Execute Phase. GGIC Operations Environmental and Social Impacts Assessment: Screening Data Sheet for GLDANULA RIVER CROSSING (Category B)

Size: px
Start display at page:

Download "Execute Phase. GGIC Operations Environmental and Social Impacts Assessment: Screening Data Sheet for GLDANULA RIVER CROSSING (Category B)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Management Consultant's Emergency Services for the North-South Gas Pipeline GIC North-South Gas Pipeline Emergency Rehabilitation Execute Phase E1410 VOL. 11 GGIC Operations Environmental and Social Impacts Assessment: Screening Data Sheet for GLDANULA RIVER CROSSING (Category B) CG E O R i i A RUISSIAN l EDERATl ION L ARMENA -' -AZERBAIJAN COI 1August06 Issued for Info,ation MG j TL Rev Dat Reason for Issue Prepared byv Approved by Sanctioned by Category Code Area Code RS03 Gldanula River site Document Type Code SCR Screening Data Sheet Life Cycle Code X Transitory Transfer Date 22 August 06 IJ Category Code Description Project Code Area Code Function Code Document Type Sequence Number Language Revision NSGP0OI RS03 I ES SCR ENG I C01 y ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page I of 8

2 Georgia Gas International Corporation (GGIC) GGIC Operations Environmental and Social Impacts Assessment (ESIA) ESIA SCREENING DATA SIIEET NO. NSGPOOI-RS03-ES-SCR ENG-COl Georgia North-South Gas Pipeline Emergency Rehabilitation HI GLDANULA R. CROSSING OVERALL PROJECT REFERENCES Project References: Project Objectives: Project Descriptions: Project Location: i. North-South Gas Pipeline Rehabilitation // Energency Works at Six Priority Sites of B and E Sections (MCC/GoG/MCG/GGIC) ii. Methane Leak Reduction from High Pressure Gas Pipeline System of Georgia (Carbon Finance) Project (World Bank/GGIC) i. Increase reliability of energy supply through the North-South gas pipeline and reduce losses // rehabilitating emergency priority sites. 11. (a) Reduce emissions of greenhouse gas from key points in North-South gas transmission infrastructure in Georgia; (b) support the development of an international market mechanism for "Emission Reductions" under the framework of the Kyoto Protocol. i. Rehabilitate the pipeline by (a) Inspecting the pipeline to identify weaknesses and defects and formulate a prioritized rehabilitation plan addressing the security and integrity of the pipeline; (b) Repairing the most urgent defects on a priority basis to bring the pipeline back to an acceptable level of technical integrity for the required throughput capacity; and (c) Repairing leaks in the pipeline to reduce technical losses // Undertake on an emergency basis rehabilitation of 6 priority sites coping with landslide rerouting (2 sites), erosion (I site), river crossing (2 sites), corrosion (1 site). ii. (a) Identify and repair gas leaks in the transmission pipeline by building the capacity of GGIC, installing highly accurate meters, developing an intensive monitoring system, allocating the required financial resources to make large system wide repairs; (b) Reduce methane emissions by replacing corroded and leaking sections of pipe, change seals, replace wom valves, improve metering and monitoring capacities, upgrade operation and maintenance skills and management of GGIC, thus making methane leak rates drop instead of continuing to grow. i. North-South gas pipeline which is Georgia's main trunkline for the transmission of natural gas II Six sites on pipeline section B. Meneso landslide, Zotikiantkari erosion, Arkala river crossing, Naniani landslide; and section E: Gldanula River crossing, corrosion at KP193. ii. The pipeline system stretches from the border with Russia to the border with Armenia and extends to the west to the Black Sea. The majority of works will be within the right of way of the pipeline system and in the earlier years will focus on rehabilitation of the north south transmission system. The project does not include any gas distribution networks. ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page 2 of 8

