1 Title: Section: Prepared by: State of Gravel Resource in the District Environmental Services & Protection Paul Murphy (Team Leader Water & Coastal Resources) Meeting Date: 7 February 2018 Legal Financial Significance = low Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for information SUMMARY The purpose of this report is to outline the state of the gravel resources in the Gisborne Region. This report will also go to the Assets & Infrastructure Committee meeting on 8 February 2018 for information. Gravel extraction is managed through policy and rules in the Gisborne Regional Freshwater Plan. A number of rivers in the Gisborne Region are aggrading. This is often due to the soft erodible sedimentary geology of sandstones and mudstones causing the river bed levels to rise. This can lead to increased bank erosion and the loss of productive land. The increasing demand of the gravel resource from forestry companies for forestry roading purposes has led to concerns about the potential effects on the riverine environment. Consequently, a series of technical reports analysing survey data of river bed levels was commissioned to improve our understanding of the bed load budget available for gravel extraction. This work has shown that bed aggradation levels in some rivers has slowed, and some locations are no longer aggrading, and down cutting is occurring. In some rivers the gravel resource may be fully allocated. The next step is to develop catchment based gravel extraction management plans with the priority placed on the Mata and Karakatuwhero catchments. The decisions or matters in this report are considered to be of low significance in accordance with the Council s Significance and Engagement Policy. RECOMMENDATIONS That the Environmental Planning & Regulations Committee: 1. Notes the contents of this report. Authorised by: Nicholas Zaman Director Environmental Services & Protection Keywords: gravel, gravel management, gravel extraction Page 1 of 5

2 BACKGROUND 1. Gravel extraction is managed through the Gisborne Regional Freshwater Plan (the Plan). 2. The Plan encourages gravel extraction to occur in areas where it provides the most benefit for river management purposes, minimising flood risk and maintaining or protecting existing structures. 3. Gravel extraction management is required to ensure: The potential effects on significant habitats and activities of native species are minimised; There is no alteration to rates of aggradation or bank erosion; There is no damage to sites of cultural significance; and There is no reduction in value for activities such as mahinga kai harvesting, recreational use, public access and impacts on natural character and amenity values. 4. Gravel extraction can only be undertaken in Outstanding Waterbodies if it is provided for in a Gravel Management Plan for that Outstanding Waterbody. The Outstanding Waterbodies in our region are: Te Arai River headwaters Urukokomuka Stream Lake Repongarae Motu River from and including the Motu Falls to the State Highway 35 Bridge including the Waitangirua, Mangaotane, Te Kahika and Mangatutara Streams Takaputahi River below its confluence with the Whitikau Stream The Ruakituri River from the headwaters to the Gisborne District Council boundary. 5. Gravel extraction demand is increasing as a result of increased forestry harvest and the use of gravel to construct forestry roads. As a result, concerns have been raised by community members and iwi as to how gravel extraction operations may be affecting the riverine environment. 6. The forestry industry has indicated peak harvest of the first rotation forests is not for several more years. Gravel extraction demand is likely to continue as road building is required. RIVER CROSS SECTION INFORMATION 7. Council staff survey a large number of river cross sections in the region on a regular basis. The cross sections were originally developed by the former Poverty Bay Catchment Board and the East Cape Catchment Board in the 1950 s and 1960 s. These cross sections were established primarily to monitor the rapidly aggrading river beds in the region. The cross section measurements have been recorded in a database allowing mean (average) bed levels to be calculated for each survey. 8. Monitoring occurs by a comparison of successive mean bed level calculations at specified cross sections over the river reach. Mean bed levels are calculated for the part of the river considered to be the active bed, which is the part of the bed that moves during a flood. 9. Mean bed level calculations are useful to assess the impact of gravel extraction when they are positioned upstream and downstream of the extraction site. Surveys should be undertaken prior to, and after, gravel extraction operations. However, the past surveys do not fulfil this criteria. Page 2 of 5

3 However, they do provide an assessment of the wider trends of bed level increasing or decreasing over time. 10. The Water and Coastal Resources Team commissioned a series of technical reports which analysed survey data of bed levels from 1956 to present. A total of 15 reports have been produced since July The reports have assessed general trends in bed level data in the following river catchments; Waiapu River Catchment River Bed Level Trend Implication Waiapu River Upper catchment gradually increasing; however, lower catchment no significant trend. Not a high priority for a gravel management plan. Good location to continue gravel extraction activities. Mata River Upper catchment decreasing, lower catchment increasing. Many of the gravel extraction sites are in the upper catchment over time these should be moved downstream to where the river is still aggrading. A gravel management plan is required. Makarika Stream Gradually increasing Unknown Makatote and Kopuaroa Stream Gradually decreasing Unknown Paoaruku Stream Gradually increasing Unknown Mangaoporo River Increasing Large gravel abstraction resource available. Tapuaeroa River Increasing Large gravel abstraction resource available. Waiorongomai stream Increasing, poor quality bed Despite large resource, unlikely to be suitable quality of Raparapaririki Stream Recently rate is decreasing. This is the source of some of the gravel resource heading down into the Tapuaeroa River. Poroporo River Increasing, recently rate has slowed. Despite large resource, unlikely to be suitable quality of Page 3 of 5

