Black Gold from Wood-waste Water Treatment Plant

Size: px
Start display at page:

Download "Black Gold from Wood-waste Water Treatment Plant"

Transcription

1 Black Gold from Wood-waste Water Treatment Plant Melissa MacIntyre, P.Eng. Environmental Manager Louisiana Pacific East River Mill March 3, 2009

2 Presentation Content Louisiana Pacific History Louisiana Pacific Process Compost Facility Process Composting Success Awards Questions

3 Louisiana Pacific - History Hardboard Mill located within East River close to Chester, NS. LP produces various profiles of exterior siding and interior door skins. LP averages a production of 211 per day of various products, of which 99% were exported outside the province and 40% out of the country.

4 Louisiana Pacific - History Construction of the Mill was started in 1966 and began production with one line in A second production line was added and was in full production in Up to 1976 there was little wastewater treatment. By 1978 there was a full secondary treatment facility in place.

5 Louisiana Pacific - History Up to 1992 treatment plant sludge was disposed of within a onsite quarry and the solids settled and the water was pumped back to the treatment plant. The solids were excavated and disposed of within an onsite landfill. After 1992, a belt press was installed and the dewatered sludge was placed in the onsite landfill.

6 Louisiana Pacific - History In the mid 1990 s, it was determined that the landfill was not going to have an extended life and either a new landfill was needed or an alternative found. In 1999, composting trials began to determine if the sludge from the wastewater treatment plant could be composted into a viable product. In 2003/04 the onsite landfill was closed and capped. Since that time 100% of the wastewater treatment plant sludge has been successfully sent to the compost facility.

7 The process begins with round wood, which gets chipped, washed, metered, and cooked. Louisiana Pacific - Process

8 Louisiana Pacific - Process Fiber is created by mechanical means. This fiber is mixed with water and chemicals to create our stock

9 Stock is then pumped onto a moving drainage table, cut into fiber mats and loaded into the press. Louisiana Pacific - Process

10 The fiber mat stays in the press from 7 to 25 minutes depending on the product being produced. Louisiana Pacific - Process

11 Louisiana Pacific - Process After pressing; the product goes through several other steps before it is ready for market: re-humidification, equalizing, cutting to size and painting. This all occurs in our Converting Department and creates very little to no water loading on our wastewater treatment plant.

12 Louisiana Pacific Wastewater Treatment Plant Process Water from the production process is pumped to a lift station and is then pumped to the wastewater treatment plant.

13 Louisiana Pacific Wastewater Treatment Plant Process Water is pumped to a dissolved air floatation (DAF) tank to remove large (un-dissolved particles), this material is sent to the belt press for dewatering. Water from the DAF is pumped to the first of two aeration basins.

14 Water then enters the first of two settling basins (clarifiers), sludge from this basin is either recycled back to the aeration basin or pumped to the belt press for dewatering. Louisiana Pacific Wastewater Treatment Plant Process

15 Louisiana Pacific Wastewater Treatment Plant Process Water is then sent to the second aeration basin and settling basin prior to discharge through a diffuser. Sludge created during this last process is also either recycled back to the aeration basin or sent to the belt press for dewatering.

16 Louisiana Pacific Wastewater Treatment Plant Process The belt press takes sludge at a solids content of 5% and dewaters to 15-20%. This dewatered sludge is then trucked to the compost facility, which is located on site.

17 Sludge from the belt press is trucked to the Compost Facility and placed inside the building for initial mixing with bulking biomass. Compost Facility Process

18 The mixture of sludge and bulking biomass are placed over air injection pipes to start the composting process, the material is placed in windrows within the building and turned throughout the time within the building. Compost Facility Process

19 Compost Facility Process Once the compost has been actively composted the material is placed outside on a covered pad to continue active composting. After this point the compost has completed its active phase and it is ready for curing.

20 Screening and then sold. Compost Facility Process

21 Compost Facility Success Material Diverted to Compost Facility 2000: : 13, : 31, : 34, : 53, : 38, : 40, : 45, : 29,311 Compost Sold 2004: 8, : 13, : 14, : 12, : 27,125

22 Compost Facility Success Nova Scotia has a capacity of 172,250 /yr of composting within the Province with 20 facilities. (As indicated on and updated Apr. 9, 2008) East River is the largest capable of 50,000 of composting per year. 30% of Nova Scotia s compost volume.

23 Compost Facility Success A community group has been established to ensure an open dialogue with community members. We meet 4-6 times per year; We have a website and community bulletin board; We will be hosting our 6 th annual Open House on June 13th. We have involved the Municipality of Chester, the Chester Basin Gardening Club, local children s organizations, the Canadian Compost Council of Canada. Odor complaints have gone from 11 in 2004 to 1 in 2006, to zero in both 2007 & What changed? We employed better reporting with the community; We reduced and avoid tasks during particular weather conditions to prevent odor migration. We improved surface water drainage, dry compost doesn t have odor.

