The Evolution of the City of Asheville Water System. Presented by Leslie Carreiro and Bill Hart

Size: px
Start display at page:

Download "The Evolution of the City of Asheville Water System. Presented by Leslie Carreiro and Bill Hart"

Transcription

1 The Evolution of the City of Asheville Water System Presented by Leslie Carreiro and Bill Hart

2 First City of Asheville Water System Asheville Water System Prior to 1883 Beaucatcher Reservoir -5 Million Gallon Capacity. Water Distribution Water Provided through pipe made of wooden logs. Watering Points water supply to public from watering stations. City Wells water also provided by city installed wells.

3 Water System Improvements Development of a filtration plant on the Swannanoa River. Waters from this plant were pumped to the improved concrete lined Beucatcher Reservoir and then distributed to the public. In Howells, Historical Account of Public Water Supplies, Howells references a marked decrease in typhoid and other enteric diseases in Asheville after the introduction of filtered water. *The early filtration plant on the Swannanoa river is abandoned in 1903, due to poor quality of water and public discontent.

4 Buncombe County, NC

5 Water System Improvements In 1900, Asheville began to seek a quality water source for the city, and began purchasing land on the North Fork of the Swannanoa River. The first purchases totaled approximately 10,000 acres. To provide a quality water source, the City of Asheville constructed a small dam on the Right Fork of the Swannanoa River and laid a 16 cast iron line that was connected to a 300,000 gallon steel storage tank on Beaucatcher Mountain. This was completed by 1903.

6

7

8 Water System Improvements In 1910, drought and seasonal shortages of water necessitated the construction of a small channel to bring water from Long Branch and the Left Fork of the Swannanoa River to the existing Right Fork intake. Between , the city experienced periods of water shortage. To augment the water supply, the city purchased property on the headwaters of Bee Tree Creek. During a 5 year period work was undertaken to clean the watershed, construct a small dam and intake, and lay a new 16 water line to a new 5 million gallon storage tank on Beaucatcher Mountain.

9

10 Water Distribution and Sewage Systems In the late 1920 s growth in Buncombe County necessitated the expansion of water distribution systems and sewer systems. Availability of these services led to industrialization and greater demand on the water system. Additional land was purchased and or condemned adjacent the existing the North Fork watershed.

11 Water System Improvements In 1924, the City of Asheville begins construction on the Bee Tree Dam. The dam is planned to impound the waters of Bee Tree Creek and to provide the quality and reliability that was needed for public water supply. Population at this time was 35,000. In 1925, Asheville suffered a severe drought that led to water shortages. Because of ongoing drought and water shortages, the city constructed a 2 million gallon per day, filtration plant on the grounds of the Biltmore Estate in This plant was constructed in 52 days, and provided water from the French Broad River until the Bee Tree Reservoir was completed.

12 French Broad Filter Plant Raw water pump station and intake 1 mixing tank, 21,000 gallons 4 subsidence tanks, 85,000 gallons each 4 filters, 500,000 gallon/day capacity 1 clear water tank, 50,000 gallon capacity 1 wash tank, 45,000 gallons High Service pumping system and 26,000 feet of 12 inch pipeline to connect to the city distribution system

13

14

15

16 Completion of Bee Tree Dam In 1927, the Bee Tree Dam was completed at a cost of $2.5 million dollars. A new 24 water line was laid to the city and became part of the 500 mile long distribution system that included the city and county. The Bee Tree Reservoir provided a new storage capacity of 500 million gallons. This reservoir provided the city a combined capacity of 10 million gallons per day.

17 Water System Improvements In 1934, the original 16 line from Bee Tree intake was re-used and laid to a new intake on the Left Fork of the Swannanoa River. During this same year, ammonia treatment was introduced at North Fork and Bee Tree for the disinfection of water. In 1939, an 8 line was laid to an intake on Sugar Fork. Total available supply in a dry year at this time was 9.3 million gallons per day.

18

19

20 Water System Improvements In 1948, the average demand had reached 10.4 million per day. The estimated city population was 64,400, and the estimated county population was 127,000. At this point the water system was at capacity and demand was increasing rapidly. *Planning had been initiated in 1920, to develop adequate water resources for the ever growing population and future expected growth.

21 Water System Improvements In 1951, Construction began on the Burnett Dam and Reservoir. In 1955, the dam was completed and the reservoir filled. The resulting reservoir was completed at a cost of $2.5 million, had 5.7 billion gallons of water storage capacity, and increased water security for the Asheville/Buncombe County area. Provided water to the distribution system through 2, 16 inch lines, and a 24 inch line. Bee Tree and North Fork Water Treatment Plants treated their respective waters without filtration.