4 Maraehara River No significant trend Unknown Manutahi Stream Gradually decreasing trend Unknown Mangaharei Stream Gradually decreasing trend Unknown East Cape Rivers Karakatuwhero River Waipaoa River Catchment No significant trend, geology contributes less bed load Gravel resource may be fully allocated. A gravel management plan is required. Mangatu River Gradually increasing Not a high priority for a gravel management plan. Good location to continue gravel abstraction activities. 12. Trend reports on the following rivers are not complete: East Coast; Awatere, Taurangakautuku, Kopuaponamu, Oweka and Waikura Rivers. Hikuwai River catchment, Pauariki Stream Waipaoa River catchment, Waipaoa River. DISCUSSION 13. The bed level trend reports are the first indication that river bed aggradation is no longer continuing to occur in all rivers used for gravel extraction. The reason for aggradation slowing is the combination of afforestation stabilising the upper catchment areas (gravel sources) and the lack of significant flooding/destabilisation activity since the 1980s. 14. Despite the trends changing, in most locations there is still a very large area of gravel which has been built up over the decades for example the Mata River bedload; however, in the medium term some gravel extraction operations may need to move, and the Council may need to be more cautious in issuing new consents in locations with stable or decreasing bed levels. 15. Based on the work done to date, the two rivers where there seems to be a need for a more planned gravel extraction approach are the Mata (where a large amount of gravel is abstracted from an area now identified as down-cutting) and the Karakatuwhero (where bed levels are stable). 16. The Freshwater Plan provides for catchment based gravel extraction management plans which identify where gravel extraction is acceptable and where gravel extraction shall be avoided. The plans are proposed to be developed with involvement from local hapū. Priority for development for these plans should be placed on the Mata and Karakatuwhero Rivers. 17. Until such time as the gravel management plans are prepared the technical reports provide useful information to inform the assessment of resource consent applications. Page 4 of 5

5 ASSESSMENT OF SIGNIFICANCE Criteria This Report The Process Overall The effects on all or a large part of the Gisborne district Low Low The effects on individuals or specific communities Low Medium The level or history of public interest in the matter or issue Low Low Inconsistency with Council s current strategy and policy Low Low Impacts on Council s delivery of its Financial Strategy and Long Term Plan. Low Low 18. The decisions or matters in this report are considered to be of low significance in accordance with Council s Significance and Engagement Policy. 19. Aggrading rivers are the cause of bank erosion and the loss of productive land which affects the livelihoods of landowners in the Gisborne Region. Community meetings have historically raised aggrading rivers and gravel extraction as issues affecting the community. The effects are Region wide due to the large area of forestry land use but are often concentrated in key areas close to major forests. Council roading contractors have also recently been accessing the gravel resource for some local roading requirements. COMMUNITY ENGAGEMENT 20. A workshop was held with the forestry industry outlining the findings of the reports on bed level trends in East Coast Rivers. East Coast hapū groups have expressed concerns regarding the volume of extraction, the potential ecological impacts and secondary impacts of truck movements, noise and dust. CONSIDERATIONS Financial/Budget 21. The budgeted costs cover the technical reports completed and forthcoming. Provided they are undertaken primarily using in-house resources, catchment based gravel management plans for the Karakatuwhero and Mata Rivers will be able to be developed over the next 3 years. Legal 22. There are no legal implications arising from the recommendations in this report. POLICY AND PLANNING IMPLICATIONS 23. Gravel abstraction is managed under the Freshwater Plan which provides for the development of gravel management plans. Catchment based gravel management plans will add value to the existing policies and plans. RISKS 24. Potential adverse effects of gravel extraction on the community and public will be minimised by identifying the state of the gravel resource, consulting with local hapū to develop a gravel management plan which will improve identifying where gravel extraction is recommended to occur. 25. NEXT STEPS Date Action/Milestone Comments July 2018 Discuss the development of a catchment based gravel management for the Mata River with local hapū Page 5 of 5

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for information

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for information 18 405 Title: Section: Prepared by: Waikanae Stream Contaminated Site Investigations Environmental Services & Protection Kate Sykes (Environmental Risk Team Leader) Meeting Date: 28 November 2018 Legal

More information

1. RESOURCE MANAGEMENT STRATEGY

1. RESOURCE MANAGEMENT STRATEGY 1. 1.1 RELATIONSHIP WITH COUNCIL S PLANNING DOCUMENTS 1.1.1 Council produces many plans and strategies to enable compliance with its legislative responsibilities and to set future directions. The District

More information

Report to COUNCIL for information

Report to COUNCIL for information 18 149 Title: Section: Prepared by: Draft Regional Target for Swimmable Lakes and Rivers Transformation & Relationships Janic Slupski (Senior Policy Advisor) Meeting Date: 5 April 2018 Legal Financial

More information

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for decision

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for decision 16 290 Title: Section: Prepared by: Waerenga-o-kuri Soil Conservation Reserve Environmental & Regulatory Services Lois Easton (Shared Services Science Manager) Meeting Date: 16 November 2016 Legal Financial

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

OPERATIVE STATUS and SEAL OF THE COUNCIL

OPERATIVE STATUS and SEAL OF THE COUNCIL Tairāwhiti Resource Management Plan Part A Last Updated 30 July 2018 OPERATIVE STATUS and SEAL OF THE COUNCIL Current Approval The common seal of the Gisborne District Council is here electronically affixed

More information

READER S GUIDE. Section 10: Cultural and Heritage Values: discusses the adverse effects of gravel excavation on heritage.

