1 DATE: September 18, 2015 SAN DIEGO COUNTY WATER AUTHORITY NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT TO: State Clearinghouse Governor s Office of Planning and Research Post Office Box Tenth Street Sacramento, California AND Agencies, Organizations, and Interested Parties LEAD AGENCY: San Diego County Water Authority 4677 Overland Avenue San Diego, CA SUBJECT: Notice of Preparation for a Supplement to the Precise Development Plan and Desalination Plant Project EIR for the Carlsbad Desalination Plant Intake and Discharge Facility Modifications The San Diego County Water Authority (Water Authority) is the Lead Agency under the California Environmental Quality Act (CEQA) for preparation of a Supplement to the EIR for the Precise Development Plan and Desalination Plant Project to address changes related to intake and discharge facility modifications. We need to know your views as to the scope and content of the environmental information which is germane to your agency s statutory responsibilities in connection with the proposed changes. Your agency may need to use this Supplement to the EIR when considering your permit or other approvals for individual project components. Due to the time limits mandated by State law, your response must be sent at the earliest possible date but no later than 30 days after receipt of this notice. Please send your written responses, including the name for a contact person in your agency to: Laurence J. Purcell, Water Resources Manager San Diego County Water Authority 4677 Overland Avenue San Diego, CA Telephone: (858) Facsimile: (858) E mail: lpurcell@sdcwa.org 1

2 Project Description and Objectives The project is located at Carlsbad Boulevard, Carlsbad, CA 92008, in north coastal San Diego County (Figure 1 Regional Map) in the vicinity of Agua Hedionda Lagoon, Coast Highway 101 (Carlsbad Boulevard), the railroad and the Pacific Ocean (Figure 2 Vicinity Map). Poseidon Water (Poseidon) is the owner/operator of the Carlsbad Desalination Plant (CDP) under contract to the Water Authority to deliver between 48,000 and 56,000 acre feet per year (AFY) of drinking water from the CDP. On May 5, 2014, Cabrillo Power I LLC (Cabrillo) provided notice that the Encina Power Station (EPS), and the associated seawater intake pump, would be decommissioned, resulting in a permanent shutdown of the seawater intake pump that is currently used to circulate cooling water through the EPS, effective June 1, This action will require the CDP to transition to permanent stand alone intake and discharge operation by this date. The intake and discharge facility modifications to enable permanent stand alone operation comprise the Proposed Project for the purposes of a Supplement to the Precise Development Plan and Desalination Plant Project Final Environmental Impact Report (FEIR) certified in June 2006 and amended September 2009, November 2012, September 2013, and July The Proposed Project is designed to comply with the requirements of Ocean Plan and the Water Code section (b) when the EPS permanently shuts down. As shown in Figure 3, under the Proposed Project, seawater would enter the existing intake tunnels from the outer basin of the Agua Hedionda Lagoon into a new Intake/Discharge Structure. Approximately half of the seawater volume drawn through the intake tunnels would be used for CDP feedwater. The remaining seawater drawn from the intake would be circulated to the discharge channel for initial dilution of the concentrated seawater produced by the CDP prior to discharge to the Pacific Ocean. The CDP feedwater would pass through a series of traveling screens equipped with a fish capture and return system. The screens are designed to eliminate impingement mortality and reduce entrainment mortality through the use of 1 millimeter (mm) slot openings, and a through screen velocity of less than 0.5 feet per second. After screening, the existing intake pump station will continue to deliver the feedwater to the CDP for processing through the pre treatment and reverse osmosis membrane desalination system. Approximately half the feedwater volume processed by the CDP will leave the CDP as potable drinking water, and the other half will be concentrated seawater with about twice the original feedwater salinity. Approximately half of the seawater volume drawn into the new Intake/Discharge Structure would be mixed with the CDP concentrated seawater prior discharge to the ocean. This dilution water would pass through a series of travelling screens equipped with a fish return system. The 1.0 mm mesh screens, with a through screen velocity of less than 0.5 feet per second, are designed to eliminate impingement mortality. The dilution water (and any entrained marine life) would be transferred to the discharge channel using fish friendly low impact pumps that have been demonstrated to minimize entrainment mortality. Consistent with existing CDP operation, the concentrated seawater byproduct of the 2