24 Compost Facility Success According to current fees of $70/tonne to handle similar material This would have cost LP over 15 million dollars to handle as a waste. Composting is not free, this method of handling our waste has cost LP 2.4 million in the past 5 years, with sales to help off set this cost. The Kaizer Meadows Landfill was contacted to determine the actual impact this material would have. David Daniels informed us that the landfill is designed for 42,500 /year over 5 years. Louisiana Pacific is diverting approximately 39,000 /year to the Compost Facility. This volume would decrease the lifespan of the local landfill by over 85%.

25 Solid Waste Disposal Reduction Solid Waste Category Card Board / Paper / Food Compost 2,041 kg 3,375 kg 5,364 kg 26,016 kg 36,894 kg 35,532 kg 36,860 kg 36,860 kg 36,860 kg Scrap Metal Dust to Compost Dust to Boiler 9,617 13,824 12,997 15,995 13,751 12,212 14,026 11,231 11,969 Landfill (Mixed Waste) 50,755 12,215 1, Wood Waste (Landfill) 5,023 5,948 1,367 1,897 1, Wood Waste Recycled 48 1,374 7,616 10,500 5,845 5,193 9,331 8,315 4,355

26 Awards In 2005 Eco-Efficiency's Success Story Annual Award In 2006 RRFB s Business of the Year Award In 2007 Canadian Manufactures and Exporters: Canadian Innovation Award Recognition for Environmental Technology.

27 Questions?

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

Photos of the Wastewater Plant expansion Project COMPOST PAD CONSTRUCTION. Beginning Dirt work on the Biosolids Compost Pad

Photos of the Wastewater Plant expansion Project COMPOST PAD CONSTRUCTION. Beginning Dirt work on the Biosolids Compost Pad Photos of the Wastewater Plant expansion Project COMPOST PAD CONSTRUCTION Beginning Dirt work on the Biosolids Compost Pad Compost Pad dirt work down to grade Dumping base material for the Compost Pad

More information

Class III Composting Facility Requirements

Class III Composting Facility Requirements April 2012 Class III Composting Facility Requirements The State of Ohio has specific regulations regarding registered solid waste composting facilities. The detailed requirements for Class III composting

More information

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT

CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT CITY OF LONDON ENVIRONMENTAL & ENGINEERING SERVICES DEPARTMENT WASTEWATER TREATMENT OPERATIONS GREENWAY POLLUTION CONTROL CENTRE 2013 ANNUAL REPORT FEBRUARY 2014 SUMMARY This annual report is in response

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

NAWT Septage Processing What are my disposal resources and how do they fit

NAWT Septage Processing What are my disposal resources and how do they fit NAWT Septage Processing What are my disposal resources and how do they fit National Association of Wastewater Transporters, Inc. Introductions Tom Frank 2nd generation Huntsburg, Ohio Resources available

More information

Bioremediation What is it and how does it work?

Bioremediation What is it and how does it work? Bioremediation What is it and how does it work? Bioremediation and Waste Management Biological treatment and our reliance on bacteria is not new or novel, it has played a central role in conventional waste

More information

Chapter 6 Processes to Significantly Reduce Pathogens (PSRPs)

Chapter 6 Processes to Significantly Reduce Pathogens (PSRPs) Chapter 6 Processes to Significantly Reduce Pathogens (PSRPs) 6.1 Introduction Processes to Significantly Reduce Pathogens (PSRPs) are listed in Appendix B of Part 503. There are five PSRPs: aerobic and

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

4 Onsite Sewage Systems

4 Onsite Sewage Systems 4 Onsite Sewage Systems The term onsite system refers to any system which is used to store, treat and dispose of liquid waste at the premises where the waste is generated. Many households and industries

More information

Your Guide to the. Budd Inlet Treatment Plant

Your Guide to the. Budd Inlet Treatment Plant Your Guide to the Budd Inlet Treatment Plant How does LOTT know the plant is working correctly? All activity within the treatment plant is monitored 24 hours a day, 7 days a week. A highly trained team

More information

Keep it Flowing! A Guide to Caring for Your Septic System

Keep it Flowing! A Guide to Caring for Your Septic System Keep it Flowing! A Guide to Caring for Your Septic System Your Precast Concrete Septic Tank Congratulations on your new precast concrete septic tank! A highquality precast concrete tank is an important

