1 INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the basis of prevailing environmental conditions and likely impacts of this project on various environmental parameters. This plan will also facilitate monitoring of environmental parameters. EMP includes scheme for proper and scientific treatment and disposal mechanism for air, liquid and solid hazardous pollutants. Apart from this, green belt development, safety aspect of the workers, noise control, fire protection etc. are also included in it. DETAILS OF ENVIRONMENTAL MANAGEMENT PLAN 1. AIR ENVIRONMENT 1.1 CONSTRUCTION PHASE Construction phase will be for a short period and hence the impacts will also be for a short and temporary period. During construction activities, mainly emission of dust and gases from movement of vehicles and construction activity is expected. Air emissions from construction sites can pose health risks to workers and sensitive receptors surrounding the site, if not manage properly. It is the responsibility of the contractor to provide appropriate safety training, information of the equipment, security and emergency response plans on the site. To mitigate the impact of SPM (dust), the following measures are recommended for implementation 1. A dust control plan, and 2. Procedural changes to construction activities (I) DUST CONTROL PLAN FUGITIVE DUST SOURCE Disturbed surface areas DUST CONTROL ACTIONS Water will be sprinkled on loose top soil to prevent re-suspension of dust into ambient air due to movement of vehicles etc. The most cost-effective dust suppressant is water. Water can be applied using water trucks, handheld sprays and automatic sprinkler systems. (II) PROCEDURAL CHANGES TO CONSTRUCTION ACTIVITIES Using electrically operated construction machinery is the best way to avoid all externalities produced by diesel engines. This procedural change reduces problems related to emission and maintenance. The diesel generators used on site, in case of power failure are to be maintained properly. To mitigate the impact of pollutants from other activities during construction phase, the following measures are recommended for implementation. Separate civil construction material storage yard will be created within the site and it will be enclosed.

2 Cement bags will be separately stored under cover in bales. Sand will be stacked under tarpaulin cover. Possibility of raising green belt along with construction activity will also be explored. Transport vehicles and construction equipments / machineries will be properly maintained to reduce air emissions. Vehicles and equipments will be periodically checked for pollutant emissions against stipulated norms. Exhaust vent of DG set will be kept at proper height to ensure quick dispersal of gaseous emissions. All construction workers will be provided appropriate PPEs like dust mask, ear plug, helmet, safety belt etc. and made to wear them during working hours. The roads will be well planned with sufficient width of drive ways so as to avoid congestion. This will help to avoid increase in the level of fugitive emissions due to congestion of the traffic. 1.2 OPERATIONAL PHASE There is only one main sources of pollution in operational phase is vehicular emission. To mitigate the impact of pollutants from vehicular traffic during operational phase, the following measures are recommended for implementation. Sudden acceleration or de-acceleration of vehicles produces more pollution than a vehicle maintaining a constant speed. Smoother flow of traffic within the parking area and premises of residential areas would ensure lesser pollution from the vehicles. To ensure least interference from incoming and outgoing vehicles, it is suggested that entrance and exit points of the vehicles should be different. Dedicating atleast one entry and exit to pedestrians will reduce interference in vehicular movement. 2. WATER ENVIRONMENT 2.1 CONSTRUCTION PHASE The water demand during the construction phase will be 13.0 KLD. Out of this, 10.0 KLD will be required for construction and & sprinkling activity 3.0 KLD will be required for domestic purpose. Domestic effluent generated will be 2.4 KLD which will be disposed off through SUDA drains and treated in nearest Sewage Treatment Plant of SUDA. Following management measures are implemented to protect the water quality during the construction phase: Avoiding excavation during monsoon season. All containments including oil and fuel storage shall be provided on impervious flooring. All stacking and loading areas will be provided with proper garland drains to prevent run off from the site. Proper and sufficient sanitary facility will be provided to construction workers to maintain