22

23

24

25

26 Water System Improvements In 1960, the city began to plan for increased capacity from the North Fork Water Treatment Plant by adding a 36 inch water line. In 1961, bonds were issued to fund this improvements. In 1963, construction on this 36 pipeline was completed. As a result Bee Tree Water treatment Plant was retired. And converted to recreational facility. In 1967, the city holds referendum and begins fluoridation.

27 Water System Improvements In 1976, Construction begins on the new North Fork WTP. Filtration is added to the North Fork Water Treatment Plant. Four filters are added giving the North Fork WTP a production capacity of 25 MGD. In 1985, the decision is made to discontinue use of the Bee Tree Reservoir for recreation, and to resume water production. As a result, the city builds a new plant complete with 2 filters for a production capacity of 5 MGD. In 1992, plant upgrades at the North Fork WTP add 2 additional filters and bring the production capacity to 31 MGD.

28 Water System Improvements Mid 1990s, the city begins to purchase land and plan for the construction of a new treatment plant on the Mills River in Henderson County. In 1999, the Mills River WTP is completed and begins treating water from the Mills River. In 1999, Bee Tree WTP is once again retired to conduct renovations on the existing spillway. In 2008, Bee Tree WTP is returned to service to provide extra capacity in the city water system.

29 City of Asheville Water Department The City of Asheville Water Resource Department is composed of 6 Divisions, that employee a workforce of 149 positions. The divisions are as follows; Customer Service Meter Services Water Administration Water Engineering Water Maintenance Water Production

30 City of Asheville Water System Water Resource has 58,198 service connections within the City of Asheville and Buncombe County. The City of Asheville water system is a class A system that is permitted to serve a population of 124,300. The water system serves an area of 183 square miles, and has 1,681 miles of water line, 32 water storage tanks, 37 pumping stations and 3 water treatment facilities, with a capacity to produce and deliver, 43.5 million gallons of water per day.

31 Water Production Division The 3 City of Asheville treatment facilities are; Mills River WTP North Fork WTP William DeBruhl WTP

32 Mills River WTP Mills River WTP is a conventional treatment facility that uses ozination, sedimentation and filtration through Granular Activated Carbon filters, to treat water from the Mills River. The Mills River watershed covers approximately 47,440 acres in Henderson and Transylvania Counties. The majority of this watershed is located within the Pisgah National Forest, and provides very high quality water for treatment.

33 Mills River WTP Mills River WTP

34 Mills River WTP

35 Mills River WTP

36 North Fork and William DeBruhl WTP North Fork and William DeBruhl WTP use direct filtration to treat water from pristine reservoirs, surrounded by 20,000 acres of limited access watershed. William DeBruhl WTP draws water from the 500 million gallon capacity, Bee Tree Reservoir. North Fork WTP draws water from the 5.75 billion gallon capacity, Burnett Reservoir.

37 North Fork WTP North Fork WTP

38 North Fork WTP

39 Burnett Reservoir

40 Burnett Reservoir

41 Bee Tree WTP Bee Tree WTP

42 William DeBruhl WTP

43 Bee Tree Reservoir

44 Bee Tree Reservoir

Impact Study on MSD Rate Payers of Proposed Consolidation/Merger

Impact Study on MSD Rate Payers of Proposed Consolidation/Merger *DRAFT November 9, 2012* Metropolitan Sewerage District Impact Study on MSD Rate Payers of Proposed Phase I City of Asheville Water System November 2012 Report Prepared By: ARCADIS G&M of North Carolina

More information

Impact Study on MSD Rate Payers of Proposed Consolidation/Merger

Impact Study on MSD Rate Payers of Proposed Consolidation/Merger *DRAFT November 9, 2012* Metropolitan Sewerage District Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase I City of Asheville Water System November 2012 Report Prepared By: ARCADIS

More information

Description of Water Systems

Description of Water Systems Description of Water Systems 1 WATER SYSTEM OWNERSHIP AND MANAGEMENT The City is a Washington State municipal corporation that owns and operates a Group A community water system within the boundaries of

More information

Raw water sources, facilities, and infrastructure

Raw water sources, facilities, and infrastructure WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure

More information

City of Port Orford Water Supply Expansion. Phase I Distribution System Phase II Hubbard Creek Impoundment

City of Port Orford Water Supply Expansion. Phase I Distribution System Phase II Hubbard Creek Impoundment City of Port Orford Water Supply Expansion Phase I Distribution System Phase II Hubbard Creek Impoundment City of Port Orford Water Supply Expansion Presented by: City of Port Orford SHN Consulting Engineers