More information

Keep it Flowing! A Guide to Caring for Your Septic System

Keep it Flowing! A Guide to Caring for Your Septic System Keep it Flowing! A Guide to Caring for Your Septic System Your Precast Concrete Septic Tank Congratulations on your new precast concrete septic tank! A highquality precast concrete tank is an important

More information

Current Treatment Approaches and Planning for the Future A Panel Discussion

Current Treatment Approaches and Planning for the Future A Panel Discussion Wastewater Facilities in Salt Lake County: Current Treatment Approaches and Planning for the Future A Panel Discussion Salt Lake County Watershed Symposium 2012 Panel Members: Central Valley Water Reclamation

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

Center Sanitation District

Center Sanitation District EHLS Center Sanitation District EHLS Engineering Erik Jorgensen Suzanne Givler Heath Anderson Leryn Gorlitsky Outline of Presentation Background Current and Future Conditions Decision Matrix Description

More information

PROJECT MEASUREMENT CARBON CREDIT CALCULATIONS CITY OF RICHMOND ORGANIC WASTE DIVERSION (WASTE DROP-OFF SERVICE)

PROJECT MEASUREMENT CARBON CREDIT CALCULATIONS CITY OF RICHMOND ORGANIC WASTE DIVERSION (WASTE DROP-OFF SERVICE) PROJECT MEASUREMENT CARBON CREDIT CALCULATIONS CITY OF RICHMOND ORGANIC WASTE DIVERSION (WASTE DROP-OFF SERVICE) The carbon credit calculations completed for the 2007 2013 calendar years for the City of

More information

ANAEROBIC TREATMENT OF PAPER MILL WASTEWATER

ANAEROBIC TREATMENT OF PAPER MILL WASTEWATER ANAEROBIC TREATMENT OF PAPER MILL WASTEWATER M. Eeckhaut 1, J.P. Ombregt 1, B. Vanderhaegen 2, M. Bambridge 3, A. Ginnis 4 Abstract In this paper the performance of an anaerobic wastewater treatment plant

More information

Pressure Washwater Management for Marina/Boatyard Industries

Pressure Washwater Management for Marina/Boatyard Industries Pressure Washwater Management for Marina/Boatyard Industries Paul G. Richard, P.E. Senior Program Director EBI Consulting 617.715.1825 prichard@ebiconsulting.com Agenda Introduction Storm Water vs. Industrial

More information

Biological Help for the Human Race. Wastewater Treatment. Case Study. Thatchers Cider Company Ltd, United Kingdom. BiOWiSH Aqua Benefits.

Biological Help for the Human Race. Wastewater Treatment. Case Study. Thatchers Cider Company Ltd, United Kingdom. BiOWiSH Aqua Benefits. Case Study Wastewater Treatment Thatchers Cider Company Ltd, United Kingdom Background Thatchers Cider Company Ltd is a manufacturer of cider and fruit juices situated in the county of Somerset, UK with

More information

Your defined goals and objectives:

Your defined goals and objectives: About us GECO GmbH was founded in 1977 as a private owned business by Josef Schlusche ( 2005). The company headquarters are located in Ketsch near Heidelberg. HOME Our customers: Administrative building

More information

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan 2010 2011 1 Message from the Minister and President Since its establishment in 2006, Nova Scotia Lands Inc. (NSLI) has achieved

More information

final report Water quality improvement strategy for a processing site

final report Water quality improvement strategy for a processing site final report Project title: Water Quality Improvement Strategy Project code: P.PSH.0449 Prepared by: GHD Date published: July 2010 PUBLISHED BY Meat & Livestock Australia Limited Locked Bag 991 NORTH SYDNEY

More information

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS... 4.17-1 4.17.0 Introduction... 4.17-1 4.17.1 Methodology... 4.17-2 4.17.2 Existing Conditions... 4.17-2 4.17.3 Impacts... 4.17-4 4.17.4 Applicant-Proposed

More information

SOLID WASTE DISPOSAL A BURNING PROBLEM TO BE RESOLVED

SOLID WASTE DISPOSAL A BURNING PROBLEM TO BE RESOLVED SOLID WASTE DISPOSAL A BURNING PROBLEM TO BE RESOLVED A. Introduction The disposal of solid waste is a problem. This problem continues to grow with the growth of population and development of industries.