3 hygienic conditions at site. 2.2 OPERATIONAL PHASE During operational phase total water requirement i.e KLD will be only for domestic purpose only. Total water requirement will be met from SUDA. The Water quality is through necessary treatment maintained by SUDA. As SUDA is supplying treated drinking water in water mains, there is no need for further treatment of water to make it potable. Only domestic waste water shall be generated i.e KLD will be disposed off through SUDA drainage after treating it at the proposed STP. 3. SOLID WASTE 3.1 CONSTRUCTION PHASE Main solid waste generation during construction phase will be construction debris like rubble, brick bats, debris, steel scrap, wooden scrap, sand, gravel etc. However, these materials are inert in nature and will not result into leaching of any substance or constituent. These materials will be properly sorted and will be used within premises for filling of low lying areas. Wooden scrap, steel scrap will be given to scrap dealers. On completion of civil work, all debris etc. will be completely removed from site to avoid any incompatibility with future use. 3.2 OPERATIONAL PHASE Proper collection facilities will be provided throughout the project area. Door to Door solid waste collection system is existing in whole surat city. That will be provided at location site also. The segregation of wet and dry waste will also be adopted. 3.3 OTHER WASTE Construction sites are sources of some toxic substances, such as paints, solvents, adhesives and sealants. Empty containers of these substances shall be returned back to the manufacturers or dealers as the case may be. Some management practices to be developed are; Paintbrushes and equipment for water and oil based paints shall be cleaned within a contained area and shall not be allowed to contaminate site soils, watercourses, or drainage systems. Instruct employees and subcontractors in identification of hazardous and solid waste. 4. NOISE ENVIRONMENT 4.1 CONSTRUCTION PHASE The D.G. sets will be enclosed in an inbuilt acoustic enclosure. Following measures are proposed during construction period to mitigate adverse impacts: Construction machinery and vehicles will undergo periodic maintenance to keep them in good working condition. All machineries to be used for construction purpose will be of highest standard of reputed make and compliance of noise pollution control norms by these equipments will be emphasized. Moving parts of the machines were and will be maintained properly so as to avoid metal-to-metal impact noise. Feasibility of putting up acoustic enclosure / temporary barrier around areas with high noise levels

4 will also be explored. All construction workers working in high noise areas will be provided appropriate PPEs like ear muffs and made to wear them during working hours. Possibility of raising green belt along with construction activity will also be explored so as to serve as a noise barrier. 4.2 OPERATIONAL PHASE Speed of the vehicles will be curtailed to 20 kmph to minimize noise and vibrations. The measures adopted to reduce the noise are as under- 1. The traffic flow will be smooth with less no. of starting and stopping. 2. Tree plantation will be done at all possible places. 3. The level of traffic noise levels fluctuates continuously, hence does not have significant impact. 4. Both entry and exit will be manned with trained and efficient security. 5. Road markings, stop lines, parking lanes will be painted to guide the internal road users. 6. Separate entry/exit shall be provided such that it enables the smooth movements of the vehicles. 5. LAND ENVIRONMENT Following steps are proposed to take care of impact of construction activity on project land area: On completion of civil work, all debris etc. will be completely removed from site to avoid any incompatibility with future use. Other material like paints, diesel etc. will be properly stored and handled to prevent any spillage on land. All the wastes will be stored at a designated site within the premises to prevent scattered discharge on land. 6. PLANTATION, LANDSCAPING AND ECOLOGICAL MANAGEMENT 6.1 CONSTRUCTION PHASE During the construction phase, following precautions should be followed Cutting, uprooting, coppicing of trees or small trees present in and around the project site for cooking, burning or heating purposes by the laborers will be prohibited and suitable alternatives for this purpose will be found. After completion of major construction work, the green belt will be developed with recommended plant species, as there will be no or less disturbance in these areas. After completion of soil work, temporary vegetation preferably grasses to be planted to minimize soil erosion 6.2 OPERATION PHASE Keeping in view the climatic conditions, status of soils and vegetation types in and around the project area the species shall be selected for proposed green belt development. It will also include earth filling, which may be required for the proper balance of the sapling.