More information

Glades Reservoir Environmental Impact Statement (EIS)

Glades Reservoir Environmental Impact Statement (EIS) Glades Reservoir Environmental Impact Statement (EIS) Permit Application #SAS-2007-00388 Public Scoping Meeting Proposed Operational Plan/Scenarios March 2012 Glades Reservoir Environmental Impact Statement

More information

Sugar Hollow MG 324 MG 200 MG 2,283.5 MG

Sugar Hollow MG 324 MG 200 MG 2,283.5 MG Summary of a Safe Yield Analysis for the Rivanna Water and Sewer Authority System DEQ Office of Surface and Ground Water Supply Planning April 23, 2010 Overview A water supply model was constructed to

More information

Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project. August 24, 2016

Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project. August 24, 2016 Supplemental Environmental Impact Statement for the Springfield Supplemental Water Supply Project August 24, 2016 What is a Supplemental Environmental Impact Statement? What is a Supplemental Environmental

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.0 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

REGIONAL WATER SUPPLY PLAN FOR. Albemarle County City of Charlottesville Town of Scottsville

REGIONAL WATER SUPPLY PLAN FOR. Albemarle County City of Charlottesville Town of Scottsville REGIONAL WATER SUPPLY PLAN FOR Albemarle County City of Charlottesville Town of Scottsville Prepared by Rivanna Water and Sewer Authority Charlottesville, Virginia September 30, 2011 TABLE OF CONTENTS

More information

Figure 1 Demands on Lake Athens

Figure 1 Demands on Lake Athens Table 1 Projected Demands for Athens MWA and Lake Athens Water User Group Demand on Lake Athens 2010 2020 2030 2040 2050 2060 Comments City of Athens 2,326 2,832 3,431 4,111 5,003 6,108 Henderson Co. Irrigation

More information

MSD PLANNING COMMITTEE

MSD PLANNING COMMITTEE MSD PLANNING COMMITTEE Metropolitan Sewerage District of Buncombe County, NC Agenda For: November 14, 2012 Meeting Time: Noon - Agenda Item Presenter 1. Call to Order Al Root, Chair 2. Presentation of

More information

City of Moline Water Infrastructure Overview

City of Moline Water Infrastructure Overview City of Moline Water Infrastructure Overview January 2012 Moline s Water Supply System Delivers: Public Health Protection Fire Protection Support for the Local Economy Quality of Life Moline s Water Supply

More information

History of Augusta s Waterworks Presented for. AUD Leadership Training

History of Augusta s Waterworks Presented for. AUD Leadership Training History of Augusta s Waterworks Presented for Drew Goins, Interim Director Augusta Utilities Waterworks, like cities, are seldom, if ever, completed. William Phillips, Augusta City Engineer 1865 . 200,000

More information

By Delbert Zerr, KRWA Consultant

By Delbert Zerr, KRWA Consultant By Delbert Zerr, KRWA Consultant The city of Milford, located north of Junction City on the east shore of Milford Reservoir, is switching from its surface water plant on Milford Reservoir to instead purchase

More information

Local Water Supply Planning - North Carolina Division of Water Resources

Local Water Supply Planning - North Carolina Division of Water Resources Montreat 2011 The Division of Water Resources (DWR) provides the data contained within this Local Water Supply Plan (LWSP) as a courtesy and service to our customers. DWR staff does not field verify data.

More information

Cape Fear River Water Supply Evaluation

Cape Fear River Water Supply Evaluation Cape Fear River Water Supply Evaluation March 30, 2016 Division of Water Resources Cape Fear River WaterSupply Evaluation Todays goal: Review the Draft Cape Fear River Water Supply Evaluation Review the

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Paris, Kentucky Project

More information

August 19, Subject: IBT Report for Dear Ms. Nimmer:

August 19, Subject: IBT Report for Dear Ms. Nimmer: August 19, 2016 Ms. Kim Nimmer Water Supply Planning Branch N.C. Division of Water Resources 1611 Mail Service Center Raleigh, North Carolina 27699-1611 Subject: IBT Report for 2015 Dear Ms. Nimmer: We

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH

PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH SECTION A: DEMAND CONSIDERATIONS SECTION B: SUPPLY CONSIDERATIONS SECTION C: EXISTING PROJECTS WITH

More information

Kings Run Project Public Meeting. July 31, 2014

Kings Run Project Public Meeting. July 31, 2014 Kings Run Project Public Meeting July 31, 2014 Welcome and Overview Lower Mill Creek - Kings Run Project Details Q&A Kings Run Project Stations (opportunity to talk to MSD staff) MSD is under a federal