More information

Tour of Altamonte Springs Regional Water Reclamation Facility

Tour of Altamonte Springs Regional Water Reclamation Facility Name: Date: Tour of Altamonte Springs Regional Water Reclamation Facility Middle School Earth Science Spring Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Big Idea 2 The Characteristics

More information

The Zero Discharge of Hazardous Chemicals Programme Chemical Management for the Textile Industry

The Zero Discharge of Hazardous Chemicals Programme Chemical Management for the Textile Industry The Zero Discharge of Hazardous Chemicals Programme Chemical Management for the Textile Industry Date May, 2017 Disclaimer PLEASE NOTE: The following presentation is being provided as an introduction to

More information

Refuse-to-Energy Facility

Refuse-to-Energy Facility Commerce Refuse-to-Energy Facility Waste Diversion: A Challenge for Southern California Communities Los Angeles County successfully diverts more than 50 percent of the solid waste generated each day from

More information

Wastewater Treatment Processes

Wastewater Treatment Processes Wastewater Treatment Processes CEL212 Environmental Engineering (2 nd Semester 2010-2011) Dr. Arun Kumar (arunku@civil.iitd.ac.in) Department of Civil Engineering Indian Institute of Technology (Delhi)

More information

Product Category Rules (PCR) (Approved PCR ID: PA-AA-01)

Product Category Rules (PCR) (Approved PCR ID: PA-AA-01) (Provisional Translation) Product Category Rules (PCR) (Approved PCR ID: PA-AA-01) PCR Name: Nonglutinous Rice (Japonica) Release Date: September 4, 2009 CFP Calculation and Labeling Pilot Program *The

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

CEDAR CREEK Wastewater Treatment Facility

CEDAR CREEK Wastewater Treatment Facility CEDAR CREEK Wastewater Treatment Facility Where does the waste originate Private homes Businesses from? Condominium complexes Nursing homes Apartments ANY DWELING THAT USES WATER AND IS CONNECTED TO THE

More information

ANAEROBIC DIGESTION A TOOL FOR RECYCLING ORGANICS

ANAEROBIC DIGESTION A TOOL FOR RECYCLING ORGANICS Compost Council of Canada Compost Matters in Atlantic Canada - March 11, 2015 ANAEROBIC DIGESTION A TOOL FOR RECYCLING ORGANICS Mike Kopansky, Miller Waste Systems PRESENTATION OUTLINE Evolution of Organics

More information

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project

Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Proposed Wastewater Treatment Facility Equipment Repair and Replacement Project Presented August 29 th, 2016 Function of IMKWWTP Treatment Facility History Reasons for Proposed Project Why Now? Modest

More information

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers.

Polishing Ponds. Biosolids Storage. Ammonia Removal. Digesters. Thickeners. Pretreatment. Final Clarifiers. Primary Clarifiers. Wastewater Treatment Facility (2012) Polishing Ponds Biosolids Storage Ammonia Removal Digesters Thickeners Pretreatment Primary Clarifiers Activated Sludge Final Clarifiers OVERVIEW Whenever a home, business,

More information

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council

WESTDALE WWTP AUGMENTATION AND REUSE FARM. Stephen Sullivan and Jamie Hunt. Tamworth Regional Council WESTDALE WWTP AUGMENTATION AND REUSE FARM Paper Presented by: Stephen Sullivan and Jamie Hunt Authors: Stephen Sullivan, Team Leader, Jamie Hunt, Wastewater Headworks Operator, Tamworth Regional Council

More information

MAXIMIZING RESOURCE RECOVERY. By Phee Boon Poh 5th High Level Seminar Thematic Session 1A: Waste Management Surabaya, Indonesia 28 February 2014

MAXIMIZING RESOURCE RECOVERY. By Phee Boon Poh 5th High Level Seminar Thematic Session 1A: Waste Management Surabaya, Indonesia 28 February 2014 MAXIMIZING RESOURCE RECOVERY By Phee Boon Poh 5th High Level Seminar Thematic Session 1A: Waste Management Surabaya, Indonesia 28 February 2014 CONTENTS 1. Changing the rules Source Separation Law Waste

More information

Optimization of Anaerobic Digestion with Bio- Organic Catalyst Compositions (BOCs)

Optimization of Anaerobic Digestion with Bio- Organic Catalyst Compositions (BOCs) CASE STUDY bio-organic.com Optimization of Anaerobic Digestion with Bio- Organic Catalyst Compositions (BOCs) 14th Annual European Biosolids and Organic Resources Conference and Exhibition - November 2009

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Composting Systems & Methods

Composting Systems & Methods Composting Systems & Methods Lyndell Pate Ecoverse Start here or here Compost Facility Feedstock Process Market Feedback Analyze Markets Assess Market and distribute Identify and quantify Compost Facility

More information

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works

6 WASTEWATER. 6.1 Overview. 6.2 Darvill Wastewater Works 6 WASTEWATER 6.1 Overview Umgeni Water currently owns and operates the Darvill and Ixopo Wastewater Works (WWWs). It also operates the Howick WWW for umgungundlovu District Municipality under a management