5 7. SOCIO-ECONOMIC Socio - economic effect of construction phase will be positive due to direct and indirect employment opportunity for the local population. The Social management plan has been designed to take proactive steps and adopt best practices, which are sensitive to the socio-cultural setting of the region. Contractors are required to abide employment priority towards locals and abide by the indian labour laws regarding standards on employee terms and conditions. Following the appointment of the contractor, information on employment was available to the local community. Information will be provided on scale and duration of employment, type of available work and demand projection. 8. RAINWATER RECHARGING Roof drainage will be through gutter/down take pipe. Rainwater from roof will be collected in catch basins located at different places and will be conveyed to external drainage system which is connected to proposed water bodies in different location to collect the rainwater. Rainwater recharging system will be designed as per Central Groundwater Board (CGWB) guideline/local bylaws. 9. ENERGY CONSERVATION Following measures & ways will be taken to save the Electrical Energy:- All internal common area lighting system is proposed to have either high efficiency lamps (T5/T8)/CFL. Energy efficient compact Fluorescent Lamps to be used as these CFL gives same illumination with less wattage compare to other GLS Lamps. LED type lights & Sodium vapour lights will be used for external lighting. Large size windows to get the sufficient day light. Passive solar architectural features: Well defined organic spaces between building wings. Evocative of local landscape. Heat absorbing material will be used e.g. wood, earth, colours etc. Green belt will act as a heat absorbent. Budgetary Provisions For EMP: Total capital cost and recurring cost/annum earmarked by project proponent on environmental Management plan is as given below; Sr. No. 1 Municipal solid waste Management (Organic waste converter) Item Capital Cost (Rs.) Recurring Cost (Rs.) 2,25,000 75,000 2 Sewage Management 1,15,600 72,000 3 Green Belt Development 73,500 60,000 Total Cost 4,14,100 2,07,000

6

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA

CORPORATE OFFICE BUILDING, C-11, URBAN ESTATE-II CITY CENTRE SECTOR 29, GURUGRAM, HARYANA ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the, operation and the

More information

Municipal solid / hazardous waste

Municipal solid / hazardous waste (10) ENVIRONMENTAL MANAGEMENT PLAN The mitigation measures for reducing the adverse environmental impacts together constitute a part of EMP. The environmental issues, which need management, plan for the

More information

Pre-Feasibility Report

Pre-Feasibility Report PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan

Report on Damage Assessment and. Remediation Plan and Natural & Community Augmentation Plan Report on 1. PROJECT LOCATION & LAND USE The Ganesh Park 3 is a residential building project constructed on plot 608 to 613/5 Vil: GIDC Ankleshwar in Bharuch district of Gujarat state. The project land

More information

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006.

Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Environment Impact Assessment (EIA) The proposed project falls in category 8 (a) B2 as per schedule of EIA Notification, 2006. Thus, EIA is not applicable for proposed project. We have derived project

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan () would consist of all mitigation measures for each component of the environment due to the activities increased during the construction and

More information

Health and safety norms of CPWD should be followed during construction.

Health and safety norms of CPWD should be followed during construction. Status of Compliance of Conditions of the Environmental Clearance Issued to Riveria Commercial Developers Ltd. DLF Center, Sansad Marg, New Delhi 110001- Construction of "YASHWANT PLACE COMMUNITY CENTRE"

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

Details of the proposed project as presented before the committee are tabulated below:

Details of the proposed project as presented before the committee are tabulated below: Shrungal Homes Block No. 141, F.P.No.42, O.P.No.42, T.P.S.No.58 (Bamroli), Choryasi, Surat. Screening & scoping / appraisal. Details of the proposed project as presented before the committee are tabulated

More information

Max. building height (m)

Max. building height (m) Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project

More information

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity)

(1) LAND ENVIRONMENT (Attach panoramic view of the project site and the vicinity) [Vide Paragraph - 6 of Notification dated 14 th September 2006, only for construction projects listed under item 8 of the Schedule] (1) LAND ENVIRONMENT (Attach panoramic view of the project site and the

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent - Kirtikumar Nathubhai Shah Address - N/V Damlai, Taluka- Jhagadia District - Bharuch Near Village Taluka District Area Survey No.