READER S GUIDE. Section 10: Cultural and Heritage Values: discusses the adverse effects of gravel excavation on heritage. Environment B O P Regional River Gravel Management Plan Reader s Guide READER S GUIDE There may be only some parts of this regional plan that you are interested in reading. To find those parts quickly,

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 18 166 Title: Section: Prepared by: Managed Aquifer Recharge Update and Possible Futures Environmental Services & Protection Lois Easton (Environmental & Science Manager) Meeting Date: 5 April 2018 Legal

More information

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES

subdivision BUSH LIVING ENVIRONMENT ASSESSMENT CRITERIA RULES RULES 10.0 General The following rules apply to Subdivision of land within the Bush Living Environment except that area identified as Titirangi Subdivision Area 1 and Titirangi-Laingholm Subdivision Area

More information

3 Objectives 3 Ob jec tives

3 Objectives 3 Ob jec tives 3 Objectives 3 Objectives 3 Objectives 3 Objectives contents Objective number Page 3.1 Ki uta ki tai: mountains to the sea O1-O5 37 3.2 Beneficial use and development O6-O13 38 3.3 Māori relationships

More information

National Environmental Standards for Plantation Forestry. Overview of the regulations

National Environmental Standards for Plantation Forestry. Overview of the regulations National Environmental Standards for Plantation Forestry Overview of the regulations New national rules for plantation forestry Plantation forestry is New Zealand s third largest primary sector. It delivers

More information

14 NATURAL HAZARDS Background Resource Management Issues

14 NATURAL HAZARDS Background Resource Management Issues 14 NATURAL HAZARDS 14.1 Background The particular geology, hydrology and topography of the Hutt Valley make Upper Hutt vulnerable to a variety of natural hazards. Earthquakes and flooding are the most

More information

National Policy Statement for Freshwater Management. National Environmental Standard on Ecological Flows and Water Levels

National Policy Statement for Freshwater Management. National Environmental Standard on Ecological Flows and Water Levels National Policy Statement for Freshwater Management The National Policy Statement for Freshwater Management (NPSFM) was gazetted on 12 May 2011 and took effect from 1 July 2011. As of 1 July 2011, decision-makers

More information

FORM B: DAMMING AND DIVERSION OF WATER

FORM B: DAMMING AND DIVERSION OF WATER APPLICATION FOR RESOURCE CONSENT FORM B: DAMMING AND DIVERSION OF WATER NOTES Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan

More information

2 If yes, you can only comment on adverse effects to the environment that would affect you, it must not relate to trade competition.

2 If yes, you can only comment on adverse effects to the environment that would affect you, it must not relate to trade competition. SUBMISSION PROPOSED GISBORNE REGIONAL FRESHWATER PLAN OCTOBER 2015 NAME: Pia Pohatu ORGANISATION: Hikurangi Takiwa Trust POSTAL ADDRESS: PO Box 42, Ruatorea DAYTIME PHONE NUMBER: 021653341 or 06 8648667

More information

Application for resource consent Form B Damming and diversion of water

Application for resource consent Form B Damming and diversion of water Application for resource consent Form B Damming and diversion of water Notes Resource use activities must meet all the conditions of any relevant Permitted Activity Rules in the Waikato Regional Plan or

More information

7 Section 32 Summary for the Natural Hazards Chapter

7 Section 32 Summary for the Natural Hazards Chapter 7 Section 32 Summary for the Natural Hazards Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Natural Hazards Chapter of the

More information

Form 1: Application for resource consent

Form 1: Application for resource consent Form 1: Application for resource consent All sections must be completed in full and accompanied by the initial fixed application fee (see section 11) and the relevant activity form (see section 7). Failure

More information

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for decision

Report to ENVIRONMENTAL PLANNING & REGULATIONS Committee for decision o 17 090 Title: Section: Prepared by: Western and Coastal Township Closed Landfills Preliminary Site Investigations and RASCL Assessments Shared Science Services James Langford (Land Management Officer)

More information

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit

Guide. Preparing a resource consent application to take surface water, including replacing a deemed permit Guide Preparing a resource consent application to take surface water, including replacing a deemed permit August 2015 Contents 1. Purpose and structure of the guide... 1 2. Preparing a resource consent

More information

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover. 5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities

More information

National Environmental Standards for Sources of Human Drinking Water

National Environmental Standards for Sources of Human Drinking Water National Environmental Standards for Sources of Human Drinking Water Managing catchment risk 19 September 2017 / Tim Sharp Managing catchment risk New Zealand regulatory framework Resource Management Act

More information

E1. Water quality and integrated management

E1. Water quality and integrated management E1. Water quality and integrated management E1.1. Introduction The National Policy Statement for Freshwater Management, the New Zealand Coastal Policy Statement and this Plan seek to improve the integrated

More information

NRC 1988: Coastal Hazard Identification. Whangarei County. Technical Publication No.1988/1, March 1988, held by Northland Regional Council.

NRC 1988: Coastal Hazard Identification. Whangarei County. Technical Publication No.1988/1, March 1988, held by Northland Regional Council. 56 Natural Hazards 56.1 Introduction This Chapter contains rules relating to land uses in areas mapped as hazard areas. These areas are shown on the Planning Maps by shading on the Resource Area Maps.