3 PROPOSED ENVIRONMENTAL CLASSIFICATION National (Georgia classification system): International (IVICCIMCG and World Bank classification systems): Category (H) Category (B) PROPOSED RESETTLEMENT INSTRUMENT None. Resettlement issues to be compiled into concise memo. APPLICABLE ENVIRONMENTAL AND SOCIAL SAFEGUARD POLICIES The World Bank Safeguard Policies Triggered YES NO TBD Environmental Assessment (OP/BP 4.01) X 0 0 Natural Habitats (OP/BP 4.04) 0 X 0 Forests (OP/BP 4.36) 0 X 0 Cultural Property (OPN 11.03) 0 X 0 Involuntary Resettlement (OP/BP 4.12) X 0 0 Policy on Disclosure of Information X 0 0 SITE SPECIFIC REFERENCES Site and Work Package Reference: Brief Description of Proposed Site Works: Site Location and GPS Coordinates: Gldanula River Crossing E-BRC-1 At Gldanula River Crossing, capital repairs of the crossing are planned. The pipeline was initially placed underground but at present considerable part of the pipe is aboveground due to erosion and washout of the fill material/soil. The pipeline is in an unstable condition due to active scour and lateral erosion at the crossing, a significant part of the riverbank already eroded and the bank revetment structures is also damaged. The pipeline is under stress in a crossing subject to heavy erosion and flooding (see photos below). These conditions endanger pipe integrity creating risk for the adjacent populated area. Two solutions were considered: bury the pipeline or aerial crossing. Proposed option is the river crossing by burying. Installation of the river crossing section is planned to be the open cut method with the pipe lowered into the wet trench and backfilling. KP (E); E ; N (WGS84, UTM38) Anticipated Mobilization - end of September 2006 Period of Works Demobilization - end of November 2006 ELECTRONIC FILE REFERENCE: NSGPOOI-RS03-ES-SCR ENG-CO1 Page 3 of 8

4 Site image(s):,,,,,,,-a -- - Image 1. Gidanula Crossing: Residential areas within the close vicinity. 44 IN wherepipe in ''E - 4 f Image 2. Gldanula Crossing: Heavyderosion aexpsewihi the close tocintres.rvrbn * 4 s o, v -,,*~ Image 2. Gidanula Crossing: Heavy erosion exposes the pipe to stress. River bank where pipe is anchored is private land fenced off for farmning. ELECTRONIC FILE REFERENCE: NSGPOO1-RSO3-ES-SCR ENG-CO1 Page 4 of 8

5 map(s) - Map 1. Image-map of Tbilisi, Gldani area. Arrow indicates approximate location of Gldanula River crossing. (image source: Google-Earth) Drawing(s): -t Drawing 1. Gldanula River crossing drawings. -a X <.11,iq2i Drawing 2. Cross-section levels. ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page 5 of 8

6 POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS - ALL CATEGORIES Ecological Impacts: Re-laying: Re-alignment: Land Acquisition: Resettlement: Access Road: Productive Land: Other Social Impacts: Cultural Heritage: Commercial or Residential Area: Protected Areas: - Erosion of the river bank is exacerbated by four existing pipelines (3 are not in use, of which at least one is GGIC property). Due to limited land access, staging area may be in river bed. Seasonal fauna unknown. - emissions from construction vehicles and other equipment - emissions of fumes from welding and coating materials - short-term noise impacts associated with the use of the range of machinery - emissions from burning un-recyclable wood and other construction debris - the release of methane during evacuation of line gas (site safety) Yes. Reburying pipeline in existing ROW. Not required. Portion of the existing ROW has encroachments such as gardens, fenced areas, and some constructed buildings but manageable, should be clarified with appropriate authority and easement obtained if necessary. Other issues: - establish safety zones - gain access and move machinery to the Gldanula crossing - establish staging camps for workers and supplies, this can be done on the south bank of the river crossing Although, ROW ownership surrounding river on both sides is unclear. Community liaison for temporary access to fenced off lands may be necessary. A resettlement memo is required for this action - Access to river bed exists through one road. Limited space for equipment. In addition the bank will need to be cut in order to allow movement into the flood plain. This bank will need to be restored upon completion of the work. - Previous history of land ownership conflict in surrounding area - No impacts on local lifestyle or demographics - Cemetery above the river crossing (300 m from river) - not affected by work limited to river crossing only. No commercial interests. Residential areas in the hinterland, safety zones to be established during works. ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page 6 of 8

