100% Report of Geotechnical Engineering Investigation for Structures CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH MP A811.

Size: px
Start display at page:

Download "100% Report of Geotechnical Engineering Investigation for Structures CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH MP A811."

Transcription

1 100% Report of Geotechnical Engineering Investigation for Structures CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH MP A811.3 Shingle Creek Bridge Financial Project No GEC Project No. 2135G6

2 December 22, 2014 AECOM 300 Colonial Center Parkway, Suite 130 Lake Mary, Florida Attention: Subject: Mr. George Gault, P.E. 100% Report of Geotechnical Engineering Investigation for Structures CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH MP A811.3 Shingle Creek Bridge Financial Project No GEC Project No. 2135G6 Dear Mr. Gault: Geotechnical and Environmental Consultants, Inc. (GEC) is pleased to present this 100% Report of Geotechnical Engineering Investigation for Structures for Phase 2 South of the Central Florida Commuter Rail Transit (CFCRT) SunRail project. The purpose of this investigation was to explore subsurface conditions at the MP A811.3 Shingle Creek bridge site, and to use the information obtained to develop geotechnical engineering recommendations to guide design and construction of the proposed rail improvements. This report describes our exploration procedures, exhibits the data obtained and presents our recommendations and conclusions regarding the geotechnical engineering aspects of this project. Geotechnical recommendations included in this report are subject to change as project plans develop. The results of our geotechnical investigation for the remainder of the CFRC Phase 2 South alignment improvements are submitted under separate cover. GEC appreciates the opportunity to be of service to AECOM and the FDOT on this project. If you should have any questions concerning the contents of this report, please contact us.

3 Very truly yours, GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS, INC Michigan Avenue, Suite D Kissimmee, Florida Certificate of Authorization No Craig G. Ballock, P.E. Senior Geotechnical Engineer Gary L. Kuhns, P.E. President cc: Mr. Tharwat Hannadawod FDOT Geotechnical Project Manager GEC Project No. 2135G6 ii 100% Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

4 Table of Contents 1.0 ALIGNMENT DESCRIPTION REVIEW OF AVAILABLE DATA NRCS Soil Survey USGS Quadrangle Map USGS Potentiometric Map Data Regional Geology SUBSURFACE EXPLORATION SPT Borings Machine Auger Borings Groundwater Measurement LABORATORY TESTING SUBSURFACE CONDITIONS Bridge Boring Results Groundwater Levels ANALYSES AND RECOMMENDATIONS Foundation Design Alternatives Axial Load Analysis Downdrag Settlement Considerations Scour Resistance SINKHOLE RISK USE OF THIS REPORT GEC Project No. 2135G6 iii 100% Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

5 APPENDIX Pile Data Table Davisson Pile Capacity vs. Pile Tip Elevation Graphs Figure 1: USGS Quadrangle Map Figure 2: NRCS Soil Survey Map Figures 3 8: Boring Location Plan and SPT Boring Results Table 6: Table 7: Summary of Corrosion Series Test Results Table Summary of D 50 Test Results and Particle Size Distribution Curves Scour Resistance Calculations Sample FB Deep Analyses GEC Project No. 2135G6 iv 100% Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

6 1.0 ALIGNMENT DESCRIPTION The Central Florida Commuter Rail Transit, or SunRail, Phase 2 South alignment begins at the Sand Lake Road Station in Orange County (MP A796.6) and extends southward along the former CSX railroad to its termination point at the Poinciana Station in Osceola County (MP A813.8), a distance of about 17.2 miles. The proposed improvements include the addition of approximately 13.5 miles of 2 nd track, upgrades to approximately 4.1 miles of track siding, replacement of 7 bridges and 2 large culvert crossings, replacement/extension of 26 cross drains and the addition of linear ponds along the north and south sides of portions of the alignment for floodplain compensation. This report addresses the proposed replacement of the MP A811.3 bridge structure over Shingle Creek. This report addresses the proposed replacement of the MP A811.3 bridge structure over Shingle Creek. The existing bridge at MP A811.3 supports a single track section supported on timber piles. The Shingle Creek floodplain, consisting of wetlands and swamp areas, borders the project alignment to the north and Old Tampa Highway, a two-lane, rural section roadway, parallels the project alignment to the south. The project site is shown on an excerpt of the USGS Quadrangle map on Figure 1 in the Appendix. A summary of the MP A811.3 bridge location, proposed replacement structure and the existing ground surface elevations (based on project DTM information at the boring locations) are summarized in the following table: Table 1 Summary of Bridge Locations Bridge Mile Post No. Existing Structure Type Replacement Structure Type Section Township Range Approx. Ground Surface Elevation (ft NAVD88) A811.3 Bridge: 370 ft. Timber Trestle Dual Bridges (11 Spans) S 29 E +55 to +65 The results of our geotechnical investigation and recommendations for the remainder of the SunRail Phase 2 South alignment improvements are submitted under separate cover. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

7 2.0 REVIEW OF AVAILABLE DATA To obtain general information on soil and groundwater conditions at the MP A811.3 bridge structure, GEC reviewed available data including USGS Quadrangle Maps, the Natural Resources Conservation Service (NRCS) Soil Survey of Osceola County and other published sources. A summary of this information is presented in the following report sections. 2.1 NRCS Soil Survey The United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Soil Survey of Osceola County, Florida was reviewed to obtain near-surface soils and groundwater information along the project alignment in the area the MP A11.3 Bridge. An excerpt of the NRCS Soil Survey map showing the approximate project alignment and bridge location is presented on Figure 2 in the Appendix. The NRCS soils depicted in the vicinity of the MP A811.3 Bridge are summarized in the following table. Table 2 NRCS Soil Survey Summary - Osceola County Florida Unit No. Soil Name 13 Gentry fine sand Depth (inches) Soil Description Fine sand Fine sandy loam, sandy loam, sandy clay loam Fine sand, loamy fine sand, fine sandy loam Unified Classification Symbol SM, SP, SP-SM SC, SC-SM, SM SM, SP-SM Depth to Seasonal High Groundwater (feet) In general, the soil unit listed above is classified as sands with varying amounts of silt fines (SP, SP-SM, SM, SM-SC, SC) and is generally appropriate for support of the proposed improvements. However, Gentry fine sand (Soil Unit 13) is typically associated with areas of poorly drained soils in shallow depressions, sloughs, drainage ways and swamps. The NRCS predicts seasonal high groundwater levels at the MP A811.3 bridge site to range from 2 feet above the natural ground surface at the natural ground surface. Information contained in the NRCS Soil Survey is very general and may be outdated. It may not, therefore, be reflective of actual soil and groundwater conditions, particularly if development in GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