3 desalination process would be returned to the discharge channel and mixed with the dilution water to reduce salinity in the discharge to a level that has been demonstrated to eliminate toxicity in the receiving water. The new Intake/Discharge Structure would house the screens, the fish friendly low impact pumps and the fish return system. It would be constructed southwest of the existing intake pump station and adjacent to the existing intake forebay. This structure and an associated electrical building would occupy approximately 8,000 square feet, at an elevation of approximately 2 and 12 feet above grade, respectively. In addition, since the CDP approvals, the efficiency of reverse osmosis membrane technology has improved. These advances enable the CDP to increase the average daily potable water output from approximately 50 MGD to approximately 60 MGD with minimal improvements to the plant. Improvements would include installing reverse osmosis membranes into existing housing, and an additional skid, piping, pressure exchangers, booster pumps and other related accessories. Potential Environmental Issues to be Considered in the Supplement to the EIR The environmental document for the proposed intake and discharge facility modifications will be a Supplement to the previously certified EIR in accordance with CEQA Guidelines (Section 15163). The Supplement to the EIR will identify the general environmental effects associated with the physical changes contemplated by the Proposed Project. The Supplement to the EIR will evaluate potential environmental effects from construction and operation of the intake and discharge facility modifications on the following resource topics: o Air Quality o Hydrology and Water Quality o Biological Resources o Growth Inducement o Greenhouse Gas Emissions o Land Use and Planning In order to ensure the Supplement to the EIR addresses all appropriate environmental concerns, this NOP is intended to seek all relevant comments pertaining to the scope of analysis that should be considered in the Supplement to the EIR. Public Scoping Period & Meeting The Water Authority will accept written comments on the NOP regarding scoping of the Supplement to the EIR until October 29, A public scoping meeting will be held on October 1, 2015 from 6:00 PM until 8:00 PM in the Faraday Center, 1635 Faraday Ave., Carlsbad, CA The meeting will provide a public forum for information dissemination, discussion of the public s concerns with respect to the environmental issues noted above, and receipt and response to questions on the project, Supplemental EIR, and the overall CEQA process. No decisions will be made during this meeting, and anyone wishing to make formal comments on the Notice of Preparation must do so in writing. This scoping meeting is intended to satisfy the requirements of the Public Resources Code, Section , which requires the Lead Agency to call at least one scoping meeting for the project. 3

4 Attachments: Figure 1: Regional Map Figure 2: Vicinity Map Figure 3: Site Layout 4

5 San Diego County Imperial County 1 San Juan Capistrano Dana Point g San Clemente Orange County San Diego County Temecula Rainbow 371 Riverside County San Diego County Salton Sea 5 Camp Pendleton North Fallbrook Bonsall Camp Pendleton South Oceanside Vista 15 Hidden Meadows Project Site 76 Valley Center 79 Borrego Springs 86 Carlsbad San Marcos Escondido Santa Ysabel P a c i f i c Encinitas 56 Poway 67 Ramona San Diego Country Estates 78 Julian O c e a n 209 Coronado San Diego Lemon Grove La Mesa National City Bonita Santee Lakeside El Cajon Spring Valley Rancho San Diego Jamul Harbison Canyon Alpine 8 Pine Valley Boulevard Miles 75 Imperial Beach Chula Vista Campo MEXICO Jacumba Copyright:' 2014 Esri 8426 Carlsbad Desal SEIR FIGURE 1 Regional Map

6 Project Site 5 0 1,000 2,000 Feet Modified Intake Boundary Copyright:' 2013 National Geographic Society, i-cubed 8426 SOURCE: USGS 7.5-Minute Series - San Luis Ray Quadrangle. Carlsbad Desal SEIR FIGURE 2 Vicinity Map

7 8426 SOURCE: Carlsbad Desal SEIR FIGURE 3 Site Layout

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County

400,000. MILLION GALLONS of water per day. The Desalination Plant and Process Locations. Welcome and Overview. people in San Diego County The Carlsbad Desalination Plant is capable of delivering more than 50 million gallons of fresh, desalinated drinking water per day enough to serve approximately 400,000 people in San Diego County. Commercial

More information

Christmas Tree & Greenery Recycling Holiday 2015/ brought to you by

Christmas Tree & Greenery Recycling Holiday 2015/ brought to you by Christmas Tree & Greenery Recycling Holiday 2015/2016 - brought to you by www.wastefreesd.org Community Pick Up Details Regarding Pick Up Flocked tree accepted for pick up Drop off Details regarding drop

More information

Christmas Tree & Greenery Recycling Holiday brought to you by

Christmas Tree & Greenery Recycling Holiday brought to you by Christmas Tree & Greenery Recycling Holiday 2014 - brought to you by www.wastefreesd.org Community Pick up Details regarding pick up Flocked tree accepted for pick up Drop off Details regarding drop off

More information

Carlsbad Seawater Desalination Project ( Project ) consists of 50 MGD (56,000 AFY)

Carlsbad Seawater Desalination Project ( Project ) consists of 50 MGD (56,000 AFY) 1 Carlsbad Seawater Desalination Project ( Project ) consists of 50 MGD (56,000 AFY) Developed and owned by Poseidon Resources Channelside LP ( Poseidon ) Co-located with Encina Power Station (which relies

More information

3.0 Relationship to Other Conservation Plans

3.0 Relationship to Other Conservation Plans 3.0 Relationship to Other Conservation Plans 3.1 Water Authority NCCP/HCP The Water Authority began to prepare this Plan in 1995, at a time when other jurisdictions and regional utilities in southern California

More information

County of San Diego DEPARTMENT OF PARKS AND RECREATION. Administrative Office: (858) Fax: (858) Reservations: (858)