More information

Your Problem. Current Practices. Survey about Storage. Thinking about Cost. Mixed waste {Your truck} Your Resources Options Future

Your Problem. Current Practices. Survey about Storage. Thinking about Cost. Mixed waste {Your truck} Your Resources Options Future Introduction to owning a Facility National Association of Wastewater Transporters, Inc. Solids Your Problem Mixed waste {Your truck} Liquid Current Practices 25% of US Households use Onsites for infrastructrue

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

REQUEST FOR PROPOSAL. Organics Processing Facility Feasibility Analysis

REQUEST FOR PROPOSAL. Organics Processing Facility Feasibility Analysis REQUEST FOR PROPOSAL Organics Processing Facility Feasibility Analysis November 2011 REQUEST FOR PROPOSAL (RFP) Organics Processing Facility Feasibility Analysis November 2011 1. Statement of Purpose The

More information

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI

International Joint Commission Water & Wastewater Treatment Best Management Practices Forum Monday, March 26, 2012 Wayne State University, Detroit MI STARTUP AND OPERATION OF A BIOLOGICAL AERATED FILTER (BAF) FOR SIMULTANEOUS BOD REMOVAL AND NITRIFICATION AT THE LOU ROMANO WATER RECLAMATION PLANT WINDSOR ONTARIO CANADA International Joint Commission

More information

Avon Lake Municipal Landfill, Lorain County Ohio Administrative Code (OAC) Rule Authorization

Avon Lake Municipal Landfill, Lorain County Ohio Administrative Code (OAC) Rule Authorization State of Ohio Environmental Protection Agency STREET ADDRESS: MAILING ADDRESS: Lazarus Government Center TELE: (614) 644-3020 FAX: (614) 644-3184 P.O. Box 1049 122 S. Front Street www.epa.state.oh.us Columbus,

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

Compostable/Biodegradable Bags Island Waste Management Corporation s Experience

Compostable/Biodegradable Bags Island Waste Management Corporation s Experience Compostable/Biodegradable Bags Island Waste Management Corporation s Experience 4 th Canadian Waste Resource Symposium April 13th 16 th, 2008 Westin Nova Scotia Hotel Halifax, NS Presented by: Heather

More information

City of Tacoma Surface Water Management Manual

City of Tacoma Surface Water Management Manual City of Tacoma Surface Water Management Manual Volume IV Source Control BMPs Prepared by: Tacoma Public Works Environmental Services January 2003 Table of Contents Chapter 1 Introduction to Volume IV...

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

Petro-Canada Re-Uses Treated Edmonton Waste Water. Coking.com Safety Seminar Calgary September 2008

Petro-Canada Re-Uses Treated Edmonton Waste Water. Coking.com Safety Seminar Calgary September 2008 Petro-Canada Re-Uses Treated Edmonton Waste Water Coking.com Safety Seminar Calgary September 2008 1 Membrane-Treated Waste Water Project Petro-Canada has completed modifications at its Edmonton refinery

More information

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction

Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants. Introduction Case History: Anaerobic and Aerobic Treatment of Textile Wastes at South Carolina Textile Plants Charles C. Ross, P.E. Environmental Treatment Systems, Inc. Atlanta, Georgia John S. Cox, P.E. John S. Cox

More information

(c) Tertiary Further treatment may be used to remove more organic matter and/or disinfect the water.

(c) Tertiary Further treatment may be used to remove more organic matter and/or disinfect the water. ENERGY FROM SEWAGE Introduction - Sewage treatment, that is, the physical, chemical and biological processes used to clean industrial and domestic wastewater, has improved significantly over the past 20

More information

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel

Sustainability and Environmental Issues in the Kraft Pulp Industry. Celso Foelkel Sustainability and Environmental Issues in the Kraft Pulp Industry Celso Foelkel www.celso-foelkel.com.br www.eucalyptus.com.br Sustainability Sustainability Anthropocentric-oriented concept Long term

More information

Town Hall Slide Presentation

Town Hall Slide Presentation Town Hall Slide Presentation John Braam, P.Eng. Managing Director Environmental & Engineering Services & City Engineer This is Julian... He was born in London in May 2011. When he's all grown up, with

More information

Utilizing Anaerobic Digester Capacity to Process Source Separated Organics: Two Case Studies

Utilizing Anaerobic Digester Capacity to Process Source Separated Organics: Two Case Studies Utilizing Anaerobic Digester Capacity to Process Source Separated Organics: Two Case Studies Anastasia Rudenko PE, ENV SP GHD October 30, 2013 North East Biosolids & Residuals Conference Presentation overview