8 the site vicinity has modified soil conditions or surface/subsurface drainage. The information obtained from the soil borings provides a better characterization of actual site subsurface conditions. 2.2 USGS Quadrangle Map Based on GEC s review of the Kissimmee, Florida Quadrangle map, reproduced in Figure 1, and project topographic survey information, the existing ground surface elevations in the vicinity of the MP A811.3 bridge site range from approximately +55 to +65 feet NAVD. In addition, project topographic survey information indicates the Shingle Creek channel bottom elevation typically ranges from +53 to +56 feet NAVD. Based on our review of the Quadrangle map, the MP A811.3 bridge site vicinity can be classified as lowland topography and terrain associated with the Shingle Creek Floodplain. 2.3 USGS Potentiometric Map Data Based on our review of the September 2008 USGS Map, Potentiometric Surface of The Upper Floridan Aquifer in the St. Johns River Water Management District and Vicinity, Florida, the approximate potentiometric level of the Floridan aquifer at the MP A811.3 bridge site is +59 feet NGVD (+58.1 feet NAVD). Since the existing ground surface elevations in the project artesian flow conditions should be anticipated at the MP A811.3 bridge site 2.4 Regional Geology vicinity range from approximately +53 to +65 feet NAVD, artesian flow conditions should be anticipated at the MP A811.3 bridge site in borings or wells that penetrate the clay confining layer. Artesian conditions were not encountered in our soil borings. Due to its prevalent geology, referred to as karst, Central Florida is prone to the formation of sinkholes, or large, circular depressions created by local subsidence of the ground surface. The nature and relationship of the three sedimentary layers typical of Central Florida geology cause sinkholes. The deepest, or basement, layer is a massive cavernous limestone formation known as the Floridan GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

9 aquifer. The Floridan aquifer limestone is overlain by a silty or clayey sand, clay, phosphate and limestone aquitard (or flow-retarding layer) ranging in thickness from nearly absent to greater than 100 feet and locally referred to as the Hawthorn formation. The Hawthorn formation is in turn overlain by a surficial layer of sand, on the order of 40 to 70 feet in thickness, bearing the water table aquifer. The likelihood of sinkhole occurrence at a given site within the region is determined by the relationship among these three layers, specifically by the water (and soil)- transmitting capacity of the Hawthorn formation at that location. The water table aquifer is comprised of Recent and Pleistocene sands and is separated from the Eocene limestone of the Floridan aquifer by the Miocene sands, clays and limestone of the Hawthorn formation. Since the thickness and consistency of the Hawthorn layer is variable across Central Florida, the likelihood of groundwater flow from the upper to the lower aquifer (known as aquifer recharge) will also vary by geographical location. In areas where the Hawthorn formation is absent, water table groundwater (and associated sands) can flow downward to cavities within the limestone aquifer, like sand through an hourglass, recharging the Floridan aquifer, and sometimes causing the formation of surface sinkholes. This process of subsurface erosion associated with recharging the Floridan aquifer is known as raveling. Thus, in Central Florida, areas of effective groundwater recharge to the Floridan aquifer have a higher potential for the formation of surface sinkholes. the project is in an area where the risk of sinkhole formation is low compared to the overall risk across Central Florida. No method of geological, geotechnical, or geophysical exploration is known that can accurately predict the occurrence of sinkholes. It is common geotechnical practice in Central Florida to make a qualitative prediction of sinkhole risk on the basis of local geological conditions in the vicinity of a particular site. Based on our review of the U.S. Geological Survey Map entitled Recharge and Discharge Areas of the Floridan Aquifer in the St. Johns River Water Management District and vicinity, Florida, 1984, the project is in an area of generally no recharge and, therefore, we can conclude it is in an area where the risk of sinkhole formation is low compared to the overall risk across Central Florida. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

10 3.0 SUBSURFACE EXPLORATION GEC evaluated subsurface conditions at the MP A811.3 bridge replacement site by performing Standard Penetration Test (SPT) borings to depths ranging from to feet below existing ground surface. The locations and depths of our borings are summarized in the following table: Table 3 Boring Locations and Depths Bridge MP No. Boring No. B6-1 B6-2 B6-3 B6-4 B6-5 B6-6 Station Offset (ft) 32 LT 30 LT 30 LT 30 LT 24 RT 24 RT Boring Depth (ft) A811.3 GEC established the majority of the boring locations such that working limits, per the CSX Operating rules, were not required to be established. In compliance with Central Florida Rail Commission (CFRC) safety restrictions, SPT borings performed with a drill rig were required to be a minimum of 25 feet from the existing track. However, working limits were established for bridge borings B6-5 and B6-6 in order to evaluate subsurface conditions closer to the existing track alignment. Boring locations were not established by survey, but rather by using project plans and a handheld, sub-meter accuracy, Global Positioning Satellite (GPS) unit (Trimble GeoXT 500 Series). Although the boring and probe locations are, therefore, given only approximately, the methods used to locate them are, in GEC s opinion, sufficient to meet the intent of this study. Ground surface elevations at the bridge boring locations were estimated by AECOM from project DTM survey data. The boring locations are referenced from the CFRC Centerline of Construction shown on project plans provided by AECOM. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