County of San Diego DEPARTMENT OF PARKS AND RECREATION. Administrative Office: (858) Fax: (858) Reservations: (858) BRIAN ALBRIGHT DIRECTOR County of San Diego DEPARTMENT OF PARKS AND RECREATION Administrative Office: (858) 694-3030 Fax: (858) 495-5841 Reservations: (858) 565-3600 www.sdparks.org NOTICE OF PREPARATION

More information

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF)

Amortized annual capital cost ($) + Annual Operating Cost ($) = Unit Cost ($/acre-foot) Annual beneficially used water production in acre-feet (AF) Attention: Water Planning Committee Unit Cost of New Local Water Supply Alternatives (Information) Purpose This report discusses current unit costs for new local water supply alternatives including water

More information

Southern California Leadership Council POSITION PAPER

Southern California Leadership Council POSITION PAPER A NEW, PRIVATELY FINANCED SOUTHERN CALIFORNIA TRADE CORRIDOR SYSTEM Southern California has become a global leader in trade and logistics. Over 44% of the waterborne trade in the U.S. moves through our

More information

An Update of Coastal Desalination Status in the West Coast

An Update of Coastal Desalination Status in the West Coast An Update of Coastal Desalination Status in the West Coast Joseph Wong, Brown and Caldwell CA-NV AWWA Fall Conference September 30 October 3, 2013 Sacramento, California Map of Proposed Desalination Plants

More information

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process

Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process West Basin Municipal Water District Proposed Ocean Water Desalination Project Citizen s Guide: A Handbook to the Draft Environmental Impact Report and Review Process March 2018 2018 West Basin Municipal

More information

JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination

JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination JOINT MANAGEMENT PLAN REVIEW DRAFT ACTION PLAN: Coastal Development: Desalination REVISED: May 13, 2003 Please Note: The MBNMS and the Sanctuary Advisory Council have tasked the management plan working

More information

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Notice of Preparation of an Environmental Impact Report and Scoping Meeting Notice of Preparation of an Environmental Impact Report and Scoping Meeting Date: August 15, 2017 To: Project Sponsor and Lead Agency: Staff Contact: Project Title: Location: General Plan Designation:

More information

4.16 WATER SUPPLY EXISTING CONDITIONS WATER SUPPLY AGENCIES. Metropolitan Water District Water Supply

4.16 WATER SUPPLY EXISTING CONDITIONS WATER SUPPLY AGENCIES. Metropolitan Water District Water Supply 4.16 WATER SUPPLY This section evaluates the water supply impacts of the proposed Plan. The information presented was compiled from multiple sources, including the San Diego County Water Authority (SDCWA),

More information

Committee on Water. Desalination as a Water Source

Committee on Water. Desalination as a Water Source Committee on Water Committee on Water Desalination as a Water Source Water Supply Reliability for San Diego County NARUC Summer Policy Summit July 17, 2017 Bob Yamada Director of Water Resources San Diego

More information

Got Desalination. In Your Water Portfolio? Mark Lambert, CEO IDE Americas. Texas Desalination Association, 2016

Got Desalination. In Your Water Portfolio? Mark Lambert, CEO IDE Americas. Texas Desalination Association, 2016 Got Desalination In Your Water Portfolio? Mark Lambert, CEO IDE Americas Texas Desalination Association, 2016 IDE Technologies Industrial Water Treatment Seawater Desalination Wastewater Reuse 2 A Full

More information

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015

Montecito Water District Desalination Facilities Status Update. Board of Directors Meeting March 17, 2015 Montecito Water District Desalination Facilities Status Update Board of Directors Meeting March 17, 2015 Desalination Studies Update 1) Desalination Feasibility Study 2) Desalination Technical Support

More information

Desalination Plans to Solve Water Scarcity

Desalination Plans to Solve Water Scarcity Desalination Plans to Solve Water Scarcity Thomas Manaugh, PhD Integral Scientific Institute "A new type of thinking is essential if mankind is to survive and move toward higher levels. -- Albert Einstein

More information

Charles Meyer Desalination Plant

Charles Meyer Desalination Plant Charles Meyer Desalination Plant Presentation to CalDesal Meeting October 1, 2015 Introduction City built & operated a seawater desalination plant in 1991-1992 Permitting for permanent facility was completed

More information

County of El Dorado Notice of Preparation Tilden Park Project

County of El Dorado Notice of Preparation Tilden Park Project County of El Dorado Tilden Park Project DATE: December 19, 2012 TO: FROM: SUBJECT: Responsible Agencies, Trustee Agencies, and Interested Parties Pierre Rivas, Principal Planner, El Dorado County (NOP)

More information

California tries one solution to water problems treating seawater

California tries one solution to water problems treating seawater California tries one solution to water problems treating seawater By Sacramento Bee, adapted by Newsela staff on 12.04.14 Word Count 900 In this April 25, 2014, photo, Joshua Haggmark, interim resources

More information

AlChE Conference 2015

AlChE Conference 2015 AlChE Conference 2015 International Society for Water Solutions Mark Lambert/ November 2015 1 If we could produce fresh water from salt water at a low cost, that would indeed be a great service to humanity,