More information

Environment Management Plan For B 2 Category Project

Environment Management Plan For B 2 Category Project Environment Management Plan For B 2 Category Project Project Proponent Shri Alihusen Haji Mohammadali Alirajpurwala Address - N/V Kanawant, Taluka & District - Chhotaudepur Near Taluka District Area Survey

More information

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan

ENVIRONMENTAL MANAGEMENT PLAN. Hotel Project for Mohamed Ilyas & Ms. Alamzahan ENVIRONMENTAL MANAGEMENT PLAN Of Hotel Project for Mohamed Ilyas & Ms. Alamzahan at Khasra No. 269Ga, 269Kh, 266Kh & 270 Village Majra, Tehsil Central Doon, District Dehradun (Uttarakhand) GENERAL ENVIRONMENTAL

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,

More information

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS

FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps

More information

5. ENVIRONMENT MANAGEMENT PLAN

5. ENVIRONMENT MANAGEMENT PLAN 5. ENVIRONMENT MANAGEMENT PLAN The environmental management plan consist of the set of mitigation measures, management and, monitoring measures to be taken during construction and operation phase to eliminate

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

The emphasis on the EMP development is on the following;

The emphasis on the EMP development is on the following; ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015

SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Six Monthly Compliance Report June-2015 M/s Mahagun Real Estate Pvt. Ltd SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex Mahagunpuram AT VILLAGE Mehrauli, Dasna, Ghaziabad, U.P. Being developed

More information

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra.

Pre- feasibility Report. For. At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Pre- feasibility Report For Shiv Kailasha At Plot No. 242, 241, 238/2, 239, 237/1, 238/1, 247/1 of Village Sondapar, Tehsil :HingnaDistrict- Nagpur, Maharashtra. Proposed By M/S Om Shivam Buildcon Private

More information

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018)

TATA STEEL LIMITED. Environment Compliance Report (Oct 2017 to Mar 2018) TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Oct 2017 to Mar 2018) Environment Department Tata

More information

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017

COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER TO MARCH-2017 COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE FOR THE PERIOD OF OCTOBER - 2016 TO MARCH-2017 F.No. SEIAA 281/2014/EC/110 SUBMITTED BY- M/S. TERON CONSTRUCTION PVT. LTD MAA PADMA COMMERCIAL COMPLEX, H/N-

More information

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005.

GENERAL CONDITIONS. 7. The Applicant will adopt the prescribed norms, and standards provided in the national Building Code of India 2005. GENERAL CONDITIONS 1. The Project Proponent shall comply with all the conditions stipulated in the building approval letter. 2. The applicant (Project proponent) will take necessary measures for preventions,

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN Clearance for Affordable Group Housing Colony ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan () is a site specific plan developed to ensure that the project is implemented in an environmental

More information

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE

ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION 1.2 EMP DURING CONSTRUCTION PHASE ENVIRONMENTAL MANAGEMENT PLAN 1.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality. The

More information

1. ENVIRONMENT MANAGEMENT PLAN

1. ENVIRONMENT MANAGEMENT PLAN 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed Sewerage System in District A of Allahabad, Uttar Pradesh. The

More information

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN

Larsen & Turbo Limited ENVIRONMENTAL MANAGEMENT PLAN ` Larsen & Turbo Limited The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plans for which the

More information

Check list for construction Project of EC [Category 8(a)]:

Check list for construction Project of EC [Category 8(a)]: Check list for construction Project of EC [Category 8(a)]: Provide authenticated (with stamp & Signature) hard copy of this check-list during submission of hard copy of ToR application. Sr. no. Checklist

More information

DHANWADA CRUSHER STONE QUARRY

DHANWADA CRUSHER STONE QUARRY ENVIRONMENT MANAGEMENT PLAN FOR Mining of Crusher Stone Area 1.910 Hect, Kh. No. 95 AT Village: Dhanwada, Tehsil: Khirkiya, Dist: Harda (MP) Proponent Shri Atul Kumar Agrawal S/o- Shri Ashok Agrawal Resi-