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

City of Greenfield Water Treatment Plant/System

City of Greenfield Water Treatment Plant/System City of Greenfield Water Treatment Plant/System General Information County: Highland Counties Served: Highland Type of System: Public: X 6119: Private: Year Established: 1893 Year of Upgrades: 1972, 1977,

More information

Overview of US Water Sector

Overview of US Water Sector Overview of US Water Sector The broadly defined US water sector represented approximately US$124 billion in revenues in 2008, growing 4-5% over 2007 figures. Water utilities (about 70% public sector) and

More information

Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON

Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON May 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY Page Purpose and Background... ES-1 Existing Water System... ES-1 Water Demands...

More information

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017

Water and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 ANALYSIS OF WATER & WASTEWATER SYSTEMS... 1 2.1 Present Water Demands... 1 2.2 Water Supply... 3 2.3 Water Treatment Plant... 4 2.4 Storage, High-Service Pumps,

More information

City of Loveland Water System

City of Loveland Water System General Information County: Clermont Counties Served: Clermont Type of System: Public: X 6119: Private: Year Established: N/A Year of Upgrades: N/A EPA District: Southwest Watershed: N/A Source: Surface

More information

City of Cartersville Water Department History. Original Filter Plant (1913) and Steam Powered Pumping Station (1893)

City of Cartersville Water Department History. Original Filter Plant (1913) and Steam Powered Pumping Station (1893) City of Cartersville Water Department History Original Filter Plant (1913) and Steam Powered Pumping Station (1893) Timeline Jan 1888 Committee of 4 councilmen & 8 citizens look into cost of setting up

More information

DROUGHT RESPONSE AND CONTINGENCY PLAN

DROUGHT RESPONSE AND CONTINGENCY PLAN DROUGHT RESPONSE AND CONTINGENCY PLAN 1. Background and Purpose In 2004, a Rivanna Regional Drought Response Committee was formed to work cooperatively to provide a coordinated response to drought in this

More information

Safe Yield Study January 2004

Safe Yield Study January 2004 Safe Yield Study January 2004 Safe Yield Study Prepared For Prepared By January 2004 RIVANNA WATER AND SEWER AUTHORITY CHARLOTTESVILLE, VIRGINIA SAFE YIELD STUDY EXECUTIVE SUMMARY BACKGROUND Since 1973

More information

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS

CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS CITY OF LAGRANGE, GEORGIA UTILITY DEPARTMENT WATER CONSERVATION AND DROUGHT CONTINGENCY PLANS Modified: May 2012 WATER CONSERVATION PLAN SYSTEM MANAGEMENT AND SALES Permit Information. The City of LaGrange

More information

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved.

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved. Breckenridge Second Water Treatment Plant Public Open House April 11, 2018 2015 HDR, all rights reserved. Why Build a Second Water Treatment Plant? Future Tarn WTP Refurbishment: o Allows existing Tarn

More information

WATER POLLUTION CONTROL PLANT

WATER POLLUTION CONTROL PLANT WATER POLLUTION CONTROL PLANT Welcome to the Sunnyvale Water Pollution Control Plant For 60 years, Sunnyvale s Water Pollution Control Plant has worked tirelessly 24 hours a day and 7 days a week. Rain

More information

8.3 Somervell County Water Supply Project

8.3 Somervell County Water Supply Project 8.3 Somervell County Water Supply Project 8.3.1 Description of Option The Somervell County Water District (SCWD) completed the first part of their surface water supply system in October 2011. Previously,

More information

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Utility Fast Facts Average household uses 107,000 gallons of water each year. 1,851 gallons of water to refine

More information

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration

More information

EXCELLENCE * INTEGRITY * STEWARDSHIP * COMMITMENT * EFFICIENCY * VISION

EXCELLENCE * INTEGRITY * STEWARDSHIP * COMMITMENT * EFFICIENCY * VISION 1 TOPICS September 8 & 22, 2011 The Challenge The Solution (Part of it) The Grand Park The Results 2 The North Georgia Water Challenge High dependency on Lake Lanier and Chattahoochee River (>70%). 11

More information

Florida Government Utility Authority- Lehigh Utility System

Florida Government Utility Authority- Lehigh Utility System Florida Government Utility Authority- Lehigh Utility System Florida Governmental Utility Authority, Utility Refunding Revenue Bonds (Lehigh Utility System), Series 2014, $20,625,000, Dated: November 13,