More information

Legislative and Policy Framework

Legislative and Policy Framework 2 Legislative and Policy Framework 2 L E G I S L A T I V E A N D P O L I C Y F R A M E W O R K 2.1 Introduction The principal statute under which the natural and physical resources of Otago s coastal marine

More information

S e c t i o n B i o d i ve r s i t y

S e c t i o n B i o d i ve r s i t y S e c t i o n 2. 2 - B i o d i ve r s i t y The District has a wealth of ecosystems which support indigenous vegetation and habitats of indigenous fauna. Many of these ecosystems are the remnants of the

More information

B7. Toitū te whenua, toitū te taiao Natural resources

B7. Toitū te whenua, toitū te taiao Natural resources B7. Toitū te whenua, toitū te taiao Natural resources Ngā ariki o te rangi, ngā ariki o te whenua, ngā ariki o te moana, ngā ariki o te taiao The chiefly deities of the sky, of the earth, of the sea, the

More information

Kaipara District Plan

Kaipara District Plan Kaipara District Plan A guide to subdivision in the rural zone The purpose of this brochure is to provide an overview of the types of rural subdivision in the Proposed Kaipara District Plan - Decisions

More information

ENVIRONMENTAL RISKS...

ENVIRONMENTAL RISKS... CONTENTS C5 ENVIRONMENTAL RISKS... 1 C5.1 CONTAMINATED LAND... 1 C5.1.1 Introduction... 1 C5.1.2 Issues... 1 C5.1.3 Objectives... 1 C5.1.4 Policies... 2 C5.1.5 Methods... 3 C5.1.6 Rules for Contaminated

More information

C5.1.1 Introduction... 1 C5.1.2 Issues... 1 C5.1.3 Objectives... 1 C5.1.4 Policies... 2 C5.1.5 Methods... 2 C5.1.6 Rules for Contaminated Sites...

C5.1.1 Introduction... 1 C5.1.2 Issues... 1 C5.1.3 Objectives... 1 C5.1.4 Policies... 2 C5.1.5 Methods... 2 C5.1.6 Rules for Contaminated Sites... CONTENTS C5 ENVIRONMENTAL RISKS... 1 C5.1 CONTAMINATED LAND... 1 C5.1.1 Introduction... 1 C5.1.2 Issues... 1 C5.1.3 Objectives... 1 C5.1.4 Policies... 2 C5.1.5 Methods... 2 C5.1.6 Rules for Contaminated

More information

Case study 11. Low Stanger Floodplain Reconnection Project

Case study 11. Low Stanger Floodplain Reconnection Project Case study 11. Low Stanger Floodplain Reconnection Project Author: Ian Creighton Main driver: Flood alleviation Project stage: Completed 2015 Photo 1: Downstream breach, Low Stranger Farm (source: West

More information

SENIOR PROJECT ENGINEER- WAIPAOA FLOOD CONTROL PROJECT. Council is committed to achieving the three key outcomes identified by our local community:

SENIOR PROJECT ENGINEER- WAIPAOA FLOOD CONTROL PROJECT. Council is committed to achieving the three key outcomes identified by our local community: Position Profile Position Title: Reports to: Department: SENIOR PROJECT ENGINEER- WAIPAOA FLOOD CONTROL PROJECT Rivers, Drainage & Coastal Manager Environment & Regulatory Community Outcomes Council is

More information

Sustainability Appraisal of Water Management Strategies for Canterbury

Sustainability Appraisal of Water Management Strategies for Canterbury Sustainability Appraisal of Water Management Strategies for Canterbury Professor Bryan Jenkins Waterways Centre: University of Canterbury and Lincoln University PRESENTATION COVERAGE Inability of effects-based

More information

National Policy Statement for Freshwater Management Implementation Review. Gisborne Te Tai Rāwhiti

National Policy Statement for Freshwater Management Implementation Review. Gisborne Te Tai Rāwhiti National Policy Statement for Freshwater Management Implementation Review Gisborne Te Tai Rāwhiti Published in August 2017 by the Ministry for the Environment Manatū Mō Te Taiao Crown copyright New Zealand

More information

Southland Water and Land Plan Environment Southland Private Bag Invercargill 9840

Southland Water and Land Plan Environment Southland Private Bag Invercargill 9840 To: From: Southland Water and Land Plan Environment Southland Private Bag 90116 Invercargill 9840 policy@es.govt.nz Mid-Aparima Catchment Group C/O Jolene and Hadleigh Germann (jolene@agribusiness.co.nz)

More information

Comments on the Proposed National Environmental Standard for Plantation Forestry (information booklet on the revised proposal)

Comments on the Proposed National Environmental Standard for Plantation Forestry (information booklet on the revised proposal) (information booklet on the revised proposal) Name Organisation Address Nelson Management Limited Email contact Phone contact Introduction Nelson Management Limited (NML) manages the assets of Nelson Forests

More information

ACTIVITIES ON THE SURFACE OF WATER RULES

ACTIVITIES ON THE SURFACE OF WATER RULES Chapter 62A ACTIVITIES ON THE SURFACE OF WATER RULES 62A.1 INTRODUCTION Activities on the surface of water are jointly controlled by the Napier City Council, Hastings District Council, the Hawke s Bay

More information

E2. Water quantity, allocation and use

E2. Water quantity, allocation and use E2. Water quantity, allocation and use E2.1. Introduction E2 Water quantity, allocation and use Demand for water already equals or exceeds availability in some surface waterbodies and aquifers. Future