7 Wetland Area: Visual: Watershed Protection Area: Water Resources Area: Avalanche Hazard Area: Yes, this is a flood plain. - Buried crossing, removal of existing pipelines and restoration of the riverbed will have positive impact on quite degraded area. - Contamination of surface waters by construction, operational and accidental spills (fuels, other) should be avoided and managed - Special consideration to be given to operational and accidental spilling of condensate during pipeline opening operations - Discharge of hydro-test water - Exposure of personnel, equipment and materials to sudden stonn events or floods - Risk of scour, bank erosion and channel migration over the longer-term - Pollution with heavy metals if waste generated out of pipe welding and isolation materials not managed and disposed of properly Other Natural Hazard Area: River Crossings: Other Comments: Current Status and Studies Required: Yes. Pipe burial across the river bed - If the pipeline is rerouted due to encroachment pressures, steps should be taken to properly abandon the area by removing the pipelines from the river. - Topsoil to be stored separately to prevent mixing with subsoil. - In a wider context, this section of the pipeline is the 700 mm pipe that traverses the Gldani area. This is a heavily populated region. ROW is unclear in many cases. Structures, farms, cemeteries all fall within this section of pipeline directly on the ROW. For this reason, a re-routing of a large section is also under consideration. Such a re-routing would obviate the need for this crossing. Design decisions, taking into account the emergency nature of this crossing, are required. 3 design altematives are discussed for re-routing (involving partial use of existing ROW-s - the 1200 mm line, the 1000 mm line, and the BTC). - Initial engineering design drawings for river crossing are available - Final site-specific EMP-s to be prepared by selected contractor - Contractor to take special precaution measures for erosion protection, diversion channel and dam design and construction. Proposed Actions: - Clear decision made on broader re-routing - Environmental Assessment with inclusion of the EMP, Mitigation, and Monitoring program. - Draft Environmental Management Plans (for incorporation into the works ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page 7 of 8

8 bidding package) covering at least the following themes: - Local public outreach and engagement (resolve access issue, site safety) - Waste management - Noise management - Reinstatement management - Pollution prevention and management - Emergency response (accidental or operational spills) - Safety and health - Conduct discussion with proper authority for ROW clarification and easement, if found necessary. - Submit screening / scoping documentations and generic EMP-s as part of the application for combined construction and environmental permit - Undertake public disclosure of information in compliance with WB/MCG and GoG requirements. - GGIC to undertake careful review of final EMP-s before approval and monitor in detail the implementation by contractor ELECTRONIC FILE REFERENCE: NSGPOO1-RS03-ES-SCR ENG-CO1 Page 8 of 8

GGIC Operations Environmental and Social Impacts Assessment: Screening Data Sheet for NANIANI LANDSLIDE (Category A)

GGIC Operations Environmental and Social Impacts Assessment: Screening Data Sheet for NANIANI LANDSLIDE (Category A) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Management Consultant's Emergency Services for the North-South Gas Pipeline North-South

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

4. Agency (or Institution) Responsible for Implementing the Project

4. Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study 1. Full Title of the Project Urban Transport Policy and System Development Master Plan for the ity of Dar es Salaam 2. Type of Study Master Plan 3. ategorisation and Its Reason

More information

ROADS: OPERATION AND MAINTENANCE

ROADS: OPERATION AND MAINTENANCE ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service

More information

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES

ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5 Training materials produced in Turkey to aid reinstatement / biorestoration 5 5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5.1 PROJECT WIDE APPROACH Training