11 3.1 SPT Borings SPT borings were drilled in general accordance with ASTM Procedure D The boreholes were advanced by the rotary wash method with bentonite-based mud used as the circulating fluid to stabilize the borehole. GEC s field crew obtained SPT samples continuously in the borings to a depth of 10 feet and at 2.5-foot depth intervals thereafter. However, most boring locations were augered by hand the first four to six feet to avoid damage to underground, unmarked utilities. A GEC engineering technician monitored the drilling operation, and collected, examined and visually classified each sample. He then packaged representative portions of each sample for transport to our laboratory for further examination and laboratory testing. 3.2 Machine Auger Borings Machine auger borings were performed in general accordance with ASTM Procedure D Machine auger borings were performed by hydraulically turning a 4-inch wide continuous flight, solid-stem, auger into the ground in 5-foot increments until the desired boring termination depth was achieved. The auger flights were retrieved in 5-foot increments without further rotation and the soils retained on the auger were examined by our technician prior to collection of representative soil samples. The samples were placed in sealed jars and transported to GEC s laboratory for further examination and limited laboratory testing. 3.3 Groundwater Measurement A GEC engineering technician measured the depth to the groundwater in the boreholes at the time of drilling and again after approximately 24 hours. Once the groundwater measurements were recorded, the boreholes were backfilled with soil cuttings to prevailing ground surface. At SPT borehole locations a hand auger boring was performed adjacent to each of the SPT boreholes to record the groundwater depth, since the SPT borings were grout-sealed immediately upon completion. 4.0 LABORATORY TESTING Selected soil samples obtained from the borings were tested in accordance with Florida Standard Testing Methods (FM). Florida Standard Testing Methods are adaptations of GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

12 recognized standard methods, e.g., ASTM and AASHTO, which have been modified to accommodate Florida s geological conditions. The GEC laboratory is reviewed annually by the Construction Materials Engineering Council, Inc. (CMEC) to verify compliance with FM. Our laboratory testing program is summarized in the following Table: Table 4 Summary of Laboratory Testing Program No. of Test Description Tests Percent Fines (FM 1-T88) 44 Grain Size Analysis (FM 1-T88) 5 Atterberg Limits (FM 1-T89/90) 16 Natural Moisture Content (FM 1-T265) 17 Organic Content (FM 1-T267) 1 Hydrometer Analysis (ASTM D-422) 1 Corrosion Series (FM 5-550/551/552/553) 3 Laboratory test results are presented adjacent to the soil boring profiles on the Report of SPT Borings sheets in the Appendix. Corrosion series tests were performed on representative soil and water samples obtained at the bridge location to evaluate the substructure environmental classification. In accordance with the FDOT Structure Design Guidelines and the results of our corrosion series test results, which are included in Table 6 in the Appendix, the substructure environmental classification for the MP A811.3 bridge site is summarized in the following table. The superstructure environmental classification is estimated to be slightly aggressive for concrete and steel bridge components. Table 5 Bridge Substructure Environmental Classification Summary Bridge/Culvert MP No. Substructure Environmental Classification Concrete Steel A811.3 Moderately Aggressive Moderately Aggressive GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

13 Five grain size analyses and one hydrometer analysis were performed on representative samples of the surficial soils encountered in our bridge borings to determine laboratory D 50 values for bridge hydraulic evaluation. The particle size distribution reports and a Summary of D 50 Test Results table (Table 7) are included in the Appendix. 5.0 SUBSURFACE CONDITIONS The results of our borings are presented on the Report of SPT Boring sheets in the Appendix. The soils encountered in the SPT boring were classified in accordance with the Unified Soil Classification System (USCS) (SP-SM, SM, etc.). Soils were described using the ASTM soil descriptions (e.g., sand with silt). We based our classifications on visual examination and the limited laboratory testing performed. The boring logs and related information included in this report are indicators of subsurface conditions only at the specific boring location at the time of our field exploration. Subsurface conditions, including groundwater levels, at other locations of the subject site may differ from conditions we encountered at the boring locations. Moreover, conditions at the boring locations can change over time. Groundwater levels fluctuate seasonally, and soil conditions can be altered by earthmoving operations. The depths and thicknesses of the subsurface strata indicated on the boring logs were interpolated between samples obtained at different depths in the borings. The actual transition between soil layers may be different than indicated. 5.1 Bridge Boring Results In general, the bridge SPT borings performed for the MP A811.3 bridge encountered primarily loose to medium dense fine sand with varying silt and clay content to typical depths of 70 to 80 feet. Intermittent layers of clay and silt (CH, CL, ML) were encountered within this surficial sand layer. Below this surficial layer, the borings typically encountered medium dense to very dense fine sand with varying shell content to depths of 70 to 115 feet. This layer was underlain by loose to very dense weathered limestone, which extended to the boring termination depths of 115 to feet. Notable exceptions to this general profile are given as follows: Boring B6-5 encountered a potential void between approximate elevations -72 and feet NAVD. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

14 Boring B6-2 did not encounter the medium dense to very dense fine sand with varying shell content layer. Drilling fluid circulation loss occurred during drilling operations at boring locations B6-1, B6-2, B6-3 and B6-5 as indicated on the Boring Results sheets. For specific subsurface conditions encountered at each boring location, please refer to the Report of SPT Borings for Structures sheets in the Appendix. 5.2 Groundwater Levels Groundwater levels were measured at least 24 hours after completion of the borings. Groundwater levels were generally encountered at elevations ranging from to feet NAVD88 at the boring locations. Groundwater levels can vary seasonally and with changes in subsurface conditions between boring locations. Alterations in surface and/or subsurface drainage brought about by site development can also affect groundwater levels. Therefore, groundwater depths measured at different times or at different locations on the site can be expected to vary from those measured by GEC during this investigation. For the purposes of this report, estimated seasonal high groundwater levels are defined as groundwater levels that are anticipated at the end of the wet season of a normal rainfall year under current site conditions. We define a normal rainfall year as a year in which rainfall quantity and distribution were at or near historical rainfall averages. GEC estimated seasonal high groundwater levels each boring location. Estimated seasonal high groundwater levels are anticipated to range from elevation to feet NAVD88 at the boring locations. However, at boring locations B6-3 and B6-6, the estimated seasonal high groundwater level is estimated to be above ground surface; indicated by AGS on the boring logs. Encountered and estimated seasonal high groundwater levels are shown adjacent to each boring profile on the Report of SPT Boring sheets in the Appendix. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