More information

4. Present Activities and Roles

4. Present Activities and Roles 4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified

More information

Overview of Local Facilities. Integrated Resource Planning Advisory Committee

Overview of Local Facilities. Integrated Resource Planning Advisory Committee Overview of Local Facilities Integrated Resource Planning Advisory Committee City of Henderson Utility Services System Overview 2 CITY OF HENDERSON Department of Utility Services The Department of Utility

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment

UTILITY SYSTEM OVERVIEW. Water Source Water Distribution Wastewater Collection Wastewater Treatment 1 UTILITY SYSTEM OVERVIEW Water Source Water Distribution Wastewater Collection Wastewater Treatment 2 AGENDA Overview of the Utility System (building on the Council tours) ARWA Petersburg SCWWA Infrastructure

More information

light & power wastewater stormwater water fact book

light & power wastewater stormwater water fact book 2015 fact book light & power stormwater wastewater water INSIDE UTILITIES Utilities revenue is fee based, not general fund (sales tax). Our intent: to deliver a level of service our customers expect in

More information

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water

OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT. Tony Humphries. Tony Humphries, Operator, SEQ Water OPTIMISATION OF IMAGE FLAT WATER TREATMENT PLANT Paper Presented by: Tony Humphries Author: Tony Humphries, Operator, SEQ Water 34th Annual Qld Water Industry Operations Workshop Indoor Sports Stadium,

More information

FISCAL NOTE Rule Citation Number: 15A NCAC 2B.0304 French Broad River Basin

FISCAL NOTE Rule Citation Number: 15A NCAC 2B.0304 French Broad River Basin 1 FISCAL NOTE Rule Citation Number: 15A NCAC 2B.0304 French Broad River Basin Rule Topic: Reclassification of French Broad River segment to Class Water Supply-IV (WS-IV) Critical Area (CA) DENR Division:

More information

Proposition 1 Funding Opportunities for Los Angeles

Proposition 1 Funding Opportunities for Los Angeles Proposition 1 Funding Opportunities for Presentation to the CMAA SC Chapter October 30, 2014 EVELYN CORTEZ DAVIS, P.E. MANAGER OF WATER RECYCLING POLICY & WATER RIGHTS Department of Water and Power Proposition

More information

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 Mayor Kevin Foy Town of Chapel Hill 306 North Columbia Street Chapel Hill, NC 27516 Chairman Barry Jacobs Orange County Board of Commissioners

More information

Future Additional Water Demand Based on Existing Planned Growth

Future Additional Water Demand Based on Existing Planned Growth Table 7: Water Supply Currently Available for Existing and Future Growth for Each Municipal System (in Gallons per Day) Current Unserved Net Permitted Avg Day Avg Day Avg Day Avg. Daily Drought Remaining

More information

Water Treatment Overview. Gabe Sasser December 2016

Water Treatment Overview. Gabe Sasser December 2016 Water Treatment Overview Gabe Sasser December 2016 Topics of Discussion Source Water Information Treatment Plants (History and Capacity) Water Quality Water Treatment Process Distribution System Conservation

More information

Purpose of the Comprehensive Water System Plan

Purpose of the Comprehensive Water System Plan 2006 TACOMA WATER COMPREHENSIVE WATER SYSTEM PLAN UPDATE EXECUTIVE SUMMARY Purpose of the Comprehensive Water System Plan Tacoma Water s planning activities center on the need to meet increasing demands

More information

ADVERTISEMENT: REQUEST FOR PROPOSAL

ADVERTISEMENT: REQUEST FOR PROPOSAL City of Cortez Service Center 110 West Progress Circle Cortez, CO 81321 PW-18-96 ADVERTISEMENT: REQUEST FOR PROPOSAL WATER TREATMENT PLANT PLC AND SCADA SYSTEM UPGRADE PROJECT SCOPE: The City of Cortez

More information

The next step in ozone purification

The next step in ozone purification The next step in ozone purification An early adopter adds high-capacity pretreatment to remove almost all particles and algae before filtration. By Peter Tunnicliffe, PE Variable-flow software lowers costs

More information

MARIPOSA PUBLIC UTILITY DISTRICT GENERAL INFORMATION

MARIPOSA PUBLIC UTILITY DISTRICT GENERAL INFORMATION MARIPOSA PUBLIC UTILITY DISTRICT GENERAL INFORMATION November 2016 The Mariposa Public Utility District (MPUD) was established in 1947 under the "Public Utilities Act of 1921", as contained in Sections