More information

Environmental Management Plan during Construction Phase

Environmental Management Plan during Construction Phase Management Plan during Phase Sr 1 Ambient Air Quity Negative inside site premises outside site 2 ise Negative near noise generation sources inside premises on ambient noise levels in the Surrounding area

More information

No construction activity started

No construction activity started Sr. Particulars Details No. 1. Proposal is for New Project 2. Type of Project Residential Flats and Shops 3. Project / Activity No. 8(a) [8(a) or 8(b)] 4. Name of the project Kaveri Soham Vistara 5. Name

More information

Environment Clearance for Multi Level Parking with Commercial Development

Environment Clearance for Multi Level Parking with Commercial Development Clearance for Multi Level Parking with Commercial Development ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan () is a site specific plan developed to ensure that the project is implemented

More information

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT

Dilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure

More information

Environment Compliance Report (Apr 2017 to Sep 2017)

Environment Compliance Report (Apr 2017 to Sep 2017) TATA STEEL LIMITED Construction of Residential Complex For Tata Steel Plant located at Kalinganagar Industrial Complex, at Environment Compliance Report (Apr 2017 to Sep 2017) Environment Department Tata

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan 1. OBJECTIVE The objective of Environmental Management Plan (EMP) is to formulate which will: Mitigate adverse impacts on various environmental components, which have been

More information

1. ENVIRONMENT MANAGEMENT PLAN

1. ENVIRONMENT MANAGEMENT PLAN Project : Environmental Management Plan for District E Allahabad 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Action Plan (EMP) is required to ensure sustainable development of the proposed

More information

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.

WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R. WELCOM TO THE STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT APPRAISAL COMMITTEE,A.P. For the Presentation proposed Granite Mine 7.50 Acres M/S N.R.Global Granites Production Granite Black Granits At Survey

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,

More information

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE

ADDITIONAL ATTACHMENTS TO FORM-1 M/S. SDB DIAMOND BOURSE ADDITIONAL ATTACHMENTS TO FORM-1 FOR OBTAINING ENVIRONMENT CLEARANCE For Proposed Commercial Complex Surat Diamond Bourse M/S. SDB DIAMOND BOURSE Block No. 177/P, Moje- Khajod, Taluka- Surat City, District

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION An Environmental Management Plan (EMP) is a site-specific plan developed to ensure that all necessary measures are identified and implemented in order to protect

More information

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar.

F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. 20. Karnavati Premier Living F.P.No.52, S.No.53/B, 54/2/B, D.T.P.S.No.80, Village: Bhat, Dist: Gandhinagar. Screening & scoping / appraisal Details of the proposed project as presented before the committee

More information

Indicative Checklist for construction projects of EC [Category 8(a)]:

Indicative Checklist for construction projects of EC [Category 8(a)]: Indicative Checklist for construction projects of EC [Category 8(a)]: Sr. Checklist point Remark Yes/No Pg. no./ annexure 1. Covering letter signed by the applicant Yes Form-1 Page 1 page 13 2. Completed

More information

Phase II (BIA Phase-II),

Phase II (BIA Phase-II), PROJECT PREFEASIBILITY REPORT FOR OBTAINING PRIOR ENVIRONMENTAL CLEARENCE IN TERMS OF PROVISIONS OF EIA NOTIFICATION-2006 1.0 EXECUTIVE SUMMARY OF THE PROJECT Sr. No Description Details 1 Proposed project

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,

More information

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative)

Sr. No. Date of starting the project and completion schedule. January 2012 January 2017 (Tentative) Six Monthly Progress Report reg. Construction of Group Housing Colony at village Sarai Aurangabad in Sector 3-A, Bahadurgarh (Distt. Jhajjar), Haryana by M/s Prabhu Shanti Real Estate Pvt. Ltd., due in