15 6.0 ANALYSES AND RECOMMENDATIONS The following recommendations are based on the structure design elements previously described and the subsurface conditions encountered in our borings. If the project design requirements change or if subsurface conditions are different from those described in this report, GEC should be retained to review and modify, if necessary, the following recommendations in light of such changes. 6.1 Foundation Design Alternatives GEC performed an evaluation of foundation alternatives that included shallow spread footings, drilled shafts, steel pipe piles, steel H piles and driven precast prestressed concrete (PPC) piles. The results of these foundation analyses are included in our Preliminary Report of Geotechnical Investigation, dated December 7, We understand that 18-inch Precast Prestressed Concrete (PPC) piles have been selected as the preferred foundation system for the proposed MP A811.3 bridge replacement at Shingle Creek. The following report sections provide analysis and recommendations for the selected foundation systems. 6.2 Axial Load Analysis GEC analyzed axial capacity for 18-inch concrete piles using the FDOT computer program FB- Deep Version 2.04, which is based on FDOT Research Bulletin RB-121. A Graph of Davisson Pile Capacity vs. Pile Tip Elevation and samples of the FB-Deep analyses are included in the Appendix. Project plans indicate that the existing 14-inch, timber piles are to be cut at the existing ground surface and abandoned in place. Project plans provided by AECOM indicate that the existing 14- inch, timber piles at the MP A811.3 bridge site are to be cut at the existing ground surface and abandoned in place. Based on our review of the existing bridge bent configurations, each bent consists of 6 timber piles. From the existing bent centerline, the inner 2 piles are plumb with the following 2 piles installed at a 1:12 batter and the outer piles installed at a 2:12 batter. Based on our review of the proposed new, 18-inch PPC pile locations and the existing pile locations, the proposed piles do not appear to be in conflict with the existing pile locations. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

16 GEC was provided with Service Loads and scour elevations for each bridge bent. We used this information and a factor of safety of 2.5 to calculate the Nominal Bearing Resistances for each bent. Based upon this provided information, our Davisson Pile Capacity vs. Pile Tip Elevation curves and the calculated Nominal Bearing Resistances, pile design parameters for 18-inch PPC piles the proposed bridge are summarized in the Pile Data Table in the Appendix....set-checks and/or re-drives should be anticipated during both the test pile program and production pile installation. FB-Deep results predict the long-term axial capacity after soil pore water pressures have had time to dissipate and skin friction capacity is fully regained. It may take several days after endof-drive to regain significant skin friction capacity. Because a consistent bearing stratum was not encountered, end bearing capacity is not expected to be a large component of total axial capacity. Therefore, set-checks and/or re-drives should be anticipated during both the test pile program and production pile installation to assess skin friction capacity gain at this site. Elevations and capacities recommended in this report are for individual piles. The analyses and recommendations apply for piles spaced at minimum distances of three pile widths as measured from center to center. Group reductions would be required for more closely spaced piles. Because existing ground surface elevations are below the potential artesian head elevation of +58 feet NAVD as detailed in Section 2.3 of this Report, GEC recommends the following note be added to all Pile Data Table sheets in the project plan set: Artesian conditions were not noted by the driller during drilling. However, based on review of the St. Johns River Water Management District potentiometric map of the upper Floridan Aquifer for the project area, the potential artesian head elevation is estimated to be +58 feet NAVD88. The Contractor shall be prepared to control artesian flow up to a head elevation of +58 feet NAVD88. We recommend a test pile program be established for the proposed structure. The test piles should be instrumented with the Pile Driving Analyzer (PDA) in accordance with FDOT Specification 455. The substructure environmental classification for concrete substructure is moderately aggressive at the MP A811.3 bridge site. If concrete piles are selected, minimum concrete GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

17 cover requirements should be accounted for in accordance with the FDOT Structures Design Guidelines. 6.3 Downdrag Settlement Considerations Based on project plans, embankment fill will be placed at the MP A811.3 bridge abutments. This fill will need to be placed after the abutment piles are driven. Therefore, soil settlement caused by fill loads at the end bent pile locations could generate downdrag loads on the piles. As previously described, the soil profile encountered in the borings is composed primarily of loose to very dense fine sands. Due to the cohesionless, granular nature of the majority of the subsurface profile, settlement of the sand profile caused by placement of the new embankment fill will occur concurrently during embankment construction. Once the embankment fill is complete, subsoil settlement will essentially cease and the superstructure can be constructed with negligible post-construction abutment fill settlement. Therefore, we do not anticipate that downdrag will be a significant factor in pile performance at this site. 6.4 Scour Resistance A total of 5 full grain size analyses and 1 hydrometer analysis were performed for the MP A811.3 bridge site. The D 50 grain sizes were determined for use by the Drainage Engineer to calculate the 100 year scour elevations. GEC then performed scour resistance calculations for the proposed bridge based on the 100 year scour elevations, soil type and average SPT resistance values. Based on our review of the project plans, a riprap rubble scour protection is proposed for all bridge bents excluding bents 7N, 7S, 8N and 8S. Scour resistance was only calculated for those bent locations without scour protection. The grain size curves and scour resistance calculations are included in the Appendix. 7.0 SINKHOLE RISK As discussed in Section 2.4, the geology of some regions within Central Florida is conducive to the formation of sinkholes. Areas of high recharge from the water table aquifer to the underlying limestone aquifer are generally considered to exhibit a high risk of sinkhole activity compared to the background risk in Central Florida. The SunRail Phase 1 alignment, from the Debary Station to the Sand Lake Road Station, crosses several high recharge areas that have an elevated risk of sinkhole formation. These high risk areas have historically been developed with roadways and buildings, as well as rail. Sinkholes have occurred in these areas GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