More information

Leading Creek Conservancy District Water Treatment Plant

Leading Creek Conservancy District Water Treatment Plant Leading Creek Conservancy District Water Treatment Plant General Information County: Meigs Counties Served: Vinton, Meigs, Gallia Type of System: Public: 6119: X Private: Year Established: 1969 Year of

More information

MAP, PLAN AND REPORT WILLIAMS LAKE WATER DISTRICT WILLIAMS LAKE RESORT TOWN OF ROSENDALE, ULSTER COUNTY, NY

MAP, PLAN AND REPORT WILLIAMS LAKE WATER DISTRICT WILLIAMS LAKE RESORT TOWN OF ROSENDALE, ULSTER COUNTY, NY MAP, PLAN AND REPORT WILLIAMS LAKE WATER DISTRICT WILLIAMS LAKE RESORT TOWN OF ROSENDALE, ULSTER COUNTY, NY PREPARED FOR HUDSON RIVER VALLEY RESORTS PO BOX 385 ROSENDALE, NY 12472 PREPARED BY Crawford

More information

BRADEN RIVER UTILITIES BRU

BRADEN RIVER UTILITIES BRU BRADEN RIVER UTILITIES BRU WHO OWNS BRU & WHY BRU IS OWNED AND OPERATED BY SMR AS A NON-PUBLIC MEMBER UTILITY, STARTED IN 1994 SMR IS THE HOLDER OF ALL WATER USE PERMITS (WUP) FOR THE ENTIRE RANCH INCLUDING

More information

Capital Improvement Plan. Fiscal Years ADOPTED June Crozet Finished Water Pump Station. Wholesale Master Metering.

Capital Improvement Plan. Fiscal Years ADOPTED June Crozet Finished Water Pump Station. Wholesale Master Metering. Capital Improvement Plan Crozet Finished Water Pump Station Fiscal Years 2019 2023 ADOPTED June 2018 Wholesale Master Metering Odor Control Granular Activated Carbon Odor Control Rivanna Water & Sewer

More information

City Water, Light & Power

City Water, Light & Power City Water, Light & Power 1820-1856 Water is a precious commodity for early Springfieldians. Private wells and a handful of public hand pumps supply the city s water needs. An 1853 law prohibits the wasteful

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

Freitas + Freitas Engineering and Planning Consultants, Inc.

Freitas + Freitas Engineering and Planning Consultants, Inc. Freitas + Freitas Engineering and Planning Consultants, Inc. 15011 Ms. Lois Henry Board Members Lompico County Water District 11255 Lompico Road Felton, CA 95018 Subject: Review of Projects and Cost Estimates

More information

LADWP WATER INFRASTRUCTURE PLAN

LADWP WATER INFRASTRUCTURE PLAN LADWP 2017-18 WATER INFRASTRUCTURE PLAN Introduction All major components of the Water System infrastructure are evaluated as part of the ongoing Asset Management (AM) Program. The goal of AM is to systematically

More information

MEMORANDUM THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN

MEMORANDUM THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN MEMORANDUM TO: FROM: SUBJECT: RIVANNA WATER & SEWER AUTHORITY BOARD OF DIRECTORS THOMAS L. FREDERICK, EXECUTIVE DIRECTOR ANDREA TERRY, WATERSHED MANAGER DRAFT DROUGHT RESPONSE AND CONTINGENCY PLAN DATE:

More information

WESTCAS 2009 Fall Conference. October 30, 2009 Tucson, AZ Solutions for Life TM

WESTCAS 2009 Fall Conference. October 30, 2009 Tucson, AZ Solutions for Life TM Tucson s CLEARWATER Program From a Turbulent Beginning to Today s Sustainable and Drought Resistant Water Supply George P. Maseeh, P.E., BCEE Malcolm Pirnie, Inc. WESTCAS 2009 Fall Conference October 30,

More information

Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR

Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System Tiffanie Hawley, CFPUA Randy Plummer, HDR NC AWWA Spring Conference 2014 Background Data CFPUA Water System Fear Public

More information

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout ) THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout - 2018) PLANT HISTORY The Bossier City Water Treatment Plant was built in 1958. The original plant had a treatment capacity

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: February 16, 2017 CONSENT AGENDA: Informational ATTACHMENTS:

More information

RWSA BOARD OF DIRECTORS Minutes of Regular Meeting April 25, 2017

RWSA BOARD OF DIRECTORS Minutes of Regular Meeting April 25, 2017 695 MOORES CREEK LANE CHARLOTTESVILLE, VA 22902-9016 TEL: 434.977.2970 FAX: 434.293.8858 WWW.RIVANNA.ORG 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013