More information

NOTICE OF PREPARATION & PUBLIC SCOPING MEETING NOTICE

NOTICE OF PREPARATION & PUBLIC SCOPING MEETING NOTICE 17140 South Avalon Boulevard, Suite 210 Carson, CA 90746 Phone: (310) 660-6232 NOTICE OF PREPARATION & PUBLIC SCOPING MEETING NOTICE DATE: August 31, 2015 TO: LEAD AGENCY: SUBJECT: Agencies, Organizations,

More information

Desalination. Section 10 SECTION TEN. Desalination

Desalination. Section 10 SECTION TEN. Desalination SECTION TEN Desalination Section 10 Desalination SECTION 10 Desalination West Basin s experience in recycled water treatment includes substantial knowledge on methods used for the removal of salt from

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Environmental Impact Report for People s Moss Landing Water Desalination Project Introduction In accordance with the provisions of the California Environmental Quality Act (CEQA)

More information

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4

FINAL ENVIRONMENTAL IMPACT REPORT Volume 1. NBC Universal Evolution Plan ENV EIR STATE CLEARINGHOUSE NO Council District 4 Division of Land / Environmental Review City Hall 200 N. Spring Street, Room 750 Los Angeles, CA 90012 FINAL ENVIRONMENTAL IMPACT REPORT Volume 1 ENV-2007-0254-EIR STATE CLEARINGHOUSE NO. 2007071036 Council

More information

Aligning Seawater Desalination in California with Key State Policies

Aligning Seawater Desalination in California with Key State Policies Aligning Seawater Desalination in California with Key State Policies Tom Luster California Coastal Commission 45 Fremont Street, #2000 San Francisco, CA 94105 415-904-5248 / tluster@coastal.ca.gov What

More information

Subsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #2 City of Santa Barbara, California January 27, 2016

Subsurface Desalination Intake & Potable Reuse Feasibility Studies. TAP Workshop #2 City of Santa Barbara, California January 27, 2016 Subsurface Desalination Intake & Potable Reuse Feasibility Studies TAP Workshop #2 City of Santa Barbara, California January 27, 2016 Agenda Feasibility Study Background & Objectives Update following TAP

More information

Why Desalination? Q A Q A

Why Desalination? Q A Q A Why Desalination? Why do we need a desalination facility? Fresh water makes it possible to undertake the developments needed for a sustainable Lāna i. If the island stays as it is, without any additional

More information

1.0 INTRODUCTION 1.1 EIR REQUIREMENT

1.0 INTRODUCTION 1.1 EIR REQUIREMENT This Draft Environmental Impact Report (EIR) describes the potential environmental effects that could result from implementation of the proposed Sonoma County General Plan 2020 (Draft GP 2020), which provides

More information

Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources

Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources Summary of Issues Strategies Benefits & Costs Key Uncertainties Additional Resources KEY POINT: In some cases, subsurface intakes can be less expensive than surface water intakes at stand-alone facilities.

More information

3.0 CUMULATIVE PROJECTS SCENARIO

3.0 CUMULATIVE PROJECTS SCENARIO 3.0 CUMULATIVE PROJECTS SCENARIO The CEQA Guidelines define cumulative impacts as two or more individual effects that, when considered together, are considerable or which compound or increase other environmental

More information

Brian Villalobos, CHG, CEG GEOSCIENCE Support Services, Inc. American Water Works Association California-Nevada Section Reno, Nevada

Brian Villalobos, CHG, CEG GEOSCIENCE Support Services, Inc. American Water Works Association California-Nevada Section Reno, Nevada Subsea Groundwater for Desalination Feedwater Supply Case Study: Feasibility of Using Subsurface Intake Systems in the Marina/Moss Landing Area of California Brian Villalobos, CHG, CEG GEOSCIENCE Support

More information

Engineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No

Engineer s Report. Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No 17 Santa Clara Valley Water District California Aqueduct Reverse Flow Project Project No. 60061007-6810 Engineer s Report February 2015 Water Utility Capital Division This page intentionally left blank.

More information

CENTRAL COAST REGIONAL WATER PROJECT

CENTRAL COAST REGIONAL WATER PROJECT CENTRAL COAST REGIONAL WATER PROJECT DeepWater Desal, LLC Project Description Prepared For: The California Public Utilities Commission TABLE OF CONTENTS 1. PROJECT OVERVIEW... 1 2. SITE LOCATION, EXISTING

More information

Perspectives on Desalination. John S. Young, Jr., PE President, AWWSC October 13, 2009

Perspectives on Desalination. John S. Young, Jr., PE President, AWWSC October 13, 2009 Perspectives on Desalination John S. Young, Jr., PE President, AWWSC October 13, 2009 Desalination Key Drivers & Challenges Drivers Challenges Risk of water shortage and restrictions Getting approval for

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 19, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS B203 Sacramento,

More information

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH#

CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# Volume 6: Responses Response to Comments CADIZ VALLEY WATER CONSERVATION, RECOVERY, AND STORAGE PROJECT Final Environmental Impact Report SCH# 2011031002 Prepared for Santa Margarita Water District July