More information

Beds of Water Bodies 14 September 2017

Beds of Water Bodies 14 September 2017 Beds of Water Bodies 14 September 2017 Contents Beds of Water Bodies... 1 Activities in the Beds of Water Bodies Issues... 1 Objectives... 4 Policies... 4 Methods of Implementation... 7 Rules... 11 Stock

More information

Report to OPERATIONS Committee for noting

Report to OPERATIONS Committee for noting 11/461 Subject: Rivers and Land Drainage Activity Report to 29 July 2011 Prepared by: Jürgen Komp (Rivers and Land Drainage Asset Manager) Robert Budd (Rivers and Land Drainage Engineer) Meeting Date:

More information

FURTHER COMMENTS ON NES FOR PLANTATION FORESTRY

FURTHER COMMENTS ON NES FOR PLANTATION FORESTRY Eastern Bay of Plenty Branch Royal Forest and Bird Protection Society NZ Inc PO Box 152 Whakatane 13 June 2011 Ministry for the Environment PO Box 10-362 Wellington 6143 standards@mfe.govt.nz FURTHER COMMENTS

More information

DRAFT SUBMISSION ON NES FOR PLANTATION FORESTRY

DRAFT SUBMISSION ON NES FOR PLANTATION FORESTRY Chairperson and Committee Members ENVIRONMENT AND COMMUNITY DEVELOPMENT 30 JULY 2015 Meeting Status: Public Purpose of Report: For Decision DRAFT SUBMISSION ON NES FOR PLANTATION FORESTRY PURPOSE OF REPORT

More information

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN RED ZONE

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN RED ZONE APPLICATION TO USE LAND FOR FARMING ACTIVITY IN RED ZONE PAGE 1 OF 15 July 2016 PLANNING ASSEMENT SHEET PREPARED FOR FARMING ACTIVTIES WITHIN THE RED NUTRIENT ALLOCATION ZONE UNDER THE CANTERBURY LAND

More information

Report for Agenda Item: 2

Report for Agenda Item: 2 QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage

More information

Before Hearing Panel Proposed Natural Resources Plan for the Wellington Region. The Resource Management Act 1991 (the Act)

Before Hearing Panel Proposed Natural Resources Plan for the Wellington Region. The Resource Management Act 1991 (the Act) Before Hearing Panel Proposed Natural Resources Plan for the Wellington Region Under The Resource Management Act 1991 (the Act) In the matter of Proposed Natural Resources Plan for the Wellington Region:

More information

Region-wide Water Quantity - Proposed Plan Change 9 to the Bay of Plenty Regional Natural Resources Plan (Clean Copy Version from Operative Plan)

Region-wide Water Quantity - Proposed Plan Change 9 to the Bay of Plenty Regional Natural Resources Plan (Clean Copy Version from Operative Plan) 1 December 2008 Bay of Plenty Regional Natural Resources Plan Water Quantity and Allocation (updated 9 October 2018) Version 8.1 Deliberations [note: Consequential renumbering will occur prior to this

More information

8 MANAGING THE EFFECTS OF NATURAL HAZARDS

8 MANAGING THE EFFECTS OF NATURAL HAZARDS 8 MANAGING THE EFFECTS OF NATURAL HAZARDS 8.1 RESOURCE MANAGEMENT ACT OBLIGATIONS 8.1.1 A natural hazard is defined under Section 2 as being Any atmospheric or earth or water related occurrence (including

More information

Most of Kaipara s District is Rural and this Chapter sets out how this area will be managed through the District Plan

Most of Kaipara s District is Rural and this Chapter sets out how this area will be managed through the District Plan 12 Rural Chapter 12.1 Introduction / Resource Description The majority of land in District falls within Rural Zone. Kaipara s economy has historically been driven by pastoral farming and to a lesser extent

More information

Applicants' fourth Draft Te Waikoropupū Springs and the Arthur Marble Aquifer Water Conservation Order

Applicants' fourth Draft Te Waikoropupū Springs and the Arthur Marble Aquifer Water Conservation Order Applicants' fourth Draft Te Waikoropupū Springs and the Arthur Marble Aquifer Water Conservation Order v1 April 2017 v2 March 2018 v4 4 May 2019 Comment [AL1]: Applicants v 4 changes highlighted in light

More information

Ecologically Beneficial Native Afforestation Site Prioritisation. for carbon sinks and other purposes. Kāpiti Coast District

Ecologically Beneficial Native Afforestation Site Prioritisation. for carbon sinks and other purposes. Kāpiti Coast District Ecologically Beneficial Native Afforestation Site Prioritisation for carbon sinks and other purposes Kāpiti Coast District 14 November 2017 Paul Hughes OpenGeo Contents Introduction...3 Native afforestation

More information

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA

subdivision WORKING ENVIRONMENT AND COMMUNITY ENVIRONMENT RULES ASSESSMENT CRITERIA Character, Mauri, Amenity Values, Neighbourhood Character, Health & Safety and Heritage RULES ASSESSMENT CRITERIA 5.0 General The following rules shall apply to the of land situated in the Community Environment