18 in recent years, some requiring remedial measures due to their proximity to roadways and/or structures. Sinkhole risk for the CFRC Phase 1 alignment was discussed in the EarthTech (AECOM) memorandum dated February 26, However, the geology of the CRFC Phase 2 South alignment is significantly different than the geology of the Phase I alignment. The rail alignment from the Sand Lake Road Station to the Kissimmee Station is characterized as low to moderate recharge, and the rail alignment from the Kissimmee Station to the Poinciana Station is within a zone of no recharge. Therefore, the risk of sinkhole activity along the Phase II alignment is relatively low compared to the background risk in Central Florida. Further, deep Standard Penetration Test (SPT) borings performed for rail bridge replacements along the CFRC Phase 2 South alignment did not encounter strong indicators of ongoing sinkhole activity including soil voids, extensive zones of very loose soil or drilling fluid losses in the soils above the limestone formation. There is currently no methodology that can accurately predict the occurrence of sinkholes. Geophysical methods, such as Ground Penetrating Radar, and deep soil borings can only provide subsurface information that is useful in evaluating relative sinkhole risk. These methods are often used on proposed major structure sites in high risk sinkhole locations to evaluate relative risk, but they are far from definitive in predicting the occurrence of sinkholes. Sinkhole risk evaluations, including deep soil borings, are not typically performed for horizontal facilities such as roadways (or rail lines) since the cost of performing such an evaluation could not be justified based on the benefit derived. The potential for a sinkhole to occur during the design or construction of SunRail Phase 1 or Phase 2 South project is relatively low. The potential for a sinkhole to occur during the design or construction of SunRail Phase 1 or Phase 2 South project is relatively low. As discussed in the previous memorandum several sinkholes did occur during the most recent widenings of Interstate 4 in Orange and Seminole Counties, and GEC was involved in the remediation of several of these subsidences. These events impacted traffic and required remediation that caused additional project costs and delays. However, it is highly unlikely that even the most detailed and costly sinkhole investigation techniques available would have predicted those occurrences. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

19 8.0 USE OF THIS REPORT GEC has prepared this report for the exclusive use of our client, AECOM and the Florida Department of Transportation District 5, and for specific application to this project. GEC will not be held responsible for any other party s interpretation or use of this report s subsurface data or engineering analysis without our written authorization. The sole purpose of the borings performed by GEC at this site was to obtain indications of subsurface conditions as part of a geotechnical exploration program. GEC has not evaluated the soil from the borings for the potential presence of contaminated soil or groundwater, nor have we subjected any soil samples to analysis for contaminants. GEC has strived to provide the services described in this report in a manner consistent with that level of care and skill ordinarily exercised by members of our profession currently practicing in Central Florida. No other representation is made or implied in this document. GEC Project No. 2135G % Report of Geotechnical Engineering Investigation for Structures SunRail Phase 2 South: MP A811.3 Shingle Creek Bridge

20 APPENDIX

21 PILE DATA TABLE

22 Pile Data Table Sunrail Phase 2 South MP A811.3 Shingle Creek Bridge FPID No GEC Project No. 2135G6 Page 1 of 1 Pile Recommendations Bridge MP A811.3 Bent No. Boring No. Approximate Pile Cut Off Elevation (ft NAVD) Anticipated Pile Tip Elevation (ft NAVD) PPC Pile Size (in) 1 Nominal Bearing Resistance (tons) Tension Resistance (tons) Minimum Pile Tip Elevation (ft NAVD) Test Pile Length (ft) Required Preform Elevation (ft NAVD) 2 Factored Design Load (tons) 3 Service Load (tons) Downdrag (tons) Total Scour Resistance (tons) Net Scour Resistance (tons) 100 Year Scour Elevation (ft NAVD) Long Term Scour Elevation (ft NAVD) Resistance Factor Compression 1 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 2 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 3 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 4 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 5 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 6 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 7 B N/A N/A N/A N/A 0.65 N/A 8 B N/A N/A N/A N/A 0.65 N/A 9 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 10 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 11 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A 12 B N/A N/A N/A N/A N/A N/A N/A 0.65 N/A Resistance Factor Tension Notes 1. Recommended Nominal Bearing Resistance: 2. Based on a soil resistance factor of Based on an approximate overall factor of safety of 2.5.

23 DAVISSON PILE CAPACITY VS. PILE TIP ELEVATION GRAPH

24 18-IN SQUARE PPC PILES Sunrail Phase 2 South Bridge MP A811.3 (Shingle Creek) Financial Project No GEC Project No. 2135G PILE TIP ELEVATION (FT NAVD) DAVISSON PILE CAPACITY (TONS) B6-1 B6-2 B6-3 B6-4 B6-5 B6-6

25 USGS QUADRANGLE AND NRCS SOIL SURVEY MAPS

26

27

28 BORING LOCATION PLAN AND SPT BORING RESULTS

29

30

31

32

33

34

35

36 SUMMARY OF CORROSION SERIES TEST RESULTS

37 Table 6 Summary of Corrosion Series Test Results Sunrail Phase 2 South GEC Project No. 2135G6 Page 1 of 1 Bridge No. Sample Minimum Boring USCS Chlorides Sulfates Substructural Environmental Classification Depth ph Resistivity No. Symbol (ppm) (ppm) (feet) (ohm-cm) Concrete Steel A811.3 B6-1 SC , Slightly Aggressive Moderately Aggressive A811.3 B6-3 Water , Slightly Aggressive Moderately Aggressive A811.3 B6-4 SC , Moderately Aggressive Moderately Aggressive

38 SUMMARY OF D 50 TEST RESULTS AND PARTICLE SIZE DISTRIBUTION CURVES

39 Table 7 Summary of D50 Test Results Sunrail Phase 2 South GEC Project No. 2135G6 Page 1 of 1 Sample Depth (feet) Sample Elevation (feet NAVD88) Bridge/Culvert No. Boring No. Station Offset (feet) USCS Symbol D 50 (mm) A811.3 B LT SC A811.3 B LT SP A811.3 B LT SP-SM A811.3 B LT SM A811.3 B LT SP A811.3 B LT SM

40

41

42

43 SCOUR RESISTANCE CALCULATIONS

44 Scour Resistance Calculations Sunrail Phase 2 South Bridge MP A811.3 (Shingle Creek): Bents 7 & 8 Financial Project No GEC Project No. 2135G6 BORING B6-3 (ELEVATION TO FT NAVD) 18" Square Prestressed Concrete Pile Layer Soil Average Ultimate Side Layer Pile Surface Scour Resistance Number Type N Friction Thickness Area from (tsf) (ft) (sf/ft) Design Chart (tons) Total Scour Resistance 26

45 SAMPLE FB DEEP ANALYSES

46

47

48

49

50

51

52

53

54

55

56

57

Report of Preliminary Geotechnical Engineering Investigation for Ponds

Report of Preliminary Geotechnical Engineering Investigation for Ponds Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 3: State Road 400 (SR 400)/Interstate 4 (I-4) from One Mile East of SR 434 to East of SR 15-600/US 17-92 Seminole County (77160),

More information

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light 100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida

More information

Report of Preliminary Geotechnical Engineering Investigation for Ponds

Report of Preliminary Geotechnical Engineering Investigation for Ponds Report of Preliminary Geotechnical Engineering Investigation for Ponds Segment 2: State Road 400 (SR 400)/Interstate 4 (I-4) from West of SR 528 (Beachline Expressway) to West of SR 435 (Kirkman Road)

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5 TABLE OF CONTENTS 1.0 SITE AND PROJECT DESCRIPTION... 1 2.0 NRCS SOIL SURVEY... 1 3.0 USGS POTENTIOMETRIC MAP DATA... 2 4.0 SUBSURFACE EXPLORATION... 3 4.1 SPT Borings... 3 4.2 Groundwater Measurement...