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI

220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI 220 KV TRANSMISSION LINE AKHALTSIKHE-BATUMI ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT TERMS OF REFERENCE Transmission line Akhalsikhe-Batumi Georgia Terms of Reference for Tender docs and ESIA 2 1 PROJECT

More information

Chapter 14 Overall Project Assessment

Chapter 14 Overall Project Assessment Chapter 14 Overall Project Assessment TABLE OF CONTENTS 14 OVERALL PROJECT ASSESSMENT... 14-1 14.1 Introduction... 14-1 14.2 Development of the ESIA... 14-1 14.2.1 Adopted Process... 14-1 14.2.2 Challenges

More information

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events)

Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) Chapter 12 Hazard Analysis and Risk Assessment (Unplanned Events) TABLE OF CONTENTS 12 HAZARD ANALYSIS AND RISK ASSESSMENT... 12-1 12.1 Introduction... 12-1 12.2 Pipeline Design and Risk... 12-1 12.2.1

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Reducing Environmental Footprint

Reducing Environmental Footprint 18 Reducing Environmental Footprint Myanmar-China Oil & Gas Pipeline Project (Myanmar Section) Special Report on Social Responsibility Reducing Environmental Footprint We follow CNPC s global HSE culture,

More information

Construction of Dariali HEPP. Reinstatement Plan

Construction of Dariali HEPP. Reinstatement Plan Construction of Dariali HEPP Reinstatement Plan 2016 Table of Content 1. Introduction... 3 2. Site Clean-up... 4 3. Headwork Site Reinstatement... 4 4. Reinstatement Of The Pipeline Corridor.9 5. Cable

More information

E1184 v1. 6. Environmental Management Plan (EMP)

E1184 v1. 6. Environmental Management Plan (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 6. Environmental Management Plan (EMP) This EMP reviews the potential negative impacts

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

ENVIRONMENTAL MANAGEMENT PLAN (EMP)

ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENTAL MANAGEMENT PLAN (EMP) BUILDING DISASTER/CLIMATE RESILIENCE IN COMMUNITIES

More information

Integrated Safeguards Data Sheet (Updated)

Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:

More information

This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications.

This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications. MECHANICAL DAMAGE (1) Preamble This study is concerned with mechanical damage experienced by steel pipes transporting gas and liquids for energy-related applications. (2) Definition In the context of the

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country?

Main Check Items. 1 Are wastes properly treated and disposed of in accordance with the laws and regulations of the host country? Checklist: 16. Power Transmission and Distribution Lines(1) Confirmation of and Social (1) ESIA and Permits 1 Have ESIA reports been officially completed? Have ESIA reports been written in the official

More information

Appendix D Construction Phase ESMMP Amendments

Appendix D Construction Phase ESMMP Amendments Appendix D Construction Phase ESMMP Amendments TABLE OF CONTENTS SCP Expansion Project, Azerbaijan 1 INTRODUCTION... 1 2 AMENDMENTS TO THE MANAGEMENT PLANS... 2 Tables Table 1: SCPX ESMMP Amendment Register...

More information

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM

COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM AGRICULTURAL PROJECT IMPLEMENTATION UNIT COMMUNITY AGRICULTURAL RESOURCE MANAGEMENT AND COMPETITIVENESS PROJECT II PONENT 1: COMMUNITY PASTURE AND LIVESTOCK MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT PLAN

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

NOTICE OF A PROPOSED CHANGE TO AN APPROVED DEVELOPMENT

NOTICE OF A PROPOSED CHANGE TO AN APPROVED DEVELOPMENT NOTICE OF A PROPOSED CHANGE TO AN APPROVED DEVELOPMENT LEGACY PROJECT K+S Potash Canada GP November 30, 2012 TABLE OF CONTENTS 1. Introduction... 3 2. Description of Proposed Change... 4 3. Existing Environment...11

More information

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report

EXECUTIVE SUMMARY of the Environmental Impact Assessment Report Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Introduction Additional Financing for Third East West Highway Improvement Project EXECUTIVE