More information

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive

URBAN WATER QUALITY STRATEGY FOR OTAGO. Caring for Otago s environment: Enabling communities to thrive URBAN WATER QUALITY STRATEGY FOR OTAGO Caring for Otago s environment: Enabling communities to thrive 1 CONTENTS Water quality in Otago 3 About this strategy 4 Who is involved 4 Otago s vision for water

More information

PART H ESPLANADE RESERVES/STRIPS

PART H ESPLANADE RESERVES/STRIPS PART H ESPLANADE RESERVES/STRIPS KAPITI COAST DISTRICT COUNCIL 407 DISTRICT PLAN This page has intentionally been left blank KAPITI COAST DISTRICT COUNCIL 408 DISTRICT PLAN H. ESPLANADE RESERVES/STRIPS

More information

Bay of Plenty Regional Water and Land Plan

Bay of Plenty Regional Water and Land Plan Operative Bay of Plenty Regional Water and Land Plan Working with our communities for a better environment E mahi ngatahi e pai ake ai te taiao Bay of Plenty Regional Water and Land Plan Update Record

More information

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION

7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7. NATURAL HAZARDS 7.1 SECTION INTRODUCTION 7.1.1 The Resource Management Act empowers Council to control any actual or potential effects of the use, development, or protection of land for the purpose

More information

Issues... 1 Objectives... 3 Policies... 4 Methods of Implementation... 5 Rules... 8

Issues... 1 Objectives... 3 Policies... 4 Methods of Implementation... 5 Rules... 8 Wetlands 14 September 2017 Contents WT Wetlands...1 Issues... 1 Objectives... 3 Policies... 4 Methods of Implementation... 5 Rules... 8 BAY OF PLENTY REGIONAL COUNCIL TOI MOANA 1 Wetlands 14 September

More information

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051

Prepared by Christchurch City Council, P.O. Box 73013, Christchurch. Submission by Avon-Ōtākaro Network, 9 Stable Way, Christchurch 8051 Christchurch City Council Christchurch October 2013 Submission to the Draft South New Brighton Reserves Management Plan, 2013 Draft South New Brighton Reserves Development Plan, 2013 For Bligh s Garden,

More information

8 Subdivision and Development

8 Subdivision and Development 8 Subdivision and Development 8.1 Significant Issues Subdivision and development can provide a catalyst for environmental protection and enhancement. Subdivision and development can provide opportunities

More information

RIPARIAN LAND MANAGEMENT AND PUBLIC ACCESS DISTRICT WIDE ACTIVITY

RIPARIAN LAND MANAGEMENT AND PUBLIC ACCESS DISTRICT WIDE ACTIVITY SECTION 13.9 RIPARIAN LAND MANAGEMENT AND PUBLIC ACCESS DISTRICT WIDE ACTIVITY 13.9.1 INTRODUCTION The Resource Management Act requires Council to recognise and provide for the preservation of the natural

More information

6.5.1 Advocacy Education Regulation Review of Provisions Regulating Land Use Change on Land Overlay 3A Land...

6.5.1 Advocacy Education Regulation Review of Provisions Regulating Land Use Change on Land Overlay 3A Land... 6.0 SOIL CONSERVATION... 1 6.1 INTRODUCTION... 1 6.2 ISSUES... 2 6.3 OBJECTIVES... 2 6.4 POLICIES... 3 6.5 METHODS OF IMPLEMENTATION... 7 6.5.1 Advocacy... 7 6.5.2 Education... 8 6.5.3 Regulation... 9

More information

Orari, Temuka, Opihi and Paerora (OTOP) Zone - Current Pathways Planning Overview November 2016

Orari, Temuka, Opihi and Paerora (OTOP) Zone - Current Pathways Planning Overview November 2016 Purpose Orari, Temuka, Opihi and Paerora (OTOP) Zone - Current Pathways Planning Overview November 2016 This paper summarises the regional plans that currently manage the freshwater resources of the OTOP

More information

CHAPTER 22: AQUACULTURE

CHAPTER 22: AQUACULTURE CHAPTER 22: AQUACULTURE 22.0 INTRODUCTION This chapter deals with aquaculture development in the coastal marine area of the District. Aquaculture development is expected to have significant social, cultural

More information

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT

PLANNING ASSESSMENT SHEET: FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT APPLICATION TO USE LAND FOR FARMING ACTIVITY IN HINDS/HEKEAO CATCHMENT PAGE 1 OF 11 MAY 2017 PLANNING ASSEMENT SHEET PREPARED FOR FARMING ACTIVTIES WITHIN HINDS/HEKEAO CATCHMENT The Resource Management

More information

Setting Environmental Flows in Water Management Areas

Setting Environmental Flows in Water Management Areas Setting Environmental Flows in Water Management Areas This information pack has been prepared for engagement with iwi, hapū, community groups, stakeholders and general public when working towards setting

More information

Kopuaranga River. Draft policy preferences for feedback managing water flows and levels. Water use characteristics. Key issues and drivers

Kopuaranga River. Draft policy preferences for feedback managing water flows and levels. Water use characteristics. Key issues and drivers Kopuaranga River The Kopuaranga River is defined by the surface water catchment upstream of the confluence with the Ruamāhanga River. The minimum flow is monitored at Palmers Use of water in catchment:

More information

7 Mineral and Energy Resources

7 Mineral and Energy Resources 7 Mineral and Energy Resources This chapter examines Humboldt County s mineral (including sand and gravel extraction) and energy (oil, gas, and geothermal) resources. Existing General Plan policies and