More information

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

Final Report of Geotechnical Engineering Investigation For Miscellaneous Structures WEKIVA PARKWAY (SR 429) SECTION 7A From 0.

Final Report of Geotechnical Engineering Investigation For Miscellaneous Structures WEKIVA PARKWAY (SR 429) SECTION 7A From 0. Final Report of Geotechnical Engineering Investigation For Miscellaneous Structures WEKIVA PARKWAY (SR 429) SECTION 7A From 0.2 Miles West of Longwood-Markham Road to 0.1 Miles East of Orange Boulevard

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

Preliminary Soil Survey Report

Preliminary Soil Survey Report Florida Department of TRANSPORTATION Preliminary Soil Survey Report Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering DATE: August 31, 2000 Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM EMI PROJECT NO: 99-136 PREPARED FOR: COPIES: PREPARED BY: Tayfun Saglam / Parsons Brinckerhoff Juan

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No.

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No. Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W40) AID Project No. GOA16001 Orange County, Florida GEC Project No. 956G July 6, 2017 American Infrastructure Development, Inc. 7 North

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

October 11, 2011 Re-Issued November 15, 2011

October 11, 2011 Re-Issued November 15, 2011 Shadow Wood Investors LLC 425 W New England Avenue, Suite 425 Winter Park, FL 32789 October 11, 2011 Re-Issued November 15, 2011 LOCATIONS: Atlanta Daytona Beach Fort Myers Fort Pierce Gainesville Jacksonville

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

PREPARED BY: ALBERT NEUMANN E.I. PROJECT MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT 5

PREPARED BY: ALBERT NEUMANN E.I. PROJECT MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT 5 SR 19 OVER LITTLE LAKE HARRIS BRIDGE 110026 SUBSTRUCTURE REPAIR LAKE COUNTY, FL PREPARED BY: ALBERT NEUMANN E.I. PROJECT MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT 5 DAVID THOMPSON P.E. ENGINEER

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB#

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB# ADDENDUM NO. 1 DATE: January 22, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: 23.15 ---- Wakulla Co

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V.

cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design P. Sanders FROM: Bart Asher, P.E. V. M E M O R A N D U M (SA-007-2011) cc: K. Sandefur B. Greene TO: Mark Hite, P.E. R. Powell Division of Structural Design J. Moore P. Sanders FROM: Bart Asher, P.E. V. Forsythe TEBM, Geotechnical Branch

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS CREEKSIDE BOULEVARD FORCE MAIN EXTENSION AND INTERCONNECT NAPLES, COLLIER COUNTY, FLORIDA COLLIER COUNTY PROJECT NO. 700.2. P.O. #0003, CN #3-66

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

Subsurface Environmental Investigation

Subsurface Environmental Investigation Subsurface Environmental Investigation Lake Development East Lake and 21 st Avenue South February 23, 201 Terracon Project No. MP14738A Prepared for: Minneapolis Public Schools Prepared by: Terracon Consultants,

More information

DRAFT GEOTECHNICAL TECHNICAL MEMORANDUM

DRAFT GEOTECHNICAL TECHNICAL MEMORANDUM DRAFT GEOTECHNICAL TECHNICAL MEMORANDUM Project Development & Environment Study SR 655 (Recker Highway) Grade Separation over CSX Railroad Crossing #623082F From east of Barton Park Road to SR 600 (US

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

LADOTD DRIVEN PILE DESIGN & VERIFICATION. Jesse G Rauser, PE USING LRFD

LADOTD DRIVEN PILE DESIGN & VERIFICATION. Jesse G Rauser, PE USING LRFD LADOTD DRIVEN PILE DESIGN & VERIFICATION Jesse G Rauser, PE USING LRFD OBJECTIVES Not all of our policies, guidelines, and SOP s are in the same location Answer commonly asked questions about LADOTD pile

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 203 to 210 Drainage Structure Pipe Jacking Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC

More information

Chapter 21 GEOTECHNICAL REPORTS

Chapter 21 GEOTECHNICAL REPORTS Chapter 21 GEOTECHNICAL REPORTS Final SCDOT GEOTECHNICAL DESIGN MANUAL June 2010 Table of Contents Section Page 21.1 Introduction... 21-1 21.2 Geotechnical Base Line Report... 21-1 21.3 Bridge Geotechnical

More information

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by:

Prepared for: HDR Engineering, Inc. 200 West Forsyth Street, Suite 800 Jacksonville, Florida Prepared by: REPORT OF GEOTECHNICAL EXPLORATION REHABILITATE WHARF STRUCTURE AT BERTHS 6 AND ½ OF BERTH 5 TALLEYRAND MARINE TERMINAL, JACKSONVILLE, FLORIDA E&A PROJECT NO. 0756-0081 Prepared for: HDR Engineering, Inc.