More information

AGENDA FOR MAY 27, 2010

AGENDA FOR MAY 27, 2010 WATER PLANNING COMMITTEEE AGENDA FOR MAY 27, 2010 Javier Saunders Chair Rua Petty Vice Chair Betty Ferguson Vice Chair Marilyn Dailey Lynne Heidel Keith Lewinger Bud Lewis John Linden Barry Martin Dan

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

NIGHTTIME ILLUMINATION

NIGHTTIME ILLUMINATION IV.A.3 NIGHTTIME ILLUMINATION 1. INTRODUCTION This section analyzes and discusses the extent to which the proposed project s artificial lighting would affect the visual environment of the project site

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula

FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula FINAL REPORT Evaluation of Seawater Desalination Projects Proposed for the Monterey Peninsula Submitted to: Monterey Peninsula Water Management District Prepared By: GEI/Bookman Edmonston Separation Processes

More information

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association

Desalination Intake Approaches: Open Ocean Intake vs Subsurface. Monterey Bay Water Works Association Desalination Intake Approaches: Open Ocean Intake vs Subsurface Monterey Bay Water Works Association 16 October 2008 Todd Reynolds, PE Michael Maley, PE, PG, CHg Presentation Outline Introduction to Desalination

More information

Karen, Best regards, *National Environmental Policy Act

Karen, Best regards, *National Environmental Policy Act From: Pell, Jerry To: 'karen_goebel@fws.gov' Cc: 'Tim Murphy' ; 'Richard Williams' ; Como, Anthony ;

More information

City of Santa Cruz Water Supply Advisory Committee Solutions Phase -- Technical Summary Consolidated Alternative 07 - Deepwater Desalination

City of Santa Cruz Water Supply Advisory Committee Solutions Phase -- Technical Summary Consolidated Alternative 07 - Deepwater Desalination Consolidated Alternative 07 - Deepwater Desalination Agenda Item 4c Part 2 of 5 This alternative would desalt seawater withdrawn through a new deepwater intake system at Moss Landing, producing approximately

More information

Model BMP Design Manual San Diego Region. For Permanent Site Design, Storm Water Treatment and Hydromodification Management

Model BMP Design Manual San Diego Region. For Permanent Site Design, Storm Water Treatment and Hydromodification Management Model BMP Design Manual San Diego Region For Permanent Site Design, Storm Water Treatment and Hydromodification Management February 2016 Model BMP Design Manual This Model BMP Design Manual to be adapted

More information

San Benito County Water District

San Benito County Water District 30 Mansfield Road P.O. Box 899 Hollister, CA 95024-0899 Phone: (831) 637-8218 Fax: (831) 637-7267 DATE: June 22, 2010 TO: FROM: SUBJECT: Governor s Office of Planning and Research/State Clearinghouse Unit,

More information

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN.

ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH ) FOR THE NEWPARK PLACE SPECIFIC PLAN. ADDENDUM TO THE NEWARK GENERAL PLAN TUNE UP PROGRAM ENVIRONMENTAL IMPACT REPORT (SCH 2013012052) FOR THE NEWPARK PLACE SPECIFIC PLAN. INTRODUCTION The City of Newark (City) certified a Environmental Impact

More information

Implementation of the Colorado River Quantification Settlement Agreement

Implementation of the Colorado River Quantification Settlement Agreement Addendum to the Final Program Environmental Impact Report Implementation of the Colorado River Quantification Settlement Agreement s September 2003 Coachella Valley Water District Imperial Irrigation District

More information

4.3 AGRICULTURE AND FOREST RESOURCES

4.3 AGRICULTURE AND FOREST RESOURCES 4.3 AGRICULTURE AND FOREST RESOURCES 4.3.1 INTRODUCTION This section describes existing agricultural and forest resources within the project area, Federal, State and local regulatory setting, and analyzes

More information

CITY OF DANA POINT AGENDA REPORT HONORABLE MAYOR AND DANA POINT CITY COUNCIL

CITY OF DANA POINT AGENDA REPORT HONORABLE MAYOR AND DANA POINT CITY COUNCIL 02/21/17 Page 1 Item # 11 CITY OF DANA POINT AGENDA REPORT Reviewed By: DH X CM X CA DATE: FEBRUARY 21, 2017 TO: FROM: HONORABLE MAYOR AND DANA POINT CITY COUNCIL MIKE KILLEBREW, ACTING CITY MANAGER SUBJECT:

More information

Neptune Clean Water. Business Plan

Neptune Clean Water. Business Plan Neptune Clean Water Business Plan July 2015 The Only Existing, Quick, Reliable, Affordable, Green and Sustainable Water Project Table of Contents Introduction Background... 3-4 Map..5 Existing Desal. 6

More information

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan

More information

San Diego Chapter Newsletter. Our Mission. Meeting Announcements. WateReuse California Annual Conference 2013

San Diego Chapter Newsletter. Our Mission. Meeting Announcements. WateReuse California Annual Conference 2013 San Diego Chapter Newsletter Volume 27 January 2013 Our Mission The San Diego Chapter of the WateReuse Association provides a forum for the exchange of information to promote the beneficial use of recycled