More information

Alberta Transportation The City of Edmonton The City of Calgary

Alberta Transportation The City of Edmonton The City of Calgary Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Report No.: ISDSA3140 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: July 30, 2013 I. BASIC INFORMATION

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:

More information

GENERAL NOTES ENGINEERS OVERSIGHT 1. ALL ELEVATIONS, DIMENSIONS, ALIGNMENTS AND ORIENTATION OF ALL ELEMENTS SHOWN IN THE PLANS MUST BE APPROVED BY THE ENGINEER OR ENGINEER'S REPRESENTATIVE ( REP ENGINEER

More information

Chapter 1 INTRODUCTION

Chapter 1 INTRODUCTION Chapter 1 Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 1.1 Introduction... 1 1.2 Preconstruction Division... 1 1.2.1 Regional Production Groups... 2 1.2.2 Preconstruction

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

JOSOP 607- Repair Procedure for Flowlines, Pipelines, Vessels, Tanks, Separators and other equipment

JOSOP 607- Repair Procedure for Flowlines, Pipelines, Vessels, Tanks, Separators and other equipment JOSOP 607- Repair Procedure for Flowlines, Pipelines, Vessels, Tanks, Separators and other equipment Approved 27 March, 2011 Version 1.0 1 Table of Contents 1.0 Purpose, Objectives and Scope... 3 1.1 Purpose...

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Williams Transco Pipeline

Williams Transco Pipeline open house Williams Transco Pipeline Williams Transco pipeline is a major transporter of natural gas, delivering much of the natural gas consumed in the northeastern and southeastern United States. Transco

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

Reclamation Manual Design Data Collection Guidelines Chapter 5 Typical Design Data Package Template

Reclamation Manual Design Data Collection Guidelines Chapter 5 Typical Design Data Package Template Reclamation Manual The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing a design data collection request, design data collection

More information

CLOCA Rural & Agricultural Guide to Permits

CLOCA Rural & Agricultural Guide to Permits CLOCA Rural & Agricultural Guide to Permits Regulation of Development, Interference with Wetlands and Alterations to Shoreline and Watercourses, Ontario Regulation 42/06 April 2014 Table of contents Introduction...

More information

Agency (or Institution) Responsible for Implementing the Project

Agency (or Institution) Responsible for Implementing the Project Summary of Preparatory Study Full Title of the Project The Study on Integrated Flood Management for Nyando River asin in the Republic of Kenya Type of Study Master Plan ategorisation and Its Reason 3.1

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

Chapter 14 Overall Project Assessment

Chapter 14 Overall Project Assessment Chapter 14 Overall Project Assessment TABLE OF CONTENTS 14 OVERALL PROJECT ASSESSMENT...14-1 14.1 Introduction...14-1 14.2 Development of the ESIA...14-1 14.2.1 Adopted Process... 14-1 14.2.2 Challenges

More information

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007

Wytch Farm Pipeline Refurbishment Project. Environmental Statement. Non-Technical Summary. November 2007 Wytch Farm Pipeline Refurbishment Project Environmental Statement Non-Technical Summary November 2007 Location map 0 1 2 3 4 5 kilometres Development area Introduction BP Exploration Operating Company

More information

Company Name: Property Name:

Company Name: Property Name: Distribution Integrity Management: Guidance for Master Meter and Small Liquefied Petroleum Gas Pipeline Operators Pipeline Safety: Integrity Management Program for Gas Distribution Pipelines Company Name:

More information

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS

UNRAVELING THE MYRAID OF STANDARDS AND TOOLS UNRAVELING THE MYRAID OF STANDARDS AND TOOLS HYDRO POWER DEVELOPMENT IN MEKONG REGION: CYCLING THROUGH FROM POLICY TO IMPLEMENTATION WORKSHOP SEPTEMBER 12-13, 2013 Basin Wide National regulations Project

More information

Canadian Solar Developers Ltd.