More information

5 Land and Soil Module

5 Land and Soil Module 5 Land and Soil Module Table of Contents 5.1 Accelerated Erosion* 5-5 5.1.1 Issue 5-7 5.1.2 Objective 5-7 5.1.3 Policies 5-9 5.1.4 Implementation Methods Accelerated Erosion 5-11 5.1.5 Conditions for

More information

Report to COUNCIL for decision

Report to COUNCIL for decision 17 570 Title: Section: Prepared by: 2018-2028 Long Term Plan- Tairāwhiti Piritahi Maori Policy Review and Consultation Transformation & Relationships Te Rina Whaanga (Policy Advisor) and Sarah Pohatu (Policy

More information

Te Mania Sub-Catchment Action Plan

Te Mania Sub-Catchment Action Plan Te Mania Sub-Catchment Action Plan 2012 The Te Mania Sub-Catchment Action Plan is one of a series produced for the sub-catchments surrounding the Tauranga Harbour. The aim of this action plan is to provide

More information

Goat Management Areas. Presentation for the Proposed Opōtiki District Plan Hearing (24 August 2017)

Goat Management Areas. Presentation for the Proposed Opōtiki District Plan Hearing (24 August 2017) Goat Management Areas Presentation for the Proposed Opōtiki District Plan Hearing (24 August 2017) Goat Management under the Proposed Opotiki District Plan Regional Council supports the existing goat management

More information

Proposed Change 5 Land and freshwater management. Hawke's Bay Regional Resource Management Plan

Proposed Change 5 Land and freshwater management. Hawke's Bay Regional Resource Management Plan Hawke's Bay Regional Resource Management Plan Proposed Change 5 Land and freshwater management Date notified: 2 October 2012 SD 12/19 HBRC Plan Number 4396 Proposed Change 5 to the Hawke's Bay Regional

More information

Harvest Slash 6.2 Managing Cut-over Slash on High Risk Slopes

Harvest Slash 6.2 Managing Cut-over Slash on High Risk Slopes 6.2 Managing Cut-over Slash on High Risk Slopes A high risk slope is where slope failure may have major adverse consequences as a result of cut-over slash being mobilised in the slope failure. High risk

More information

15B Maori Purposes: Treaty Settlement Land

15B Maori Purposes: Treaty Settlement Land 15B Maori Purposes: Treaty Settlement Land 15B.1 Introduction / Resource Description This Chapter of the District Plan addresses land included as part of the recent Treaty Settlements between: Te Uri o

More information

13 Section 32 Summary for the Residential Chapter

13 Section 32 Summary for the Residential Chapter 13 Section 32 Summary for the Residential Chapter The purpose of this section is to present a summary of the evaluation of the objectives, policies and methods of the Residential Zone Chapter of the Proposed

More information

Lecture 1 Integrated water resources management and wetlands

Lecture 1 Integrated water resources management and wetlands Wetlands and Poverty Reduction Project (WPRP) Training module on Wetlands and Water Resources Management Lecture 1 Integrated water resources management and wetlands 1 Water resources and use The hydrological

More information

S e c t i o n S u b d i vision

S e c t i o n S u b d i vision S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned

More information

Friends of Owhiro Stream Wellington, New Zealand

Friends of Owhiro Stream Wellington, New Zealand Friends of Owhiro Stream Wellington, New Zealand First name(s) Last name Street address Mr Martin Payne I am writing this submission on behalf of an organisation Friends of Owhiro Stream Type of organisation:

More information

The natural hazard types that have been identified within the City include the following:

The natural hazard types that have been identified within the City include the following: Chapter 62 NATURAL HAZARDS 62.1 INTRODUCTION Napier City, like many other cities within New Zealand, is subject to the effects of natural hazards. Since the enactment of the Resource Management Act, the

More information

Last amended 3 May 2011 Earthworks Operative 27/07/2000

Last amended 3 May 2011 Earthworks Operative 27/07/2000 29 Earthworks 29.1 Introduction Earthworks are essential to the development of the City. They create the areas of level land used for living, business and recreation, and the even gradients for paths and

More information

The matrix will record the findings of the assessment by using the following: Score Significance

The matrix will record the findings of the assessment by using the following: Score Significance Site: Appendix 5.3.4.6 North Tawton Neighbourhood Plan Site Assessment Matrices. Each site considered for allocation within the North Tawton Neighbourhood Plan has been subject to an assessment against

More information

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2 COASTAL CONSERVANCY Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2 File No. 03-137 Project Manager: Marc Beyeler RECOMMENDED ACTION: Authorization

More information

DOCDM- 7 December Dear Sir/Madam PROPOSED GISBORNE FRESHWATER PLAN. Proposed Plan. Yours sincerely

DOCDM- 7 December Dear Sir/Madam PROPOSED GISBORNE FRESHWATER PLAN. Proposed Plan. Yours sincerely DOCDM- 7 December 2015 Dear Sir/Madam PROPOSED GISBORNE FRESHWATER PLAN SUBMISSIONS Proposed Plan. If you have any questions or would like to arrange a time to meet and discuss this submission, please

More information

Regional Freshwater Plan for the Wellington Region

Regional Freshwater Plan for the Wellington Region Regional Freshwater Plan for the Wellington Region Publication No. WRC/RP-G-99/31 ISBN 0-909016-69-0 December 1999 Updated July 2014 Wellington Regional Council Wakefield Street, Wellington PO Box 11-646,

More information

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans

Improving the physical condition of Scotland s water environment. A supplementary plan for the river basin management plans Improving the physical condition of Scotland s water environment A supplementary plan for the river basin management plans Contents Executive summary... 2 1. Introduction... 3 2. Vision... 4 3. Taking

More information

Report to FUTURE TAIRAWHITI Committee for decision

Report to FUTURE TAIRAWHITI Committee for decision 17 317 Title: Scope of the Waste Management Minimisation Plan Review 2017 Section: Prepared by: Strategic Planning Carrie White (Senior Policy Advisor) Meeting Date: 20 July 2017 Legal Financial Significance

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011.