More information

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager

San Diego, A Cadillac Desert; Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager San Diego, A Cadillac Desert; Sustainable Strategies for Living in a Desert Presentation by: Dana Fi Friehauf, fpe P.E. Water Resources Manager Green Lunch Bag Series September 24, 2014 San Diego County

More information

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes

Soquel Creek Water District s Groundwater Recharge Feasibility Study. Lydia Holmes Soquel Creek Water District s Groundwater Recharge Feasibility Study Lydia Holmes Soquel Creek Water District (SqCWD) Filename.ppt/2 Small beach community east of Santa Cruz 37,000 residents 100% reliant

More information

URBAN WATER Management Plan

URBAN WATER Management Plan 2010 URBAN WATER Management Plan Prepared by San Diego County Water Authority Water Resources Department >> 2010 Urban Water Management Plan Prepared by: San Diego County Water Authority Water Resources

More information

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017 DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the

More information

AN EXAMINATION OF THE DESALINATION PROCESS AND FACILITY

AN EXAMINATION OF THE DESALINATION PROCESS AND FACILITY AN EXAMINATION OF THE DESALINATION PROCESS AND FACILITY By Elizabeth M. Granger Senior Project City and Regional Planning Department California Polytechnic State University San Luis Obispo 2015 Thank you

More information

Modutech S.r.l. WDS SEAWATER DROPLET SYSTEM FOR FRESH WATER SUPPLY. Ing. Alessandro Cariani

Modutech S.r.l. WDS SEAWATER DROPLET SYSTEM FOR FRESH WATER SUPPLY. Ing. Alessandro Cariani Modutech S.r.l. WDS SEAWATER DROPLET SYSTEM FOR FRESH WATER SUPPLY Ing. Alessandro Cariani The world's water consumption rate is doubling every 20 years, outpacing by two times the rate of population growth.

More information

Fact Sheet for Order No. R February 9, 2005 Scripps Institution of Oceanography

Fact Sheet for Order No. R February 9, 2005 Scripps Institution of Oceanography CONTACT INFORMATION: Regional Water Quality Control Board Mr. Paul J. Richter, P.E. Water Resource Control Engineer 9174 Sky Park Court, Suite 100 San Diego, CA 92123 Telephone: (858) 627-3929 Facsimile:

More information

City of San Diego Pure Water Project October 2014

City of San Diego Pure Water Project October 2014 City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,

More information

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report

Notice of Preparation For Link Union Station (Link US) Project. Joint Environmental Impact Statement and Environmental Impact Report Notice of Preparation For Link Union Station (Link US) Project Joint Environmental Impact Statement and Environmental Impact Report Date: May 27, 2016 To: Subject: Project Title: From: All Interested Agencies,

More information

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant:

Commerce Park. Draft Environmental Impact Report. CITY OF FONTANA Citrus Commerce Park SCH SEPTEMBER 2014 VOLUME 1. Project Applicant: SCH 2014051005 SEPTEMBER 2014 VOLUME 1 Commerce Park CITY OF FONTANA Citrus Commerce Park Draft Environmental Impact Report Project Applicant: Alere Property Group LLC 100 Bayview Circle, Suite 310 Newport

More information

FACT SHEETS SAN BERNARDINO COUNTY

FACT SHEETS SAN BERNARDINO COUNTY FACT SHEETS SAN BERNARDINO COUNTY WHAT IS THE REGIONAL TRANSPORTATION PLAN/ SUSTAINABLE COMMUNITIES STRATEGY (RTP/SCS) Every four years the Southern California Association of Governments (SCAG) prepares

More information

S A N D A G INFO MANAGING SOLID WASTE IN THE SAN DIEGO REGION

S A N D A G INFO MANAGING SOLID WASTE IN THE SAN DIEGO REGION S A N D A G INFO J A N U A R Y - F E B R U A R Y 1 9 9 9, N O. 1 T H R E E D O L L A R S MANAGING SOLID WASTE IN THE SAN DIEGO REGION INTRODUCTION In 1988, the California Legislature found that Californians

More information

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN): This PCN integrates the requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit Program within the South Pacific Division (SPD), including the Albuquerque, Los Angeles, San Francisco,

More information

PRELIMINARY HYDROLOGY STUDY

PRELIMINARY HYDROLOGY STUDY PRELIMINARY HYDROLOGY STUDY FOR Tentative Tract Map West Side of Loma Alta Drive City of Oceanside, CA Prepared For: EMERALD HILLS LLC 4272 Dogwood Avenue Seal Beach, CA 90740 Contact: Mr. Jimmy Chen Ph:

More information

VALLECITOS WATER DISTRICT

VALLECITOS WATER DISTRICT VALLECITOS WATER DISTRICT WATER, WASTEWATER, AND RECYCLED WATER MASTER PLAN Draft Program Environmental Impact Report SCH No. 2010071073 VALLECITOS WATER DISTRICT 2008 Water, Wastewater and Recycled Water