More information

Class Environmental Assessment for Burloak Water Purification Plant Phase 2 Expansion Public Information Centre No.1

Class Environmental Assessment for Burloak Water Purification Plant Phase 2 Expansion Public Information Centre No.1 for Burloak Water Purification Plant Phase 2 Expansion Welcome Burloak Water Purification Plant Phase 2 Expansion Please sign in on the sheet provided. Please review display materials. Our representatives

More information

COST SAVINGS THROUGH REGIONAL BIOSOLIDS COMPOSTING IN THE TRIANGLE REGION

COST SAVINGS THROUGH REGIONAL BIOSOLIDS COMPOSTING IN THE TRIANGLE REGION COST SAVIGS THROUGH REGIOAL BIOSOLIDS COMPOSTIG I THE TRIAGLE REGIO Patrick Davis Water Resources Project Director Triangle J Council of Governments Research Triangle Park C Judy lncaid Solid Waste Planning

More information

The Pittsburgh Pirates

The Pittsburgh Pirates The Pittsburgh Pirates Pittsburgh Pirates History The Pittsburgh Pirates were founded in 1887 The Pirates have played in four ballparks: Exposition Park (1891 1909) Forbes Field (1909 1970) Three Rivers

More information

20/02/2013. Saskatchewan produces more than. each year, every year!!! Durable Long lasting Virtually indestructible Definitely not bio-degradable

20/02/2013. Saskatchewan produces more than. each year, every year!!! Durable Long lasting Virtually indestructible Definitely not bio-degradable Durable Long lasting Virtually indestructible Definitely not bio-degradable After many years on the job, they can last hundreds of years as an environmental legacy for generations of Saskatchewan residents

More information

EMERGING TRENDS IN WATER TREATMENT

EMERGING TRENDS IN WATER TREATMENT Architecture & Construction Food & Beverage Mineral & Aggregate Processing OEM Pulp & Paper Refining & Petrochemical Water Treatment Water Well EMERGING TRENDS IN WATER TREATMENT THOMAS STEINKE GLOBAL

More information

Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping

Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Storm Sewer System Maintenance: Post-Construction and Pollution Prevention/Good Housekeeping August 20, 2015 APWA Mid-Atlantic Lunch-n-Learn Agenda

More information

Fauquier County Department of Environmental Services

Fauquier County Department of Environmental Services Fauquier County Department of Environmental Services W. Nathaniel Townley Commodity Coordinator Former Chairman VRA C&D Committee Building Contractor Phone : 540-347-6811 Mobile : 540-631-4321 Fax : 540-341-7129

More information

Annual Environmental Report for Glennon Bros. Cork Ltd.

Annual Environmental Report for Glennon Bros. Cork Ltd. Annual Environmental Report for Glennon Bros. Cork Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P0344-01 Date: 31/03/2010

More information

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic.

AquaPASS. Aqua MixAir System. Phase Separator. System Features and Advantages. Anaerobic. Staged Aeration. Pre-Anoxic. PHASED ACTIVATED SLUDGE SYSTEM PHASED ACTIVATED SLUDGE SYSTEM Aqua-Aerobic Systems has led the industry in time-managed, biological technology since 1984. In 2004, Aqua-Aerobic applied its expertise in

More information

Mount Gambier Aquatic Centre Biomass Boiler

Mount Gambier Aquatic Centre Biomass Boiler Case Study Mount Gambier Aquatic Centre Biomass Boiler April 2014 Background The Mount Gambier Aquatic Centre was constructed by the Mount Gambier City Council in the 1980s as an outdoor pool facility

More information

ASSESSMENT OF POTENTIAL BPA EMISSIONS IN KEY APPLICATIONS OF EPOXY RESINS EPOXY RESIN COMMITTEE

ASSESSMENT OF POTENTIAL BPA EMISSIONS IN KEY APPLICATIONS OF EPOXY RESINS EPOXY RESIN COMMITTEE ASSESSMENT OF POTENTIAL BPA EMISSIONS IN KEY APPLICATIONS OF EPOXY RESINS EPOXY RESIN COMMITTEE ASSESSMENT OF POTENTIAL BPA EMISSIONS Over the past decades, epoxy manufacturers have invested millions of

More information

How to Care for Your Septic System

How to Care for Your Septic System How to Care for Your Septic System Did you know as a homeowner it is your responsibility to maintain your septic system? Did you know maintaining your septic system is protecting your investment? Did you

More information

SBR PROCESS FOR WASTEWATER TREATMENT

SBR PROCESS FOR WASTEWATER TREATMENT SBR PROCESS FOR WASTEWATER TREATMENT IMR E&T S.r.l. Maria Vittoria Marra maria.vittoria.marra@imr.it www.imr.it Purification of wastewater A process aimed at removing organic and inorganic contaminants