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER

Promoter: Navkar Prime Developers Private Limited ENVIRONMENTAL MANAGEMENT PLAN & CER ENVIRONMENTAL MANAGEMENT PLAN & CER 52 ENVIRONMENTAL & SOCIAL MANAGEMENT PLAN 1.1 INTRODUCTION: The Environmental impact can be defined as any alteration of environmental conditions, adverse or beneficial,

More information

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD

PRE FEASIBILITY REPORT PROPOSED CONSCTRUCTION BUILDING PROJECT GUJARAT HOUSING BOARD PRE FEASIBILITY REPORT FOR PROPOSED CONSCTRUCTION BUILDING PROJECT (66460.23 SQ. M) BY GUJARAT HOUSING BOARD AFFORDABLE RESIDENTIAL BUILDING & COMMERCIAL PROJECT PACKAGE 23, PLOT NO. 61/1, 63/1 & 64, TARSAMIYA,

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

J-11011/45/2009- IA II (I)

J-11011/45/2009- IA II (I) SL SPECIFIC CONDITIONS STATUS 1 Continuous stack monitoring facilities to monitor gaseous emissions from all the stacks shall be provided. The particulate emissions shall be controlled within 50 mg/nm

More information

Environmental Impact Assessment

Environmental Impact Assessment Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences

More information

Scanned by CamScanner

Scanned by CamScanner Scanned by CamScanner ENVIRONMENT STATEMENT (FORM V) Udaipur Cement Works Limited Daroli Limestone Mine-1 YEAR 2017-18 Udaipur Cement Works Limited SHRIPATINAGAR, P.O. CFA: DABOK, DISTRICT UDAIPUR (RAJASTHAN)-313021

More information

Environmnetal Management Plan (EMP)

Environmnetal Management Plan (EMP) Environmnetal Management Plan () M/s Meenakshi Re Rollers Pvt. Ltd. (Mini Steel Plant) Location of Project Sector A-2, Industrial Area Gandhari, Datiya District Datiya, Madhya Pradesh Product- Billets,

More information

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area. ENVIRONMENT CLEARANCE COMPLIANCE STATUS ENVIRONMENT CLEARANCE No. J-11015/406/2006-IA.II(M) dt. 13/04/2007 DHANGARWADI MINES Sr. CONDITIONS COMPLIANCE No. A) Specific Conditions :- i) Top soil to be stacked

More information

EM P. Project Name. Project Address Lok Nayak Hospital, Jawahar Lal Nehru Marg, New Delhi Environment Consultant

EM P. Project Name. Project Address Lok Nayak Hospital, Jawahar Lal Nehru Marg, New Delhi Environment Consultant Clearance for the Proposed New Medicine, Maternity and ENVIRONMENT MANAGEMENT PLAN Introduction The Management Plan (EMP) is a site specific plan developed to ensure that the project is implemented in

More information

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests Madhya Pradesh Pollution Control Board E 5. Arera Colony Bhopal 4620 16 visit us

More information

Chapter- V MANAGEMENT PLAN (EMP)

Chapter- V MANAGEMENT PLAN (EMP) Chapter- V MANAGEMENT PLAN (EMP) The Environment Management Plan (EMP) for a development project prescribes the mitigation measures to be adopted to nullify or to minimize various anticipated environment

More information

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi

PRE FEASIBILITY REPORT. For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS. M/s. M.K. DRUGS. F-10, Industrial Area, Focal Point, Tehsil: Derabassi PRE FEASIBILITY REPORT For PROPOSED BULK DRUG PRODUCTS MANUFACTURING UNITS Of M/s. M.K. DRUGS F-10, Industrial Area, Focal Point, Tehsil: Derabassi Dist: Mohali, Punjab INTRODUCTION M/s. M.K. Drugs is

More information

4. The ambient air quality monitoring stations We are monitoring the ambient air quality

4. The ambient air quality monitoring stations We are monitoring the ambient air quality GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions

More information

Proposed TOR Calix Industries

Proposed TOR Calix Industries 1 A tabular with index for point-wise compliance of below mentioned TORs. 2 Executive summary of the project giving a prima facie idea of the objectives of the proposal, use of resources, justification,

More information

Application of Low and Non Waste Technology in the production process;

Application of Low and Non Waste Technology in the production process; 9.0 ENVIRONMENT MANAGEMENT PLAN (EMP) 9.1 INTRODUCTION Environment Management Plan is required for ensuring sustainable development. It should not affect the surrounding environment adversely. The management

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Environment protection measures / technology

Environment protection measures / technology Sr. No. Conditions A. Specific Conditions: i. The gaseous and particulate matter emissions from various units should conform to the standards prescribed by the State Pollution Control Board. At no time,

More information

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.

Existing vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc. Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in

More information

Appendix 9 - Engineering Performance Standards

Appendix 9 - Engineering Performance Standards Appendix 9 - Engineering Performance Standards A9.1 Introduction A9.1.1 This Appendix contains standards that apply to the subdivision of land. It is referred to in the Subdivision Rules for the Living,

More information

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE

ENVIRONMENTAL MANAGEMENT REPORT COLOUR GRANITE MINE ENVIRONMENTAL MANAGEMENT REPORT Of COLOUR GRANITE MINE Sy. No.Old: 52/2B1 (New 52/2B1) of Peddavelagatur Village, Peddapanjani Mandal,Chittor District, Andhra Pradesh AREA OF MINING LEASE 5.70 Ha. For

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

GRAVEL & ROUGH STONE QUARRY

GRAVEL & ROUGH STONE QUARRY ENVIRONMENTAL MANAGEMENT REPORT Of GRAVEL & ROUGH STONE QUARRY Sy. No. 211 (Carved out of Sy.No.1) Tarluwada Village & Anandapuram Mandal, Visakhapatnam District, Andhra Pradesh. AREA OF MINING LEASE 23.760

More information

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED HALF YEARLY PROGRESS REPORT ON IMPLEMENTATION OF ENVIRONMENTAL CLEARANCE CONDITION BY MoEF (PERIOD FROM OCTOBER 13 TO MARCH 14) HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED SIX MONTHLY

More information

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED

NOC GRANTED FOR THE EXPANSION OF KASHLOG LIMESTONE MINES OF AMBUJA CEMENTS TIMITED Sr. STIPULATION ACTION No. 2A. Specific Conditions (i) (ii) All the conditions stipulated by the State Pollution Control Board in their Consent should be effectively implemented. The project proponent

More information

ENVIRONMENT MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN ENVIRONMENT MANAGEMENT PLAN OF ALAMPUR THIKARIYA SAND DEPOSIT QUARRY KHASRA NO. 149, TOTAL AREA- 8.0 Hect. (MALENI RIVER) AT VILLAGE- ALAMPUR THIKARIYA, TEHSIL-JAORA, DISTRICT- RATLAM, STATE-MADHYA PRADESH

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY & 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007-IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 1.1 INTRODUCTION The primary function of an environmental impact assessment study is to predict and quantify potential impacts, and assess & evaluate

More information

APPENDIX II (See paragraph 6)

APPENDIX II (See paragraph 6) APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Environmental Impact Assessment Statement describing the impact of mining and beneficiation on environment on the following: i) Land area indicating the area likely to be degraded

More information

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT Subject: Compliance report of Environmental Clearance for Plant 3 Reference: J-11011/603/2010-IA,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan 10.1 INTRODUCTION The Environmental Management Plan (EMP) is aimed at mitigating the possible adverse impact of a project and ensuring the existing environmental quality.