More information

RPU WATER SUPPLY PLAN UPDATE October 7, 2011

RPU WATER SUPPLY PLAN UPDATE October 7, 2011 RPU WATER SUPPLY PLAN UPDATE October 7, 2011 Overview of Water Supply Planning Develop a safe, reliable, local, sustainable, and cost effective water supply to maintain Riverside s water independence for

More information

2018 & 2022 Draft LCR Study Results San Diego-Imperial Valley

2018 & 2022 Draft LCR Study Results San Diego-Imperial Valley 2018 & 2022 Draft LCR Study Results San Diego-Imperial Valley Frank Chen - Regional Transmission Engineer Lead David Le - Senior Advisor Regional Transmission Engineer Stakeholder Meeting March 9, 2017

More information

PROPOSED GUIDELINES SALINITY/NUTRIENT MANAGEMENT PLANNING. in the SAN DIEGO REGION (9)

PROPOSED GUIDELINES SALINITY/NUTRIENT MANAGEMENT PLANNING. in the SAN DIEGO REGION (9) Item No. 7; Supporting Document No. 2 PROPOSED GUIDELINES SALINITY/NUTRIENT MANAGEMENT PLANNING in the SAN DIEGO REGION (9) Suggested framework and guidelines for salinity/nutrient management plans required

More information

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION

CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION CHAPTER 4.0 ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION Sections 4.1 through 4.14 of Chapter 4.0 of this EIR contain a discussion of the potential environmental effects from implementation of the proposed

More information

Guide to the Santa Margarita Water District Records. No online items

Guide to the Santa Margarita Water District Records.  No online items http://oac.cdlib.org/findaid/ark:/13030/kt0n39q6rg No online items Processed by Cyndi Shein; machine-readable finding aid created by Cyndi Shein Special Collections and Archives The UCI Libraries P.O.

More information

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project University of Colorado Law School Colorado Law Scholarly Commons Western Water Law, Policy and Management: Ripples, Currents, and New Channels for Inquiry (Martz Summer Conference, June 3-5) Getches-Wilkinson

More information

A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP TO ALLOW THE

A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP TO ALLOW THE 1 PLANNING COMMISSION RESOLUTION NO. 6092 2 A RESOLUTION OF THE PLANNING COMMISSION OF THE 3 CITY OF CARLSBAD, CALIFORNIA, APPROVING COASTAL DEVELOPMENT PERMIT CDP 0-1 TO ALLOW THE INSTALLATION OF UNDERGROUND

More information

Water Use, Electric Power, and Nuclear Energy: Environmental Stewardship. William Skaff Nuclear Energy Institute September 15, 2009

Water Use, Electric Power, and Nuclear Energy: Environmental Stewardship. William Skaff Nuclear Energy Institute September 15, 2009 Water Use, Electric Power, and Nuclear Energy: A Holistic Approach to Environmental Stewardship William Skaff Nuclear Energy Institute September 15, 2009 Assumption: Energy Diversityit In addition to efficiency

More information

Introduction. Background

Introduction. Background Introduction FY 2014 CHIEF OF NAVAL OPERATIONS ENVIRONMENTAL AWARD COMPETITION AWARD CATEGORY: SUSTAINABILITY TEAM Spray Aeration Reduces Trihalomethane Concentrations in Drinking Water Naval Base Coronado

More information

The Los Angeles Desalination Project

The Los Angeles Desalination Project DRAFT PROPOSAL The Los Angeles Desalination Project Author: Brian Nissen Company: Bella Machines www.bellamachines.com The Los Angeles Desalination Project CALIFORNIA WATER The California water crisis

More information

EMERGENCY STORAGE PROJECT

EMERGENCY STORAGE PROJECT EMERGENCY STORAGE PROJECT San Vicente Pumping Station/Surge Control Facility Carryover Storage and San Vicente Dam Raise EIR/EIS San Vicente Dam Raise Briefing Summary DATE: Oct. 18, 2006 ORGANIZATION:

More information

10.1 Local Water Planning

10.1 Local Water Planning 10 COORDINATION WITH EXISTING LOCAL/REGIONAL PLANS Each of the IRWM agencies plan and execute both short-term capital improvement programs and long-term plans and management programs. It is their plans,

More information

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department

Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Lorelei H. Oviatt, Director, AICP Kern County Planning and Community Development Department Sept. 16, 2013, Lost Hills Recreation Building, Lost Hills Park, Highway 46, Lost Hills, CA 1. To Introduce the

More information

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council.