More information

County Landfill Eco-Park. Prince William County Department of Public Works Solid Waste Division January 28, 2015

County Landfill Eco-Park. Prince William County Department of Public Works Solid Waste Division January 28, 2015 County Landfill Eco-Park Prince William County Department of Public Works Solid Waste Division January 28, 2015 Unique Opportunities Award winning 1000 acre landfill with extensive environmental controls

More information

Mobile Treatment Units

Mobile Treatment Units Mobile Treatment Units DE-WATERING SEDIMENT CONTROL TECHNIQUE Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils High Flow Rates High Filtration Polluted Soils [1]

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Odour Management at the Edmonton Waste Management Centre. Heather Speers E.I.T., Project Engineer, Waste Management Services

Odour Management at the Edmonton Waste Management Centre. Heather Speers E.I.T., Project Engineer, Waste Management Services Odour Management at the Edmonton Waste Management Centre Heather Speers E.I.T., Project Engineer, Waste Management Services Presentation Outline Background Odour at the Edmonton Waste Management Centre

More information

Green Building Congress 2017

Green Building Congress 2017 MAGS and WETT De-Centralized Waste Management Innovations Green Building Congress 2017 Water and Energy: The Real Resource Recovery Imperative Introduction Bharco Ecotechnologies is a U.S.A. based company

More information

The Brand and the Composting Process

The Brand and the Composting Process OGOGROW The Brand and the Composting Process Presented to the Composting Council of Canada, Oct.1, 2009 By: Gordon Light, Solid Waste Organics Supervisor glight@kelowna.ca KELOWNA VERNON REGIONAL COMPOST

More information

ISAM INTEGRATED SURGE ANOXIC MIX

ISAM INTEGRATED SURGE ANOXIC MIX ISAM INTEGRATED SURGE ANOXIC MIX P r o v e n T e c h n o l o g y FLUIDYNE S ISAM IS A TOTAL TREATMENT SYSTEM incorporating BOD, TSS and nitrogen removal along with sludge reduction in an integrated system.

More information

Waste management and water conservation with REAJ Spain

Waste management and water conservation with REAJ Spain Waste management and water conservation with REAJ Spain National Association REAJ HI Spain Hostels -As Corcerizas (Ourense) -Espinosa de los Monteros (Burgos) -Twentytu (Barcelona) SDG Contribution Summary

More information

Developing Watershed Plans to Restore and Protect Our Waters

Developing Watershed Plans to Restore and Protect Our Waters Developing Watershed Plans to Restore and Protect Our Waters Wastewater Treatment Systems Roger Miranda Texas Commission on Environmental Quality Texas Watershed Planning Short Course June 2-6, 2008 Bandera,

More information

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100

Copies: Mark Hildebrand (NCA) ARCADIS Project No.: April 10, Task A 3100 MEMO To: Jeff Pelz (West Yost) Kathryn Gies (West Yost) Copies: Mark Hildebrand (NCA) ARCADIS U.S., Inc. 200 Harvard Mills Square Suite 430 Wakefield Massachusetts 01880 Tel 781 224 4488 Fax 781 224 3033

More information

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia.

Case Study. BiOWiSH Aqua. Biological Help for the Human Race. Municipal Wastewater Bathurst Waste Water Treatment Works Australia. Case Study BiOWiSH Aqua Municipal Wastewater Bathurst Waste Water Treatment Works Australia BiOWiSH Aqua Executive Summary The main objective of the validation was to quantify cost savings in using BiOWiSH.

More information

Compost Pilots and Demos

Compost Pilots and Demos Compost Pilots and Demos Guidelines for the Application Process November 2011 Division of Waste Management Solid Waste Section Composting and Land Application Branch 1646 Mail Service Center Raleigh, NC

More information

POTW s As An Emergency Option For Dairy Manure Disposal

POTW s As An Emergency Option For Dairy Manure Disposal POTW s As An Emergency Option For Dairy Manure Disposal A POTW s Perspective 2011 Manure Summit February 15 & 16, 2011 Lambeau Field Atrium Chris Stempa, Deputy Utilities Director City of Appleton Wastewater

More information

State of the Art Composting Comes to Florida David Hill McGill Compost

State of the Art Composting Comes to Florida David Hill McGill Compost State of the Art Composting Comes to Florida David Hill McGill Compost Richmond Raleigh Wilmington Charleston Brighton In development About McGill Founded 1991 Multiple indoor manufacturing plants in U.S.