PARR. PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No SC JANUARY 2013 PARR HYDROELECTRIC PROJECT PARR HYDRO DEVELOPMENT & FAIRFIELD PUMPED STORAGE FACILITY DEVELOPMENT FERC PROJECT No. 1894 - SC JANUARY 2013 PARR Relicensing Project PARR AND FAIRFIELD LOCATIONS FFPS PARR

More information

Marlette Water System Overview

Marlette Water System Overview Marlette Water System Overview For Legislative Committee for Review and Oversight of TRPA and Marlette Water System April 13, 2006 By Pat McInnis, P.E. Chief Engineer Buildings and Grounds Administration

More information

DALLAS WATER UTILITIES LONG RANGE PLANNING FOR SUSTAINABILITY

DALLAS WATER UTILITIES LONG RANGE PLANNING FOR SUSTAINABILITY DALLAS WATER UTILITIES LONG RANGE PLANNING FOR SUSTAINABILITY Albert H. Halff 2015 Water Resources Workshop Dallas Post of the Society of American Military Engineers July 20, 2015 Maggiano's Little Italy,

More information

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016

Springfield Water and Sewer Commission. Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Springfield Water and Sewer Commission Fiscal Year 2017 Budget and Capital Plan Public Hearing June 7, 2016 Joshua Schimmel Executive Director Introduction Overview of System Presentation Summary Commission

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

Background Paper 81-7 REVIEW OF THE MARLETTE LAKE WATER SYSTEM AND PROPOSALS FOR SALE OF THE SYSTEM OR WATER FROM THE SYSTEM TO CARSON CITY

Background Paper 81-7 REVIEW OF THE MARLETTE LAKE WATER SYSTEM AND PROPOSALS FOR SALE OF THE SYSTEM OR WATER FROM THE SYSTEM TO CARSON CITY Background Paper 81-7 REVIEW OF THE MARLETTE LAKE WATER SYSTEM AND PROPOSALS FOR SALE OF THE SYSTEM OR WATER FROM THE SYSTEM TO CARSON CITY Review of the Marlette Lake Water System and Proposals for Sale

More information

City of Orofino, Water Treatment Upgrades

City of Orofino, Water Treatment Upgrades EPA Region 10 DWSRF WATERS Awards 2017 WATERS Well-Planned Affordable Transferable Efficient Resilient Sustainable 2017 WATERS Award Winners About The WATERS Awards Recognizing the most innova ve and effec

More information

WATER TREATMENT PLANT TOUR

WATER TREATMENT PLANT TOUR Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow WATER TREATMENT PLANT TOUR Tom Kula, Executive Director Billy George, Assistant Deputy Director Water August 11, 2017 Member

More information

7 Management of Existing Supplies

7 Management of Existing Supplies 7 Management of Existing Supplies 7.1 Lake Belton to Lake Stillhouse Hollow Pipeline 7.1.1 Description of Option A pipeline is proposed to connect Lake Belton to Lake Stillhouse Hollow (Figure 7.1-1) to

More information

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.

This is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established. WATER PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,

More information

PLANNING FOR REUSE IN NORTH CAROLINA

PLANNING FOR REUSE IN NORTH CAROLINA PLANNING FOR REUSE IN NORTH CAROLINA Tim Woody City of Raleigh Public Utilities Department P.O. Box 590 Raleigh, NC 27602 Michael B. Shafer, PE Black & Veatch International Company P. O. Box 33396, Raleigh,

More information

Amesville Water System

Amesville Water System Water system timeline System built in 1960 s Tank telemetry failed 1970 s June 2012 duracho and electric outage May 2013-29 EPA citations (see copy) June 2014 started consultation with Triad Engineering

More information

4 EXISTING FACILITIES EVALUATION

4 EXISTING FACILITIES EVALUATION 4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater

More information

EnTech, Inc. Consulting Engineers Sheridan, Wyoming

EnTech, Inc. Consulting Engineers Sheridan, Wyoming TOWNS OF DAYTON AND RANCHESTER WATER SUPPLY PROJECTS UPDATE PRESENTED BY: EnTech, Inc. Consulting Engineers Sheridan, Wyoming TOWN OF DAYTON PROBLEM AREAS WITH CURRENT WATER SYSTEM EXISTING 10 ASBESTOS

More information

Fridley Filter Plant Rehabilitation

Fridley Filter Plant Rehabilitation CITY OF MINNEAPOLIS Fridley Filter Plant Rehabilitation MINNEAPOLIS WATER WORKS Public Works Department Water Treatment & Distribution Services Division Overview Minneapolis Water Fridley Filter Plant