U.S. Water Budget. Figure Source:Data from The Nation s Water Resources , Vol. 1, U.S. Water Resources Council. U.S. Water Budget Figure 10.18 10-9 Source:Data from The Nation s Water Resources 1975-2000, Vol. 1, U.S. Water Resources Council. Average U.S. Precipitation Figure 10.19 10-10 Source: U.S. Water Resources

More information

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY

3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 3.0 CUMULATIVE IMPACT ANALYSIS METHODOLOGY 1. PURPOSE The purpose of this section is to explain the methodology for the cumulative project analysis presented in this EIR. This section is important because,

More information

San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington

San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop. Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington San Diego Hydrology Model (SDHM 3.0) Reviewer Workshop Doug Beyerlein, P.E., P.H., D.WRE Clear Creek Solutions, Inc. Mill Creek, Washington Clear Creek Solutions Hydrology Expertise Clear Creek Solutions,

More information

INTEGRATED FLOOD MANAGEMENT PLANNING

INTEGRATED FLOOD MANAGEMENT PLANNING INTEGRATED FLOOD MANAGEMENT PLANNING APRIL 2013 1 INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Integrated Flood Management Approach... 1-3 1.3 General Regional Flood Management Issues... 1-3 1.4 California

More information

Project Update: Soil Investigation and Groundwater Remedy at Pacific Gas & Electric Company Topock Compressor Station

Project Update: Soil Investigation and Groundwater Remedy at Pacific Gas & Electric Company Topock Compressor Station Fact Sheet November 2016 The mission of DTSC is to protect California s people and environment from harmful effects of toxic substances through the restoration of contaminated resources, enforcement, regulation

More information

Navigating the Permit Process for Desalination LBWD Experience

Navigating the Permit Process for Desalination LBWD Experience Navigating the Permit Process for Desalination LBWD Experience AWWA Desalination Symposium May 8, 2006 Long Beach Water Department Tai Tseng, P.E. 1 Presentation Outline Long Beach Overview Permits for

More information

WATER STORIES WEST BASIN, CA

WATER STORIES WEST BASIN, CA WATER STORIES WEST BASIN, CA CHALLENGES PAGE 5 SOLUTIONS PAGE 7 RESULTS PAGE 9 INNOVATION & TECHNOLOGY PAGE 11 COMMUNITY INVOLVEMENT PAGE 13 THE FUTURE PAGE 15 THE RIGHT MOVE FOR SOUTHERN CALIFORNIA It

More information

) ) ) ) ) ) ) ) DIRECT TESTIMONY OF DAVID M. BISI SAN DIEGO GAS & ELECTRIC COMPANY AND SOUTHERN CALIFORNIA GAS COMPANY

) ) ) ) ) ) ) ) DIRECT TESTIMONY OF DAVID M. BISI SAN DIEGO GAS & ELECTRIC COMPANY AND SOUTHERN CALIFORNIA GAS COMPANY Application No: A.1-1-xxx Exhibit No.: Witness: David M. Bisi Application of Southern California Gas Company (U 0 G) and San Diego Gas & Electric Company (U 0 G) For Authority To Recover North-South Project

More information

TAYLOR DENSON* TABLE OF CONTENTS

TAYLOR DENSON* TABLE OF CONTENTS Desalination and California s Water Problem: The Viability of the Desalination Industry as Examined Through the Lens of California s New Desalination Rules and Development TAYLOR DENSON* Long considered

More information

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number: Public Notice Applicant: Lennar Homes Project No.: SWF-2013-00265 Date: October 29, 2013 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It is

More information

El Dorado Water & Power Authority. El Dorado Water Reliability Project

El Dorado Water & Power Authority. El Dorado Water Reliability Project El Dorado Water & Power Authority 1 WELCOME El Dorado Water Reliability Project EIR SCOPING MEETING El Dorado Water & Power Authority is implementing the El Dorado Water Reliability Project as a component

More information

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL Potable Reuse as an Alternative Water Supply AWRA Conference Orlando, FL Who We Are New Port Richey Tampa St. Petersburg 100 percent groundwater pumped from 13 wellfields Tampa Bay Water History Integrated,

More information

APPENDIX A. Project Scoping

APPENDIX A. Project Scoping APPENDIX A Project Scoping Notice of Preparation To: From: Agencies and Interested Parties Paul Brunner, Executive Director, Three Rivers Levee Improvement Authority Date: June 13, 2006 Subject: Notice

More information

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that:

This comparison is designed to satisfy the requirements of State CEQA Guidelines, Section (d), Evaluation of Alternatives, which state that: 6.0 Comparison of Proposed Project and Alternatives This chapter summarizes the environmental advantages and disadvantages associated with the Proposed Project and the alternatives. Based upon this discussion,

More information

Joe Geever Surfrider Foundation

Joe Geever Surfrider Foundation Joe Geever Surfrider Foundation Water Programs Manager ( Policy Guy not engineer or marine scientist) Regulating brine and other residual waste streams generated from ocean desalination. Broad brush recommendations

More information

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations

City of Los Angeles. Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City of Los Angeles Integrated Resources Plan (IRP) Certification of Final Environmental Impact Report (EIR) and Adoption of IRP Recommendations City Council Meeting November 14, 2006 The Challenges New

More information

South Coast Water District

South Coast Water District South Coast Water District Providing Quality Water & Wastewater Services To the Coastal Communities SOUTH LAGUNA TUNNEL STABILIZATION & SEWER PIPELINE REPLACEMENT PROJECT Resolution of Necessity Hearing

More information