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia

The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia The Impact of Elevated Leachate Levels on LFG Generation and Recovery at MSW Landfills in Asia Methane to Markets Partnership Expo New Delhi, India 2-55 March 2010 Bryce Lloyd Organic Waste Technologies

More information

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL

City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL City of Portsmouth Portsmouth, New Hampshire Public Works Department RFP #52-14 REQUEST FOR PROPOSAL DESIGN ENGINEERING SERVICES PEASE WASTEWATER TREATMENT FACILITY HEADWORKS UPGRADE INVITATION Sealed

More information

THE FACTS: CHINA S TIGHTER CONTROLS ON THE QUALITY OF WASTE IMPORTS

THE FACTS: CHINA S TIGHTER CONTROLS ON THE QUALITY OF WASTE IMPORTS UPDATED 16 th February 2018 THE FACTS: CHINA S TIGHTER CONTROLS ON THE QUALITY OF WASTE IMPORTS The recycling, recovery and trade in recovered materials is a multi-billion dollar global business. Millions

More information

Food Scrap Recovery 101

Food Scrap Recovery 101 Food Scrap Recovery 101 June 19, 2013 Prepared for: Florida Retail Federation Food Waste in Landfill More food reaches landfills and incinerators than any other single material in municipal solid waste

More information

Solid Waste Management Services recommended 2015 Operating and Capital Budgets and Rates Divisional overview:

Solid Waste Management Services recommended 2015 Operating and Capital Budgets and Rates Divisional overview: January 20, 2015 Solid Waste Management Services recommended 2015 Operating and Capital Budgets and Rates Divisional overview: What Solid Waste Management Services does: Manages approximately 1 million

More information

Remote Waste. (AOWMA) is the provincial, not-for profit, organization established to educate, train and certify industry professionals.

Remote Waste. (AOWMA) is the provincial, not-for profit, organization established to educate, train and certify industry professionals. Remote Waste Remote leads Western Canada s wastewater treatment industry by utilizing premier technology and experienced personnel to supply, operate and maintain a mobile fleet of wastewater treatment

More information

Tour of Regional Water Reclamation Facility

Tour of Regional Water Reclamation Facility Name: Date: Tour of Regional Water Reclamation Facility High School Physical Science Fall Module 3 Regional Water Reclamation Facility NGSSS Big Idea: Standard 17 Interdependence Benchmark Code & Description:

More information

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation

POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation POREX Tubular Membrane Filter Modules For Metal Contaminated Wastewater Treatment & Reclamation Background Industrial processes can often result in waste water contaminated with heavy metals (Hg, Pb, Zn,

More information

Building a Stormwater BMP Maintenance Program from the ground up.

Building a Stormwater BMP Maintenance Program from the ground up. DEPARTMENT OF TRANSPORTATION AND ENVIRONMENTAL SERVICES Building a Stormwater BMP Maintenance Program from the ground up. May 4-6, 2016 APWA Mid-Atlantic Presentation Agenda Post-Construction Stormwater

More information

Advanced Wastewater Treatment Plant Plant Profile

Advanced Wastewater Treatment Plant Plant Profile Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.

More information

Why THP Made Sense for TRA

Why THP Made Sense for TRA Why THP Made Sense for TRA June 16, 2016 Central Regional Wastewater System Treatment Plant (CRWS) CRWS Solids Treatment Area 2 162-mgd ADF permitted and 125- mgd average daily flows Pre-THP Solids Process:

More information

THE FACTS: CHINA S TIGHTER RESTRICTIONS ON WASTE IMPORTS

THE FACTS: CHINA S TIGHTER RESTRICTIONS ON WASTE IMPORTS THE FACTS: CHINA S TIGHTER RESTRICTIONS ON WASTE IMPORTS The recycling, recovery and trade in recovered materials is a multi-billion dollar global business. Millions of tonnes of recovered materials are

More information

Natural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond

Natural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond Natural Gas Well Development in the Marcellus Shale: The Use of Fresh Water and Beyond Jason de Wolfe, Chief Oil and Gas Q: How much water does the industry use to develop the Marcellus Shale? Each well

More information

WATER USED FOR HYDRAULIC FRACTURING: AMOUNTS, SOURCES, REUSE,

WATER USED FOR HYDRAULIC FRACTURING: AMOUNTS, SOURCES, REUSE, WATER USED FOR HYDRAULIC FRACTURING: AMOUNTS, SOURCES, REUSE, AND DISPOSAL GROUND WATER PROTECTION COUNCIL 2011 Annual Forum Atlanta, GA September 24-28, 2011 David Alleman, ALL Consulting PROJECT FUNDING

More information