More information

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project

City of Saint John, New Brunswick. Safe, Clean Drinking Water Project City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting Engineering Awards 2017 City of Saint John, New Brunswick Safe, Clean Drinking Water Project Canadian Consulting

More information

BAYVIEW IRRIGATION DISTRICT # 11. Water Conservation Plan. Update. August 24, 2009

BAYVIEW IRRIGATION DISTRICT # 11. Water Conservation Plan. Update. August 24, 2009 BAYVIEW IRRIGATION DISTRICT # 11 Water Conservation Plan Update August 24, 2009 Bayview Irrigation District #11 Conservation Plan Update Page 1 of 6 Water Conservation Plan Update Bayview Irrigation District

More information

ENSURING REGIONAL PROSPERITY

ENSURING REGIONAL PROSPERITY Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow ENSURING REGIONAL PROSPERITY Society of American Military Engineers: Infrastructure Forum R.J. Muraski, Assistant Deputy Director,

More information

(b) Water Engineering Basics

(b) Water Engineering Basics NRRI Training for the Oklahoma Corporation Commission March 14-16, 2017 Topic 3 (b) Water Engineering Basics Kathryn J. Kline Research Associate National Regulatory Research Institute kkline@nrri.org Industry

More information

LAKE PALO PINTO STORAGE RESTORATION

LAKE PALO PINTO STORAGE RESTORATION Palo Pinto County MWD No. 1 and City of Mineral Wells Joint Meeting Cory Shockley, P.E. November 8, 2018 LAKE PALO PINTO STORAGE RESTORATION TURKEY PEAK PROJECT 2014 HDR, Inc., all rights reserved. History

More information

City of Asheville Capital Improvements and Risk Based Planning. April

City of Asheville Capital Improvements and Risk Based Planning. April City of Asheville Capital Improvements and Risk Based Planning April 19 2016 Introduction City of Asheville Water System System Characteristics: 125,000 Customers 20.5 MGD Distribution System 3 Treatment

More information

Partners in Water Quality

Partners in Water Quality Partners in Water Quality Presentation to the Treasure Coast Regional Planning Council Mayor Gregory J. Oravec Port St. Lucie is a Safe, Beautiful and Prosperous City for All People When they laid out

More information

Background on New Orleans and the Sewerage and Water Board of New Orleans

Background on New Orleans and the Sewerage and Water Board of New Orleans Hurricane Katrina s Impact on New Orleans Water System: How the System Was Restored and the Lessons Learned Presented to: 2008 American Public Works Association International Public Works Congress & Exposition

More information

Profile of the South Platte River Basin

Profile of the South Platte River Basin Cooperative Extension, Colorado State University http://dare.agsci.colostate.edu/csuagecon/extension/pubstools.htm Department of Agricultural and Resource Economics, Fort Collins, CO 80523-1172 December

More information

Springfield Supplemental Water Supply Project Supplemental Environmental Impact Statement

Springfield Supplemental Water Supply Project Supplemental Environmental Impact Statement The purpose of this Supplemental Environmental Impact Statement is to evaluate new and significant information within the project area, evaluate all appropriate and reasonable alternatives, assess the

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

NTMWD ESSENTIAL SERVICES, PROJECTS

NTMWD ESSENTIAL SERVICES, PROJECTS Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow NTMWD ESSENTIAL SERVICES, PROJECTS Society of American Military Engineers (SAME) Dallas Post September 17, 2018 Tom Kula, NTMWD

More information

Executive Summary INTRODUCTION COOPERATING AGENCIES PUBLIC AND AGENCY PARTICIPATION

Executive Summary INTRODUCTION COOPERATING AGENCIES PUBLIC AND AGENCY PARTICIPATION INTRODUCTION The City and County of Denver, acting by and through its Board of Water Commissioners (Denver Water) notified the United States (U.S.) Army Corps of Engineers (Corps) of their intent to apply

More information

Acclaimed city water works system fueled growth

Acclaimed city water works system fueled growth Acclaimed city water works system fueled growth By Mike Boyer, Cincinnati Enquirer*, mboyer@enquirer.com Unidentified workers and engineers pose at the Ohio River intake tunnel project circa 1898 Cincinnati's

More information

Funding Crumbling Infrastructure

Funding Crumbling Infrastructure Funding Crumbling Infrastructure Naeem Qureshi Progressive Consulting Engineers, Inc. 6120 Earle Brown Drive, Suite 629 Minneapolis, MN 55430 Phone: (763) 560-9133 Fax: (763) 560-0333 E-mail: naeemqureshi@pce.com

More information