More information

Whitewater River Region SWMP Appendix L

Whitewater River Region SWMP Appendix L Whitewater River Region SWMP Appendix L BMPs for Firefighting Agency Activities January 2015 INTENT The purpose of this plan is to identify Best Management Practices (BMPs) used by fire fighting agencies

More information

IV.E. HYDROLOGY AND WATER QUALITY

IV.E. HYDROLOGY AND WATER QUALITY IV.E. HYDROLOGY AND WATER QUALITY The following section presents the information provided in the hydrology report prepared by Sukow Engineering. Supporting hydrology data from this report is included in

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Air Traffic Control Tower and Technical Block, Netaji Subhash Chandra Bose International Airport, Kolkata

Air Traffic Control Tower and Technical Block, Netaji Subhash Chandra Bose International Airport, Kolkata 1. ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,

More information

Environmental Clearance Compliance Half Yearly Report

Environmental Clearance Compliance Half Yearly Report Environmental Clearance Compliance Half Yearly Report HALF YEARLY COMPLIANCE REPORT- April 2015 to September 2015 Ref: 1. MOEF, New Delhi Environment Clearance F. No. J-11011/119/2007- IA II (I) dated

More information

New Administration Building

New Administration Building New Administration Building Stormwater Pollution Prevention Plan Hudson Valley Community College Troy, New York Prepared for: Hudson Valley Community College 80 Vandenburgh Avenue Troy, New York 12180

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan Of Dr. Mittal Laboratories Pvt. Ltd. Plot No. C-10/2, SARA Industrial Estate Ltd., Village Rampur, Dehradun - Chakrata Road, Selaqui, Dehradun, Uttrakhand For Manufacturing

More information

[FORM-V] PART-A PART-B

[FORM-V] PART-A PART-B [FORM-V] (See Rule 14) Environment Statement for the financial year ending the 31 st March 2015 PART-A (1) Name and address of the owner - M/s. Serajuddin and Co. / Occupier of the industry, Balda Block

More information

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING

ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING ENVIRONMENT MANAGEMENT PLAN FOR STONE MINING 1. Name and Address of Quarry Lease Holder: a. Name of applicant Priyesh Singh Thakur S/o Shri Karan Singh Thakur b. Designation of applicant Owner c. Name

More information

Environment Management Plan. SEZ Phase III Residential Project,

Environment Management Plan. SEZ Phase III Residential Project, For SEZ Phase III Residential Project, at Village Hinjewadi, Taluka - Mulshi, District Pune. Proposed by Paranjape Schemes (Construction) Ltd. CONSULTANT Mahabal Enviro Engineers Pvt. Ltd. Plot F-7, Road

More information

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village,

Environmental Management Plan. For Mining of. Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Environmental Management Plan For Mining of Building Stone & Road Metal Over an extent of 0.56 Ha at Survey No: 493 Kannala Village, Palakurthy Mandal, Peddapally District, Telangana State Applicant Sri

More information

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015. STATUS OF CONDITIONS IMPOSED IN ENVIRONMENTAL CLEARANCE FOR 3 MTPA REFINERY& 3X30 MW CO-GENERATION POWER PLANT VIDE LETTER NO. J-11011/753/2007- IA II (I), DATED 29.01.2008. PROJECT NAME: UTKAL ALUMINA

More information

Period of Compliance Report : April, 2017 to September, 2017

Period of Compliance Report : April, 2017 to September, 2017 Name of the Project Project Code Clearance Letter No. with date : OSTAPAL CHROMITE MINES, M/S. FACOR LTD. : Mining (Non-Coal) : No. J-11015/183/2007-IA-II (M) dt.13-05-09 Period of Compliance Report :

More information

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village: PRE FEASIBILITY REPORT 1.0 EXECUTIVE SUMMARY In our Masonry Stone Mining Lease (M.L. No. 15/96, Area: 1.0 ha), Production capacity of masonry stone: 142920 TPA and existing Stone Crusher Unit named M/s.

More information

Sanitary Design and Construction of Food Processing and Handling Facilities Introduction To ensure safe food and adequate sanitation programs, the

Sanitary Design and Construction of Food Processing and Handling Facilities Introduction To ensure safe food and adequate sanitation programs, the Sanitary Design and Construction of Food Processing and Handling Facilities Introduction To ensure safe food and adequate sanitation programs, the facility and surroundings in which food processing and

More information