Canadian Solar Developers Ltd. Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE. I. Basic Information Date prepared/updated: 07/13/2009 Report No.: 49497 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

The PennEast Pipeline Project

The PennEast Pipeline Project The Project About the Project AGL Resources; NJR Pipeline Company; PSEG Power; South Jersey Industries; Spectra Energy and UGI Energy Services (UGIES) comprise Company, LLC. Over $1 billion investment

More information

Enclosure 23 Revised Invasive Species Plan

Enclosure 23 Revised Invasive Species Plan ROVER PIPELINE, PANHANDLE BACKHAUL, AND TRUNKLINE BACKHAUL PROJECTS Implementation Plan Enclosure 23 Revised February 2017 ROVER PIPELINE PROJECT ROVER PIPELINE LLC Rover Pipeline Project September 2016

More information

Auckland Unitary Plan Operative in part 1

Auckland Unitary Plan Operative in part 1 Designation Schedule - New Zealand Refining Company Number Purpose 6500 Operation, maintenance and repair, upgrade and renewal of the existing petroleum transmission pipeline and ancillary facilities...

More information

Pipeline Compliance and Risk Management Pipeline Risk Assessment Line 9B Reversal and Line 9 Capacity Expansion Project

Pipeline Compliance and Risk Management Pipeline Risk Assessment Line 9B Reversal and Line 9 Capacity Expansion Project Page of Pipeline Compliance and Risk Management Pipeline Risk Assessment Line B Reversal and Line Capacity Expansion Project Page of TABLE OF CONTENTS.0 EXECUTIVE SUMMARY....0 INTRODUCTION....0 PIPELINE

More information

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting Engineering Awards 2017 City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting

More information

Chapter 1 Introduction

Chapter 1 Introduction Chapter 1 Introduction TABLE OF CONTENTS 1 INTRODUCTION... 1-1 1.1 General... 1-1 1.2 Background to the WREP... 1-1 1.3 Rationale for WREP-SR Project... 1-2 1.4 WREP Operator: GPC and BP Relationship...

More information

Imperial s Sarnia Products Pipeline

Imperial s Sarnia Products Pipeline Imperial s Sarnia Products Pipeline Waterdown to Finch Project Community Information Session Imperial s Waterdown to Finch Project Important infrastructure to the Greater Toronto and Hamilton Area (GTHA).

More information

192GasCatalog.

192GasCatalog. 192GasCatalog www.energyu.org www.midwestenergy.org 192-Abnormal Operating Conditions... 4 192-0101 Characteristics and Hazards of Natural Gas... 4 192-0201 Gas Detection and Alarm System Maintenance...

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: April 12, 2006 1. Basic Project Data INTEGRATED

More information

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:

ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives: ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 13-Dec-2012

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT

SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI RECOVERY PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SAMOA ENVIRONMENTAL AND SOCIAL SCREENING AND ASSESSMENT FRAMEWORK FOR A POST-TSUNAMI

More information

Village Salkhino-Letsave-Balda road (Martvili Municipality) Rehabilitation. Sub-Project Environmental and Social Screening and

Village Salkhino-Letsave-Balda road (Martvili Municipality) Rehabilitation. Sub-Project Environmental and Social Screening and Village Salkhino-Letsave-Balda road (Martvili Municipality) Rehabilitation Sub-Project Environmental and Social Screening and Environmental Management Plan WORLD BANK FINANCED SECOND REGIONAL AND MUNICIPAL

More information

URS- EIA- REP Date of Issue 19th November 2012

URS- EIA- REP Date of Issue 19th November 2012 DocID: External DocID: URS-EIA-REP-201040 46369085_Doc020_REP_Rev03 Date of Issue 19th November 2012 This report has been prepared by URS Infrastructure & Environment UK Limited on behalf of South Stream