A smaller 7.65MW wind farm at Mount Stuart, comprising 9 turbines with a maximum height of 75- metres, was also constructed in 2011. 3.4. ENERGY 3.4.1. INTRODUCTION The use of energy is of fundamental importance to the development and functioning of modern society. The RMA definition of natural and physical resources includes energy

More information

TRANSPORT and INFRASTRUCTURE

TRANSPORT and INFRASTRUCTURE The Resource Management Act allows district and regional plans and policy statements to enable people and communities to provide for their economic, cultural and social well being (that is part of the

More information

The aims of the Kaipara River Catchment Water Allocation Strategy are:

The aims of the Kaipara River Catchment Water Allocation Strategy are: A Introduction 1 1 Background 1.1 Introduction The Kaipara River catchment is the third largest river system in the Auckland Region. In places, there are competing demands for the water resources of the

More information

Section 1 - Introduction

Section 1 - Introduction VERSION 1.0 Stormwater Solutions for Residential Sites Section 1 - Introduction Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November

More information

5.3 CONSERVATION (WETLAND) ZONE

5.3 CONSERVATION (WETLAND) ZONE 5.3 CONSERVATION (WETLAND) ZONE 5.3.1 ZONE PURPOSE (1) The purpose of the Conservation (Wetland) Zone is one of conservation, protection and enhancement (including values of importance to tangata whenua)

More information

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6

Part B Assessment of Environmental Effects. Earthworks (Minor Effects) Consent No.:... Earthworks (Minor Effects) AEE 6 Consent No.:... Earthworks (Minor Effects) AEE 6 Part B Assessment of Environmental Effects Earthworks (Minor Effects) Whangārei Office Phone: 09 470 1200 Fax: 09 470 1202 Kaitāia Office Phone: 09 408

More information

Comments on the Proposed NES for Plantation Forestry

Comments on the Proposed NES for Plantation Forestry Comments on the Proposed NES for Plantation Forestry Contact Details Nga Uri o te Ngahere Trust 13 th June 2011 Overview The location for a substantial portion of the Trust s research and restoration projects

More information

HAWKE S BAY REGIONAL COUNCIL Job Description

HAWKE S BAY REGIONAL COUNCIL Job Description Position Title: Responsible to: Responsible for: Salary Range: HAWKE S BAY REGIONAL COUNCIL Job Description Chief Executive Asset Management and Works Group Staff Realistic and commensurate with the importance

More information

Greater Wellington Regional Council BIODIVERSITY STRATEGY. Cover photos

Greater Wellington Regional Council BIODIVERSITY STRATEGY. Cover photos Greater Wellington Regional Council BIODIVERSITY STRATEGY Cover photos Cover photo: Mt Climie, Pakuratahi Forest Contents Executive summary 3 1 Introduction 5 1.1. Biodiversity in the Wellington region:

More information

Rural Residential Development Control Plan

Rural Residential Development Control Plan 1 Rural Residential Development Control Plan Council of the City of Greater Lithgow 180 Mort Street, Lithgow NSW 2790 Telephone: (02) 6354 1077 2 EXPLANATORY NOTE: Council has been aware for some time

More information

The Barefoot Scientist. Local engagement in the management of freshwater: Te Tairawhiti, a vision for the future

The Barefoot Scientist. Local engagement in the management of freshwater: Te Tairawhiti, a vision for the future The Barefoot Scientist Local engagement in the management of freshwater: Te Tairawhiti, a vision for the future Presentation structure Examples of current and recent projects A successful model: the barefoot

More information

The Proposed Auckland Unitary Plan (notified 30 September 2013)

The Proposed Auckland Unitary Plan (notified 30 September 2013) ART 3 REGIONAL AND DISTRICT RULES»Chapter H: Auckland wide rules»4 Natural resources» 4.14 Stormwater management Introduction The roposed Auckland Unitary lan (notified 30 September 2013) This section

More information

FACILITATING CARBON OFFSETS FROM NATIVE FORESTS

FACILITATING CARBON OFFSETS FROM NATIVE FORESTS FACILITATING CARBON OFFSETS FROM NATIVE FORESTS An Executive Summary of Working Paper 17-xx Thomas Carver and Suzi Kerr Motu Economic and Public Policy Research, suzi.kerr@motu.org.nz SUMMARY HAIKU Natives

More information

15B Maori Purposes: Treaty Settlement Land

15B Maori Purposes: Treaty Settlement Land 15B Maori Purposes: Treaty Settlement Land 15B.1 Introduction / Resource Description This Chapter of the District Plan addresses land included as part of the recent Treaty Settlements between: Te Uri o

More information