More information

EXHIBIT G GEOTECHNICAL REPORT (DRAFT)

EXHIBIT G GEOTECHNICAL REPORT (DRAFT) EXHIBIT G GEOTECHNICAL REPORT (DRAFT) APPENDIX 1 PROJECT SITE 'B' B-1 B-2 I-2 B-3 B-4 B-5 I-1 PROJECT LOCATION LEGEND B-1 = APPROXIMATE BORING LOCATION I-1 = APPROXIMATE INFILTRATION

More information

This Page Intentionally Left Blank

This Page Intentionally Left Blank GEOTECHNICAL REPORT This Page Intentionally Left Blank July 30, 2014-Revised December 11, 2013 South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 Attn: Mr. Jesse

More information

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C

May 3, Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A Washington, D.C 1250 West Century Avenue Mailing Address: P.O. Box 5601 Bismarck, ND 58506-5601 (701) 530-1600 May 3, 2018 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street NE, Room 1A

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Milepost 210 to 218 Drainage Structure Pipe Jacking Creek County, Oklahoma July 1, 2016 Terracon Project No. 04165017 Prepared for: Benham Tulsa,

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

For. Report of Geotechnical Exploration. JEA Northside Switchyard 4377 Heckscher Drive Jacksonville, Florida

For. Report of Geotechnical Exploration. JEA Northside Switchyard 4377 Heckscher Drive Jacksonville, Florida Report of Geotechnical Exploration For 4377 Heckscher Drive Jacksonville, Florida MAE Project No. 007-0007 June 30, 2017 Prepared for: Prepared by: Jacksonville, Florida 3226 Phone (904) 19-6990 Fax (904)

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering

Earth Mechanics, Inc. Geotechnical & Earthquake Engineering Earth Mechanics, Inc. Geotechnical & Earthquake Engineering TECHNICAL MEMORANDUM DATE: June 3, 2009 EMI PROJECT NO: 01-143 TO: COPY: FROM: SUBJECT: John Chun, P.E. / Port of Long Beach (POLB) Jorge Castillo

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF CONTENTS 422.01 SCOPE 422.02

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

PART 1b. Section 7.2 of SJRWMD Special Publication SJ93-SP10

PART 1b. Section 7.2 of SJRWMD Special Publication SJ93-SP10 PART 1b GEOTECHNICAL INVESTIGATION TO ESTIMATE AQUIFER PARAMETERS Note the word is estimate & not determine. Must appreciate the physical meaning of each aquifer parameter. Aquifer, in this sense, does

More information

Chapter 1 INTRODUCTION

Chapter 1 INTRODUCTION Chapter 1 Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 1.1 Introduction... 1 1.2 Preconstruction Division... 1 1.2.1 Regional Production Groups... 2 1.2.2 Preconstruction

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations

Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Consultant Specifications for Subsurface Investigation & Geotechnical Analysis and Design Recommendations Mn/DOT Geotechnical Section - Office of Materials & Road Research http://www.mrr.dot.state.mn.us/geotechnical/foundations/tcontract.asp

More information

PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI

PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI PRELIMINARY ENGINEERING DESIGN MEMORANDUM WATER TREATMENT PLANT FLOOD WALL TO PROTECT BACKWASH SETTLING BASIN CITY OF NEW BUFFALO, MI City of New Buffalo, MI Preliminary Engineering Design Memorandum Water

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Pavement Subgrade Survey State Highway 125 over Hudson Creek Ottawa County, Oklahoma September 23, 21 Terracon Project No. 415121 Prepared for: Guy Engineering Services,

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

Table of Contents 18.1 GENERAL Overview Responsibilities References

Table of Contents 18.1 GENERAL Overview Responsibilities References Table of Contents Section Page 18.1 GENERAL... 18.1-1 18.1.1 Overview... 18.1-1 18.1.2 Responsibilities... 18.1-1 18.1.3 References... 18.1-2 18.2 MISCELLANEOUS FOUNDATION DESIGNS... 18.2-1 18.2.1 Buildings...

More information

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Collier County Project Number 70043.14.1 Vanderbilt Drive and Finger Streets From Vanderbilt Beach Road to 111th Avenue

More information

HSA ENGINEERS & SCIENTISTS. A member of the CRA family of companies

HSA ENGINEERS & SCIENTISTS. A member of the CRA family of companies HSA ENGINEERS & SCIENTISTS A member of the CRA family of companies Report of Pavement Coring and Services Town of Belleair Rosery Road Seawall, Roadway and Drainage Improvements Atkins 4030 West Boy Scout

More information

GEOTECHNICAL INVESTIGATION & ASSESSMENT TO ESTIMATE AQUIFER PARAMETERS

GEOTECHNICAL INVESTIGATION & ASSESSMENT TO ESTIMATE AQUIFER PARAMETERS GEOTECHNICAL INVESTIGATION & ASSESSMENT TO ESTIMATE AQUIFER PARAMETERS SJRWMD PONDS WORKSHOP! Note the word is estimate & not determine! Must appreciate the physical meaning of each aquifer parameter!

More information

June i TABLE OF CONTENTS

June i TABLE OF CONTENTS June 2005 - i - 05-526 TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION... 1 1.1 Purpose of the Investigation... 1 1.2 Description of the Project and Scope of Work... 1 1.3 Site Geology... 1 1.4 Site Description

More information

penetrometer test (CPT) soundings were done to supplement the SPT data. Construction recommendations were made for most of the new buildings.

penetrometer test (CPT) soundings were done to supplement the SPT data. Construction recommendations were made for most of the new buildings. 2016 ASCE Ridge Branch Florida Section Project of the Year Grouted Pulldown Micropile foundation design for Four-story Building at Southeastern University, Lakeland, Florida Introduction and Project Description

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 APRIL 2004 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS IN OPEN CUT TABLE OF

More information

Soil Improvement by Compaction Grouting

Soil Improvement by Compaction Grouting CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 31-3223.12 Soil Improvement by Compaction Grouting Part 1 - General 1.01 Introduction

More information

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California Mr. Victor Garcia The Holt Group 1601 N. Imperial Ave. El Centro, California 92243 September 28, 2017 Project No. EC595 SUBJECT: REFERENCE: GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for

More information

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 422 November 2015 CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT TABLE OF CONTENTS D 422.01 D 422.02 D 422.03

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT GRAND AVENUE PEDESTRIAN BRIDGE RELOCATION ROARING FORK RIVER GLENWOOD SPRINGS, COLORADO April 18, 2016 Prepared By: Prepared For: Mr. Bob Pattillo, P.E. Pattillo Associates

More information

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC

APPENDIX A DRAINAGE STUDY PHASE 2 ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE 4C IMPROVEMENTS LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC DRAINAGE STUDY PHASE ALTERNATIVE IMPROVEMENTS CRYSTAL LAKE ALTERNATIVE C IMPROVEMENTS ` FOR: LAKEWOOD PIRATELAND SWASH HORRY COUNTY, SC APPENDIX A J-.000 Prepared by: Savannah, GA Charleston, SC Myrtle