More information

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS

NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS PDF Version [Printer-friendly - ideal for printing entire document] NATIONAL ENERGY BOARD ONSHORE PIPELINE REGULATIONS Published by Quickscribe Services Ltd. Updated To: [includes Federal Regulation SOR/2016-134

More information

Greater Amman Municipality

Greater Amman Municipality Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ECO Consult Municipal Solid Waste Management & Carbon Finance in Amman Greater Amman

More information

5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES

5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5 5 ENVIRONMENTAL AND SOCIAL TRAINING ACTIVITIES 5.1 PROJECT WIDE APPROACH Training continues to take place at many levels of the Project, to ensure all employees are effective in their job and are able

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

Important Safety Information

Important Safety Information Important Safety Information for Public Officials 2015 Please do not discard. You are receiving this because we have a pipeline in your area. Pipelines Near You Formerly known as Access Midstream, Williams

More information

CHAPTER 7 STAKEHOLDER ENGAGEMENT

CHAPTER 7 STAKEHOLDER ENGAGEMENT CHAPTER 7 STAKEHOLDER ENGAGEMENT TABLE OF CONTENTS 7 STAKEHOLDER ENGAGEMENT PROCESS... 7-1 7.1 INTRODUCTION... 7-1 7.2 STAKEHOLDERS IDENTIFIED... 7-2 7.3 STAKEHOLDER ENGAGEMENT PROCESS... 7-4 7.3.1 Stakeholder

More information

Addressing Key Environmental Hazards after an Earthquake

Addressing Key Environmental Hazards after an Earthquake Addressing Key Environmental Hazards after an Earthquake A. International Experience 1. Environmental management is not a well-recognized priority issue in an emergency situation. So rather than confine

More information

Safety gets the right of way. Your guide to staying safe when working around a pipeline right of way

Safety gets the right of way. Your guide to staying safe when working around a pipeline right of way Safety gets the right of way Your guide to staying safe when working around a pipeline right of way Table of contents What is a FortisBC right of way? 2 What is a natural gas transmission pipeline? 2

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item

Environmental Checklist: 17. Roads, Railways and Bridges(1) Confirmation of Environmental and Social Considerations. Environmental Item Checklist: 17. Roads, Railways and Bridges(1) 1. Permits and Approvals, Explanations (1) ESIA and Permits (2) Explanations to the Public Main Check s 1 Have ESIA reports been officially completed? Have

More information

Syvash Wind Farm Environmental and Social Action Plan (ESAP)

Syvash Wind Farm Environmental and Social Action Plan (ESAP) General Environmental, Social Governance (ESG) management 1. Ensure Compliance with National legislation and attain all relevant National Permits, including EIA permit for the Project and associated infrastructure

More information

Hay Bale Barriers are prohibited

Hay Bale Barriers are prohibited Amber McIntyre OKR10 General Permit If an acre or more will be disturbed, you must obtain an authorization to discharge under the OKR10 General Permit from the Oklahoma Department of Environmental Quality.

More information

Spire STL Pipeline Project

Spire STL Pipeline Project Spire STL Pipeline Project Resource Report 11 Reliability and Safety FERC Docket No. CP17- - FERC Application January 2017 Public RESOURCE REPORT 11 - RELIABILITY AND SAFETY SUMMARY OF FILING INFORMATION

More information

YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP)

YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP) YEŞİL ENERJİ ELEKTRİK ÜRETİM SAN. TİC. A.Ş. POYRAZ HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Kahramanmaras Province, Andirin District PROJECT SPECIFIC ASPECTS FOR RENEWABLE ENERGY

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

I Managing Unit: EASRE

I Managing Unit: EASRE Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill

More information

Appendix 14-I Description of Stream Crossing for Electrical Interconnect

Appendix 14-I Description of Stream Crossing for Electrical Interconnect Appendix 14-I Description of Stream Crossing for Electrical Interconnect 14.0 Ecology Appendix 14-I CPV Valley Energy Project Description of Stream Crossing for Electrical Interconnect The CPV Valley Energy

