & Railways Lecture 7 BALLAST & SUBGRADE Dr. Charisma Choudhury April 2011 Ballast Functions Provide a hard and level bed for sleepers Hold sleepers in place
More informationHorizontal Directional Drilling
Horizontal Directional Drilling Horizontal Directional Drilling Why HDD Surface is neither broken nor damaged Restoration and repair are not required No public hazard or traffic disturbance Low social
More informationSubsurface Environmental Investigation
Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,
More informationSPECIFICATIONS - DETAILED PROVISIONS Section Water Well Drilling, Casing & Testing TABLE OF CONTENTS
SPECIFICATIONS - DETAILED PROVISIONS Section 02734 - Water Well Drilling, Casing & Testing TABLE OF CONTENTS 1.0 GENERAL... 1 1.01 DESCRIPTION... 1 1.02 WELL CONSTRUCTION STANDARDS... 1 1.03 WELL CONSTRUCTION
More informationDIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS
DIAPHRAGM WALLS, CUT-OFF WALLS AND SLURRY WALLS Implenia Spezialtiefbau GmbH Robert Bosch Straße 25 D-63225 Langen Phone: +49 6103 988 345 Fax: +49 6103 988 277 Email: info.spezialtiefbau@implenia.com
More informationCementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing
GRC Transactions, Vol. 39, 2015 Cementing Tool Supports Cement Plug in Large Diameter Geothermal Well Casing Ozgur Balamir 1, Wm. M. Rickard 1, Fred Wilson 1, Kristian Harestad 2, and Per Arild Årebråt
More informationSPECIFICATION FOR PREFABRICATED VERTICAL DRAIN
SPECIFICATION FOR PREFABRICATED VERTICAL DRAIN 1.0 GENERAL This work comprises of supply and installation of prefabricated vertical drains in accordance to the Specifications and Drawings. 2.0 MATERIALS
More informationOverview of Completions
Overview of Completions PESA Oil & Gas 101 21 May 2015 Nick Clem, Applications Engineering Director Ganesh Subbaraman, Engineering Manager Outline Background Drivers affecting selection of completion types
More informationVertical Cuttings Dryers Overview
Vertical Cuttings Dryers Overview Maximizing WBM and OBM Drilling Fluid Recovery 2017 Revision Q Full-Service OEM Engineering, Design, Manufacturing, Commissioning and Servicing. Solids Control Waste Management
More informationDesign Data 4. Jacking Concrete Pipe
Design Data 4 Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing
More informationCOMBINED WELLS. 1 Central combined well. 1.1 Implementation
D COMBINED WELLS 1 Central combined wells 325 1.1 Implementation 325 1.1.1 Drilling the borehole 325 1.1.2 Digging the well 325 1.1.3 Planning 326 1.2 Resources required 327 1.2.1 Human resources 327 1.2.2
More informationGround Improvement. Martin G. Taube, P.E., P.G. February 4, 2003
ODOT Geotechnical Information Exchange Seminar Ground Improvement Martin G. Taube, P.E., P.G. February 4, 2003 Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 ph. (412) 221-4500 fax (412)
More informationS.No Description Unit Quantity Rate (Rs) Amount (Rs)
, S.No Description Unit Quantity Rate (Rs) Amount (Rs) 1 2 Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation
More informationGround Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations.
Ground Improvement Piling Piled Retaining Walls Enlarged Head Piles Innovations www.keller-foundations.co.uk 4 Ground Improvement Solutions Introduction Ground Improvement Solutions Keller Ground Engineering
More informationHOLE CLEANING IN DIRECTIONAL WELLS
HOLE CLEANING IN DIRECTIONAL WELLS 1 ❶ Welcome to this presentation about Hole Cleaning in Directional Wells. It has been prepared by Sedco Forex, to give you a better understanding of the cuttings-transport
More informationDEEP INJECTION WELL CONSTRUCTION AND OPERATION
DEEP INJECTION WELL CONSTRUCTION AND OPERATION MORGAN COUNTY PLANNING AND ZONING DEPARTMENT UIC WELL STAKEHOLDERS HAL DEMUTH, M.S. WES JANES, P.G. PETROTEK ENGINEERING CORPORATION SEPTEMBER 19, 2017 2
More informationAn Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States
An Evaluation of Well Construction/Drilling/Conversion Methodologies Associated with Gas Storage Depleted Field Operations in the United States Presented at: GWPC 2016 Annual Forum, September 11-14, 2016,
More informationMichigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals
Michigan Department of Environmental Quality Resource Management Division Office of Oil, Gas, and Minerals DEQ Mission Statement The Michigan Department of Environmental Quality promotes wise management
More informationDesign Data 4M. Jacking Concrete Pipe
Design Data 4M Jacking Concrete Pipe FOREWORD Jacking or tunneling concrete pipe is an increasingly important construction method for installing concrete pipelines without interrupting commerce, or disturbing
More informationSPECIFICATION : BORING AND JACKING
SPECIFICATION 330524: BORING AND JACKING PART 1.0 GENERAL 1.1 DESCRIPTION 1.1.1 The work of this specification includes all labor, machinery, construction equipment and appliances required to perform in
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 450 NOVEMBER 2002 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION IN SOIL BY HORIZONTAL DIRECTIONAL DRILLING TABLE OF CONTENTS 450.01
More informationFIGURES Printed By: aday Print Date: 3/23/2011 12:48:08 PM File Name: \\geodesign.local\files\jobs\m-r\penskeauto\penskeauto-1\penskeauto-1-01\figures\cad\penskeauto-1-01-vm01.dwg Layout: FIGURE 1 VICINITY
More informationReverse Osmosis, Nano Filtration and Ultra Filtration
Seal-less Pump Technology Reverse Osmosis, Nano Filtration and Ultra Filtration Simplicity - Reliability Hydra-Cell Reverse Osmosis Pumps Seal-less pumps for long life, high reliability and low total life-cycle
More informationMott All-Metal Catalyst Recovery Systems High-strength, high-efficiency filtration of particulate
Process Filtration News Processes that involve precious metal catalysts require reliable, high-efficiency filtration to ensure their complete recovery. But avoiding catalyst loss isn't enough. For the
More informationA Case Study: Foundation Design in Liquefiable Site
RESEARCH ARTICLE OPEN ACCESS A Case Study: Foundation Design in Liquefiable Site Tahar Ayadat* *(Department of Civil Engineering, College of Engineering, PMU University, P.O. Box 1664, Al-Khobar, 31952,
More informationPermit Number: 1900B Expiration Date: July 15, 2021
Expiration Date: July 15, 2021 GENERAL PERMIT WATER POLLUTION CONTROL FACILITIES CLASS V GEOTHERMAL FLUIDS INJECTION DURING GEOTHERMAL EXPLORATION ISSUED TO: GEN19 /NWR File No. Department of Environmental
More informationObtaining Representative Groundwater Samples
Obtaining Representative Groundwater Samples Two field studies demonstrating the effect of sampling method and device selection Water Technologies Symposium April 2016 Acknowledgments Clients Maxxam and
More informationTeacher Resources: Lesson 3: Groundwater. Lesson #3: Groundwater
Teacher Resources: Lesson 3: Groundwater Lesson #3: Groundwater Main Ideas: Accounts (From the Water Upper Anchor V. 3) Structure of Systems: Water usually exists underground in the liquid state. Macroscopic
More information