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Coquina Beach Drainage Improvements Bradenton Beach, Florida July 16, 2018 Dunkelberger Project No. HC1032 Prepared for: Manatee County Construction Services Division Bradenton,

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

PART 2D. Section 7.2 of SJRWMD Special Publication SJ93-SP10

PART 2D. Section 7.2 of SJRWMD Special Publication SJ93-SP10 PART 2D GEOTECHNICAL INVESTIGATION TO ESTIMATE AQUIFER PARAMETERS Note the word is estimate & not determine. Must appreciate the physical meaning of each aquifer parameter. Aquifer, in this sense, does

More information

Estimating the Seasonal High Water Table: A Mix of Art & Science

Estimating the Seasonal High Water Table: A Mix of Art & Science Estimating the Seasonal High Water Table: A Mix of Art & Science PONDS WORKSHOP - SJRWMD Devo Seereeram, Ph.D., P.E. This paper was originally written over 4 years ago & generated a lot of interest. The

More information

GEOTECHNICAL SUBSURFACE DATA REPORT

GEOTECHNICAL SUBSURFACE DATA REPORT GEOTECHNICAL SUBSURFACE DATA REPORT SC-41 REPLACEMENT BRIDGE OVER MAIDEN DOWN SWAMP MARION COUNTY, SOUTH CAROLINA PREPARED FOR Mr. Joshua Meetze, E.I.T. RPG-2 GDS South Carolina Department of Transportation

More information

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.

More information

July 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735

July 23, Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735 Mr. Richard Miller, Vice President Lake Arrowhead Property Owners Association 7065 Arrowroot Trail Gaylord, Michigan 49735 Re: Task No. 3 Report of Findings Section 32, Township 30 North, Range 4 West

More information

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming

Geotechnical Engineering Evaluation Campbell County Athletic Play Fields Campbell County High School South Campus Gillette, Wyoming March 9, 2016 Proposal No. WYP16064 Campbell County School District Mr. Andy Mravlja 1000 W. 8 th Street Gillette, WY 82716 amravlja@ccsd.k12.wy.us RE: PROPOSAL Geotechnical Engineering Evaluation Campbell

More information

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company

ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING. Kansas City Terminal Railway Company James P. Hyland Page 1 ARGENTINE CONNECTION BRIDGE TRIPLE TRACK CROSSING Kansas City Terminal Railway Company James P. Hyland, P.E. Senior Bridge Engineer TranSystems Corporation James P. Hyland Page 2

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

Florida s Leading Engineering Source

Florida s Leading Engineering Source Since 1988 Florida s Leading Engineering Source Environmental Geotechnical Construction Materials Testing Threshold and Special Inspections Plan Review & Code Compliance Mr. Ron Ridenour Hanson Professional

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

PROJECT CULVERT REPLACEMENTS GEOTECHNICAL ENGINEERING REPORT CONTRACT No WO01 PALM BEACH COUNTY, FL FEBRUARY 2013

PROJECT CULVERT REPLACEMENTS GEOTECHNICAL ENGINEERING REPORT CONTRACT No WO01 PALM BEACH COUNTY, FL FEBRUARY 2013 SOUTH FLORIDA WATER MANAGEMENT DISTRICT PROJECT CULVERT REPLACEMENTS GEOTECHNICAL ENGINEERING REPORT CONTRACT No. 4600002703-WO01 PALM BEACH COUNTY, FL FEBRUARY 2013 Prepared for: South Florida Water Management

More information

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS COLORADO SPRINGS COLORADO Prepared for: UNIVERSITY OF COLORADO AT COLORADO SPRINGS Facilities Services 1420 Austin Bluffs Parkway Colorado Springs Colorado 80918

More information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information

Table of Contents 5.1 GENERAL Overview Investigation and Engineering Information Table of Contents Section Page 5.1 GENERAL... 5.1-1 5.1.1 Overview... 5.1-1 5.1.2 Investigation and Engineering Information... 5.1-2 5.2 PRELIMINARY GEOTECHNCIAL REPORTS... 5.2-1 5.2.1 Preliminary Geotechnical

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

A Case History of Pile Freeze Effects in Dense Florida Sands

A Case History of Pile Freeze Effects in Dense Florida Sands A Case History of Pile Freeze Effects in Dense Florida Sands By Ching Kuo 1, Guoan Cao 2, Amy L. Guisinger 3, and Paul Passe 4 Submission Date: August 1, 2006 2,804 Words 1 Table 5 Figures 1 Professional

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

Report No A. Prepared for

Report No A. Prepared for Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727) 572-9797 FLORIDA 1-800-248-CFTL FAX (727)

More information

GEOTECHNICAL INVESTIGATION I-15 MILE POST CL 120 INTERCHANGE MESQUITE, NEVADA PREPARED FOR:

GEOTECHNICAL INVESTIGATION I-15 MILE POST CL 120 INTERCHANGE MESQUITE, NEVADA PREPARED FOR: GEOTECHNICAL INVESTIGATION I-15 MILE POST CL 120 INTERCHANGE MESQUITE, NEVADA PREPARED FOR: HORROCKS ENGINEERS 2162 WEST GROVE PARKWAY, SUITE 400 PLEASANT GROVE, UTAH 84062 ATTENTION: BRIAN ATKINSON, P.E.

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Proposed Prairie Lane HDD Cores D7-A and D7-B Wayne County, Ohio February 14, 2015 Terracon Project No. N4149328 Prepared for: Project Consulting Services, Inc. Prepared by: Terracon

More information

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014

APPENDIX F GEOTECHNICAL INVESTIGATION UPDATE CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 GEOTECHNICAL INVESTIGATION UPDATE. CITY OF SANTA CRUZ D RAFT EIR L A B AHIA H OTEL JANUARY 2014 October 5, 2013 Project No. SCR-0720 SANTA CRUZ SEASIDE COMPANY Craig French 911 Center Street, Suite B Santa

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT Project: NW Bucklin Hill at Silverdale Way NW Project Number: 12023 Prepared for: Barber Development P.O. Box 473 Redmond, WA 98073 Prepared by: South Sound Geotechnical

More information