More information

Category Environmental Item Main Check Items Confirmation of Environmental Considerations

Category Environmental Item Main Check Items Confirmation of Environmental Considerations al Checklist: 2. Oil and Natural Gas Development 1 1 Permits and Explanation 2 Mitigation (1) EIA and al Permits (2) Explanation to the Public (1) Air Quality (2) Water Quality (3) Wastes Have EIA reports

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011

Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 Construction Requirements for Installation of Utilities in the Public Right-of-way of McPherson County, Kansas October 2011 General Provisions and Specifications - These provisions and specifications shall

More information

ATTACHMENT A: FINDINGS

ATTACHMENT A: FINDINGS ATTACHMENT A: FINDINGS 1.0 CEQA FINDINGS 1.1 CEQA Exemption The County Planning Commission finds that the proposed project is exempt from environmental review under the California Environmental Quality

More information

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e) Checklist: 3. Hydropower Stations, Dams and Reservoirs (1) 1 Permits and Explanation 2 Pollution Control (1) EIA and Permits (2) Explanation to the Local Stakeholders Main Check s Have EIA reports been

More information

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT Date: September 18, 2017 NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT To: Agencies and Interested Parties Lead Agency: Sacramento Municipal Utility District 6201 S Street, MS H201 Sacramento,

More information

Europe and Central Asia Region Capacity Development Trust Fund

Europe and Central Asia Region Capacity Development Trust Fund Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Europe and Central Asia Region Capacity Development Trust Fund RP1439 Draft Terms of

More information

Checklist for Local Government To Evaluate Land Use and Development Practices Near Transmission Pipelines

Checklist for Local Government To Evaluate Land Use and Development Practices Near Transmission Pipelines Pipelines and Informed Planning Alliance () is a stakeholder initiative led and supported by the US Department of Transportation s Pipeline and Hazardous Materials Safety Administration (PHMSA). s goal

More information

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I)

A CITIZEN S GUIDE. Awareness Raising on Hydropower Project Development and EIA for Citizens (part I) A CITIZEN S GUIDE Awareness Raising on Hydropower Project Development and EIA for Citizens (part I) Prepared by Lasha Gurgenidze and Tamar Mtvarelidze with Dr. Shivcharn S. Dhillion May, 2014 Content of

More information

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011

Pipeline and Informed Planning Alliance (PIPA) Recommended Practice Evaluation Worksheet For Pipeline Operators. Draft 12/15/2011 Pipeline and Informed Planning Alliance () Recommended Evaluation Worksheet For Pipeline Operators Draft 12/15/2011 Checklist for Pipeline Operator Recommended Evaluation The Pipelines and Informed Planning

More information

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal

More information

Safeguard Requirements And the Framework Process

Safeguard Requirements And the Framework Process Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower

More information

SECTION TEMPORARY ENVIRONMENTAL CONTROLS

SECTION TEMPORARY ENVIRONMENTAL CONTROLS SECTION 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS PART 1 GENERAL 1.01 SECTION INCLUDES A. CONTRACTOR shall provide environmental controls consistent with regulatory requirements throughout the duration

More information

Participatory risk assessment and monitoring

Participatory risk assessment and monitoring Integrated Local Risk Management Participatory risk assessment and monitoring (Draft 19.06.09) Guidelines for baseline assessment and monitoring 1 Strengths and limits of ILRM and its participatory risk

More information

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP) Disclaimer: The information contained in this communication document is intended solely for the use of guidance cannot be

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

MINING EIA REVIEW CHECKLIST

MINING EIA REVIEW CHECKLIST EIA Review Checklist Mining and the Environment Mining is a sustainable activity MINING EIA REVIEW CHECKLIST Reviewing the Content General aspects Does the environmental assessment conform to national

More information

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:

C. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation.

Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation. Ensuring that EMP s are a positive EIA legacy as the EAP s opportunity to facilitate sound project implementation. Years of project implementation Implementation of international good practice Exposure

More information